HomeMy WebLinkAboutOpening of Proposals - Main St Housing Parking Garage Proj No 125-065 - GarmongSTATEMENT OF QUALIFICATIONS in response to
City of South Bend | Tuesday, March 10, 2026
C. H. Garmong & Son, Inc. | 1502 Magnavox Way, Suite 240, Fort Wayne, IN 46804| 260.279.2220 | GARMONG.NET
Paul Okeson, President
pokeson@garmong.net
317.514.4843
Tony Anderson, Project Executive
tanderson@garmong.net
317.496.9597
C. H. Garmong & Son, Inc. | 1502 Magnavox Way, Suite 240, Fort Wayne, IN 46804| 260.279.2220 | GARMONG.NET
March 10, 2026
Board of Public Works
City of South Bend
227 W. Jefferson Blvd., Suite 1400S
South Bend, IN 46601
Re: Construction Manager as Constructor Services
Morris Performing Arts Center Parking Garage
Project No. 125-065
Dear Members of the Evaluation Committee:
The Morris Parking Garage is the final phase of The Neverending Encore and a significant public investment in downtown South
Bend. This project must do more than provide 474 parking spaces. It must support the Morris Performing Arts Center, connect
seamlessly to the Raclin Murphy Encore Center, enable adjacent residential development, and strengthen Main Street for
decades to come.
The City has outlined clear expectations for this effort. You are seeking disciplined preconstruction, a fair and competitive
bidding process, measurable inclusion, sustainability, thoughtful evaluation of a Guaranteed Maximum Price, and delivery
within a defined construction schedule. This is a high visibility urban project that requires careful phasing, cost control, and
coordination with multiple stakeholders while protecting ongoing downtown activity.
Garmong’s responsibility as CMc will be to provide structure, transparency, and accountability to help the City meet those
objectives.
During preconstruction, we will focus on progressive cost estimating, constructability reviews, and early identification of cost
drivers specific to structured parking, including structural systems, façade integration, waterproofing, durability, and long-term
maintenance. We will coordinate closely with the housing developer to ensure the podium interface is technically aligned and
schedule ready before vertical construction begins.
Our bidding strategy is built around market competitiveness and fairness. We do not intend to self-perform trade work. Instead,
we will develop clear bid packages, apply consistent prequalification standards, and provide complete bid tabulations and
documentation in alignment with Indiana Code 5-32.
If the City elects to establish a GMP, we support a phased approach tied to design maturity, supported by open book
documentation and defined contingency management. Our goal is to provide cost certainty while preserving informed decision
making.
We appreciate the opportunity to submit our proposal and look forward to discussing how we can support the City of South
Bend in delivering a well-managed and durable Morris Parking Garage.
Respectfully submitted,
Paul Okeson, President
C. H. Garmong & Son, Inc.
pokeson@garmong.net
317.514.4843
Tony Anderson, Project Executive
C. H. Garmong & Son, Inc.
tanderson@garmong.net
317.496.9597
2Morris Performing Arts Center Parking Garage
Garmong Construction
SECTION PAGE
3Morris Performing Arts Center Parking Garage
Garmong Construction
Briefly summarize your firm’s mission, core lines of business, history, and structure.
Founded in 1923 and guided by 4th-generation leadership, Garmong specializes in construction management for both public
and private sector clients. We have offices in Indianapolis, Terre Haute, Evansville, and Fort Wayne, Indiana, and most recently
Atlanta, Georgia.
Garmong has a vast resume of experience with municipal clients throughout Indiana, including projects for entities such as the
Cities of South Bend, Indianapolis, and Evansville, as well as the Counties of Hamilton, Jackson, and Hendricks.
In addition to municipal experience, we have intimate knowledge of delivering successful projects using the CMc delivery
method, including the Terre Haute Convention Center, Martin Luther King Jr. Dream Center, Monon on Main Development,
Rose-Hall, Indiana State University, and the Vigo County School Corporation, among others.
Please indicate the size of your firm and volume of annual projects.
Garmong has over 200 full-time employees and handles an annual volume of projects valued at approximately $364 million.
Please list any awards or relevant industry certifications.
Garmong consistently ranks as one of the Top 25 fastest-growing companies by the Indianapolis Business Journal. Additionally,
Garmong made the 2026 list for Best Places to Work in Indiana for the third straight year. Garmong was also presented with
the 2024 Governor’s Century Award for longevity and community service and was recognized as a finalist in the Indiana
Companies to Watch program presented by the Indiana Economic Development Corporation, its Small Business Development
Centers, and Purdue University.
THE GARMONG TEAM IS WORKING WITH
4Morris Performing Arts Center Parking Garage
Garmong Construction
Josh Springer
Project Manager
David Joyce
Project Superintendent
Paul Okeson
Principal-in-Charge
Mitch Hannum
Executive Vice President
Rochelle Gardner
Director of Preconstruction
Tony Anderson
Project Executive
5Morris Performing Arts Center Parking Garage
Garmong Construction
Paul Okeson | Principal-in-Charge
As President of Garmong, Paul focuses on developing and maintaining client relationships, government
affairs, revenue generation, and corporate structure. In addition to 20 years of business expertise, Paul
possesses intimate knowledge and experience in state and local government.
EDUCATION | B.A., College of Arts and Sciences, Indiana University (IPFW)
PROJECT EXPERIENCE
Governor Mitch Daniels
Administration - 2005
Indianapolis Chamber
Board 2016 - Present
Secretary of State, Todd E.
Rokita Chief of Staff/Deputy
Secretary
City of Indianapolis
Chief of Staff
Indiana Election Commission
Chair
2019 - Present
Ballard Administration
State of Indiana
Tony Anderson | Project Executive
With over 28 years of construction experience, Tony brings a wealth of knowledge to any project.
Notably, his work on the $1.29 billion Westville State Prison highlights his significant expertise in large-
scale and sophisticated construction. Tony’s skills span a variety of critical areas such as cost control,
estimating, value engineering, systems analysis, quality control, project coordination, project phasing,
safety, expediting, purchasing, and scheduling, making him an invaluable asset. In addition, Tony
has successfully completed similar projects in this area, giving him firsthand familiarity with the site,
stakeholders, and operational considerations that will directly benefit this effort.
EDUCATION | B.S., Construction Management, Purdue University
PROJECT EXPERIENCE
Hamilton County Parking
Garage
Noblesville, IN
Criminal Justice Center Parking
Garages
Indianapolis, IN
The Foundry @ Eddy Street
South Bend, IN
CityWay and the Alexander
Indianapolis, IN
The Cole
Columbus, IN
Bloomington Trades Garage
Bloomington, IN
6Morris Performing Arts Center Parking Garage
Garmong Construction
Rochelle Gardner | Director of Preconstruction
Rochelle has over 33 years of construction experience and brings a wealth of knowledge and experience
to the table. She will play an active role in design decisions, evaluations, and studies. Rochelle excels
in value engineering, ensuring that projects are efficient and cost-effective. Additionally, she is adept at
scheduling and conducting constructibility reviews, always working hand-in-hand with the project team
to provide the necessary support. Rochelle’s comprehensive skill set makes her an invaluable asset to any
construction project.
EDUCATION | A.S., Architectural Tech; B.S., Construction Management, Indiana State University
PROJECT EXPERIENCE
Hamilton County Parking
Garage
Noblesville, IN
IU Health South Support
Building
Indianapolis, Indiana
Martin Luther King Jr. Dream
Center
South Bend, Indiana
Kennedy Park Renovations
South Bend, Indiana
Terre Haute Convention Center
Terre Haute, Indiana
Mitch Hannum | Executive Vice President
Mitch has over 15 years of experience in the construction industry. He will provide leadership to the
project team for all construction, project management, and project administration from inception through
completion. Key aspects such as budgeting, scheduling, resource allocation, and timeline assessment fall
under his purview.
EDUCATION | B.A., Economics and Management, DePauw University
PROJECT EXPERIENCE
Hamilton County Parking
Garage
Noblesville, IN
Criminal Justice Center Parking
Garages
Indianapolis, IN
IU Health South Support
Building
Indianapolis, Indiana
Bloomington Trades Garage
Bloomington, IN
Monon on Main Parking
Garage
Carmel, IN
Midtown East Parking Garages
Carmel, IN
7Morris Performing Arts Center Parking Garage
Garmong Construction
Josh Springer | Project Manager
With over 13 years in the construction industry, Josh is an invaluable asset to our team. His expertise lies
in a range of key areas, including cost control, estimating, value engineering, systems analysis, quality
control, project coordination, project phasing, safety, expediting, purchasing, and scheduling. With his
wide-ranging skill set and wealth of experience, Josh will ensure project success by effectively managing
every aspect from start to finish.
EDUCATION | B.S., Architecture, Ball State University; M.S., Construction Management, Florida
International University
PROJECT EXPERIENCE
Martin Luther King Jr. Dream
Center
South Bend, Indiana
Kennedy Park Renovations
South Bend, Indiana
Hendricks County Highway
Garage
Danville, Indiana
Parkview Education Center
Fort Wayne, Indiana
Lutheran Downtown Hospital
Fort Wayne, Indiana
Arlington/Lincoln Elementary
Renovations
Fort Wayne, Indiana
David Joyce | Project Superintendent
David A. Joyce is a seasoned construction leader with over 25 years of experience managing large-scale
projects ranging from ground-up developments to complex renovations. He has led projects overseeing
all phases from site development through final turnover. David is recognized for his strong safety record,
subcontractor coordination, scheduling expertise, and ability to deliver high-quality results in fast-paced
environments. His extensive background in wood frame over podium, precast, structural steel, and green
building construction makes him well-suited to serve as a Project Superintendent focused on safety,
efficiency, and successful project execution.
EDUCATION | B.S., Construction Management, Purdue North Central
PROJECT EXPERIENCE
The Foundry @ Eddy Street
South Bend, IN
CityWay
Indianapolis, IN
Austin Landing
Toledo, OH
8Morris Performing Arts Center Parking Garage
Garmong Construction
Terre Haute Convention Center | Terre Haute, IN
Garmong served as Construction Manager for the 41,000 square-foot Terre Haute
Convention Center. Located in the downtown area, the facility is largely single-
story with a main ballroom, which accommodates up to 900 people, and a full-
service kitchen area. The structure also includes a two-story section that houses the
Larry Bird Museum on the first floor and administrative areas on the second floor.
Garmong also constructed a five-level, pre-cast parking garage to accommodate
the Convention Center.
Project Cost: $25,000,000
Reference: Tennille Wanner | 812.244.1559
Challenges and Successes: Before construction could begin, extensive utility
relocations were necessary due to the need for deep foundations. This added
complexity to the early phases of the project and required close collaboration with
utility providers and city officials.
Monon on Main Parking Garage | Carmel, IN
Garmong served as Construction Manager for this $20M mixed-use development
project in downtown Carmel. The three-story, 12,000 square-foot building features
an upscale steakhouse; a three-story office building with 17,600 square-feet of
office space and 8,000 square-feet of ground level retail space along Main Street;
seven townhouses, a park along the Monon Trail and a parking garage. The project
is located at the intersection of Main Street and the Monon Trail.
Project Cost: $20,000,000
Reference: Chuck Lazzara | 317.846.9158
Challenges and Successes: The project involved redeveloping an entire city block
in downtown Carmel, requiring careful coordination with both a private developer
and the City of Carmel.
Midtown East Parking Garages | Carmel, IN
Garmong completed two independent parking structures as part of the Midtown
East commercial and residential development. These parking structures were
constructed concurrently with adjacent multi-story commercial buildings that were
not completed by Garmong. Our team helped the owner coordinate the design
and construction of the structures with multiple stakeholders, including city officials,
private developers, the public, and owners of adjacent buildings.
Project Cost: $16,100,000
Reference: Henry Mestetsky | 317.571.2492
Challenges and Successes: The south parking garage included the installation
of a subsurface rainwater collection tank to serve the area’s development, adding
complexity to the construction process and requiring careful coordination with site
utilities and environmental requirements..
9Morris Performing Arts Center Parking Garage
Garmong Construction
Bloomington Trades Garage | Bloomington, IN
The Bloomington Trades District Garage is a four-story, cast-in-place parking
structure located in the heart of the city’s Trades District. Garmong served as
Construction Manager for this project, which provides 350 parking spaces, electric
vehicle charging stations, a solar array, and retail/commercial shell space for
future build-outs.The garage is one of the first in Indiana to achieve Parksmart
certification, reflecting a strong commitment to sustainability and innovation.
Project Cost: $12,300,000
Reference: Joshua Scism | 317.979.9998
Challenges and Successes: Garmong, in collaboration with the owner’s
representative and architect, developed a series of value engineering options to
maintain project viability.
Hamilton County Parking Garage | Noblesville, IN
Garmong served as Construction Manager and provided the Hamilton County
Commissioners with design and construction services through the Build-Operate-
Transfer (BOT) statute. This five-story 162,000 square-foot, cast-in-place parking
structure accommodates over 480 parking spaces and provides Hamilton County
a long-term solution to the downtown parking challenges.
Project Cost: $11,500,000
Reference: Mark Heirbrandt | 317.590.3460
Challenges and Successes: Constructing this five-story, 162,000 square-foot
parking structure in a busy downtown environment required detailed logistics
planning to minimize disruption to local businesses, government operations,
and traffic.
IU Health South Support Building | Indianapolis, IN
The IU Health South Support Building (SSB) will serve as IU Health’s new
downtown Indianapolis hospital as part of the IU Health medical campus
project. The SSB will include a lower level, street level, and seven parking decks
encompassing over a million square feet. The lower support level and street levels
will contain a loading dock, logistics space, offices, retail space, and bulk medical
gas storage in an exterior yard. Also included is a utility corridor providing a
pathway for critical utilities between a central utility plant and the new hospital.
Project Cost: $178,000,000
Reference: Jim Mladucky | jmladucky@iuhealth.org
Challenges and Successes: This project required close coordination with ongoing
work on the main hospital, central utility plant, plaza, and site infrastructure.
10Morris Performing Arts Center Parking Garage
Garmong Construction
Kennedy Park Renovations | South Bend, IN
Garmong has recently been selected as the Construction Manager for this new
intergenerational aquatics center and park amenities at Kennedy Park. The aquatics
center will include: a toddler play area with a zero-depth entry, an area with nets
for water basketball, a deep pool zone with a waterslide, lifeguard stations, and
more. The park amenities will include: a new basketball court, two pickleball
courts, picnic shelters, additional tree planting, and more. This project is scheduled
to be completed in the fall of 2027.
Project Cost: $15,000,000
Reference: Eric Horvath | 574.235.9251
Challenges and Successes: Meeting the City’s project schedule required
proactive alignment of design development, permitting, and bidding milestones.
Martin Luther King Jr. Dream Center | South Bend, IN
Garmong served as Construction Manager for the new Martin Luther King Jr. Dream
Center which includes a community center and park. The building is approximately
42,000 square-feet and includes a community meeting space, indoor playground,
administrative offices, computer room, and gym. This project was completed in 2025.
Project Cost: $24,000,000
Reference: Patrick Sherman | 574.235.5601
Challenges and Successes: As the first CMc project for the City of South Bend,
Garmong took extra care when it came to involvement with the City and answering
questions regarding the delivery process.
Criminal Justice Center Parking Garage | Indianapolis, IN
Garmong provided the city with design and construction services through the
Build-Operate-Transfer statute to provide a five-story and a four-story cast-in-
place parking structure. These two parking facilities will accommodate over 1,100
parking spaces and provide the campus with a long-term solution to parking on the
new campus.
Project Cost: $36,000,000
Reference: Sarah Riordan | 317.327.4220
Challenges and Successes: The BOT approach demands extensive collaboration
among public and private stakeholders to ensure compliance, transparency, and
timely approvals.
11Morris Performing Arts Center Parking Garage
Garmong Construction
Safety
Garmong’s safety record goes beyond the goal of ensuring that everyone goes home each day injury-free. It also provides you
with the peace of mind of knowing that our construction “hot zone” does not pose any risks to our staff and visitors. Garmong
has achieved CCS Certified status, meeting or exceeding national safety standards and demonstrating its commitment by
achieving at least 50% of Best Practices for both a Safety Program Review (SPRS) and a Home Office Audit, with no OSHA-
cited fatalities.
Our safety program includes:
• Enhancing safety culture with daily knowledge assessments for field and office staff using ClickSafety for OSHA microlearning
• The development of a comprehensive safety plan for each construction site to ensure staff and visitor safety within the
construction “hot zone”.
• Proactive approach to the identification of specific job site hazards and risks through the use of the Job Hazard Analysis
process to ensure tasks are performed in a way to help prevent work-related injuries
• Using the SDS Mobile app gives field teams immediate access to OSHA-required Safety Data Sheets (SDS), protecting
against chemical exposures
• Employing a dedicated safety consultant or safety director to work closely with the superintendent for safety oversight,
including conducting on-site safety audits and providing necessary training
• All project management and job site supervisory staff have completed First Aid and CPR certification courses
SAFETY RECORD 2025 2024 2023 2022
EMR 0.61 0.60 0.65 0.79
12Morris Performing Arts Center Parking Garage
Garmong Construction
Understanding of the Project
The Morris Performing Arts Center Parking Garage is
more than a parking structure. It is the final phase of The
Neverending Encore initiative and a catalytic downtown
investment that will serve the Morris Performing Arts Center,
connect directly to the Raclin Murphy Encore Center, and
support a future residential development along Main
Street. The project includes site infrastructure, a 474-space
structured parking garage, and a first-floor concrete
podium that will support attached wood frame housing and
commercial space.
This is a multi-year, multi-phase urban project in a high-
visibility downtown corridor. It requires disciplined
coordination, careful phasing, stakeholder communication,
and cost certainty. Garmong understands that the City’s
mission emphasizes excellence, accountability, innovation,
inclusion, and empowerment, and our approach is built to
support those values throughout delivery.
Preconstruction Leadership and Cost Control
As CMc, we proactively engage during design to eliminate
surprises and reduce risk. During preconstruction, we will work
alongside the City and design team to refine scope, validate
constructability, and identify cost drivers early.
We will provide progressive cost estimating throughout
design development, including value engineering, life
cycle cost analysis, and real-time market feedback. Parking
garages require careful analysis of structural systems, façade
treatments, waterproofing, corrosion protection, and long-term
durability. Our estimating process will evaluate cast-in-place
versus precast systems, traffic coatings, drainage details,
and façade integration to ensure longevity and controlled
maintenance costs.
Constructability reviews will focus on sequencing the site
infrastructure, garage structure, and podium work in a way
that allows the housing developer to mobilize efficiently
following podium completion. The podium interface is critical,
and we will coordinate structural tolerances, embed locations,
and load transfer requirements early to avoid downstream
conflict.
Our preconstruction services will also include a detailed bid
packaging strategy, subcontractor prequalification planning,
permitting coordination, and development of a conceptual
CPM schedule aligned with the anticipated August 2026 to
December 2027 construction window.
Hamilton County Parking Garage
Monon on Main Parking Garage
13Morris Performing Arts Center Parking Garage
Garmong Construction
Guaranteed Maximum Price Strategy
Indiana Code 5-32 allows for the establishment of a
Guaranteed Maximum Price under CMc delivery. Garmong
supports a phased GMP approach that balances cost
certainty with design development.
• Open book budgeting with full transparency into
subcontractor bids
• Early identification of long lead materials and
procurement strategy
• Market testing of trade packages prior to GMP
establishment
• Clear delineation of contingency ownership and use
• Structured risk allocation discussions with the City
We will collaborate with the City to evaluate the cost-benefit
of locking in a GMP at the appropriate design milestone. Our
goal is to protect the City’s budget while preserving flexibility
where design refinement is still in progress.
Urban Site Logistics and Phasing
The garage sits within a tight downtown footprint bordered
by Main Street, LaSalle Avenue, Colfax Avenue, and
adjacent cultural and residential buildings. Construction
must be carefully staged to minimize disruption to the Morris
Performing Arts Center, the Raclin Murphy Encore Center,
surrounding businesses, and pedestrian traffic.
• Ensure traffic control and pedestrian rerouting are
implemented
• Plan delivery sequencing in a constrained urban
environment
• Coordinate with adjacent property owners and tenants
• Manage noise and vibration during foundation and
structural work
• Maintain safe separation of construction activities from
public access
Public communication will be coordinated with the City’s
Department of Community Investment and Public Works to
ensure proactive messaging to downtown stakeholders.
Fair and Competitive Bidding Process
The City has expressed a preference for maintaining a fair
and competitive process and generally prefers that CMc
firms not self-perform work. Garmong’s standard approach
is to serve as a neutral construction manager and not self-
perform trade work. This reinforces transparency and market
competitiveness.
• Develop clear, logical bid packages
• Conduct open pre-bid meetings
• Apply consistent prequalification criteria aligned with City
goals
• Provide full bid tabulations and scope leveling
documentation
• Require Responsible Bidder documentation for first-tier
subcontractors
This structure ensures a level playing field while protecting
quality and schedule.
Sustainability and Long-Term Performance
The City has emphasized longevity, durability, and minimizing
lifecycle costs. Parking garages are long-term assets that
must resist chloride exposure, freeze-thaw cycles, and heavy
vehicle loading.
• Evaluation of concrete mix design for durability and
reduced permeability
• High-performance traffic coatings and waterproofing
systems
Bloomington Trades District Garage
Criminal Justice Center Parking Garage
14Morris Performing Arts Center Parking Garage
Garmong Construction
• Proper drainage detailing to reduce long-term
deterioration
• Energy-efficient lighting and controls
• Life cycle cost comparisons during material selection
We will assist the City in making informed decisions that
balance first cost with long-term operating performance.
Local Labor and XBE Participation
Supporting local labor and meeting Indiana XBE participation
goals is a priority. Garmong has a strong track record of
exceeding participation goals on Indiana CMc projects.
• Conduct early outreach to local MBE, WBE, and veteran-
owned firms
• Structure bid packaging to create accessible opportunities
• Targeted prequalification aligned with Indiana Code
5-32 when appropriate
• Inclusion of local suppliers within the general conditions
of procurement
• Ongoing tracking and reporting to ensure measurable
results
Safety and Risk Management
Safety is foundational to our operations. On a downtown
project of this scale, risk management includes worker safety,
public safety, structural stability, and environmental controls.
• Site-specific safety planning
• Daily superintendent oversight
• Controlled access and perimeter security
• Coordination with emergency services
• Regular safety audits and reporting
All subcontractors will comply with E-Verify requirements,
nondiscrimination commitments, and the use of domestic steel
as required under Indiana statutes.
Communication, Technology, and Community
Engagement
Clear communication is critical for a high-profile civic project.
Garmong will provide:
• Monthly executive progress reports
• Cloud-based document management and submittal
tracking
• Real-time budget and schedule dashboards
• Coordination support for media inquiries and public
updates
Post Occupancy and Long-Term Support
Upon completion, we will support commissioning, training of
City personnel, preparation of maintenance manuals, and
coordination of service contracts as requested. A structured
one-year warranty walkthrough will ensure any deficiencies
are promptly addressed.
The Morris Parking Garage is a transformational civic
investment that will support downtown vitality for decades.
Garmong brings deep CMc experience under Indiana Code
5-32, strong cost control discipline, transparent bidding
practices, and a collaborative leadership style that aligns with
the City’s values.
We are prepared to serve as a trusted partner to the City
of South Bend, delivering this project safely, competitively,
sustainably, and within budget while protecting the public
interest at every stage.
Midtown East Parking Garages
15Morris Performing Arts Center Parking Garage
Garmong Construction
Preliminary Parking Garage Schedule
ID Task Name Duration Start Finish
3 Preconstruction & Design Phase 240 days Mon 4/6/26 Fri 3/5/27
4 Schematic Design 60 days Mon 4/6/26 Fri 6/26/26
5 SD Budget 15 days Mon 6/29/26 Fri 7/17/26
6 Design Development (DDs)60 days Mon 7/20/26 Fri 10/9/26
7 DD Budget 20 days Mon 10/12/26 Fri 11/6/26
8 Construction Documents - Design 45 days Mon 11/9/26 Fri 1/8/27
10 State CDR 20 days Mon 1/11/27 Fri 2/5/27
9 Local Permitting 20 days Mon 2/8/27 Fri 3/5/27
11 Bidding Phase 40 days Mon 1/11/27 Fri 3/5/27
12 Bidding/Procurement 30 days Mon 1/11/27 Fri 2/19/27
13 GMP Development & Finalization 10 days Mon 2/22/27 Fri 3/5/27
14 Long-Lead Procurement & Submittals Phase 145 days Mon 3/8/27 Fri 9/24/27
25 Construction Phase 295 days Mon 4/5/27 Fri 5/19/28
26 Site 290 days Mon 4/5/27 Fri 5/12/28
34 Building 245 days Mon 6/14/27 Fri 5/19/28
1 Owner PR Items 10 days Mon 4/26/27 Fri 5/7/27
2 Ground Breaking 10 days Mon 4/26/27 Fri 5/7/27
54 Turnover 0 days Fri 5/19/28 Fri 5/19/28
55 Turnover to Developer 0 days Fri 5/19/28 Fri 5/19/28
Preconstruction & Design Phase
Schematic Design
SD Budget
Design Development (DDs)
DD Budget
Construction Documents - Design
State CDR
Local Permitting
Bidding Phase
Bidding/Procurement
GMP Development & Finalization
Long-Lead Procurement & Submittals Phase
Construction Phase
Site
Building
Owner PR Items
Ground Breaking
Turnover
Turnover to Developer
Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 12026202720282029
City of South Bend Morris Performing Arts CenterParking Garage
Page 1 of 1
16Morris Performing Arts Center Parking Garage
Garmong Construction
Garmong Construction has made meaningful inclusion of diverse business enterprises a consistent priority across both public
and private projects. In 2025, we achieved an average of 12.1% diverse participation, whether required by the Owner or not.
On the MLK Dream Center project with the City of South Bend, we delivered 21% XBE participation. Additional recent projects
include 17% XBE participation on a $12,000,000 police station in Lawrence and 54% participation on the $4,000,000
Purdue Brees Academic Center. These results exceeded municipal and university expectations and demonstrate our ability to
drive strong participation even in competitive markets.
We recognize that labor shortages, supply chain volatility, and shifting economic conditions present real challenges. To
address this, we leverage the flexibility allowed under Indiana Code 5-32 for CMc delivery. This statute permits Owners and
Construction Managers to establish prequalification criteria collaboratively, including targeted inclusion of XBE and local
contractors when desired. Garmong has extensive experience navigating IC 5-32 and can help develop practical, results-
driven prequalification strategies that promote participation without compromising budget integrity.
Beyond subcontractor alignment, we also create inclusion opportunities through general conditions procurement by sourcing
items such as fencing, dumpsters, and jobsite services from XBE and local suppliers whenever possible.
While Garmong is not a certified minority or woman-owned enterprise, inclusion has long been embedded in our culture. We
have partnered with school corporations to support diversity internship programs that provide paid field and office experience
to minority high school students. As a union signatory contractor, we benefit from trade partners who actively promote minority
and female participation in the construction workforce.
Within our own organization, 21% of our Project Management team and 28% of our corporate staff are women. We support
professional organizations that advance women in construction and have engaged third-party HR consultants to strengthen our
recruitment and retention strategies. Our commitment is ongoing, measurable, and focused on creating real opportunity across
the communities we serve.
Purdue University Brees Academic Center
17Morris Performing Arts Center Parking Garage
Garmong Construction
COST COVERED BY THE OWNER
• Design Fees
• State Design Release
• Utility Connection Fees
PRECONSTRUCTION SERVICES
We propose a $15,000 lump sum amount for all
preconstruction activities. This includes attending design
meetings, creating a detailed budget, and bidding of
completed construction documents.
CONSTRUCTION MANAGEMENT FEE
3% of the Cost of Work
Costs the owner is responsible for:
• Design Fees
• State Design Release
• Utility Connection Fees
DETAILS OF COSTS ASSOCIATED WITH
GENERAL CONDITIONS
The RFP indicates a 17 month construction schedule, while our
proposal offers an accelerated 14 month on site construction
duration.
The following items would be reimbursable and included
within the GMP:
• Safety Equipment
• Temporary Power Service
• Temporary Water Service
• Job Trailer/Trailer Utilities
• Material Testing
• Dumpsters
• Portable Toilets
COST OVERRUNS, DELAYS, AND INCENTIVES
The GMP sets a maximum cost for the project for a specific
scope of work and specific schedule. Any cost overruns
would be covered by Garmong under the GMP as long
as they are not the result of an increase in the scope of the
project. The same applies to schedule delays. As long as the
schedule delay isn’t out of the control of the CM, or a result of
an increase in the scope of the project - Garmong would be
responsible for making up the lost time. We have seen project
incentives succeed in the past, but each Owner is slightly
different. Given that this is a public project, we would not
recommend using performance-based incentives.
18Morris Performing Arts Center Parking Garage
Garmong Construction
Non-Collusion Non-Debarment Affidavit Non-Iran Form
19Morris Performing Arts Center Parking Garage
Garmong Construction
Non-Collusion Non-Debarment Affidavit Non-Iran Form
20Morris Performing Arts Center Parking Garage
Garmong Construction
Certificate of Insurance
21Morris Performing Arts Center Parking Garage
Garmong Construction
Bonding Capacity