HomeMy WebLinkAboutChange Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm April 28, 2026 Mr. Tony Bogard F.A. Wilhelm Construction Co., Inc. 630 E. Bronson St., Suite 2 South Bend, IN 46601 tonybogard@fawilhelm.com RE: Change Order No. 1 – Madison Lifestyle District – New Parking Garage CMc – Project No. 123-074 Dear Mr. Bogard: At its April 28, 2026 meeting, the Board of Public Works approved the above referenced Change Order be increased by $1,100,176, bringing the revised contract amount to $7,939,176. Enclosed is a copy of the Change Order for your records. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk Board of Public Works FROM: Zach Hurst, PE, Sr. Project Engineer SUBJECT: Change Order No. 1 - Project No. 123-074 Madison Lifestyle District – New Parking Garage – CMc DATE: 04/23/2026 At the March 24th Board of Public Works meeting, the Board approved a Request to Advertise for the new Madison Street Water Main, between Main Street and Dr. Martin Luther King, Jr. Boulevard. The new 12-inch water main will serve both Phase I and Phase II of the Madison Lifestyle District development, currently in the initial stages of construction. When working through the site logistics required to construct this new water main, it became apparent that this work should instead be a part of FA Wilhelm’s Construction Manager contract with the City to build the new seven level parking garage which will serve the new multi-family housing and hotel to be built during Phase I of the development. The attached site diagram shows the logistical challenges presented by this water main project. The water main installation will require open-cutting of Madison Street for the entire length, all while construction personnel for the new parking garage will be trying to cross back and forth between the construction area and the staging/laydown area. Change-ordering this work into Wilhelm’s contract allows them to have control over all personnel in the fenced area, greatly improving site safety. The City wants to avoid having two general contractors try to occupy the same area. Indiana Earth, the sitework contractor for the parking garage, would perform this work as a subcontractor to Wilhelm. They have submitted a price of $575,176 which is below the $750,000 amount allocated for this work. Also included in the Change Order will be a $525,000 Owner’s Contingency to address unforeseen items uncovered during the demolition of the existing parking lot. This item was overlooked during the execution of Amendment 1 for the early release work. April 28, 2026 April 28, 2026 PROJECT MANUAL FOR Madison Lifestyle District Phase I Utility Design Water Main Replacement April 6, 2026 PREPARED FOR: PREPARED BY: TECHNICAL SPECIFICATION INDEX CITY OF SOUTH BEND MADISON LIFESTYLE DISTRICT PHASE I UTILITY DESIGN WATER MAIN REPLACEMENT PROJECT TECHNICAL SPECIFICATIONS Section Title City of South Bend TABLE OF CONTENTS Madison Lifestyle District Phase I Utility Design Water Main Replacement TOC- 1 DIVISION 01 GENERAL REQUIREMENTS 01 01 00 Summary 01 20 00 Price and Payment Procedures 01 25 00 Substitution Procedures 01 30 00 Administrative Requirements 01 32 16 Construction Progress Schedule 01 33 00 Submittal Procedures 01 38 00 Preconstruction Audio-Video Documentation 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 57 00 Maintenance of Traffic 01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements DIVISION 03 CONCRETE 03 30 00 Concrete Pavement DIVISION 09 FINISHES 09 30 00 Pedestrian Crosswalk Paint DIVISION 31 EARTHWORK 31 05 13 Soils for Earthwork 31 05 16 Aggregates for Earthwork 31 23 16 Excavation 31 23 16.13 Trenching 31 23 19 Dewatering 31 25 00 Erosion and Sedimentation Controls DIVISION 32 EXTERIOR IMPROVEMENTS 32 12 16 Asphalt Paving and Pavement Striping DIVISION 33 UTILITIES 33 01 10.58 Disinfection of Water Utility Piping Systems 33 14 13 Public Water Utility Distribution Piping SUMMARY 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 011000 - 1 SECTION 01 10 00 SUMMARY 1.1 SUMMARY A. This work shall be in accordance with all applicable sections of the City of South Bend Indiana These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf 1.2 CONTRACT DESCRIPTION A. Work of the Project consists of but is not limited to the replacement of an existing water main including, installation of new water main including approximately 450 LF of 12-inch ductile iron pipe through open cut installation; water service line, hydrant reconnection, associated valves and fittings, and all associated site restoration. 1.3 WORK SEQUENCE A. Contractor shall coordinate all work activities with Owner and other utility contractors. Work shall be sequenced such that water and sanitary services are maintained. If service must be interrupted, the Contractor shall coordinate with the Owner at least one week prior. B. Sequencing of Construction Plan: Before start of construction, submit a construction plan regarding phasing of demolition and new Work for acceptance by Owner. After acceptance of plan, construction sequencing shall comply with accepted plan unless deviations are accepted by Owner in writing. C. There will be other construction projects on-going within the area. Contractor to coordinate work sequence and any roadway closures with adjacent projects. 1.4 PERMITS A. Contractor shall furnish all necessary local permits for construction of Work. B. An IDEM Water Main Notice of Intent (NOI) is required to construct the proposed water main. An application for NOI has been submitted to IDEM. It is the contractor's responsibility to notify IDEM a minimum of ten (10) working days prior to the start of construction. Contractor to email IDEM at dwnoi@idem.in.gov. END OF SECTION 01 10 00 PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 1 SECTION 01 20 00 - PRICE AND PAYMENT PROCEDURES 1.1 SUMMARY A. Section includes: 1. Schedule of Values 2. Application for Payment 3. Change Procedures 4. Defect Assessment. 5. Unit prices 1.2 SCHEDULE OF VALUES A. The Unit Prices submitted as the Bid and incorporated into the Agreement shall serve as the Schedule of Values. 1.3 APPLICATION FOR PAYMENT A. Submit Contractor's Application for Payment in format required by the Owner. B. Content and Format: Use Schedule of Values for listing items in Application for Payment. C. Submit updated construction schedule with each Application for Payment. D. Payment Period: Submit at intervals stipulated in the Agreement. E. Submit submittals with transmittal letter as specified in Section 013300 - Submittal Procedures. F. Substantiating Data: When Engineer requires substantiating information, submit data justifying dollar amounts in question. Include the following with Application for Payment: 1. Current construction photographs specified in Section 013300 - Submittal Procedures. 2. Partial release of liens from major Subcontractors and vendors. 3. Record Documents as specified in Section 017000 - Execution and Closeout Requirements, for review by Owner, which will be returned to Contractor. 4. Affidavits attesting to off-Site stored products. 5. Construction Progress Schedule, revised and current as specified in Section 013300 - Submittal Procedures. 1.4 CHANGE PROCEDURES A. Submittals: Submit name of individual who is authorized to receive change documents and is responsible for informing others in Contractor's employ or Subcontractors of changes to the Work. PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 2 B. Carefully study and compare Contract Documents before proceeding with fabrication and installation of Work. Promptly advise Engineer of any error, inconsistency, omission, or apparent discrepancy. C. Requests for Interpretation (RFI) and Clarifications: Allot time in construction scheduling for liaison with Engineer; establish procedures for handling queries and clarifications. 1. Use CSI Form 13.2A - Request for Interpretation for requesting interpretations. 2. Engineer may respond with a direct answer on the Request for Interpretation form, CSI Form 13.3A Clarification Notice or EJCDC C-942 - Field Order. D. Engineer will advise of minor changes in the Work not involving adjustment to Contract Sum/Price or Contract Time by issuing supplemental instructions on EJCDC C-942. E. Engineer may issue Notice of Change including a detailed description of proposed change with supplementary or revised Drawings and Specifications, a change in Contract Time for executing the change with stipulation of overtime work required and with the period of time during which the requested price will be considered valid. Contractor will prepare and submit estimate within seven days. F. Contractor may propose changes by submitting a request for change to Engineer, describing proposed change and its full effect on the Work. Include a statement describing reason for the change and the effect on Contract Sum/Price and Contract Time with full documentation and a statement describing effect on the Work by separate or other Contractors. G. Stipulated Sum/Price Change Order: Based on Proposal Request, CSI Form 13/6A or Notice of Change and Contractor's fixed price quotation or Contractor's request for Change Order as approved by Engineer. H. Unit Price Change Order: For Contract unit prices and quantities, the Change Order will be executed on a fixed unit price basis. For unit costs or quantities of units of that which are not predetermined, execute Work under Work Directive Change. Changes in Contract Sum/Price or Contract Time will be computed as specified for Time and Material Change Order. I. Work Directive Change: Engineer may issue directive, on EJCDC C-940 - Work Change Directive signed by Owner, instructing Contractor to proceed with change in the Work, for subsequent inclusion in a Change Order. Document will describe changes in the Work and designate method of determining any change in Contract Sum/Price or Contract Time. Promptly execute change. J. Maintain detailed records of Work done on time and material basis. Provide full information required for evaluation of proposed changes and to substantiate costs for changes in the Work. K. Document each quotation for change in Project Cost or Time with sufficient data to allow evaluation of quotation. L. Change Order Forms: EJCDC C-941 - Change Order. M. Execution of Change Orders: Engineer will issue Change Orders for signatures of parties as provided in Conditions of the Contract. PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 3 N. Correlation of Contractor Submittals: 1. Promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as separate line item and adjust Contract Sum/Price. 2. Promptly revise Progress Schedules to reflect change in Contract Time, revise sub schedules to adjust times for other items of Work affected by the change, and resubmit. 3. Promptly enter changes in Record Documents. 1.5 DEFECT ASSESSMENT A. Replace the Work, or portions of the Work, not conforming to specified requirements. B. If, in the opinion of Engineer, it is not practical to remove and replace the Work, Engineer will direct appropriate remedy or adjust payment. C. The defective Work may remain, but unit sum/price will be adjusted to new sum/price at discretion of Owner. D. Defective Work will be partially repaired according to instructions of Engineer, and unit sum/price will be adjusted to new sum/price at discretion of Owner. E. Individual Specification Sections may modify these options or may identify specific formula or percentage sum/price reduction. F. Authority of Engineer and Owner to assess defects and identify payment adjustments is final. G. Nonpayment for Rejected Products: Payment will not be made for rejected products for any of the following reasons: 1. Products wasted or disposed of in a manner that is not acceptable. 2. Products determined as unacceptable before or after placement. 3. Products not completely unloaded from transporting vehicle. 4. Products placed beyond lines and levels of the required Work. 5. Products remaining on hand after completion of the Work. 6. Loading, hauling, and disposing of rejected products. 1.6 UNIT PRICES A. Take measurements and compute quantities. Owner will verify measurements and quantities. B. Unit Quantities: Quantities and measurements indicated on Bid Form are for Contract purposes only. Actual quantities provided shall determine payment. 1. When actual Work requires more or fewer quantities than those quantities indicated, provide required quantities at contracted unit sum/prices. 2. When actual Work requires 25 percent or greater change in quantity than those quantities indicated, Owner or Contractor may claim a Contract Price adjustment. PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 4 C. Payment Includes: Full compensation for required labor, products, tools, equipment, plant and facilities, transportation, services and incidentals; erection, application, or installation of item of the Work; overhead and profit. D. Final payment for Work governed by unit prices will be made on basis of actual measurements and quantities accepted by Architect/Engineer multiplied by unit sum/price for Work incorporated in or made necessary by the Work. E. Unit Price Schedule: 1. Item 1: Mobilization and Demobilization a. Description: This item covers the mobilization and demobilization of construction equipment and personnel. Mobilization and demobilization shall include, but not necessarily be limited to: site mobilization and demobilization, construction engineering, obtaining all required permits, bonds, and insurance; installing and removing temporary construction utilities, providing on-site sanitary facilities and potable water facilities, street cleaning; snow removal; dust and mud control; and all other incidentals not directly engaged in construction of the Project but which are necessary to support the Work. b. Basis of Payment: Lump Sum (LS) c. Payment Details: For the purpose of payment, the pay quantity for the mobilization portion of the Work will be limited to seventy-five percent (75%) of the total contract bid amount for this Work item, which will be included in the first partial payment estimate. The balance of the bid price shall be considered as demobilization and will be paid for when all work is completed on the job and final clean-up is completed. No additional payment will be made for demobilization and remobilization, initiated by the Contractor, due to shutdowns, suspensions of the Work, or for other mobilization activities. 2. Item 2: Maintenance of Traffic a. Description: This work shall consist of all labor, equipment, and materials necessary for maintenance of traffic on the project site including but not limited to detour route markers, construction signs, and barricades. Unless otherwise noted in the plans, all roads shall be kept open to traffic while undergoing improvements. The portion of the project being used by public traffic shall be kept in such condition that such traffic will be accommodated adequately. Temporary approaches to businesses, parking lots, residences, and crossings and intersections with roads and streets shall be provided in a safe condition b. Basis of Payment: Lump Sum (LS) 3. Item 3: Erosion and Sediment Control a. Description: This work shall consist of all labor, equipment, and materials necessary for erosion and sediment control on the project site including but not limited to inlet protection, silt fence, placing geotextile fabric, and maintenance of erosion control measures. b. Basis of Payment: Lump Sum (LS) 4. Item 4: 8-inch x 8-inch Tapping Sleeve and Valve a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the tapping sleeve and valve and valve PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 5 box including excavation, hauling and disposal, bedding, backfill, valve, valve box, joint restraint, valve key extensions (if required), connection to the existing water main, shut down of the existing water main (if required), and thrust block. b. Basis of Payment: Per each (EA), complete in place. 5. Item 5: 8-inch Ductile Iron Water Main, Restrained Joint a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the water main including excavation, hauling and disposal, bedding, backfill, granular backfill, piping, fittings (joint restraint required), caps, joint restraint, thrust blocks, dewatering, connections to existing water main, locator wire, polywrap, testing, chlorination tap and abandonment, disinfection, dechlorination, and all other appurtenances required. b. Basis of Payment: The acceptable quantities of pipe will be measured on a per linear foot (LF) basis, complete in place. 6. Item 6: 12-inch Ductile Iron Water Main a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the water main including excavation, hauling and disposal, bedding, backfill, granular backfill, piping, fittings, caps, joint, thrust blocks, dewatering, connections to existing water main, locator wire, polywrap, testing, chlorination tap and abandonment, disinfection, dechlorination, and all other appurtenances required. b. Basis of Payment: The acceptable quantities of pipe will be measured on a per linear foot (LF) basis for the pipe of the type and size specified, complete in place. 7. Item 7: 12-inch Ductile Iron Water Main, Restrained Joint a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the water main including excavation, hauling and disposal, bedding, backfill, granular backfill, piping, fittings (joint restraint required), caps, joint restraint, thrust blocks, dewatering, connections to existing water main, locator wire, polywrap, testing, chlorination tap and abandonment, disinfection, dechlorination, and all other appurtenances required. b. Basis of Payment: The acceptable quantities of pipe will be measured on a per linear foot (LF) basis, complete in place. 8. Item 8: 20-inch x 12-inch Tapping Sleeve and Valve a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the tapping sleeve and valve and valve box including excavation, hauling and disposal, bedding, backfill, valve, valve box, joint restraint, valve key extensions (if required), connection to the existing water main, shut down of the existing water main (if required), and thrust block. b. Basis of Payment: Per each (EA), complete in place. 9. Item 9: 2-inch Curb Stop a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the curb stop and service shut-off box, including piping, fittings, couplings, locator wire, testing, and all other appurtenances required. b. Basis of Payment: Per each (EA), complete in place. 10. Item 10: 6-inch Gate Valve and Valve Box PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 6 a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the valve and valve box including excavation, bedding, backfill, valve, valve box, and valve key extensions (if required). b. Basis of Payment: Per each (EA), complete in place. 11. Item 11: 6-inch Pipe Abandon a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the abandonment of the existing water main and all other appurtenances required. b. Basis of Payment: The acceptable quantities of pipe will be measured on a per linear foot (LF) basis. 12. Item 12: Valve Box, Removal a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the removal of a valve box on the abandoned water main including necessary excavation, backfill, and restoration. b. Basis of Payment: Per each (EA), complete in place. 13. Item 13: 6-inch Line Stop a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the line-stop valve to provide temporary closure of the existing main, sleeve, necessary fittings, cap, temporary joint restraint, necessary excavation, backfill, concrete thrust collars, excavation to locate and expose the main, protection of existing utilities, disinfection, and restoration. b. Basis of Payment: Per each (EA), complete in place. 14. Item 14: 6-inch Ductile Iron Water Main, Restrained Joint a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the water main including excavation, bedding, backfill, granular backfill, piping, fittings, joint restraint, connections to existing water main, polywrap, testing, chlorination tap and abandonment, disinfection, dechlorination, and all other appurtenances required Basis of Payment: The acceptable quantities of water main will be measured on a per linear foot (LF) basis, complete in place. 15. Item 15: 2-inch Service Line a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the installation of the water service including excavation, bedding, and backfill, piping, fittings, coupling, service saddle, corporation stop, reconnection to the existing water service, locator wire, testing, disinfection, dichlorination, and all other appurtenances required. b. Basis of Payment: The acceptable quantities of water service will be measured on a per linear foot (LF) basis, complete in place. 16. Item 16: Asphalt Pavement Removal a. Description: This work shall consist of all labor, equipment, and materials necessary to complete the removal of existing pavement to facilitate installation of the water main including saw cutting, pavement edge protection, milling, asphalt PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 7 removal, disposal of existing pavement, and surface preparation for asphalt replacement. b. Basis of Payment: The acceptable quantities of asphalt pavement removal will be measured on cubic yard (CYS) basis, complete in place. 17. Item 17: Curb Replacement a. Description: This work shall consist of all labor, equipment, and materials necessary to complete curb replacement including saw cutting existing pavement and curb, excavation behind and beneath the curb, disposal of existing curb, subgrade preparation, installing curb forms, concrete, expansion joints, dowels, curing compound, and backfill. b. Basis of Payment: The acceptable quantities of curb replacement will be measured on a lineal foot (LF) basis, complete in place. 18. Item 18: HMA Asphalt, Surface a. Description: This work shall consist of all labor, equipment, and materials necessary to complete HMA asphalt surface including asphalt, surface cleaning and preparation, placement, spreading, compaction, joints, and all appurtenances. b. Basis of Payment: The acceptable quantities of HMA asphalt surface will be measured on a ton basis, complete in place. 19. Item 19 a. Description: This work shall consist of all labor, equipment, and materials necessary to complete HMA asphalt intermediate including asphalt, surface cleaning and preparation, placement, spreading, compaction, joints, and all appurtenances. b. Basis of Payment: The acceptable quantities of HMA asphalt intermediate will be measured on a ton basis, complete in place. 20. Item 20: HMA Asphalt, Base a. Description: This work shall consist of all labor, equipment, and materials necessary to complete HMA asphalt base including asphalt, surface cleaning and preparation, placement, spreading, compaction, joints, and all appurtenances. b. Basis of Payment: The acceptable quantities of HMA asphalt base will be measured on a ton basis, complete in place. 21. Item 21: HMA Asphalt for Tack Coat a. Description: This work shall consist of all labor, equipment, and materials necessary to complete HMA asphalt tack coat including heating, application, s surface cleaning and preparation, placement, spreading, and all appurtenances. b. Basis of Payment: The acceptable quantities of HMA asphalt tack coat will be measured on square yard (SY) basis, complete in place. 22. Item 22: Aggregate Base, No. 53 a. Description: This work shall consist of all labor, equipment, and materials necessary to complete installation of aggregate base, no. 53 including aggregate, preparation of subgrade, compaction, placing aggregate in uniform lifts, and all appurtenances. b. Basis of Payment: The acceptable quantities of aggregate base, no. 53 will be measured on a ton basis, complete in place. PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 8 23. Item 23: Pavement Striping, Thermoplastic, 6-inch Solid White, Crosswalk a. Description: This work shall consist of all labor, equipment, and materials necessary to complete installation of pavement striping including cleaning and preparation of pavement surface, applying primer (if required), heating thermoplastic, installing markings, forming edges and transitions, protecting markings until set, and all appurtenances. b. Basis of Payment: The acceptable quantities of pavement striping will be measured on a lineal foot (LF) basis, complete in place. 24. Item 24: Pavement Striping, Thermoplastic, 24-inch Solid White, Stop Bar a. Description: This work shall consist of all labor, equipment, and materials necessary to complete installation of pavement striping including cleaning and preparation of pavement surface, applying primer (if required), heating thermoplastic, installing markings, forming edges and transitions, protecting markings until set, and all appurtenances. b. Basis of Payment: The acceptable quantities of pavement striping will be measured on a lineal foot (LF) basis, complete in place. 25. Item 25: Pavement Striping, Thermoplastic, 4-inch Solid White a. Description: This work shall consist of all labor, equipment, and materials necessary to complete installation of pavement striping including cleaning and preparation of pavement surface, applying primer (if required), heating thermoplastic, installing markings, forming edges and transitions, protecting markings until set, and all appurtenances. b. Basis of Payment: The acceptable quantities of pavement striping will be measured on a lineal foot (LF) basis, complete in place. 26. Item 26: Pavement Striping, Thermoplastic, 4-inch Solid Yellow a. Description: This work shall consist of all labor, equipment, and materials necessary to complete installation of pavement striping including cleaning and preparation of pavement surface, applying primer (if required), heating thermoplastic, installing markings, forming edges and transitions, protecting markings until set, and all appurtenances. b. Basis of Payment: The acceptable quantities of pavement striping will be measured on a lineal foot (LF) basis, complete in place. 27. Item 27: Green Paint, Bike Lane a. This work shall include all labor, equipment, and materials necessary to complete installation of pavement paint including cleaning and preparation of pavement surface, masking, mixing, and applying paint, protection during curing time, waste disposal, protection of adjacent surfaces, and all appurtenances b. Basis of Payment: The acceptable quantities of pavement striping will be measured on a square foot (SFT) basis, complete in place. 28. Item 28: Pavement Striping, Thermoplastic Arrow, White a. Description: This work shall consist of all labor, equipment, and materials necessary to complete installation of pavement striping including cleaning and preparation of pavement surface, applying primer (if required), heating thermoplastic, installing markings, forming edges and transitions, protecting markings until set, and all appurtenances. b. Basis of Payment: Per each (EA), complete in place. PRICE AND PAYMENT PROCEDURES 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 9 29. Item 29: Pavement Striping, Thermoplastic , White a. Description: This work shall consist of all labor, equipment, and materials necessary to complete installation of pavement striping including cleaning and preparation of pavement surface, applying primer (if required), heating thermoplastic, installing markings, forming edges and transitions, protecting markings until set, and all appurtenances. b. Basis of Payment: Per each (EA), complete in place. 30. Item 30: Contingency a. Description: A $25,000 contingency shall be included in all bids for unforeseen conditions and will not be billed unless receiving written approval from the Owner. b. Basis of Payment: This will be a lump sum (LS) item PART 2 - PRODUCTS - Not Used PART 3 - EXECUTION - Not Used END OF SECTION 01 20 00 SUBSTITUTION PROCEDURES 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 012500 - 1 SECTION 01 25 00 - SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Quality assurance. 2. Product options. 3. Product substitution procedures. 1.2 QUALITY ASSURANCE A. Contract is based on products and standards established in Contract Documents without consideration of proposed substitutions. B. Products specified define standard of quality, type, function, dimension, appearance, and performance required. C. Substitution Proposals: Permitted for specified products except where specified otherwise. Do not substitute products unless substitution has been accepted and approved in writing by Owner. 1.3 PRODUCT OPTIONS A. See Section 01 60 00 - Product Requirements. 1.4 PRODUCT SUBSTITUTION PROCEDURES A. Instructions to Bidders specifies time restrictions for submitting requests for substitutions during Bidding period. B. Substitutions may be considered when a product becomes unavailable through no fault of Contractor. C. Document each request with complete data, substantiating compliance of proposed substitution with Contract Documents, including: 1. Manufacturer's name and address, product, trade name, model, or catalog number, performance and test data, and reference standards. 2. Itemized point-by-point comparison of proposed substitution with specified product, listing variations in quality, performance, and other pertinent characteristics. 3. Reference to Article and Paragraph numbers in Specification Section. 4. Cost data comparing proposed substitution with specified product and amount of net change to Contract Sum. 5. Changes required in other Work. SUBSTITUTION PROCEDURES 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 012500 - 2 6. Availability of maintenance service and source of replacement parts as applicable. 7. Certified test data to show compliance with performance characteristics specified. 8. Samples when applicable or requested. 9. Other information as necessary to assist Engineer's evaluation. D. A request constitutes a representation that Contractor: 1. Has investigated proposed product and determined that it meets or exceeds quality level of specified product. 2. Will provide same warranty for substitution as for specified product. 3. Will coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to Owner. 4. Waives claims for additional costs or time extension that may subsequently become apparent. 5. Will coordinate installation of the accepted substitute, making such changes as may be required for the Work to be complete in all respects. 6. Will reimburse Owner and Engineer for review or redesign services associated with reapproval by authorities having jurisdiction. E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals without separate written request or when acceptance will require revision to Contract Documents. F. Substitution Submittal Procedure: 1. Submit requests for substitutions on CSI Form 13.1A Substitution Request-After the Bidding/Negotiating Stage. 2. Submit electronic files of Request for Substitution for consideration. Limit each request to one proposed substitution. 3. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer. 4. Engineer will notify Contractor in writing of decision to accept or reject request. 1.5 INSTALLER SUBSTITUTION PROCEDURES A. Instructions to Bidders specifies time restrictions for submitting requests for substitutions during Bidding period. B. Engineer will consider requests for substitutions only within 15 days after date of Owner- Contractor Agreement. C. Document each request with: 1. Installer's qualifications. 2. Installer's experience in work similar to that specified. 3. Other information as necessary to assist Engineer's evaluation. D. Substitution Submittal Procedure: SUBSTITUTION PROCEDURES 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 012500 - 3 1. Submit electronic files of Request for Substitution for consideration. Limit each request to one proposed substitution. 2. Engineer will notify Contractor in writing of decision to accept or reject request. PART 2 - PRODUCTS - Not Used PART 3 - EXECUTION - Not Used END OF SECTION 01 25 00 ADMINISTRATIVE REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013000 - 1 SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Coordination and Project conditions. 2. Preconstruction meeting. 3. Site mobilization meeting. 4. Progress meetings. 5. Closeout meeting. 1.2 COORDINATION AND PROJECT CONDITIONS A. Coordinate scheduling, submittals, and Work of various Sections of Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements. B. Verify that utility requirements and characteristics of operating equipment are compatible with building utilities. Coordinate Work of various Sections having interdependent responsibilities for installing, connecting to, and placing operating equipment in service. C. Coordinate space requirements, supports, and installation of mechanical and electrical Work indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit as closely as practical; place runs parallel with lines of building. Use spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. 1. Coordination Drawings: Prepare as required to coordinate all portions of Work. Show relationship and integration of different construction elements that require coordination during fabrication or installation to fit in space provided or to function as intended. Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are important. D. Coordination Meetings: In addition to other meetings specified in this Section, hold coordination meetings with personnel and Subcontractors to ensure coordination of Work. E. In finished areas conceal pipes, ducts, and wiring within construction. Coordinate locations of fixtures and outlets with finish elements. F. Coordinate completion and clean-up of Work of separate Sections in preparation for Substantial Completion. G. After Owner's occupancy of premises, coordinate access to Site for correction of defective Work and Work not complying with Contract Documents, to minimize disruption of Owner's activities. ADMINISTRATIVE REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013000 - 2 1.3 PRECONSTRUCTION MEETING A. Contractor will schedule and preside over meeting after Notice of Award. B. Attendance Required: Owner, Resident Project Representative, appropriate governmental agency representatives, Construction Manager, major Subcontractors and Contractor. C. Minimum Agenda: 1. Execution of Owner-Contractor Agreement. 2. Submission of executed bonds and insurance certificates. 3. Distribution of Contract Documents. 4. Submission of list of Subcontractors, list of products, schedule of values, and Progress Schedule. 5. Designation of personnel representing parties in Contract, and Engineer. 6. Communication procedures. 7. Procedures and processing of requests for interpretations, field decisions, field orders, submittals, substitutions, Applications for Payments, proposal request, Change Orders, and Contract closeout procedures. 8. Scheduling. 9. Critical Work sequencing. 10. Scheduling activities of Geotechnical Engineer. D. Contractor: Record minutes and distribute to participants within two days after meeting including Owner, Resident Project Representative, and those affected by decisions made. 1.4 SITE MOBILIZATION MEETING A. Owner will schedule meeting at Project Site prior to Contractor occupancy. Construction Manager presides over meeting. B. Attendance Required: Owner, Contractor, Contractor's superintendent, Construction Manager, major Contractors. C. Minimum Agenda: 1. Use of premises by Owner and Contractor. 2. Owner's requirements and occupancy. 3. Construction facilities and controls. 4. Temporary utilities. 5. Security and housekeeping procedures. 6. Schedules. 7. Procedures for testing. 8. Procedures for maintaining record documents. 9. Inspection and acceptance. D. Construction Manager: Record minutes and distribute to participants within two days after meeting to Engineer, Owner, and those affected by decisions made. ADMINISTRATIVE REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013000 - 3 1.5 PROGRESS MEETINGS A. Schedule and administer meetings throughout progress of the Work at maximum bi-monthly intervals. B. Make arrangements for meetings, prepare agenda with copies for participants, and preside over meetings. C. Attendance Required: Job superintendent, major Contractors and suppliers, and Owner as appropriate to agenda topics for each meeting. D. Minimum Agenda: 1. Review minutes of previous meetings. 2. Review of Work progress. 3. Field observations, problems, and decisions. 4. Identification of problems impeding planned progress. 5. Review of submittal schedule and status of submittals. 6. Review of off-Site fabrication and delivery schedules. 7. Maintenance of Progress Schedule. 8. Corrective measures to regain projected schedules. 9. Planned progress during succeeding work period. 10. Coordination of projected progress. 11. Maintenance of quality and work standards. 12. Effect of proposed changes on Progress Schedule and coordination. 13. Other business relating to Work. E. Construction Manager: Record minutes and distribute to participants within two days after meeting, with two copies each to Engineer, Owner, and those affected by decisions made. 1.6 CLOSEOUT MEETING A. Schedule Project closeout meeting with sufficient time to prepare for requesting Substantial Completion. Preside over meeting and be responsible for minutes. B. Attendance Required: Construction Manager, major Contractors major Subcontractors, Owner, Resident Project Representative, and others appropriate to agenda. C. Notify Owner and Engineer seven (7) days in advance of meeting date. D. Minimum Agenda: 1. Contractor's inspection of Work. 2. Contractor's preparation of an initial "punch list." 3. Procedure to request Engineer inspection to determine date of Substantial Completion. 4. Completion time for correcting deficiencies. 5. Inspections by authorities having jurisdiction. 6. Certificate of Occupancy and transfer of insurance responsibilities. 7. Partial release of retainage. 8. Final cleaning. 9. Preparation for final inspection. ADMINISTRATIVE REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013000 - 4 10. Closeout Submittals: a. Project record documents. b. Affidavits. 11. Final Application for Payment. 12. Contractor's demobilization of Site. 13. Maintenance. E. Record minutes and distribute copies to participants within two days after meeting, with two copies each to Engineer, Owner, and those affected by decisions made. PART 2 - PRODUCTS - Not Used PART 3 - EXECUTION – Not Used END OF SECTION 01 30 00 CONSTRUCTION PROGRESS SCHEDULE 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013216 - 1 SECTION 01 32 16 - CONSTRUCTION PROGRESS SCHEDULE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Submittals. 2. Bar Chart Schedule 3. Review and evaluation. 4. Updating schedules. 5. Distribution. 1.2 SUBMITTALS A. Schedule Updates: 1. Overall percent complete, projected and actual. 2. Completion progress by listed activity and subactivity, to within five working days prior to submittal. 3. Changes in Work scope and activities modified since submittal. 4. Delays in submittals or resubmittals, deliveries, or Work. 5. Adjusted or modified sequences of Work. 6. Other identifiable changes. 7. Revised projections of progress and completion. B. Narrative Progress Report: 1. Submit with each monthly submission of Progress Schedule. 2. Summary of Work completed during the past period between reports. 3. Work planned during the next period. 4. Explanation of differences between summary of Work completed and Work planned in previously submitted report. 5. Current and anticipated delaying factors and estimated impact on other activities and completion milestones. 6. Corrective action taken or proposed. 1.3 BAR CHART SCHEDULES A. Format: Bar chart Schedule, to include at least: 1. Identification and listing in chronological order of those activities reasonably required to complete the Work, including: a. Subcontract Work. b. Project closeout and cleanup. c. Work sequences, constraints, and milestones. CONSTRUCTION PROGRESS SCHEDULE 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013216 - 2 2. Listings identified by Specification Section number. 3. Identification of the following: a. Horizontal time frame by year, month, and week. b. Duration, early start, and completion for each activity and subactivity. c. Critical activities and Project float. d. Subschedules to further define critical portions of Work. 1.4 REVIEW AND EVALUATION A. Participate in joint review and evaluation of schedules with Resident Project Representative at each submittal. B. Evaluate Project status to determine Work behind schedule and Work ahead of schedule. C. After review, revise schedules incorporating results of review, and resubmit within seven (7) days. 1.5 UPDATING SCHEDULES A. Maintain schedules to record actual start and finish dates of completed activities. B. Indicate progress of each activity to date of revision, with projected completion date of each activity. Update schedules to depict current status of Work. C. Identify activities modified since previous submittal, major changes in Work, and other identifiable changes. D. Upon approval of a Change Order, include the change in the next schedule submittal. E. Indicate changes required to maintain Date of Substantial Completion. F. Submit information as required to support recommended changes. G. Prepare narrative report to define problem areas, anticipated delays, and impact on schedule. Report corrective action taken or proposed and its effect. 1.6 DISTRIBUTION A. Following joint review, distribute copies of updated schedules to Contractor's Project site file, to Subcontractors, suppliers, Engineer and Owner. B. Instruct recipients to promptly report, in writing, problems anticipated by projections shown in schedules. CONSTRUCTION PROGRESS SCHEDULE 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013216 - 3 PART 2 - PRODUCTS - Not Used PART 3 - EXECUTION - Not Used END OF SECTION 01 32 16 SUBMITTAL PROCEDURES 202400254 Madsion Lifestyle District Phase I Utility Design Water Main Replacement 013300 - 1 SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Definitions. B. Submittal procedures. C. Construction progress schedules. D. Product data. E. Use of electronic CAD files of Project Drawings F. Shop Drawings. G. Other submittals. H. Test reports. I. Certificates. J. Construction photographs. K. Contractor review. L. Engineer review. 1.2 DEFINITIONS A. Action Submittals: Written and graphic information and physical samples that require Engineer's and Construction Manager's responsive action. B. Informational Submittals: Written and graphic information and physical samples that do not require Engineer's responsive action. Submittals may be rejected for not complying with requirements. 1.3 SUBMITTAL PROCEDURES A. Sequentially number transmittal forms. Mark revised submittals with original number and sequential alphabetic suffix. B. Identify: Project, Contractor, Subcontractor and supplier, pertinent Drawing and detail number, and Specification Section number appropriate to submittal. C. Apply Contractor's stamp, signed or initialed, certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is according to requirements of the Work and Contract Documents. D. Schedule submittals to expedite Project, and submit electronic submittals via email as PDF electronic files. Coordinate submission of related items. E. For each submittal for review, allow 10 days excluding delivery time to and from Contractor. F. Identify variations in Contract Documents and product or system limitations that may be detrimental to successful performance of completed Work. SUBMITTAL PROCEDURES 202400254 Madsion Lifestyle District Phase I Utility Design Water Main Replacement 013300 - 2 G. Allow space on submittals for Contractor and Engineer review stamps. H. When revised for resubmission, identify changes made since previous submission. I. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements. J. Submittals not requested will not be recognized nor processed. K. Incomplete Submittals: Engineer will not review. Complete submittals for each item are required. Delays resulting from incomplete submittals are not the responsibility of Engineer. 1.4 CONSTRUCTION PROGRESS SCHEDULES A. Comply with Section 01 32 16 - Construction Progress Schedule 1.5 PRODUCT DATA A. Product Data: Action Submittal: Submit to Engineer for review for assessing conformance with information given and design concept expressed in Contract Documents. B. Submit electronic submittals via email as PDF electronic files. C. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project. 1.6 ELECTRONIC CAD FILES OF PROJECT DRAWINGS A. Electronic CAD Files of Project Drawings: Distributed only under the following conditions: 1. Use of files is solely at receiver's risk. Engineer does not warrant accuracy of files. Receiving files in electronic form does not relieve receiver of responsibilities for measurements, dimensions, and quantities set forth in Contract Documents. In the event of ambiguity, discrepancy, or conflict between information on electronic media and that in Contract Documents, notify Engineer of discrepancy and use information in hard-copy Drawings and Specifications. 2. CAD files do not necessarily represent the latest Contract Documents, existing conditions, and as-built conditions. Receiver is responsible for determining and complying with these conditions and for incorporating addenda and modifications. 3. User is responsible for removing information not normally provided on Shop Drawings and removing references to Contract Documents. Shop Drawings submitted with information associated with other trades or with references to Contract Documents will not be reviewed and will be immediately returned. 4. Receiver shall not hold Engineer responsible for data or file clean-up required to make files usable, nor for error or malfunction in translation, interpretation, or use of this electronic information. 5. Receiver shall understand that even though Engineer has computer virus scanning software to detect presence of computer viruses, there is no guarantee that computer viruses are not present in files or in electronic media. SUBMITTAL PROCEDURES 202400254 Madsion Lifestyle District Phase I Utility Design Water Main Replacement 013300 - 3 6. Receiver shall not hold Engineer responsible for such viruses or their consequences, and shall hold Engineer harmless against costs, losses, or damage caused by presence of computer virus in files or media. 1.7 SHOP DRAWINGS A. Shop Drawings: Action Submittal: Submit to Engineer for assessing conformance with information given and design concept expressed in Contract Documents. B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances. C. When required by individual Specification Sections, provide Shop Drawings signed and sealed by a professional Engineer responsible for designing components shown on Shop Drawings. 1. Include signed and sealed calculations to support design. 2. Submit Shop Drawings and calculations in form suitable for submission to and approval by authorities having jurisdiction. 3. Make revisions and provide additional information when required by authorities having jurisdiction. D. Submit electronic submittals via email as PDF electronic files. E. After review, produce copies and distribute according to "Submittal Procedures" Article and for record documents described in Section 017000 - Execution and Closeout Requirements and in the City of South Bend Construction Standards & Specifications Section 1-10.2. 1. This document is available at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf 1.8 OTHER SUBMITTALS A. Informational Submittal: Submit data for Engineer's knowledge as Contract administrator or for Owner. B. Submit information for assessing conformance with information given and design concept expressed in Contract Documents. 1.9 TEST REPORTS A. Informational Submittal: Submit reports for Engineer's knowledge as Contract administrator or for Owner. B. Submit test reports for information for assessing conformance with information given and design concept expressed in Contract Documents. SUBMITTAL PROCEDURES 202400254 Madsion Lifestyle District Phase I Utility Design Water Main Replacement 013300 - 4 1.10 CERTIFICATES A. Informational Submittal: Submit certification by manufacturer, installation/application Subcontractor, or Contractor to Engineer, in quantities specified for Product Data. B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate. C. Certificates may be recent or previous test results on material or product but must be acceptable to Engineer. 1.11 CONSTRUCTION PHOTOGRAPHS A. Provide photographs of construction throughout progress of Work produced by an experienced photographer acceptable to Engineer. B. Each month submit photographs with Application for Payment. C. Take site photographs from different directions and photographs of the water mains indicating relative progress of the Work. D. Take photographs as evidence of existing Project conditions as follows: 1. All exterior work including open-cut pipe installation, curb restoration, asphalt repair and erosion control measures. E. Photographs: Submit electronic via email. F. Digital Images: Include date and time for each image. 1.12 CONTRACTOR REVIEW A. Review for compliance with Contract Documents and approve submittals before transmitting to Engineer. B. Contractor is responsible for: 1. Determination and verification of materials including manufacturer's catalog numbers. 2. Determination and verification of field measurements and field construction criteria. 3. Checking and coordinating information in submittal with requirements of Work and of Contract Documents. 4. Determination of accuracy and completeness of dimensions and quantities. 5. Confirmation and coordination of dimensions and field conditions at Site. 6. Construction means, techniques, sequences, and procedures. 7. Safety precautions. 8. Coordination and performance of Work of all trades. C. Stamp, sign or initial, and date each submittal to certify compliance with requirements of Contract Documents. SUBMITTAL PROCEDURES 202400254 Madsion Lifestyle District Phase I Utility Design Water Main Replacement 013300 - 5 D. Do not fabricate products or begin Work for which submittals are required until approved submittals have been received from Engineer. 1.13 ENGINEER REVIEW A. Do not make "mass submittals" to Engineer. "Mass submittals" are defined as six or more submittals or items in one day or 15 or more submittals or items in one week. If "mass submittals" are received, Engineer's review time stated above will be extended as necessary to perform proper review. Engineer will review "mass submittals" based on priority determined by Engineer after consultation with Owner. B. Informational submittals and other similar data are for Engineer's information, do not require Engineer's responsive action, and will not be reviewed or returned with comment. C. Submittals made by Contractor that are not required by Contract Documents may be returned without action. D. Submittal approval does not authorize changes to Contract requirements unless accompanied by Change Order. E. Owner may withhold monies due to Contractor to cover additional costs beyond the second submittal review. PART 2 - PRODUCTS - Not Used PART 3 - EXECUTION - Not Used END OF SECTION 01 33 00 PRECONSTRUCTION AUDIO-VIDEO DOCUMENTATION 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013800 - 1 SECTION 01 38 00 - PRECONSTRUCTION AUDIO-VIDEO DOCUMENTATION PART 1 - GENERAL 1.1 SCOPE OF WORK A. The work of this Section includes, but is not limited to, Preconstruction Audio-Video Documentation consisting of high definition color video recording, with audio description, of surface features along the entire line of the project and including all work, easement, and storage areas and all access roadways, and, prior to audio-video recording, visual investigation of all areas to be inventoried with notations made to items not readily visible by recording methods including, but not limited to, size, type and condition of driveway culverts, headwalls, etc. Audio-video recording shall be performed by an independent company or individual having at least three (3) years of experience in similar type work and shall be done prior to commencement of the construction or delivery of any equipment, materials, or supplies to the site of Work. B. The purpose of the high definition color audio-video recording of the project is to provide the necessary information for restoration of surface features after completion of the project. This recording shall cover the project area in its entirety to assist in returning those areas affected by construction to their original condition with as little controversy as possible. Video recording shall be performed no more than 12 months prior to construction in the area, and any areas recorded more than 12 months prior to the construction shall be redone at no additional cost to Owner. 1.2 QUALIFICATIONS A. Color audio-video recording must be compiled by a professional videographer with at least three years verifiable experience in color audio-video recording of similar type projects for municipal agencies. The names of the company, individual videographer(s) and additional requested information must be submitted to Owner or Engineer for approval by Owner prior to engaging the company or photographer proposed to perform the pre-construction video recording. 1.3 OWNERSHIP OF RECORDINGS A. All recordings produced will become the permanent property of Owner. The Contractor shall deliver copies of all video recordings to Owner or Engineer for review by Owner at least 30 days prior to the start of any construction. B. Any portion of the recorded coverage deemed unacceptable by Owner must be re-recorded by Contractor at no additional cost to Owner. PART 2 - PRODUCTS 2.1 ELECTRONIC REQUIREMENTS A. Audio-video recording shall be delivered via electronic format. PART 3 - EXECUTION PRECONSTRUCTION AUDIO-VIDEO DOCUMENTATION 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013800 - 2 3.1 COVERAGE OF RECORDING A. The area to be recorded shall include, but not be limited to, all existing driveways, sidewalks, curbs, ditches, streets, landscaping, trees, culverts, catch basins, headwalls, retaining walls, fences, visible utilities, and all buildings located within the zone of influence of construction. Of particular concern are any existing faults, fractures, defects, or other imperfections exhibited by the above mentioned surface features. Audio description shall be made simultaneously with and support the video coverage. 1. Streets: All streets adjacent to excavation sites shall be recorded for the full width of the public right-of-way and for a length equal to 500 feet in each direction of the anticipated excavation. 2. Easement Areas: Easement areas shall be recorded for the full width of the perpetual and temporary easements and all other adjacent areas lying within 30 feet of the easement. The size and locations of all easements are shown on the Contract Drawings. 3. Building Exteriors: Contractor shall furnish audio and color video of all exterior surfaces of buildings specifically identified by Owner to receive such coverage. At a minimum, any structure or building shall be recorded if adjacent to sewer installation or is expected to receive service as part of the project. Buildings so identified may include houses, apartments, factories, warehouses, retail stores and other structures. Exterior building coverage shall include, but not be limited to, walls, visible foundations, chimney, porches, and trim. 4. Lots: Contractor shall also furnish audio and color video of portions of lots to receive sanitary sewer service visible from the right-of-way. 3.2 LOCATION INFORMATION A. All video shall properly identify location, date and project name in a manner acceptable to Owner or Engineer. B. A record of the contents of each video shall be supplied identifying each video by location, date, and water stationing. C. A brief report and inventory of all videos completed, referenced by location and video number, shall be furnished to Owner or Engineer upon completion of the work and delivery of the videos. D. All video recordings shall begin with the date and time of recording, the project name, the sheet numbers or engineering stationing as shown on the Contract Drawings, the name of the street, easement or building being recorded, the direction of travel, and the viewing side. E. Houses and buildings shall be identified visually by house or building number, when possible, in such a manner that the progress of the recording and the proposed system may be located by reference to the houses and buildings. 3.3 ENTERING PROPERTY PRECONSTRUCTION AUDIO-VIDEO DOCUMENTATION 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 013800 - 3 A. If it becomes necessary to enter onto private property, Contractor shall notify the owner of such property at least 24 hours in advance of the planned entry to obtain their permission to do so. Should the owner of the property refuse to give their permission for said entry, Contractor shall notify Owner or Engineer. Contractor is advised that it shall not enter any private property before permission is granted to do so or Owner or Engineer notifies Contractor in writing that the legal right to enter the property has been obtained. Contractor shall be held liable for entry made other than stated above. Contractor shall, at its own expense, repair or restore any areas damaged during the work of this Section. 3.4 SITE RECORDING CONDITIONS A. All recording shall be done during times of good visibility. No outside recording shall be done during periods of visible precipitation or when the ground area is covered with snow, leaves, or debris unless otherwise authorized in writing by Owner or Engineer. B. In order to produce the proper detail and perspective, adequate auxiliary lighting will be required to fill in shadow areas caused by trees, utility poles, road signs and other such objects, as well as other conditions requiring artificial illumination. C. The average rate of speed in the general direction of travel of the conveyance used during recording shall not exceed 48 feet per minute. Panning rates and zoom-in zoom-out rates shall be controlled sufficiently such that playback will produce adequate clarity of the objects being viewed. D. When conventional wheeled vehicles are used as conveyances for the recording, the distance from the camera lens to the ground shall not be less than 8 feet to ensure proper perspective. In instances where coverage will be required in areas not accessible to conventional wheeled vehicles, such coverage shall be obtained by walking or by special conveyance approved by Owner, but with the same requirements for disk quality and content as specified herein except as may be specifically exempted by Owner in writing. END OF SECTION 01 38 00 QUALITY REQUIREMENTS 014000 - 1 SECTION 01 40 00 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Quality control. B. Tolerances. C. References. D. Testing and inspection services. E. Manufacturers' field services. 1.2 QUALITY CONTROL A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality. B. Comply with specified standards as the minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. C. Perform Work using persons qualified to produce required and specified quality. D. Products, materials, and equipment may be subject to inspection by Engineer and Owner at place of manufacture or fabrication. Such inspections shall not relieve Contractor of complying with requirements of Contract Documents. E. Supervise performance of Work in such manner and by such means to ensure that Work, whether completed or in progress, will not be subjected to harmful, dangerous, damaging, or otherwise deleterious exposure during construction period. 1.3 TOLERANCES A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate. B. Comply with manufacturers' recommended tolerances and tolerance requirements in reference standards. When such tolerances conflict with Contract Documents, request clarification from Engineer before proceeding. C. Adjust products to appropriate dimensions; position before securing products in place. QUALITY REQUIREMENTS 014000 - 2 1.4 REFERENCES A. For products or workmanship specified by association, trade, or other consensus standards, comply with requirements of standard except when more rigid requirements are specified or are required by applicable codes. B. Conform to reference standard by date of issue current as of date of Contract Documents except where specific date is established by code. C. Obtain copies of standards and maintain on Site when required by product Specification Sections. D. When requirements of indicated reference standards conflict with Contract Documents, request clarification from Engineer before proceeding. E. Neither contractual relationships, duties, or responsibilities of parties in Contract nor those of Engineer shall be altered from Contract Documents by mention or inference in reference documents. 1.5 TESTING AND INSPECTION SERVICES A. Employ and pay for services of an independent testing agency or laboratory acceptable to Owner to perform specified testing. 1. Before starting Work, submit testing laboratory name, address, and telephone number, and names of full-time specialist and responsible officer. 2. Submit copy of report of laboratory facilities' inspection made by Materials Reference Laboratory of National Bureau of Standards during most recent inspection, with memorandum of remedies of deficiencies reported by inspection. B. Independent firm will perform tests, inspections, and other services specified in individual Specification Sections and as required by authorities having jurisdiction. 1. Laboratory: Authorized to operate in State of Indiana. 2. Laboratory Staff: Maintain full-time specialist on staff to review services. 3. Testing Equipment: Calibrated at reasonable intervals with devices of an accuracy traceable to National Bureau of Standards or accepted values of natural physical constants. C. Testing, inspections, and source quality control may occur on or off Project Site. Perform off- Site testing as required by Engineer or Owner. D. Reports shall be submitted by independent firm to Engineer, Contractor, and authorities having jurisdiction, indicating observations and results of tests and compliance or noncompliance with Contract Documents. 1. Submit final report indicating correction of Work previously reported as noncompliant. E. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested. QUALITY REQUIREMENTS 014000 - 3 1. Notify Engineer and independent firm 24 hours before expected time for operations requiring services. 2. Make arrangements with independent firm and pay for additional Samples and tests required for Contractor's use. F. Employment of testing agency or laboratory shall not relieve Contractor of obligation to perform Work according to requirements of Contract Documents. G. Retesting or re-inspection required because of nonconformance with specified or indicated requirements shall be performed by same independent firm on instructions from Engineer. Payment for retesting or re-inspection will be charged to Contractor. H. Agency Responsibilities: 1. Test Samples of mixes submitted by Contractor. 2. Provide qualified personnel at Site. Cooperate with Architect/Engineer and Contractor in performance of services. 3. Perform indicated sampling and testing of products according to specified standards. 4. Ascertain compliance of materials and mixes with requirements of Contract Documents. 5. Promptly notify Architect/Engineer and Contractor of observed irregularities or nonconformance of Work or products. 6. Perform additional tests required by Architect/Engineer. 7. Attend preconstruction meetings and progress meetings. I. Agency Reports: After each test, promptly submit two copies of report to Engineer, Contractor, and authorities having jurisdiction. When requested by Engineer, provide interpretation of test results. Include the following: 1. Date issued. 2. Project title and number. 3. Name of inspector. 4. Date and time of sampling or inspection. 5. Identification of product and Specification Section. 6. Location in Project. 7. Type of inspection or test. 8. Date of test. 9. Results of tests. 10. Conformance with Contract Documents. J. Limits on Testing Authority: 1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. 2. Agency or laboratory may not approve or accept any portion of the Work. 3. Agency or laboratory may not assume duties of Contractor. 4. Agency or laboratory has no authority to stop the Work. QUALITY REQUIREMENTS 014000 - 4 1.6 MANUFACTURER'S FIELD SERVICES A. When specified in individual Specification Sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe Site conditions, conditions of surfaces and installation, quality of workmanship, testing, adjusting, and balancing of equipment commissioning as applicable, and to initiate instructions when necessary. B. Submit qualifications of observer to Owner 30 days in advance of required observations. Observer is subject to approval of Owner. C. Report observations and Site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturer's written instructions. D. Refer to Section 01 33 00 - Submittal Procedures, "Manufacturer's Field Reports" Article. PART 2 - PRODUCTS - Not Used PART 3 - EXECUTION - Not Used END OF SECTION 01 40 00 TEMPORARY FACILITIES AND CONTROLS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 015000 - 1 SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Temporary Utilities: 1. Temporary electricity. 2. Temporary lighting for construction purposes. 3. Temporary water service. 4. Temporary sanitary facilities. B. Construction Facilities: 1. Field offices and sheds. 2. Vehicular access. 3. Parking. 4. Progress cleaning and waste removal. 5. Traffic regulation. 6. Fire-prevention facilities. C. Temporary Controls: 1. Barriers. 2. Security. 3. Water control. 4. Dust control. 5. Erosion and sediment control. 6. Noise control. 7. Pollution control. D. Removal of utilities, facilities, and controls. 1.2 REFERENCES A. ASTM International: 1. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials. 2. ASTM E 90 - Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements. 3. ASTM E 119 - Standard Test Methods for Fire Tests of Building Construction and Materials. TEMPORARY FACILITIES AND CONTROLS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 015000 - 2 1.3 TEMPORARY ELECTRICITY A. Provide and pay for power service required from utility source as needed for construction operation. B. Complement existing power service capacity and characteristics as required for construction operations. 1.4 TEMPORARY LIGHTING FOR CONSTRUCTION PURPOSES A. Provide and maintain lighting for construction operations B. Maintain lighting and provide routine repairs. C. Permanent building lighting shall not be used during construction. 1.5 TEMPORARY WATER SERVICE A. Provide suitable quality water service as needed to maintain specified conditions for construction operations. Connect to existing water source. 1.6 TEMPORARY SANITARY FACILITIES A. Provide and maintain required facilities and enclosures. Provide facilities at time of Project mobilization. B. At end of construction, return existing facilities used for construction operations to same or better condition as original condition. 1.7 FIELD OFFICES AND SHEDS A. Existing spaces to be used for storage will be designated during preconstruction meeting. B. Storage Areas and Sheds: Size to storage requirements for products of individual Sections, allowing for access and orderly provision for maintenance and inspection of products to suit requirements in Section 01 60 00 - Product Requirements. C. Preparation: Fill and grade Sites for temporary structures sloped for drainage away from buildings. D. Installation: 1. Install field office spaces ready for occupancy 15 days after date established by Notice to Proceed. 2. Employee Residential Occupancy: Not allowed on Owner's property. E. Maintenance and Cleaning: TEMPORARY FACILITIES AND CONTROLS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 015000 - 3 1. Weekly janitorial services for field offices; periodic cleaning and maintenance for sheds and storage areas. 2. Maintain walks free of mud, water, snow, and the like. F. Removal: At completion of Work remove buildings, foundations, utility services, and debris. Restore areas to same or better condition as original condition. 1.8 VEHICULAR ACCESS A. Construct temporary access roads from public thoroughfares to serve construction area, of width and load-bearing capacity to accommodate unimpeded traffic for construction purposes. B. Construct temporary bridges and culverts to span low areas and allow unimpeded drainage. C. Extend and relocate vehicular access as Work progress requires and provide detours as necessary for unimpeded traffic flow. D. Locate as approved by Owner. E. Provide unimpeded access for emergency vehicles. Maintain 20 foot-wide driveways with turning space between and around combustible materials. F. Provide and maintain access to fire hydrants and control valves free of obstructions. G. Provide means of removing mud from vehicle wheels before entering streets. 1.9 PARKING A. Locate as approved by Owner. B. If Site space is not adequate, provide additional off-Site parking. C. Use of designated areas of existing on-Site streets and driveways used for construction traffic is not permitted. Tracked vehicles are not allowed on paved areas. D. Use of designated areas of existing parking facilities used by construction personnel is not permitted. E. Do not allow heavy vehicles or construction equipment in parking areas. F. Do not allow vehicle parking on existing pavement. G. Designate one parking space for Owner. H. Permanent Pavements and Parking Facilities: 1. Before Substantial Completion, bases for permanent roads and parking areas may be used for construction traffic. 2. Avoid traffic loading beyond paving design capacity. Tracked vehicles are not allowed. 3. Use of permanent parking structures is not permitted. TEMPORARY FACILITIES AND CONTROLS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 015000 - 4 I. Maintenance: 1. Maintain traffic and parking areas in sound condition free of excavated material, construction equipment, products, mud, snow, ice, and the like. 2. Maintain existing and permanent paved areas used for construction; promptly repair breaks, potholes, low areas, standing water, and other deficiencies, to maintain paving and drainage in original condition. J. Removal, Repair: 1. Remove temporary materials and construction at Substantial Completion. 2. Remove underground Work and compacted materials to depth of 2 feet; fill and grade Site as indicated. 3. Repair existing permanent facilities damaged by use, to original condition. K. Mud from Site vehicles: Provide means of removing mud from vehicle wheels before entering streets. 1.10 PROGRESS CLEANING AND WASTE REMOVAL A. Maintain areas free of waste materials, debris, and rubbish. Maintain Site in clean and orderly condition. B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, before enclosing spaces. C. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids. 1.11 TRAFFIC REGULATION A. Signs, Signals, and Devices: 1. Post-Mounted and Wall-Mounted Traffic Control and Informational Signs: As approved by authorities having jurisdiction. 2. Traffic Control Signals: As approved by local jurisdictions. 3. Traffic Cones, Drums, Flares, and Lights: As approved by authorities having jurisdiction. 4. Flag Person Equipment: As required by authorities having jurisdiction. B. Flag Persons: Provide trained and equipped flag persons to regulate traffic when construction operations or traffic encroach on public traffic lanes. C. Flares and Lights: Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic. D. Haul Routes: 1. Consult with authorities having jurisdiction and establish public thoroughfares to be used for haul routes and Site access. TEMPORARY FACILITIES AND CONTROLS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 015000 - 5 E. Traffic Signs and Signals: 1. Provide signs at approaches to Site and on Site, at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic. 2. Provide, operate, and maintain traffic control signals to direct and maintain orderly flow of traffic in areas under Contractor's control and areas affected by Contractor's operations. 3. Relocate signs and signals as Work progresses, to maintain effective traffic control. F. Removal: 1. Remove equipment and devices when no longer required. 2. Repair damage caused by installation. 3. Remove post settings to depth of 2 feet. 1.12 FIRE-PREVENTION FACILITIES A. Prohibit smoking within buildings under construction and demolition. Designate area on Site where smoking is permitted. Provide approved ashtrays in designated smoking areas. B. Establish fire watch for cutting, welding, and other hazardous operations capable of starting fires. Maintain fire watch before, during, and after hazardous operations until threat of fire does not exist. C. Portable Fire Extinguishers: NFPA 10; 10-pound capacity, 4A-60B: C UL rating. 1. Provide minimum of one fire extinguisher in every construction trailer and storage shed. 1.13 BARRIERS A. Provide barriers to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations and demolition. B. Tree and Plant Protection: Preserve and protect existing trees and plants designated to remain. 1. Protect areas within drip lines from traffic, parking, storage, dumping, chemically injurious materials and liquids, ponding, and continuous running water. 2. Provide 6-foot-high barriers around drip line, with access for maintenance. 3. Replace trees and plants damaged by construction operations. C. Protect non-owned vehicular traffic, stored materials, Site, and structures from damage. 1.14 SECURITY A. Security Program: 1. Protect Work on existing premises and Owner's operations from theft, vandalism, and unauthorized entry. 2. Initiate program in coordination with Owner's existing security system at Project mobilization. TEMPORARY FACILITIES AND CONTROLS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 015000 - 6 3. Maintain program throughout construction period until directed by Engineer. B. Entry Control: 1. Restrict entrance of persons and vehicles to Project Site and existing facilities. 2. Allow entrance only to authorized persons with proper identification. 3. Maintain log of workers and visitors and make available to Owner on request. 4. Coordinate access of Owner's personnel to Site in coordination with Owner's security forces. 1.15 WATER CONTROL A. Grade Site to drain. Maintain excavations free of water. Provide, operate, and maintain necessary pumping equipment. B. Protect Site from puddles or running water. 1.16 DUST CONTROL A. Execute Work by methods that minimize raising dust from construction operations. B. Provide positive means to prevent airborne dust from dispersing into atmosphere. 1.17 EROSION AND SEDIMENT CONTROL A. Plan and execute construction by methods to control surface drainage from cuts and fills from borrow and waste disposal areas. Prevent erosion and sedimentation. B. Minimize surface area of bare soil exposed at one time. C. Provide temporary measures including berms, dikes, drains, and other devices to prevent water flow. D. Construct fill and waste areas by selective placement to avoid erosive surface silts and clays. E. Periodically inspect earthwork to detect evidence of erosion and sedimentation. Promptly apply corrective measures. F. Comply with sediment and erosion control plan indicated on Drawings. 1.18 NOISE CONTROL A. Provide methods, means, and facilities to minimize noise produced by construction operations to meet local ordinances. TEMPORARY FACILITIES AND CONTROLS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 015000 - 7 1.19 POLLUTION CONTROL A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances and pollutants produced by construction operations. 1.20 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS A. Remove temporary utilities, equipment, facilities, and materials before Substantial Completion inspection. B. Remove underground installations to minimum depth of 2 feet. C. Clean and repair damage caused by installation or use of temporary Work. D. Restore existing and permanent facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition. PART 2 - PRODUCTS - Not Used PART 3 - EXECUTION - Not Used END OF SECTION 01 50 00 MAINTENANCE OF TRAFFIC 015700 - 1 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement SECTION 01 57 00 - MAINTENANCE OF TRAFFIC This work shall be in accordance with all applicable sections of the City of South Bend Indiana but not limited to, Sections 1-7.2 and 1-8.1. These sections include signage, traffic control, and maintenance of traffic. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp- content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf PRODUCT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 016000 - 1 SECTION 01 60 00 - PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Products. B. Product delivery requirements. C. Product storage and handling requirements. D. Product options. 1.2 PRODUCTS A. At minimum, comply with specified requirements and reference standards. B. Specified products define standard of quality, type, function, dimension, appearance, and performance required. C. Furnish products of qualified manufacturers that are suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise. Confirm that manufacturer's production capacity can provide sufficient product, on time, to meet Project requirements. D. Domestic Products: Except where specified otherwise, domestic products are required and interpreted to mean products mined, manufactured, fabricated, or produced in United States or its territories. 1.3 PRODUCT DELIVERY REQUIREMENTS A. Transport and handle products according to manufacturer's instructions. B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged. C. Provide equipment and personnel to handle products; use methods to prevent soiling, disfigurement, or damage. 1.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS A. Store and protect products according to manufacturer's instructions. B. Store products with seals and labels intact and legible. PRODUCT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 016000 - 2 C. Store sensitive products in weathertight, climate-controlled enclosures in an environment suitable to product. D. For exterior storage of fabricated products, place products on sloped supports aboveground. E. Provide off-Site storage and protection when Site does not permit on-Site storage or protection. F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products. G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter. H. Provide equipment and personnel to store products; use methods to prevent soiling, disfigurement, or damage. I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition. 1.5 PRODUCT OPTIONS A. Products Specified by Reference Standards or by Description Only: Products complying with specified reference standards or description. B. Products Specified by Naming One or More Manufacturers: Products of one of manufacturers named and complying with Specifications; no options or substitutions allowed. C. Products Specified by Naming One or More Manufacturers with Provision for Substitutions: Submit Request for Substitution for any manufacturer not named, according to Section 01 25 00 - Substitution Procedures. PART 2 - PRODUCTS – Not Used PART 3 - EXECUTION - Not Used END OF SECTION 01 60 00 EXECUTION AND CLOSEOUT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 017000 - 1 SECTION 01 70 00 - EXECUTION AND CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Field engineering. B. Closeout procedures. C. Project record documents. D. Operation and maintenance data. E. Spare parts and maintenance products. F. Product warranties and product bonds. G. Examination. H. Preparation. I. Execution. J. Cutting and patching. K. Protecting installed construction. L. Final cleaning. 1.2 FIELD ENGINEERING A. Employ land surveyor registered in State of Indiana and acceptable to Engineer. B. Locate and protect survey control and reference points. Promptly notify Engineer of discrepancies discovered. C. Control datum for survey is indicated on Drawings. D. Prior to beginning Work, verify and establish elevations of existing facilities to ensure that new Work will meet existing elevations in smooth and level alignment except where specifically detailed or indicated otherwise. E. Verify setbacks and easements; confirm Drawing dimensions and elevations. F. Provide field engineering services. Establish elevations, lines, and levels using recognized engineering survey practices. G. Submit copy of Site drawing signed by land surveyor certifying elevations and locations of the Work are in conformance with Contract Documents. H. Maintain complete and accurate log of control and survey Work as Work progresses. I. Protect survey control points prior to starting Site Work; preserve permanent reference points during construction. J. Promptly report to Engineer loss or destruction of reference point or relocation required because of changes in grades or other reasons. EXECUTION AND CLOSEOUT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 017000 - 2 K. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to Engineer. 1.3 CLOSEOUT PROCEDURES A. Prerequisites to Substantial Completion: Complete following items before requesting Certification of Substantial Completion, either for entire Work or for portions of Work: 1. Submit maintenance manuals, Project record documents, digital images of construction photographs, and other similar final record data in compliance with this Section. 2. Conduct inspection to establish basis for request that Work is substantially complete. Create comprehensive list (initial punch list) indicating items to be completed or corrected, value of incomplete or nonconforming Work, reason for being incomplete, and date of anticipated completion for each item. Include copy of list with request for Certificate of Substantial Completion. 3. Obtain and submit releases enabling Owner's full, unrestricted use of Project and access to services and utilities. Include releases from authorities having jurisdiction and utility companies. 4. Deliver tools, spare parts, extra stocks of material, and similar physical items to Owner. 5. Make final change-over of locks eliminating construction master-key system and transmit keys directly to Owner. Advise Owner's personnel of change-over in security provisions. 6. Discontinue or change over and remove temporary facilities and services from Project Site, along with construction tools, and similar elements. 7. Perform final cleaning according to this Section. B. Substantial Completion Inspection: 1. When Contractor considers Work to be substantially complete, submit to Owner: a. Written certificate that Work, or designated portion, is substantially complete. b. List of items to be completed or corrected (initial punch list). 2. Within seven days after receipt of request for Substantial Completion, Owner will make inspection to determine whether Work or designated portion is substantially complete. 3. Should Owner determine that Work is not substantially complete: a. Owner will promptly notify Contractor in writing, stating reasons for its opinion. b. Contractor shall remedy deficiencies in Work and send second written request for Substantial Completion to Owner. c. Owner will reinspect Work. d. Redo and Inspection of Deficient Work: Repeated until Work passes Owner's inspection. 4. When Owner finds that Work is substantially complete, Owner will: a. Prepare Certificate of Substantial Completion, accompanied by Contractor's list of items to be completed or corrected as verified and amended by Engineer and Owner (final punch list). b. Submit Certificate to Owner and Contractor for their written acceptance of responsibilities assigned to them in Certificate. EXECUTION AND CLOSEOUT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 017000 - 3 5. After Work is substantially complete, Contractor shall: a. Allow Owner occupancy of Project under provisions stated in Certificate of Substantial Completion. b. Complete Work listed for completion or correction within time period stipulated. 6. Owner will occupy all of project as specified in Section 01 10 00 - Summary. C. Prerequisites for Final Completion: Complete following items before requesting final acceptance and final payment. 1. When Contractor considers Work to be complete, submit written certification that: a. Contract Documents have been reviewed. b. Work has been examined for compliance with Contract Documents. c. Work has been completed according to Contract Documents. d. Work is completed and ready for final inspection. 2. Submittals: Submit following: a. Final punch list indicating all items have been completed or corrected. b. Final payment request with final releases and supporting documentation not previously submitted and accepted. Include certificates of insurance for products and completed operations where required. c. Specified warranties, workmanship/maintenance bonds, maintenance agreements, and other similar documents. d. Accounting statement for final changes to Contract Sum. e. Contractor's affidavit of payment of debts and claims. f. Contractor affidavit of release of liens. g. Consent of surety to final payment. 3. Perform final cleaning for Contractor-soiled areas according to this Section. D. Final Completion Inspection: 1. Within seven days after receipt of request for final inspection, Owner will make inspection to determine whether Work or designated portion is complete. 2. Should Owner consider Work to be incomplete or defective: a. Owner will promptly notify Contractor in writing, listing incomplete or defective Work. b. Contractor shall remedy stated deficiencies and send second written request to Owner that Work is complete. c. Owner will reinspect Work. d. Redo and Inspection of Deficient Work: Repeated until Work passes Owner's inspection. EXECUTION AND CLOSEOUT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 017000 - 4 1.4 PROJECT RECORD DOCUMENTS A. Maintain on Site one set of the following record documents; record actual revisions to the Work: 1. Drawings. 2. Specifications. 3. Addenda. 4. Change Orders and other modifications to the Contract. 5. Reviewed Shop Drawings, product data, and Samples. 6. Manufacturer's instruction for assembly, installation, and adjusting. B. Ensure entries are complete and accurate, enabling future reference by Owner. C. Store record documents separate from documents used for construction. D. Record information concurrent with construction progress, not less than weekly. E. Specifications: Legibly mark and record, at each product Section, description of actual products installed, including the following: 1. Manufacturer's name and product model and number. 2. Product substitutions or alternates used. 3. Changes made by Addenda and modifications. F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction as follows: 1. Include Contract modifications such as Addenda, supplementary instructions, change directives, field orders, minor changes in the Work, and change orders. 2. Include locations of concealed elements of the Work. 3. Identify depth of buried utility lines and provide dimensions showing distances from permanent facility components that are parallel to utilities. 4. Dimension ends, corners, and junctions of buried utilities to permanent facility components using triangulation. 5. Identify and locate existing buried or concealed items encountered during Project. 6. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements. 7. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work. 8. Field changes of dimension and detail. 9. Details not on original Drawings. G. Submit PDF electronic files of marked-up documents to Engineer before Substantial Completion. 1.5 OPERATION AND MAINTENANCE DATA A. Submit in PDF composite electronic indexed file. EXECUTION AND CLOSEOUT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 017000 - 5 B. Contents: Prepare table of contents for each volume, with each product or system description identified, typed on white paper, in three parts as follows: 1. Part 1: Directory, listing names, addresses, and telephone numbers of Engineer, Contractor, Subcontractors, and major equipment suppliers. 2. Part 2: Operation and maintenance instructions, arranged by system and subdivided by Specification Section. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Include the following: a. Significant design criteria. b. List of equipment. c. Parts list for each component. d. Operating instructions. e. Maintenance instructions for equipment and systems. f. Maintenance instructions for special finishes, including recommended cleaning methods and materials, and special precautions identifying detrimental agents. g. Safety precautions to be taken when operating and maintaining or working near equipment. 3. Part 3: Project documents and certificates, including the following: a. Shop Drawings and product data. b. Air and water balance reports. c. Certificates. d. Photocopies of warranties and bonds. 1.6 SPARE PARTS AND MAINTENANCE PRODUCTS A. Furnish spare parts, maintenance, and extra products in quantities specified in individual Specification Sections. B. Deliver to Project Site and place in location as directed by Owner; obtain receipt prior to final payment. 1.7 PRODUCT WARRANTIES AND PRODUCT BONDS A. Obtain warranties and bonds executed in duplicate by responsible Subcontractors, suppliers, and manufacturers within ten days after completion of applicable item of Work. B. Execute and assemble transferable warranty documents and bonds from Subcontractors, suppliers, and manufacturers. C. Verify documents are in proper form, contain full information, and are notarized. D. Co-execute submittals when required. E. Include table of contents and assemble in PDF composite electronic indexed file. F. Submit prior to final Application for Payment. EXECUTION AND CLOSEOUT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 017000 - 6 G. Time of Submittals: 1. For equipment or component parts of equipment put into service during construction with Owner's permission, submit documents within ten days after acceptance. 2. Make other submittals within ten days after date of Substantial Completion, prior to final Application for Payment. 3. For items of Work for which acceptance is delayed beyond Substantial Completion, submit within ten days after acceptance, listing date of acceptance as beginning of warranty or bond period. PART 2 - PRODUCTS - Not Used PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that existing Site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions. B. Verify that existing substrate is capable of structural support or attachment of new Work being applied or attached. C. Examine and verify specific conditions described in individual Specification Sections. D. Verify that utility services are available with correct characteristics and in correct locations. 3.2 PREPARATION A. Clean substrate surfaces prior to applying next material or substance according to manufacturer's instructions. B. Seal cracks or openings of substrate prior to applying next material or substance. C. Apply manufacturer-required or -recommended substrate primer, sealer, or conditioner prior to applying new material or substance in contact or bond. 3.3 EXECUTION A. Comply with manufacturer's installation instructions, performing each step in sequence. Maintain one set of manufacturer's installation instructions at Project Site during installation and until completion of construction. B. When manufacturer's installation instructions conflict with Contract Documents, request clarification from Engineer before proceeding. C. Verify that field measurements are as indicated on approved Shop Drawings or as instructed by manufacturer. EXECUTION AND CLOSEOUT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 017000 - 7 D. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement. 1. Secure Work true to line and level and within specified tolerances, or if not specified, industry- recognized tolerances. 2. Physically separate products in place, provide electrical insulation, or provide protective coatings to prevent galvanic action or corrosion between dissimilar metals. 3. Exposed Joints: Provide uniform joint width and arrange to obtain best visual effect. Refer questionable visual-effect choices to Engineer for final decision. E. Allow for expansion of materials and building movement. F. Climatic Conditions and Project Status: Install each unit of Work under conditions to ensure best possible results in coordination with entire Project. 1. Isolate each unit of Work from incompatible Work as necessary to prevent deterioration. 2. Coordinate enclosure of Work with required inspections and tests to minimize necessity of uncovering Work for those purposes. G. Adjust operating products and equipment to ensure smooth and unhindered operation. H. Clean and perform maintenance on installed Work as frequently as necessary through remainder of construction period. Lubricate operable components as recommended by manufacturer. 3.4 CUTTING AND PATCHING A. Employ skilled and experienced installers to perform cutting and patching. B. Submit written request in advance of cutting or altering elements affecting: 1. Structural integrity of element. 2. Integrity of weather-exposed or moisture-resistant elements. 3. Efficiency, maintenance, or safety of element. 4. Visual qualities of sight-exposed elements. 5. Work of Owner or separate contractor. C. Execute cutting, fitting, and patching including excavation and fill to complete Work and to: 1. Fit the several parts together, to integrate with other Work. 2. Uncover Work to install or correct ill-timed Work. 3. Remove and replace defective and nonconforming Work. 4. Remove samples of installed Work for testing. 5. Provide openings in elements of Work for penetrations of mechanical and electrical Work. D. Execute Work by methods to avoid damage to other Work and to provide proper surfaces to receive patching and finishing. E. Cut masonry and concrete materials using masonry saw or core drill. F. Restore Work with new products according to requirements of Contract Documents. EXECUTION AND CLOSEOUT REQUIREMENTS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 017000 - 8 G. Fit Work tight to pipes, sleeves, ducts, conduits, and other penetrations through surfaces. H. Maintain integrity of wall, ceiling, or floor construction; completely seal voids. I. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for assembly, refinish entire unit. J. Identify hazardous substances or conditions exposed during the Work to Engineer for decision or remedy. 3.5 PROTECTING INSTALLED CONSTRUCTION A. Protect installed Work and provide special protection where specified in individual Specification Sections. B. Provide temporary and removable protection for installed products. Control activity in immediate Work area to prevent damage. C. Prohibit traffic or storage upon waterproofed or roofed surfaces. When traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer. D. Prohibit traffic from landscaped areas. 3.6 FINAL CLEANING A. Execute final cleaning prior to final Project assessment. 1. Employ experienced personnel or professional cleaning firm. B. Clean Site; sweep paved areas, rake clean landscaped surfaces. C. Remove waste and surplus materials, rubbish, and construction facilities from Site. END OF SECTION 01 70 00 CONCRETE PAVEMENT 033000 - 1 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement SECTION 03 30 00 CONCRETE PAVEMENT This work shall be in accordance with all applicable sections of the City of South Bend Indiana but not limited to, Section 1-7.5, Section 2-5, and Section 500. These documents are available online at https://southbendin.gov/wp-content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf PEDESTRIAN CROSSWALK PAINT 099300 - 1 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement SECTION 09 93 00 PEDESTRIAN CROSSWALK PAINT This work shall be in accordance with all applicable sections of the City of South Bend Indiana but not limited to, Section 6-5.2(d). These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp- content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf SOILS FOR EARTHWORK 310513 - 1 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement SECTION 31 05 13 - SOILS FOR EARTHWORK PART 1 - GENERAL 1.1 SUMMARY A. This work shall be in accordance with all applicable sections of the City of South Bend Indiana including, but not limited to, Section 7 Earthwork & Erosion and Sediment Control. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf B. Section Includes: 1. Submittals 2. Quality Assurance 3. Subsoil materials 4. Topsoil materials 5. Source Quality Controls 6. Excavation 7. Stockpiling 8. Stockpile Cleanup C. Related Sections: 1. Section 31 05 16 - Aggregates for Earthwork. 2. Section 31 23 13 Excavation. 3. Section 31 23 16.33 - Trenching. 1.2 REFERENCES A. American Association of State Highway and Transportation Officials: 1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a 10-lb Rammer and an 18-in. Drop. B. ASTM International: 1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort 12,400 ft-lbf/ft3. 2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort 56,000 ft-lbf/ft3. 3. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System). SOILS FOR EARTHWORK 310513 - 2 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 1.3 SUBMITTALS A. Section 01 33 00 - Submittal Procedures: Requirements for submittals. B. Materials Source: Submit name of imported materials source. C. Manufacturer's Certificate: Certify all specified materials meet or exceed specified requirements. 1.4 QUALITY ASSURANCE A. Furnish each subsoil and topsoil material from single source throughout the Work. B. Perform Work in accordance with INDOT standards. PART 2 - PRODUCTS 2.1 SUBSOIL MATERIALS A. Subsoil: 1. Excavated and re-used material. 2. Graded. 3. Free of lumps larger than 3 inches, rocks larger than 2 inches, and debris. 4. Conforming to ASTM D2487 Group Symbol CL. 2.2 TOPSOIL MATERIALS A. Topsoil: Conforming to Section 914 of current INDOT Standard Specifications. 2.3 SOURCE QUALITY CONTROL A. Section 01 40 00 - Quality Requirements: Testing and Inspection Services, Testing and analysis of soil material. B. Testing and Analysis of Subsoil Material: Perform in accordance with ASTM D698. Testing and Analysis of Topsoil Material: Perform in accordance with ASTM D698. C. When tests indicate materials do not meet specified requirements, change material and retest. D. Furnish materials of each type from same source throughout the Work. SOILS FOR EARTHWORK 310513 - 3 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement PART 3 - EXECUTION 3.1 EXCAVATION A. Excavate subsoil and topsoil from areas designated. Strip topsoil to full depth of topsoil in designated areas. B. Stockpile excavated material meeting requirements for subsoil materials and topsoil materials. C. Remove excess excavated subsoil and topsoil not intended for reuse from site. D. Remove excavated materials not meeting requirements for subsoil materials and topsoil materials from site. 3.2 STOCKPILING A. Stockpile materials on site at locations designated by Owner. B. Stockpile in sufficient quantities to meet Project schedule and requirements. C. Separate differing materials with dividers or stockpile apart to prevent mixing. D. Stockpile topsoil 8 feet high maximum. E. Prevent intermixing of soil types or contamination. F. Direct surface water away from stockpile site to prevent erosion or deterioration of materials. G. Stockpile unsuitable materials on impervious material and cover to prevent erosion and leaching, until disposed of. 3.3 STOCKPILE CLEANUP A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent freestanding surface water. B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface to prevent freestanding surface water. END OF SECTION 31 05 13 AGGREGATES FOR EARTHWORK 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 310516 - 1 SECTION 31 05 16 - AGGREGATES FOR EARTHWORK PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Submittals 2. Quality Assurance 3. Coarse aggregate materials 4. Fine aggregate materials 5. Source Quality Control 6. Stockpiling 7. Stockpile Cleanup B. Related Sections: 1. Section 31 05 13 - Soils for Earthwork. 2. Section 31 23 16.13 - Trenching. 3. Section 33 14 13 - Public Water Utility Distribution Piping. 1.2 REFERENCES A. American Association of State Highway and Transportation Officials: 1. AASHTO M147 - Standard Specification for Materials for Aggregate and Soil-Aggregate Subbase, Base and Surface Courses. 2. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a 10-lb Rammer and an18-in. Drop. B. ASTM International: 1. ASTM C136 - Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates. 2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort 12,400 ft-lbf/ft3. 3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort 56,000 ft-lbf/ft3. 4. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System). 5. ASTM D4318 - Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. 1.3 SUBMITTALS A. Section 01 33 00 - Submittal Procedures: Requirements for submittals. AGGREGATES FOR EARTHWORK 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 310516 - 2 B. Materials Source: Submit name of imported materials suppliers. C. Manufacturer's Certificate: Certify all specified materials meet or exceed specified requirements. 1.4 QUALITY ASSURANCE A. Furnish each aggregate material from single source throughout the Work. B. Perform Work according to INDOT Standard Specifications. PART 2 - PRODUCTS 2.1 COARSE AGGREGATE MATERIALS A. Coarse Aggregate Size: Conforming to Drawings and City of South Bend standards. B. Coarse Aggregate Type: Conforming to Drawings and City of South Bend standards. C. Coarse Aggregate No. 2, 8, 53: Conforming to INDOT Standard Specifications according to ASTM D698 and as indicated on the Drawings. 2.2 FINE AGGREGATE MATERIALS A. Fine Aggregate Size: Conforming to Drawings and City of South Bend standards. B. Fine Aggregate Type: Conforming to INDOT Standard Specifications and City of South Bend standards. 2.3 SOURCE QUALITY CONTROL A. Section 01 40 00 - Quality Requirements: Testing and inspection services. B. Coarse Aggregate Material - Testing and Analysis: Perform according to ASTM D698. C. Fine Aggregate Material - Testing and Analysis: Perform according to ASTM D698. D. When tests indicate materials do not meet specified requirements, change material and retest. PART 3 - EXECUTION 3.1 STOCKPILING A. Stockpile materials on site at locations designated by Engineer. AGGREGATES FOR EARTHWORK 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 310516 - 3 B. Stockpile in sufficient quantities to meet Project schedule and requirements. C. Separate different aggregate materials with dividers or stockpile individually to prevent mixing. D. Direct surface water away from stockpile site to prevent erosion or deterioration of materials. E. Stockpile unsuitable materials on impervious material and cover to prevent erosion and leaching, until disposed of. 3.2 STOCKPILE CLEANUP A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent freestanding surface water. B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface to prevent freestanding surface water. END OF SECTION 31 05 16 EXCAVATION 312316 - 1 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement SECTION 31 23 16 EXCAVATION This work shall be in accordance with all applicable sections of the City of South Bend Indiana but not limited to, Section 5-3.2. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp- content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf TRENCHING 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 312316.13 - 1 SECTION 31 23 16.13 – TRENCHING This work shall be in accordance with all applicable sections of the City of South Bend Indiana “Construction Standards and Specifications” and “Prevailing & Supplemental Specifications” including, but not limited to, Section 5-3.8 and 5-3.9. These documents are available online at https://southbendin.gov/wp-content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf DEWATERING 312319 - 1 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement SECTION 31 23 19 – DEWATERING This work shall be in accordance with all applicable sections of the City of South Bend Indiana “Construction Standards and Specifications” and “Prevailing & Supplemental Specifications” including, but not limited to, 5-3.3. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp- content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf EROSION AND SEDIMENTATION CONTROLS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 312500 - 1 SECTION 31 25 00 - EROSION AND SEDIMENTATION CONTROLS This work shall be in accordance with all applicable sections of the City of South Bend Indiana “Construction Standards and Specifications” and “Prevailing & Supplemental Specifications” including, but not limited to, Section 7 – Earthwork & Erosion and Sediment Control. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp- content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf ASPHALT PAVING 2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 32 12 16 - 1 SECTION 32 12 16 - ASPHALT PAVING AND PAVEMENT STRIPING This work shall be in accordance with all applicable sections of the City of South Bend Indiana but not limited to, Sections 2-3, 2-4 and Section 400. These documents are available online at https://southbendin.gov/wp-content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf as well as INDOT Section 808. DISINFECTION OF WATER UTILITY PIPING SYSTEMS 2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement 330110.58 - 1 SECTION 33 01 10.58 - DISINFECTION OF WATER UTILITY PIPING SYSTEMS This work shall be in accordance with all applicable sections of the City of South Bend Indiana “Construction Standards and Specifications” and “Prevailing & Supplemental Specifications” including, but not limited to, Section 5-4.2. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp- content/uploads/2020/05/Prevailing-Supplemental-Specifications.pdf PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 1 SECTION 33 14 13 - PUBLIC WATER UTILITY DISTRIBUTION PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for public line 2. Tapping sleeves and valves 3. Valves and valve boxes 4. Hydrants B. Related Requirements: 1. Section 01 20 00 Price and Payment Procedures. 2. Section 31 05 13 Soils for Earthwork. 3. Section 31 05 16 Aggregates for Earthwork. 4. Section 31 23 16 Excavation. 5. Section 31 23 16.13 Trenching. 6. Section 31 23 19 Dewatering. 7. Section 33 01 10.58 Disinfection of Water Utility Piping. 1.2 REFERENCE STANDARDS A. American Association of State Highway and Transportation Officials: 1. AASHTO T 180 - Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop. B. American Society of Mechanical Engineers: 1. ASME B16.1 - Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and 250. C. ASTM International: 1. ASTM A307 - Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength. 2. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3). 3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3). 4. ASTM D6938 - Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth). D. American Water Works Association: 1. AWWA C104 - Cement-Mortar Lining for Ductile-Iron Pipe and Fittings. PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 2 2. AWWA C105 - Polyethylene Encasement for Ductile-Iron Pipe Systems. 3. AWWA C110 - Ductile-Iron and Gray-Iron Fittings. 4. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. 5. AWWA C115 - Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded Flanges. 6. AWWA C151 - Ductile-Iron Pipe, Centrifugally Cast. 7. AWWA C153 - Ductile-Iron Compact Fittings. 8. AWWA C500 - Metal-Seated Gate Valves for Water Supply Service. 9. AWWA C600 - Installation of Ductile-Iron Mains and Their Appurtenances. E. Manufacturers Standardization Society of the Valve and Fittings Industry: 1. MSS SP-60 - Connecting Flange Joints between Tapping Sleeves and Tapping Valves. F. NSF International: 1. NSF 61 - Drinking Water System Components - Health Effects. 2. NSF 372 - Drinking Water System Components - Lead Content. 1.3 COORDINATION A. Section 01 30 00 - Administrative Requirements: Requirements for coordination. B. Coordinate Work of this Section with structure excavation and existing utilities. 1.4 PREINSTALLATION MEETINGS A. Section 01 30 00 - Administrative Requirements: Requirements for preinstallation meeting. B. Convene minimum one week prior to commencing Work of this Section. 1.5 SUBMITTALS A. Section 01 33 00 - Submittal Procedures: Requirements for submittals. B. Product Data: Submit manufacturer information regarding pipe materials, pipe fittings, valves, valve boxes, and hydrants. C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. D. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections. E. Preconstruction Photographs: Submit digital files of color photographs of Work areas and material storage areas, as specified in Section 01 70 00 - Execution and Closeout Requirements. F. Qualifications Statements: 1. Submit qualifications for manufacturer and installer. PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 3 1.6 CLOSEOUT SUBMITTALS A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for submittals. B. Project Record Documents: Record actual locations of piping mains, valves, connections, thrust restraints, and invert elevations. C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities. 1.7 QUALITY ASSURANCE A. Valves: Mark valve body with manufacturer's name and pressure rating. B. Materials in Contact with Potable Water: Certified according to NSF 61 and NSF 372. C. Perform Work according to City of City of South Bend construction standards and specifications. D. Maintain a copy of each standard affecting Work of this Section on Site. 1.8 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience. B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience in installation of liner materials. 1.9 DELIVERY, STORAGE, AND HANDLING A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products. B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage. C. Storage: 1. Store materials according to manufacturer instructions. 2. Block individual and stockpiled pipe lengths to prevent moving. 3. Do not place pipe or pipe materials on private property or in areas obstructing pedestrian or vehicle traffic. 4. Store PE and PVC materials out of sunlight. D. Protection: 1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas. PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 4 2. Store gaskets for mechanical and push-on joints in cool and dry location, out of direct sunlight, and not in contact with petroleum products. 3. Provide additional protection according to manufacturer instructions. 1.10 EXISTING CONDITIONS A. Field Measurements: 1. Verify field measurements prior to fabrication. 2. Indicate field measurements on Shop Drawings. 1.11 WARRANTY A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for warranties. B. Furnish five-year manufacturer's warranty for valves. PART 2 - PRODUCTS 2.1 US STEEL AND FOUNDARY PRODUCTS shall be used for all water main piping, fittings, restrained joints, valves, tapping sleeves, and appurtenances 2.2 WATER PIPING A. Ductile-Iron Pipe: 1. This work shall be in accordance with all applicable sections of the City of South Bend Section 5-2.2(a). These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf B. Jackets: PE encasement: 1. This work shall be in accordance with all applicable sections of the City of South Bend Section 5-2.3. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf C. Corporation Stop and Curb Stop Assemblies: 1. This work shall be in accordance with all applicable sections of the City of South Bend Section 5-2.5(g). These documents are available online at https://southbendin.gov/wp- PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 5 content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf D. Line Stop Assemblies: 1. All line stop sleeves shall be fabricated to assure a 360-degree seal around the pipe under working pressures up to 200 psi. The valve assembly, when in the open position shall give a full unobstructed full flow waterway after installation. The sleeve shall be made of ASTM A-36 steel, epoxy coated to 10-12 mils. The sleeve shall be lined and coated with fusion bonded epoxy meeting the requirements of AWWA-C213. E. Service Saddles: 1. Type: Tapped Full-Circle wrap around Stainless Steel Service Clamp. 2. Designed to hold pressures in excess of pipe working pressure. F. Service Lines: 1. Water service pipe and fittings shall be Type K copper, conforming to ASTM B88 with compression fittings in one (1) inch or two (2) inch diameter. G. Tracer Wire: Electronic detection materials for nonconductive piping products. 1. Install THWN-insulated #14-10 unshielded solid copper or #14-10 steel core tracer wire. Tracer wire splicing shall be in accordance with the City of South Bend Standards. 2.3 VALVES A. This work shall be in accordance with all applicable sections of the City of South Bend Indiana 5-2.5. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf 2.4 FIRE HYDRANTS A. This work shall be in accordance with all applicable sections of the City of South Bend Indiana 5-2.6. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 6 2.5 VALVE BOXES A. This work shall be in accordance with all applicable sections of the City of South Bend Indiana -2.5(f). These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf B. Lid Inscription: WATER 2.6 TAPPING SLEEVES AND VALVES A. This work shall be in accordance with all applicable sections of the City of South Bend Indiana 5-2.5(e). These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf 2.7 MATERIALS A. Bedding and Cover: 1. Bedding: This work shall be in accordance with all applicable sections of the City of limited to, Section 5-3.8. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf 2. Cover: This work shall be in accordance with all applicable sections of the City of South Section 5-3.6. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf 3. Soil Backfill from above Pipe to Finish Grade: This work shall be in accordance with all 5-3.9. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 7 2.8 ACCESSORIES A. Pipe Markers: As required by City of South Bend Water. B. Steel Rods, Bolt, Lugs, and Brackets: 1. Comply with ASTM A36/A36M or A307. 2. Grade A carbon steel. PART 3 - EXECUTION 3.1 EXAMINATION A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation examination. B. Verify that existing utility water main size, location, and invert are as indicated on Drawings. 3.2 PREPARATION A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation preparation. B. Remove large stones or other hard matter capable of damaging pipe or of impeding consistent backfilling or compaction. C. Preconstruction Site Photos: 1. As specified in Section 01 38 00 Preconstruction Audio-Video Documentation. D. Pipe Cutting: 1. Cut pipe ends square, ream pipe and tube ends to full pipe diameter, and remove burrs. 2. Use only equipment specifically designed for pipe cutting; use of chisels or hand saws is not permitted. 3. Grind edges smooth with beveled end for push-on connections. E. Remove scale and dirt on inside and outside before assembly. 3.3 PIPE HANDLING A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation examination. B. Prior to installation, each pipe length shall be carefully inspected for damage. C. All pipe, fittings, and appurtenances shall be thoroughly cleaned before installation and shall be kept clean until installation and backfilling has been completed. PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 8 D. Use only nylon ropes, slings, or other lifting devices that will not damage the surface of the pipe. E. Keep the pipe clean and free of debris, dirt, animals, and trash during and after laying operations. F. At the close of each operating day, seal the open end of the pipe using a gasketed night cap. 3.4 INSTALLATION A. Bedding: 1. Excavation: 1. This work shall be in accordance with all applicable sections of the City of South limited to, Section 5-3.2. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf 2. Hand trim for accurate placement of pipe to elevations as indicated on Drawings. 2. Dewatering: 1. This work shall be in accordance with all applicable sections of the City of South limited to, Section 5-3.3 These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf 3. Place bedding material at trench bottom, level fill materials in one continuous layer not exceeding 6 inches of compacted depth, and compact to 95 percent of maximum density. B. Piping: 1. This work shall be in accordance with all applicable sections of the City of South Bend Section 5-3.4. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf C. PE Encasement: 1. Encase piping in PE to prevent contact with surrounding backfill material. 2. Comply with AWWA C105. 3. Terminate encasement 3 to 6 inches above ground where pipe is exposed. Overlap 1 foot in each direction at joints and secure around pipe. PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 9 D. Thrust Restraints: 1. Provide pressure pipeline with restrained joints. At connection locations with existing pipeline provide thrust blocking at bend adjacent to the connection to the existing pipeline. E. Corporation Stop Assemblies: 1. Make connection for each different kind of water main, using suitable materials, equipment, and methods as approved by Engineer. 2. Provide service clamps for mains constructed of materials other than cast iron or ductile iron. 3. Location: 1. Screw corporation stops directly into tapped and threaded iron main at 10- and 2- o'clock positions along main's circumference. 2. Locate and stagger corporation stops at least 12 inches apart longitudinally. 4. Use seals or other devices such that no leaks are present in mains at points of tapping. 5. Do not backfill and cover service connections until installation has been approved by Owner. F. Backfilling: 1. This work shall be in accordance with all applicable sections of the City of South Bend Section 5-3.9. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf G. Disinfection of Potable Water Piping Systems: 1. This work shall be in accordance with all applicable sections of the City of South Bend Section 5-4.2. These documents are available online at https://southbendin.gov/wp- content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf 3.5 TOLERANCES A. Section 01 40 00 - Quality Requirements: Requirements for tolerances. B. Install pipe to indicated elevation within tolerance of 3 inch. 3.6 FIELD QUALITY CONTROL A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for testing, adjusting, and balancing. B. Testing: PUBLIC WATER UTILITY DISTRIBUTION PIPING 2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 10 1. Pressure test piping system according to AWWA C600 and following: 1. Test Pressure: Not less than 150 psi in excess of maximum static pressure 2. Conduct hydrostatic test for a minimum of two hours. 3. Slowly fill section to be tested with water; expel air from piping at high points. 4. Install corporation cocks at high points. 5. Close air vents and corporation cocks after air is expelled. 6. Raise pressure to specified test pressure. 7. Observe joints, fittings, and valves under test. 8. Remove and renew cracked pipes, joints, fittings, and valves showing visible leakage, and retest. 9. Correct visible deficiencies and continue testing at same test pressure for additional two hours to determine leakage rate. 10. Maintain pressure within plus or minus 5 psi (34.4 kPa) of test pressure. 11. Leakage is defined as quantity of water supplied to piping necessary to maintain test pressure during period of test. 12. Compute maximum allowable leakage using following formula: 1) L = SD x sqrt(P)/C. 2) L = testing allowance, gph. 3) S = length of pipe tested, feet. 4) D = nominal diameter of pipe, inches . 5) P = average test pressure during hydrostatic test, psig. 6) C = 148,000. 13. If pipe under test contains sections of various diameters, calculate allowable leakage from sum of computed leakage for each size. 14. Leakage: 1) If test of pipe indicates leakage greater than allowed, locate source of leakage, make corrections, and retest until leakage is within allowable limits. 2) Correct visible leaks regardless of quantity of leakage. 2. Compaction Testing: 1. Comply with ASTM D698. 2. Frequency of Compaction Tests: every other lift. 3. If tests indicate Work does not meet specified requirements, remove Work, replace, and retest. END OF SECTION 33 14 13 03-12-2026 03-12-2026 4/6/2026 4/6/2026 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 04/23/2026 Name Zach Hurst Department DPW BPW Date 04/28/2026 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name F. A. Wilhelm New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Madison Lifestyle District – New Parking Garage CMc Project Number 123-074 Funding Source River West DA Bond Account No. PO-0037917 Amount This change: $1,100,176; Revised Amount: $7,939,176 Terms of Contract Purpose/Description Change Order no. 1 adds $575,176 for the new Madison Street water main and $525,000 for Owner’s Contingency to address unforeseen conditions during parking lot removal. For Change Orders Only Amount of Increase Decrease $ 1,100,176 ($ ) Previous Amount $ 6,839,000 Current Percent of Change: Increase Decrease 16.1% ( %) New Amount $ 7,939,176 Total Percent of Change: Increase Decrease 16.1% ( %) Time Extension Amount: New Completion Date: