Loading...
HomeMy WebLinkAbout2017-03-09 Beck's Lake Testing ScheduleBeck's Lake Field Investigation Schedule ID Task Name Ouratton [Start Finish July 1 Septamhar 1 1 November 1 January 1 1 March 1 May 1 July 1 _ 1. 6/5 713 . 7/$1 812,8. 19/25 10/23 11/20 12/18 1/15 2112 3/12 4/9 SJ7 6/4 712 1 •7N i;Sled Hill Excavation and Soil Sample Collection 6 days Tue 7/12/16 Tue 7/19/16 T _ 2 'Sled Hill Soil Sample Analysis and Data Validations s wks Wed 7/20/16 Fri 9/23/16 E 3 ,Geophysical Survey 10 days Mon 7/18/16 Fri 7/29/16 4 �Expadl[ed Area - Soil, GW, Soil Gas Install and Sample 16 days Mon 7126116 Fri 8112116 5 Groundwater well install (4 shallow, 3 deep) 5 days Mon 7/25/16 Fri 7/29/16 6 Install Vapor Points (2 locations x2 points) 1 day Mon 8/1/16 Mon 8/1/16 ' 7 Soil Borings (18) and Groundwater Grab Samples (6) 4 days Tue 8/2116 Fri 8/5/16 8 Surface Soil Sampling (22 locations) 4 days Mon 8/8/16 Thu 8/11/16 9 • Groundwater Well Samples (3) and Slug Tests (3-7) 2 days Wed 6/10/16 Thu 8/11/16 ® 1 LO I Sample Vapor Points (4) 1 day Fri 8/12/16 Fri 8/12/16 11 ;Expedited Area Sample Analysis and Data Validation 10.6 wks Mon 8/15/16 Wed 10/26/16 32 �Expedlted Data Summary Report 5 wks Thu 10/27/16 Wed 11/30/16 13 'EPA review (30 days) 6.2 wks Wed 11/30/16 Wed 1/11/17 { 14 IExpd RI Rpt & Health Risk Asmnt 10.6 wks Thu 1/12/17 Mon 3127117 f f 1 15 [Surface Water and Sediment Collection 5 days Mon 7/25/16 Fri 7129/16 16 Surface Water and Sediment Analysis and Data Validation 8.6 wks Wed 8/3116 Fri 9/30/16 17 Surface Soil Sample Collection 9 days Mon 8/15/16 Thu 8/25/16 IIB 18 Surface Soil Sample Analysis and Data Validation 8.8 wks Fri 8/26/16 Wed 10/26/16 19 Soil Borings — Soil Sample Collection 17 days Tue 9/6/16 Wed 9/28/16 YD IGroundwater grab Sample Collection 17 days Tue 9/6/16 Wed 9/28/16 21 (Soft and GW grab Sample Analysis and Data Validation 15.8 wks Thu 9/29/16 Tue 1/17/17 22 Monitor Well Installation (remaining wells) 8 days Wed 9/28/16 Fri 10!1/16 23 GW Levels, Survey, Sampling, Slug Test 8 days Tue 10111116 Thu 10/20/16 24 Graurldwafer Sample Analysis and Data Validation 12.6 wks Fri 10/21/16 Tue 1/17/17 [ ] 25 Sell Gas Vapor Point Installation 3 days Wed 10/5/16 Fri 1017116 N 26 Sell Gas Sample Collection 1 day Tue 11/1116 Tue 11/1116 27 Solt Gas Sample Analysis and Data Validation 7.2 wks Wed 11/2/16 Wed 12/21/16 28 LPA Data Summary Report 11.2 wks Tue 1/17/17 Tue 4/4/17 - 29 TEPA review (30 days) 5 wks Wed 4/5/17 Tue 5/9117 3o ILPA RI Rpt & Risk Asmnt 13 wks Wed 5/10/17 Tue 818117 1 Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Becks Date: Lake Site V6 1 of 1 Thu 3/9/17 Split p •••• ••-•••-• External Tasks Inactive Summa [Y Manual Summa Summary �� Progress WSP I Parsons Brinckerhoff Milestone External Milestone Manual Task f I Start -only Manual Progress Summary I Inactive Task Duration -only Page 1 Finish -only