HomeMy WebLinkAbout805 Arch Avenue_AA 2026-0625BSarah Andrews,
President
HISTORIC
PRESERVATION
COMMISSION
OF
SOUTH BEND
AND
ST. JOSEPH
COUNTY
CERTIFICATE
OF
APPROPRIATENESS
The Historic Preservation Commission of South Bend and St.
Joseph County has approved the following work:
1. Replace window sashes in eastern second story window with
wood sashes to match style and pattern of other windows in
house.
2. Install aluminum siding on north and east facades of house to
match south and east facades.
3. Wrap window trim on east and north facades with aluminum.
*NO TRIM MAY BE REMOVED*
4. Wrap soffit and facsia of house and porches with aluminum to
match existing.
5. Replace north facade basement windows with glass block
6. Replace window sashes in garage with custom made wood
805 ARCH AVE
SOUTH BEND, IN, 46618
Edgewater Place
Application No. 2026-0625B
in the County of St. Joseph; State of Indiana; which is:
Located in a Local Historic District
A Local Historic Landmark
and found this application to be appropriate according to the Standards
pertaining to Local Historic Landmarks and/or Local Historic Districts.
Regulations pertaining to the Historic Preservation Commission are
found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter
26 of the St. Joseph County Code.
The issuance of this certificate does NOT in any manner, release
the recipient from the responsibility of complying with the requirements
of the zoning ordinances, building codes, safety codes, ADA or other
requirements of the City of South Bend, the County of St. Joseph, the
State of Indiana, or the United States Federal Government.
This certificate is good for one year from the date of issuance and
is effective from the date entered herein. Plans are on file and open for
public inspection at the office of the Historic Preservation Commission of
South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400
S, South Bend, Indiana, during normal business hours.
THIS CERTIFICATE IS NOT TRANSFERABLE
NAME OF APPLICANT:Andrew & Rebecca Czarnecki
CERTIFICATE ISSUED BY:
Ross Van Overberghe
Historic Preservation Administrator
POST IN A CONSPICUOUS PLACE ON THE STREET SIDE
OF THE PROJECT UNTIL COMPLETION OF ALL WORK.
Phone: (574) 235-9371
E-mail: SBSJCHPC@southbendin.gov
ROSS VAN OVERBERGHE
Historic Preservation
Administrator
6/29/2026DATE CERTIFICATE
TAKES FORCE:6/29/2027DATE CERTIFICATE
EXPIRES:
Ord No. 6846-80
Edgewater Place
ADMINISTRATIVE APPROVAL
Thursday, June 25, 2026
Application for Certificate of
Appropriateness
Important Information Regarding this Request
REQUIRED DOCUMENTATION AND SITE PLANS
The Historic Preservation Commission of South Bend and St. Joseph County cannot process an Application
without required documentation. Comprehensive documentation provides a complete understanding of the
project. Problems often occur during a project review or during the execution of the project when the
property owner, staff or commissioners are unclear as to project specifics. Applications will NOT be
processed without required documentation.
Photographs may be submitted in digital format or in photographic print. When a project involves
blueprints and/or site plans, one (1) set shall be submitted with the Application. Any documentation
submitted to this office cannot be returned to the applicant.
APPLICATION FEE
The application processing fee for any Application for a Certificate Of Appropriateness is $20
Payment must accompany the application at the time of submission. For an electronically submitted
application, payment must reach the HPC office within 48 hours following transmission. Payment can be
made by credit card by contacting
Business License Administrator Michelle Adams at (574) 235-5912; by cash in person in the Department of
Community Investment on the 14th floor of the County City Building; or by check made out to City of
South Bend. Applications will NOT be processed without the required fee.
MEETING ATTENDANCE
When an Application has been scheduled for any meeting, the owner, architect or contractor(s) retained for
the project shall attend the meeting where their project will be reviewed and a decision rendered. Failure by
the owner, architect, or contractor to attend such meetings may result in denial of the Application due to
insufficient representation.
CERTIFICATE ISSUANCE
Certificates of Appropriateness will be filed with the Building Department of South Bend and St. Joseph
County. A copy of the Certificate will be emailed directly to the owner and/or contractor(s) listed on the
application.
INSPECTION AUTHORITY
All projects will be inspected during and following execution for compliance with the decision(s) rendered
by the Historic Preservation Commission of South Bend and St. Joseph County.
1
Owner acknowledges that while the Historic Preservation Commission only considers Certificates of
Appropriateness for exterior features, under certain circumstances it may be necessary for the Commission
Staff to have access to the interior of the building in order to accurately assess the condition of the exterior
feature and that the lack of access to the interior may prevent the Commission Staff from making a
favorable recommendation.
Any work performed on a historic landmark or in an historic district which does not conform to the
Certificate of Appropriateness certificate shall be immediately halted by the Historic Preservation
Commission and the Building Department of South Bend and St. Joseph County. Fines may be levied for
projects not in compliance.
I read and understand the information
above:Yes, Continue
Date Thursday, June 25, 2026
2
Proper ty Information
Property Address for Proposed Work:805 Arch Avenue
Property City South Bend
Property Zip Code 46601
Property Owner Information:Rebecca and Andrew Czarnecki
Owner Email
Owner Address 805 Arch Avenue
Proposed Work and Project Information
All projects must comply with applicable building and zoning codes.
South Bend Zoning Ordinance St. Joseph County Zoning Ordinance
Does your project involve any of the
following? (Check all that apply):Fences, Landscaping Roofs
Windows, Siding, Doors
Contractor Information City of South Bend They will choose contractors
Description of Proposed Work:
Please see attached Scope of Work from Lead Protection Program.
Specification of Material via
Manufacture Brochure:PDF Scope of Work 3.pdf
File Upload
3
Site Plans, Aerial Views, and/or Blueprints: One (1) set shall be submitted with the Application.
Uploaded documentation must show existing property lines, buildings, structures, and proposed project
location(s). Hand Drawn Plans/Elevations are ok
Photographs to include: each area affected by project, close up detail of project areas.
Windows, Siding, and/or Door projects must include photographs of each window/door/siding affected
by the project and detailed close up of condition
Applications will not be processed if the required photographs and/or documentation are not
included.
Any documentation submitted to this office cannot be returned to the applicant.
Project Type - List:Fences, Landscaping, Roofs, Windows, Siding, Doors
Overhead View of Proposed Project
Location(s):PDF Scope of Work 3_7932.pdf
Site Plan or Aerial View of Proposed
Project Location(s):PDF Scope of Work 3_6522.pdf
Elevations (Existing and Proposed
New): PDF Scope of Work 3_1418.pdf
Quote/Evaluation(s) by Repair Professional (Optional):
PDF Scope of Work 3_665.pdf
Photographs:
PDF Scope of Work 3_2517.pdf
Payment
Invoice ID # INV-000262
Payment Method Pay via Card or PayPal
4
SPECS BY LOCATION/TRADE 6/11/2026
Bidding Open Date:
Bidding Close Date:
Project Manager:
Initial:
Case Number:
Devyn Unger
Phone:
26.7516Pre-Bid Site Visit:
805 Arch AvenueAddress:01 - Lead HazardsUnit:
General RequirementsLocation:0Approx. Wall SF: 0Ceiling/Floor SF:1 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
LBPGC01 1.00 ALCONSTRUCTION PERFORMANCE STANDARDS n/a n/a
It is the Bidding Contractor's responsibility to have all bids
comply with the Programs Residential Construction
Performance Standards and to include in every bid all items
associated with the written scope item (i.e. Scope written as
stabilize paint, it is the contractor's responsibility to include
needed items such as plastic, tape, HEPA vacuum, scrapers,
paint, etc.).
LBPGC02 1.00 GRLEAD-SPECIFIC LAWS, RULES, REGULATIONS &
GUIDELINES
n/a n/a
The execution of this work shall comply with all applicable
federal, state and local laws, rules, regulations and guidelines
for lead dust environments, including but not limited to: 29 CFR
1926.62 - Lead Construction Standard; 29 CFR1910.1200 -
Hazard Communication Standard; 40 CFR Part 745 -
Lead-Based Paint Poisoning Prevention in Certain Residential
Structures (EPA Regulations); 24 CFR Part 35 - HUD's Lead
Safe Housing Rule.
LBPGC03 1.00 ALPAINT COLOR n/a n/a
Owner's choice of color or match existing paint color as close
as possible when applicable. This does not include
encapsulant, which shall be white, unless otherwise specified or
approved.
LBPGC04 1.00 EANOTIFICATION REQUIREMENTS ________________
Make applicable notifications to state or local agencies, create
occupant protection plan, post job signs and secure lead hazard
reduction sites. If project includes Lead Abatement, Contractor
will be responsible for ISDH Notification and applicable fees.
LBPGC05 1.00 ALWORKER TRAINING AND SUPERVISION - ABATEMENT n/a n/a
All workers conducting "abatement" lead hazard reduction
activities must be trained and certified as lead abatement
workers and provide proof of valid state or EPA-approved
licenses or certificates. All persons acting as supervisors during
"abatement" lead hazard reduction activities must be trained
and certified as lead abatement supervisors and provide proof
of valid state or EPA-approved licenses or certificates.
LBPGC06 1.00 EAOCCUPANT PROTECTION ________________
Unit is occupied. Treatment of the dwelling unit interior is to be
completed within 5 calendar days, the work site will be
contained as to prevent the release of leaded dust and debris
into nonwork areas, treatment will not create other safety, health
or environmental hazards; and, at the end of the work on each
Page 1 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
General RequirementsLocation:0Approx. Wall SF: 0Ceiling/Floor SF:1 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
day, the work site and the area within at least 10 feet of the
containment area will be cleaned to remove any visible dust and
debris, and occupants will have safe access to sleeping areas,
a bathroom and kitchen facilities. Occupants will not be
permitted to enter the work site during the lead hazard reduction
activities until after the lead abatement project has been
completed and clearance is achieved. Contractor is responsible
for ensuring occupant protection is completed in accordance
with HUD rules and regulations.
LBPGC07 1.00 ALQUANTITY VERIFICATION n/a n/a
The quantities herein expressed within the specification are for
informational purposes only. Contractors shall be responsible
for obtaining their own quantity schedule. INCAA shall not be
held liable for any difference in estimated and actual quantities;
therefore, change orders will not be approved for differences in
quantities. Contractors shall immediately notify the INCAA
during the bidding process if field measurements vary
significantly from those estimated within this specification.
Contractor's bid shall be reflective of completing specified work
to eliminate lead hazards at the project site.
LBPGC08 1.00 EACLEAN TO CLEARANCE ________________
After completion of all lead hazard reduction activities, all work
areas shall be cleaned for clearance. Typical work practices
include, but are not limited to: wet mist, fold and remove all
containment polyethylene sheeting; HEPA vacuum all visible
surfaces including walls, floors, ceilings and window troughs
from the top down; detergent scrub all horizontal surfaces in
small sections using a 3-bucket system, changing rinse water
every 250 SF; completely rinse with clean water and new
equipment. After surfaces are dry, HEPA vacuum all visible
surfaces except ceiling.
The following lead dust hazards were identified in the residence
and must be addressed:
Room 2 - Window Sills
Room 6 - Floor
Room 11 - Window Sills
Room 13 - Window Sills
LBPGC09 1.00 EAWALL NAMING PROTOCOLS n/a n/a
Walls and attached components shall be identified with the
letters A, B, C & D. Wall A is always the wall that is closest to
the address elevation or the "street side" of the house. Moving
clockwise, the walls are then B, C, D.
Windows are provided a numerical number, which is reflected
on the site plans included in the Lead Inspection & Risk
Assessment Report.
LBPGC10 1.00 EABUILDING PERMIT REQUIRED ________________
The contractor is responsible for submitting this owner-prepared
work write up to the building department, applying for, paying for
and receiving a building permit(s) prior to starting any work.
LBPGC11 1.00 DUOWNER RESPONIBILITIES n/a n/a
Page 2 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
General RequirementsLocation:0Approx. Wall SF: 0Ceiling/Floor SF:1 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
The owner shall provide:
1. Utilities and sanitary facilities.
2. Remove all personnel items from work area.
3. All full and complete access to work areas.
4. Allow site access during normal work areas.
LBPGC12 1.00 DUSTABILIZE NON-LBP PAINT ________________
Deteriorated non-LBP has been identified in association with the
structure. to ensure proper cleaning and prevent lead-dust
hazards from non-LBP that contains lead below HUD/EPA
regulatory limits, loose paint shall be adequately removed prior
to final cleaning. After establishing any required floor
containment with polyethylene sheeting, mist defective paint
area with water. Aggressively remove all loose paint or
deteriorate substrate with a stiff bristled brush or broom.
Contractor may elect to: Repair any damaged substrate and
spot prime areas of deteriorated non-LBP paint to ensure that
paint does not become loose prior to clearance.
Project will fail clearance if any paint chips, dust or debris are
identified, regardless of source.
Location Total:____________
Page 3 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 1 - Front EntryLocation:0Approx. Wall SF: 0Ceiling/Floor SF:2 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
LBPD09 1.00 EADOOR PAINT REMOVAL--HISTORICAL PRESERVATION ________________
Workers must wear protective gloves, disposable, full body,
protective clothing and face shield. Protect all areas not to be
stripped. Strip lead-based paint containing door components
with a caustic stripper. use any recommended cover sheet in
accordance with manufacturer's specifications. Collect residue
and rinse water in 55 gal drums compatible with caustic.
Neutralize and rinse surface in accordance with manufacturer's
directions. Project Manager to approve prior to painting /
staining. Prime and paint door components with premium
acrylic latex if painted. If stained, stain to match existing.
Doors components have deteriorated lead-based paint.
Containment Required per 24 CFR 35.1345
Door Jamb and Threshold - To Exterior
Location Total:____________
Page 4 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 2 - Family RoomLocation:0Approx. Wall SF: 0Ceiling/Floor SF:3 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9436.2 4.00 EAWINDOW--SILL, JAMB, LINERS & STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
All exposed jamb paint must be stabilized and painted.
Window Trough - Windows 4, 5, 6, 20
Location Total:____________
Page 5 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 5 - Dining RoomLocation:0Approx. Wall SF: 0Ceiling/Floor SF:4 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9436.2 3.00 EAWINDOW--SILL, JAMB, LINERS & STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
All exposed jamb paint must be stabilized and painted.
Window Tough - Windows 1, 2, 3
Location Total:____________
Page 6 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 6 - Screened PorchLocation:0Approx. Wall SF: 0Ceiling/Floor SF:5 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9380 136.00 SFREPLACE FLOORING WOOD ________________
Remove package and dispose of lead containing flooring.
Install 3" wide #2 red oak. Sand, prime, and 3 coat with
polyurethane varnish.
Floor - All
9436.2 1.00 EAWINDOW--TROUGH, JAMB, STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
Window Casing, Sill and Trough, Window 23
LBPD11 1.00 EAINTERIOR DOOR - STABILIZE, PLANE & ADJUST ________________
After establishing any required floor containment with
polyethylene sheeting, remove door hinge pins and carry to a
fully contained lead work room. Place pins in plastic bag on
jamb for safekeeping. Plane door edges and adjust the hasp
and strike plate to minimize door/jamb friction and contact. Mist
deteriorated paint with water to the point of saturation. Remove
and replace stop molding with new stock. Clean and de-gloss
door with detergent wash, rinse, dry and HEPA vacuum any
paint chips, dust and debris. Spot prime and top coat with
premium acrylic latex. Re-install doors on hinges.
Door and components have deteriorated lead-based paint.
Containment Required per 24 CFR 35.1345
Double Doors and Casing - To Room 5
Trade: 219 Lead Abatement
LBPENCA 212.00 SFELASTOMERIC ENCAPSULANT ________________
After establishing any required floor containment with
polyethylene sheeting, prepare surface by degreasing and
deglossing. Apply any recommended primer and roll out a
liquid, polymer, elastomeric encapsulant to create a continuous
seal over the surface in accordance with manufacturer's
specifications. Product must be pre-approved prior to
installation. Use the required number of coats and coverage
rate of elastomeric to guarantee a minimum 20-year
manufacturer's warranty. Repair substrate as necessary to
ensure proper adhesion and performance.
Screen Frame - Side A, C, D
Posts and Beams - Side A, C, D
Ceiling - All
Siding - Side B
LBPPR02 6.00 LFREMOVE PAINT- CHEMICAL - TRIM ________________
Prepare area and protect adjacent areas not being stripped in
Page 7 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 6 - Screened PorchLocation:0Approx. Wall SF: 0Ceiling/Floor SF:5 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
accordance with manufacturer's directions. Provide adequate
worker protection. Apply chemical stripper and any
recommended cover sheet in accordance with manufacturer's
specifications. Neutralize and rinse surface in accordance with
manufacturer's directions. Collect residue and rinse water in 55
gal drums. Provide disposal of drums. Chemical must be
pre-approved by Project Manager. Following paint removal, the
Project Manager must inspect to verify completion. Upon
approval by Project Manager, prime and apply coat of paint to
owner's selection of standard paint colors. If repainting occurs
prior to Project Manager approval, Contractor shall remove all
paint again.
Threshold - Side B (To Room 5)
Location Total:____________
Page 8 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 7 - KitchenLocation:0Approx. Wall SF: 0Ceiling/Floor SF:6 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9436.2 1.00 EAWINDOW--TROUGH, JAMB, & STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
Any exposed Jamb paint must be stabilized and painted.
Window Trough - Window 22
LBPSCPI 73.00 SFSCRAPE AND PAINT - INTERIOR ________________
After establishing any required floor containment with
polyethylene sheeting, mist defective paint area with water to
the point of saturation.
Repair substrate as necessary to ensure proper adhesion and
performance and aggressively scrape all loose paint with a
scraper. Feather edges with a wet, 100-grit, sponge sanding
block. Detergent wash, rinse, allow to dry, and HEPA vacuum
all visible chips. Prime, caulk seams and top coat with premium
acrylic latex per manufacturer's instructions.
Components contain deteriorated lead-based paint.
Containment Required per 24 CFR 35.1345.
Wall - Side A
Location Total:____________
Page 9 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 8 - Basement StairsLocation:0Approx. Wall SF: 0Ceiling/Floor SF:7 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
LBPST01 8.00 RIREPLACE STAIRWELL - BASEMENT ________________
Wet mist, remove, wrap in polyethylene sheeting and dispose of
all lead-painted stairwell components. HEPA vacuum any paint
chips, dust and debris. Rebuild stairs to code, match existing
trim and materials as closely as possible.
Also satisfies Healthy Homes "Falls on Stairs" hazard.
Stair Tread, Riser and Stringers - Lower Section Only
Location Total:____________
Page 10 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 9 - 2nd Floor StairwayLocation:0Approx. Wall SF: 0Ceiling/Floor SF:8 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9436.2 1.00 EAWINDOW--TROUGH, JAMB, & STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
All exposed jamb paint must be stabilized and painted.
Window Jamb and Trough - Window 21
Location Total:____________
Page 11 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 10 - HallwayLocation:0Approx. Wall SF: 0Ceiling/Floor SF:9 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
LBPSCPI 9.00 SFSCRAPE AND PAINT - INTERIOR ________________
After establishing any required floor containment with
polyethylene sheeting, mist defective paint area with water to
the point of saturation.
Repair substrate as necessary to ensure proper adhesion and
performance and aggressively scrape all loose paint with a
scraper. Feather edges with a wet, 100-grit, sponge sanding
block. Detergent wash, rinse, allow to dry, and HEPA vacuum
all visible chips. Prime, caulk seams and top coat with premium
acrylic latex per manufacturer's instructions.
Components contain deteriorated lead-based paint.
Containment Required per 24 CFR 35.1345.
Door Casing - To Room 12
Trade: 219 Lead Abatement
LBPD05 4.00 EAINT-DOOR - HISTORIC ________________
Remove, package, dispose of door components as listed,
replace with like door components. Install all necessary door
hardware. Door finish to be similar to that of existing door. All
work to be completed following lead safe work practices and
applicable lead abatement regulations.
Door Casing and Jamb - To Rooms 11, 14, Closet
Door Jamb - To Room 13
Location Total:____________
Page 12 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 11 - Bedroom 1Location:0Approx. Wall SF: 0Ceiling/Floor SF:10 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9436.2 2.00 EAWINDOW--TROUGH, JAMB, & STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
All exposed jamb paint must be stabilized and painted.
Window Casing, and Trough - Windows 29, 30
LBPSCPT 14.00 SFSCRAPE AND PAINT - TRIM ________________
After establishing any required floor containment with
polyethylene sheeting, mist defective paint area with water to
the point of saturation.
Repair substrate as necessary to ensure proper adhesion and
performance and aggressively scrape all loose paint with a
scraper. Feather edges with a wet, 100-grit, sponge sanding
block. Detergent wash, rinse, allow to dry, and HEPA vacuum
all visible chips. Prime, caulk seams and top coat with premium
acrylic latex per manufacturer's instructions.
Components contain deteriorated lead-based paint.
Containment Required per 24 CFR 35.1345.
Baseboards - A, B, C, D
Trade: 219 Lead Abatement
LBPD05 1.00 EAINT-DOOR - HISTORIC ________________
Remove, package, dispose of door components as listed,
replace with like door components. Install all necessary door
hardware. Door finish to be similar to that of existing door. All
work to be completed following lead safe work practices and
applicable lead abatement regulations.
Door Casing and Jamb - To Closet
Location Total:____________
Page 13 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 12 - Bedroom 2Location:0Approx. Wall SF: 0Ceiling/Floor SF:11 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9436.2 3.00 EAWINDOW--TROUGH, JAMB, & STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
All exposed jamb paint must be stabilized and painted.
Window Trough - Windows 26, 27, 28
Location Total:____________
Page 14 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 13 - Bedroom 3Location:0Approx. Wall SF: 0Ceiling/Floor SF:12 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9436.2 1.00 EAWINDOW--TROUGH, JAMB, & STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
All exposed jamb paint must be stabilized and painted.
Window Trough - Window 25
9451 1.00 EAWOOD REPLACEMENT SASH - HISTORIC PRESERVATION
REQUIRED
________________
After establishing any required floor containment with
polyethylene sheeting, wet mist, remove, wrap in polyethylene
sheeting and dispose of sash, parting bead and interior stops.
Strip paint from jambs and interior stool/sill moldings with a heat
gun or chemical or caustic stripper. Mist any remaining
defective paint with water to the point of saturation. Wet scrape
interior and exterior trim. Detergent wash, rinse, allow to dry
and HEPA vacuum any paint chips, dust and debris. Prime and
top coat jamb with premium acrylic latex. Install custom-made
wood replacement sashes with matching muntin pattern, double
glazing, parting bead & interior stops. Repair & adjust window
weights & hardware for smooth operation. Prime and paint
sashes with premium acrylic latex and clean glass.
Window Casing, Sash and Trough - Window 32
LBPSCPT 19.00 SFSCRAPE AND PAINT - TRIM ________________
After establishing any required floor containment with
polyethylene sheeting, mist defective paint area with water to
the point of saturation.
Repair substrate as necessary to ensure proper adhesion and
performance and aggressively scrape all loose paint with a
scraper. Feather edges with a wet, 100-grit, sponge sanding
block. Detergent wash, rinse, allow to dry, and HEPA vacuum
all visible chips. Prime, caulk seams and top coat with premium
acrylic latex per manufacturer's instructions.
Components contain deteriorated lead-based paint.
Containment Required per 24 CFR 35.1345.
Baseboards - A, B, C, D
Door Casing - To Room 10
Trade: 219 Lead Abatement
LBPD05 1.00 EAINT-DOOR - HISTORIC ________________
Remove, package, dispose of door components as listed,
replace with like door components. Install all necessary door
hardware. Door finish to be similar to that of existing door. All
work to be completed following lead safe work practices and
applicable lead abatement regulations.
Page 15 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 13 - Bedroom 3Location:0Approx. Wall SF: 0Ceiling/Floor SF:12 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
Door Casing and Jamb - To Closet
Location Total:____________
Page 16 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 14 - Bathroom 2Location:0Approx. Wall SF: 0Ceiling/Floor SF:13 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9436.2 1.00 EAWINDOW--TROUGH, JAMB, & STABILIZE ________________
After establishing any required floor containment with
polyethylene sheeting. Temporarily remove window sashes.
Laminate trough/well with .027 aluminum coil stock. Mist
defective paint with water to the point of saturation. Wet scrape
all exposed paint on jambs and troughs. Wash with detergent
solution, rinse, allow to dry and HEPA vacuum all visible paint
chips, dust, and debris.
All exposed jamb paint must be stabilized and painted.
Window Trough - Window 31
Location Total:____________
Page 17 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 16 - Mecanical RoomLocation:0Approx. Wall SF: 0Ceiling/Floor SF:14 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
LBPD05 1.00 EAINT-DOOR - HISTORIC ________________
Remove, package, dispose of door components as listed,
replace with like door components. Install all necessary door
hardware. Door finish to be similar to that of existing door. All
work to be completed following lead safe work practices and
applicable lead abatement regulations.
Door - To Room 17
Location Total:____________
Page 18 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Room 17 - Storage RoomLocation:0Approx. Wall SF: 0Ceiling/Floor SF:15 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
LBPSCPI 42.00 SFSCRAPE AND PAINT - INTERIOR ________________
After establishing any required floor containment with
polyethylene sheeting, mist defective paint area with water to
the point of saturation.
Repair substrate as necessary to ensure proper adhesion and
performance and aggressively scrape all loose paint with a
scraper. Feather edges with a wet, 100-grit, sponge sanding
block. Detergent wash, rinse, allow to dry, and HEPA vacuum
all visible chips. Prime, caulk seams and top coat with premium
acrylic latex per manufacturer's instructions.
Components contain deteriorated lead-based paint.
Containment Required per 24 CFR 35.1345.
Wall - Side B
Location Total:____________
Page 19 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Exterior HouseLocation:0Approx. Wall SF: 0Ceiling/Floor SF:16 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9641 7.00 SQENCLOSE TYVEK/ALUMINUM SIDING ________________
Apply a Tyvek vapor barrier to enclose the lead containing paint.
Mark siding as LBP every 6'. Protect Tyvek with aluminum
siding and aluminum wrapped trim installed in accordance with
manufacturer's specifications. Enclose all LBP trim with
aluminum wrap. Owner's choice of pattern, color and
embossing. Match existing siding on Side A & B as closely as
possible.
Siding - Side C, D
Window Casings - Windows 20, 21, 22, 30, 31, 32
Door Casing - To Room 8
FTS01 722.00 SFBARE SOIL--INSTALL 4" MULCH AND LANDSCAPE
BARRIER
________________
Install a 4' wide, U.V. resistant landscape barrier over bare soil
with 6" landscape staples 1' on center, after mowing lawn as low
as practical. Overfill area with at least 4" of pine bark or
shredded hardwood mulch.
Remove existing landscaping if necessary to allow for
installation of new landscaping fabric and mulch.
Elevated lead levels identified in bare soil.
Exterior House Drip line - Side, A, B, C, D
Trade: 219 Lead Abatement
LBPENCA 98.00 SFELASTOMERIC ENCAPSULANT ________________
After establishing any required floor containment with
polyethylene sheeting, prepare surface by degreasing and
deglossing. Apply any recommended primer and roll out a
liquid, polymer, elastomeric encapsulant to create a continuous
seal over the surface in accordance with manufacturer's
specifications. Product must be pre-approved prior to
installation. Use the required number of coats and coverage
rate of elastomeric to guarantee a minimum 20-year
manufacturer's warranty. Repair substrate as necessary to
ensure proper adhesion and performance.
Screen Frame - Side A, C, D (Side D Porch)
Posts and Beams - Side A, C, D (Side D Porch)
Vent Cover - Side D (Gable Vent) & Side C (By Window 22)
LBPSOF2 85.00 LFENCLOSE SOFFIT/FASCIA-- ALUM ________________
After establishing any required ground contaiment with
polyethylene sheeting, mark "Lead Paint" every 10 linear feet.
Enclose soffit and fasica with aluminum soffit / fascia panels,
color selected by owner. Back caulk all seams with siliconized
acrylic to create a weathertight seal. HEPA vacuum all visible
paint chips, dust and debris.
Homeowner to approve color and finish. Must match Side A &
B as closely as possible.
Soffit and Fascia has deteriorated lead-based paint.
Page 20 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Exterior HouseLocation:0Approx. Wall SF: 0Ceiling/Floor SF:16 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 219 Lead Abatement
Containment Required per 24 CFR 35.1345
Soffit and Fascia - Side C & D (Main House)
Soffit and Fascia - Side A, C, D (Side D Porch)
LBPW04 2.00 EAWINDOW - REMOVE AND INSTALL GLASS BLOCK IN
OPENING
________________
After establishing any required floor containment with
polyethylene sheeting, wet mist, remove, wrap in polyethylene
sheeting and dispose of all interior and exterior window
components. Install glass block per manufacturer's specs, tool
joints, install expansion spacers around perimeter and mortar to
existing foundation or framing. Trim exterior and interior to
match existing.
Window Casing and Sash - Windows 35, 36
Location Total:____________
Page 21 of 27
805 Arch AvenueAddress:01 - Lead HazardsUnit:
Exterior GarageLocation:0Approx. Wall SF: 0Ceiling/Floor SF:17 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
9451 4.00 EAWOOD REPLACEMENT SASH - HISTORIC PRESERVATION
REQUIRED
________________
After establishing any required floor containment with
polyethylene sheeting, wet mist, remove, wrap in polyethylene
sheeting and dispose of sashes, parting bead and interior stops.
Strip paint from jambs and interior stool/sill moldings with a heat
gun or chemical or caustic stripper. Mist any remaining
defective paint with water to the point of saturation. Wet scrape
interior and exterior trim. Detergent wash, rinse, allow to dry
and HEPA vacuum any paint chips, dust and debris. Prime and
top coat jamb with premium acrylic latex. Install custom-made
wood replacement sashes with matching muntin pattern, double
glazing, parting bead & interior stops. Repair & adjust window
weights & hardware for smooth operation. Prime and paint
sashes with premium acrylic latex and clean glass.
Window Casing and Sash - Windows G1, G2, G3, G4
9522 1.00 EAEXTERIOR DOOR - STABILIZE & ADJUST ________________
After establishing any required floor containment with
polyethylene sheeting, mist defective paint with water to the
point of saturation. Plane exterior door edges and adjust hasp
and strike plate to minimize door/jamb friction. Wet scrape door
jambs and trim. Clean and degloss with detergent solution.
Rinse to neutral and allow to dry. HEPA vacuum any paint
chips, dust and debris. Spot prime and top coat with premium
acrylic latex.
Door and Casing - Side A (Man Door)
Trade: 219 Lead Abatement
LBPENCA 795.00 SFELASTOMERIC ENCAPSULANT ________________
After establishing any required floor containment with
polyethylene sheeting, prepare surface by degreasing and
deglossing. Apply any recommended primer and roll out a
liquid, polymer, elastomeric encapsulant to create a continuous
seal over the surface in accordance with manufacturer's
specifications. Product must be pre-approved prior to
installation. Use the required number of coats and coverage
rate of elastomeric to guarantee a minimum 20-year
manufacturer's warranty. Repair substrate as necessary to
ensure proper adhesion and performance.
Siding - Side A, B, C, D
Soffit - Side A, C, D
Fascia - Side A, C
Door Casing - Side B (Overhead)
Location Total:____________
Page 22 of 27
Unit Total for 805 Arch Avenue, Unit 01 - Lead Hazards:____________
805 Arch AvenueAddress:02 - Healthy HomesUnit:
Damp and Mold GrowthLocation:0Approx. Wall SF: 0Ceiling/Floor SF:1 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 15 Roofing
4567 30.00 SFROOF--REPAIR SHINGLES ________________
Carefully remove any damaged shingles without damaging any
surrounding roof components. Replace missing or damaged
shingles with matching shingles.
When installing under existing shingles higher on the roof fasten
the new shingles by gently prying up existing shingles. Add
roofing felt under the repaired area as necessary to maintain a
continuous layer maintaining a waterfall installation. The
finished repair will be water tight.
Roof leak - Room 6 - Screened Porch
Location Total:____________
Page 23 of 27
805 Arch AvenueAddress:02 - Healthy HomesUnit:
Asbestos, Silica and Other MMFLocation:0Approx. Wall SF: 0Ceiling/Floor SF:2 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 9 Environmental Rehab
2080 80.00 LFASBESTOS INSUL-ENCAPSULATE ________________
Encapsulate asbestos pipe or duct covering with approved
sealants per EPA requirements.
Duct wrap throughout basement on joints and boots.
Location Total:____________
Page 24 of 27
805 Arch AvenueAddress:02 - Healthy HomesUnit:
Carbon Monoxide and Fuel CombustioLocation:0Approx. Wall SF: 0Ceiling/Floor SF:3 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 23 Electric
LBPSMOK 3.00 EASMOKE DETECTOR - 10 YEAR BATTERY POWERED ________________
Install a ceiling mounted 10 year battery Smoke Detector such
as the First Alert Smoke Alarm SA305CN3.Install smoke alarms
inside each bedroom, outside each sleeping area and on every
level of the home, including the basement. On levels without
bedrooms, install alarms in the living room (or den or family
room) or near the stairway to the upper level, or in both
locations. Smoke alarms installed in the basement should be
installed on the ceiling at the bottom of the stairs leading to the
next level. Mount smoke alarms high on walls or ceilings .
Wall-mounted alarms should be installed not more than 12
inches away from the ceiling (to the top of the alarm). Don't
install smoke alarms near windows, doors, or ducts where
drafts might interfere with their operation. Provide Owner with
manufacturer’s instructions.
Upstairs Bedrooms
Trade: 27 Fire Protection
LBPCARB 3.00 EACARBON MONOXIDE DETECTOR ________________
Install a battery operated or outlet plug-in carbon monoxide
detector with battery back up and with a digital display capable
of showing both peak CO level recorded by the alarm since it
was last reset or unplugged, and the present level of carbon
monoxide the unit is sensing.
Location Total:____________
Page 25 of 27
805 Arch AvenueAddress:02 - Healthy HomesUnit:
Electrical HazardsLocation:0Approx. Wall SF: 0Ceiling/Floor SF:4 -
Spec Quantity Units Unit Price Total PriceSpec #
Trade: 23 Electric
7560 1.00 EARECEPTACLE REPLACE ________________
Replace receptacle with duplex receptacle and cover plate.
Room 10 (Loose Outlet - Side B)
Location Total:____________
Page 26 of 27
Unit Total for 805 Arch Avenue, Unit 02 - Healthy Homes:____________
____________Address Grand Total for 805 Arch Avenue:
_________________________________________________Bidder:
Page 27 of 27