Loading...
HomeMy WebLinkAboutAmendment No 2 to PSA - Walker Field Restroom Proj No 125-024 - Kil Architecture February 10, 2026 Mr. Gregory A. Kil Kil Architecture 1126 Lincolnway East South Bend, IN 46601 gkil@kilarchitecture.com RE: Amendment No. to Professional Services Agreement Dear Mr. Kil: At its February 10, 2026 meeting, the Board of Public Works approved the above referenced amendment for additional design services for the Walker Field Restroom Building, Project No. 125-024 in the amount of $27,000. Enclosed please find a copy of the amendment for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk SUPPLEMENTARY AMENDMENT #2 TO THE AGREEMENT BETWEEN THE CITY OF SOUTH BEND AND GREGORY A. KIL & ASSOCIATES INC. FOR ARCHITECTURAL SERVICES CITY OF SOUTH BEND AND GREGORY A. KIL & ASSOCIATES, INC. (d/b/a Kil Architecture/Planning) Architectural Design and Planning Services for the Proposed Study of the Existing Walker Field House and Addition of a Predesigned Restroom Structure Original Agreement Dated 03/19/2025 (01/06/2026) 01/26/2026 Walker Field House Amendment 2 V_2 Kil A/P # 25010 Page 1 1 1 2 6 L I N C O L N W A Y E A S T S O U T H B E N D I N 4 6 6 0 1 ( 5 7 4 ) 2 8 8 . 2 6 5 4 V O I C E 2 8 9 . 2 4 2 0 F A X ADD THE FOLLOWING: Section VI. SITE AND CIVIL DESIGN FOR WALKER FIELD HOUSE: A. The following is for consultation for Owner requested Civil Engineering and the Architectural Design and Engineering for the Owner Provided Items identified in Section II.B 10 and 11 for Specifications for Removal and Regrading of Existing Tennis Courts (Item 10) and Specifications for a bid alternate for Sealing & Striping the Existing Parking Lot (Item 11). 1. Survey Services: a. Provide Topographic Survey work for sealing and striping of the existing parking lot. 2. Engineering Service Scope of Work: a. Provide Engineering and Construction Documents to Install new sanitary line from Walnut Street to the proposed new restroom location. b. Provide Engineering and Construction Documents for the Removal of the existing paved tennis courts to be replaced with fill and seed per the city of South Bend Standards. c. Provide Engineering and Construction Documents for the Site drainage where the site is being disturbed and include percolation testing. Note: Geotech work is not included in this Scope of Work and is to be provided to Civil Engineer by Others in a direct contract with the Owner. d. Provide Engineering and Construction Documents for new electrical and water connections from existing Field House Building. e. Proposal to include alternate for seal and strip of the existing parking lot. f. Erosion Control Plan as required by the City. B. The Engineered site plan for the above detailed Scope of Services Final Plan Set shall include the following deliverables: 1. Survey of Existing Conditions and Removals Plan. 2. Site Layout Plan with proposed driveway/reconstruction cuts. 3. Grading and Drainage Plans. 4. Utilities Plan, Sewer, Water, Gas & Electric lead locations if required. 5. Standard Specification Details. 6. Landscape Plan as required. 7. Underground/above ground Stormwater Retention Plan with Storm Sewer Details. 8. Lighting Plan as required, supplied to DHA (Simple lumen plan from manufacturer of spec. lighting). SUPPLEMENTARY AMENDMENT #2 TO THE AGREEMENT BETWEEN THE CITY OF SOUTH BEND AND GREGORY A. KIL & ASSOCIATES INC. FOR ARCHITECTURAL SERVICES CITY OF SOUTH BEND AND GREGORY A. KIL & ASSOCIATES, INC. (d/b/a Kil Architecture/Planning) Architectural Design and Planning Services for the Proposed Study of the Existing Walker Field House and Addition of a Predesigned Restroom Structure Original Agreement Dated 03/19/2025 (01/06/2026) 01/26/2026 Walker Field House Amendment 2 V_2 Kil A/P # 25010 Page 2 1 1 2 6 L I N C O L N W A Y E A S T S O U T H B E N D I N 4 6 6 0 1 ( 5 7 4 ) 2 8 8 . 2 6 5 4 V O I C E 2 8 9 . 2 4 2 0 F A X 9. Erosion Control Plan as Required. C. COMPENSATION FOR SITE AND CIVIL WORK FOR WALKER FIELD HOUSE: 1. The Survey and Engineering Scope of Work as listed above will be provided for a fee of $27,000.00 (twenty-seven thousand dollars) All other sections of the agreement dated 03/19/2025 with Amendment 1 signed November 12, 2025 remain in full effect. If Owner Approves this Amendment #2 Agreement as state above, please countersign below and we can begin our Study. _______________________________________________________________ Owner (Signature)Architect (Signature) ________________________________Gregory A Kil, Architect_ _ ____ Printed name and title Printed name and title ________________________________January 26, 2026________________ date date END OF AMENDMENT #2 TO 03/19/2025 AGREEMENT February 10, 2026 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 1/23/2026 Name: Zak Tebell Department of Public Works – Engineering Division BPW Date: 2/10/2026 Phone Extension: 9358 Required Prior to Submittal to Board BPW Attorney X Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ratify Emergency Contract Ease./Encroach Required Information Company or Vendor Name Kil Architecture New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Walker Field restroom Building Project Number 125-024 Funding Source PR-00040052 Account No. 456-10-101-121-444000--PROJ00000619 Amount $27,000.00 Terms of Contract Lump Sum Special Contract Provisions N/A Purpose/Description Civil design services for the Walker Restroom Building Project. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: