Loading...
HomeMy WebLinkAboutOpening of Quotes - 2026 Signal Knockdown & Wiring Proj No 126-019 - Midwestern Electric Version 9/29/2021 Page - 1 Public Works Quote SCOPE OF WORK CITY OF SOUTH BEND PROJECT NAME: 2026 Signal Knock Down & Wiring Investigation PROJECT NO. 126-019 QUOTES DUE 03/24/2026 by 9:00am by email to bpwbids@southbendin.gov I. PROJECT DESCRIPTION A. The project includes the furnishing of all equipment, material, insurance, and labor for installation of traffic signal knock down replacements and wiring investigation at various locations within the City of South Bend, IN. The locations at which replacements are to be installed or wiring investigation performed will be assigned by the Division of Engineering on an as needed basis. II. PREVAILING SPECIFICATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this project. B. Each Quote provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND SPECIFICATIONS prior to submitting a quote. C. Wherever the PREVAILING SPECIFICATIONS refer to “State Specifications,” it shall mean the 2026 INDOT Standard Specifications for the letting effective after September 1, 2025. D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III. TERM “OR EQUAL” A. Prevailing Specifications: None B. Additions 1. Where the term "or equal" is used in these specifications, the Quote provider deviating from specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its proposed article or equal. The City of South Bend shall be the sole judge in determining if the “or equal” offered meets the specification. IV. TAX EXEMPT A. Prevailing Specifications: None B. Additions 1. Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V. INDEMNIFICATION A. Prevailing Specifications: None B. Additions 1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, Version 9/29/2021 Page - 2 Public Works Quote or because of arising out of any defect in the goods, materials or equipment supplied by the Quote provider. VI. INSURANCE A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 103 B. Additions: 1. All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a. General Liability: Premises-Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b. There shall be no exclusion for explosion, collapse or underground hazard. c. Workmen’s Compensation: Statutory State of Indiana Employer's Liability - $100,000. d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. e. The City of South Bend shall be named as additional insured on the Certificate of Insurance. VII. CONTROL OF WORK A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 105 B. Additions: 1. The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. 3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South Bend Department of Public Works. VIII. LEGAL RELATIONS A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 107 B. Additions: 1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where mentioned in these documents, is the City of South Bend Department of Public Works – Division of Engineering. 2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. 3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result in the forfeiture of Contractor’s performance bond to the Owner. IX. PAYMENT FOR WORK A. Prevailing Specifications: None B. Additions: 1. Standard Unit Prices shall be paid as noted in the Unit Price Summary sheet. 2. The total compensation for services and line items is Not to Exceed $50,000. Version 9/29/2021 Page - 3 Public Works Quote X. PROSECUTION AND PROGRESS A. Prevailing Specifications: 2026, INDOT Standard Specifications Sec. 108 B. Additions: 1. The project will have a completion date of March 31, 2027 The contract time will start when the Notice to Proceed is delivered and signed. 2. The City, Engineer, and Contractor will hold a pre-construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3. The Contractor shall be required to mobilize within 5 – 10 working days after the Owner/Engineer determines each project and gives the Contractor direction to proceed. 4. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. XI. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 108 B. Additions 1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XII. DEFAULT AND TERMINATION A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor’s failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may at any time thereafter terminate this contract in which case the termination shall be final and effective. 3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that the Contractor has in order under Contractor’s subcontracts are assigned to the City, subject to the City’s right to take assignment of all or only selected subcontracts at the City’s discretion. The sole obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed Version 9/29/2021 Page - 4 Public Works Quote after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City’s Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City’s request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liability to subcontractors for any payment already involved, and for any claim, suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. XIII. LIQUIDATED DAMAGES A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 108 B. Additions: 1. The contractor shall proceed with the work at such rate of progress to insure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given written notice of such delay to the Owner and Engineer/Architect. a. To any preference, priority, or allocation order duly issued by the Owner. b. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. XIV. RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 109 B. Additions: 1. Payments will be made every thirty (30) calendar days 2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3. Before final payment and retainage are released the Contractor must satisfy the following: a. All parts and labor meet requirements stated in the specifications. b. Provide copies of test reports or cut sheets on all materials supplied. c. Provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. XV. WARRANTY A. Prevailing Specifications: None B. Additions 1. All Parts shall include the following: Version 9/29/2021 Page - 5 Public Works Quote a. Performance specifications b. Bill of Materials c. Warranties on all parts d. Installation and safety requirements XVI. OTHER UTILITIES A. Prevailing Specifications: None B. Additions: 1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in Indiana) or 1-800-382-5544 (outside of Indiana), or via www.indiana811.org, at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before proceeding with construction. It shall also be the Contractor’s responsibility to contact any other utility that is not contacted by Indiana811 and verify the utility locations. 2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, etc. in order to assure that all utilities that need to be replaced or relocated can be done with a minimum disturbance to service. The Contractor shall also be responsible for coordinating schedules with the various utilities such that they can proceed with their relocation work as efficiently as possible. 3. If the odor of natural gas is detected in a work area at any time during the course of work, the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also immediately notify the residents of adjacent properties. The Contractor shall advise the residents to evacuate their homes immediately if the odor is present within the dwelling. 4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the Contractor at no additional cost to the City or the Owner of the system. XVII. MAINTENANCE OF TRAFFIC A. Prevailing Specifications: 2026, INDOT Standard Specifications Sections 105 & 801 B. Additions: 1. Maintenance of traffic during construction shall conform to the “Indiana Manual on Uniform Traffic Control Devices” and the City of South Bend Design and Construction Standards. 2. The attached “Traffic Closure Request” form is to be used for any lane restrictions or closures and required to be filled out and sent to the Department of Public Works 3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary facilities shall be left unattended in the right-of-way of any street or left parked overnight without proper marking and lighting. 4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its proposed schedule of operations for the review of the Engineer. The schedule of operations as reviewed by the Engineer shall be maintained at all times. 5. There will be no direct payment for this work. XVIII. DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment for the installation of traffic signal knock down replacements and wiring investigation at various places within the City of South Bend, IN. 2. The locations at which replacements are to be installed or wiring investigation performed will be assigned by the Division of Engineering &/or the Division of Traffic and Lighting on an as needed basis. 3. Prior to commencement of work at each location, the Contractor shall provide a cost estimate of time and materials for review by the City representatives. Version 9/29/2021 Page - 6 Public Works Quote 4. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and their property from damage caused by the Contractor’s operations. XIX. TS-2 CONTROLLER P-1 FOUNDATION A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. A Type P-1 foundation shall be provided for a TS-2 Controller Cabinet in accordance with INDOT Standard Drawings, see attached sheet. 2. The Contractor shall call for utility locates prior to the installation of the foundation. 3. Placement of the foundation shall be field verified by the Engineer prior to installation. 4. Cabinet foundation, wiring, and all necessary connections are included in this pay item. 5. The item TS-2 CONTROLLER P1 FOUNDATION shall be measured by each properly installed. 6. Payment shall be made at the contract unit price as set forth in the proposal as follows: TS-2 CONTROLLER P-1 FOUNDATION……………… EA XX. TS-2 CONTROLLER CABINET, INSTALL A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. This work shall consist of installing the TS-2 Controller Cabinet to the poured foundation. 2. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The City will not be responsible for delivery of materials to the project site. 3. The item INSTALL TS-2 CONTROLLER CABINET shall be measured by each properly installed. 4. Payment shall be made at the contract unit price as set forth in the proposal as follows: TS-2 CONTROLLER CABINET, INSTALL ……………… EA XXI. TESCO CABINET, INSTALL A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. The electric service pedestals shall be a City of South Bend approved enclosure as manufactured by Tesco Controls, Inc. Location of single and dual meter service pedestals are provided in the plans. TESCO cabinets shall be painted black. 2. Cabinet foundation, wiring and all connections necessary are included in this pay item. 3. Traffic signals shall remain in operation at all times during installation of service pedestals. 4. The Contractor shall extend the wiring from the existing signal cabinet to the new service pedestal in new conduit. 5. The removal of the existing service from the existing controller cabinet as shown on the plans will not be paid for separately but shall be included in the cost of this pay item. 6. Payment shall be made at the contract unit price as set forth in the proposal as follows: TESCO CABINET W/ DUAL SERVICE, FOUNDATION, WIRING, ETC, INSTALL……………… EA TESCO CABINET W/ SINGLE SERVICE, FOUNDATION, WIRING, ETC, INSTALL……………… EA XXII. SIGNAL CANTILIEVER, FOUNDATION A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. Signal Cantilever Foundation shall be installed in accordance with 2010 INDOT Standard Drawing E805-SGMA, see attached sheet. 2. The contractor shall call for utility locates prior to the installation of the foundation. 3. Placement of the foundation shall be field verified by the engineer prior to installation. 4. The item SIGNAL CANTILIEVER, FOUNDATION shall be measured by each properly installed. 5. Payment shall be made at the contract unit price as set forth in the proposal as follows: Version 9/29/2021 Page - 7 Public Works Quote SIGNAL CANTILIEVER, FOUNDATION ……………… EA XXIII. SIGNAL CANTILEVER STRUCTURE, SINGLE ARM, INSTALL A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. This work shall consist of installing signal poles and mast arms to the poured foundations and anchor bolts. 2. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The City will not be responsible for delivery of materials to the project site. 3. The cost of all necessary anchor bolts, hardware, labor, etc. necessary for installation of the cantilever structure shall be included in the cost of this item. 4. The cost of foundation, new signal heads, and wiring shall be paid for separately. 5. The item SIGNAL CANTILEVER STRUCTURE, SINGLE ARM, INSTALL shall be measured by each properly installed. 6. Payment shall be made at the contract unit price as set forth in the proposal as follows: SIGNAL CANTILEVER STRUCTURE, SINGLE ARM, INSTALL ……………… EA XXIV. TRAFFIC SIGNAL HEAD, 3 SECTION, INSTALL A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. Work for this item shall include the installation and assembly of new traffic signal head. Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The City will not be responsible for delivery of materials to the project site. 2. The item TRAFFIC SIGNAL HEAD, 3 SECTION, INSTALL shall be measured by each properly installed. 3. Payment shall be made at the contract unit price as set forth in the proposal as follows: TRAFFIC SIGNAL HEAD, 3 SECTION, INSTALL ……………… EA XXV. TRAFFIC SIGNAL HEAD, 5 SECTION, INSTALL A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. Work for this item shall include the installation and assembly of new traffic signal head. Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The City will not be responsible for delivery of materials to the project site. 2. The item TRAFFIC SIGNAL HEAD, 5 SECTION, INSTALL shall be measured by each properly installed. 3. Payment shall be made at the contract unit price as set forth in the proposal as follows: TRAFFIC SIGNAL HEAD, 5 SECTION, INSTALL ……………… EA XXVI. PEDESTRIAN PUSH BUTTON ASSEMBLY, APS, INSTALL A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. Work for this item shall include the installation and assembly of new pedestrian push button assembly. Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The City will not be responsible for delivery of materials to the project site. 2. Pedestrian push button assemblies shall be in accordance with MUTCD and ADA guidelines. 3. The item PEDESTRIAN PUSH BUTTON ASSEMBLY, APS, INSTALL shall be measured by each properly installed. Version 9/29/2021 Page - 8 Public Works Quote 4. Payment shall be made at the contract unit price as set forth in the proposal as follows: PEDESTRIAN PUSH BUTTON ASSEMBLY, APS, INSTALL ……………… EA XXVII. PEDESTRIAN SIGNAL HEAD, INSTALL A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. Work for this item shall include the installation and assembly of new pedestrian signal heads. Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The City will not be responsible for delivery of materials to the project site. 2. Pedestrian push button assemblies shall be in accordance with MUTCD and ADA guidelines. 3. The item PEDESTRIAN SIGNAL HEAD, INSTALL, shall be measured by each properly installed. 4. Payment shall be made at the contract unit price as set forth in the proposal as follows: PEDESTRIAN SIGNAL HEAD, INSTALL ……………… EA XXVIII. CONDUIT A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. The material provided shall meet the National Electrical Manufacturers Association (NEMA) TC-2, Type 2 requirements. 2. All conduit shall be paid for at the contract unit price per linear foot (LFT) installed. The cost of all labor, material, utility and equipment necessary to complete the work shall be included in the unit price. Any required drilling or coring of existing handholes shall be included in the conduit unit price. 3. Payment shall be made at the contract unit price as set forth in the proposal as follows: CONDUIT, PVC SCHEDULE 80, 3” ……………… LFT CONDUIT, PVC SCHEDULE 80, 2” ……………… LFT XXIX. SIGNAL CABLE A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. All signal cable shall be paid for at the contract unit price per linear foot (LFT) installed. The cost of all labor, material, utility, and equipment necessary to complete the work shall be included in the respective contract unit prices for signal cable. 2. Payment shall be made at the contract unit price as set forth in the proposal as follows: SIGNAL CABLE, 3C/8 GA ……………… LFT SIGNAL CABLE, 5C/14 GA ……………… LFT SIGNAL CABLE, 3C/14 GA ……………… LFT SIGNAL CABLE, 7C/14 GA ……………… LFT XXX. STREET IDENTIFICATION SIGN, INSTALL A. Prevailing Specifications: 2026, INDOT Standard Specification Section 805 B. Additions 1. Work for this item shall include the installation and assembly of new street identification signs. Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The City will not be responsible for delivery of materials to the project site. 2. The item STREET IDENTIFICATION SIGN, INSTALL, shall be measured by each properly installed. 3. Payment shall be made at the contract unit price as set forth in the proposal as follows: STREET IDENTIFICATION SIGN, INSTALL ……………… EA Version 9/29/2021 Page - 9 Public Works Quote CITY OF SOUTH BEND, INDIANA CONTRACTOR’S QUOTE FOR PUBLIC WORK PROJECT NAME: 2026 Signal Knock Down & Wiring Investigation PROJECT NO. 126-019 QUOTES DUE 03/24/2026 by 9:00am by email to bpwbids@southbendin.gov (Must be completed for all quotes. Please type or print) Date: Firm: Address: City/State/Zip: Telephone Number: ( ) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Installation of traffic signal knock down replacements and wiring investigation at various places within the City of South Bend, IN the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend, Department of Public Works and dated for the sum of (enter the Total Quote as shown on the Proposal) ($ ) (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. ACCEPTANCE The above quote is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Joseph R. Molnar, Vice-President Abigail E. Magas, Member Breana N. Micou, Member Murray L. Miller, Member Attest: Hillary Horvath, Clerk By (Signature) (Printed Name of Person Signing) 03/23/26 Midwestern Electric, LLC. 1620 East Chicago Avenue East Chicago, IN, 46312 219 397-4444 03/24/26 Gene Mann 24,528.00Twenty Four Thousand Five Hundred Twenty Eight and Zero Cents Version 9/29/2021 Page - 10 Public Works Quote When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized Indiana Lake Version 9/29/2021 Page - 11 Public Works Quote alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel Version 9/29/2021 Page - 13 Public Works Quote QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME 2026 Signal Knock Down & Wiring Investigation PROJECT NO. 126-019 QUOTES DUE 03/24/2026 by 9:00am by email to bpwbids@southbendin.gov Item No. Description Unit Unit Price 1 TS-2 Controller P-1 Foundation EA 2 TS-2 Controller Cabinet, Install EA 3 Tesco Cabinet w/Dual Service, Foundation, Wiring, Etc., Install EA 4 Tesco Cabinet w/Single Service, Foundation, Wiring, Etc., Install EA 5 Signal Cantilever, Foundation EA 6 Signal Cantilever Structure, Single Arm, Install EA 7 Traffic Signal Head, 3 Section, Install EA 8 Traffic Signal Head, 5 Section, Install EA 9 Pedestrian Push Button Assembly, APS, Install EA 10 Pedestrian Signal Head, Install EA 11 Conduit, PVC Schedule 80, 3” LFT 12 Conduit, PVC Schedule 80, 2” LFT 13 Signal Cable, 3c/8 GA LFT 14 Signal Cable, 5c/14 GA LFT 15 Signal Cable, 3c/14 GA LFT 16 Signal Cable, 7c/14 GA LFT 17 Street Identification Sign, Install EA 18 Traffic Signal ISMA Certified Level 2 Technician HR 19 Laborer HR 20 Licensed Electrician HR Firm: Address: City/State/Zip: Telephone Number: ( ) Fax Number: ( ) By (Signature) (Printed Name of Person Signing) $3,300.00 $1,850.00 $3,600.00 $7,800.00 $2,700.00 $235.00 $265.00 $115.00 $235.00 $75.00 $74.00 $1.00 $1.00 $1.00 $1.00 $145.00 $115.00 $145.00 $270.00 $3,600.00 Midwestern Electric, LLC. 1620 East Chicago Avenue East Chicago, IN 46312 219 397-4444 Gene Mann