HomeMy WebLinkAboutOpening of Proposals - Bendix Phase 2 Improvements - Lochmueller GroupCITY OF SOUTH BEND
August 25, 2026
BENDIX DRIVE CE SERVICES
in the LaPorte District
Des # 2100022
City of South Bend
Bendix Drive
CE Services
in the LaPorte District
Des 2100022
August 25, 2026
A+ Local Construction Management
Our team will deliver for the City of South Bend.
JESSICA CLARK, PE
Authorized Negotiator &
N. IN Regional Leader
jclark@lochgroup.com
574.286.8074
RESPONSIBLE OFFICELochmueller Group112 West Jefferson Boulevard, Suite 500South Bend, IN 46601
We have the local
presence, capacity,
technical expertise,
and a strong
commitment to the
City of South Bend.
We will exceed your
expectations on
this project!
CHARLIE SCHUELERConstruction Manager
charlie.schueler@lochgroup.com260.247.4319
Based in our South Bend office, Lochmueller Group’s (Lochmueller) Construction Inspection Team provides responsive construction inspection services throughout Northern Indiana. The team is led by Construction Manager Charlie
Schueler, a trusted construction professional with more than 16 years of experience delivering transportation projects across the region. Charlie will oversee Construction
Project Supervisor John Smith, who brings more than 31 years of experience supervising roadway construction projects. We have teamed with SJCA, Inc. and McCormick Engineering, LLC, both with offices in South Bend, to provide additional local inspection support and staffing flexibility. Together, our team offers the leadership,
technical expertise, local experience, and readily available resources needed to
successfully deliver the Bendix Drive improvements.
With a proven track record of successful project delivery, Lochmueller’s construction inspection team brings extensive experience with urban roadway reconstruction, complex maintenance of traffic, utility coordination, drainage improvements, and active railroad interfaces. Our INDOT construction inspection performance scores average 57% higher than the industry average, demonstrating
the consistent quality, responsiveness, and reliability our team delivers on projects
across Indiana. By applying our expertise in construction oversight, the LPA process, and City and INDOT standards, we will help keep the Bendix Drive improvements moving forward efficiently, safely, and in full compliance with all applicable requirements.
Lochmueller’s construction inspection team delivers cost-effective services that protect project schedules and taxpayer dollars. We accomplish this by maintaining compliance with City and INDOT requirements, closely monitoring quantities and contractor progress, and identifying potential utility, railroad, traffic-control, and constructability issues before they affect the project’s cost or schedule. Our team will efficiently coordinate inspection coverage and align staffing with the contractor’s active operations, providing the appropriate level of oversight as construction needs change. Through proactive issue resolution, accurate documentation, and clear
communication, we will help the City of South Bend deliver the Bendix Drive
improvements on time, within budget, and to the expected level of quality.
Proudly Above Average57% HIGHER SCORES
Cost Effective Delivery PROVEN COST SAVINGS! See page 12 for a recent project highlighting cost savings!
Lochmueller | City of South Bend Bendix Drive 2
ORGANIZATIONAL CHART
+On-Site Construction Inspection +Site Manager &
AASHTOWare
Responsibilities +Material Records & Testing +Progress Meetings &
Contractor Coordination
+Utility Coordination +As-Builts +Erosion Control
Monitoring
+Public Notices +Final Construction Records (FCR) +Pay Applications,
Estimates, & Change
Orders
Leslie Biek, PE
Assistant City Engineer
Department of Public Works – Engineering Division
Charlie Schueler
Construction Manager
John Smith
Construction Project Supervisor
100% Available
31+ Years of Roadway Construction Experience
Day-to-day Contract Management
100% Available
Dale WillsPart-timeProject Advisor
Susan Al Abbas, PEIndiana Market Leader
Jessica Clark, PENorthern IndianaRegional Leader
Dave Barich, PEClient Liaison
16+ Years of Transportation
Construction Leadership
23+ Years of Roadway Construction Experience
Adam
DeMeyer
Full-time
Inspector 44+ Years of Local Transp.Construction Experience
Local Team
Support Team
Tracy
McCormick, PE
Inspector3+ Years of Construction Inspection Experience
Cameron
Riewe
Inspector 32+ Years of Construction Inspection Experience
80% Lochmueller
5% McCormick Engineering, LLC
15% SJCA, Inc.
RESIDENCE MAP
Adam DeMeyer
Dale Wills
John Smith
LEGEND
Project Site
Lochmueller Office
SJCA Office
McCormick
Office
Lochmueller | City of South Bend Bendix Drive 3
John will manage daily inspection
activities, coordinating coverage
and documentation with the City,
contractor, utilities, railroad
representatives, and project
stakeholders. Drawing on his
urban construction experience,
he will monitor sequencing, MOT,
access, utility work, and progress
while providing practical technical
guidance to keep construction
aligned with contract requirements
and the City’s schedule, budget, and
quality objectives.
John and his team bring decades of
experience delivering transportation
projects across Northern Indiana.
Supported by local staff and South
Bend-based partners SJCA and McCormick
Engineering, the team provides expertise in
roadway reconstruction, utility coordination,
traffic signals, multi-use paths, railroad
coordination, MOT, environmental
compliance, and Federal-Aid administration.
John will promote responsive
decision-making, efficient inspection,
and protection of the City’s interests.
Communication
& Stakeholder Coordination
Proven Urban
Project Delivery
Leadership
& Teamwork
TEAM LEADERSHIP
John understands the requirements
of successful urban roadway
reconstruction and maintains
clear communication with the
City, contractor, utilities, railroad
representatives, businesses, and
other stakeholders, including the
South Bend International Airport.
His proactive coordination will
minimize disruptions, maintain
access, and support safe, efficient
improvements along the Bendix
Drive corridor.
JOHN SMITH | Project Supervisor
PRAISE FOR JOHN
“John has worked on our projects for nearly 15 years and knows the City of La Porte better than anyone. We use him regularly and trust his judgment and decision making on construction activities. In the 10 years I have been here, John has been a valuable asset to the City’s improvement with our capital improvement projects.
- City of La Porte Engineer
PROVEN
MUNICIPAL TRUSTWe selected John to manage construction inspection because he will bring the proven urban experience, sound judgment, and responsive decision-making trusted by the City of La Porte to the City of South Bend—keeping the Bendix Drive improvements coordinated and on track.
John brings more than 31 years of transportation construction and construction management experience, with inspection assignments ranging from small municipal projects to large, multimillion-dollar INDOT contracts. His experience spans both INDOT and Local Public Agency (LPA) contracts in rural and urban settings, providing a well-rounded perspective on transportation infrastructure construction. John’s extensive field experience, responsiveness, and practical understanding of construction operations make him well suited to lead the fast-paced, multifaceted construction of the Bendix Drive improvements. The City of South Bend will benefit from John’s proven field leadership as Project Supervisor through his ability to:
3 Maintain clear, responsive communication with the City, contractor, utilities, railroad representatives, adjacent businesses, and other project stakeholders 3 Coordinate phased roadway reconstruction, storm sewer, traffic signal, multi-use path, and railroad-interface activities in accordance with the contract documents 3 Monitor construction progress and proactively identify field, access, utility, and maintenance-of-traffic issues that could affect the project’s schedule, budget, or quality 3 Lead construction inspection staff while aligning daily coverage with contractor operations and maintaining accurate, timely project documentation 3 Ensure compliance with the project plans, City and INDOT specifications, and all applicable construction documentation requirements
31 YRS EXPERIENCE100% Contract Commitment | Certified INDOT Technician
RELEVANT LPA & INDOT CONSTRUCTION INSPECTION EXPERIENCE
+Urban Road Reconstruction & Widening (R-40735) | Hoham Drive for the City
of Plymouth (LPA) through INDOT LaPorte District
+Urban Roadway, Utility, & Trail Reconstruction | Truesdell Avenue and Clear Lake
Greenway for the City of La Porte (LPA)
+HMA Overlay & Small Structure Replacement (R-43028) | US 35 for INDOT
LaPorte District in La Porte County
+Major Stormwater & Utility Improvements | Boyd Boulevard for the City of
La Porte (LPA)
Lochmueller | City of South Bend Bendix Drive 4
LOCAL PROJECT LEADERSHIP & INSPECTION SUPPORT
Dale brings more than 44 years of construction inspection experience, including extensive
work for the City of South Bend and throughout St. Joseph County. As Project Advisor, he will provide John, Adam, and the inspection team with trusted local insight, technical guidance, and proven construction practices. Dale will remain available to attend progress meetings, visit the site during critical operations, and assist with complex field conditions, coordination challenges, and important project decisions. His familiarity with local infrastructure,
stakeholders, and construction practices provides the team with an experienced resource who can help anticipate concerns and support successful delivery of the Bendix Drive improvements.
RELEVANT SOUTH BEND & ST. JOSEPH COUNTY EXPERIENCE:
+Urban Park, Riverwalk, & Trail Reconstruction (Project No. 117-093A) | Seitz Park for the City of South Bend (LPA) +Five-Leg Intersection & Utility Improvements (Project No. 116-034) | Corby Boulevard, Ironwood Drive & Rockne Drive for the City of South Bend (LPA) +Intersection Improvement, Roundabout (R-42200) | Cleveland Road & Beech Road for St. Joseph County (LPA) through INDOT LaPorte District +Road Reconstruction & Multi-Use Path (R-40170) | Cleveland Road for St. Joseph County (LPA) through INDOT LaPorte District
CHARLIE SCHUELER
Construction Manager
BS, Civil Engineering, University of
North Dakota
Charlie brings more than 16 years of construction engineering and inspection experience with Lochmueller and INDOT. As Construction Manager, he will support the inspection team through staffing coordination, progress meetings, change-order review, contract administration, and issue resolution. Having served as Construction Project Engineer on more than 25 INDOT and LPA contracts, Charlie provides expertise in urban roadway reconstruction, utilities, maintenance of traffic, and federal-aid administration to help keep the Bendix Drive project on schedule, within budget, and in compliance with contract requirements.
DALE WILLS | PROJECT ADVISOR
CHARLIE SCHUELER
Construction Manager
BS, Civil Engineering, University of North Dakota 16 YRS EXP
Tracy brings 32+ years of experience as a project supervisor and inspector. Based in South Bend, she provides local expertise in materials testing, contract administration, and INDOT requirements. We will draw on her sound judgment and technical expertise to support critical construction operations and resolve complex field issues.
TRACY MCCORMICK, PE
McCormick Engineering Inspector
BS, Civil Engineering, Purdue University 32 YRS EXP
44 YRS EXPERIENCEBS, Civil Engineering, Purdue University
Adam brings more than 23 years of transportation construction experience, including 20 years on the contractor side. His understanding of construction methods, sequencing, and field operations allows him to efficiently evaluate work, identify constructability concerns, and coordinate effectively with contractors and project stakeholders. His strong work ethic, hands-on experience, and familiarity with roadway and bridge construction make him well suited to provide consistent, full-time inspection for the Bendix Drive improvements. Adam’s understanding of both contractor operations and construction inspection will help him anticipate field issues, verify quality, and keep daily activities moving efficiently.
ADAM DEMEYER
Inspector
Certified INDOT Technician 23 YRS EXP
Cameron brings an organized, detail-oriented approach supported by his background in manufacturing engineering and technology. Through SJCA’s South Bend office, he will provide local inspection support with a focus on quality control, materials testing, accurate pay quantities, and thorough project documentation.
CAMERON RIEWE
SJCA Inspector
BS, Manufacturing Engineering & Technology 3 YRS EXP
Lochmueller | City of South Bend Bendix Drive 5
PROJECT UNDERSTANDING - BENDIX DRIVE FROM VOORDE DRIVE TO NORTH OF LATHROP STREET
OUR APPROACH
TO PROJECT DELIVERY
PROFESSIONAL, RESPECTFUL, & HONEST
John understands trust is built through timely, candid
communication, and consistent follow-through. As the
primary field point of contact, he will communicate facts
clearly, document decisions, elevate concerns early, and
work collaboratively toward solutions. His calm, respectful approach will help the City make informed decisions and keep the project team aligned throughout construction.
John: Your Primary Field Point of Contact
City of South Bend: Provide timely progress
updates, clearly present issues, and elevate
decisions requiring City direction. Contractor: Coordinate daily operations,
inspection coverage, upcoming activities, and
two-week look-ahead schedules.Utilities & Railroad: Track constraints, responsibilities,
required actions, and schedule-critical coordination items.Businesses, Residents & Public: Coordinate access
needs and advance notifications with the City to minimize
disruptions.Inspection Team & Project Partners: Establish clear
assignments, share field information, and maintain
consistent documentation.
PROACTIVE, PEOPLE-FOCUSED LEADERSHIP
John will work closely with the City, contractor, and project stakeholders to deliver a safe, high-quality project that meets schedule, budget, and performance goals. Our experienced construction inspection team takes
a proactive approach in the field by identifying potential
issues early, communicating clearly, and responding quickly
to changing conditions. Through effective coordination
and timely decision-making, we will help maintain project
momentum while minimizing disruptions to adjacent
businesses, residents, corridor users, and the surrounding
community.
We have reviewed the plans and visited the project corridor
to develop a thorough understanding of its purpose, key
construction activities, and potential challenges. Our review
considered phased roadway and intersection construction,
stormwater improvements, utility and railroad interfaces,
multi-use path construction, traffic control, and property
access. This preparation allows us to anticipate critical
activities, support informed field decisions, and provide
the consistent leadership and construction oversight
needed for successful project delivery.
UNDERSTANDING THE PROJECT NEED
Lochmueller’s construction inspection team understands this project is about more than replacing deteriorated pavement. By reconstructing Bendix Drive and extending the three-lane configuration of the previously improved corridor north of Lathrop Street, while improving stormwater management and adding a multi-use path, the City is making a long-term investment in safety, mobility, accessibility, and the surrounding community. Throughout construction, phased roadway and intersection work, utility and railroad coordination, and traffic changes will require proactive oversight to maintain access and minimize disruptions. Our team will communicate clearly with the City, contractor, utility providers, railroad representatives, adjacent businesses, residents, and other stakeholders. You can count on us to provide responsive construction oversight and serve as a trusted partner from Notice to Proceed through final closeout.
John will reinforce clear, accountable communication throughout construction by providing:
+Advance Notifications: Coordinate timely mailings, door-to-door flyers, and other notices before traffic changes, access impacts, and major construction activities.
+Responsive Communication: Meet on-site or coordinate directly with affected businesses, residents, utilities, and other stakeholders when questions or access concerns require individual attention.
+Weekly Project Reports: Provide detailed updates to the City summarizing schedule progress, completed and upcoming work, payments, changes, key decisions, and field photos to maintain accountability and confidence in project delivery.
OUR COMMUNICATION COMMITMENTS
BEFORE AFTER
Lochmueller | City of South Bend Bendix Drive 6
PROJECT CORRIDOR ASSESSMENT
PROPOSED CORRIDOR IMPROVEMENTS
Reconstruction & Lane Reduction: Full-depth
reconstruction will transform the existing four-lane
roadway into two- and three-lane configurations
that vary along the corridor.
Stormwater & Green Infrastructure: Proposed
storm sewer, drainage structures, infiltration
components, and a V-bottom bioswale will improve
drainage and stormwater management
East-Side Multi-Use Path: A new multi-use path
will provide a continuous pedestrian and bicycle
connection along the east side of Bendix Drive,
including accessible transitions at intersections
and driveways.
Intersection Improvements: Proposed
improvements at Lathrop Street and Voorde Drive
include signal, pedestrian, pavement, drainage, and
roadway-transition work.
KEY CONSTRUCTION CONSIDERATIONS
NICTD Railroad Interfaces: Work near active at-grade railroad crossings will require early coordination, facility protection, safe clearances, and careful sequencing of adjacent construction.
Underground Infrastructure: Coordinate the proposed water main and fiber-optic interconnect with storm sewer, roadway construction, existing utilities, and any remaining third-party relocations.
Corridor Transitions & Tie-Ins: Closely monitor pavement, drainage, grading, markings, and pedestrian connections at Voorde Drive, the railroad, Lathrop Street, and the previously reconstructed corridor to the north.
COMMUNITY & TRAFFIC
Business & Property Access: Maintain safe, practical access to commercial, industrial, and private properties while coordinating temporary entrance impacts before work occurs.
Proposed MOT & Detours: Coordinate five proposed MOT phases, two detour routes, traffic shifts, advance notifications, and phase-readiness reviews to minimize public disruption.
PROJECT BENEFITS
A Safer, Connected Corridor: The completed
project will extend previous Bendix Drive
improvements southward while enhancing safety,
mobility, multimodal connectivity, accessibility, and
stormwater management.
1
2
3
4
5
6
7
8
9
10
9A
10
7A
6A
3
2
5 7B
8
1B
6B
4B
7C
9B
KEY CORRIDOR ELEMENTS
+Roadway Reconstruction & Lane Reduction
+Storm Sewer & Green
Infrastructure +Multi-Use Path & Pedestrian Facilities +Intersection & Signal
Improvements
+Water Main & Fiber-Optic Interconnect +NICTD Railroad Coordination
+Phased MOT, Detours &
Access
VIRIDIAN DR.
LATHROP ST.
VOORDE DR.
1A
4A
Lochmueller | City of South Bend Bendix Drive 7
PROJECT APPROACH
CRITICAL ELEMENTS OUR
TEAM KNOWS TO LOOK FOR
ROADWAY, SUBGRADE, & PAVEMENT
OPERATIONSDuring our site visit, we observed localized pavement distress consistent with underlying support deficiencies. Long-term pavement performance begins below the finished surface, and our team understands the importance of identifying unstable areas during excavation and subgrade preparation—before aggregate and pavement conceal the condition.
+Subgrade Acceptance: Monitor excavation and proof rolling for yielding, pumping, rutting, soft spots, and other signs of instability. Verify unsuitable-material removal, moisture and density, required treatment, and corrective limits before pavement construction begins.
+Aggregate & Backfill: Monitor material type, lift thickness, compaction, and testing around pavement, utilities, drainage structures, and roadway transitions.
+QC/QA Concrete Pavement: Verify line and grade, pavement thickness, dowels, tie bars, joint layout, concrete testing, finishing, texturing, curing, and
protection.
STORMWATER, BIOSWALE, & INFILTRATION
SYSTEM
The proposed drainage improvements combine
conventional storm sewer with a V-bottom bioswale and
infiltration system. Their performance will depend on
accurate elevations, compatible materials, and protecting
the system from sediment and construction damage.
+Storm-Sewer Installation: Verify pipe and structure
locations, line and grade, bedding, connections,
backfill, castings, and positive drainage before work
is covered.
+Bioswale & Infiltration Assembly: Inspect
excavation, aggregate, perforated pipe, underdrain
components, filter media, slopes, elevations,
transitions, and outlet connections at defined hold
points to verify runoff moves through the system as
designed.
+Erosion Control & Establishment: Prevent
sediment from entering completed systems and
monitor stabilization, plantings, and restoration
needed for long-term performance.
Existing NICTD Railroad Interface
NICTD RAILROAD INTERFACE
Work near the active NICTD crossings will require early
coordination, clear responsibilities, and close attention to
railroad requirements. Our team will help integrate
railroad-related activities into the contractor’s schedule
while protecting active facilities and minimizing impacts.
+Early Coordination: Confirm railroad contacts,
permissions, scheduling requirements, construction
limits, and any required flagging before adjacent work
begins.
+Facility Protection: Protect tracks, crossing surfaces,
gates, signals, underground facilities, and railroad
clearances throughout construction.
+Sequencing & Access: Coordinate roadway, drainage,
utility, and traffic-control activities near the crossings
to avoid conflicts and unplanned interruptions.
+Field Communication: Track railroad-related action
items and promptly communicate changes that could
affect access, safety, or the construction schedule.
SIGNALS, MULTI-USE PATH, & PEDESTRIAN
FACILITIESThe proposed signal and pedestrian improvements at Lathrop Street and Voorde Drive must integrate safely with the east-side multi-use path and reconstructed corridor. Our team will verify these improvements are properly located, accessible, well drained, and ready for operation.
+Signal Installation & Activation: Track equipment procurement; inspect conduit, handholes, wiring, grounding, detection, and pedestrian equipment; and coordinate testing and activation at both intersections.
+Multi-Use Path & Accessibility: Verify width, grade, cross slope, drainage, detectable warnings, landings, and transitions while coordinating construction around active entrances and pedestrian routes.
Lathrop Street Intersection Voorde Drive Intersection
Lochmueller | City of South Bend Bendix Drive 8
PROJECT APPROACH
WE PAY ATTENTION TO THE DETAILS:
MOT, PHASING, AND ACCESS
Site Visit Observations Along the Proposed Detour Routes
MOT & PROPOSED PHASED CONSTRUCTION
The Stage 3 plans identify five proposed MOT phases
involving staged intersection construction, a full roadway
closure, half-width reconstruction, and separate detour
routes for Bendix Drive and Lathrop Street. Each traffic
shift will be a schedule-critical operation requiring careful
preparation and coordination.
During our site visit, we drove both proposed detour
routes and reviewed the phase limits to understand traffic
patterns, route length, key intersections, access needs, and
potential impacts. Combined with our team’s
phased-construction experience, this firsthand review
positions us to anticipate concerns, coordinate transitions,
minimize disruptions, and keep construction progressing
toward the City’s schedule.
WE UNDERSTAND THE PROPOSED SEQUENCE
Phase IA | West Lathrop Street Approach & North
Bendix Drive
Construct the west Lathrop Street approach and the initial
portion of north Bendix Drive while maintaining traffic
through the remaining roadway.
Phase IB | East Lathrop Street Approach & North
Bendix Drive
Shift traffic and construct the east Lathrop Street approach
and remaining portion of north Bendix Drive.
Phase II | Central Bendix Drive
Fully close Bendix Drive from immediately north of the
NICTD railroad to Lathrop Street for roadway, drainage,
bioswale, and multi-use path construction.
Phase IIIA | South Bendix Drive
Reconstruct the east half of Bendix Drive between Voorde
Drive and south of the NICTD railroad while maintaining
traffic on the opposite side.
Phase IIIB | South Bendix Drive
Shift traffic onto the completed pavement and reconstruct
the west half of Bendix Drive.
PROPOSED DETOUR APPLICATION
The Bendix Drive detour will remain in place throughout
all proposed MOT phases. The Lathrop Street detour will
supplement it during Phases IA and IB while the intersection
approaches are constructed.
OUR MOT & DETOUR APPROACH
+Detour & INDOT Coordination: Inspect the full
detour, including US 20 and US 31, for sign visibility
and continuity while coordinating traffic concerns with
INDOT LaPorte District.
+Schedule & Signal Readiness: Use the contractor’s
two-week look-ahead to track phase prerequisites
and verify signal heads are bagged and applicable
overhead signs covered for each traffic pattern.
+Half-Width Traffic Shifts: Evaluate pavement,
transitions, drop-offs, drainage, markings, and traffic-
control devices before shifting traffic onto existing or
newly completed lanes.
+Access & Traffic Monitoring: Maintain property
access, provide advance notice of traffic changes, and
recommend timely adjustments based on work-zone
and detour operations.
PROJECT CORRIDOR
BENDIX DRIVE
DETOUR ROUTE
PROPOSED DETOUR MAP
LATHROP STREET
DETOUR ROUTE
BEFORE TRAFFIC MOVES, OUR TEAM WILL BE READY
Before each proposed phase change, John will lead a
pre-MOT meeting to confirm responsibilities, schedule,
access, notifications, detour signing, and outstanding
actions. Our team will then verify pavement, markings,
traffic-control devices, access, and safety measures are
ready before traffic is shifted.
Lochmueller | City of South Bend Bendix Drive 9
PROJECT APPROACH
WE PREPARE +Pre-construction kick-off meeting to set the tone for ongoing, positive communication +Meeting minutes +Contractor pay estimates +Change orders when authorized by the City
WE COORDINATE +Regularly scheduled progress meetings with all key stakeholders, weekly or bi-weekly +Contractor two-week “Look-Ahead” schedules +HMA & PCCP mix designs with INDOT testing +Utilities & any necessary relocation
WE REVIEW +All project documents and drawings +All current and future work schedules +Project schedule, budget, & work quality +Permits +Potential delays & challenges
ACCURATE & ON-TIME DOCUMENTATION +EEO compliance including rental/lease agreements, confirming subcontractor approvals, wage rate interviews, commercially useful function, job board, etc. +Progressive IC-642’s to Contractor for quantity discrepancies +Approved certified payroll +Review & approve Contractor Erosion & Sediment Control reports +Verify Contract Sample Checklist for material shortages +Contractor-signed IC-124 Weekly Reports +Use Directive 109 guidance for Material Testing contract acceptance +Complete FCR within 45 days of Substantial Completion
WE RESPOND +Quickly & proactively to address any questions or challenges +24/7 for any emergency on site including phone calls & messages
OUR APPROACH REINFORCES TOP-LEVEL WORKMANSHIP
Expertise &
understanding
of all
construction
elements
Excellent plan
& specification
compliance
Proven success
on similar
road projects
Effective
communication
with all
stakeholders
Budget
management
skills
1 2 3 4 5
BENEFITS
WITH JOHN AS
YOUR PROJECT
SUPERVISOR
PROPOSED INFRASTRUCTURE & UTILITY COORDINATION
The Stage 3 plans include proposed City infrastructure improvements consisting of a 12-inch water main with associated valves, hydrants, and connections, along with a fiber-optic interconnect system incorporating conduit and handholes. Lochmueller will coordinate these improvements with roadway, drainage, and MOT activities; verify installation, testing, and required clearances; and document underground work before it is covered.
The plans and our site observations confirm electric, gas, water, sewer, communications, and fiber facilities throughout the corridor. Because the scope and timing of potential third-party relocations are not yet known, our team will confirm utility status, responsibilities, contacts, and schedule constraints before construction begins.
If relocation activities continue into construction or unanticipated conflicts arise, Lochmueller will maintain direct communication with the City, contractor, and utility representatives; track outstanding actions; coordinate field resolutions and sequencing; and communicate potential schedule impacts. This proactive approach will help protect existing services, minimize rework, and keep the Bendix Drive improvements moving forward. +Electric: AEP Distribution and Transmission +Gas: NIPSCO +Communications & Fiber: AEP Fiber, AT&T, Choice Light, Comcast, Metro Fibernet, and RVP Fiber +Water & Sewer: City of South Bend
Lochmueller | City of South Bend Bendix Drive 10
SOUTH BEND & ST. JOSEPH COUNTY CONSTRUCTION INSPECTION EXPERIENCE
117-093A | SEITZ PARK, RIVERWALK &
TRAIL RECONSTRUCTION
City of South Bend (LPA)
Completed 2025 | $10.2M
Lochmueller provided construction inspection services for the reconstruction of Seitz Park and rehabilitation of riverwalk trails and the portage area along the St. Joseph River. Improvements included concrete walks, retaining walls, planters, lighting, landscaping, seating areas, a new pavilion, and an event stage. Construction required careful coordination around aging riverfront infrastructure and the adjacent hydroelectric facility.
PROJECT RELEVANCE +Recent construction inspection experience for the City +Urban trails, concrete, lighting & site improvements +Complex stakeholder coordination & unforeseen conditions
116-034 | CORBY BOULEVARD, IRONWOOD
DRIVE & ROCKNE DRIVE INTERSECTION
City of South Bend (LPA - Federal Aid)
Completed Fall 2020 | $3.1M
Lochmueller provided construction inspection services for
improvements to a complex five-leg urban intersection.
Work included roadway reconstruction and geometric
modifications, new storm and sanitary sewers, traffic
signals, ornamental lighting, HMA pavement, curbs,
sidewalks, driveways, ADA ramps, and landscaping. The
project improved traffic operations, pedestrian connectivity,
drainage, and safety within an established residential area.
PROJECT RELEVANCE
+Recent construction inspection experience for the City
+Urban roadway, utilities, signals & ped. improvements
+MOT, access, public coordination, & LPA administration
R-40170 | CLEVELAND ROAD
RECONSTRUCTION & MULTI-USE PATH
St. Joseph County (LPA - Federal Aid)
Completed Summer 2019 | $8.3M
Lochmueller provided construction inspection services for the reconstruction of approximately 0.9 miles of four-lane Cleveland Road from Riverside Drive to SR 933. Work included replacement of deteriorated concrete pavement and curb, a new multi-use path, pedestrian-activated crossing signal, lighting, storm sewer improvements, utility coordination, and bridge rehabilitation. The improvements enhanced pavement condition, drainage, pedestrian connectivity, and corridor safety.
PROJECT RELEVANCE +Urban roadway reconstruction & concrete pavement +Multi-use path, drainage, lighting & ped. improvements +Utility coord., traffic maintenance & LPA administration
ADDITIONAL RELEVANT EXPERIENCE
IN & NEAR SOUTH BEND
Douglas Road Reconstruction & Bridge Replacement (R-37496) • Pierce Road Reconstruction (R-41176) • Fillmore Road Reconstruction & Widening • Cleveland/Beech Roundabout (R-42200) • Auten Road Multi-Use Trail (R-37502)
Lochmueller | City of South Bend Bendix Drive 11
PROVEN LEADERSHIP ON COMPARABLE URBAN CORRIDORS
Our sustained record of technical excellence, as well as our history of construction inspection
work in Northern Indiana, makes us a logical fit to serve your needs. By selecting Lochmueller,
you receive a capable and experienced team ready to work!
UNMATCHED EXCELLENCE
R-40735 | HOHAM DRIVE RECONSTRUCTION
& WIDENING
City of Plymouth (LPA - Federal Aid)
Completed Fall 2024 | $2.5M
John served as Project Supervisor for the reconstruction
and widening of Hoham Drive from Western Avenue to
Michigan Street. Improvements included new pavement,
curb and gutter, sidewalks, storm drainage and a
detention basin, upgraded traffic signals, and intersection
geometric improvements. Extensive coordination was
required for water, gas, electric, and communication
utilities.
PROJECT RELEVANCE
+Urban roadway reconstruction, widening &
pedestrian facilities
+Storm drainage, detention, traffic signals & utility
coordination
+Federal-aid LPA administration, traffic maintenance
& access
R-41565 | SR 22 RECONSTRUCTION &
BRIDGE REPLACEMENT
Town of Upland (LPA), INDOT Fort Wayne District
Completed 2026 | $18.2M
Charlie served as Construction Project Engineer and
led day-to-day construction inspection and contract
administration for the reconstruction of 1.5 miles of SR
22 through Upland. Work included complete pavement,
curb, and storm sewer reconstruction; ADA pedestrian
improvements; a lighted multi-use pathway; downtown
parking and streetscape enhancements; decorative
lighting; extensive utility coordination; and replacement
of the bridge over the CERA Railroad.
PROJECT RELEVANCE
+Urban roadway, drainage, pedestrian, & streetscape
improvements
+Complex utility, railroad, access, & MOT coordination
+LPA administration and communication with INDOT,
the Town, Taylor University, and the public
TRUESDELL AVENUE & CLEAR LAKE
GREENWAY RECONSTRUCTION
City of La Porte (LPA Only)
Completed 2024 | $4.5M
John served as Project Supervisor for the full reconstruction
of approximately two miles of Truesdell Avenue from
Pine Lake Avenue to McClung Road. A new multi-use trail
extended throughout the corridor, connected two existing
trails, and incorporated a lakefront plaza and boardwalk.
PROJECT RELEVANCE
+Urban roadway, storm sewer, sanitary sewer, & utility
improvements
+Multi-use trail, ADA facilities, lighting, & corridor
connectivity
+Municipal coordination, MOT, access, & public
communication
Lochmueller | City of South Bend Bendix Drive 12
The City of South Bend expects construction inspection
services demonstrating strong fiscal stewardship while
maintaining rigorous standards for quality, safety, and
compliance. Lochmueller consistently delivers this balance
on City roadway projects by providing disciplined,
cost-conscious inspection services without compromising
performance.
On three recent St. Joseph County construction inspection
assignments, Lochmueller completed services under the
authorized inspection budgets, generating more than
$330,000 in documented inspection fee savings. These
projects required continuous coordination with contractors,
responsiveness to changing construction activities, and
careful management of inspection resources. The savings
were achieved through proven inspection management
practices, including:
3 Accurate hour tracking and disciplined control of
staffing levels
3 Strategic deployment of inspection personnel
aligned with sequencing and activity
3 Detailed monthly invoice review and verification
3 Active schedule management to prevent
unnecessary inspection duration extensions
We will apply this same structured and accountable
approach to the Bendix Drive improvements by aligning
inspection coverage with active operations, monitoring the
contractor’s schedule, verifying invoices and quantities, and
adjusting staffing as construction needs change. This focus
on efficiency, transparency, and proactive oversight will
safeguard taxpayer dollars while maintaining compliance
with contract requirements, City and INDOT standards, and
applicable federal requirements.
St. Joseph County Bridge #301, Main Street over Indiana Toll Road,
saved taxpayers over $100,000 on construction inspection fees!
WHY LOCHMUELLER?
LOCAL TEAM. IMMEDIATE SUPPORT
With our South Bend
office, assigned personnel
located within 30 miles, and
local partners SJCA and McCormick
Engineering, our team can respond
quickly when project needs arise. This
local presence strengthens coordination
with the City, provides dependable
backup coverage, and reduces
unnecessary travel time and costs.
PROVEN VALUE CASE STUDY: ST. JOSEPH COUNTY
LOCAL LEADERSHIP. PROVEN VALUE. ACCOUNTABLE DELIVERY.
OUR INDOT
CONSTRUCTION
INSPECTION
PERFORMANCE
SCORES ARE
57% HIGHER
THAN THE INDUSTRY
AVERAGE
RIGHT-SIZED INSPECTION COVERAGE
John will direct daily inspection
coverage, while Adam
provides consistent full-time
field inspection. Dale and local partner
staff will support critical or concurrent
operations, and Charlie will adjust
resources as construction activities
change. This approach provides the
right expertise when needed without
redundant oversight.
DOCUMENTATION & CLOSEOUT FROM
DAY ONE
Our team will maintain
timely daily reports, verified
quantities, organized records, and clear
change documentation throughout
construction. By treating final-record
preparation as an ongoing responsibility,
we support accurate payments, informed
decisions, and an efficient closeout
without waiting until construction is
complete.
OUR COMMITMENT TO SOUTH BEND
+Our dedicated local team has clearly defined roles, direct accountability, and flexible
resources to support critical or concurrent construction operations.
+Our combined contractor-side and inspection-side perspectives will help identify
constructability, utility, access, and maintenance-of-traffic concerns before they
affect construction.
+Our proven urban corridor experience spans drainage, utilities, railroad
coordination, pedestrian facilities, traffic signals, and phased MOT—supported by
INDOT performance scores that demonstrate our commitment to safety, quality,
schedule, and budget.