HomeMy WebLinkAboutAmendment No 1 to PSA - Long Tern Control Plan Proj No 124-039 - Stantec
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU
CITY HALL
215 S. MARTIN LUTHER KING JR. BLVD.,
SUITE 400
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
December 16, 2025
Mr. T. Joe Johnson
Stantec Consulting Services, Inc.
350 N. Orleans Street, Suite 8000N
Chicago, IL 60654
Joe.johnson@stantec.com
RE: Amendment No. 1 to Professional Services Agreement
Dear Mr. Johnson:
At its December 16, 2025 meeting, the Board of Public Works approved the
above referenced amendment for the Complete Preliminary Design and Start Final
Design Phases for the Federally Mandated Long-term Control Plan for the Randolph-
Sampson Treatment Basin, Project No. 124-039 in the amount of $1,747,259.
Please find enclosed the agreement. Kindly sign and return it to
hhorvath@southbendin.gov and retain a copy for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Hillary Horvath
Hillary Horvath, Clerk
Enclosures
HH
1
AMENDMENT NO. 1 TO AGREEMENT
FOR PROFESSIONAL CONSULTING SERVICES BETWEEN THE
BOARD OF PUBLIC WORKS, CITY OF SOUTH BEND, INDIANA AND
STANTEC CONSULTING SERVICES, INC.
RANDOLPH-SAMPSON RETENTION TREATMENT BASIN
This Amendment No. 1 to the Agreement Between Board of Public Works, City of South Bend, Indiana and
Stantec Consulting Services, Inc. dated November 12, 2024 (“Agreement”) is made and entered into this
16th day of December, 2025.
Whereas, Stantec Consulting Services, Inc. (“Engineer”) and the Board of Public Works, City of South Bend,
Indiana (“Owner”) did enter into a written Agreement on November 12, 2024 whereby Engineer agreed to
perform engineering services; and
Whereas, it is the desire of the parties to enter into this Amendment No. 1 to the Agreement under which
the Consultant agrees to perform additional study/preliminary engineering, preliminary design, and 60%
design services for the Randolph-Sampson Retention Treatment Basin.
Now therefore, for and in consideration of the covenants and agreements herein set forth, it is agreed by
and between the parties hereto, that the said Agreement is hereby amended in the following particulars:
1. The original Exhibit A – Engineering Services for Randolph-Sampson Retention Treatment Basin
is amended to include the Additional Engineering Services for Randolph-Sampson Retention
Treatment Basin included with this Amendment as Exhibit A1.
2. The original Compensation Packet BC-1: Basic Services – Lump Sum is modified as shown below
to include the basis of compensation for the new scope of services authorized under this
Amendment No. 1. The Total, Lump Sum compensation is hereby increased to $3,069,259 as
indicated below:
Original
Agreement
Amendment 1 Total
a. Study/PER Phase $1,322,000.00 $0.00 $1,322,000.00
b. Preliminary Design Phase $TBD $1,521,656.00 $1,521,656.00
c. Final Design Phase $TBD $225,603.00 $225,603.00
d. Bidding and Negotiating Phase $TBD $TBD $TBD
e. Construction Phase $TBD $TBD $TBD
f. Post-Construction Phase $TBD $TBD $TBD
3. The Period of Service defined in the original Compensation Packet BC-1 is amended to a total
duration of 20 months, ending in June 30, 2026.
2
Except as amended by the provisions hereof and prior authorized amendments, the Agreement between
the parties hereof dated November 12, 2024 shall be and remains in full force and effect.
In witness whereof, the parties hereto have executed this Amendment to Agreement on the day and year
first above written, with the expressed intent of the parties that said Amendment No. 1 to Agreement,
including Exhibit A1 is hereby incorporated into and made a part of said original Agreement and shall be
effective pursuant thereto.
IN WITNESS WHEREOF, the undersigned have executed this Amendment to Agreement acknowledging
that there are no other oral agreements that have not been reduced to writing in this statement.
Owner: City of South Bend, Indiana Engineer: Stantec Consulting Services, Inc.
Board of Public Works
___________________________________ ___________________________________
Elizabeth A. Maradik, President
___________________________________
Joseph R. Molnar, Vice President
___________________________________
Gary A. Gilot, Member
December 16, 2025
Exhibit A1
Additional Engineering Services for Randolph-Sampson Retention Treatment Basin
Introduction
This document defines the scope of additional engineering services for the Randolph-
Sampson Retention Treatment Basin (RTB) project to be provided under this Amendment
No. 1. It details tasks involving Preliminary Design Phase and Final Design Phase. The
amendment covers activities through Preliminary Design Phase and 60% design
completion and project delivery planning of the process mechanical and site/civil
disciplines.
Scope of Services
Task 1 - Preliminary Design Phase
Subtask 1.1 – Site Investigation
Preliminary Design site investigations aim to further define conditions impacting design
and permitting based on findings from the previously authorized activities. This includes
site alternatives analysis, additional topographic, utility, property surveys, a Phase IA
archaeological reconnaissance to support funding e.orts, a Letter of Map Revision (LOMR)
application, a Phase II Environmental Site Assessment (ESA), a detailed design
geotechnical investigation, and field visits to Cincinnati and Detroit RTB facilities.
The archaeological survey involves shovel test units (STUs) at 15-meter intervals due to
anticipated low surface visibility, with a report expected to find no archaeological sites.
A LOMR application is planned due to the site's location in a FEMA Zone A flood hazard
area. The Phase II ESA will test soil, groundwater, and soil gas for contamination using
eleven boreholes with specific analyses for volatile organic compounds, metals, and other
contaminants. Sampling and laboratory analysis will follow USEPA methods, with a report
summarizing field data, lab results, and comparisons to Indiana standards.
A detailed design geotechnical investigation will include seven test borings up to 75 feet
deep, soil sampling, installation of groundwater monitoring wells and various laboratory
tests to inform foundation and excavation design. Geotechnical reports will provide
baseline conditions and design bases including soil parameters, groundwater control, and
construction considerations.
Field visits to Cincinnati and Detroit RTB facilities are also planned to gather insights for the
project.
Deliverables that will be included for this subtask will include (All deliverables will be
submitted via email in PDF format unless otherwise noted):
·Survey basemap in AutoCAD Civil 3D 2025 version.
·Electronic copies of the reports and shapefiles for the Phase IA Archaeological
Reconnaissance.
·LOMR application.
·Phase II Environmental Site Assessment.
·Detailed Design Geotechnical Investigation Data Report
·Summary of Cincinnati and Detroit RTB Facilities Visit Findings
Subtask 1.2 – Preliminary 30% Design
This phase includes process, site/civil, architectural, structural, mechanical, electrical,
and instrumentation/control design:
·Process Design: Preparation of a Basis of Design Report (BODR) covering project
description, regulatory requirements, service area, design flows, treatment process,
solids management, and sta.ing. The RTB system integrates diversion, mechanical
screening, a 4.7-million-gallon storage tank, flushing systems, chlorine disinfection,
dechlorination, dewatering pumps, and odor control systems.
·Hydraulic Modeling and Design: Hydraulic profiling will evaluate system flows
under various conditions including dry weather, wet weather, stormwater peaks,
and emergency discharges. The project will use Flow-3D Hydro software to develop
four 3D CFD models focusing on the diversion structure, flow to screens, storage
and chlorine contact tanks, and discharge junction structure. These models will
optimize hydraulic performance, assess turbulence, prevent dead zones, and
recommend design improvements. Results will be summarized for the Basis of
Design Report.
·Site/Civil Design: Review of field data, site visit, zoning ordinance review,
preliminary layouts for roads, grading, storm sewer piping, stormwater
management, and preparation of technical specifications. Submission of a 30%
concept site plan for permitting is included.
·Architectural Design: Building code review, preliminary floor plans and elevations
for screening, electrical, and chemical storage buildings, design narratives, and
technical specifications prepared using Revit 2024.
·Structural Design: Review of documentation and geotechnical reports, preliminary
foundation design for tanks and buildings, development of structural requirements
for precast tanks (to be designed by manufacturer), and preparation of technical
specifications.
·Mechanical/HVAC/Plumbing Design: Preliminary system level drawings, natural
gas, water, drainage for process operations, ventilation and NFPA 820 compliance,
heating/cooling calculations, fire protection coordination, and emergency fixtures
design.
·Electrical Design: Load analysis, single-line diagrams, coordination with electric
company, site plans, motor control center layouts, backup power considerations,
lighting, communications, and fire/security systems.
·Instrumentation and Control Design: Preliminary control and SCADA diagrams,
PLC system description, interface with existing plant controls, operator interface,
P&ID development assistance, and technical specifications.
Deliverables that will be included on this subtask:
·30% design plans (estimated 59 sheets).
·List of anticipated specifications.
·Basis of Design Report.
Subtask 1.3 – Permitting/Project Implementation
STANTEC will evaluate project implementation factors including:
·Land and Easement Requirements: Revisions to land acquisition and easements
documentation based on 30% Design as needed.
·Permitting: Coordination with permitting agencies for required permits including
railroad crossing, NPDES updates, floodplain revisions, erosion control,
construction stormwater, building and infrastructure permits, wildlife and historic
preservation reviews.
·Project Financing: Support for State Revolving Fund loan application to address
comments from the Indiana Finance Authority (IFA).
Deliverables that will be included on this subtask:
·Permitting information will be included in the BODR and evaluations from these
activities will be incorporated into the PER.
Task 2 – Final Design Phase
Subtask 2.1 – 60% Design
Design documents will be advanced to 60% design for process mechanical and site/civil
design, incorporating Owner and IDEM comments. The use of Revit 2025 for 3D modeling of
tanks and buildings is planned. Updated design calculations and coordination with
vendors for equipment and instrumentation will occur.
·Process Mechanical: Progress on the preliminary detailed design documents, work
includes building, access road, and utility layouts in coordination with other
disciplines; hydraulic profiles; process flow diagrams; and updated vendor
proposals based on design refinements. Prepare layouts, plans, sections, and
details for major process structures and equipment, including diversion structure,
screens, washer-compactors, storage tanks, disinfection and flushing systems,
electrical/control building, chemical storage building, and junction chambers.
Define chemical building layout, chemical selection, delivery options, and storage
requirements. Provide plans and sections for plant piping, valves, and
appurtenances, update the Basis of Design Report (60%), and develop technical
specifications.
·Site/Civil Design: Prepare site layout grading and yard piping plans depicting
influent, e.luent, air, gas, water, power, and control conduits; storm sewer and
stormwater management plans; typical roadway sections and general details;
temporary and permanent erosion control plans; and a Stormwater Pollution
Prevention Plan. Technical specifications will be included for all civil components.
Deliverables that will be included on this subtask:
·Wastewater process design with layouts, hydraulic profiles, process flow diagrams,
updated vendor proposals, and technical specifications.
·Site/civil design with site grading, yard piping, storm sewer design, erosion control,
and Stormwater Pollution Prevention Plan.
·Updates from the Hydraulic design and CFD to be implemented in the process
mechanical design.
·Deliverable 60% process mechanical design and site/civil design drawings, and
selected specifications. A total of 91 60% design drawings is anticipated for this
amendment.
The above 60% scope covers the full 60% design for process mechanical and site/civil
disciplines. The remaining disciplines design scope for 60% design submittal (a total of 180
drawings anticipated) and beyond will be included in Amendment No. 2 once the Owner
approves the process mechanical and site/civil design.
Project Management
Project Administration/Management: Included in each of the above phases is project
management. Project management will be conducted under Engineer’s internal
framework, including updates to the Project Execution Plan, ongoing schedule and budget
monitoring, and ongoing monthly reporting to the Owner. Scope or schedule changes will
be documented and require Owner approval before additional services proceed.
Meetings: Meetings include bi-weekly progress meetings with the Owner, bi-weekly
internal progress meetings, weekly inter-discipline coordination meetings, and as-needed
Teams meetings to discuss items that need immediate attention by the Owner and the
project team.
Quality Management, Risk Management, and Schedule Management: Quality
management involves rigorous review of deliverables with Owner feedback incorporated.
Risk management includes maintaining a risk register reviewed regularly during progress
meetings. Schedule management involves maintaining and updating the schedule through
the course of the project.
Deliverables (All deliverables will be submitted via email in PDF format unless otherwise
noted):
·Meeting agenda distributed two (2) business days before the meeting.
·Meeting presentation and/or other documents shared during the meeting.
·Meeting notes submitted within five (5) business days after the meeting.
·Risk register and updates.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 12/10/2025
Name: Kieran Fahey Department of Public Works – Engineering Division
BPW Date: December 16th 2025 Phone Extension: 5993
Required Prior to Submittal to Board
BPW Attorney X Attorney Name
Dept. Attorney Attorney Name Michael Schmidt
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Stantec Consulting Services
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name LTCP Sewage storage tank
Project Number 124-039
Funding Source LTCP Engineering
Account No. 642-06-605-514-431002--
Amount $1,747,259
Terms of Contract Study phase, previously approved, has been completed, now this is to complete
Preliminary design and start Final design phases.
Special Contract Provisions
Purpose/Description Building out the Federally mandated Long-term control Plan
For Change Orders Only
Amount of Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: