Loading...
HomeMy WebLinkAboutOpening of Proposals - Bendix Phase 2 Improvements - United ConsultingUNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 1 BENDIX DRIVE (LATHROP TO VOORDE) MICHAEL ROWE, PE Principal Contact President TERRY MINIX Business Development Client Liaison OFFICE: 317-895-2585 CELL: 317-450-0115 EMAIL: michael.rowe@ucindy.com OFFICE: 317-895-2585 CELL: 574-207-3543 EMAIL: terry.minix@ucindy.com ■ OFFICE LOCATION 8440 Allison Pointe Blvd., Suite 200 Indianapolis, IN 46250 ■ PRINCIPAL CONTACT ■ PROJECT LIAISON ■ VALUES FOCUSED. CLIENT DRIVEN. PUT UNITED’S VALUES TO WORK FOR YOU. ■ Leadership built on integrity. ■ Talent driven by excellence. ■ Service centered around caring. ■ Success by working together. 16x United Consulting is pleased to submit our Letter of Interest for construction inspection services for the City of South Bend Bendix Drive project. Our presence in Northern Indiana is well established and supported by wide-ranging experience with roadway construction inspection projects throughout the region. Our team's familiarity with locally administered, federally funded projects—and the INDOT documentation standards that accompany them—allows us to step in seamlessly and deliver results from Day One. CLEAR COMMUNICATION, EVERY STEP OF THE WAY United takes pride in maintaining clear, consistent communication with our clients through every phase of construction. From the preconstruction meeting that aligns the contractor and subcontractors on expectations, to weekly progress reports with photos, bi-weekly on-site meetings, and the final walkthrough, our project manager keeps you informed, involved, and confident throughout. ON SCHEDULE — ON BUDGET United is recognized for completing projects on time and within budget. Our project manager actively manages the contractor and subcontractors to maintain schedule discipline and reduce the potential for change orders. By holding work to plans and specifications, we help protect quality and prevent cost overruns, delivering a finished product that meets the City’s expectations. A PARTNER YOU CAN COUNT ON United has a proven record of delivering successful construction inspection projects across Indiana since 1965. Our leadership, project management, and business development teams share a commitment to responsiveness, accountability, and collaboration. You can count on us to bring the same dedication to this project that has earned our clients’ trust statewide for over 60 years. Thank you for considering United for this project. We welcome the opportunity to discuss our construction inspection plan and demonstrate how we will deliver a well-managed, high-quality improvement for the South Bend community. With deep technical expertise, proactive communication, and a client-focused approach, United is well positioned to be your trusted partner on this project and beyond! UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 2 CLIENT SUPPORT PROJECT MANAGEMENT / DELIVERY Team Organization The right Staff for the job. Michael Rowe, PE Principal Contact PRESIDENT AUTHORIZED CONTRACT NEGOTIATOR Brian Miller Construction Inspection Department DEPARTMENT MANAGER Terry Minix Project Liaison BUSINESS DEVELOPMENT REPRESENTATIVE TEAM MEMBER FIRM PARTICIPATION 100% UNITED IS COMMITTEDTO THE CITY OF SOUTH BEND. Our Project Manager, Owen Yeadon is 100% committed to completing active tasks throughout the contract length of this project.50%UNITED’S 2026 CONTRACT CAPACITY United currently has 50% of our firm’s contracting capacity available for new projects. United’s Project Manager (Owen Yeadon) and his Inspection Staff are 100% dedicated to this project which is expected to use 8% of their overall capacity. PROJECT MANAGER AND TEAM CAPACITY 8% Service: 13.1 . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . 100 %United Consulting BRAUN RODGERS, PE Field Operations ManagerTechnical Support OWEN YEADON Project Manager BLAKE GRIBBEN Assistant Project Manager LESLIE BIEK, PEAssistant City Engineer SOUTH BEND RESIDENT JAKE GAUL Inspector / As-Needed CITY OF SOUTHBEND UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 3 OWEN YEADON CONSTRUCTION INSPECTION PROJECT MANAGER 3+ YEARS EXPERIENCE Education Trine University ■BS Design Engineering Certifications ■ INDOT’s Certified Technician Program – Certified in All Areas ■ INDOT’s Quality Assurance Procedures for Construction ■OSHA - Confined Space Entry Course ■OSHA 30-Hour Training Course ■First Aid and CPR Training ■Proficiency in Site Manager O: (317) 895-2585 M: (260) 330-4212 E: owen.yeadon@ucindy.com Owen will serve in a multifaceted role on this project, combining on-site project management, cost-saving strategy, inspection, and communications expertise. Drawing on his recent South Bend experience, Owen will proactively identify potential issues before they escalate, providing timely, cost-effective recommendations to keep the project on track. He will ensure all stakeholders are kept fully informed of any project impacts, supporting the City’s vision and maintaining the project schedule. RELEVANT EXPERIENCE SOUTH BEND OUR LADY OF HUNGARY SCHOOL CLIENT: City of South Bend APPROXIMATE CONSTRUCTION COST: $800,000 REFERENCE: Gemma Stanton, PE / Former Project Engineer / 574-631-9735 Construction Project Manager: The project focused on enhancing sidewalks and curb ramps along key walking routes to schools within the Rum Village neighborhood. Improvements extended westward from Olive Street to Main Street and northward along Ewing Street to Indiana Street. Upgrades at over 15 major intersections included the construction of ADA-compliant ramps, adjustments to stormwater systems, and improvements to alley and driveway transitions to ensure safer and more accessible pedestrian crossings. KENNEDY AVENUE ROAD DIET CLIENT: City of Hammond APPROXIMATE CONSTRUCTION COST: $4,200,000 REFERENCE: Dean Button, PE / City Engineer / 219-309-6523 Construction Project Manager: Kennedy Avenue Road from 164th Place to the Indiana Toll Road in Hammond underwent a multi-phase Road Diet transformation. This project converted the existing four-lane roadway into a two-lane corridor with dedicated bike lanes, turn lanes, and parking stalls. Additional enhancements include upgraded drainage, new sidewalks, rain gardens, and fresh pavement. United Consulting provided construction inspection services for the City of Hammond. The project presented unique challenges due to the high number of businesses and residences along this busy stretch of Kennedy Avenue. Despite these complexities—including extensive utility coordination—the City of Hammond and the United team sucessfully completed the project on schedule. United worked closely with the contractor’s traffic control supervisor, recommending alternative maintenance of traffic phasing. This approach not only resulted in a superior finished product but also ensured the project remained on schedule. PROFICIENT IN DPW CIP PROFICIENT IN INDOT AWP UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 4 BRAUN RODGERS, PECONSTRUCTION INSPECTION FIELD OPERATIONS MANAGER O: (317) 895-2585 M: (812) 592-0562 E: braun.rodgers@ucindy.com RELEVANT EXPERIENCE PROFICIENT IN DPW CIP PROFICIENT IN INDOT AWP CR 100 S FROM DAN JONES TO RONALD REAGAN PARKWAY CLIENT: Avon, Indiana APPROXIMATE CONSTRUCTION COST: $12,800,000 Field Operations Manager: CR 100 S expanded a two-mile stretch from Dan Jones Road to Ronald Reagan Parkway with two added travel lanes, a boulevard-style center median, a new arch bridge over Clark’s Creek, and roundabouts at Salt Lake Road, CR 900 E, and All Points Court to serve current and future corridor development. When a Duke Energy guy wire conflicted with the proposed sanitary sewer at the start of reconstruction, the team redesigned the system, secured WCCD approval, and procured new manholes, limiting the delay to 43 calendar days. United’s early completion of relocation work enabled an alternative traffic phasing plan that improved the end product and allowed early roadway opening14+ YEARS EXPERIENCE Braun will provide additional oversight for this project, ensuring quality control and familiarity throughout the construction process. His experience will enable him to identify potential issues proactively and provide timely recommendations for cost-effective solutions. EDUCATIONBS, CIVIL ENGINEERINGPurdue University Certifications ■PROFESSIONAL ENGINEERIndiana; PE11600321 ■INDOT Certified Technician Program - Certified in All Areas ■INDOT Quality Assurance Certified ■INDOT Certified Bridge Inspection Team Leader ■OSHA Confined Space Entry Course ■INDOT Storm Water Management BLAKE GRIBBENCONSTRUCTION INSPECTION ASSISTANT PROJECT MANAGER O: (317) 895-2585 M: (260) 571-9711 E: blake.gribben@ucindy.com RELEVANT EXPERIENCE PROFICIENT IN DPW CIP PROFICIENT IN INDOT AWP SAFE ROUTES TO SCHOOL AT MUESSEL PRIMARY/HOLY CROSS CLIENT: South Bend, Indiana APPROXIMATE CONSTRUCTION COST: $1,632,000 Construction Project Manager: This project will improve pedestrian safety and accessibility for students and the community by upgrading sidewalks and ADA ramps to current standards. Scheduled for June–August 2026, construction is timed with the school’s summer break to minimize disruption. United provides construction inspection, ensuring effective communication, cost control, and stakeholder coordination. These enhancements will create safer routes for children walking or biking to school and provide lasting benefits for students and local residents. KENNEDY AVENUE ROAD DIET CLIENT: Hammond, Indiana APPROXIMATE CONSTRUCTION COST: $4,200,000 Assistant Project Manager: Kennedy Avenue Road from 164th Place to the Indiana Toll Road in Hammond is undergoing a multi-phase Road Diet transformation. This project is converting the existing four-lane roadway into a two-lane corridor with dedicated bike lanes, turn lanes, and parking stalls. Additional enhancements include upgraded drainage, new sidewalks, rain gardens, and fresh pavement. United Consulting is providing construction inspection services for the City of Hammond. 1+ YEAR EXPERIENCE Blake's recent South Bend experience and familiarity with the area will be an asset to this project. He has established a rapport with City representatives and understands what South Bend expects to achieve from its infrastructure improvement projects as well as the work flows and processes the City implements to achieve success. EDUCATION BS, PUBLIC AFFAIRS Purdue University Certifications ■INDOT Certified Technician Program - Certified in All Areas ■INDOT Quality Assurance Certified ■INDOT Site Manager Proficiency ■First Aid and CPR Training UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 5 Project Approach: PROJECT OVERVIEW ROAD DIET CONVERSION ■Convert the existing 4-lane roadway to: • 3-lane configuration (one lane each direction with a center turn lane) from Voorde Drive to the railroad tracks. • 2-lane configuration (one lane each direction) from the railroad tracks to just north of Lathrop Road. ■Provides space for additional pedestrian and bicyclefacilities. PEDESTRIAN/BICYCLE ENHANCEMENTS ■Adding a multi-use path along the east side of Bendix Drive, connecting to existing paths from the prior phase north of Lathrop Street. ■Striping for a new bike lane. ■New curb ramps and crosswalks throughout the project. TRAFFIC SIGNAL UPGRADES ■New traffic signals at Voorde Drive and Lathrop Street. PAVEMENT/DRAINAGE IMPROVEMENTS ■Rehabilitate or reconstruct the existing concretepavement with 9-1/2inch tick QC-QA concrete pavement. ■Storm sewer upgrades including new inlets as neededdue to the reduced pavement widths. RAILROAD AND UTILITY COORDINATION ■Coordination with NICTD for work required at the at-grade railroad crossing and signals. ■Relocation of utilities (including water, gas, fiber) asneeded. MAINTENANCE OF TRAFFIC / DETOURS ■Bendix Drive will be constructed in multiple phases. See map on Page 6. ■Two Detour Routes (Bendix Drive and Lathrop Drive) will be used. See map on Page 7. LANDSCAPING/ENVIRONMENTAL ■There are bioswale planting beds areas throughout theproject planned. ■There are also tree plantings and native plant plug mixes planned in areas of Bendix Drive. SCHEDULE ■Letting date: March 10, 2027. This Bendix Drive project (Lathrop Street to Voorde Drive) will provide improvements to strengthen corridor safety, accessibility, and continuity throughout the corridor by incorporating design elements consistent with the City’s prior phase of Bendix Drive. Project Overview Bendix Drive, from Lathrop Street to Voorde Drive, City of South Bend ■ “Road Diet” with the reduction from four to three lanes creating a consistent corridor on Bendix Drive while improving safety. ■ Upgraded signals will improve traffic flow and pedestrian safety at Voorde Drive and Lathrop Street. Key Scope Elements UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 6 Project Approach: PROJECT LOCATION & MOT PHASES VOORDE DRVOORDE DR LATHROP STLATHROP ST BENDIX DRBENDIX DRThe project is scheduled for a March 10, 2027 INDOT letting date. Bendix Drive will be constructed in multiple phases. MAINTENANCE OF TRAFFIC PHASES ■DETOUR FOR BENDIX DRIVE – WFJ Nimtz Parkway, US 31 (St. Joseph Valley Parkway), and US 20. ■DETOUR FOR LATHROP STREET – Portage Avenue, Bendix Drive, Boland Drive, and Foundation Drive PHASE IA • Construct the west side of Bendix Drive from Lathrop to Viridian Drive.• Maintain one lane of local traffic for Bendix Drive southbound. PHASE IB • Close and construct Lathrop Street (east of Bendix Drive) and the east side of Bendix Drive from Lathrop Street to just south of Viridian Drive. PHASE II • Close and construct all of Bendix Drive from the railroad tracks Lathrop Drive. PHASE IIIA • Construct the east portion of Bendix Drive from Voorde Drive to railroad tracks. • Maintain one lane of local traffic for Bendix Drive southbound. PHASE IIIB • Construct the west portion of Bendix Drive from Voorde Drive to railroad tracks. • Maintain one lane of local traffic for Bendix Drive northbound. WFJ NIMTZ PKWYWFJ NIMTZ PKWY VIRIDIAN DRVIRIDIAN DR AIRFIELD UPS INDUSTRIALPARK BOLAND DRBOLAND DR 1 2 3 Beacon Occupational Health South BendGrowing Kids Childcare Ccenter Ryder Truck Rental 1 2 3 CONCRETE ASPHALT RECYCLING BENDIX DRBENDIX DRPHASE IIIA PHASE IIIB PHASE II PHASE IA PHASE IB UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 7 Project Approach: CRITICAL CONSTRUCTION ITEMS Property AccessProperty access for all businesses and adjoining streets on Bendix Drive will be maintained throughout construction. The project will likely be constructed in multiple phases to allow for the construction of the new three lane roadway, multi-use-path, storm sewer upgrades, and traffic signals. United’s Project Manager Owen Yeadon will keep all businesses informed of any phase changes. Stakeholder CommunicationUnited is committed to maintaining clear, consistent communication with all project stakeholders. Regular updates will be provided through phone calls, emails, photographic documentation, and weekly reporting. Communication with the City on budget matters, schedule changes, and major milestones will be prioritized. ScheduleAdhering to the project schedule is critical for timely delivery and maintaining public confidence. At each progress meeting, Owen will review the original schedule and compare it to the current timeline to assess progress. Should delays arise, United will coordinate with the contractor to identify causes and implement necessary adjustments to keep the project on track. Early identification and proactive management of schedule variances will help ensure overall project completion remains on schedule. Erosion Control Special attention will be given to erosion control to prevent off-site sediment from leaving the site as well as entering the existing storm sewer after rainfall events. During construction, all impacted areas will be identified and measures will be implemented to protect the flow to ditches and storm inlets. Stormwater runoff will be managed using Best Management Practices to ensure compliance with environmental regulations, including those set by the Indiana Department of Environmental Management (IDEM) and the City’s local stormwater agency. Any areas not adequately protected will be promptly identified and brought to the contractor’s attention for remediation. POR T AG E AV E POR T AG E AV EFOUNDATION DRFOUNDATION DRBUS W FJ N I M TZ PKWY W FJ N I M TZ PKWY LATHROP STLATHROP ST VOORDE DRVOORDE DR BENDIX DRBENDIX DRBOLAND DRBOLAND DR BENDIX DRDETOUR LATHROP ST DETOUR PROJECT LIMITS BENDIX DRIVE AND LATHROP STREET / DETOUR ROUTES UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 8 Project Approach: CLIENT COMMUNICATION At United, we strive to exceed our client’s expectations. In this pursuit, we have constructed our communication plan to be fully transparent from day one, so there are no surprises along the way. CLIENT PROJECT ACTION PLAN The intent of our action plan is to provide a strategic overview—for all project stakeholders—of the essential actions and responsibilities required to support successful project delivery. United will work closely with the contractor’s Certified Traffic Control Supervisor to ensure they submit all weekly sign and barricade reports properly and on time. Daily monitoring of all signs and barricades, as well as the detour route, will be necessary to maintain a safe travel environment. United’s Owen Yeadon will also make personal contact with all impacted businesses and residents located within the project limits and provide contact information in case there are any questions or concerns for the project duration. This personal contact communication procedure has been successfully utilized on our past road projects. See page 7 of this LOI for critical construction items. Weekly check-ins are our standard. We’ll provide weekly progress reports every Monday summarizing completed work. An example of a progress report is provided on page 10. Weekly or bi-weekly progress meetings (based on client preference) will be held until project completion, with agendas sent 24 hours in advance. Our Construction or Field Operations Manager will attend as needed, and all staffing matters will be discussed openly. Meeting minutes will be delivered within three calendar days. All key documents, including contractor pay estimates and the current IC 642, will be shared for client records. Throughout the project, we encourage open communication regarding schedules, budget, construction concerns, or other issues. OUR CLEAR +COMPREHENSIVE PROACTIVE PROBLEM SOLVING COMMUNITY ENGAGEMENT ADDRESSING PUBLIC CONCERNS FORMS OF COMMUNICATION Anticipating challenges before they arise is always our goal. Should an issue occur, we have procedures in place to resolve these unforeseen conditions quickly and cost effectively. We realize the importance of utilizing information identified in public outreach meetings to communicate with multiple stakeholders through the construction process. We understand that addressing public items of concern are key in delivering a successful project, while at the same time gaining and maintaining the support of the community. To ensure effective and timely communication, our team tailors the contact method based on the recipient, urgency of the information, and preferred communication style. The project manager will contact the client and designer if there is a question on the design, and present solutions based on their experience and the designer’s intent. If there is a field construction issue, the project manager will work directly with the contractor to efficiently solve any problems at the project level. These will vary per project scope, but many frequent entitiesincludeSite Development and Redevelopment Projects, Transit Authorities, Emergency Services, Schools and Training Facilities, Churches, Commercial Businesses, Residents, and Property Owners, Municipality Services, Utilities, and Design/Funding/Ownership teams. Several such common concerns are Public Business and Drive Access During Construction, Street Lighting, Flooding and Stormwater Control, Trees and Greenspaces, Coordination Planning Across Multiple Projects, Construction Work Hours, Site Access for Public and Emergency Services, and Retaining Wall Maintenance. Some of which include Public Outreach Meetings to discuss schedule and mobilization, On-Site Progress Meetings with the contractor and utilities, a dedicated project email and Google Voice number for the inspection team or contractor to answer questions, and regular reports with photos for client website and social media updates. UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 9 Project Approach: UTILITIES United's utility coordination experience on roadway reconstruction projects spans over 60 years of construction inspection projects. We understand the importance of utility relocations and their potential impacts to overall project development — utility delays are one of the most common delays a project can face. Early coordination with impacted utilities can alleviate many of the risks often seen on road reconstruction projects. On Federal Aid projects like Bendix Drive, any delay claims from the contractor caused by utilities are 100% reimbursed by the City. A site visit and plan review identified several over and underground utilities within the project limits on both sides of Bendix Drive. Coordination with multiple overhead and underground utility providers will be required in order to complete the project. The main concern for conflicts on the Bendix Drive “road diet” project will be underground utilities. Due the scope of the project the road width will be changed from the existing four lane section to a three lane section, therefore new curb inlets will need placed in areas where there are potential conflicts with existing utilities. UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 10 Project Approach: COST CONTROL Monthly monitoring and updates on the project budget will ensure cost control. Preparing the contractor’s bi-monthly pay applications on time, in comparison to planned quantities and projected costs of future work, will keep the project on budget. Keep change orders below 3%Research all claims and provide cost effective solutions Presents solutions instead of problems to the City Reduce project delays Solve construction related issues at the project level Respectfully reduces the time City staff commits to project concerns Protect the project budget Verify quantities daily and discuss at progress meetings Keeps City of South Bend aware of the budget Utility coordination Invite impacted utilities to all progress meetings Reduces impacts to project schedule PROJECT COST CONTROL GOALS ACHIEVEMENT PROCESS BENEFITS TO THE CITY OF SOUTH BEND Intermediate Completion: Week Starting: Final Completion Date: Week Ending:Contract Amount: Contractor:Cost Incurred to Date: Tasks Completed Project Complete1,659,900.00$ 1,504,733.88$ 8/14/2026 49% 91% South Bend Muessel Primary Holy Cross Safe Routes 19Report No: 7/26/2026 12/1/2026 Time Elapsed 8/1/2026 Milestone Monday, 7/27: Milestone finished right-of-way removals and poured sidewalk and approach concrete on Vassar Ave. Tuesday, 7/28: Milestone prepared subgrade for Vassar/Wilbur curb ramps, and poured curb, curb ramp, and sidewalk concrete on Cleveland and Vassar Ave. Wednesday, 7/29: Milestone spread topsoil and poured curb ramp/sidewalk concrete on Vassar Ave, Cleveland Ave, and California Ave. Thursday, 7/30: Milestone spread topsoil on Vassar Ave, laid brick at curb ramps, milled curb ramp and approach areas for HMA, and poured curb ramp concrete on Vassar and California Ave. Friday, 7/31: Milestone installed HMA around curb ramps and approaches on Vassar and California Ave, poured curb ramps on Vassar Ave/Wilbur St, and laid brick at curb ramps near Muessel Elementary School. Upcoming Schedule Construction ManagerBlake Gribben Prepared by: Week of 8/2: Milestone will finish all concrete pours, continue installing brick around Muessel Elementary School, and place HMA and topsoil throughout Vassar and California Ave. 1 UPDATED REPORTS Along with the site manager reports, weekly progress reports, including key pictures of current activities, will be provided to the City of South Bend. These updates can be distributed to all affected stakeholders. EXAMPLE WEEKLY REPORT UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 11 UNITED Project Experience Similar Projects Completed by Our Team CLIENT: City of Evansville, Indiana PROJECT DESCRIPTION: The city of Evansville reduced the existing four-lane Covert Avenue Corridor to three lanes as a part of a “road diet” project to eliminate extra lanes, improve pedestrian facilities, and incorporate bike lanes. The new roadway cross-section was minimized to one lane in each direction with a center two-way left-turn lane. Curbs and sidewalks were added or repaired as necessary, and new bike lanes were added in each direction. The addition of bike lanes required careful coordination with each roadway crossing and signalized intersection to ensure compliance with best practices for bicycle users. CONSTRUCTION COST: $5,914,000 SERVICES PROVIDED BY UNITED: Construction Inspection Covert Avenue Road Diet CLIENT: City of Jeffersonville, Indiana PROJECT DESCRIPTION: The project involved the comprehensive reconstruction and widening of 10th Street in Jeffersonville, expanding the roadway from four to five lanes and converting the new fifth lane into a dedicated center turn lane to improve traffic flow and safety. Spanning from Dutch Lane/Penn Street to Reeds Lane, the improvements included the installation of new curb and gutter, a modern storm sewer system, upgraded sanitary sewer, and retaining walls to support the expanded roadway. United provided construction inspection services for the project, overseeing the addition of attractive, pedestrian-friendly sidewalks on both sides of the street, ADA-accessible curb ramps, and new drive approaches to enhance accessibility for all users. The project also featured the construction of four new intersections with decorative traffic signals, upgraded street lighting, and new signage to improve both safety and aesthetics. Throughout construction, special attention was given to maintaining safe and continuous access for the high volume of pedestrian traffic along this major thoroughfare, ensuring the community remained connected and accessible during every phase of the project. CONSTRUCTION COST: $13,500,000 10th Street Reconstruction and Widening SERVICES PROVIDED BY UNITED: Construction Inspection Utility Coordination Land Acquisition UNITED CONSULTING  CITY OF SOUTH BEND  BENDIX DRIVE (LATHROP TO VOORDE) / DES # 2100022 IN THE LAPORTE DISTRICT 12 UNITED Project Experience Similar Projects Completed by Our Team CLIENT: Hendricks County PROJECT DESCRIPTION: This 1.6-mile section of the parkway extends north from the current end of Ronald Reagan at CR 600 N to CR 750 N, featuring a new four-lane roadway with at-grade intersections and traffic signals at both CR 700 N and CR 750 N. The project includes a new storm sewer system with curb and gutter, as well as a 10-foot-wide multi-use path along the east side of the roadway. A 313-foot-long by 97.5-foot-wide, two-span bridge was constructed to carry the parkway over the CSX railroad tracks and Marathon pipelines, supported by 2,331 linear feet of Mechanically Stabilized Earth (MSE) walls at the end bents and approaches. The project also involved multiple maintenance of traffic phases, including road and lane closures and detour routes, to minimize disruption. Additional improvements include 1.6 miles of four-lane asphalt pavement, 4.0 miles of curb and gutter, sidewalks with ADA ramps, and the continuous multi-use path, providing enhanced connectivity and safety for both vehicles and pedestrians. CONSTRUCTION COST: $38,000,000 Ronald Reagan Parkway SERVICES PROVIDED BY UNITED: Construction Inspection Bridge Design CLIENT: City of Lebanon, Indiana PROJECT DESCRIPTION: The Fordice Road project connected Downtown Lebanon with the newly constructed Central Elementary School at John-Bart Road. The reconstruction included a new water main, storm sewer, and a full depth asphalt roadway. Pedestrian facilities — including a multi-use trail, sidewalk, and ADA compliant curb ramps placed along Fordice Road to safely connect local residences with the school. Lighting fixtures were added for nighttime illumination. Prior to construction, United helped manage the utility coordination efforts to keep the relocation work moving forward. During construction, utility conflicts were quickly identified, coordinated, and resolved to help keep the road reconstruction on schedule. CONSTRUCTION COST: $6,900,000 Fordice Road SERVICES PROVIDED BY UNITED: Construction Inspection