HomeMy WebLinkAbout330 West Navarre Street_AA 2026-0421Sarah Andrews,
President
HISTORIC
PRESERVATION
COMMISSION
OF
SOUTH BEND
AND
ST. JOSEPH
COUNTY
CERTIFICATE
OF
APPROPRIATENESS
The Historic Preservation Commission of South Bend and St.
Joseph County has approved the following work:
Flat roof replacement on under 1SQ of EPDM
Full tear off, install new High density board to match existing thickness
Re-use original copper to terminate over shingles
Run EPDM to edges and terminate with cover strip
Run up chimney terminate with T-Bar and Custom bent counter
flashing.
ASSCHER ROOFING, LLC, Contractor
for the following location:
330 NAVARRE ST
South Bend, IN, 46616
Chapin Park
Application No. 2026-0421
in the County of St. Joseph; State of Indiana; which is:
Located in a Local Historic District
A Local Historic Landmark
and found this application to be appropriate according to the Standards
pertaining to Local Historic Landmarks and/or Local Historic Districts.
Regulations pertaining to the Historic Preservation Commission are
found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter
26 of the St. Joseph County Code.
The issuance of this certificate does NOT in any manner, release
the recipient from the responsibility of complying with the requirements
of the zoning ordinances, building codes, safety codes, ADA or other
requirements of the City of South Bend, the County of St. Joseph, the
State of Indiana, or the United States Federal Government.
This certificate is good for one year from the date of issuance and
is effective from the date entered herein. Plans are on file and open for
public inspection at the office of the Historic Preservation Commission of
South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400
S, South Bend, Indiana, during normal business hours.
THIS CERTIFICATE IS NOT TRANSFERABLE
NAME OF APPLICANT:Daniel Chapman
CERTIFICATE ISSUED BY:
Ross Van Overberghe
Historic Preservation Administrator
POST IN A CONSPICUOUS PLACE ON THE STREET SIDE
OF THE PROJECT UNTIL COMPLETION OF ALL WORK.
Phone: (574) 235-9371
E-mail: SBSJCHPC@southbendin.gov
ROSS VAN OVERBERGHE
Historic Preservation
Administrator
4/29/2026DATE CERTIFICATE
TAKES FORCE:4/29/2027DATE CERTIFICATE
EXPIRES:
Ord No. 9574-05
Chapin Park
ADMINISTRATIVE APPROVAL
Tuesday, April 21, 2026
Application for Certificate of
Appropriateness
Important Information Regarding this Request
REQUIRED DOCUMENTATION AND SITE PLANS
The Historic Preservation Commission of South Bend and St. Joseph County cannot process an Application
without required documentation. Comprehensive documentation provides a complete understanding of the
project. Problems often occur during a project review or during the execution of the project when the
property owner, staff or commissioners are unclear as to project specifics. Applications will NOT be
processed without required documentation.
Photographs may be submitted in digital format or in photographic print. When a project involves
blueprints and/or site plans, one (1) set shall be submitted with the Application. Any documentation
submitted to this office cannot be returned to the applicant.
APPLICATION FEE
The application processing fee for any Application for a Certificate Of Appropriateness is $20
Payment must accompany the application at the time of submission. For an electronically submitted
application, payment must reach the HPC office within 48 hours following transmission. Payment can be
made by credit card by contacting
Business License Administrator Michelle Adams at (574) 235-5912; by cash in person in the Department of
Community Investment on the 14th floor of the County City Building; or by check made out to City of
South Bend. Applications will NOT be processed without the required fee.
MEETING ATTENDANCE
When an Application has been scheduled for any meeting, the owner, architect or contractor(s) retained for
the project shall attend the meeting where their project will be reviewed and a decision rendered. Failure by
the owner, architect, or contractor to attend such meetings may result in denial of the Application due to
insufficient representation.
CERTIFICATE ISSUANCE
Certificates of Appropriateness will be filed with the Building Department of South Bend and St. Joseph
County. A copy of the Certificate will be emailed directly to the owner and/or contractor(s) listed on the
application.
INSPECTION AUTHORITY
All projects will be inspected during and following execution for compliance with the decision(s) rendered
by the Historic Preservation Commission of South Bend and St. Joseph County.
1
Owner acknowledges that while the Historic Preservation Commission only considers Certificates of
Appropriateness for exterior features, under certain circumstances it may be necessary for the Commission
Staff to have access to the interior of the building in order to accurately assess the condition of the exterior
feature and that the lack of access to the interior may prevent the Commission Staff from making a
favorable recommendation.
Any work performed on a historic landmark or in an historic district which does not conform to the
Certificate of Appropriateness certificate shall be immediately halted by the Historic Preservation
Commission and the Building Department of South Bend and St. Joseph County. Fines may be levied for
projects not in compliance.
I read and understand the information
above:Yes, Continue
Date Tuesday, April 21, 2026
2
Property Information
Property Address for Proposed Work:330 West Navarre St
Property City South Bend
Property Zip Code 46616
Property Owner Information:Daniel Chapman
Owner Email
Proposed Work and Project Information
All projects must comply with applicable building and zoning codes.
South Bend Zoning Ordinance St. Joseph County Zoning Ordinance
Does your project involve any of the
following? (Check all that apply):Roofs
Contractor Information Asscher Roofing Top of Roof Erik Mendez
Contractor Phone Number (574) 993-4174
Contractor Email Erik@asscherroofing.com
Description of Proposed Work:
Flat roof replacement on under 1SQ of EPDM
Full tear off, install new High density board to match existing thickness
Re-use original copper to terminate over shingles
Run EPDM to edges and terminate with cover strip
Run up chimney terminate with T-Bar and Custom bent counter flashing.
Specification of Material via
Manufacture Brochure:PDF PDS-EPDM-Syste….pdf
File Upload
Site Plans, Aerial Views, and/or Blueprints: One (1) set shall be submitted with the Application.
Uploaded documentation must show existing property lines, buildings, structures, and proposed project
location(s). Hand Drawn Plans/Elevations are ok
Photographs to include: each area affected by project, close up detail of project areas.
Windows, Siding, and/or Door projects must include photographs of each window/door/siding affected
by the project and detailed close up of condition
3
April 29, 2026 MA
Rec. No. 384906 $20.00
Applications will not be processed if the required photographs and/or documentation are not
included.
Any documentation submitted to this office cannot be returned to the applicant.
Project Type - List:Roofs
Overhead View of Proposed Project
Location(s):
85.46 KB
Quote/Evaluation(s) by Repair Professional (Optional):
PDF Daniel Champman signed contract….pdf
4
Photographs:
598.14 KB 458.48 KB
615.51 KB 618.69 KB
5
Payment
Invoice ID # INV-000237
Payment Method Pay in Person
6
Erik Mendez (Apr 21, 2026 11:44:12 EDT)
Erik Mendez
+-v,+ -
PROPOSAL SUBMITTED TO DATE
2/27/2026Pgli.e.l.f.l,.i.p.n an
ADDRESS
330 W. Navarre St.
BILLING ADDRESS
CITY
,.I.o.,ntt'..9s..14
EI\,4AIL
STATE
IN
..
Proposal:
1) Proiect Outline
ZIP
46616
CITY STATE ZIP
l.,'),th,1)Reqo,,,e
\nshtl
fre-vse
fl,nl roo{
eP0,u1 bo( srrkm
colfi-. P1atil'n7 (l
hJh 9<n,)
or TPo (D'Y"a'a1 o" hq
c n*|ra\ 1o ftPl1"' IltHd.'"I '.'b& *,-.t"d){0ltd''1 04 histu4
(.r: I '-', 'I I
e-h:.i),(
Permit City
Additional (*change orders)
Remove additional root layer (S30 per Sq.)
Unsound decking rryill be replaced at an additional charge.
*4'x8' OSB 7/16" $50--4'x8' OSB I /2" $60--4'x8' OSB 3/4" S70--1x6x10 lumb€r S50---1x8x10 lumber S60
*4'x8'plyryood 7/16" S60--4'x8' plywood 1/2' S70--4'x8' plywood 3/a" S80
Estimated Start Date: TBD upon signing of contract
The aclual start aod completion dates may vary depending on weath€r, contactor availability, material availability,
concealed conditions, changes ordered by customer, vandalism, and olher similar tactors, Reasonable ertensions of time
shall be allowed and Asscher Roofing LLC is not liable for any claim or expenses due to delay. lf the work is conting€nl on
approval by the cuslom€rs insurance company, the completion dates are expr€ssed by the number of days after sutficient
notic€ from the insurance carrier approving adequate repair o. resloration. Asscher Rooting to provide dump trailer or
dumpster and remove all corstruction debris same day upon completion. Asscher Roofing LLC is licensed, bonded, and
insured.
Amendment lo contract: Aherations to payment schedule or work specs must be first agreed by Customer and Asscher
roofrng before any work is started and entered below:
,l
):
l!
-:E
l_.j
u
../\
[))
)
Asscher Roofing proposes hereby to furnish all labor, supplies, and materials and equipment in accordance-TJi6'tfitiTi:j'ii"'?:flt""ff"i/^/ Fftn O,ilq,r ?&, Bs-r-1,0,.,
50% Down ibyment dire prior tb start of job. Amount oue: / 'PllLS , O D '
BALANCE DUE UPOI^.I COMPLETION OF WORK
lf customer fails to make paymenl, Asscher Roofing LLC may terminate this contract and recover payment for the work
performed. all other costs, damages, and expenses, including reasonable attomeys'fees and olher costs and expenses of
collection.
An additional charge of 3.5% will be applied to the total cost of completed job for credit card payments . A charge of 2%
per month (24% per annum)will be made on past due balance-with a $5 minimum service charge. Payment is made as
lollows. 50% payment due boforc start of job wlth balanca due day of lob conpletlon.
Conc€alBd Conditions-lf concealed, unanticipated, or unfores€en conditions are encountered, Asscher Roofing LLC shall
notify the customer and the contract price shall be adjusted by Asscher Roofing on the basis of the actual cosl of additional time
and materials, unless a mutually agreed change order is signed.
lnsurance-Customer may have insurance that provides coverage for the work. Asscher Roofing LLC can't guarante€ that
custom€r's insurer will provide coverage or pay the contract p.ice in whole. Customer understands and acknowledges that its
insurer isn't a party to this contract and that customer is responsible for palng for the work regardless of whether its insurer
provides coverage. lf the customer's claim will be partially or wholly covered by insurance, lhe subiect real property will be
repaired or restored to th6 same condition in which the r€al property existed before the damage, loss, or expense occurred. or
to a mmparable condition. Asscher Roofing LLC shall nol asserl any insurance claim on the customeis behalf. Asscher
Roofing LLC canies workers' cornpensation insurance and liability insurance, as well as any insurance required by law.
Disput€s-- Asscher Roofing LLC and customer agree that they will try lo resolve all disputes or claims thal may arise under lhis
contract amicably between themselves. The parties consent and agree that exdusive venue, personal jurisdiction, and subject
matter jurisdiclion for any litigation involving all such disputes or claims shall be in St. Joseph County, lndiana. Both parlies
waive the right to a iury trial.The prevailing pany to any dispute shall be awarded it's reasonable attorney's fees and expenses
Scope of Work: See work described in proposal. Asscher Roofing LLC shall perform the work in accordance wilh
the contract documents, manutacturer's specifrcations, and applicable law. Asscher Roofing LLC shall have sole
control over means, methods, techniques, sequences and procedures to complete the work. Asscher Roofing LLC
shall provide and pay for all labor, materials, supplies, tools, equipment, and machinery reasonably necessary to
complete the work. Some variation may occur in color, texture, and plans of materials. Asscher Roofing LLC may
utilize subcontractors, vendors, suppliers or others who aren't a parly to his contract to provide labor, services.
material, equipment or machinery in connection with the work. Contract Documents: The contract documents
include: (a) the proposal and any drawings, plans and specifications for the work set forth in the proposal; (b) this
roofing contract; and (c) any change orders. The contract documents for the entire and integrated contract between
customer and Asscher Roofing LLC and supersede all prior written or oral negotiations, representations, or
agreements. Cancellation: You may cancel this contract at any time before midnight on the lhird business day after
the later of the tollowing: (a) The date this contract is signed by you and Asscher Roofing LLC. (b) lf applicable, the
date you receive written notiflcation from your insurance company of a final determination as to whether all or any
part of your claim or this contract is a covered loss under your insurance policy. See attached notice of
cancellation form for an explanation of this righl.
Customer Obligations Customer ag.ees lo give Asscher
Roofing LLC free access to the real property to the extent
ecessary for rt to complete the work. Customer shall not
cause or permil any interference with Asscher Roofing LLC s
ability to cornplete the work. Customer understands that
Asscher Roofing LLC may need to slore construclion
materials on lhe prem scs. usc the customer s utilities. and
bring any heavy equrpment onto the property necessary to
complete the job. Customer agrees to arrange for the
idenlillcation of any underground utilitres before Asscher
Roollng LLC periorms any digging if required. Cuslomer
agrees lo remove or secure any personal propedy before
Asscher Rooirng LLC commences work. Custonrer shall hold
Asscher Rooling LLC harmless from any and alldamage to
customer s personal property. including but not limited to
drywall, plaster. decoralions. or intenor lixes unless caused
by Asscher Roofrng LLC s negligence. Asscher Roofing LLC
rs 10t responsible fo..e-adlustJng satelllc d,shes or for nail
pops rn sheetrock thal coLrld occur during inslallation.
Warranties: All materials are guaranteed to be as specified.
All work is to be completed according to standard praclices.
Any alterations or deviations from the scope of rfork will
become an additional charge over and above the estimate.
All agre€merts are contingent upon strikes, accidents, or
d€lays beyond our control. A Six-year workmanship
rvarranty is provided.(NO WARRANW ON REPAIRS) Asscher
Roofing LLC expressly disclaims any and all other
warranties, whether express, implied or oral, including any
implied warranties or merchantabilit, habitability,
wo manship, or fitness for a particular purpose.
""""^"'ru^'4b*fu/^
Note: Thas proposal may be withdrawn if not accepted
wilhin 30 days.
Contractor Signature
Signature Dale
Dat-^
Notice of Cancellation You may cancel this contract by mailing, delivering, or submitting by electronic mail a signed
and dated copy of this cancellalion notice or any other written notice to (name of real property improvement
supplier) at (address of real property improvement suppliefs place of business), or (electronic mail address
described in section 10(aX2XA) or 1o(aX2XBXiii) [C 24- 5-11-10(aX2XA) or lC 2a-5-11-10(aX2)(B)(iii)] of this
chapter), at any time before midnight on the third business day after the later of the following: (A) The date this
contract is signed by you and (name of real property improvement supplier)- (B) It applicable, the date you receive
written notification from your insurance company of a final determinalion as to whether all or any part of your claim
or this contract is a covered loss under your insurance policy. lf you cancel this contract, any payments made by
you under the contract will be returned lo you within ten (10) business days following receipt by (name of real
property improvement supplier) of your cancellation notice, minus any amounts you may owe lor work already done
by (name of real property improvement supplier).1 HEREBY CANCEL THIS TRANSACTION AND wlLL PAY FEE OF S350.00
Customer's Signature_Date
Asscher Roofing Company
Revised: April-2017 PDS 09-1320 Page 1 of 4
Product Data Sheet
MULE-HIDE STANDARD REINFORCED AND
FR REINFORCED EPDM MEMBRANE
PRODUCT DESCRIPTION
Mule-Hide Standard Reinforced EPDM is a high performance,
polyester reinforced membrane that stands up to tearing,
impacts, punctures and normal roof traffic. The elastomeric
properties of the EPDM membrane compensate for thermal
shock and building movement. EPDM membranes provide
excellent resistance to ozone and aging. The membrane is
manufactured in accordance with the guidelines established by
the RMA (Rubber Manufacturers Association) and meets or
exceeds the ASTM Standard Specification D 4637, Type II. Also
available as a Fire retardant (FR) membrane that is specially
formulated to inhibit spread of flame and meet or exceed code
body testing criteria for fire retardant roofing membranes.
Mule-Hide STANDARD REINFORCED and FR REINFORCED EPDM membranes are available with in-seam
tape that is pre-applied to the sheet. See below for sizes available.
BASIC USES
The Standard Reinforced and FR Reinforced EPDM membrane is used in mechanically attached and fully
adhered roofing systems in new construction, reroofing and recover (retrofit) applications. It may also be used as
flexible membrane flashings for walls, curbs, etc, when installing an EPDM membrane roofing systems. The
system must be installed over acceptable roof insulation or other suitable substrate. See the Mule-Hide EPDM
Specifications Manual for complete specifications and details.
SPECIFICATIONS
Physical Properties* Test Method SPEC. (Pass) Typical Standard
Tolerance on Nominal Thickness, % ASTM D 751 + 10 + 10
Thickness Over Scrim, min, in.(mm)
.045
.060
.075
ASTM D 4637
Annex
0.015 (0.381)
0.016 (0.406)
0.020 (0.508)
0.032 (0.810)
Weight, lbm/ft2 (kg/m2)
.045
.060
.075
0.27 (1.3)
0.39 (1.9)
0.48 (2.3)
Elongation, Ultimate, min, %
.045 & .060
.075
ASTM D 412
Die C
250**
480***
500***
Tear Strength min, lbf (N)
.045, .060 & .075
ASTM D 751
B Tongue Tear
10 (45)
70 (311)
Breaking Strength, min, lbf(N)
.045, .060
.075
ASTM D 751
(Grab Method) 90(400)
140(623)
177 (787)
Factory Seam Strength, min. ASTM D 816
(Modified)
Membrane
Rupture
Membrane
Rupture
Brittleness point, max, deg.F (deg.C)* ASTM D 2137 -49(-45) -49(-45)
Resistance to Heat Aging*
Properties after 4 weeks @ 240oF(116oC)
Breaking Strength, min, lbf(N)
Elongation, Ultimate, min, %
Linear Dimensional Change, max, %
ASTM D 573
ASTM D 751
ASTM D 412 Die C
ASTM D 1204
80(355)
200**
+ 1.0
182 (823)
250**
-1.0
Page 2 of 4 PDS 09-1320 Revised April-2017
Product Data Sheet
MULE-HIDE STANDARD REINFORCED AND FR REINFORCED EPDM MEMBRANE
SPECIFICATIONS - Continued
Ozone Resistance**
Conditions after exposure 100 pphm
Ozone in air for 168 hrs @ 104oF(40oC)
Specimen wrapped around 3 inch mandrel
ASTM D 1149 No Cracks No Cracks
Resistance to Water Absorption*
After 7 days immersion @ 158oF (70oC),
Change in mass, max, %
ASTM D 471 +8, -2** 5.5**
Resistance to Outdoor (Ultraviolet)
Weathering - Xenon-Arc, exposure, 0.70
W/m2 irradiance,176oF (80oC) black panel
temperature
ASTM G 155
No Cracks
No Crazing
7,560 kJ/m2
3,000 hours
No Cracks
No Crazing
33,320 kJ/m2
14,000 hours
At 0.35 W/m2 irradiance,176oF (80oC) black
panel temperature
6,000 hours 28,000 hours
Fungi Resistance ASTM G21 N/A 0 (no growth)
*Typical properties and characteristics are based on samples tested and are not guaranteed for all
samples of this product. This data and information is intended as a guide and does not reflect the
specification range for any particular property of this product.
*Not a Quality Control Test due to the time required for the test or the complexity of the test. However,
all tests run on a statistical basis to ensure overall long-term performance of the sheeting.
***Specimens to be prepared from coating rubber compound, vulcanized in a similar method to the
reinforced product.
PACKAGING
Mule-Hide Standard Reinforced and FR Reinforced EPDM Membranes (with and with-out tape) are available in a
variety of sizes with widths up to 10’ and lengths up to 100’ long. Contact Mule-Hide Products for available roll
sizes.
BENEFITS & SUPPLEMENTAL STATEMENTS
• Can be installed over a variety of roof decks
• Outstanding weatherability
• Sheets can be pre-taped for labor savings and consistent seam placement
• Requires no special equipment to install
• Available as a lightweight system
• Full line of pre-taped accessories available
CODE APPROVALS/COMPLIANCE
A variety of Factory Mutual Ratings and Underwriter Laboratory Classifications are available. Contact Mule-Hide
Technical Department for additional information. Meets or exceeds ASTM D4637, Type II for reinforced EPDM
single-ply membranes.
INSTALLATION INSTRUCTIONS
1) Approved insulation shall be attached to the roof deck with an approved insulation adhesive or approved
fasteners and plates. Install insulation with its largest dimension perpendicular to the direction of the
membrane seams where possible.
LEED Information
Pre-consumer Recycled Content 5%
Post-consumer Recycled Content 0%
Manufacturing Location Carlisle, PA or Greenville, IL
Solar Reflectance Index (SRI) 9
Revised: April-2017 PDS 09-1320 Page 3 of 4
Product Data Sheet
MULE-HIDE STANDARD REINFORCED AND FR REINFORCED EPDM MEMBRANE
INSTALLATION INSTRUCTIONS - Continued
2) Mechanically Attached Roofing System
a) Perimeter sheets to be installed in an approved pattern along all exterior roof edges.
b) Mechanical fasteners and plates are installed in the seams of both the perimeter sheets and field sheets
and into the roof deck. Use approved fasteners and maintain proper penetration for specific roof deck.
3) Fully Adhered Roofing System
a) Perimeter sheets are not required.
b) The membrane is required to be mechanically attached at the base of all vertical surfaces, roof edges,
and angle changes.
c) The field of the roof is fully adhered to the substrate with Mule-Hide membrane adhesive.
4) All seams are made with Mule-Hide Tape Primer and In-Seam Tape.
5) All details will be done in accordance with Mule-Hide details.
6) On projects where a Mule-Hide Standard or Premium Warranty is requested, an authorized Mule-Hide
representative shall inspect all completed work. This is only a brief summary and not the complete
specification. Mule-Hide Specifications, Details, Technical Bulletins, and associated documents should be
thoroughly reviewed prior to starting any project. Contact Mule-Hide Products for additional information.
PRECAUTIONS
• Use proper stacking procedures to ensure sufficient stability of the materials.
• Surfaces may be slippery when wet, or due to frost and ice build-up. Exercise caution to prevent falls.
• Exercise care when working near edge of roof.
• Store Mule-Hide membrane in original wrappings in a cool, shaded area. Cover with light colored,
breathable, waterproof tarpaulins.
• Pre-Taped membranes should not be exposed to prolonged jobsite storage temperatures in excess of
90ºF (32ºC), otherwise the shelf life of the Pre-Tape may be affected.
• When using pre-taped membranes in warm, sunny weather, shade the tape end of the rolls until ready to
use.
STORAGE & HANDLING
• Use proper stacking procedures to ensure sufficient stability of the materials.
• Surfaces may be slippery when wet, or due to frost and ice build-up. Exercise caution to prevent falls.
• Exercise care when working near edge of roof.
• Store Mule-Hide membrane in original wrappings in a cool, shaded area. Cover with light colored,
breathable, waterproof tarpaulins.
• Pre-Taped membranes should not be exposed to prolonged jobsite storage temperatures in excess of
90ºF (32ºC), otherwise the shelf life of the Pre-Tape may be affected.
• When using pre-taped membranes in warm, sunny weather, shade the tape end of the rolls until ready to
use.
• Mule-Hide Pre-Tape has a shelf life of one year.
PROTECTION & SAFETY
Mule-Hide maintains Safety Data Sheets on all of its non-exempt products. Safety Data Sheets contain health
and safety information for your development of appropriate product handling procedures to protect your
employees and customers. Mule-Hide's Safety Data Sheets should be read and understood by all of your
supervisory personnel and employees before using Mule-Hide products in your facilities.
ADDITIONAL INFORMATION
The information given on this PDS is subject to change without notice. Always check the Mule-Hide website at
www.mulehide.com for the latest information, changes and updates or contact Mule-Hide Products Company at
800-786-1492.
Page 4 of 4 PDS 09-1320 Revised April-2017
Product Data Sheet
MULE-HIDE STANDARD REINFORCED AND FR REINFORCED EPDM MEMBRANE
DISCLAIMER
The statements provided concerning the material shown are intended as a guide for material usage and are believed to be true and accurate
at the time of printing. No statement made by anyone may supersede this information, except when done in writing by Mule-Hide Products
Co., Inc. Since the manner of use is beyond our control, Mule-Hide does not authorize anyone to make any warranty of merchantability or
fitness for any particular purpose or any other warranty, guarantee or representation, expressed or implied, concerning this material. This
product may be eligible for a Mule-Hide warranty, please check the Mule-Hide website at www.mulehide.com or contact Mule-Hide directly at
800-786-1492 for details. Buyer and user accept the product under these conditions and assume the risk of any failure, any injury person or
property (including that of the user), loss or liability resulting from the handling, storage or use of the product whether or not it is handled,
stored or used in accordance with the directions or specifications. Mule-Hide must be notified in writing of any claims and be given the
opportunity to inspect the alleged failure before repairs are made.