HomeMy WebLinkAboutOpening of Proposals - Bendix Phase 2 Improvements - American StucturepointCITY OF SOUTH BEND
BENDIX DRIVE
(LATHROP STREET TO
VOORDE DRIVE)
DES # 2100022
AUGUST 25, 2026
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)2026.02503 PAGE 1
August 25, 2026
Leslie Biek, PE
Assistant City Engineer
215 S Dr Martin Luther King Jr Blvd, Suite 400
South Bend, IN 46601
Dear Ms. Biek and Selection Committee Members:
At American Structurepoint, we are committed to delivering high-quality work, and we will bring that same commitment
to the Bendix Drive project. By understanding the project’s challenges and stakeholder priorities, our team will deliver
solutions that support your goals and reduce impacts on the community.
THE RIGHT TEAM FOR YOU The American Structurepoint team’s understanding of local conditions,
experience with LPA processes, and construction expertise provides a strong foundation for delivering the
Bendix Drive project. Our team is highly skilled, responsive, and experienced in municipal transportation
projects. Project Supervisor Justin Sherman brings valuable familiarity with LPA requirements and the City
of South Bend through his work on the Olive Street Reconstruction and Coal Line Trail Phase III projects.
This experience provides insight into City processes and expectations, enabling efficient, dependable
construction oversight and immediate project readiness.
LPA/INDOT KNOWLEDGE Effective construction oversight requires disciplined contract administration,
accurate documentation, compliance with INDOT standards, and proactive communication. Our team’s
extensive LPA and INDOT experience enables us to anticipate issues, maintain compliance, support
informed decision-making, and help the City deliver a quality project on schedule and in accordance with all
requirements.
MAINTAINING TRAFFIC AND LOCAL ACCESS Reconstructing Bendix Drive while maintaining
reliable access for businesses, residents, pedestrians, and the traveling public will be one of the project’s
most important challenges. Our team has extensive experience managing phased construction in active
corridors and understands the importance of planning each traffic shift, temporary driveway, and pedestrian
route before work begins. We will closely monitor MOT operations, maintain ADA-compliant pedestrian
access, and coordinate upcoming construction impacts with the City and affected stakeholders.
American Structurepoint is ready to partner with the City of South Bend to make the Bendix Drive project a success.
We welcome the opportunity to discuss our approach, demonstrate the value our team can bring, and expand our
partnership through our focus on on delivering a quality project that provides lasting value to the City of South Bend
and the Bendix Drive community.
Sincerely,
American Structurepoint, Inc.
John Tucker, PE
Project Manager
FIRM OVERVIEW
CAPACITY AND KEY STAFF
PROJECT UNDERSTANDING/ APPROACH
PROJECT EXPERIENCE
PG 2
PG 4
PG 7
PG 11
Justin Sherman
Project Supervisor
Zach Wolf, PE
Vice President
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 2
FIRM OVERVIEW
INDIANA’S INSPECTION LEADER
With more than 800 experts working in-house
across 11 disciplines, American Structurepoint
understands how to successfully move your
projects from concept to completion. We provide
a wealth of experience and resources dedicated
to helping you make your vision a reality. Since
opening our doors in 1966, our mission has been
to improve quality of life through our commitment
to communities. Offering strength in numbers,
stability that lasts, and innovative solutions, we
provide complete consulting and comprehensive
design services. When it comes to inspecting
the construction of a project, our experience
reaches well beyond the day-to-day activities of
a construction site. Our inspectors have the ability
to assist you with the financial management of
our project; keep contractors on task; monitor
schedules for key milestone and completion
dates; and coordinate the entire process of
bringing contractors, stakeholders, designers,
and the community together.
MCCORMICK ENGINEERING, LLC
SUBCONSULTANT
McCormick Engineering, LLC was established
in South Bend, Indiana in 2008 with one goal in
mind: to provide outstanding customer service to
the public sector. McCormick is a civil engineering
consulting firm passionate about helping
communities provide an improved quality of life to
the general public through public works projects.
McCormick’s construction inspection staff
leverage technology and use their experience in
transportation planning, design, and inspection to
provide an end product you will be proud of both
today and long into the future.
RESPONSIBLE OFFICE
American Structurepoint, Inc.202 S. Michigan Street, Suite 605 South Bend, IN 46601
TEL 317.547.5580
AUTHORIZED NEGOTIATOR
Steven J. Davidson, PEChief Strategy Officer
CELL 317.522.6888
EMAIL sdavidson@structurepoint.com
PERCENTAGES AND PREQUALIFICATIONS
American Structurepoint, Inc. - 95%McCormick Engineering, LLC - 5%
13.1 Construction InspectionAmerican Structurepoint dedicates as much as 2,000 hours a year to provide training for our inspection
staff. We keep this group armed with the newest technologies, regulations, and current methods for
providing inspection services.
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 3
FIRM OVERVIEWRESOURCES THAT STREAMLINE THE CONSTRUCTION PROCESS
The American Structurepoint team offers a variety of unique resources that provide value-added benefits and efficiency during the construction process.
TECHNICAL EXPERTISE
Over the last 60 years, our staff has provided
construction inspection services on more than
1,000 projects. Our inspectors have developed
an impressive set of technical capabilities that
allows them to document all the daily work tasks
performed at the job site. Our staff will use their
technical expertise on this project to:
• Track and document construction material
quantities
• Test and sample materials used
• Review daily maintenance of traffic
• Address all concerns for safety
• Maintain project accounting and contractor
payrolls
EFFICIENCY
The construction process can take a consider-
able amount of time, which is why keeping an
eye on efficiency throughout the entire project
is so important. To complete the construction
phase of this project in the most efficient manner
possible, our team will:
• Make timely and knowledgeable decisions
• Quickly evaluate immediate/long-term
effects of our decisions
• Coordinate among all parties through
transparency, communication, and fairness
• Quickly complete required project closeout
activities
• Prepare/submit final construction record
within 45 days of job acceptance
TOOLS
Our team is equipped with the most up-to-date
equipment to provide high-level service.
• Cell Phones
• Computer
• Drones
• All necessary PPE (Personal Protective
Equipment)
• Measuring Tapes and Wheels
• Digital Box Beam Levels
• Survey Rod and Level Sets
• Concrete Testing Equipment including
slump cones, air meters, and scales
• Dynamic Cone Penetrometers and
Lightweight Deflectometers (to measure
density/stiffness of soil or aggregates)
• One-point proctor equipment (to determine
maximum dry density and optimum
moisture of soil)AASHTOWARE PROJECT (AWP) TRAINING
INDOT’s move to AASHTOWare Project (AWP) is a major shift for construction administration. While most
consultants trained one staff member, American Structurepoint quickly acted on a late opening to train a second
individual—strengthening our ability to support this transition from day one.
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 4
JOHN TUCKER, PE
PROJECT MANAGER
John has provided leadership in American
Structurepoint’s Construction Solutions Group
since 2004. He has extensive experience over-
seeing projects across northern Indiana, providing
oversight for federal, state, and local public agen-
cies on federal-aid and locally funded road, bridge,
and utility infrastructure projects; assisting project
supervisors with project administration and field
operations observed by inspectors; and recording
work and material data. In addition, he manages
project funding and change orders, reports project
progress to owners, and troubleshoots construc-
tion and design issues. As project manager, John
will work closely with the project team to facilitate
and maintain regular communication with all stake-
holders, and verify our team has all the resources
needed to deliver a successful project.
EDUCATION
Bachelor of Science, Civil Engineering, Purdue University
LICENSE AND CERTIFICATIONS
Professional Engineer – Indiana, Ohio
INDOT Qualified Technician Tests
INDOT Project Engineer/Project Supervisor Workshop
INDOT Certified Technician (All Categories)
PROJECT EXPERIENCE
• Safe Routes to School Project near LaSalle School Area,
South Bend, Indiana
• LaSalle School Area Storm Sewer Separation, South
Bend, Indiana
• Hively Avenue Reconstruction, Elkhart, Indiana
• Chicago Street Reconstruction, Hammond, Indiana
• Central Avenue Reconstruction, Portage, Indiana
CAPACITY AND KEY STAFFOUR PEOPLE MAKE THE DIFFERENCE
The inspection team we’re proposing has been selected based on each member’s experience,
proximity to the project site, and availability throughout the entire construction schedule. Each
key staff member is fully committed to dedicating the time and effort to this project, which is what
your community deserves.
Our proposed team is fully committed to devoting 100 percent of their time to
the successful completion of this project. There are no resource limitations that
could adversely affect our team’s ability to properly staff and execute this project.
CAPACITY
American Structurepoint has one of the largest
and most experienced inspection groups in
Indiana. We employ more than 85 full-time,
certified inspectors. We routinely have over 120
staff in the field during the construction season
by utilizing trained in-house staff and experienced
seasonal personnel. American Structurepoint has
carefully considered our staffing and selected
only inspectors who have the capacity and ability
to deliver the highest-quality project on time and
within budget. When considering capacity, we
don’t just look at our workload here and now;
instead, we look at the entire duration of the
project to identify staff who will be committed to
this project from start to finish.
• More than 800 staff companywide
• Over 85 full-time, certified inspectors with the
ability to quickly double that using in-house
and seasonal personnel
• 100-percent committed staff
CITY OF SOUTH BEND
Leslie Biek, PE
PROJECT MANAGER
John Tucker, PE
CONSTRUCTION INSPECTORS
Aaron Duncan
Tracy McCormick, PE
As Needed
PROJECT SUPERVISOR
Justin Sherman
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 5
PROJECT EXPERIENCE
Olive Street Reconstruction, South Bend, Indiana*
As the Assistant Project Supervisor for the reconstruc-
tion of three quarters of a mile of Olive Street from SR 23
to the NS railroad tracks, Justin inspected and reported
quantities for all the contractors’ work throughout the
jobsite and documented all events, visitors, and hap-
penings on site. He also worked on field books, change
orders, and made Site Manager entries, including daily
reports, and material records as well as material testing
of concrete and sampling of QA/QC.
Edison Road Added Center Turn Lane from
Ironwood Road to Gordon Drive,
South Bend, Indiana
Justin served as Resident Project Representative
on this project which added a center turn lane to an
existing busy four-lane road. His duties included
verifying the daily compliance of work was monitored
and handling oversight of project paperwork, project
funds and materials. He also verified compliance with
standards, specifications and project plans through
visual inspections and testing. He reported project
progress to the owners and stakeholders, negotiated
change orders, handled troubleshooting of design and
constructability issues, and maintained various public
relocations.
169th Street Rehabilitation, Phase IV,
Hammond, Indiana
This $10 million project reconstructed one mile of 169th
Street from Southeastern Avenue to Lindberg Avenue.
The existing 4-lane section was reconstructed with new
storm sewers, sanitary sewer, water main, curb and
gutter, sidewalk, utility relocation, QC/QA HMA asphalt
pavement, signage, greenery, and signals.
Hively Avenue Reconstruction, Elkhart, Indiana
This 1.7-mile project reconstructed Hively Avenue
from 400 feet east of Nappanee Road (SR 19) to
Benham Avenue. Elements of the project included
the construction of new storm sewer, water main, and
center-turn lane for Hively Avenue. The centerpieces
of the project were the installation of two roundabouts
one at Hively Avenue and 17th Street and the other at
Hively Avenue and Oakland Avenue.
JUSTIN SHERMANPROJECT SUPERVISOR
Justin brings 18 years of construction management and inspection experience
and will provide hands-on leadership as Project Supervisor for the Bendix
Drive reconstruction. He will oversee the construction inspection team, mon-
itor the contractor’s progress, and serve as a primary point of communication
between the City, INDOT, contractor, utilities, and project stakeholders. Justin’s
approach emphasizes clear, timely communication and proactive issue reso-
lution, allowing concerns to be identified and addressed before they impact
the project. His goal is a successful project delivery from notice to proceed
through final acceptance.
EDUCATION
Bachelor of Science, History, Ball State University
LICENSE AND CERTIFICATIONS
INDOT Certified Technician (All Categories)
INDOT AASHTOWare Project (AWP)
INDOT Utility Coordination Certification
INDOT Railroad Coordination Certification
INDOT Storm Water Quality Management Level 1
IWEA Water and Sewage Construction Inspection
OSHA 10-hour Construction Safety Course
FAA - Certified UAS Pilot
CAPACITY AND KEY STAFFEXPERIENCED LEADER FOR BENDIX DRIVE
THOROUGH PROJECT RECORDS
Supports the project with thorough
documentation of construction
activities and accurate daily
records.
PLANS & SPECIFICATIONS
Carefully reviews work for
compliance with contract plans and
specifications to help ensure quality
construction.
READY ON DAY ONE
Experienced with INDOT and LPA
procedures, allowing him to step
into the role with no learning curve.
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 6
AARON DUNCAN
CONSTRUCTION INSPECTOR
As a construction inspector, Aaron’s responsibilities include construction
observation of the quality and progress of field work, verifying contractor work
conforms to the construction documents and specifications, documentation
and reporting of daily field activities, acting as a liaison between the
contractors and the project supervisor, material testing observations, field
measurements, and quantity estimates.
EDUCATION
Bachelor of Science, Civil Engineering, Purdue University
LICENSE AND CERTIFICATIONS
INDOT Qualified Technician Tests
IWEA Water & Sewer Construction Observation
INDOT Certified Technician (All Categories)
PROJECT EXPERIENCE
• Airport Road Reconstruction Phase 3, Gary, Indiana
• 45th Avenue Reconstruction - Phase 3, Lake County, Indiana
• US 421 & US 24 Road Reconstruction and Resurface, Monticello, Indiana
• Buffington Harbor Access Road, Gary, Indiana
TRACY MCCORMICK, PE
MCCORMICK ENGINEERING
CONSTRUCTION INSPECTOR, AS NEEDED
Tracy is experienced in planning, design, and construction observation of
civil engineering projects. She is client focused, results oriented, and self-
directed. By communicating with clients throughout the life cycle of projects
she can see to it that expectations are understood and achieved by both
parties. As a co-founder of McCormick Engineering, she is self-directed and
results oriented.
EDUCATION
Bachelor of Science, Civil Engineering, Purdue University
LICENSE AND CERTIFICATIONS
Professional Engineer - Indiana
INDOT Certified Technician
INDOT Construction Storm Water Certification
PROJECT EXPERIENCE
• CR 17 Multi-Use Path & Bridge, Elkhart County, Indiana
• CR 18 at CR 13/115 Intersection Improvement, Elkhart County, Indiana
• INDOT BMP Water Quality Measures, Indiana
• Striebel Arm Detention Facility, Michigan City, Indiana
• The Retreat, Indianapolis, Indiana
• 45th Avenue Reconstruction, Phase 2A, Lake County, Indiana
• Bristol Street Reconstruction Project, Elkhart, Indiana
CAPACITY AND KEY STAFF
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 7
PROJECT UNDERSTANDING AND APPROACH
WHY OUR TEAM
American Structurepoint has assembled a highly qualified team that combines proven INDOT construction
inspection experience with the local knowledge, technical expertise, and collaborative culture necessary to
successfully deliver the Bendix Drive Reconstruction Project. Our team understands that successful construc-
tion administration extends well beyond documentation and inspection—it requires proactive communication,
sound engineering judgment, and a commitment to anticipating and resolving issues before they impact the
project schedule, budget, or traveling public.
Our team has successfully delivered construction engineering and inspection services on complex roadway,
bridge, and multimodal projects throughout northern Indiana. We understand the expectations of The City of
South Bend, INDOT, local public agencies, contractors, utility owners, and stakeholders, and we apply that knowl-
edge to provide consistent, high-quality inspection services from Notice to Proceed through Final Acceptance.
Justin Sherman brings extensive experience administering reconstruction projects involving complex main-
tenance of traffic, utility relocations, phased construction, ADA compliance, traffic signal improvements, and
coordination with adjacent businesses and the public. McCormick Engineering complements these capabilities
with additional resources and technical depth.
PROJECT UNDERSTANDING
Bendix Drive is a roadway reconstruction project between Lathrop Street and Voorde Drive. The existing roadway
will be reduced from a four-lane roadway into a safer, three-lane corridor. The project includes full-depth concrete
pavement reconstruction, a center shared left-turn lane, new curb and gutter, storm sewer improvements, ADA-
compliant sidewalk and curb ramps, a multi-use path, pavement markings, and traffic signal improvements. The
project will require careful consideration of traffic operations, pedestrian and bicycle connectivity, drainage, utilities,
and long-term corridor safety while maintaining access to adjacent commercial and industrial properties.
Bendix Drive is located adjacent to South Bend International Airport and crosses the NICTD Railroad tracks, requiring
coordination with airport operations and railroad facilities while maintaining safe and reliable traffic flow throughout
construction. The corridor also serves industrial and commercial. Construction staging and maintenance of traffic will
require a coordinated approach to minimize impacts to motorists, pedestrians, businesses, railroad operations, and
emergency services.
DRAINAGE AND STORM SEWER COORDINATION
Bendix Drive’s drainage improvements require more than conventional storm sewer installation, with the proposed
system transitioning from a 36-inch storm sewer network south of the NICTD railroad to an extensive 18-inch perforated-
pipe collection system north of the railroad. The project includes numerous new and modified catch basins, inlets, and
manholes that must be coordinated with existing drainage infrastructure, utilities, roadway grades, and the railroad
corridor. North of the NICTD railroad, the 18-inch perforated pipe is installed within a stone and geotextile trench
associated with the proposed hybrid V-bottom ditch. Justin will closely monitor pipe grades and elevations, structure
connections, trench and aggregate installation, geotextile placement, and protection of the perforated system
throughout construction.
The team will coordinate the new system with existing City drainage facilities and verify connections before they are
covered. This proactive approach will see that the completed system performs as designed.
Voorde Drive looking East
Bendix Drive looking North
Bendix Drive and Lathrop Street Intersection
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 8
MAINTENANCE OF TRAFFIC CONSIDERATIONS
Our team recognizes that construction will require carefully planned mainte-
nance of traffic and phased operations to minimize impacts to the traveling
public and adjacent businesses. We approach these challenges with proactive
planning, continuous communication, and disciplined construction adminis-
tration. Maintaining safe vehicular, pedestrian, and bicycle movements while
completing roadway reconstruction, drainage improvements, utility work, and
intersection improvements will require coordination between the Contractor,
City, utility owners, and project stakeholders. Temporary traffic control
devices and pedestrian routes will be inspected throughout construction to
verify they remain safe, functional, and compliant with project requirements.UTILITY COORDINATION
As with most construction projects, utility coordination will play a role in the
success of the overall project schedule. We are committed to leading the
coordination effort so that utilities are relocated quickly and efficiently to
minimize conflicts. Existing underground and overhead utilities—including
water, sanitary sewer, storm sewer, gas, electric, telecommunications, and
fiber optic facilities—are expected within the project limits and may require
relocation, protection, adjustment, or coordination during construction. Justin
will work closely with utility owners, the contractor, and the Owner to verify
relocation schedules, identify conflicts early, document field changes, and
minimize delays to critical construction activities.
PROJECT COMMITMENT
Successful delivery requires proactive field coordination, continuous
monitoring of traffic control, timely identification of unforeseen conditions,
and close coordination among project stakeholders.
Our team’s experience with roadway reconstruction, maintenance of traffic,
and public stakeholder coordination provides the technical knowledge
and field leadership necessary to successfully administer the Bendix Drive
Reconstruction Project.
Contract R-44115 is scheduled for INDOT letting on March 10, 2027.
American Structurepoint has conducted site visits and reviewed project
information.
From Notice to Proceed through Final Acceptance, our team will be
visible, responsive, and proactive—protecting the City’s investment while
delivering a safe, high-quality project for the South Bend community.
PHASE LOCATION WORK / TRAFFIC
MAINTENANCE
DETOUR
ROUTE
General Bendix Drive Detour route applies for
all construction phases.
Bendix Drive
detour via
Lincoln Way
West, US 31, and
Nimtz Parkway
Phase I Bendix Drive
between Lathrop
Street and 0.1
miles north of
Lathrop Street
IA: Construct west half
while maintaining one
southbound lane.
IB: Construct east half
while maintaining one
southbound lane.
Lathrop Street
detour via
Foundation
Drive → Boland
Drive → Bendix
Drive → Portage
Avenue.
Phase II Bendix Drive
between the
NICTD Railroad
and Lathrop
Street
Full closure of Bendix
Drive.
Phase III Bendix Drive
between the
NICTD Railroad
and Voorde
Drive
IIIA: Construct east half
while maintaining one
southbound lane.
IIIB: Construct west half
while maintaining one
southbound lane.
PROJECT UNDERSTANDING AND APPROACH
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 9
INSPECTING YOUR PROJECT
Having provided inspection services on road projects throughout the state, our team possesses a high level
of familiarity with these types of projects. This familiarity will be valuable to the construction of Bendix Drive
because we can assist you with:
• Financial management of the project.• Maintaining the construction schedule.
• Managing the coordination among contractors,
stakeholders, and designers.
• Coordination with INDOT (confirming City
of South Bend’s interests are heard prior to
INDOT authorizing any change orders).
Our project team has led, managed, and/or inspected multiple projects in South Bend, and in the INDOT LaPorte
District, and we can use this experience to provide a streamlined, efficient, and well-organized project. This
experience has led our staff to build excellent relationships with INDOT, local contractors, and utility companies.
TECHNICAL APPROACH
All of our construction inspection staff are trained to use a very deliberate and detailed approach to their work
in both the technical and communication aspects, including:
• Work with contractors and subcontractors firmly
while being mindful of what’s fair for everyone.
• Detailed inspection where new work fits into
existing features.
• Thorough knowledge and complete
understanding of the plans and specifications.
• Thinking about the long-term effects of our
decisions.
• Addressing issues quickly and concisely.• Detailed project paperwork and records.
• Keeping up to date on the latest technologies
and all required certifications.
• Daily agreement on quantities with the contractor• Completing and turning in final construction
records within 45 days of job acceptance.
DETAILED APPROACH
We have also developed an approach specifically tailored for this project that includes:
• Detailed preconstruction documentation of
existing conditions, including photographs.
• Constant communication with South Bend
residents and businesses near the project site to
resolve concerns and/or issues quickly.
• Periodic stakeholder meetings throughout
construction to verify all current information
is available and questions/concerns are
addressed.
• Coordination and cooperation with local
elected officials, South Bend Community School
Corporation, and emergency service providers,
as well as the postal service and solid waste
removal companies.
• Review of maintenance-of-traffic and
construction plans to identify deficiencies and
minimize impact.
• Coordination with all community events in the
area.
• Taking the lead in any utility coordination efforts
to resolve utility conflicts quickly to keep the
project on schedule (knowing all the local utility
company contacts allows us to quickly respond
to any issues that arise).
• Reviewing erosion and sediment control
measures to verify all permits are being satisfied.
• Continued effective coordination with the design
engineering firm.
PROJECT UNDERSTANDING AND APPROACH EFFECTIVE COMMUNICATION
Our approach to effective project communication includes:
Face-to-face introduction at the beginning of the project
Returning messages promptly
Availability to those affected by the project (cell phone, email, fax, and the field office)
Explanation letters to homeowners
Following through and following up on directions given and received
Weekly project forecasts with photographs to all stakeholders
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 10
PROJECT UNDERSTANDING AND APPROACH
Our team will conduct regularly scheduled meetings with the City of South Bend to
obtain your input, address any concerns, and identify potential project roadblocks.
Our process, in conjunction with regular construction progress meetings, facilitates the
thorough planning of construction phasing, verifies that project plans and specifications
are adhered to, discusses and mitigates the consequences of unforeseen circumstances,
and addresses any unresolved issues. Minutes will be taken for all meetings, with action
items and responsible parties identified. We will be vigilant in following up with all parties
so that action items are addressed in a timely manner and results are communicated to
the owner. Ultimately, our proven, well-established approach and diligent preparation
efforts afford us the opportunity to anticipate problems and be proactive to deliver
positive results when dealing with the inevitable challenges encountered on this type of
project.
MAKING THIS A COMMUNITY PROJECT
A well-informed and engaged stakeholder is an asset and plays a key role in the
overall success of a project. An early action item for our team will be to develop direct
lines of communication with all stakeholders. Based on our previous knowledge and
understanding concerning projects of this type, we will accomplish this through:
• Personal introductions to adjacent
property owners.• Weekly project activity reports.
• Progress meetings every two weeks.• One-on-one meetings with interested
parties to review plans and project
parameters.
• Open-door policy for our field office.
• Cell phone numbers on business
cards.
• Meeting with community officials and
support agencies to garner buy-in.
• Presentations at community or public
meetings (as requested).
Keeping the community aware of vital construction activities that affect their day-to-day
life is crucial. Our Project Supervisor, Justin Sherman, will work with all team members
to secure the best public image of this project throughout construction. Our team has
experience speaking directly with residents; leading public meetings; and creating
websites, flyers, mailings, and news releases that enhance public awareness of projects
like yours.
Another effective tool for communicating with the public will be to hold a public
information meeting or groundbreaking ceremony prior to the start of construction. This
can be accomplished on site and allows the residents in the area to view the construction
plans and meet and obtain contact numbers for the project team.
Bendix Drive looking north at NICTD crossing
Bendix Drive looking south at NICTD crossing
Intersection of Bendix Drive and Lathrop Street
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 11
PROJECT EXPERIENCE WHERE JUSTIN SHERMAN SERVED AS THE PROJECT SUPERVISOR AMERICAN STRUCTUREPOINT CHECKS ALL THE BOXES!
TRUSTED PROJECT SUPERVISOR
Justin Sherman is extremely qualified and experienced in the construction of similar roadway projects. His knowledge of the project site mitigates the concern for unexpected challenges.
UNIQUE APPROACH
Public outreach and stakeholder coordination will be a critical success factor. Our innovative techniques, combined with our local knowledge, will serve the best interests of the community and your project team.
PROVEN SUCCESS
We have experience on road and construction inspection projects of this caliber. Our team is primed with a solid understanding of INDOT/LPA requirements, specification, and procedures to support this project being constructed as planned.
EDISON ROAD ADDED CENTER TURN LANE FROM IRONWOOD ROAD TO GORDON DRIVE
SOUTH BEND, INDIANA
This federal-aid LPA project required our construction inspection
services to oversee the addition of a center turn lane to this busy
existing four-lane road. To successfully accomplish this improvement,
the roadway was widened to the north and south sides of Edison
Road. Sidewalks, curb ramps, and drives were all removed and replaced to accommodate the new center
turn lane. New striping, sod, and trees were also installed. All this construction work was completed and
inspected by our professionals with minimal disruption to traffic. Minimizing the impacts to traffic was
important due to the close proximity of this roadway to the University of Notre Dame, as Edison Road is
one of the main thoroughfares used to access Notre Dame Stadium.
Construction Cost: $364,866 Contract: R-33792
LASALLE SCHOOL AREA STORM SEWER SEPARATION
SOUTH BEND, INDIANA
American Structurepoint provided construction inspection services
for this sewer separation project in the LaSalle School Area. Project
limits included Elwood Avenue, Calhoun Street, Eclipse Place and
Elliot Street. Drainage work included new storm sewers, replacement
of inlets and catch basins, restoring water and sanitary sewer service
connections, and bypass pumping to maintain sewer flow. Roadway elements included asphalt milling
and resurfacing, removing and replacement of curb and gutters, driveways, sidewalks and curb ramps,
and restoration of areas disturbed during construction. The project included installation of a new 3.5-acre
retention basing that consisted of an energy dissipation area and discharge swale. Maintenance of traffic
was critical due to the LaSalle Intermediate School.
Construction Cost: $1.7M
IRONWOOD ROAD AND AUTEN ROAD INTERSECTION IMPROVEMENTS
GRANGER, INDIANA
The project involved reconstruction of Ironwood Road and Auten
Road with a roundabout. The overall project length on Ironwood Road
and Auten Road was 0.25 mile, the roadway profile was lowered to
increase sight distance at the intersection, and retaining walls were
constructed to accommodate the difference in elevations. Roadway work included an asphalt mainline
section with curb and gutter. Reconstruction was achieved through a pavement section consisting of 1.5
inches of QC/QA HMA surface on 3 inches of QC/QA HMA intermediate on 6.5 QC/QA HMA base on
subgrade treatment type IA. The roundabout has 20-foot lanes with a 10-foot decorative concrete truck
apron. Drainage work included installation of storm sewers on both roads.
Construction Cost: $2.11M Contract: R-33234
CITY OF SOUTH BEND - BENDIX DRIVE (LATHROP STREET TO VOORDE DRIVE)AMERICAN STRUCTUREPOINT PAGE 12
PROJECT EXPERIENCEPROOF OF PROJECT SUCCESS
At American Structurepoint we practice what we preach. The following projects are proof of our disciplined application of plans, coordination with INDOT and local agencies, and ability to maintain quality, schedule, and compliance throughout construction.
STATE BOULEVARD REALIGNMENT PHASE 2 FORT WAYNE, INDIANA
American Structurepoint provided construc-
tion inspection services for this urban roadway
realignment and bridge replacement project
within a constrained corridor. Improvements
included roadway widening, structure replace-
ment, and pedestrian accommodations requiring
detailed coordination and staging. Our inspec-
tion staff documented quantities, tracked
progress, and worked with stakeholders to
support compliance with INDOT standards and
maintain schedule on a multi-phase project.
Construction Cost: $7.7M
Contract: R-33130
HIVELY AVENUE RECONSTRUCTION
ELKHART, INDIANA
This 1.7-mile project reconstructed Hively Avenue
from 400 feet east of Nappanee Road (SR 19)
to Benham Avenue. Elements of the project
included the construction of new storm sewer,
water main, and center-turn lane for Hively
Avenue. The centerpieces of the project were
the installation of two roundabouts-one at Hively
Avenue and 17th Street and the other at Hively
Avenue and Oakland Avenue. Elements of the
project included decorative concrete pavement,
irrigation systems, decorative lighting, and land-
scaping consisting of trees, shrubs, perennials,
and ground cover. Additional work elements
included the demolition of 6 residences, 21,000
cys of common excavation, 15,000 lft of new
storm sewer, 9,200 lft of new 12-inch water main,
800 lft of new 8-inch water main, 2,200 lft of
new sanitary sewer, 31,300 tons of QC/QA HMA
pavement, 17,800 lft of concrete curb and gut-
ter, 6,000 sys of concrete pavement, and over
15,000 lft of new concrete sidewalk.
Construction Cost: $7.4M
Contract: R-29445
COAL LINE TRAIL (PHASE 1) FROM LINCOLN WAY WEST TO RIVERSIDE DRIVE
SOUTH BEND, INDIANA
American Structurepoint provided construction
inspection services for this federal-aid proj-
ect that constructed a multi-use path along the
abandoned railroad corridor from Lincoln Way
West to Riverside Drive. The path consisted
of concrete and asphalt pavement sections.
Decorative concrete sidewalk along with a
covered pavilion were installed at Muessel
Grove Park. Drainage elements consisted of a
new storm sewer system that discharges to an
existing retention pond near Angela Blvd. Rest
stops that included a bench and lighted bollard
were constructed, along with other amenities
such as bike rack and repair stations, drinking
fountain, decorative bollards, wayfinding
signage, and solar power beacons.
Construction Cost: $1.9M
Contract: R-38064
www.structurepoint.com