Loading...
HomeMy WebLinkAboutChange Order No 5 Raclin Murphy Encore Proj No 123-056 - Larson-Danielson January 27, 2026 Mr. David Merkel Larson-Danielson Construction Co., Inc. 302 Tyler St. LaPorte, IN 46350 mcd@ldconstruction.com; btl@ldconstruction.com RE: Change Order No. 5 – Raclin Murphy Encore Center – Project No. 123-056 Dear Mr. Merkel: At its January 27, 2026 meeting, the Board of Public Works approved the above referenced Change Order be increased by $250,703.83, bringing the revised contract amount to $16,304,225.09 and a completion date of January 23, 2026. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Hillary Horvath 5 $ 15,202,000.00 $ 581,521.26 $ 15,783,521.26 X #$ $ 16,034,225.09 3.83 % 5.19 % Contractor Signature CONSTRUCTION MANAGER CITY OF SOUTH BEND Address BOARD OF PUBLIC WORKS 0 City, State, Zip Printed Name and Title 0 Company Name 0 Member Member Member Approved Date: President Member SUBJECT OF CHANGE ORDER: 123-056 Raclin Murphy Encore Center 8/26/2024 Variety of cost increases and savings as detailed in the attached documentation. PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKSPROJECT CHANGE ORDER DATE:1/27/2025 The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is Increased 250,703.83Decreased The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time 9/17/2025 52 Days RECOMMENDED FOR Extension of date/time by previous change orders Date/time extension by this change order 45 New completion date/time 1/23/2025 CONTRACTOR January 27, 2026 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk Board of Public Works FROM: Patrick Sherman: Director of Project Management SUBJECT: Raclin Murphy Encore Center: Change Order #5 DATE: January 22nd, 2026 Greetings, The documents herein detail the costs associated with Change Order #5 for the Raclin Murphy Encore Center project. See the attached This includes a variety of costs associated with the project including unforeseen issues and some necessary design changes. It also includes the addition of some monumental donor signage for the building. This is to acknowledge the contributions of generous donors that have contributed more than $15M towards the construction of the Raclin Murphy Encore Center and subsequent parking garage. The date is also being extended to January 23rd, 2026. There are a number of justified delays due to needing to do re-designs after unforeseen issues both in the building and underground related to utility conflicts. With this change order, the entire change percentage is now at 5.2%, 1.2% of which is unforeseen, which puts the general change at 4%. These changes are still within the planned contingency in the project. This change order also includes project savings of $81,964.28, which reflects efforts by the project team to control allowance usage and control costs with value engineering. Total cost controls on the project reduced cost by about 1%. Thank you and please let me know if you have any questions. Patrick Sherman Ph : 219-362-2127 302 Tyler Street LaPorte, IN 46350 Change Order Date: Project: LARSON-DANIELSON CONST CO. INC. 302 Tyler Street LaPorte, IN 46350 56-702 SBPUBWKS-RCLN MRPHY ENCORE Change Order:5 1/16/2026 To Contractor: Architect's Project: SOUTH BEND, IN 46601 211 N MICHIGAN ST The Contract is changed as follows: Change Order 5 21R CCD 8 Floor to Floor Elevation Changes $27,256.00 34 Relocate Plumbing at Portals $2,311.00 39 Credit for Sternburg Light Fixtures $-10,500.00 49B-R CCD 13 Interior Portal Changes (includes Restrooms) & CCD 7 Basement Portal Changes $27,216.00 49AR CCD 13 Portal Changes - Structural $69,491.00 59 CCD 14 Additional Visual Displays $31,912.00 71 Credit for Lighting Controller $-8,100.00 72 Relocate Fire Protection at Portals $1,441.00 73 RFI 223 Exit Signs in EOA $609.00 75A Extend Terrazzo to Colonnade $5,062.00 76 Rework Storm Due to Conflicts $3,954.00 77 Rework Sanitary Due to Conflicts $113.00 78 Delete WC3 $-2,500.00 79 Donor Signage $134,504.11 80 Credit to Remove Acoustic Wall Panels $-10,557.00 81 Change Ceiling Tile Room 104 $1,130.00 84 Banquet Seating Memorabilia Swap $0.00 85 Rework Site Concrete/Bollards Eastside $3,613.00 86 Change Grilles $3,360.00 89 Exit Signs in Equity in Arts $1,799.00 91 Change Out VIP Unistrut Lighting $15,570.00 92 Additional Corner Guards $1,141.00 93 Beer Taps $2,186.00 95 Delete Installation of Picture Frame Trim $-1,540.00 98 Reduce Allowance $-48,767.28 $250,703.83Total: Ph : 219-362-2127 302 Tyler Street LaPorte, IN 46350 Change Order Date: Project: LARSON-DANIELSON CONST CO. INC. 302 Tyler Street LaPorte, IN 46350 56-702 SBPUBWKS-RCLN MRPHY ENCORE Change Order:5 1/16/2026 To Contractor: Architect's Project: SOUTH BEND, IN 46601 211 N MICHIGAN ST NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACT AND OWNER. OWNERARCHITECT SHIVE-HATTERY CONTRACTOR LARSON-DANIELSON CONST CO. INC. The date of Substantial Completion as of the date of this Change Order therefore is The Contract Time will be increased by 45 days. $15,202,000.00 $16,034,225.09 The original Contract Amount was Net change by previously authorized Change Orders The Contract Amount prior to this Change Order was The Contract will be increased by this Change Order in the amount of The new Contract Amount including this Change Order will be $581,521.26 $15,783,521.26 $250,703.83 321 SOUTH MAIN STREET, SOUTH BEND, IN 46601 302 Tyler Street LaPorte, IN 46350 (Signature)(Signature) Date DateDate ByBy By (Signature) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 01/22/2026 Name: Patrick Sherman Department of Public Works – Engineering Division BPW Date: 01/27/2026 Phone Extension: 5601 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Mickey Lovy Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 5 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Larson Danielson Construction New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Raclin Murphy Encore Center Project Number 123-056 Funding Source Multiple Account No. PR/PO # 32487 Amount $250,703.83 Terms of Contract Lump Sum Bid Special Contract Provisions Purpose/Description Change order for various items related to the Raclin Murphy Encore Center asdetailed in the attached memo. For Change Orders Only Amount of Increase Decrease $250,703.83 ($ ) Previous Amount $ 15,783,521.26 Current Percent of Change: Increase Decrease 3.8% ( %) New Amount $ 16,034,225.09 Total Percent of Change: Increase Decrease 5.2% ( %) Time Extension Amount: 45 Days New Completion Date: 01/23/2026