HomeMy WebLinkAbout620 West LaSalle Avenue_AA 2026-0818Sarah Andrews,
President
HISTORIC
PRESERVATION
COMMISSION
OF
SOUTH BEND
AND
ST. JOSEPH
COUNTY
CERTIFICATE
OF
APPROPRIATENESS
The Historic Preservation Commission of South Bend and St.
Joseph County has approved the following work:
Remove 3 feet of chimney and rebuild with salvaged and new
brick to match in color and density. REplace and repair flue
liner as needed. Install new precast chimney cap.
LAW'S TRU STONE LLC, Contractor
for the following location:
620 LASALLE AVE
South Bend, IN, 46601
Application No. 2026-0818
in the County of St. Joseph; State of Indiana; which is:
Located in a Local Historic District
A Local Historic Landmark
and found this application to be appropriate according to the Standards
pertaining to Local Historic Landmarks and/or Local Historic Districts.
Regulations pertaining to the Historic Preservation Commission are
found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter
26 of the St. Joseph County Code.
The issuance of this certificate does NOT in any manner, release
the recipient from the responsibility of complying with the requirements
of the zoning ordinances, building codes, safety codes, ADA or other
requirements of the City of South Bend, the County of St. Joseph, the
State of Indiana, or the United States Federal Government.
This certificate is good for one year from the date of issuance and
is effective from the date entered herein. Plans are on file and open for
public inspection at the office of the Historic Preservation Commission of
South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400
S, South Bend, Indiana, during normal business hours.
THIS CERTIFICATE IS NOT TRANSFERABLE
NAME OF APPLICANT:Clare Maher
CERTIFICATE ISSUED BY:
Ross Van Overberghe
Historic Preservation Administrator
POST IN A CONSPICUOUS PLACE ON THE STREET SIDE
OF THE PROJECT UNTIL COMPLETION OF ALL WORK.
Phone: (574) 235-9371
E-mail: SBSJCHPC@southbendin.gov
ROSS VAN OVERBERGHE
Historic Preservation
Administrator
8/21/2026DATE CERTIFICATE
TAKES FORCE:8/21/2027DATE CERTIFICATE
EXPIRES:
ADMINISTRATIVE APPROVAL
Tuesday, August 18, 2026
Application for Certificate of
Appropriateness
Important Information Regarding this Request
REQUIRED DOCUMENTATION AND SITE PLANS
The Historic Preservation Commission of South Bend and St. Joseph County cannot process an Application
without required documentation. Comprehensive documentation provides a complete understanding of the
project. Problems often occur during a project review or during the execution of the project when the
property owner, staff or commissioners are unclear as to project specifics. Applications will NOT be
processed without required documentation.
Photographs may be submitted in digital format or in photographic print. When a project involves
blueprints and/or site plans, one (1) set shall be submitted with the Application. Any documentation
submitted to this office cannot be returned to the applicant.
APPLICATION FEE
The application processing fee for any Application for a Certificate Of Appropriateness is $20
Payment must accompany the application at the time of submission. For an electronically submitted
application, payment must reach the HPC office within 48 hours following transmission. Payment can be
made by credit card by contacting
Business License Administrator Michelle Adams at (574) 235-5912; by cash in person in the Department of
Community Investment on the 14th floor of the County City Building; or by check made out to City of
South Bend. Applications will NOT be processed without the required fee.
MEETING ATTENDANCE
When an Application has been scheduled for any meeting, the owner, architect or contractor(s) retained for
the project shall attend the meeting where their project will be reviewed and a decision rendered. Failure by
the owner, architect, or contractor to attend such meetings may result in denial of the Application due to
insufficient representation.
CERTIFICATE ISSUANCE
Certificates of Appropriateness will be filed with the Building Department of South Bend and St. Joseph
County. A copy of the Certificate will be emailed directly to the owner and/or contractor(s) listed on the
application.
INSPECTION AUTHORITY
All projects will be inspected during and following execution for compliance with the decision(s) rendered
by the Historic Preservation Commission of South Bend and St. Joseph County.
1
Owner acknowledges that while the Historic Preservation Commission only considers Certificates of
Appropriateness for exterior features, under certain circumstances it may be necessary for the Commission
Staff to have access to the interior of the building in order to accurately assess the condition of the exterior
feature and that the lack of access to the interior may prevent the Commission Staff from making a
favorable recommendation.
Any work performed on a historic landmark or in an historic district which does not conform to the
Certificate of Appropriateness certificate shall be immediately halted by the Historic Preservation
Commission and the Building Department of South Bend and St. Joseph County. Fines may be levied for
projects not in compliance.
I read and understand the information
above:Yes, Continue
Date Tuesday, August 18, 2026
2
Proper ty Information
Property Address for Proposed Work:620 W Lasalle Ave
Property City South Bend
Property Zip Code 46601
Property Owner Information:Clare Maher
Owner Email
Owner Address 620 W Lasalle Ave
Proposed Work and Project Information
All projects must comply with applicable building and zoning codes.
South Bend Zoning Ordinance St. Joseph County Zoning Ordinance
Does your project involve any of the
following? (Check all that apply):Roofs
Contractor Information Law’s Tru Stone Chimney Jeremy Law
Contractor Phone Number (574) 855-3145
Contractor Email jeremy@lawstrustone.com
Description of Proposed Work:
Originally applied for COA and was approved IN 2024, that contractor fell through. Chimney has continued
to deteriorate and in need of repair prior to winter. Demolition ONLY referencing removal and replacement
of damaged brick, nothing else material to structure.
Demolition
-Demolition of crown and top +/- 3 feet of compromised brick/mortar joints and rebuild with new materials
to match at best.
-Inspect exposed interior flue liners upon demolition and advise if further restoration is needed at
additional cost.
Top flue liners
Replace top flue liners and apply surrounding cement board and foam for anti-rot and flex protection for
expansion.
Pre Cast Cap
Install new pre-cast cap.
NP1
Apply NP1 polyurethane caulk at brick and flashing upon completion.
Acid Wash
Acid wash work rendered as needed.
3
Siloxane sealant
Seal work rendered with Siloxane sealant to help prevent water penetration and preserve masonry.
Recommended every 3-5 years for maintenance.
Specification of Material via
Manufacture Brochure:PDF Estimate_3542_fr….pdf
File Upload
Site Plans, Aerial Views, and/or Blueprints: One (1) set shall be submitted with the Application.
Uploaded documentation must show existing property lines, buildings, structures, and proposed project
location(s). Hand Drawn Plans/Elevations are ok
Photographs to include: each area affected by project, close up detail of project areas.
Windows, Siding, and/or Door projects must include photographs of each window/door/siding affected
by the project and detailed close up of condition
Applications will not be processed if the required photographs and/or documentation are not
included.
Any documentation submitted to this office cannot be returned to the applicant.
Project Type - List:Roofs
Overhead View of Proposed Project
Location(s):
248.2 KB
4
Quote/Evaluation(s) by Repair Professional (Optional):
PDF Estimate_3542_from_Laws_Tru_St….pdf
Photographs:
966.02 KB 1.11 MB
5
1.63 MB 1005.31 KB
Payment
Invoice ID # INV-000274
Payment Method Pay via Card or PayPal
6
Law's Tru Stone LLC
PO Box 16
Edwardsburg, MI 49112 US
+15748553145
jeremy@lawstrustone.com
Estimate
ADDRESS
Clare Maher
620 W Lasalle Ave
South Bend, IN
ESTIMATE #3542
DATE 08/18/2026
EXPIRATION DATE 09/08/2026
FILE NUMBER
13656
ACTIVITY QTY RATE AMOUNT
Demolition
-Demolition of crown and top +/- 3 feet of compromised
brick/mortar joints and rebuild with new materials to
match at best.
-Inspect exposed interior flue liners upon demolition and
advise if further restoration is needed at additional cost.
Top flue liners
Replace top flue liners and apply surrounding cement
board and foam for anti-rot and flex protection for
expansion.
Pre Cast Cap
Install new pre-cast cap.
NP1
Apply NP1 polyurethane caulk at brick and flashing upon
completion.
Acid Wash
Acid wash work rendered as needed.
Siloxane sealant
Seal work rendered with Siloxane sealant to help prevent
water penetration and preserve masonry. Recommended
every 3-5 years for maintenance.
Debris Removal
Remove all related debris from work rendered and clean
job site.
Line Items
Profile of work described below will be added to grand
total of estimate if elected to proceed.
1 0.00
Flashing
Install new counter flashing & seal to brick with
polyurethane caulk. ($640)
1 0.00 0.00
LTS Contract
Laws Tru Stone will make every attempt to provide an
accurate estimate of work to be rendered and cost of
ACTIVITY QTY RATE AMOUNT
project. However, there are rare situations where
underlying issues may be present behind originally
quoted work that we cannot foresee. Most often this is
exposed upon demo. In these rare situations if additional
work and materials are needed to make the project safe
and correct, there would be additional charges to the
originally quoted price which would be discussed with the
customer as soon as the situation may arise.
Please be advised as with any restoration an exact
material match is difficult based on age and wear of
existing product and new product. . Law's Tru Stone will
make every effort to match and blend as close as
possible to the existing product however please be
prepared for variation in color and texture.
Laws Tru Stone LLC hereby proposes to furnish labor
and materials in a workmanlike manner (according to
standard practices) until completion.
Changes to the scope of work requested by purchaser
must be estimated, and additional agreement must be
signed before the additional work may commence.
Estimate (figures/totals) is approximated and subject to
change after 10 days. One year warranty on labor. Law's
Tru Stone reserves the right to hire a subcontractor in the
event it is needed.
Laws Tru Stone strives to offer the best materials
available. However, due to the nature of the restoration
process, brick/joint sizes, textures, and color may
differentiate from the existing structure’s material. Any
concerns must be addressed before any work begins.
Efflorescence is a sodium deposit on surfaces of
masonry, stucco or concrete. It is whitish in appearance,
and can be difficult to remove depending on the source
and severity of the “stain”. Efflorescence can often but
not always be removed from masonry by applying
solvents. However, if the source of the sodium is not
addressed efflorescence may reappear. Sources may
include but are not limited to composition of the structure,
ground water, and road salt.
Additionally, the estimation may change due to a
deviation in the scope of work after the job has
commenced. Law’s Tru Stone will communicate any
additional costs promptly. Law’s Tru Stone is not
responsible for compensating additional costs accrued
by additional work. Please be advised that any estimate
totaling over $2,000.00 will be subject to a 50% deposit
at time of scheduling.
LTS Contract cont.
Upon the acceptance and signing of this proposal by the
purchaser this estimate becomes a binding legal contract
between the seller and the purchaser, whose signatures
appear below and is contingent upon delays due to
ACTIVITY QTY RATE AMOUNT
weather, acts of God and/or other cases beyond the
control of the seller. Any and all permits required by
local, state or federal governments pertaining to masonry
work rendered are the sole and complete responsibility of
the purchaser.
In the case of suspending masonry installation at any
time by the request of the purchaser to the seller, any
and all ensuing expense thereof, including the time and
travel of the seller and/or their employees and
independent contractors to said job site to complete said
project, it is expressly agreed that all expenses shall be
assumed and paid by the purchaser hereof.
For any/all projects relating to excavation, it is imperative
that all utility lines be located. All lines need to be flagged
and painted; this protects seller’s installers from injury
and harm. It also protects purchaser’s investments from
liability issues with regard to property damage. The
locates usually include electric lines, gas lines, city
utilities, telephone lines, TV cable etc. and any
underground pipelines that could affect immediate area
of installation.
Upon receipt of purchasers signed contract and deposit
seller will immediately schedule the installation process
and notify the states central location office for location of
primary utility lines of property said. Please note that
purchaser is responsible for informing seller and locating
all self-ran and secondary lines in and around of property
said which also includes irrigation and/or septic systems.
Purchaser agrees to pay invoice in full according to
payment terms described on proposal per attached. In
addition, purchaser agrees to pay seller the greater of
monthly interest computed at 2% per month on any past
due amount or monthly late fee of $20.00. If purchaser
fails to pay invoice according to payment terms
purchaser recognizes and agrees that seller shall have
the right to file a lien against purchaser’s property.
Purchaser agrees to be responsible for and pay all of the
seller’s costs of collection and/or enforcement of the
contract, including without limitation, attorney fees, court
costs, and recording fees.
Acceptance of proposal; the prices and specifications are
satisfactory and hereby accepted. By signing purchaser
also agrees to terms described in contract per attached.
SIGNATURE:
DATE:
Materials 435.00 435.00
Building Cost:Labor 3,000.00 3,000.00
Services -75.00 -75.00
TOTAL $3,360.00
Accepted By Accepted Date
Law's Tru Stone LLC
PO Box 16
Edwardsburg, MI 49112 US
+15748553145
jeremy@lawstrustone.com
Estimate
ADDRESS
Clare Maher
620 W Lasalle Ave
South Bend, IN
ESTIMATE #3542
DATE 08/18/2026
EXPIRATION DATE 09/08/2026
FILE NUMBER
13656
ACTIVITY QTY RATE AMOUNT
Demolition
-Demolition of crown and top +/- 3 feet of compromised
brick/mortar joints and rebuild with new materials to
match at best.
-Inspect exposed interior flue liners upon demolition and
advise if further restoration is needed at additional cost.
Top flue liners
Replace top flue liners and apply surrounding cement
board and foam for anti-rot and flex protection for
expansion.
Pre Cast Cap
Install new pre-cast cap.
NP1
Apply NP1 polyurethane caulk at brick and flashing upon
completion.
Acid Wash
Acid wash work rendered as needed.
Siloxane sealant
Seal work rendered with Siloxane sealant to help prevent
water penetration and preserve masonry. Recommended
every 3-5 years for maintenance.
Debris Removal
Remove all related debris from work rendered and clean
job site.
Line Items
Profile of work described below will be added to grand
total of estimate if elected to proceed.
1 0.00
Flashing
Install new counter flashing & seal to brick with
polyurethane caulk. ($640)
1 0.00 0.00
LTS Contract
Laws Tru Stone will make every attempt to provide an
accurate estimate of work to be rendered and cost of
ACTIVITY QTY RATE AMOUNT
project. However, there are rare situations where
underlying issues may be present behind originally
quoted work that we cannot foresee. Most often this is
exposed upon demo. In these rare situations if additional
work and materials are needed to make the project safe
and correct, there would be additional charges to the
originally quoted price which would be discussed with the
customer as soon as the situation may arise.
Please be advised as with any restoration an exact
material match is difficult based on age and wear of
existing product and new product. . Law's Tru Stone will
make every effort to match and blend as close as
possible to the existing product however please be
prepared for variation in color and texture.
Laws Tru Stone LLC hereby proposes to furnish labor
and materials in a workmanlike manner (according to
standard practices) until completion.
Changes to the scope of work requested by purchaser
must be estimated, and additional agreement must be
signed before the additional work may commence.
Estimate (figures/totals) is approximated and subject to
change after 10 days. One year warranty on labor. Law's
Tru Stone reserves the right to hire a subcontractor in the
event it is needed.
Laws Tru Stone strives to offer the best materials
available. However, due to the nature of the restoration
process, brick/joint sizes, textures, and color may
differentiate from the existing structure’s material. Any
concerns must be addressed before any work begins.
Efflorescence is a sodium deposit on surfaces of
masonry, stucco or concrete. It is whitish in appearance,
and can be difficult to remove depending on the source
and severity of the “stain”. Efflorescence can often but
not always be removed from masonry by applying
solvents. However, if the source of the sodium is not
addressed efflorescence may reappear. Sources may
include but are not limited to composition of the structure,
ground water, and road salt.
Additionally, the estimation may change due to a
deviation in the scope of work after the job has
commenced. Law’s Tru Stone will communicate any
additional costs promptly. Law’s Tru Stone is not
responsible for compensating additional costs accrued
by additional work. Please be advised that any estimate
totaling over $2,000.00 will be subject to a 50% deposit
at time of scheduling.
LTS Contract cont.
Upon the acceptance and signing of this proposal by the
purchaser this estimate becomes a binding legal contract
between the seller and the purchaser, whose signatures
appear below and is contingent upon delays due to
ACTIVITY QTY RATE AMOUNT
weather, acts of God and/or other cases beyond the
control of the seller. Any and all permits required by
local, state or federal governments pertaining to masonry
work rendered are the sole and complete responsibility of
the purchaser.
In the case of suspending masonry installation at any
time by the request of the purchaser to the seller, any
and all ensuing expense thereof, including the time and
travel of the seller and/or their employees and
independent contractors to said job site to complete said
project, it is expressly agreed that all expenses shall be
assumed and paid by the purchaser hereof.
For any/all projects relating to excavation, it is imperative
that all utility lines be located. All lines need to be flagged
and painted; this protects seller’s installers from injury
and harm. It also protects purchaser’s investments from
liability issues with regard to property damage. The
locates usually include electric lines, gas lines, city
utilities, telephone lines, TV cable etc. and any
underground pipelines that could affect immediate area
of installation.
Upon receipt of purchasers signed contract and deposit
seller will immediately schedule the installation process
and notify the states central location office for location of
primary utility lines of property said. Please note that
purchaser is responsible for informing seller and locating
all self-ran and secondary lines in and around of property
said which also includes irrigation and/or septic systems.
Purchaser agrees to pay invoice in full according to
payment terms described on proposal per attached. In
addition, purchaser agrees to pay seller the greater of
monthly interest computed at 2% per month on any past
due amount or monthly late fee of $20.00. If purchaser
fails to pay invoice according to payment terms
purchaser recognizes and agrees that seller shall have
the right to file a lien against purchaser’s property.
Purchaser agrees to be responsible for and pay all of the
seller’s costs of collection and/or enforcement of the
contract, including without limitation, attorney fees, court
costs, and recording fees.
Acceptance of proposal; the prices and specifications are
satisfactory and hereby accepted. By signing purchaser
also agrees to terms described in contract per attached.
SIGNATURE:
DATE:
Materials 435.00 435.00
Building Cost:Labor 3,000.00 3,000.00
Services -75.00 -75.00
TOTAL $3,360.00
Accepted By Accepted Date