HomeMy WebLinkAbout04142026 BPW Meeting Minutes - FinalAGENDA REVIEW SESSION APRIL 9, 2026 53
The Agenda Review Session of the Board of Public Works was convened at 10:31 a.m. on
April 9, 2026, by Board President Elizabeth A. Maradik, Vice President Joseph Molnar (not
present), and Board Members Murray Miller (virtual), Breana Micou, Abigail Magas and
Board Attorney Michael Schmidt (virtual) present. The Board of Public Works Clerk, Hillary
R. Horvath, presented the Board with a proposed agenda of items presented by the public
and by City Staff.
ACTION ITEM
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
Leslie Biek, Assistant City Engineer, stated the first contract covers Appendix Phase Two,
from Lathrop to Bordy, focused on the right-of-way phase. Most of the land needed will be
temporary for driveway construction, with some permanent right-of-way required near the
Lathrop intersection to improve corner areas. Under an agreement with INDOT, up to 80%
of the costs for this phase will be reimbursed with federal funds.
Ms. Biek then stated second LPA contract involves consulting services for the design phase
of a traffic central management system, focused on modernizing traffic signals. Like the first
project, it qualifies for up to 80% federal reimbursement through INDOT. The necessary
consultant agreements have already been approved, and the contract enables access to
that reimbursement.
Type Business Description Amount/
Funding
Motion/
Second
INDOT/LPA
Contract
Indiana
Department of
Transportatio
n
Contract for the Bendix
Phase II Right of Way
Phase, INDOT will
Reimburse 80% of the
Cost, Project No. 121-
047
NA Magas/ Micou
INDOT/LPA
Contract
Indiana
Department of
Transportatio
n
Contract to Perform
Consulting Work on the
Traffic Central
Management System,
INDOT will Reimburse
80% of the Cost, Project
No. 125-051
NA Magas/ Micou
Board members discussed the following item(s) from the agenda.
RESOLUTIONS
City Attorney Jenna Throw introduced Item 11. A. Resolution 14-2026 Agreement
between the City of South Bend and Rides2U and stated this resolution relates to the
Commuter Trust program, which connects residents with transportation providers (such
as Uber, Lyft, and others). A new potential partner, Rides2U, is being considered. Attorney
Throw noted that one of the company’s associates, Chad Mastagh, is also a city employee
(a firefighter), additional legal steps are required. These include public disclosure and
approval in a public meeting. She explains that his city role is unrelated to the contract, he
has disclosed his financial interest, and the agreement meets legal requirements, and
stated the team is present to answer questions.
CHANGE ORDERS
Board Member Murray Miller asked if item 7. A. Beacon Health Parking Lot change order
for the Beacon Health parking lot project, specifically about unforeseen foundation-like
elements discovered during construction. Engineer Zach Hurst clarified that the issue was
not related to the South Bend Medical Foundation demolition. Instead, the discovery
involved an unexpected, buried utility structure in the former parking lot area, which
required removal and led to the change order.
REGULAR MEETING ARPIL 14, 2026 54
CHANGE ORDERS
Board Member Abigail Magas asked about item 7. G WWTP Headworks Office
Improvement Engineer Gemma Stanton stated that they need to add a few accessories
like a lit exit sign in order for the building department to sign off on the occupancy of these
spaces.
CHANGE ORDERS
Board Member Abigail Magas asked about item 7. H SRTS Kennedy School and 7. I SRTS
Muessel Primary/Holy Cross Schools and had concerns about school drop off and pick up.
Engineer Gemma Stanton stated this change order will allow work to be completed
sooner and Muessel Primary/Hold Cross has been a long time coming. She noted that
coordination with contractors and inspectors has taken place, and most sidewalk work
will occur away from school entrances, minimizing impacts on school operations like
pickup and drop-off.
CHANGE ORDERS
Board Member Abigail Magas asked about the reasons for changes for item 7. J.
Riverfront West Urban Neighborhood Development. Engineer Charlotte Brach stated
change order was driven by delays related to private utility relocations and unforeseen
site conditions, including more complex water main work than expected. Additional
temporary solutions and labor are needed to allow the contractor to continue progressing
and stay close to schedule. These adjustments aim to minimize delays and avoid impacting
the developer’s timeline, particularly JC Hart’s project.
PRIVILEGE OF THE FLOOR
Attorney Michael Schmidt shared with the Board that staff received an email from a
resident at Preston Dr. regarding their concerns about Sorin Park Playground and the SB
Thrive Development. Attorney Schmidte insured that the email will be shared with the
Board and that staff will follow up directly with the resident to address his concerns.
ADJOURNMENT
There being no further business to come before the Board, President Maradik adjourned
the meeting at 10:45 a.m.
ATTEST:
_________________________________
Hillary R. Horvath, Clerk
REGULAR MEETING APRIL 14, 2026
The Regular Meeting of the Board of Public Works was convened at 9:31 a.m. on Tuesday,
April 14, 2026, by Board President Elizabeth A. Maradik in the 4th Floor Public Meeting
Room, Council Chambers of the City Hall Building, 215 S. Martin Luther King Jr. Blvd., Suite
April 28, 2026
REGULAR MEETING ARPIL 14, 2026 55
400., South Bend, Indiana. The meeting was also streamed live to the public via Microsoft
Teams. Board Clerk Hillary R. Horvath confirmed the presence of Board President
Elizabeth A. Maradik, Vice President Joseph Molnar, and Board Members Murray Miller,
Breana Micou, Abigail Magas and Board Attorney Michael Schmidt, with a roll call.
President Maradik reminded virtual attendees to mute their microphones and turn off their
cameras when not speaking, and to save their questions and comments for the Privilege of
the Floor.
APPROVE MINUTES OF PREVIOUS MEETING
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
minutes for the Agenda Review Session and Regular Meetings of the Board held on March
19, and March 24, were approved.
OPENING OF BIDS – 2026 STREET AND SEWER MATERIALS BID – PROJECT NO. 126-
015 (FUNDS: 202, 251, 266, 412, 640, 641)
This was the date set for receiving and opening sealed bids for the above referenced
project. The Clerk tendered proof of publication of the Notice in the South Bend Tribune,
which was found to be sufficient. The following bids were opened and publicly read:
BUC CONSTRUCTION SUPPLY, INC.
2304 Brothers Dr., Suite E
Lafayette, IN 47909
tc@bucconstructionsupply.com
Bid was signed by Ms. Teresa Butler
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY No Bid
A-2 Class A High Early 800 CY No Bid
A-3 7 Bag Mix 600 CY No Bid
A-4 High Early Concrete w/
Integral Color- Black
650 CY No Bid
A-5 Flowable Fill, Removable 350 CY No Bid
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY No Bid
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY No Bid
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY No Bid
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON No Bid
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642
(Circle One)
300 EA $382.00
Neenah
REGULAR MEETING ARPIL 14, 2026 56
R-1642
Natural
Finish
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 (Circle One)
300 EA $350.00
Neenah
R-1642
Natural
Finish
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
REGULAR MEETING ARPIL 14, 2026 57
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: $73,200
FURGUSON WATERWORKS
1077 Oliver Plow Ct.
South Bend, IN 46601
Thomas.Holmer@Ferguson.com
Bid was signed by Mr. Thomas Holmer
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY No Bid
A-2 Class A High Early 800 CY No Bid
A-3 7 Bag Mix 600 CY No Bid
A-4 High Early Concrete w/
Integral Color- Black
650 CY No Bid
A-5 Flowable Fill, Removable 350 CY No Bid
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY No Bid
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY No Bid
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY No Bid
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON No Bid
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
REGULAR MEETING ARPIL 14, 2026 58
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642
(Circle One)
300 EA $384.20
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 (Circle One)
300 EA $351.55
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
REGULAR MEETING ARPIL 14, 2026 59
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: $73,575
RIETH-RILEY CONSTRUCTION CO., INC.
25200 State Road 23
South Bend, IN 46614
ralvarado@rieth-riley.com; jkwilasz@rieth-riley.com
Bid was signed by Mr. Jacob K. Kwilasz
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY No Bid
A-2 Class A High Early 800 CY No Bid
A-3 7 Bag Mix 600 CY No Bid
A-4 High Early Concrete w/
Integral Color- Black
650 CY No Bid
A-5 Flowable Fill, Removable 350 CY No Bid
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY No Bid
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY No Bid
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY No Bid
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON $19.00
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
REGULAR MEETING ARPIL 14, 2026 60
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642 or
approved equal (Circle One)
300 EA No Bid
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 or approved equal
(Circle One)
300 EA No Bid
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
REGULAR MEETING ARPIL 14, 2026 61
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: NOT PROVIDED
ENNIS-FLINT INC.
4161 Piedmont Pkwy., Suite 370
Greensboro, NC 27410
jhankins@ppg.com; dl-ts-contracts@ppg.com
Bid was signed by Mr. Matthew G. Morrissette
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY No Bid
A-2 Class A High Early 800 CY No Bid
A-3 7 Bag Mix 600 CY No Bid
A-4 High Early Concrete w/
Integral Color- Black
650 CY No Bid
A-5 Flowable Fill, Removable 350 CY No Bid
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY No Bid
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY No Bid
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY No Bid
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
REGULAR MEETING ARPIL 14, 2026 62
B-1 No. 23 Sand 5,000 TON No Bid
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642 or
approved equal (Circle One)
300 EA No Bid
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 or approved equal
(Circle One)
300 EA No Bid
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
REGULAR MEETING ARPIL 14, 2026 63
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL $13.25/Gal
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL $13.25/Gal
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL $18.50/Gal
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL $17.50/Gal
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: $60,100
SMITH READY MIX, INC
251 Lincolnway
Valparaiso, IN 46383
jacobwood@smithreadymix.com
Bid was signed by Mr. Jacob Wood
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY $172.00
A-2 Class A High Early 800 CY $182.00
A-3 7 Bag Mix 600 CY $194.00
A-4 High Early Concrete w/
Integral Color- Black
650 CY $272.00
A-5 Flowable Fill, Removable 350 CY $125.00
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY $3.50
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY $7.00
REGULAR MEETING ARPIL 14, 2026 64
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY $14.00
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON No Bid
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642
(Circle One)
300 EA No Bid
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 (Circle One)
300 EA No Bid
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
REGULAR MEETING ARPIL 14, 2026 65
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: $950,087.50
AMERICAN HIGHWAY PRODUCTS
11723 Strasburg Bolivar Rd. NW
Bolivar, OH 44612
jdowning@ahp1.com
Bid was signed by Mr. Jason Downing
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY No Bid
A-2 Class A High Early 800 CY No Bid
A-3 7 Bag Mix 600 CY No Bid
A-4 High Early Concrete w/
Integral Color- Black
650 CY No Bid
A-5 Flowable Fill, Removable 350 CY No Bid
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY No Bid
REGULAR MEETING ARPIL 14, 2026 66
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY No Bid
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY No Bid
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON No Bid
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642
(Circle One)
300 EA No Bid
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 (Circle One)
300 EA No Bid
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA $116.00
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA $122.00
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA $129.50
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA $137.00
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA $191.00
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA $197.50
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA $204.50
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA $129.50
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA $148.00
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA $116.00
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA $122.50
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA $116.00
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA $122.50
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA $129.50
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA $122.50
REGULAR MEETING ARPIL 14, 2026 67
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA $129.50
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA $116.00
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA $122.50
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA $129.50
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA $137.00
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: $66,427.50
BIT-MAT PRODUCTS OF INDIANA
PO Box 428
Ashley, IN 46705
pprumm@bitmatproducts.com; kmonroe@bitmatproducts.com
Bid was signed by Mr. Anthony Winters
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY No Bid
A-2 Class A High Early 800 CY No Bid
A-3 7 Bag Mix 600 CY No Bid
A-4 High Early Concrete w/
Integral Color- Black
650 CY No Bid
A-5 Flowable Fill, Removable 350 CY No Bid
REGULAR MEETING ARPIL 14, 2026 68
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY No Bid
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY No Bid
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY No Bid
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON No Bid
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642
(Circle One)
300 EA No Bid
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 (Circle One)
300 EA No Bid
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
REGULAR MEETING ARPIL 14, 2026 69
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL $2.95
G-2 RS-2 25,000 GAL $2.85
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: $145,000
KLINK TRUCKING, INC.
PO Box 428
Ashley, IN 46705
pprumm@bitmatproducts.com; kmonroe@klinktrucking.com
Bid was signed by Mr. Anthony Winters
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY No Bid
A-2 Class A High Early 800 CY No Bid
A-3 7 Bag Mix 600 CY No Bid
REGULAR MEETING ARPIL 14, 2026 70
A-4 High Early Concrete w/
Integral Color- Black
650 CY No Bid
A-5 Flowable Fill, Removable 350 CY No Bid
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY No Bid
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY No Bid
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY No Bid
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON $18.25
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON $22.00
B-4 No. 53 Slag 1000 TON $23.75
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON $29.25
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642
(Circle One)
300 EA No Bid
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 (Circle One)
300 EA No Bid
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
REGULAR MEETING ARPIL 14, 2026 71
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: $309,250
PENN SOILS LLC
14760 Douglas Road
Mishawaka, IN 46545
jcbpdllc.est2019@gmail.com
Bid was signed by Ms. Tracy McKenzie
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
REGULAR MEETING ARPIL 14, 2026 72
A-1 Class A Concrete 2,500 CY No Bid
A-2 Class A High Early 800 CY No Bid
A-3 7 Bag Mix 600 CY No Bid
A-4 High Early Concrete w/
Integral Color- Black
650 CY No Bid
A-5 Flowable Fill, Removable 350 CY No Bid
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY No Bid
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY No Bid
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY No Bid
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON No Bid
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON $15.30
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642 or
approved equal (Circle One)
300 EA No Bid
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 , or approved equal
(Circle One)
300 EA No Bid
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
REGULAR MEETING ARPIL 14, 2026 73
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: $10,710.00
OZINGA READY MIX CONCRETE, INC.
715 W. Ireland Rd.
South Bend, IN 46614
bethbirkholz@ozinga.com
Bid was signed by Ms. Beth Birkholz-Oldfather
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
REGULAR MEETING ARPIL 14, 2026 74
Division A – PCC Materials
Item
No.
Description Quantity Unit Unit Price
A-1 Class A Concrete 2,500 CY $170.0
A-2 Class A High Early 800 CY $174.00
A-3 7 Bag Mix 600 CY $184.00
A-4 High Early Concrete w/
Integral Color- Black
650 CY $244.00
A-5 Flowable Fill, Removable 350 CY $125.00
A-6 Non-Chloride Accelerator
added to concrete – 0.5%
325 EA CY $3.75
A-7 Non-Chloride Accelerator
added to concrete – 1%
1000 EA CY $7.50
A-8 Non-Chloride Accelerator
added to concrete – 2%
2100 EA CY $15.00
Division B – Aggregate Materials
Item
No.
Description Quantity Unit Unit Price
B-1 No. 23 Sand 5,000 TON No Bid
B-2 No. 53 Gravel 1000 TON No Bid
B-3 No. 53 Recycled Concrete 7500 TON No Bid
B-4 No. 53 Slag 1000 TON No Bid
B-5 Topsoil 700 TON No Bid
B-6 No. 11 Slag Chip Stone 1000 TON No Bid
Division C – Sewer Materials - Castings
Item
No.
Description Quantity Unit Unit Price
C-1 Manhole Cover & Frame: EJ
1040A, Neenah R-1642
(Circle One)
300 EA No Bid
C-2 Catch Basin Cover & Frame
EJ 1020-M1 or Neenah R-
1642 (Circle One)
300 EA No Bid
Division D – Sewer Materials
Item
No.
Description Quantity Unit Unit Price
D-1 MH Riser 20 ¾” D – 1” R –
7/8” L
40 EA No Bid
D-2 MH Riser 20 ¾” D – 1 ½” R –
7/8” L
40 EA No Bid
D-3 MH Riser 20 ¾” D – 2” R –
7/8” L
20 EA No Bid
D-4 MH Riser 20 ¾” D – 2 1/2” R
– 7/8” L
10 EA No Bid
D-5 MH Riser 21 ¾” D – 1” R – 1
3/8” L
20 EA No Bid
D-6 MH Riser 21 ¾” D – 1 1/2” R
– 1 3/8” L
30 EA No Bid
D-7 MH Riser 21 ¾” D – 2” R – 1
3/8” L
30 EA No Bid
D-8 MH Riser 22 1/8” D – 2” R –
1 1/4” L
20 EA No Bid
D-9 MH Riser 22 1/8” D – 3” R –
1 1/4” L
20 EA No Bid
REGULAR MEETING ARPIL 14, 2026 75
D-10 MH Riser 22 1/4” D – 1” R –
1 1/2” L
30 EA No Bid
D-11 MH Riser 22 1/4” D – 1 ½” R
– 1 ½ ” L
30 EA No Bid
D-12 MH Riser 23” D – 1” R – 1
3/4” L
30 EA No Bid
D-13 MH Riser 23” D – 1 1/2” R –
1 3/4” L
20 EA No Bid
D-14 MH Riser 23” D – 2” R – 1
3/4” L
40 EA No Bid
D-15 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/8” L
10 EA No Bid
D-16 MH Riser 23 5/8” D – 2” R –
1 1/8” L
10 EA No Bid
D-17 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
20 EA No Bid
D-18 MH Riser 23 5/8” D – 1 1/2”
R – 1 1/2” L
25 EA No Bid
D-19 MH Riser 23 5/8” D – 2” R –
1 1/2” L
20 EA No Bid
D-20 MH Riser 23 5/8” D – 2 1/2”
R – 1 1/2” L
20 EA No Bid
Division E – Traffic Materials
Item
No.
Description Quantity Unit Unit Price
E-1 High Build Fast Dry
Waterborne Traffic Marking
Paint - White
2200 GAL No Bid
E-2 High Build Fast Dry
Waterborne Traffic Marking
Paint - Yellow
2200 GAL No Bid
E-3 High Build Fast Dry
Waterborne Traffic Marking
Paint - Blue
50 GAL No Bid
E-4 High Build Fast Dry
Waterborne Traffic Marking
Paint - Green
50 GAL No Bid
E-5 Pavement Markings Beads,
Standard
40000 LBS No Bid
Division F – Snow Removal Materials
Item
No.
Description Quantity Unit Unit Price
F-1 Beet Juice Concentrate 20,000 GAL No Bid
Division G – Street Materials
Item
No.
Description Quantity Unit Unit Price
G-1 AE-T Tack 25,000 GAL No Bid
G-2 RS-2 25,000 GAL No Bid
G-3 Crack Sealant 72,000 LBS No Bid
TOTAL: NOT PROVIDED
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
above bids were referred to Engineering for review and recommendation.
OPENING OF BIDS – 2026 ASPHALT MATERIALS BID – PROJECT NO. 125-016 (FUNDS:
251, 266, 412)
REGULAR MEETING ARPIL 14, 2026 76
This was the date set for receiving and opening sealed bids for the above referenced
project. The Clerk tendered proof of publication of the Notice in the South Bend Tribune,
which was found to be sufficient. The following Bids were opened and publicly read:
MILESTONE CONTRACTORS NORTH, INC.
24358 State Road 23
South Bend, IN 46614
akrueger@milestonelp.com
Bid was signed by Mr. Dustin P. Hilary
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Item
No.
Description Quantity Unit Unit Price Total
A-1 HMA Surface Type B,
9.5mm, PG 64-28P
10,000 Ton $66.75
$667,500
A-2 HMA Surface Type B,
9.5mm, PG 70-22P
17,500 Ton $70.00 $1,225,000
A-3 HMA Binder 11 22,500 Ton $66.75 $1,501,875
A-4 HMA Base 5D 3,000 Ton $59.00 $177,000
A-5 CMA Patch AE-300P 250 Ton $141.00 $35,250
A-6 High Performance Cold Mix 250 EA $141.00 $70,500
TOTAL: $3,677,125
RIETH-RILEY CONSTRUCTION CO., INC.
25200 State Road 23
South Bend, IN 46614
ralvarado@rieth-riley.com; jkwilasz@rieth-riley.com
Bid was signed by Mr. Jacob K. Kwilasz
Non-Collusion, Non-Discrimination Affidavit Form was completed.
BID:
Item
No.
Description Quantity Unit Unit Price Total
A-1 HMA Surface Type B,
9.5mm, PG 64-28P
10,000 Ton $68.45 $684,500
A-2 HMA Surface Type B,
9.5mm, PG 70-22P
17,500 Ton $70.95 $1,241,625
A-3 HMA Binder 11 22,500 Ton $68.45 $1,540,125
A-4 HMA Base 5D 3,000 Ton $58.00 $174,000
A-5 CMA Patch AE-300P 250 Ton $100.00 $25,000
A-6 High Performance Cold Mix 250 EA $100.00 $50,000
TOTAL $3,715,250
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
above bids were referred to Engineering for review and recommendation.
OPENING OF BIDS – 2026 TRAFFIC CALMING – PROJECT NO. 126-023 (PR-00046576)
This was the date set for receiving and opening sealed bids for the above referenced
project. The Clerk tendered proof of publication of the Notice in the South Bend Tribune,
which was found to be sufficient. The following Bids were opened and publicly read:
SELGE CONSTRUCTION CO., INC.
2833 South 11th Street
Niles, MI 49120
bkuhns@selgeconstruction.com
Bid was submitted by Mr. Robert P. Kuhns
Non-Collusion, Non-Discrimination Affidavit Form was completed.
Five percent (5%) Bid Bond was submitted.
REGULAR MEETING ARPIL 14, 2026 77
Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed.
One (1) of One (1) Addendum Acknowledgements received.
BID:
Base Bid $360,500
Alternate #1 $67,490
Alternate #2 $74,490
Alternate #3 $67,490
PREMIUM CONCRETE SERVICES
712 Richmond St.
Elkhart, IN 46516
rbecker@premiumservices.group
Bid was submitted by Mr. Rob Becker
Non-Collusion, Non-Discrimination Affidavit Form was completed.
Five percent (5%) Bid Bond was submitted.
Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed.
One (1) of One (1) Addendum Acknowledgements received.
BID:
Base Bid $324,860
Alternate #1 $52,310
Alternate #2 $53,030
Alternate #3 $52,310
MILESTONE CONTRACTORS L.P.
24358 State Road 23
South Bend, IN 46614
akrueger@milestonelp.com, dhilary@milestonelp.com
Bid was signed by Mr. Dustin Hilary
Non-Collusion, Non-Discrimination Affidavit Form was completed.
Five percent (5%) Bid Bond was submitted.
Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed.
One (1) of One (1) Addendum Acknowledgements received.
BID:
Base Bid $335,400
Alternate #1 $52,800
Alternate #2 $52,800
Alternate #3 $52,800
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
above bids were referred to Engineering for review and recommendation.
OPENING OF BIDS – SALE OF CITY-OWNED PROPERTY – 3814 S. MICHIGAN ST.
This was the date set for receiving and opening sealed bids for the above referenced
project. The Clerk tendered proof of publication of the Notice in the South Bend Tribune,
which was found to be sufficient. The following Bids were opened and publicly read:
K.R. PALMER
Palmer Funeral Homes
3718 S. Michigan St.
South Bend, IN 46619
kr@palmerfuneralhomes.com
BID: $7,550
REGULAR MEETING ARPIL 14, 2026 78
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
above bids were referred to DCI for review and recommendation.
OPENING OF BIDS – SALE OF CITY-OWNED PROPERTY – VACANT LOT 39 –
MICHIGAN ST
This was the date set for receiving and opening sealed bids for the above referenced
project. The Clerk tendered proof of publication of the Notice in the South Bend Tribune,
which was found to be sufficient. The following Bids were opened and publicly read:
K.R. PALMER
Palmer Funeral Homes
3718 S. Michigan St.
South Bend, IN 46619
kr@palmerfuneralhomes.com
BID: $8,450
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
above bids were referred to DCI for review and recommendation.
AWARD BID AND APPROVE CONTRACT – SEITZ PARK RECONSTRUCTION, PHASE II –
PROJECT NO. 125-041 (PR-00045293)
Patrick Sherman, Engineering, advised the Board that on March 10, 2026, bids were
received and opened for the above referenced project. After reviewing those bids, Mr.
Sherman recommended that the Board award the contract to the lowest responsive and
responsible bidder, Larson-Danielson Construction Co., Inc., in the amount of $5,281,019.
Therefore, VP Molnar made a motion that the recommendation be accepted, and the bid be
awarded, and the contract approved as outlined above. Mr. Miller seconded the motion,
which carried by roll call.
AWARD BID AND APPROVE CONTRACT – 2026 CONTRACTOR PAVING ROUND 1 –
PROJECT NO. 126-017 (PR-00047154)
Dan Jones, Engineering, advised the Board that on March 24, 2026, bids were received and
opened for the above referenced project. After reviewing those bids, Mr. Jones
recommended that the Board award the contract to the lowest responsive and responsible
bidder, Rieth-Riley Construction Co., Inc., in the amount of $1,102,852. Therefore, VP
Molnar made a motion that the recommendation be accepted, and the bid be awarded, and
the contract approved as outlined above. Mr. Miller seconded the motion, which carried by
roll call.
AWARD QUOTATION AND APPROVE CONTRACT – 2026 LAMPPOST PROGRAM –
PROJECT NO. 126-018 (PR-00047261)
Lidya Abreha, Engineering, advised the Board that on April 3, 2026, quotations were
received and opened for the above referenced project. After reviewing those quotations,
Ms. Abreha recommended that the Board award the contract to the lowest responsive and
responsible quoter, Gama Sonic Solar Lighting, in the amount of $52,245.25. Therefore, VP
Molnar made a motion that the recommendation be accepted, and the quotation be
awarded, and the contract approved as outlined above. Mr. Miller seconded the motion,
which carried by roll call.
AWARD QUOTATION AND APPROVE CONTRACT – 2026 SIGNAL KNOCKDOWN &
WIRING INVESTIGATIONS – PROJECT NO. 126-019 (PR-00047261)
Nifemi Oluwatomini, Engineering, advised the Board that on March 24, 2026, quotations
were received and opened for the above referenced project. After reviewing those
quotations, Mr. Oluwatomini recommended that the Board award the contract to the
lowest responsive and responsible quoter, JBL Signals and Lighting, in the amount not to
exceed $30,000. Therefore, VP Molnar made a motion that the recommendation be
accepted, and the quotation be awarded, and the contract approved as outlined above. Mr.
Miller seconded the motion, which carried by roll call.
REGULAR MEETING ARPIL 14, 2026 79
APPROVE CHANGE ORDER NO. 3 – ND TO DTSB TRAIL – PROJECT NO. 122-040A (PO-
0030356)
President Maradik advised that Charlotte Brach, Engineering, has submitted change order
number 3 on behalf of Milestone Contractors, L.P., indicating the contract amount be
increased by $49,926.51 for a new contract sum, including this change order, in the amount
of $5,673,109.40 and additional one (1) day. Upon a motion made by VP Molnar, seconded
by Mr. Miller and carried by roll call, the change order was approved.
APPROVE CHANGE ORDER NO. 6 – RACLIN MURPHY ENCORE CENTER – PROJECT
NO. 123-056 (PO-0032487)
President Maradik advised that Patrick Sherman, Engineering, has submitted change order
number 6 on behalf of Larson-Danielson Construction Co., Inc. , indicating the contract
amount be increased by $64,989.70 for a new contract sum, including this change order, in
the amount of $16,099,214.79. Upon a motion made by VP Molnar, seconded by Mr. Miller
and carried by roll call, the change order was approved.
APPROVE CHANGE ORDER NO. 1 – STUDEBAKER MUSEUM SKYLIGHT
REPLACEMENT – PROJECT NO. 124-019 (PO-0035275)
President Maradik advised that Patrick Sherman, Engineering, has submitted change order
number 1 on behalf of Shaffner Heaney and Associates, indicating the contract amount be
increased by $1,500 for a new contract sum, including this change order, in the amount of
$78,447 with an additional two-hundred and fifteen (215) days and a completion date of
November 1, 2025. Upon a motion made by VP Molnar, seconded by Mr. Miller and carried
by roll call, the change order was approved.
APPROVE CHANGE ORDER NO. 1 – O’BRIEN SPLASHPAD AND RESTROOM – PROJECT
NO. 125-025 (PO-0041970)
President Maradik advised that Zak Tebell, Engineering, has submitted change order
number 1 on behalf of C&E Excavating, Inc., indicating the contract amount be increased by
$5,445 for a new contract sum, including this change order, in the amount of $1,547,868.
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
change order was approved.
APPROVE CHANGE ORDER NO. 5 – BEACON HEALTH PARKING LOT – PROJECT NO.
123-076A (PO-0036234)
President Maradik advised that Zach Hurst, Engineering, has submitted change order
number 5 on behalf of Indiana Earth, Inc., indicating the contract amount be increased by
$3,883.75 for a new contract sum, including this change order, in the amount of
$2,682,951.72. Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by
roll call, the change order was approved.
APPROVE CHANGE ORDER NO. 1 – DEMOLTION OF FORMER NIPSCO BUILIDNG –
PROJECT NO. 125-080 (PO-0042066)
President Maradik advised that Zach Hurst, Engineering, has submitted change order
number 1 on behalf of Ritschard Bros., Inc., indicating the contract amount be increased by
$7,500 for a new contract sum, including this change order, in the amount of $246,216.
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
change order was approved.
APPROVE CHANGE ORDER NO. 1(F) – WWTP HEADWORKS OFFICE IMPROVEMENTS
– PROJECT NO. 125-023 (PO-0041167)
President Maradik advised that Gemma Stanton, Engineering, has submitted change order
number 1 (F) on behalf of Larson-Danielson Construction Co., Inc., indicating the contract
amount be increased by $2,046.12 for a new contract sum, including this change order, in
the amount of $68,516.12 and an additional eighty-three (83) day with a completion date
of January 1, 2026. Upon a motion made by VP Molnar, seconded by Mr. Miller and carried
by roll call, the change order was approved.
APPROVE CHANGE ORDER NO. 1 – SRTS KENNEDY SCHOOL – PROJECT NO. 123-017
(PO-0041449)
REGULAR MEETING ARPIL 14, 2026 80
President Maradik advised that Gemma Stanton, Engineering, has submitted change order
number 1 on behalf of INDOT/Rieth-Riley Construction Co., Inc., indicating the start date
be changed from June 8, 2026 to May 4, 2026, with no dollar amount change. Upon a
motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change
order was approved.
APPROVE CHANGE ORDER NO. 1 – MUESSEL PRIMARY/HOLY CROSS SCHOOLS –
PROJECT NO. 122-066 (PO-0037460)
President Maradik advised that Gemma Stanton, Engineering, has submitted change order
number 1 on behalf of INDOT/Milestone Contractors, L.P., indicating the start date be
changed from June 8, 2026 to March 30, 2026, with no dollar amount change. Upon a
motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change
order was approved.
APPROVE CHANGE ORDER NO. 1 – RIVERFRONT WEST URBAN NEIGHBORHOOD
DEVELOPMENT – PROJECT NO. 121-067 (PO-0037460)
President Maradik advised that Charlotte Brach, Engineering, has submitted change order
number 1 on behalf of C&E Excavating, Inc., indicating the contract amount be increased by
$522,000 for a new contract sum, including this change order, in the amount of $6,501,535.
Attorney Schmidt asked the Board to approve the $522,000 increase, but milestone 3 and
4 are still being finalized and will be brought to the Board at a later date. Upon a motion
made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change order was
approved for the dollar amount and conditional approval on the milestones.
APPROVE CHANGE ORDER NO. 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT –
2024 EVSE INSTALLATIONS – PROJECT NO. 124-052 (PO-0036708)
President Maradik advised that Kyle Ludlow, Engineering, has submitted change order
number 1 (final) on behalf of Barnes Concepts LLC, indicating the contract amount be
decreased by $91.25 for a new contract sum, including this change order, of $49,233.75.
Also submitted was the project completion affidavit indicating this new final cost of
$49,233.75. Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll
call, change order number 1 (final) and the project completion affidavit were approved.
APPROVE PROJECT COMPLETION AFFIDAVIT – SOUTH BEND CITY HALL
RENOVATION – PROJECT NO. 124-001 (ECONOMIC DEVELOPMENT LIT, TIF, WATER
& SEWER CAPITAL)
President Maradik advised that Rebecca Plantz, Engineering, has submitted the project
completion affidavit on behalf of Larson-Danielson Construction Co., Inc., for the above
referenced project, indicating a final cost of $7,921,618.86. Upon a motion made by VP
Molnar, seconded by Mr. Miller and carried by roll call, the project completion affidavit was
approved.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE SHEET
– 2026 CONTRACTOR PAVING ROUND 2 – PROJECT NO. 126-026 (PR-00047128)
In a memorandum to the Board, Dan Jones, Engineering, requested permission to advertise
for the receipt of bids for the above referenced project. Also presented at this time for
approval and execution was the title sheet. Upon a motion made by VP Molnar, seconded
by Mr. Miller and carried by roll call, the above request to advertise was approved, and the
title sheet was approved and signed.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE SHEET
– 2024 LEAD SERVICE LINE REPLACEMENTS NORTHWEST ZONE REBID – PROJECT
NO. 123-069CR (STATE REVOLVING FUND)
In a memorandum to the Board, Rebecca Plantz, Engineering, requested permission to
advertise for the receipt of bids for the above referenced project. Also presented at this
time for approval and execution was the title sheet. Upon a motion made by VP Molnar,
seconded by Mr. Miller and carried by roll call, the above request to advertise was
approved, and the title sheet was approved and signed.
REGULAR MEETING ARPIL 14, 2026 81
ADOPT RESOLUTION NO. 14-2026 – A RESOLUTION OF THE CITY OF SOUTH BEND,
INDIANA BOARD OF PUBLIC WORKS, REGARDING AN AGREEMENT BETWEEN THE
CITY OF SOUTH BEND AND RIDES2U
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
following resolution was adopted by the Board of Public Works:
RESOLUTION NO. 14-2026
A RESOLUTION OF THE BOARD OF PUBLIC WORKS OF THE CITY OF SOUTH
BEND, INDIANA, REGARDING AN AGREEMENT BETWEEN THE CITY OF
SOUTH BEND AND RIDES2U
WHEREAS, consistent with the requirements of Indiana Code 35-44.1-1-
4(a), the City of South Bend, Indiana, Board of Public Works (the “Board”) meeting on
March 24, 2026 shall serve as the public meeting for the disclosure of the proposed
contract described herein; and
WHEREAS, the City, acting by and through the Department of Innovation and
Technology has negotiated an Agreement with Rides2U for ride-sharing services
associated with the City’s Commuters Trust program (the “Agreement”), attached
hereto as Exhibit A; and
WHEREAS, Chad Mastagh is the founder of Rides2U and is also a Firefighter
on the South Bend Fire Department; and
WHEREAS, Mastagh is not a staff member of the Department of Innovation
and Technology, and he is neither a member of nor a staff member supporting the
Board of Public Works; and
WHEREAS, Mastagh’s duties for the City as a member of the South Bend Fire
Department are entirely unrelated to the ride-sharing services which Rides2U
proposes to provide for the Commuters Trust program pursuant to the Agreement;
and
WHEREAS, Mastagh has prepared a written disclosure which describes the
proposed contract and describes his pecuniary interest in the agreement which has
been affirmed under penalty of perjury, attached hereto as Exhibit B; and
WHEREAS, this Agreement has met the prerequisites for approval under I.C.
35-44.1-1-
4(c).
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF PUBLIC
WORKS OF THE CITY OF SOUTH BEND, INDIANA, AS FOLLOWS:
1. The Board hereby approves the Agreement and authorizes the
Department of Innovation and Technology to proceed with finalizing the agreement
through City procurement processes.
2. This Resolution shall be in full force and effect upon its adoption.
ADOPTED at a meeting of the Board of Public Works of the City of South Bend,
Indiana held on April 14, 2026, at 215 S. Dr. Martin Luther King Jr. Blvd., Suite 300,
South Bend, Indiana 46601.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Elizabeth A. Maradik
REGULAR MEETING ARPIL 14, 2026 82
s/ Joseph R. Molnar
s/ Murray L. Miller
s/ Breana N. Micou
s/ Abigail E. Magas
ATTEST:
s/ Hillary R. Horvath, Clerk
ADOPT RESOLUTION NO. 15-2026 – A RESOLUTION OF THE CITY OF SOUTH BEND,
INDIANA BOARD OF PUBLIC WORKS REGARDING THE PURCHASE OF REAL
PROPERTY LOCATED AT 1829-1837 RANDOLPH ST., SOUTH BEND, INDIANA
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
following resolution was adopted by the Board of Public Works:
RESOLUTION NO. 15-2026
A RESOLUTION OF THE BOARD OF PUBLIC WORKS OF THE CITY OF SOUTH BEND,
INDIANA, REGARDING THE PURCHASE OF REAL PROPERTY LOCATED AT 1829-
1837 RANDOLPH ST., SOUTH BEND, INDIANA
WHEREAS, the City of South Bend, Indiana, Board of Public Works (the “Board”)
has custody of and may maintain all real property owned by the City of South Bend, Indiana
(the “City”) pursuant to I.C. 36-9-6-3; and
WHEREAS, the City, acting by and through the Board, may purchase land or
structures in accordance with the procedure stated in I.C. 36-1-10.5; and
WHEREAS, on December 9, 2025 the South Bend Common Council approved
Resolution 5156-25 pursuant to I.C. 36-1-10.5-5(1), and the Board now intends to
purchase the real property located at 1829-1837 Randolph St., South Bend, Indiana, and
more particularly described in attached Exhibit A (the “Property”); and
WHEREAS, the Board has obtained two (2) appraisals of the fair market value of
the Property, attached hereto as Exhibit B, and will provide copies of each to the South
Bend Common Council in accordance with I.C. 36-1-10.5-5(2); and
WHEREAS, the Board believes it is in the best interest of the City and its residents
to purchase the Property.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF PUBLIC WORKS OF
THE CITY OF SOUTH BEND, INDIANA, AS FOLLOWS:
1. The Board hereby appoints Ms. Erin Michaels, employee of the Department
of Community Investment, as the Board’s authorized representative in pursuing the
purchase of the Property and delegates to her all necessary authority to serve in the
Board’s place as purchasing agent under I.C. 36-1-10.5.
2. The Board hereby approves and will execute simultaneously with this
Resolution the form of purchase agreement attached hereto as Exhibit C. The Board
instructs Ms. Michaels to deliver a signed copy of the purchase agreement to the owner of
the Property.
3. The Board acknowledges that its authority to consummate the purchase of
the Property, including the authority hereby delegated to Ms. Michaels, is expressly
conditioned upon South Bend Common Council’s approval of the purchase in accordance
with I.C. 36-1-10.5-5(1).
4. This Resolution shall be in full force and effect upon its adoption.
REGULAR MEETING ARPIL 14, 2026 83
ADOPTED at a meeting of the Board of Public Works of the City of South Bend,
Indiana held on April 14, 2026, at 215 S. Dr. Martin Luther King Jr. Boulevard Suite 300,
South Bend, Indiana 46601.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Elizabeth A. Maradik
s/ Joseph R. Molnar
s/ Murray L. Miller
s/ Breana N. Micou
s/ Abigail E. Magas
ATTEST:
s/ Hillary R. Horvath, Clerk
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
The following agreements/contracts/proposals/addenda were submitted to the Board for
approval:
Type Business Description Amount/
Funding
Motion/
Second
Real Estate
Donation
Agreement
Shiv Kumar
Duggal &
Surabhi
Duggal
Agreement for the
Donation of the Vacant
Lot at 1802 Fassnacht
Ave. to the City’s
Ownership
NA Molnar/ Miller
Amendment
No. 11 to
Professional
Services
Agreement
SmithGroup
Inc.
Construction
Administration for Seitz
Park South Riverwalk
Phase II, Project No.
125-041
$122,905
(PO-
0039160)
Molnar/ Miller
Amendment
No. 1 to
Professional
Services
Agreement
Ratio
Architects,
LLC
Design Services through
Construction
Documents for the Main
St. Parking Garage and
Podium, Project No.
125-065
$1,325,000
(PO-
0040559)
Molnar/ Miller
Real Estate
Purchase
Agreement
Derrick
Mangas
Agreement for the
Donation of the Vacant
Lot at 130 E. Donald St.
to the City’s Ownership
in Exchange for Waiving
$839.50 of Code
Violations Imposed on
the Property
NA
Molnar/ Miller
Amendment
No. 1 to
Professional
Services
Agreement
JQOL Global
LLC
Redesign of the Nexus
Center Elevator, Project
No. 125-016
$38,700
(PR-
00040873)
Molnar/ Miller
Amendment
to AIA 133
CMc
Contract
Garmong
Construction
Services
Full GMP for Kennedy
Park Renovations with
Chosen CMc per I.C. 5-
32, Project No. 123-008
$15,802,659
(PR-
00047164)
Molnar/
Magas
Accept
Qualification
s
Bowen
Engineering
Corporation
Select Qualifications and
Initiate Contract
Negotiations to Hire
Provider for the
Guaranteed Saving
NA
(State
Revolving
Fund and
Molnar/ Miller
REGULAR MEETING ARPIL 14, 2026 84
Contract for the Edison
Water Treatment Plant
Improvements, Project
No. 123-067
Water
Capital)
Amendment
No. 3 to
Professional
Services
Agreement
United
Consulting
Arsenic Removal and
Testing also
Architectural Services
for Building Expansion
to the Improvements at
the Edison Water
Treatment Plant, Project
No. 123-067
$309,700
(Hourly NTE)
(PO-
0032687)
Molnar/ Miller
APPROVAL OF LICENSE AND PERMIT APPLICATIONS
The following license and permit applications were presented for approval:
Applicant Description Date/Time Location Motion
Carried
Event Day at
Eddy Street
Street Closure for
Special Event
April 18,
September
4, 12, 19,
October 10,
November
14,21,2026/
8:00 a.m. to
3:00 a.m.
Eddy St. between
Angela Blvd &
Napoleon St.
Molnar/
Miller
May First
Fridays DTSB
Street Closure for
Special Event
May 1,
2026/ 1:00
p.m. to 11:00
p.m.
Michigan St. from
Washington Ave.
to Jefferson Blvd.
Jefferson Blvd.
from Parking
Garage to Michigan
St.
Molnar/
Miller
June First
Fridays DTSB
Street Closure for
Special Event
June 5,
2026/1:00
p.m. to 11:00
p.m.
Michigan St.
between
Washington St. &
Western Blvd.
Molnar/
Miller
Summer
Reading Kick
Off
Street Closure for
Special Event
June 5,
2026/ 10:00
a.m. to 10:00
p.m.
Michigan St.
between Wayne St.
and Western Ave.
Molnar/
Miller
Corpus
Christi
Procession
Street Closure for
Special Event
June 7,
2026/ 1:30
p.m. to 2:30
p.m.
Crossings at
Intersections
between Our Lady
of Hungary Church
on Calvert St. and
St. Matthew’s
Cathedral on
Miami St.
Molnar/
Miller
Leeper Park
Art Fair
Street Closure for
Special Event
June 19-21,
2026/11:00
a.m. to 5:00
p.m.
Riverside Dr. from
Michigan St. to
Lafayette Blvd.
Molnar/
Miller
Bacon Around
the Bend 5K
Street Closure for
Special Event
June 20,
2026/ 6:00
a.m. to 11:00
a.m.
Rolling Closures
from Niles Ave, &
Cedar Blvd;
Pokagon St.,
Lawrence St.,
Napoleon Blvd., St.
Molnar/
Miller
REGULAR MEETING ARPIL 14, 2026 85
Louis Blvd;
Peashway St.,
Lawrence St.,
Pokagon St., and
Leeper Ave. to
Corby’s
Kids Triathlon Street Closure for
Special Event
July 18,
2026/ 5:00
a.m. to 12:00
p.m.
Fellows St. to
Bowman St. St.
Joseph St. to
Dubail St., Marietta
St., to Dayton St.
Begin and Finish at
Riley High School.
Molnar/
Miller
IDEA Week Street Closure for
Special Event
April 23,
2026/ 8:00
a.m. to 5:00
p.m.
Lafayette Blvd.
from LaSalle Ave.
to Colfax Ave.
Molnar/
Miller
TABLED - FAVORABLE RECOMMENDATION - PETITION TO VACATE THE ROW AT 710
& 718 NAPOLEON ST.
President Maradik indicated that Dave and Jennifer Ludwig, has submitted a request to
vacate the above referenced right-of-way. Ms. Maradik advised the Board is in receipt of
favorable recommendations concerning this vacation petition from the Public Works
Department, Fire Department, Police Department, who all state the request does meet the
criteria of I.C. 36-7-3-13, and Community Investment state the request does not meet the
criteria of I.C. 36-7-3-13. Therefore, VP Molnar made a motion to table the right of way
vacation, Mr. Miller seconded the motion which carried by roll call.
APPROVE/DENY TRAFFIC CONTROL DEVICES
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
following traffic control device request was approved:
REMOVAL: Accessible Parking Space Sign
LOCATION(s): 130 E. Altgeld St.
513 S. 28th St.
530 S. 23rd St.
1922 E. Fox St.
1841 N. Huey St.
REMARKS: All Criteria Met
APPROVE CONSENTS TO ANNEXATION AND WAIVER OF RIGHTS TO REMONSTRATE
President Maradik stated that the Board is in receipt of the following consents to
annexation and waivers of rights to remonstrate. The consents indicate that in
consideration for permission to tap into public water/sanitary sewer system of the City, to
provide water/sanitary sewer service to the below referenced properties, the applicants
waive and release all rights to remonstrate against or oppose any pending or future
annexations of the properties by the City of South Bend:
A. Julian Rodriguez, 52440 Lily Rd.
1. 52440 Lily Rd. – Sewer (Key No.71-03-24-255-004.000-003)
B. John Tsikzlas – St. Andrews Parish, 52455 N. Ironwood Dr.
1. 52455 N. Ironwood Dr.– Water (Key No. 71-04-19-277-016.000-003)
Upon a motion by VP Molnar, seconded by Mr. Miller and carried by roll call, the consents
to annexation and waivers of rights to remonstrate were approved as submitted.
APPROVE MODIFICATIONS OF INDUSTRIAL WASTEWATER DISCHARGE PERMIT(S)
REGULAR MEETING ARPIL 14, 2026 86
In a Memorandum to the Board, Ms. Serena Lozano-Shane, Division of Wastewater,
submitted the following wastewater discharge permit(s) for renewal and recommended
approval:
1)ITU AbsorbTech, Inc., 3900 West William Richardson Dr.
There being no further discussion, upon a motion made by VP Molnar, seconded by Mr.
Miller and carried by roll call, the wastewater discharge permit(s) was approved.
RATIFY APPROVAL AND/OR RELEASE CONTRACTOR, EXCAVATION, AND
OCCUPANCY BONDS
The Division of Engineering Permit Department recommended that the following bonds be
ratified pursuant to Resolution 100-2000 and/or released as follows:
Business Bond Type Approved/
Released Effective Date
NextGen Earthworks LLC Excavation Approved April 1, 2026
NextGen Earthworks LLC Occupancy Approved April 1, 2026
Justin Pletzke DBA
Neighborhood Partners
Occupancy Released May 12, 2026
VP Molnar made a motion that the bond’s approval and/or release as outlined above be
ratified. Mr. Miller seconded the motion, which carried by roll call.
RATIFY PREAPPROVED CLAIMS PAYMENTS
VP Molnar stated the Board received notices of the following preapproved claim payments
from the City’s Department of Administration and Finance:
Name Date Amount of Claim
City of South Bend Claims GBLN-0131159 03/10/2026 $2,544,976.49
City of South Bend Claims GBLN-0131716;
GBLN-0131844; GBLN-0132004
03/17/2026 $2,669,556.82
City of South Bend Claims GBLN-0132012;
GBLN-0132013; GBLN-0132344
03/24/2026 $6,073,218.10
Each claim is fully supported by an invoice; the person receiving the goods or services has
approved the claims; and the claims have been filed with the City Fiscal Officer and certified
for accuracy. Therefore, upon a motion by VP Molnar, seconded by Mr. Miller, and carried
by roll call, the Board ratified the preapproved claims payments.
PRIVILEGE OF THE FLOOR
Attorney Michael Schmidt noted that staff did receive another email from the resident on
Preston Dr. and that city staff have been assigned to investigate. VP Molnar did mention
that the new playground equipment should arrive this week.
ADJOURNMENT
There being no further business to come before the Board, President Maradik adjourned
the meeting at 10:45 a.m.
BOARD OF PUBLIC WORKS
_________________________________
Elizabeth A. Maradik, President
_________________________________
Joseph R. Molnar, Vice President
_________________________________
Murray L. Miller, Member
April 28, 2026