HomeMy WebLinkAboutChange Order No 1 - Byers Softball Complex Proj No 123-072 - R Yoder Construction May 26, 2026 Mr. Jason Yoder R. Yoder Construction, Inc. 27453 CR 150 Nappanee, IN 46550 shelly@ryoderconstruction.com RE: Change Order No. 1 – Byer’s Softball Complex 2024 Renovation – Project No. 123-072 Dear Mr. Yoder: At its May 26, 2026 meeting, the Board of Public Works approved the above referenced Change Order be increased by $71,712.64, bringing the revised contract amount to $2,643,763.64. Enclosed is a copy of the Change Order for your records. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk 1 $2,572,051.00 $0.00 $2,572,051.00 X $ $2,643,763.64 2.79 % 2.79 % 0 days RECOMMENDED FOR APPROVAL Extension of date/time by previous change orders Date/time extension by this change order 0 days New completion date/time 9/30/2025 CONTRACTOR The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time 9/30/2025 The contract sum prior to this change order By this Change Order, the project amount is Increased 71,712.64Decreased The original contract sum Net change by previously authorized change orders 123-072 Byer's Softball Complex Renovation 2/25/2025 See Change Order 1 Breakdown CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKSPROJECT CHANGE ORDER DATE:5/15/2026 PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: Member Member Approved Date: President Member Member Printed Name and Title R. Yoder Company Name 27453 CR 150 Address BOARD OF PUBLIC WORKS Nappanee, IN 46550 City, State, Zip Contractor Signature CONSTRUCTION MANAGER CITY OF SOUTH BENDBrad Yoder, VP INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk Board of Public Works FROM: Patrick Sherman: Director of Project Management SUBJECT: Byers Softball Complex Renovation: Change Order #1 DATE: May 26th, 2026 Greetings, The documents herein detail the costs associated with Change Order #1 for the Byers Softball Complex Renovation project. See the attached breakdown. This includes a variety of costs associated with the project including some owner additions, some necessary design changes, and a variety of cost savings measures that were undertaken. Many of the additions were due to unforeseen conditions. The largest addition by the owner was the repaving of the parking lot as it was found to be in poor condition and the cost is within the total project budget. This change order is within the contingency available for the project. Thank you and please let me know if you have any questions. Patrick Sherman City of South Bend Project No. 123-072 5/15/2026 Byer's Softball Complex Renovation Line Item Qty Unit Price Total Additional Trench Drain Replacements 1 LS $4,500.00 $4,500.00 Mill and Repave Parking Lot and Dogwood Drive 1 LS $141,007.25 $141,007.25 Reroute Underground Pipes at Shade Structures 2 EA $1,500.00 $3,000.00 Additional Fencing Required between Gates and Field Fence (5') 2 EA $799.25 $1,598.50 Erosion Control for Mayflower Ditch Area 1 LS $1,512.45 $1,512.45 Crack Sealing and Repair -8500 SY $4.90 ($41,650.00) Sheet Sign, On Deck Batter -8 EA $362.00 ($2,896.00) Bullpens (Batting Cages) -3 EA $26,250.00 ($65,537.50) Gravel Base for Batting Cages -4 EA $8,750.00 ($35,000.00) Revisions to Splashpad Sanitary 1 LS ($5,135.00) ($5,135.00) Overrun on Meterpit 1 LS $43,620.00 $43,620.00 Change Splashpad Piping to 3" 1 LS $5,390.00 $5,390.00 Change Splashpad Piping to 4" 1 LS $3,395.00 $3,395.00 Current Underrruns 1 LS ($5,699.06) ($5,699.06) Current Overruns 1 LS $182.00 $182.00 Replacement Bollard 1 EA $1,500.00 $1,500.00 Additional Sod Around Splashpad and Eastern edge of Parking Lot 230 SY $11.50 $2,645.00 Concrete Drive for Northern Entrence 1 LS $23,100.00 $23,100.00 Credit for Pavement and Concrete tests -1 LS $3,820.00 ($3,820.00) CO Total =$71,712.64 Contingency Tracking Full Stair Replacement. Quote $14,890.26 $ 14,890.26 Increase CT depth to 30" from 25" $ 1,180.23 Overrun on Electriconic Displays $ 7,664.00 Overrun on Facility Sign $ 3,819.70 Overrun on Strong Box $ 4,883.00 Credit for Light Bulb $ (134.85) Overrun on Backflow Assembly $ 11,615.00 Concession Building Electrical Overrruns $ 5,658.60 Two Additional Bike Racks $ 410.00 Total $ 49,985.94 Budget $ 50,000.00 Remaining $ 14.06 Line 46 Bullpens One Batting Cage Material only $ 22,250.00 Restocking Fee $ 11,812.50 Restoration Fee $ 5,400.00 $ 39,462.50 Not Completed. Change Order #1 Notes Owner Add Owner Add Unforeseen Owner Add Owner Add Unforeseen. Damaged by Public. Opted Out. Consultant Error Unforeseen Opted for Milling and repaving Opted Out. Opted Out. Includes restocking fee and restoration fee Unforeseen. Unforeseen. Unforeseen. Unforeseen. Unforeseen. Unforeseen. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 05/21/2026 Name: Patrick Sherman Department of Public Works – Engineering Division BPW Date: 05/26/2026 Phone Extension: Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Mickey Lovey Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name R. Yoder Construction New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Byer’s Softball Complex 2024 Renovation Project Number 123-072 Funding Source 201-11-201-201-444000--PROJ00000498 Account No. PO #36756 Amount $71,712.64 Terms of Contract Public bid Special Contract Provisions Purpose/Description Change Order #1 for the Byers Softball Complex Renovation. For Change Orders Only Amount of Increase Decrease $ 71,712.64 ($ ) Previous Amount $ 2,572,051.00 Current Percent of Change: Increase Decrease 2.79% ( %) New Amount $ 2,643,763.64 Total Percent of Change: Increase Decrease 2.79% ( %) Time Extension Amount: 0 Days New Completion Date: 09/30/2025