Loading...
HomeMy WebLinkAboutAward Bid - Madison Street Trail Connector Proj No 125-031 - Rieth-Riley Construction March 24, 2026 Mr. Ruben Alvarado Rieth-Riley Construction Co., Inc. 25200 State Rd. 23 South Bend, IN 46614 dsauer@rieth-riley.com RE: Award Bid – Madison Street Trail Connector – Project No. 125-031 Dear Mr. Alvarado: At its March 24, 2026 meeting, the Board of Public Works awarded the above referenced bid to you in the amount of $918,256.16, Base Bid. Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal by April 14, 2026 to my attention for Board of Public Works approval at hhorvath@southbendin.gov: 1) One (1) signed original of the Public Works Contract (enclosed) 2) Labor & Material Payment Bond 3) Performance Bond (125% of Bid Amount) 4) Certificate of Insurance naming the City of South Bend as an additional insured 5) Item #4 for all subcontractors that you use Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA PUBLIC WORKS CONTRACT This Agreement is made and entered into this 24th Day of March, 2026, by and between Rieth-Riley Construction Co., Inc., (the “Contractor”), and the Board of Public Works (the "Board”). The Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: PROJECT NO. 125-031 DESCRIPTION: MADISON STREET TRAIL CONNECTOR COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $918,256.16; BASE BID FUNDING: PR-00046841 The unit prices for this improvement were those prices as received and accepted by the Board on the 24th Day of March, 2026. The Contractor further agrees to notify the assigned Engineer when this improvement is completed. This notification shall be in the form of a Project Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractor’s final estimate will be presented to the Board for final Payment with one (1) copy of the Project Completion Affidavit and one (1) copy of a Waiver of Lien. Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has the authority to bind the named person or entity to this Agreement. BOARD OF PUBLIC WORKS RIETH-RILEY CONSTRUCTION CO., INC. President Member Printed Name Member Member Signature Member Attest: Clerk March 24, 2026 March 24, 2026 Mr. Dustin P. Hilary Milestone Contractors, L.P. 24358 State Rd. 23 South Bend, IN 46614 tschlosser@milestonelp.com; akrueger@milestonelp.com RE: Bid Award – Madison Street Trail Connector – Project No. 125-031 Dear Mr. Hilary: At its March 24, 2026, meeting, the Board of Public Works awarded the above referenced bid to Rieth-Riley Construction Co., Inc. in the amount of $918,256.16, Base Bid. Thank you for bidding, and we hope you bid with us in the future. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk March 24, 2026 Mr. Mark Osler Indiana Earth, Inc. 10343 McKinley Hwy. Osceola, IN 46651 estimatorindianaearth@yahoo.com RE: Bid Award – Madison Street Trail Connector – Project No. 125-031 Dear Mr. Osler: At its March 24, 2026, meeting, the Board of Public Works awarded the above referenced bid to Reith-Riley Construction Co., Inc. in the amount of $918,256.16, Base Bid. Thank you for bidding, and we hope you bid with us in the future. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk March 24, 2026 Mr. Rob Becker Premium Concrete Services 712 Richmond St. Elkhart, IN 46516 rbecker@premiumservices.group RE: Bid Award – Madison Street Trail Connector – Project No. 125-031 Dear Mr. Becker: At its March 24, 2026, meeting, the Board of Public Works awarded the above referenced bid to Rieth-Riley Construction Co., Inc. in the amount of $918,256.16, Base Bid. Thank you for bidding, and we hope you bid with us in the future. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk March 24, 2026 Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Charlie Brach, Assistant City Engineer SUBJECT: Award Project No. 125-031 Madison Street Trail Connector DATE: March 13, 2026 On March 10, 2026, the Board of Public Works opened and read bids for the above project, which consisted of a base bid and an alternate. The bidders ranked as follows: Base Bid: Bidder Amount 1. Rieth Riley Construction Company $918,256.16 2. Milestone Contractors $955,135.00 3. Indiana Earth $1,050,424.45 4. Premium Concrete Services $1,257,319.00 Alternate No. 1 Bidder Amount 1. Premium Concrete Services ($12,000.00) 2. Rieth Riley Construction Company ($8,766.16) 3. Milestone Contractors ($8,766.16) 4. Indiana Earth ($5,900.00) I recommend award of a contract for the base bid to the lowest responsive / responsible bidder, Rieth Riley Construction Company in the amount of $918,256.16. Sufficient funds have been appropriated from River East Residential TIF (436-10-102-121- 443001-PROJ00000450). Please call with your questions. Enc. Bid Tabulation Madison Street Trail ConnectorCity Project No. 125-031City of South BendBid TabulationBase BidEngineer's EstimateRieth-Riley Construction CompanyMilestone Contractors Indiana Earth Premium Concrete ServicesItemNo. Description Quantity Unit Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit PriceTotal Amount Unit Price Total Amount1.Mobilization/Demobilization1 LS $37,640.00 $37,640.00 $40,000.00 $40,000.00 $26,000.00 $26,000.00 $52,000.00 $52,000.00 $60,000.00 $60,000.002.Maintenance of Traffic1 LS $15,000.00 $15,000.00 $17,245.00 $17,245.00 $4,458.79 $4,458.79 $17,400.00 $17,400.00 $23,500.00 $23,500.003.Erosion Control1 LS $7,000.00 $7,000.00 $18,777.00 $18,777.00 $7,000.00 $7,000.00 $21,000.00 $21,000.00 $7,500.00 $7,500.004.Clearing Right of Way1 LS $20,000.00 $20,000.00 $20,767.00 $20,767.00 $13,000.00 $13,000.00 $95,600.00 $95,600.00 $6,000.00 $6,000.005.Common Excavation180 CYD $50.00 $9,000.00 $74.15 $13,347.00 $192.00 $34,560.00 $60.00 $10,800.00 $96.00 $17,280.006.Sign, Remove8 EA $150.00 $1,200.00 $122.47 $979.76 $122.47 $979.76 $200.00 $1,600.00 $160.00 $1,280.007.Sign, Relocate5 EA $200.00 $1,000.00 $139.96 $699.80 $139.96 $699.80 $160.00 $800.00 $180.00 $900.008.Light Pole, Remove11 EA $200.00 $2,200.00 $524.66 $5,771.26 $524.66 $5,771.26 $581.85 $6,400.35 $685.00 $7,535.009.Light Pole, Remove and Salvage16 EA $250.00 $4,000.00 $655.82 $10,493.12 $655.82 $10,493.12 $725.00 $11,600.00 $900.00 $14,400.0010.Pipe, Remove95 LFT $25.00 $2,375.00 $40.20 $3,819.00 $50.00 $4,750.00 $33.70 $3,201.50 $80.00 $7,600.0011.Structure, Remove7 EA $1,000.00 $7,000.00 $1,550.00 $10,850.00 $1,500.00 $10,500.00 $1,243.00 $8,701.00 $2,700.00 $18,900.0012.Concrete Curb, Remove920 LFT $15.00 $13,800.00 $16.60 $15,272.00 $15.00 $13,800.00 $8.80 $8,096.00 $25.00 $23,000.0013.Concrete Approaches and Sidewalk, Remove545 SYD $20.00 $10,900.00 $25.35 $13,815.75 $15.50 $8,447.50 $6.45 $3,515.25 $32.00 $17,440.0014.Concrete Pavement, Remove535 SYD $20.00 $10,700.00 $23.30 $12,465.50 $28.00 $14,980.00 $9.35 $5,002.25 $38.00 $20,330.0015.Brick, Remove425 SYD $20.00 $8,500.00 $25.94 $11,024.50 $28.50 $12,112.50 $28.75 $12,218.75 $38.00 $16,150.0016.Asphalt Milling570 SYD $6.00 $3,420.00 $14.75 $8,407.50 $16.00 $9,120.00 $18.00 $10,260.00 $20.00 $11,400.0017.Compacted Aggregate, No. 53240 TON $80.00 $19,200.00 $83.05 $19,932.00 $170.00 $40,800.00 $95.00 $22,800.00 $125.00 $30,000.0018.HMA Surface55 TON $200.00 $11,000.00 $203.05 $11,167.75 $225.00 $12,375.00 $250.00 $13,750.00 $355.00 $19,525.0019.PCCP, 8"360 SYD $100.00 $36,000.00 $82.15 $29,574.00 $119.00 $42,840.00 $128.00 $46,080.00 $132.00 $47,520.0020.PCCP, Colored, 8"30 SYD $120.00 $3,600.00 $148.90 $4,467.00 $190.00 $5,700.00 $214.00 $6,420.00 $260.00 $7,800.0021.PCCP for Approaches, 8"80 SYD $150.00 $12,000.00 $93.95 $7,516.00 $110.00 $8,800.00 $120.00 $9,600.00 $180.00 $14,400.0022.D-1 Contraction Joint90 LFT $25.00 $2,250.00 $61.45 $5,530.50 $60.00 $5,400.00 $68.00 $6,120.00 $50.00 $4,500.0023.Brick Paver Reset245 SYD $200.00 $49,000.00 $208.82 $51,160.90 $171.28 $41,963.60 $233.00 $57,085.00 $232.00 $56,840.0024.Concrete Curb1,070 LFT $40.00 $42,800.00 $29.05 $31,083.50 $49.00 $52,430.00 $52.00 $55,640.00 $56.00 $59,920.0025.Concrete Sidewalk, 4"810 SYD $70.00 $56,700.00 $57.00 $46,170.00 $86.00 $69,660.00 $75.00 $60,750.00 $95.00 $76,950.0026.Concrete Sidewalk, 5"90 SYD $90.00 $8,100.00 $60.40 $5,436.00 $87.00 $7,830.00 $94.00 $8,460.00 $110.00 $9,900.0027.Concrete Curb Ramp70 SYD $225.00 $15,750.00 $293.86 $20,570.20 $280.00 $19,600.00 $209.00 $14,630.00 $260.00 $18,200.0028.Detectable Warning Surface15 SYD $150.00 $2,250.00 $212.10 $3,181.50 $132.00 $1,980.00 $200.00 $3,000.00 $260.00 $3,900.0029.Sodding1,400 SYD $5.00 $7,000.00 $20.45 $28,630.00 $16.90 $23,660.00 $18.90 $26,460.00 $30.00 $42,000.0030.Street Tree26 EA $600.00 $15,600.00 $690.00 $17,940.00 $675.00 $17,550.00 $747.00 $19,422.00 $1,130.00 $29,380.0031.Shrub30 EA $50.00 $1,500.00 $125.00 $3,750.00 $120.00 $3,600.00$134.00 $4,020.00 $148.00 $4,440.0032.Storm Sewer Manhole2 EA $5,000.00 $10,000.00 $7,052.00 $14,104.00 $8,085.00 $16,170.00 $6,850.00 $13,700.00 $8,100.00 $16,200.0033.Storm Sewer Catch Basin7 EA $3,000.00 $21,000.00 $5,329.00 $37,303.00 $6,160.00 $43,120.00 $4,200.00 $29,400.00 $7,500.00 $52,500.0034.Storm Sewer Pipe, 12"220 LFT $100.00 $22,000.00 $138.85 $30,547.00 $80.00 $17,600.00 $81.50 $17,930.00 $220.00 $48,400.0035.Adjust Valve to Grade5 EA $500.00 $2,500.00 $261.85 $1,309.25 $80.00 $400.00 $400.00 $2,000.00 $565.00 $2,825.0036.Adjust Casting to Grade14 EA $500.00 $7,000.00 $897.55 $12,565.70 $950.00 $13,300.00 $260.00 $3,640.00 $945.00 $13,230.0037.Curb Identification Marker10 EA $150.00 $1,500.00 $80.00 $800.00 $190.00 $1,900.00 $280.00 $2,800.00 $378.00 $3,780.0038.Sign Post, Square, Type 2, Reinforced Anchor Base63 LFT $25.00 $1,575.00 $34.94 $2,201.22 $34.94 $2,201.22 $39.70 $2,501.10 $45.00 $2,835.00 39.Line, Multi-Component, Solid, White, 4"1,590 LFT $2.00 $3,180.00 $2.35 $3,736.50 $2.35 $3,736.50 $2.65 $4,213.50 $2.00 $3,180.0040.OMITTED41.OMITTED42.Line, Multi-Component, Solid, Yellow, 4"1,335 LFT $2.00 $2,670.00 $2.35 $3,137.25 $2.35 $3,137.25 $2.65 $3,537.75 $2.00 $2,670.0043.OMITTED44.Line, Thermoplastic, Solid, White, 6"145 LFT $2.00 $290.00 $6.25 $906.25 $6.25 $906.25 $7.00 $1,015.00 $3.00 $435.0045.Transverse Line, Thermoplastic, White, 24", Stop Bar50 LFT $15.00 $750.00 $11.95 $597.50 $11.95 $597.50 $14.00 $700.00 $19.00 $950.0046.Transverse Line, Thermoplastic, White, 24", Crosswalk120 LFT $15.00 $1,800.00 $11.95 $1,434.00 $11.95 $1,434.00$13.40 $1,608.00 $19.00 $2,280.0047.Pavement Message Marking, Multi-Component, Chevron2 EA $850.00 $1,700.00 $450.00 $900.00 $450.00 $900.00 $500.00 $1,000.00 $437.00 $874.0048.TESCO Combination Cabinet and Foundation1 EA $15,000.00 $15,000.00 $13,787.95 $13,787.95 $13,787.95 $13,787.95 $15,200.00 $15,200.00 $18,900.00 $18,900.0049.4-1/c No. 8 Copper Cable1,550 LFT $10.00 $15,500.00 $6.30 $9,765.00 $6.30 $9,765.00 $7.00 $10,850.00 $8.50 $13,175.0050.2" HDPE Schedule 80 for Lighting1,510 LFT $10.00 $15,100.00 $16.94 $25,579.40 $16.94 $25,579.40 $18.70 $28,237.00 $23.00 $34,730.0051.3" HDPE Schedule 80 for Lighting10 LFT $30.00 $300.00 $45.98 $459.80 $45.98 $459.80 $60.00 $600.00 $63.00 $630.0052.Light Pole Assembly, Type I and Foundation, Furnish and Install16 EA $8,500.00 $136,000.00 $9,478.03 $151,648.48 $9,478.03 $151,648.48 $10,435.00 $166,960.00 $12,500.00 $200,000.0053.Light Pole Assembly, Type I and Foundation, Furnish Only2 EA $7,500.00 $15,000.00 $7,065.28 $14,130.56 $7,065.28 $14,130.56 $3,950.00 $7,900.00 $9,700.00 $19,400.0054.Light Pole Assembly, Type II and Foundation, Furnish and Install5 EA $10,000.00 $50,000.00 $12,505.45 $62,527.25 $12,505.45 $62,527.25 $13,760.00 $68,800.00 $17,100.00 $85,500.0055.Light Pole Assembly, Type II and Foundation, Furnish Only2 EA $9,000.00 $18,000.00 $10,365.29 $20,730.58 $10,365.29 $20,730.58 $11,450.00 $22,900.00 $14,180.00 $28,360.0056.Lighting Handhole2 EA $1,500.00 $3,000.00 $2,098.63 $4,197.26 $2,098.63 $4,197.26 $2,350.00 $4,700.00 $2,870.00 $5,740.0057.Miscellaneous Equipment for Lighting1 LS $5,000.00 $5,000.00 $8,943.87 $8,943.87 $8,943.87 $8,943.87 $9,900.00 $9,900.00 $12,235.00 $12,235.0058.Swing Gate and Post2 EA $2,500.00 $5,000.00 $3,550.40 $7,100.80 $3,550.40 $7,100.80 $3,950.00 $7,900.00 $5,000.00 $10,000.00Total: Base Bid $790,350.00 $918,256.16 $955,135.00 $1,050,424.45 $1,257,319.00 Add Alternate AEngineer's EstimateRieth-Riley Construction CompanyMilestone Contractors Indiana Earth Premium Concrete ServicesItemNo. Description Quantity Unit Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit PriceTotal Amount Unit Price Total AmountA1.Light Pole Assembly, Type I and Foundation, Furnish and Install(4) EA $8,500.00 ($34,000.00) $9,478.03 ($37,912.12) $9,478.03 ($37,912.12) $9,500.00 ($38,000.00) $12,500.00 ($50,000.00)A2.Light Pole Assembly, Type III and Foundation, Furnish and Install4 EA $7,800.00 $31,200.00 $7,286.49 $29,145.96 $7,286.49 $29,145.96 $8,025.00 $32,100.00 $9,500.00 $38,000.00Total: Add Alternate A ($2,800.00) ($8,766.16) ($8,766.16) ($5,900.00) ($12,000.00)Bid SummaryEngineer's Estimate Rieth-Riley Milestone Indiana Earth Premium Concrete ServicesBase Bid Total$790,350.00 $918,256.16 $955,135.00 $1,050,424.45 $1,257,319.00Add Alternate A Bid Total-$2,800.00 -$8,766.16 -$8,766.16 -$5,900.00 -$12,000.00Base Bid + Alternate A$787,550.00 $909,490.00 $946,368.84 $1,044,524.45 $1,245,319.00Acknowledge Addendum No. 1 Yes Yes Yes YesAcknowledge Addendum No. 2 Yes Yes Yes YesI hereby certify that the above truly and accurately represents bids received for this project on March 10, 2026March 12, 2026Chad Knip, P.E. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 3/13/2026 Name: Charlotte Brach Department of Public Works – Engineering Division BPW Date: 3/24/2026 Phone Extension: 9246 Required Prior to Submittal to Board BPW Attorney X Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Rieth Riley Construction Company New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name 125-031 Madison Street Trail Connector Project Number PROJ450 Funding Source River East Residential TIF Account No. PR # 46841 Amount $918,256.16 Terms of Contract Base Bid Special Contract Provisions N/A Purpose/Description Award bid for the Madison Street Trail Connector project to Rieth Riley Construction Company. The award is for the base bid. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: