Loading...
HomeMy WebLinkAboutChange Order No 1 - Studebaker Museum Skylight Proj No 124-019 - Shaffner-Heaney & Associates April 14, 2026 Mr. Robert Johnson Shaffner Heaney Associates Inc. 2508 South Main Street South Bend, IN 46614 dgreco@shaproducts.com; rjohnson@shaproducts.com RE: Change Order No. 1 – Studebaker Museum Skylight Replacement – Project No. 124-019 Dear Mr. Johnson: At its April 14, 2026 meeting, the Board of Public Works approved the above referenced Change Order be increased by $1,500, bringing the revised contract amount to $78,447 and a completion date of November 1, 2025. Enclosed is a copy of the Change Order for your records. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: 04/14/2026 PROJECT NO: 124-019PROJECT NAME: Studebaker Museum Skylight Replacement CONTRACT DATE: November 26th, 2024 CHANGE ORDER NO. 1 SUBJECT OF CHANGE ORDER: Need to add trim for changed condition. Project was delayed due to product availability. See memo. All items completed substantially as planned. See attached Comparison of Estimate for overruns and underruns. The original contract sum $ 76,947.00 Net change by previously authorized change orders $ 0.00 The contract sum prior to this change order $ 76,947.00 By this Change Order, the project amount is Increased Decreased $ 1,500.00 The new contract sum including this change order $ 78,447.00 This Change Order represents a total change of 2.00 % Total change for entire project 2.00 % Original contracted completion date/time March 31st, 2025 Extension of date/time by previous change orders 0 Days Date/time extension by this change order 215 Days New completion date/time November 1st, 2025: RECOMMENDED FOR APPROVAL CONTRACTOR Construction Manager CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: Contractor Signature Printed Name and Title Elizabeth A. Maradik, President Company name Abigail Magas, Member Address Murray L. Miller, Member City, State, Zip Breana Micou, Member Joseph R. Molnar, Member April 14, 2026 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk Board of Public Works FROM: Patrick Sherman SUBJECT: Studebaker Museum Skylight Replacement: CO#1 DATE: April 14th, 2026 On November 26, 2024, the Board of Public Works approved a quote for Shaffner Heaney to replace the skylight at the Studebaker Museum. The work was delayed to later in the year due to specialty material availability. This delay did not affect the Museum negatively. Once received, the project was substantially completed working around the Museum’s schedule. During the punch walk, there was an area identified that would be better with some trim work to cover bare wood because of how the new skylight fit. The contractor had to wait through the winter to complete the work. Engineering recommends approving Change Order #1 for $1,500.00 for Shaffner Heaney. This is a change order of 2%. Shaffner Heaney and Associates 2508 S Main Street, South Bend, IN 46614 Phone: 574-232-7470 CONSTRUCTION CHANGE ORDER FORM Project Name:Project Number: Contract Number: Owner/Client:Contractor/Vendor: Date of Change Order:Change Order Number: 1. Description of Change Provide a detailed description of the change to the original scope of work: 2. Reason for Change Design modification Unforeseen condition Owner request Code/regulatory requirement Other: Explanation: 3. Impact on Contract Original Contract Amount:Net Change (Increase/Decrease): Revised Contract Amount: 4. Approvals Prepared By:Date: Signature: Contractor Approval:Date: Signature: Owner/Client Approval:Date: Signature: 5. Notes or Attachments Drawings/specs attached Cost breakdown attached Schedule update attached Shaffner Heaney and Associates | Construction Change Order Form Form Revision v11 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 04/09/2026 Name: Patrick Sherman Department of Public Works – Engineering Division BPW Date: 04/14/2026 Phone Extension: 5601 Required Prior to Submittal to Board BPW Attorney X Attorney Name Dept. Attorney Attorney Name Michael Schmidt Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Shaffner Heaney and Associates New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Studebaker Museum Skylight Replacement Project Number 124-019 Funding Source PROJ00000523 Account No. PO-0035275 Amount $1,500.00 Terms of Contract Lump Sum Special Contract Provisions N/A Purpose/Description Addition of some trim and finish following project punch. For Change Orders Only Amount of Increase Decrease $ 1,500.00 ($ ) Previous Amount $ 76,947.00 Current Percent of Change: Increase Decrease 2% ( %) New Amount $ 78,447.00 Total Percent of Change: Increase Decrease 2% ( %) Time Extension Amount: 215 days New Completion Date: November 1st, 2025