HomeMy WebLinkAboutChange Order No 1 - 2025 Contractor Paving Round 1 -Proj No 125-032 - Milestone Contractors, L.P. February 24, 2026 Mr. Thaddeus Horvath Milestone Contractors L.P. 24358 Indiana 23 South Bend, IN 46614 thorvath@milestonelp.com; akruger@milestonelp.com RE: Change Order No. 1 – 2025 Contractor Paving Round 1 – Project No. 125-032 Dear Mr. Horvath: At its February 24, 2026, meeting, the Board of Public Works approved the above referenced Change Order be increased by $392,389.64, bringing the revised contract amount to $1,862,399.14. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk Enclosures HH/cb INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk Board of Public Works FROM: Dan Jones, Senior Engineer SUBJECT: Change Order #1 – 2025 Contractor Paving Round 1 (#125-032) February 12, 2025 DATE: This memorandum is being provided to explain why this project has exceeded 20% in change orders. The project was originally designed and bid to mill 2" of existing pavement surfaces and replace with new surface asphalt. This method worked well on all but one of the planned roadways. Prior to beginning work on St. Joseph St, the existing concrete pavement was reanalyzed and engineering determined the pavement was too deteriorated, and any surface paving remedies would not last more than a year or two. The best method for longterm repair was to fully reconstruct the roadway. The highlighted items in the change order form show the items added for this work. These account for $243,093.66 (16.86%) of the overall changes. There were no added roadway segments throughout the project. The original scope of road network repairs remained unchanged. There are also various other overrun/under run items included in this change order. The majority of these adds are included in curb replacements and asphalt surface tonnage increases. These account for $149,295.98 (10.35%) of the overall changes. Please feel free to contact me with any questions at x9245. 2/2/2026 February 24, 2026 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 2/12/2026 Name Dan Jones Department Public Works BPW Date 2/24/2026 Phone Extension 9245 Required Prior to Submittal to Board BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Mickey Lovy Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Milestone Contractors, L.P. New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name 2025 Contractor Paving Round 1 Project Number 125-032 Funding Source PO 38774 Account No. 324-442001, 422-442001, 429-442001, 430-442001, 266-436008 Amount $392,389.64 Terms of Contract Purpose/Description Change Order #1: Full depth reconstruction of St. Joseph St; project over runs/under runs. For Change Orders Only Amount of Increase Decrease $ 392,389.64 ($ ) Previous Amount $0.00 Current Percent of Change: Increase Decrease 27.21% ( %) New Amount $1,862,399.14 Total Percent of Change: Increase Decrease 27.21% ( %) Time Extension Amount: 0 New Completion Date: