Loading...
HomeMy WebLinkAbout5D1 Budget Request (Colfax Ave. Bridge) - SignedSouth Bend Redevelopment Commission 215 S. Dr. Martin Luther King, Jr. Blvd., Room 301, South Bend, Indiana Redevelopment Commission Agenda Item DAT E : June 11, 2026 FROM: Leslie Biek, Assistant City Engineer SUBJECT: Budget Request- Colfax Bridge Improvements PN 123-010; PROJ 317 Funding Source* (circle) River West; River East; South Side; Douglas Road; West Washington; RDC General; Riv. East Res. * Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, then the authorization of the expenditure of such funds shall be void and of no effect. PURPOSE OF REQUEST: This budget request is for $3,500,000 for the Colfax Bridge project in coordination with St Joseph County. SPECIFICS: St. Joseph County has been developing plans to rehabilitate the Colfax Bridge. The County’s portion of the work will include a deck overlay with patching, expansion joint replacement, substructure repair, barrier rail replacement, deck replacement of the west span, cleaning and painting of the steel beams of the west span and approach slab replacement. The City requested additional enhancements to the bridge to create comfortable connections with downtown, the Seitz Park area, and other portions of the East Bank. Improvements include a pedestrian railing to match Seitz Park, upgraded vehicular railings, widened sidewalks, decorative streetlights, concrete monuments with lighting, and engineering fees. Also included in this estimate are MLK and Colfax intersection improvements which include modifying the curb to include the current painted bumpout, aligning the curb ramps, removing unnecessary steps in the sidewalk, adding signal poles and replacing signal heads. The County has just received bids for the project and will likely be awarded at the end of June. The County will invoice the City based on the actual bid items of City requested items prior to the award of the project. ______________ ___________Pres/V-Pres ATTEST: __________ _______ _ Date: _____________ _______ APPROVED Not Approved SOUTH BEND REDEVELOPMENT COMMISSION June 11, 2026 