HomeMy WebLinkAboutOpening of Proposals - Bendix Phase 2 Improvements - American StucturepointCITY OF SOUTH BEND BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE) DES # 2100022 AUGUST 25, 2026 CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)2026.02503 PAGE 1 August 25, 2026 Leslie Biek, PE Assistant City Engineer 215 S Dr Martin Luther King Jr Blvd, Suite 400 South Bend, IN 46601 Dear Ms. Biek and Selection Committee Members: At American Structurepoint, we are committed to delivering high-quality work, and we will bring that same commitment to the Bendix Drive project. By understanding the project’s challenges and stakeholder priorities, our team will deliver solutions that support your goals and reduce impacts on the community. THE RIGHT TEAM FOR YOU The American Structurepoint team’s understanding of local conditions, experience with LPA processes, and construction expertise provides a strong foundation for delivering the Bendix Drive project. Our team is highly skilled, responsive, and experienced in municipal transportation projects. Project Supervisor Justin Sherman brings valuable familiarity with LPA requirements and the City of South Bend through his work on the Olive Street Reconstruction and Coal Line Trail Phase III projects. This experience provides insight into City processes and expectations, enabling efficient, dependable construction oversight and immediate project readiness. LPA/INDOT KNOWLEDGE Effective construction oversight requires disciplined contract administration, accurate documentation, compliance with INDOT standards, and proactive communication. Our team’s extensive LPA and INDOT experience enables us to anticipate issues, maintain compliance, support informed decision-making, and help the City deliver a quality project on schedule and in accordance with all requirements. MAINTAINING TRAFFIC AND LOCAL ACCESS Reconstructing Bendix Drive while maintaining reliable access for businesses, residents, pedestrians, and the traveling public will be one of the project’s most important challenges. Our team has extensive experience managing phased construction in active corridors and understands the importance of planning each traffic shift, temporary driveway, and pedestrian route before work begins. We will closely monitor MOT operations, maintain ADA-compliant pedestrian access, and coordinate upcoming construction impacts with the City and affected stakeholders. American Structurepoint is ready to partner with the City of South Bend to make the Bendix Drive project a success. We welcome the opportunity to discuss our approach, demonstrate the value our team can bring, and expand our partnership through our focus on on delivering a quality project that provides lasting value to the City of South Bend and the Bendix Drive community. Sincerely, American Structurepoint, Inc. John Tucker, PE Project Manager FIRM OVERVIEW CAPACITY AND KEY STAFF PROJECT UNDERSTANDING/ APPROACH PROJECT EXPERIENCE PG 2 PG 4 PG 7 PG 11 Justin Sherman Project Supervisor Zach Wolf, PE Vice President CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 2 FIRM OVERVIEW INDIANA’S INSPECTION LEADER With more than 800 experts working in-house across 11 disciplines, American Structurepoint understands how to successfully move your projects from concept to completion. We provide a wealth of experience and resources dedicated to helping you make your vision a reality. Since opening our doors in 1966, our mission has been to improve quality of life through our commitment to communities. Offering strength in numbers, stability that lasts, and innovative solutions, we provide complete consulting and comprehensive design services. When it comes to inspecting the construction of a project, our experience reaches well beyond the day-to-day activities of a construction site. Our inspectors have the ability to assist you with the financial management of our project; keep contractors on task; monitor schedules for key milestone and completion dates; and coordinate the entire process of bringing contractors, stakeholders, designers, and the community together. MCCORMICK ENGINEERING, LLC SUBCONSULTANT McCormick Engineering, LLC was established in South Bend, Indiana in 2008 with one goal in mind: to provide outstanding customer service to the public sector. McCormick is a civil engineering consulting firm passionate about helping communities provide an improved quality of life to the general public through public works projects. McCormick’s construction inspection staff leverage technology and use their experience in transportation planning, design, and inspection to provide an end product you will be proud of both today and long into the future. RESPONSIBLE OFFICE American Structurepoint, Inc.202 S. Michigan Street, Suite 605 South Bend, IN 46601 TEL 317.547.5580 AUTHORIZED NEGOTIATOR Steven J. Davidson, PEChief Strategy Officer CELL 317.522.6888 EMAIL sdavidson@structurepoint.com PERCENTAGES AND PREQUALIFICATIONS American Structurepoint, Inc. - 95%McCormick Engineering, LLC - 5% 13.1 Construction InspectionAmerican Structurepoint dedicates as much as 2,000 hours a year to provide training for our inspection staff. We keep this group armed with the newest technologies, regulations, and current methods for providing inspection services. CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 3 FIRM OVERVIEWRESOURCES THAT STREAMLINE THE CONSTRUCTION PROCESS The American Structurepoint team offers a variety of unique resources that provide value-added benefits and efficiency during the construction process. TECHNICAL EXPERTISE Over the last 60 years, our staff has provided construction inspection services on more than 1,000 projects. Our inspectors have developed an impressive set of technical capabilities that allows them to document all the daily work tasks performed at the job site. Our staff will use their technical expertise on this project to: • Track and document construction material quantities • Test and sample materials used • Review daily maintenance of traffic • Address all concerns for safety • Maintain project accounting and contractor payrolls EFFICIENCY The construction process can take a consider- able amount of time, which is why keeping an eye on efficiency throughout the entire project is so important. To complete the construction phase of this project in the most efficient manner possible, our team will: • Make timely and knowledgeable decisions • Quickly evaluate immediate/long-term effects of our decisions • Coordinate among all parties through transparency, communication, and fairness • Quickly complete required project closeout activities • Prepare/submit final construction record within 45 days of job acceptance TOOLS Our team is equipped with the most up-to-date equipment to provide high-level service. • Cell Phones • Computer • Drones • All necessary PPE (Personal Protective Equipment) • Measuring Tapes and Wheels • Digital Box Beam Levels • Survey Rod and Level Sets • Concrete Testing Equipment including slump cones, air meters, and scales • Dynamic Cone Penetrometers and Lightweight Deflectometers (to measure density/stiffness of soil or aggregates) • One-point proctor equipment (to determine maximum dry density and optimum moisture of soil)AASHTOWARE PROJECT (AWP) TRAINING INDOT’s move to AASHTOWare Project (AWP) is a major shift for construction administration. While most consultants trained one staff member, American Structurepoint quickly acted on a late opening to train a second individual—strengthening our ability to support this transition from day one. CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 4 JOHN TUCKER, PE PROJECT MANAGER John has provided leadership in American Structurepoint’s Construction Solutions Group since 2004. He has extensive experience over- seeing projects across northern Indiana, providing oversight for federal, state, and local public agen- cies on federal-aid and locally funded road, bridge, and utility infrastructure projects; assisting project supervisors with project administration and field operations observed by inspectors; and recording work and material data. In addition, he manages project funding and change orders, reports project progress to owners, and troubleshoots construc- tion and design issues. As project manager, John will work closely with the project team to facilitate and maintain regular communication with all stake- holders, and verify our team has all the resources needed to deliver a successful project. EDUCATION Bachelor of Science, Civil Engineering, Purdue University LICENSE AND CERTIFICATIONS Professional Engineer – Indiana, Ohio INDOT Qualified Technician Tests INDOT Project Engineer/Project Supervisor Workshop INDOT Certified Technician (All Categories) PROJECT EXPERIENCE • Safe Routes to School Project near LaSalle School Area, South Bend, Indiana • LaSalle School Area Storm Sewer Separation, South Bend, Indiana • Hively Avenue Reconstruction, Elkhart, Indiana • Chicago Street Reconstruction, Hammond, Indiana • Central Avenue Reconstruction, Portage, Indiana CAPACITY AND KEY STAFFOUR PEOPLE MAKE THE DIFFERENCE The inspection team we’re proposing has been selected based on each member’s experience, proximity to the project site, and availability throughout the entire construction schedule. Each key staff member is fully committed to dedicating the time and effort to this project, which is what your community deserves. Our proposed team is fully committed to devoting 100 percent of their time to the successful completion of this project. There are no resource limitations that could adversely affect our team’s ability to properly staff and execute this project. CAPACITY American Structurepoint has one of the largest and most experienced inspection groups in Indiana. We employ more than 85 full-time, certified inspectors. We routinely have over 120 staff in the field during the construction season by utilizing trained in-house staff and experienced seasonal personnel. American Structurepoint has carefully considered our staffing and selected only inspectors who have the capacity and ability to deliver the highest-quality project on time and within budget. When considering capacity, we don’t just look at our workload here and now; instead, we look at the entire duration of the project to identify staff who will be committed to this project from start to finish. • More than 800 staff companywide • Over 85 full-time, certified inspectors with the ability to quickly double that using in-house and seasonal personnel • 100-percent committed staff CITY OF SOUTH BEND Leslie Biek, PE PROJECT MANAGER John Tucker, PE CONSTRUCTION INSPECTORS Aaron Duncan Tracy McCormick, PE As Needed PROJECT SUPERVISOR Justin Sherman CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 5 PROJECT EXPERIENCE Olive Street Reconstruction, South Bend, Indiana* As the Assistant Project Supervisor for the reconstruc- tion of three quarters of a mile of Olive Street from SR 23 to the NS railroad tracks, Justin inspected and reported quantities for all the contractors’ work throughout the jobsite and documented all events, visitors, and hap- penings on site. He also worked on field books, change orders, and made Site Manager entries, including daily reports, and material records as well as material testing of concrete and sampling of QA/QC. Edison Road Added Center Turn Lane from Ironwood Road to Gordon Drive, South Bend, Indiana Justin served as Resident Project Representative on this project which added a center turn lane to an existing busy four-lane road. His duties included verifying the daily compliance of work was monitored and handling oversight of project paperwork, project funds and materials. He also verified compliance with standards, specifications and project plans through visual inspections and testing. He reported project progress to the owners and stakeholders, negotiated change orders, handled troubleshooting of design and constructability issues, and maintained various public relocations. 169th Street Rehabilitation, Phase IV, Hammond, Indiana This $10 million project reconstructed one mile of 169th Street from Southeastern Avenue to Lindberg Avenue. The existing 4-lane section was reconstructed with new storm sewers, sanitary sewer, water main, curb and gutter, sidewalk, utility relocation, QC/QA HMA asphalt pavement, signage, greenery, and signals. Hively Avenue Reconstruction, Elkhart, Indiana This 1.7-mile project reconstructed Hively Avenue from 400 feet east of Nappanee Road (SR 19) to Benham Avenue. Elements of the project included the construction of new storm sewer, water main, and center-turn lane for Hively Avenue. The centerpieces of the project were the installation of two roundabouts one at Hively Avenue and 17th Street and the other at Hively Avenue and Oakland Avenue. JUSTIN SHERMANPROJECT SUPERVISOR Justin brings 18 years of construction management and inspection experience and will provide hands-on leadership as Project Supervisor for the Bendix Drive reconstruction. He will oversee the construction inspection team, mon- itor the contractor’s progress, and serve as a primary point of communication between the City, INDOT, contractor, utilities, and project stakeholders. Justin’s approach emphasizes clear, timely communication and proactive issue reso- lution, allowing concerns to be identified and addressed before they impact the project. His goal is a successful project delivery from notice to proceed through final acceptance. EDUCATION Bachelor of Science, History, Ball State University LICENSE AND CERTIFICATIONS INDOT Certified Technician (All Categories) INDOT AASHTOWare Project (AWP) INDOT Utility Coordination Certification INDOT Railroad Coordination Certification INDOT Storm Water Quality Management Level 1 IWEA Water and Sewage Construction Inspection OSHA 10-hour Construction Safety Course FAA - Certified UAS Pilot CAPACITY AND KEY STAFFEXPERIENCED LEADER FOR BENDIX DRIVE THOROUGH PROJECT RECORDS Supports the project with thorough documentation of construction activities and accurate daily records. PLANS & SPECIFICATIONS Carefully reviews work for compliance with contract plans and specifications to help ensure quality construction. READY ON DAY ONE Experienced with INDOT and LPA procedures, allowing him to step into the role with no learning curve. CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 6 AARON DUNCAN CONSTRUCTION INSPECTOR As a construction inspector, Aaron’s responsibilities include construction observation of the quality and progress of field work, verifying contractor work conforms to the construction documents and specifications, documentation and reporting of daily field activities, acting as a liaison between the contractors and the project supervisor, material testing observations, field measurements, and quantity estimates. EDUCATION Bachelor of Science, Civil Engineering, Purdue University LICENSE AND CERTIFICATIONS INDOT Qualified Technician Tests IWEA Water & Sewer Construction Observation INDOT Certified Technician (All Categories) PROJECT EXPERIENCE • Airport Road Reconstruction Phase 3, Gary, Indiana • 45th Avenue Reconstruction - Phase 3, Lake County, Indiana • US 421 & US 24 Road Reconstruction and Resurface, Monticello, Indiana • Buffington Harbor Access Road, Gary, Indiana TRACY MCCORMICK, PE MCCORMICK ENGINEERING CONSTRUCTION INSPECTOR, AS NEEDED Tracy is experienced in planning, design, and construction observation of civil engineering projects. She is client focused, results oriented, and self- directed. By communicating with clients throughout the life cycle of projects she can see to it that expectations are understood and achieved by both parties. As a co-founder of McCormick Engineering, she is self-directed and results oriented. EDUCATION Bachelor of Science, Civil Engineering, Purdue University LICENSE AND CERTIFICATIONS Professional Engineer - Indiana INDOT Certified Technician INDOT Construction Storm Water Certification PROJECT EXPERIENCE • CR 17 Multi-Use Path & Bridge, Elkhart County, Indiana • CR 18 at CR 13/115 Intersection Improvement, Elkhart County, Indiana • INDOT BMP Water Quality Measures, Indiana • Striebel Arm Detention Facility, Michigan City, Indiana • The Retreat, Indianapolis, Indiana • 45th Avenue Reconstruction, Phase 2A, Lake County, Indiana • Bristol Street Reconstruction Project, Elkhart, Indiana CAPACITY AND KEY STAFF CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 7 PROJECT UNDERSTANDING AND APPROACH WHY OUR TEAM American Structurepoint has assembled a highly qualified team that combines proven INDOT construction inspection experience with the local knowledge, technical expertise, and collaborative culture necessary to successfully deliver the Bendix Drive Reconstruction Project. Our team understands that successful construc- tion administration extends well beyond documentation and inspection—it requires proactive communication, sound engineering judgment, and a commitment to anticipating and resolving issues before they impact the project schedule, budget, or traveling public. Our team has successfully delivered construction engineering and inspection services on complex roadway, bridge, and multimodal projects throughout northern Indiana. We understand the expectations of The City of South Bend, INDOT, local public agencies, contractors, utility owners, and stakeholders, and we apply that knowl- edge to provide consistent, high-quality inspection services from Notice to Proceed through Final Acceptance. Justin Sherman brings extensive experience administering reconstruction projects involving complex main- tenance of traffic, utility relocations, phased construction, ADA compliance, traffic signal improvements, and coordination with adjacent businesses and the public. McCormick Engineering complements these capabilities with additional resources and technical depth. PROJECT UNDERSTANDING Bendix Drive is a roadway reconstruction project between Lathrop Street and Voorde Drive. The existing roadway will be reduced from a four-lane roadway into a safer, three-lane corridor. The project includes full-depth concrete pavement reconstruction, a center shared left-turn lane, new curb and gutter, storm sewer improvements, ADA- compliant sidewalk and curb ramps, a multi-use path, pavement markings, and traffic signal improvements. The project will require careful consideration of traffic operations, pedestrian and bicycle connectivity, drainage, utilities, and long-term corridor safety while maintaining access to adjacent commercial and industrial properties. Bendix Drive is located adjacent to South Bend International Airport and crosses the NICTD Railroad tracks, requiring coordination with airport operations and railroad facilities while maintaining safe and reliable traffic flow throughout construction. The corridor also serves industrial and commercial. Construction staging and maintenance of traffic will require a coordinated approach to minimize impacts to motorists, pedestrians, businesses, railroad operations, and emergency services. DRAINAGE AND STORM SEWER COORDINATION Bendix Drive’s drainage improvements require more than conventional storm sewer installation, with the proposed system transitioning from a 36-inch storm sewer network south of the NICTD railroad to an extensive 18-inch perforated- pipe collection system north of the railroad. The project includes numerous new and modified catch basins, inlets, and manholes that must be coordinated with existing drainage infrastructure, utilities, roadway grades, and the railroad corridor. North of the NICTD railroad, the 18-inch perforated pipe is installed within a stone and geotextile trench associated with the proposed hybrid V-bottom ditch. Justin will closely monitor pipe grades and elevations, structure connections, trench and aggregate installation, geotextile placement, and protection of the perforated system throughout construction. The team will coordinate the new system with existing City drainage facilities and verify connections before they are covered. This proactive approach will see that the completed system performs as designed. Voorde Drive looking East Bendix Drive looking North Bendix Drive and Lathrop Street Intersection CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 8 MAINTENANCE OF TRAFFIC CONSIDERATIONS Our team recognizes that construction will require carefully planned mainte- nance of traffic and phased operations to minimize impacts to the traveling public and adjacent businesses. We approach these challenges with proactive planning, continuous communication, and disciplined construction adminis- tration. Maintaining safe vehicular, pedestrian, and bicycle movements while completing roadway reconstruction, drainage improvements, utility work, and intersection improvements will require coordination between the Contractor, City, utility owners, and project stakeholders. Temporary traffic control devices and pedestrian routes will be inspected throughout construction to verify they remain safe, functional, and compliant with project requirements.UTILITY COORDINATION As with most construction projects, utility coordination will play a role in the success of the overall project schedule. We are committed to leading the coordination effort so that utilities are relocated quickly and efficiently to minimize conflicts. Existing underground and overhead utilities—including water, sanitary sewer, storm sewer, gas, electric, telecommunications, and fiber optic facilities—are expected within the project limits and may require relocation, protection, adjustment, or coordination during construction. Justin will work closely with utility owners, the contractor, and the Owner to verify relocation schedules, identify conflicts early, document field changes, and minimize delays to critical construction activities. PROJECT COMMITMENT Successful delivery requires proactive field coordination, continuous monitoring of traffic control, timely identification of unforeseen conditions, and close coordination among project stakeholders. Our team’s experience with roadway reconstruction, maintenance of traffic, and public stakeholder coordination provides the technical knowledge and field leadership necessary to successfully administer the Bendix Drive Reconstruction Project. Contract R-44115 is scheduled for INDOT letting on March 10, 2027. American Structurepoint has conducted site visits and reviewed project information. From Notice to Proceed through Final Acceptance, our team will be visible, responsive, and proactive—protecting the City’s investment while delivering a safe, high-quality project for the South Bend community. PHASE LOCATION WORK / TRAFFIC MAINTENANCE DETOUR ROUTE General Bendix Drive Detour route applies for all construction phases. Bendix Drive detour via Lincoln Way West, US 31, and Nimtz Parkway Phase I Bendix Drive between Lathrop Street and 0.1 miles north of Lathrop Street IA: Construct west half while maintaining one southbound lane. IB: Construct east half while maintaining one southbound lane. Lathrop Street detour via Foundation Drive → Boland Drive → Bendix Drive → Portage Avenue. Phase II Bendix Drive between the NICTD Railroad and Lathrop Street Full closure of Bendix Drive. Phase III Bendix Drive between the NICTD Railroad and Voorde Drive IIIA: Construct east half while maintaining one southbound lane. IIIB: Construct west half while maintaining one southbound lane. PROJECT UNDERSTANDING AND APPROACH CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 9 INSPECTING YOUR PROJECT Having provided inspection services on road projects throughout the state, our team possesses a high level of familiarity with these types of projects. This familiarity will be valuable to the construction of Bendix Drive because we can assist you with: • Financial management of the project.• Maintaining the construction schedule. • Managing the coordination among contractors, stakeholders, and designers. • Coordination with INDOT (confirming City of South Bend’s interests are heard prior to INDOT authorizing any change orders). Our project team has led, managed, and/or inspected multiple projects in South Bend, and in the INDOT LaPorte District, and we can use this experience to provide a streamlined, efficient, and well-organized project. This experience has led our staff to build excellent relationships with INDOT, local contractors, and utility companies. TECHNICAL APPROACH All of our construction inspection staff are trained to use a very deliberate and detailed approach to their work in both the technical and communication aspects, including: • Work with contractors and subcontractors firmly while being mindful of what’s fair for everyone. • Detailed inspection where new work fits into existing features. • Thorough knowledge and complete understanding of the plans and specifications. • Thinking about the long-term effects of our decisions. • Addressing issues quickly and concisely.• Detailed project paperwork and records. • Keeping up to date on the latest technologies and all required certifications. • Daily agreement on quantities with the contractor• Completing and turning in final construction records within 45 days of job acceptance. DETAILED APPROACH We have also developed an approach specifically tailored for this project that includes: • Detailed preconstruction documentation of existing conditions, including photographs. • Constant communication with South Bend residents and businesses near the project site to resolve concerns and/or issues quickly. • Periodic stakeholder meetings throughout construction to verify all current information is available and questions/concerns are addressed. • Coordination and cooperation with local elected officials, South Bend Community School Corporation, and emergency service providers, as well as the postal service and solid waste removal companies. • Review of maintenance-of-traffic and construction plans to identify deficiencies and minimize impact. • Coordination with all community events in the area. • Taking the lead in any utility coordination efforts to resolve utility conflicts quickly to keep the project on schedule (knowing all the local utility company contacts allows us to quickly respond to any issues that arise). • Reviewing erosion and sediment control measures to verify all permits are being satisfied. • Continued effective coordination with the design engineering firm. PROJECT UNDERSTANDING AND APPROACH EFFECTIVE COMMUNICATION Our approach to effective project communication includes: Face-to-face introduction at the beginning of the project Returning messages promptly Availability to those affected by the project (cell phone, email, fax, and the field office) Explanation letters to homeowners Following through and following up on directions given and received Weekly project forecasts with photographs to all stakeholders CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 10 PROJECT UNDERSTANDING AND APPROACH Our team will conduct regularly scheduled meetings with the City of South Bend to obtain your input, address any concerns, and identify potential project roadblocks. Our process, in conjunction with regular construction progress meetings, facilitates the thorough planning of construction phasing, verifies that project plans and specifications are adhered to, discusses and mitigates the consequences of unforeseen circumstances, and addresses any unresolved issues. Minutes will be taken for all meetings, with action items and responsible parties identified. We will be vigilant in following up with all parties so that action items are addressed in a timely manner and results are communicated to the owner. Ultimately, our proven, well-established approach and diligent preparation efforts afford us the opportunity to anticipate problems and be proactive to deliver positive results when dealing with the inevitable challenges encountered on this type of project. MAKING THIS A COMMUNITY PROJECT A well-informed and engaged stakeholder is an asset and plays a key role in the overall success of a project. An early action item for our team will be to develop direct lines of communication with all stakeholders. Based on our previous knowledge and understanding concerning projects of this type, we will accomplish this through: • Personal introductions to adjacent property owners.• Weekly project activity reports. • Progress meetings every two weeks.• One-on-one meetings with interested parties to review plans and project parameters. • Open-door policy for our field office. • Cell phone numbers on business cards. • Meeting with community officials and support agencies to garner buy-in. • Presentations at community or public meetings (as requested). Keeping the community aware of vital construction activities that affect their day-to-day life is crucial. Our Project Supervisor, Justin Sherman, will work with all team members to secure the best public image of this project throughout construction. Our team has experience speaking directly with residents; leading public meetings; and creating websites, flyers, mailings, and news releases that enhance public awareness of projects like yours. Another effective tool for communicating with the public will be to hold a public information meeting or groundbreaking ceremony prior to the start of construction. This can be accomplished on site and allows the residents in the area to view the construction plans and meet and obtain contact numbers for the project team. Bendix Drive looking north at NICTD crossing Bendix Drive looking south at NICTD crossing Intersection of Bendix Drive and Lathrop Street CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 11 PROJECT EXPERIENCE WHERE JUSTIN SHERMAN SERVED AS THE PROJECT SUPERVISOR AMERICAN STRUCTUREPOINT CHECKS ALL THE BOXES! TRUSTED PROJECT SUPERVISOR Justin Sherman is extremely qualified and experienced in the construction of similar roadway projects. His knowledge of the project site mitigates the concern for unexpected challenges. UNIQUE APPROACH Public outreach and stakeholder coordination will be a critical success factor. Our innovative techniques, combined with our local knowledge, will serve the best interests of the community and your project team. PROVEN SUCCESS We have experience on road and construction inspection projects of this caliber. Our team is primed with a solid understanding of INDOT/LPA requirements, specification, and procedures to support this project being constructed as planned. EDISON ROAD ADDED CENTER TURN LANE FROM IRONWOOD ROAD TO GORDON DRIVE SOUTH BEND, INDIANA This federal-aid LPA project required our construction inspection services to oversee the addition of a center turn lane to this busy existing four-lane road. To successfully accomplish this improvement, the roadway was widened to the north and south sides of Edison Road. Sidewalks, curb ramps, and drives were all removed and replaced to accommodate the new center turn lane. New striping, sod, and trees were also installed. All this construction work was completed and inspected by our professionals with minimal disruption to traffic. Minimizing the impacts to traffic was important due to the close proximity of this roadway to the University of Notre Dame, as Edison Road is one of the main thoroughfares used to access Notre Dame Stadium. Construction Cost: $364,866 Contract: R-33792 LASALLE SCHOOL AREA STORM SEWER SEPARATION SOUTH BEND, INDIANA American Structurepoint provided construction inspection services for this sewer separation project in the LaSalle School Area. Project limits included Elwood Avenue, Calhoun Street, Eclipse Place and Elliot Street. Drainage work included new storm sewers, replacement of inlets and catch basins, restoring water and sanitary sewer service connections, and bypass pumping to maintain sewer flow. Roadway elements included asphalt milling and resurfacing, removing and replacement of curb and gutters, driveways, sidewalks and curb ramps, and restoration of areas disturbed during construction. The project included installation of a new 3.5-acre retention basing that consisted of an energy dissipation area and discharge swale. Maintenance of traffic was critical due to the LaSalle Intermediate School. Construction Cost: $1.7M IRONWOOD ROAD AND AUTEN ROAD INTERSECTION IMPROVEMENTS GRANGER, INDIANA The project involved reconstruction of Ironwood Road and Auten Road with a roundabout. The overall project length on Ironwood Road and Auten Road was 0.25 mile, the roadway profile was lowered to increase sight distance at the intersection, and retaining walls were constructed to accommodate the difference in elevations. Roadway work included an asphalt mainline section with curb and gutter. Reconstruction was achieved through a pavement section consisting of 1.5 inches of QC/QA HMA surface on 3 inches of QC/QA HMA intermediate on 6.5 QC/QA HMA base on subgrade treatment type IA. The roundabout has 20-foot lanes with a 10-foot decorative concrete truck apron. Drainage work included installation of storm sewers on both roads. Construction Cost: $2.11M Contract: R-33234 CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 12 PROJECT EXPERIENCEPROOF OF PROJECT SUCCESS At American Structurepoint we practice what we preach. The following projects are proof of our disciplined application of plans, coordination with INDOT and local agencies, and ability to maintain quality, schedule, and compliance throughout construction. STATE BOULEVARD REALIGNMENT PHASE 2 FORT WAYNE, INDIANA American Structurepoint provided construc- tion inspection services for this urban roadway realignment and bridge replacement project within a constrained corridor. Improvements included roadway widening, structure replace- ment, and pedestrian accommodations requiring detailed coordination and staging. Our inspec- tion staff documented quantities, tracked progress, and worked with stakeholders to support compliance with INDOT standards and maintain schedule on a multi-phase project. Construction Cost: $7.7M Contract: R-33130 HIVELY AVENUE RECONSTRUCTION ELKHART, INDIANA This 1.7-mile project reconstructed Hively Avenue from 400 feet east of Nappanee Road (SR 19) to Benham Avenue. Elements of the project included the construction of new storm sewer, water main, and center-turn lane for Hively Avenue. The centerpieces of the project were the installation of two roundabouts-one at Hively Avenue and 17th Street and the other at Hively Avenue and Oakland Avenue. Elements of the project included decorative concrete pavement, irrigation systems, decorative lighting, and land- scaping consisting of trees, shrubs, perennials, and ground cover. Additional work elements included the demolition of 6 residences, 21,000 cys of common excavation, 15,000 lft of new storm sewer, 9,200 lft of new 12-inch water main, 800 lft of new 8-inch water main, 2,200 lft of new sanitary sewer, 31,300 tons of QC/QA HMA pavement, 17,800 lft of concrete curb and gut- ter, 6,000 sys of concrete pavement, and over 15,000 lft of new concrete sidewalk. Construction Cost: $7.4M Contract: R-29445 COAL LINE TRAIL (PHASE 1) FROM LINCOLN WAY WEST TO RIVERSIDE DRIVE SOUTH BEND, INDIANA American Structurepoint provided construction inspection services for this federal-aid proj- ect that constructed a multi-use path along the abandoned railroad corridor from Lincoln Way West to Riverside Drive. The path consisted of concrete and asphalt pavement sections. Decorative concrete sidewalk along with a covered pavilion were installed at Muessel Grove Park. Drainage elements consisted of a new storm sewer system that discharges to an existing retention pond near Angela Blvd. Rest stops that included a bench and lighted bollard were constructed, along with other amenities such as bike rack and repair stations, drinking fountain, decorative bollards, wayfinding signage, and solar power beacons. Construction Cost: $1.9M Contract: R-38064 www.structurepoint.com