My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5B1 Budget Request (Morris Garage Design) - Signed
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2026
>
03.12.2026
>
Signed Items
>
5B1 Budget Request (Morris Garage Design) - Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 10:57:04 AM
Creation date
3/12/2026 10:57:03 AM
Metadata
Fields
Template:
Dept of Community Investment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend <br />Redevelopment Commission <br />215 S. Dr. Martin Luther King, Jr. Blvd., Room 301, South Bend, Indiana <br />Redevelopment Commission Agenda Item <br />DATE : 3/9/2026 <br />FROM: Joseph Molnar, <br />Assistant Director, Growth & Opportunity <br />SUBJECT: Budget Request <br />Morris Parking Garage Design <br />Funding Source* (circle) River West; River East; South Side; Douglas Road; West Washington; RDC General; Riv. East Res. <br />* Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, <br />then the authorization of the expenditure of such funds shall be void and of no effect. <br />PURPOSE OF REQUEST: <br /> Approval of $2,000,000 for Design and Site Preparation for the Morris Performing Arts Center Parking <br />Garage <br />SPECIFICS: <br />Over the past few years, the City has completed multiple phases of The NeverEnding Encore which was <br />the culmination of the 100-year anniversary of the Morris Performing Arts Center. Phase I was <br />approximately $10 Million in improvements in the existing historical theater. Phase II was the newly <br />completed Raclin Murphy Encore Center, which is a 20,000 square foot expansion attached to the Morris. <br />Phase III has been envisioned as a new approximate 473 space parking garage attached to the western <br />portion of the Raclin Murphy Encore Center. <br /> In addition to The NeverEnding Encore project, the Redevelopment Commission released a Request for <br />Proposals for a partnership to add a residential apartment building adjacent to the proposed parking <br />garage. The Redevelopment Commission voted on July 10, 2025, to proceed with negotiations with local <br />development firm 7 Diamonds. City staff have had ongoing negotiations with 7 Diamonds and hope to <br />have a finalized Development Agreement to present to the RDC this summer. <br />The attached Budget Request would provide funding for the full design of the proposed parking garage as <br />well as funding for required site preparation that is needed to be completed in 2026 including the <br />demolition of the former South Bend Water Works building, removal of existing parking lots, and site <br />grading in preparation for construction to begin in 2027. Full funding for the construction of the parking <br />garage will require multiple funding streams including donated funds from private partners. The <br />requested funding will provide all needed funding prior to full construction. <br />______________ ___________Pres/V-Pres <br />ATTEST: __________ ________Secretary <br />Date: _____________ _______ <br /> APPROVED Not Approved <br />SOUTH BEND REDEVELOPMENT COMMISSION <br />March 12, 2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.