HomeMy WebLinkAboutRTA & Title Sheet - Potawatomi Park Ph 2A Proj No 125-050AC
HADA.KNIPR DEREPSIGE
RNo. 10300102STATE OFTENIG
N
EL ANOINSSOFENIDIAA
ER07-07-2026OLIVE ST.MIAMI STREETU.S. 31 MICHIGAN IRELANDSTREETEWINGS.R. 23 WESTERN AVE.S.R. 2ROADST.JEFFERSONBLVD.McKINLEY HWY.ST. JOSEPH RIVER
LOGAN
IRONWOOD
S.R
.
2
3CITY LIMITSSAMPLE ST.EDISON RD.HICKORY TOLL ROAD (80/90)BRICK RDGRAPE RD
DOUGLAS RDGRA
N
D
T
R
U
N
K
W
E
S
T
E
R
NJEFFERSON BLVDMISHAWAKA AVELINCOLNWAY EASTFIR RD
MAIN STMAIN ST
S.R. 331
IRONWOOD DR
CONRAIL (U.S. 20)INWOOD ROADFIR RDDRAGOONTRAIL GUMWOOD RDPORTAGE STU.S.31JUNIPER
HICKORY AUTEN RDMAYFLOWER RD.CITY LIMITSU.S. 20/LINCOLN WAYU.S. 31
S
.R
.
2
3ProjectLocationCITY OF SOUTH BEND, INDIANA, PREVAILING SPECIFICATIONS LATEST EDITION,TO BE USED WITH THESE PLANS.INDIANA ST.OTHERSTREETTRAFFICWATERSEWERPROJECT:CITY OF SOUTH BEND, INDIANADEPARTMENT OF PUBLIC WORKSPOTAWATOMI PARKIMPROVEMENTS, PHASE IIACITY PROJECT NO. 125-050ATABLE OF CONTENTSSTANDARD DRAWINGSPRESIDENTVICE PRESIDENTRECOMMENDED BYCITY STAFFDATEMEMBERMEMBERELIZABETH A. MARADIKAPPROVED BYBOARD OF PUBLIC WORKSBREANA N. MICOUJOSEPH R. MOLNARCity of South BendPLANS PREPARED FOR:South Bend City Hall, Suite 400,215 S. Dr. Martin Luther King Jr. BoulevardSouth Bend, Indiana 46601315 Jefferson BoulevardSouth Bend, IN. 46601T 574.232.8700F 574.251.4440abonmarche.comEngineering · Architecture· Land SurveyingBattle Creek GoshenBenton Harbor HobartLafayette South HavenSouth Bend ValparaisoABONMARCHECOPYRIGHT 2025 - ABONMARCHE CONSULTANTS, INC.DATECLERKHILLARY R. HORVATHMEMBERMURRAY L. MILLERASSISTANT CITY ENGINEERLESLIE BIEK, P.E.PLANNINGMICHAEL P. DIVITA, AICPDATECHAD A. KNIPPROFESSIONAL ENGINEER NO. PE10300102See Index SheetCONSTRUCTIONKYLE LUDLOW2-11Minimum Pavement Section2-12Pavement Details - Concrete Joints2-13Pavement Details - Concrete Joints2-16Pavement Details - Structure IsolationJoints2-28 Details - Residential Sidewalk2-31Details - Standard Curb2-38Details - Sidewalk Curb Ramp, Type B2-42Details - Sidewalk Curb Ramps: DetectableWarning Surface2-48Pavement Patching & Utility Cuts - Asphalt3-5Typical Structure Castings and AdjustingRings3-7Catch Basin3-10Pipe Bedding Detail6-1Service Point - Single Meter6-2Service Point - Single Meter6-8Signs - Stop Sign with Residential D3 Sign6-9Signs - Residential D3 Sign6-11Markings - Crosswalk and Turn Lane Arrow6-18Lighting - Layout and Design6-19Traffic and Lighting - Handhole Cover6-20Lighting - Foundation7-1 Temporary Gravel Construction Entrance7-2Inlet Protection Insert (Basket)7-3 Inlet Protection Along Curb7-4Temporary Silt Fence7-5Filter Sock7-6Concrete Washout7-7Erosion Control BlanketACI PROJECT NO. 25-1930CITY ENGINEERABIGAIL MAGAS, P.E.ABIGAIL E. MAGAS7/8/20267/8/20267/8/20267/8/2026Kyle Ludlow
BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM
Date 7/7/2026
Name Leslie Biek Department Engineering
BPW Date 7/14/2026 Phone Extension 9323
Review and Approval Required Prior to Submittal to Board
Diversity Compliance
and Inclusion Officer Officer Name
BPW Attorney Attorney Name Michael Schmidt
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Potawatomi Park Improvements Phase IIA
Project Number 125-050A: PROJ 683
Funding Source River East TIF
Account No. PR-49016
Amount $2,400,000
Terms of Contract
Purpose/Description RTA advertising 7/24 and 7/31 with bids due 8/11 for improvements at
Potawatomi Park.
For Change Orders Only
Amount of Increase Decrease
$
($ ) Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount: New Completion Date: