My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C3 Budget Request (EVSE O'Brien Center) - Signed
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2026
>
01.08.2026
>
Signed Items
>
6C3 Budget Request (EVSE O'Brien Center) - Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 12:31:28 PM
Creation date
1/8/2026 12:31:27 PM
Metadata
Fields
Template:
Dept of Community Investment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend <br />Redevelopment Commission <br />215 S. Dr. Martin Luther King, Jr. Blvd., Room 301, South Bend, Indiana <br />Redevelopment Commission Agenda Item <br />DAT E : 01/08/2026 <br />FROM: Alex Bazán, Director of Sustainability <br />SUBJECT: Budget Request EV charging station at O’Brien <br />Center <br />Funding Source* (circle) River West; River East; South Side; Douglas Road; West Washington; RDC General; Riv. East Res. <br />* Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, <br />then the authorization of the expenditure of such funds shall be void and of no effect. <br />PURPOSE OF REQUEST: Budget request of $20,000 to purchase and install a level 2 electric vehicle (EV) <br />charging station as part of a matching grant from GOEVIN. <br />SPECIFICS: The City was awarded a matching grant called the Charging Infrastructure Funding <br />Opportunity from GOEVIN (Go Electric Vehicle Indiana) to install EV charging stations. GOEVIN is a <br />collaborative, statewide initiative dedicated to advancing the adoption of electric vehicles across the <br />state. The GOEVIN Team is comprised of the Indiana Department of Environmental Management (IDEM), <br />the Indiana Utility Group, and Drive Clean Indiana. The City was one of a handful of applicants that were <br />selected from this statewide funding opportunity. As part of implementing the City’s EV Community <br />Infrastructure plan, the Office of Sustainability has identified areas in need of EV charging stations, which <br />include the South Side of South Bend. The O’Brien Center was identified as an ideal location as it is a <br />publicly accessible location that is in a part of the City that lacks EV charging stations. With a publicly <br />accessible EV charging station on the South Side of South Bend, the City will provide greater access to <br />charging infrastructure and allow greater progress in its goals to support the transition to clean <br />transportation. An EV charging station at O’Brien Center will support charging needs for South Side <br />community members and visitors and a supportive environment for those considering the transition to <br />electric vehicles. The budget request from the Redevelopment Commission will support continued <br />investment in the South Side of South Bend. The GOEVIN matching grant is estimated at $10,000 based <br />on project costs to install a level 2 EV charging station with 2 ports at O’Brien Center. The GOEVIN grant <br />is provided as a reimbursement once installation is complete. Net project cost is estimated at ~$10,000. <br />______________ ___________Pres/V-Pres <br />ATTEST: __________ ________Secretary <br />Date: _____________ _______ <br /> APPROVED Not Approved <br />SOUTH BEND REDEVELOPMENT COMMISSION <br />January 8, 2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.