November 25, 2025
Mr. Scott Kirkpatrick
Michiana Contracting, Inc.
7843 Lilac Road, PO Box 929
Plymouth, IN 46563
ski rkpatrickPmichianacontractin .com
RE: Award Bid - Dylan Drive Lighting Improvements - Project No.119-047
Dear Mr. Kirkpatrick:
At its November 25, 2025 meeting, the Board of Public Works awarded the above
referenced bid to you in the amount of $339,642, Base Bid and Alternate 1. Enclosed
please find a signed Bid/Proposal form.
Please forward the following documents in one submittal by December 9, 2025 to
my attention for Board of Public Works approval at hhorvathPsouthbendin.g_ov:
1) One (1) signed original of the Public Works Contract (enclosed)
2) Labor & Material Payment Bond
3) Performance Bond (125% of Bid Amount)
4) Certificate of Insurance naming the City of South Bend as an additional insured
5) Item #4 for all subcontractors that you use
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Hillary Horvath
Hillary Horvath, Clerk
Enclosures
HH
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARYA. GILOT MURRAY L. MILLER BREANA N. MICOU
CITY HALL
215 S. MARTIN LUTHER KING JR. BLVD.,
SUITE 400
SOUTH BEND, INDIANA46601-1830
PHONE 574/235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
November 25, 2025
Mr. Adam Ranck
J. Ranck Electric, Inc.
1993 Gover Parkway
Mt. Pleasant, MI 48858
AiranckP*ranck.com
RE: Bid Award - Dylan Drive Lighting Improvements - Project No.119-047
Dear Mr. Ranck:
At its November 25, 2025, meeting, the Board of Public Works awarded the above
referenced bid to Michiana Contracting in the amount of $339,642 for the Base Bid plus
Alternate 1.
Thank you for bidding, and we hope you bid with us in the future.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Hillary Horvath
Hillary Horvath, Clerk
Enclosures
HH
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARYA. GILOT MURRAY L. MILLER BREANA N. MICOU
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Dylan Drive Lighting Improvements
Project No. 119-047
For Bids Due November 12, 2025
PART I
(Must be completed for all bids. Please type or print)
Date: 11/11/25 Bidder (Firm): Michiana Contracting Inc
Address: 7843 Lilac Road, PO Box 929
City/State/Zip: Plymouth, IN 46563 Telephone Number: ( 574 ) 936-8613
Email Address: skirkpatrick@michianacontracting.com
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Dylan Drive Lighting Improvements, Project No. 119-047
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Jones, Petrie, Rafinski
and dated 10/03/25 for the sum of (enter the Total Bid as shown on the Proposal)
Three Hundred Thirty Nine Thousand Six Hundred Forty Two Dollars ($ 339,642.00 }
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount speFjged iitrr►1,�
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in gQ6&4Wft&'q ''•,,
with the notice. Any addendums attached will be specifically referenced at the applicable pag�� alb •''' C./� '
If additional units of material included in the contract are needed, the cost of units must be the3 as '�
shown in the original contract if accepted by the City of South Bend. If the id is to be awatCrq r�ti ATt�
basis, the itemization of the units shall be shown on a separate attachme
By SEAL
{Signature}
Scott Kirkpatrick, President ''�•• /rydIa�a
(Printed Name of Person Signing) . r! +1 i 11101%%
ACCEPTANCE
The above bid is accepted this day of 20
Subject to the following conditions:
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
VILa ee�z
Elizabeth A. Maradik, President Joseph R. Molnar, Vice President
-79'� a-0,�
Gary A. Gilot, Member BreanaM�icou, Member
Version 1/3/2025 Murray L. Miller, Member Attest: Hillary R. Horvath, Clerk
Date: November 25, 2025
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
This Agreement is made and entered into this 25t" Day of November 2025, by and between
Michiana Contracting, (the "Contractor"), and the Board of Public Works (the "Board").
The Contractor covenants and agrees to make the following improvement, as fully set out
in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid
Proposals, all of which are set forth as a part of this Contract, for:
PROJECT NO. 119-047
DESCRIPTION: DYLAN DRIVE LIGHTING IMPROVEMENTS
COMPLETION DATE: SEE SPECIFICATIONS
AMOUNT: $339,642 BASE BID PLUS ALTERNATE 1
FUNDING: PR-00043672
The unit prices for this improvement were those prices as received and accepted by the
Board on the 25th Day of November 2025.
The Contractor further agrees to notify the assigned Engineer when this improvement is
completed. This notification shall be in the form of a Project Completion Affidavit, signed
by the Contractor. Upon final acceptance of the improvement by the Engineer, the
Contractor's final estimate will be presented to the Board for final Payment with one (1)
copy of the Project Completion Affidavit and one (1) copy of a Waiver of Lien.
Each of the Parties, by signing below, represents and warrants to the other Party that
he/she/it has the authority to bind the named person or entity to this Agreement.
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
vl 'a
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray L. Miller, Member
Joseph R. Molnar, Vice President
Brea/n-,a, Micou, Member
d 4otL
Attest: Hillary R. Horvath, Clerk
Date: November 25, 2025
M ICH IANA CONTRACTING
Printed Name
Signature
D� Spl1Tk $��
V; INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
r8DIVISION OF ENGINEERING
TO: Hillary Horvath, Clerk
Board of Public Works
FROM: Caitlin Wyant, Project Engineer
SUBJECT: Award Project No. 119-047
Dylan Drive Lighting Improvements
DATE: November 25, 2025
On November 12, 2025, the Board of Public Works opened and read bids for the above project,
which consisted of a base bid and one (1) alternate.
The bidders ranked as follows:
Bidder
Amount
1. Michiana Contracting
$339,642.00
2. J Ranck Electric
$442,077.25
I recommend award of a contract to the lowest responsive / responsible bidder, Michiana
Contracting in the amount of $339,642.00.
Michiana Contracting has also met the responsible bidder ordinance and is now pre -qualified to
bid on City contracts through November 12, 2026.
Sufficient funds have been appropriated from the Engineering General Fund (101-500-422018)
and River West Development TIF (324-431002).
Please call with your questions.
Enc. Bid Tabulation
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
arm �'� �—
Gary A. Gilot, Member
Murray L. Miller, Member
'�2_7Tt
Joseph R. Molnar, Vice President
Breana Micou, Member
xt f 40&-,
Attest: Hillary R. Horvath, Clerk
Date: November 25, 2025
BID TABULATION
DYLAN DRIVE LIGHTING IMPROVEMENTS
v� fl Project No: 119-047
u c
DYLAN DRIVE LIGHTING IMPROVEMENTS
Base Bid
Engineer's Estimate I Michiana Contracting I 1 Ranck Electric
Item No.
Line Item
Quantity
Unit
Unit Price
Cost
Unit Price
Cost
Unit Price
Cost
1
CONSTRUCTION ENGINEERING
1
LS
$ 4,000.00
$ 4,000.00
$ 1,200.00
$ 1,200.00
$ 10,000.00
$ 10,000.00
2
MOBILIZATION/ DEMOBILAZATION
1
LS
$ 22,000.00
$ 22,000.00
$ 14,240.00
$ 14,240.00
$ 34,500.00
$ 34,500.00
3
LIGHT POLE FOUNDATION REMOVAL
1
EA
$ 1,000.00
$ 1,000.00
$ 300.00
$ 300.00
$ 725.00
$ 725.00
4
LIGHT STANDARD, TYPE B
1
EA
$ 6,400.00
$ 6,400.00
$ 7,600.00
$ 7,600.00
$ 6,500.00
$ 6,500.00
5
LIGHT STANDARD, TYPE D
1
EA
$ 17,500.00
$ 17,500.00
$ 13,900.00
$ 13,900.00
$ 13,500.00
$ 13,500.00
6
LIGHT STANDARD, REPLACEMENTTYPE A
15
EA
$ 2,400.00
$ 36,000.00
$ 1,840.00
$ 27,600.00
$ 2,100.00
$ 31,500.00
7
LIGHT STANDARD, LED UPGRADE TYPE E
23
EA
$ 2,900.00
$ 66,700.00
$ 1,874.00
$ 43,102.00
$ 2,900.00
$ 66,700.00
8
LIGHT STANDARD, LED UPGRADE TYPE F
15
EA
$ 2,900.00
$ 43,500.00
$ 2,250.00
$ 33,750.00
$ 2,900.00
$ 43,500.00
9
LIGHT POLE FOUNDATION
1
EA
$ 1,500.00
$ 1,500.00
$ 3,143.00
$ 3,143.00
$ 5,000.00
$ 5,000.00
10
NO 2 WIRE
8,994
LFT
$ 10.00
$ 89,940.00
$ 4.60
$ 41,372.40
$ 5.75
$ 51,715.50
11
N04WIRE
4,340
LFT
$ 10.00
$ 43,400.00
$ 3.10
$ 13,454.00
$ 4.00
$ 17,360.00
12
NO 6 WIRE
4,304
LFT
$ 8.00
$ 34,432.00
$ 1.90
$ 8,177.60
$ 3.00
$ 12,912.00
13
NO 8 WIRE
2,111
LFT
$ 7.00
$ 14,777.00
$ 1.40
$ 2,955.40
$ 2.25
$ 4,749.75
14
CONDUIT, PVC, SCHD 80, 2IN
3,645
LFT
$ 15.00
$ 54,675.00
$ 15.35
$ 55,950.75
$ 12.00
$ 43,740.00
15
PULL BOX
2
EA
$ 2,000.00
$ 4,000.00
$ 1,990.00
$ 3,980.00
$ 2,200.00
$ 4,400.00
16
MAINTAINING TRAFFIC
1
LS
$ 20,000.00
$ 20,000.00
$ 14,184.85
$ 14,184.85
$ 37,300.00
$ 37,300.00
TOTAL
I $ 459,824.00
$ 284,910.00
$ 384,102.25
Alternate 1
Item No.
Line Item
Quantity
Unit
Unit Price
Cost
Unit Price
Cost
Unit Price
Cost
1
LIGHT STANDARD, TYPE C
3
EA
$ 7,200.00
$ 21,600.00
$ 6,861.00
$ 20,583.00
6500
$ 19,500.00
2
LIGHT POLE FOUNDATION
3
EA
$ 1,500.00
$ 4,500.00
$ 3,143.00
$ 9,429.00
$ 3,925.00
$ 11,775.00
3
N04WIRE
2,400
LFT
$ 10.00
$ 24,000.00
$ 3.10
$ 7,440.00
$ 4.00
$ 9,600.00
4
NO WIRE
1,200
LFT
$ 7.00
$ 8,400.00
$ 1.40
$ 1,680.00
$ 2.25
$ 2,700.00
5
CONDUIT, PVC, SCHD 80, 2IN
1,200
LFT
$ 15.00
$ 18,000.00
$ 13.00
$ 15,600.00
$ 12.00
$ 14,400.00
TOTAL
$ 76,500.00
$ 54,732.00
$ 57,975.00
Base+Alternate 1 I $ 536,324.00 1 $ 339,642.00 1 $ 442,077.25
I hereby certify that the above truly and accurately represents bids received for this project on NOVEMBER 12, 2025
CAITLIN WYANT, PROJECT ENGINEER
S:\Public Works\Projects\Projects by year\2019 Projects\119-M7 Dylan Drive Lighting Improvements\1- Admin\1- BPW Documents\Bid Opening+Award\Bid Tabulation & Review
Project DYLAN DRIVE LIGHTING IMPROVEMENTS Calculated Goals Base
Project Number 119-047 MBE 1.13%
Bid Open 12-Nov-25 IWBE 4.35%
Conditional Formatting; green = meets goals, red = does not meet goals
Base Scope of Work - Michiana Contracting
Base Bid Amount (from MWBE 1.0, check that this matches bid tab total)l $ 284,910.00
MBE Utilization - Form 1.0
MBE Name
MBE Information
Scope of Work
Dollar Amount of
MBE Component
Bidder Claimed
Percentage of
Total Bid
Checked
Percentage of
Total Bid
JBL Signals & Lighting
50755 Portage Rd South
Bend, IN 46628 574-855-
2251
Install LIGHT
STANDARD, LED
UPGRADE TYPE E
$ 45,402.00
16.00%
15.94%
0.00%
Total MBE%
1 16.0%1
15.9%
WBE Utilization - Form 1.0
WBE Name
WBE Information
Scope of Work
Dollar Amount of
WBE Component
Bidder Claimed
Percentage of
Total Bid
Checked
Percentage of
Total Bid
CoreBorelN LLC
20061 Dice St South Bend,
IN 46614 269-262-2906
Install CONDUIT, PVC,
SCHD 80, 2 IN
$ 47,385.00
16.70%
16.63%
0.00%
Total WBE %
16.70%1
16.63%
Base Scope of Work - Name of Contractor 2
Base Bid Amount (from MWBE 1.0, check that this matches bid tab total)l $ 384,102.25
MBE Utilization - Form 1.0
MBE Name
MBE Information
Scope of Work
Dollar Amount
of MBE
Component
Bidder Claimed
Percentage of
Total Bid
Checked
Percentage of
Total Bid
Apex Consulting &
Surveying
1313 Broadway St Fort
Wayne, IN 46802 260-755-
5993
CONSTRUCTION
ENGINEERING
$ 4,500.00
1.18%
1.17%
0.00%
Total MBE %
i 1.18%1
1.17%
WBE Utilization - Form 1.0
WBE Name
WBE Information
Scope of Work
Dollar Amount
of WBE
Component
Bidder Claimed
Percentage of
Total Bid
Checked
Percentage of
Total Bid
State Barricading Inc
24963 US 20 West South
Bend, IN 46628
MAINTAINING TRAFFIC
$ 17,000.00
4.43%
4.43%
0.00%
Total WBE %
i 4.43%1
4.43%
Included with
Included with
Bid?
Complete?
Bid?
Complete?
Form MBE - 2.0
Evidence of Good Faith Efforts
yes
yes
Form MBE - 2.0
Evidence of Good Faith Efforts
yes
no
Form WBE - 2.0
Evidence of Good Faith Efforts
yes
yes
Form WBE - 2.0
Evidence of Good Faith Efforts
yes
no
Form MBE -2.1
MBE Contacted
yes
yes
Form MBE -2.1
MBE Contacted
yes
yes
Form WBE -2.1
WBE Contacted
yes
yes
Form WBE -2.1
WBE Contacted
yes
yes
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF INDIANA )
) SS:
MARSHALL COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 1/3/2025 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
1, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 1/3/2025 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
,�ttirll�i,
`•`''Contra,
Dated this I lth day ofNovember 2025
Michiana Contracting Inc ; •c : &PoAFF
Contractor/Bidder (Firm) —
SEAL
Signature of o ractorlBidder or Its`Ageny� .d.ana \�
111,11110,\
Scott Kirkpatrick, President
Printed Name and Title
Subscribed and sworn to before me this 1 lth
My Commission Expires 06/12/27
County of Residence
day lo�f, hNovember 2025
Notary Public
Marshall
LISA SOTTO
Notary Public - Seal
Marshall County - State of Indiana
Commission Number NP0720753
My Commission Expires Jun 12, 2027
Version 1/3/2025 Contractor's Bid for Public Works - 6
ti
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Dylan Drive Lighting Improvements
Project Number: 119-047
For Bids Due: November 12, 2025
Contractor Name: Michiana Contracting, Inc.
BASE BID
Item No.
Description
Quantity
Unit
Unit Price
Total Amount
1
CONSTRUCTION ENGINEERING
1
LS
$1,200.00
$1,200.00
2
MOBILIZATION AND DEMOBILIZATION
1
LS
$14,240.00
$14,240.00
3
LIGHT POLE FOUNDATION REMOVAL
1
EA
$300.00
$300.00
4
LIGHT STANDARD, TYPE B
1
EA
$7,600.00
$7,600.00
5
LIGHT STANDARD, TYPE D
1
EA
$13,900.00
$13,900.00
6
LIGHT STANDARD, REPLACEMENTTYPEA
15
EA
$1,840.00
$27,600.00
7
LIGHT STANDARD, LED UPGRADE TYPE E
23
EA
$1,874.00
$43,102.00
8
LIGHT STANDARD, LED UPGRADE TYPE F
15
EA
$2,250.00
$33,750.00
9
LIGHT POLE FOUNDATION
1
EA
$3,143.00
$3,143.00
10
NO.2 WIRE
8994
LFT
$4.60
$41,372.40
11
NO.4 WIRE
4340
LFT
$3.10
$13,454.00
12
NO.6 WIRE
4304
LFT
$1.90
$8,177.60
13
NO.8 WIRE
2111
LFT
$1.40
$2,955.40
14
NE)-= WIRE
49@
LFT
-
15
66
LFT
-
16
CONDUIT, PVC, SCHD 80, 2IN
3645
LFT
$15.35
$55,950.75
17
PULL BOX
2
EA
$1,990.00
$3,980.00
18
___E)_.._..__...._..._____....__..._.. ,_._.
2
EA
19
MAINTAINING TRAFFIC
1
LS
$14,184.85
$14,184.85
BASE BID TOTAL $284,910.00
Version 1/3/2025 Contractor's Bid for Public Works - 7
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Dylan Drive Lighting Improvements
Project Number: 119-047
For Bids Due: November 12, 2025
Contractor Name: Michiana Contracting, Inc.
ALTERNATE# i
Item No.
Description
Quantity
Unit
Unit Price
Tota[Amount
1
LIGHT STANDARD, TYPE C
3
LS
$6,861.00
$20,583.00
2
LIGHT POLE FOUNDATION
3
LS
$3,143.00
$9,429.00
3
NO.4 WIRE
2400
EA
$3.10
$7,440.00
4
NO. 8 WIRE
1200
EA
$1.40
$1,680.00
5
CONDUIT, PVC, SCHD 80,2 IN
1200
EA
$13.00
$15,600.00
Bidder (Firm):
Address:
City/State/Zip:
Michiana Contracting, Inc.
7843 Lilac Road
Plymouth, IN 46563
ALTERNATE #1 TOTAL $54,732.00
Telephone Number: (574) 936-8613
�� — (Signature)
_ Scott Kirkpatrick, President
SEAL (Printed Name of Person Signing)
Version 1/3/2025 Contractor's Bid for Public Works - 8
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN`'
FORM MBE-1.0
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number:
119-047
Project Name: Dflan Drive Lighting Improvements
Bidder: Michiana Contracting Inc
Name & Address of MBE Primary Contact Person
(Name/Telephone)
JbL Signals & Lighting
50755 Portage Rd
South Bend, IN 46628
Submitted by:
574-855-2251
Total Bid Amount: $284,910.00
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
INSTALL LIGHT STANDARD. LED UPGRADE TYPE E
MBE Goal: 1.13
Page 1 of 1
Dollar Am%LnLut.MBE Percentage
Component of Total
$45,402.00 1 16.0%
.•'���Gantr
Z.
G011P011ATF
Scott Kirkpatrick, President 1 JA1Z25
Print Name
si nature r SEAL Uate�
***Goals should be calculated based on the Base Bi�`0 ota a
Version 1/3/2025 Contractor's Bid for Public Works - 9
i�
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-1.0 , f'
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number:
Bidder:
119-047 Project Name: Dylan Drive Lighting Improvements
Michiana Contracting Inc
Name & Address of WBE
CoreBorelN LLC
20061 Dice St
South Bend, IN 46614
Primary Contact Person
(Name/Telephone)
Total Bid Amount: $284,910.00 WBE Goal: 4.35
Page 1 of 1
Scope of Work to be Performed Dollar Amount of WBE Percentage
(Attach scope/schedule if you need additional space) 11 Component of Total
Bid/Proposal
269-262-2906 1 INSTALL CONDUIT, PVC, SCHD 80, 2 IN
$47,385.00 1 16.7%
ok 111111,,It If
n ttQF6."111
,4
= GCRPORATco
Submitted by: Scott Kirkpatrick, President _ 1 111 V25
Print Name Signature Q- EEbe -
1 �
***Goals should be calculated based on the Base Bid only*W,,?dianal,.`�~~
►I111111
Version 1/3/2025 Contractor's Bid for Public Works - 10
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 119-047 Date: 11/11/25
Project Name: Dylan Drive Lighting Improvements
Bidder: Michiana Contracting Inc
Contact Person: Scott Kirkpatrick, President Telephone: 574-936-8613
Address: 7843 Lilac Road, PO Box 929
City: Plymouth State: IN Zip: _ 46563
Email: skirkpatrick@michianacontracting.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: http://www.in. ov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/ictoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 1/3/2025 Contractor's Bid for Public Works - 11
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affrm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related ass istances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to an or the aoove oozes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 1/3/2025 Contractor's Bid for Public Works - 12
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN k �,
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number:
Project Name
Bidder:
119-047
Dylan Drive Lighting Improvements
Michiana Contracting Inc
Contact Person: Scott Kirkpatrick, President
Address: 7843 Lilac Road, PO Box 929
City:
Email:
Plymouth
State: IN
skirkpatdck@michianacontracting.com
Date: 11/11/25
Telephone, 574-936-8613
Zip: _
46563
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S); The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: httr)://www.in.-gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.govlidoaL
I affirm that I have made good faith efforts to select portions of the contract work to be
/ performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all WBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements. _
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively
I affirm that I followed up on initial solicitations with interested WBEs.
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 1/3/2025 Contractor's Bid for Public Works - 13
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 11/13/2025
Name: Caitlin Wyant, EI
Department of Public Works — Engineering Division
BPW Date: 11/25/2025
Phone Extension: 7483
Required Prior to Submittal to Board
BPW Attorney X
Attorney Name Michael Schmidt
Dept. Attorney ❑
Attorney Name
Purchasing ❑
Check the Appropriate
Item Type — Re uired or All Submissions
❑ Professional Services Agreement
❑ Open Market Contract
❑ Bid Opening
❑ Quote Opening
❑ Proposal Opening
❑ Chg. Order, No.
❑ Other:
❑ Contract ❑ Proposal
❑ Amendment/Addendum ❑ Special Purchase, QPA
® Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Award ❑ Reject Bids/Quotes
❑ C/O & PCA No. ❑ PCA
❑ Traffic Control ❑ Resolution
❑Ease./Encroach
� Required Information
Company or Vendor Name Michiana Contracting
New Vendor ❑ Yes If Yes, Approved by Purchasing
® No
MBE/WBE Contractor ❑ MBE Completed E-Verify Form Attached ❑ Yes
❑ WBE ❑ No
Project Name Dylan Drive Lighting Improvements
Project Number 119-047
Engineering general fund, 2024 Light Up South Bend, 2025 Light Up
Funding Source South Bend, River West TIF
Account No. PR #43672
Amount $339,642.00
Terms of Contract
Special Contract Provisions
Purpose/Description Award base bid and alternate 1 for work to install new conduit and upgrade
existing light fixtures to LED fixtures in Dylan Dr industrial area
Pr For Change Orders Onl
Amount of ❑ Increase $
❑ Decrease ($ )
Previous Amount
Current Percent of Change
New Amount
Total Percent of Change:
Time Extension Amount:
Increase %
Decrease ( %
Increase %
Decrease ( %
New Completion Date: