Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No 1 to PSA - Streets Depart Locker Room Proj No 126-004 - Alliance Architects
April 28, 2026 Mr. Christopher Hartz Alliance Architects, Inc. 929 Lincolnway East, Suite 200 South Bend, IN 46601 chartz@alliarch.com RE: Amendment No. 1 to Professional Services Agreement Dear Mr. Hartz: At its April 28, 2026 meeting, the Board of Public Works approved the above referenced amendment for additional design services, construction plans and specs for the streets department locker room expansion, project no. 126-004 in the amount of $11,000. Enclosed please find a copy of the amendment for your records. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk Page 1 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. This is EXHIBIT K, consisting of pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated , . AMENDMENT TO OWNER-ENGINEER AGREEMENT Amendment No. __1___ 1. Background Data: a. Effective Date of Owner-Engineer Agreement: December 16, 2025 b. Owner: City of South Bend, Board of Public Works c. Engineer: Alliance Architects, Inc. d. Project: Division of Streets, Locker Expansion and Renovation 2. Description of Modifications: a. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: 1. Provide professional design services consisting of design development through construction administration of approved schematic design “Plan Option 1A”. Services shall include architectural and engineering design as required to create pricing and construction documents. Services shall also be provided to administer the construction contract on behalf of the Owner. b. For the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: 1. An additional Eleven Thousand Dollars ($11,000.00), with 30% for Design Development, 40% for Construction Documents, 5% for Bidding/Pricing, and 25% for Construction Administration. c. The schedule for rendering services is modified as follows: 1. Completion of design services by May 31, 2026. Completion of construction administration services will be dependent upon the Contractor’s schedule but assumed to be completed on or around September 1, 2026. 3. Agreement Summary (Reference only) a. Original Agreement amount: $5,000.00 b. Net change for prior amendments: - c. This amendment amount: $11,000.00 d. Adjusted Agreement amount: $16,000.00 Page 2 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above-referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is April 21, 2026. OWNER: ENGINEER: By: By: Christopher Hartz Title: Title: Principal Date Signed: Date Signed: April 28, 2026 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 4/17/2026 Name: Zak Tebell Department of Public Works – Engineering Division BPW Date: 4/28/2026 Phone Extension: 9358 Required Prior to Submittal to Board BPW Attorney X Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ratify Emergency Contract Ease./Encroach Required Information Company or Vendor Name Alliance Architecture New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Streets Department Locker Room Expansion Project Number 126-004 Funding Source PR-00045508 Account No. 202-06-602-503-436001, 641-06-602-509-436001 Amount $11,000.00 Terms of Contract Amendment 1 Special Contract Provisions N/A Purpose/Description Amendment 1 including 100% construction plans and specs for the Streets Department Locker Room Expansion Project. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: