HomeMy WebLinkAboutOpening Of Proposals - Ewing Trail Proj No 125-063 - HWC EngineeringCity of South Bend Ewing Trail (Des # 2500053) in the LaPorte District NOVEMBER 12, 2025 South Bend Board of Public Works 215 S. Dr. Martin Luther King, Jr. Blvd, Suite 400 South Bend, IN 46601 574-233-0311 bpwbids@southbendin.gov City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 2 HWC was founded in 1989 and has offices in Hammond, Indianapolis, Terre Haute, New Albany, Lafayette, Muncie, and North Vernon. As a full-service consulting firm, we provide transportation, landscape architecture, planning, site engineering, water, wastewater, stormwater, inspection, and survey services for both the public and private sectors. HWC has received multiple project awards from the Indiana Chapter of American Planning Association (APA-IN), the Indiana Chapter of the American Society of Landscape Architects (INASLA), and has been recognized among the top five largest engineering firms in the Indianapolis Business Journal. Experience + Qualifications As active civil engineers, landscape architects, and planners, we understand the value of regional projects and the importance of such projects as the Ewing Trail. We are currently leading design efforts for segments of several Statewide trail projects and would be thrilled to be a part of the next phase of this visionary trail network for Northern Indiana. Our Interest In Your Project Why we want to work on the Ewing Trail. Our portfolio of trail planning and design projects is robust. We have worked on everything from big picture regional trail master plans, rural rails-to-trails projects, and urban pathways navigating tight downtown infrastructure. Recent bike and pedestrian master planning in Delphi, Dillsboro, and Jennings County has broadened our understanding of safe crossings and bike infrastructure. We are also experienced with complex permitting and right-of-way issues with projects involving a large amount of property owners such as the Monon Trail widening through neighborhoods in Indianapolis and the Muscatatuck rail to trail conversion from previous CSX property in North Vernon. Additionally, we are currently navigating complex soil capping and management strategies as part of the Ohio River Greenway extension in New Albany. Firm Overview Senior Project Manager + Main Point of Contact Josh Grabijas, PE Project Manager jgrabijas@hwcengineering.com 517-304-9164 Firm Name HWC Engineering (HWC) Responsible Office 2929 Carlson Drive, Suite 305 Hammond, IN 46323 www.hwcengineering.com 317-347-3663 Authorized Negotiator Scott Wilkinson, PE Director of Transportation swilkinson@hwcengineering.com 317-363-0731 Support Office 135 N. Pennsylvania Street, Suite 2800 Indianapolis, IN 46204 www.hwcengineering.com 317-347-3663 HWC recently completed a fitness trail at Offutts Park in Connersville, Indiana Officer of the Firm Terry Baker, Chairman & CEO tbaker@hwcengineering.com 317-513-0774 City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 3 Josh Grabijas, PE SENIOR PROJECT MANAGER Scott Kreeger, PE DESIGN LEAD HWC Engineering 83% 5.2 Environmental Document Preparation - CE 6.1 Topographic Survey Data Collection 8.1 Non-Complex Roadway Design 11.1 Right of Way Plan Development 12.2 Title Search 16.1 Utility Coordination Advanced Engineering Services Inc. 10% 7.1 Geotechnical Engineering Services* WSP USA Inc. 3% 12.1 Project Management for Acquisition Services Rita Ann Gabriel & Associates, Inc. 2% 12.5 Appraisal Review Vale Appraisal Group 2% 12.4 Appraisal CITY OF SOUTH BEND LAPORTE DISTRICT Joe Bell, PE, PMP QA/QC Environmental David Bourff (HWC) Acquisition Services Pat McCallister, SR/WA (WSP) Survey Austin Yake, PS (HWC) Utility Coordination Bethany Holmes, PE (HWC) Project Design Team Jason Spain, PS (HWC) Krish Zalavadia (HWC) Andrew Hildesheim, PE, MBA (HWC) Rylan Miller, EI (HWC) Landscape Architecture Catherine Puckett, PLA (HWC) Deb Ashack, PLA (HWC) *Added Value Project Team Title Search Biljana Misic (HWC) Geotechnical Akhtar Zaman, PE (AES) Value Analysis & Appraisal Review Rita Ann Gabriel & Associates Appraisal Vale Appraisal Booked Annualized INDOT Design/Inspection27% Available Annualized INDOT Design/Inspection73% City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 4 Experience and Skills Josh has over 13 years of industry experience as a Civil Engineer and Project Manager. He has managed a wide variety of projects, including multiuse pedestrian trails, roadway rehabilitations, reconstructions, streetscapes, road diets, and bridge replacements, among others. As an analytical, self-motivated, and solutions-oriented leader, he has a history of developing proven results for many types of project improvements in local communities, including pavement deterioration, poor drainage, lack of shoulders, road realignment, and overall public safety improvements, to name a few. Relevant Experience Education BS, Civil Engineering, Hope College Josh Grabijas, PE Senior Project Manager (HWC)Trail Design • Walker Field Connectivity, South Bend, IN • Kitselman Trail, Muncie, IN • Lakeshore Drive Pedestrian Trail, LaPorte, IN* • Freedom Trail, Lowell, IN* • Marquette Greenway Trail Phase 3, Burns Harbor RDC, Portage, IN* Additional Design Experience • Meridian Road Bridge Replacement, Porter County, IN • Brummitt Road Small Structure Replacement, Porter County, IN • 100 W Small Structure Replacement, Porter County, IN • 750 W Small Structure Replacement, Porter County, IN • Bridge 7 Replacement, LaPorte County, IN • SR 1 Preventive Maintenance Overlay, Bluffton, IN • Western Avenue Streetscape Phase 4, South Bend, IN • Downtown Streetscape, Attica, IN • Southshore Expansion Project, NICTD* • Bridge 62 Reconstruction, Hebron, IN* • Wisconsin Street Reconstruction/Bridge Replacement, Hobart, IN* • SR 26 Road Rehabilitation, Howard County, IN* • Bridge 150 Reconstruction and Roadway Realignment, Porter County, IN* • Pedestrian Bridge over Cady Marsh Ditch, Munster, IN* • CCMG Paving Projects, Munster, IN* *Previous Employer To ensure a successful project delivery JOSH’S AVAILABILITY WILL BE 100% during the heavier production times Project Team City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 5 Education BS, Environmental and Natural Resource Engineering, Purdue University Experience & Skills Scott has more than 7 years of experience in roadway project management, design leadership, and construction inspection for locally funded transportation projects. He has developed and implemented Community Crossings Matching Grant (CCMG) applications and asset management plans for multiple communities throughout Indiana. He previously served as the Roadway Engineer for the City of South Bend, Indiana where he managed and maintained the City’s 491 miles of roadway infrastructure. His personal knowledge of South Bend’s infrastructure, history, and City standards provides a strong foundation for delivering efficient solutions that align with the City’s long-term goals for safety and pedestrian connectivity. Scott Kreeger, PE Design Lead (HWC) Experience & Skills Catherine has more than 20 years of experience. She has led a wide range of place-based design projects, including urban mixed-use, infill, redevelopment, streetscape, and public space projects for both public and private clients. She has experience working on community development projects that range in size from small pocket parks to large community public spaces. With an eye for design and compassion for both the client and end-user, she has been instrumental in the renewal and re-imaging of downtown districts in cities and towns across Indiana. By carefully implementing master plans through multi-phased, creatively funded infrastructure improvement projects, she has seen her concepts become reality. Education BLA, Landscape Architecture, Ball State University Catherine Puckett, PLA Director of Landscape Architecture (HWC) Trail Planning & Design Relevant Experience • Walker Field Connectivity, South Bend, IN • Regional Trails Master Plan, Align Southern Indiana, Clark, Floyd, Harrison, Scott, Jefferson, and Washington Counties, IN • Big 4 Trail Next Level Trails Application, Zionsville, IN • Trails Feasibility Study, New Albany, IN • Lake Salinda Trails Feasibility Study, Salem, IN • Monon South Freedom Trail, New Albany, IN • Monon South Freedom Trail, Floyd County, IN • Loop Island Wetlands Trail Improvements, New Albany, IN • Silver Creek Trail, New Albany, IN • Silver Creek Landing (Kayak Launch), New Albany, IN • Ohio River Greenway Trail Extension, New Albany, IN • Access for Fishing and Boating, New Albany, IN • Market Street Streetscape + Plaza, New Albany, IN • White River Canal District Plaza + Trail Extension, Muncie, IN • Downtown Loop Trail, Crawfordsville, IN • Muscatatuck Trail, North Vernon, IN • Bloor Lane Multiuse Pathway, Zionsville, IN • Tiger, Toyota, and Heritage Trails, Princeton, IN • Kitselman Trailhead Phases 1, 2, and 3, Muncie, IN • Crossroads Park and Trailhead, Seymour, IN • West Street Trail, Muncie, IN *Previous Employer Relevant Experience Trail Design • Stellar Sidewalk Streetscape, Dillsboro, IN Other • SR 46 Intersection Redesign, Ellettsville, IN • CCMG Paving Projects, Elwood, IN • CCMG Paving Projects, Avon, IN • CR 375 and CR 225 Reconstruction, Cass County, IN • Bendix Drive Reconstruction North of Lathrop Road to I-80, South Bend, IN* • School Zone Flashing Beacon, South Bend, IN* • CCMG Projects 2018-2024, South Bend, IN* City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 6 • 10+ years of experience with managing project deliverables, coordinating subconsultants, and leading multidisciplinary task teams on successful project completion Education | MBA, General Business, University of Pikeville; BS, Business Science, University of Louisville Design (HWC) Andrew Hildesheim, PE, MBA • 1+ year of experience in the engineering industry • Experience with various software including AutoCAD, Civil 3D, and Revit • Completed the design of various roadways, water mains, and storm sewers Education | BS, Civil Engineering, Purdue University Northwest Design (HWC) Krish Zalavadia • 17+ years of experience as a Lead Designer, Project Manager, and Team Leader for federal, state, and locally funded transportation projects and programs in Indiana • HWC’s Roadway Department Manager for three and a half years Education | BS, Civil Engineering, University of Kentucky QA/QC (HWC) Joe Bell, PE, PMP • Experience in roadway design and utility coordination • Her dual experience provides technical solutions for utility-related conflicts that arise during projects Education | BS, Civil Engineering, Rose- Hulman Institute of Technology Utility Coordination (HWC) Bethany Holmes, PE • 22+ years of experience as a Survey Party Chief, Senior Project Surveyor, Project Manager, and Land Surveyor • Extensive survey and project management experience Education | BS, Surveying Technology, Vincennes University; AS, Surveying Technology, Vincennes University Survey (HWC) Austin Yake, PS • 16+ years of experience in landscape architecture • Led landscape architecture design on the Walker Field Connectivity project • Experience with site planning, parks, mixed-use developments, and retail environments Education | BLA, Landscape Architecture, Ball State University Landscape Architecture (HWC) Deb Ashack, PLA • 30+ years of experience in geotechnical engineering • Has worked on various types of projects, including roads, highways, bridges, railroads, ports, power plants, automobile assembly plants, and water and wastewater treatment facilities • Experienced in environmental consulting and construction materials testing operation Education | MS, Civil Engineering, Texas Tech University; BS, Civil Engineering, BUET Geotechnical (AES) Akhtar Zaman, PE • 10+ years of experience in survey and right-of-way projects for road improvements, culvert replacements, drainage improvements, and bridge repairs Education | AGGF, Geodesy, University of Banja Luka Title Search (HWC) Biljana Misic • 30+ years of industry experience and 18 years of experience managing right-of-way acquisition projects for INDOT and LPAs Acquisition Services (WSP) Pat McCallister, SR/WA Education | AS, Applied Sciences, Vincennes University • 24+ years of industry experience for NEPA and transportation-related projects, which included environmental compliance, due diligence, quality control, and preparation of environmental studies Education | BS, Environmental Science and Management, Indiana University Environmental (HWC) David Bourff • 2+ years of experience in onsite measurements and tracking, evaluating plans, coordination and communication with clients, contractors, and community members, permitting, and maintenance of traffic design Education | BS, Civil Engineering, Rose-Hulman Institute of Technology Design (HWC) Rylan Miller, EI • 25+ years of experience • Land Surveyor and Project Manager with an array of experience that includes the design, development, and management of municipal, recreational, and commercial projects Education | BS, Construction Civil Technology, Purdue University Design (HWC) Jason Spain, PS City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 7 TASK 1: ON-SITE REVIEW OF EXISTING CONDITIONS • HWC completed a site visit on October 16, 2025 to identify potential conflicts and confirm the best location of the trail. • HWC reviewed existing documentation from the design of South Bend Walker Field Connectivity, which is the reconstructed roadway immediately east of the current project limits. HWC designed the Walker Field Connectivity project and understands the project intent and purpose. TASK 2: SURVEY AND ENVIRONMENTAL ANALYSIS • Perform and review a topographic survey to confirm site observations and obtain a basis for the design of the project. • Includes full topographical survey from the back of the existing walk to the back of the existing walk. • Will obtain measurements for all drainage structures to ensure our design accommodates proper drainage. • Will survey all existing trees in the R/W and will minimize impacts to trees. • Identify areas where additional property acquisition or easements may be required for trail, trailhead, and/or utility needs. • Prepare a proposed R/W diagram and table to illustrate future R/W needs. In general, our method for the design of the W. Ewing Avenue Reconstruction and Trail from Olive Street to Gertrude Street consists of two distinct parts. The first part consists of preliminary engineering and scoping. This part is intended to identify a preferred alternative and minimize impacts to the project schedule from right-of-way needs, permitting requirements, or utility coordination. The second part of the project consists of preparing detailed construction documents, permitting, R/W acquisition, and construction of the new roadway and trail as identified in Part 1. The scope of services proposed for Part 1: Preliminary Engineering and Scoping is listed below. • Prepare a diagram to illustrate potential utility conflicts. • Identify environmental resources and constraints along the corridor, including wetlands, floodplains, karst features, pipelines, wells, and hazardous materials concerns. TASK 3: PRELIMINARY ENGINEERING • Develop preliminary engineering plans to include the following: • Roadway reconstruction plans • Maintenance of traffic plans • Trail alignment • Striping plan • Typical sections • Location of trailhead amenities and parking • Drainage plans for reconstructed roadway • Spot grading for area of concern • Initiate outreach for preliminary utility coordination. • Attend one (1) design coordination meeting with the City and any other stakeholders (assumed up to two [2] meetings). • Attend three (3) progress meetings with South Bend. Project Approach Southeast corner of Ewing Avenue and Prairie Avenue, looking west across Prairie Avenue Steep slope along the back of walk Minimal R/W with large apparent R/W City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 8 TASK 4: BUDGET, SCHEDULE, PERMITS • A detailed list of permitting needs for the project will be identified, including, but not limited to: • IDEM Construction Stormwater General Permits • DNR Construction in a Floodway Permit (not anticipated) • IDEM Section 401 Water Quality Certification • INDOT Right-of-Way Permit • Following completion of preliminary engineering plans, HWC will identify project elements that will cause extended project timelines, such as: • Utility relocation • Property acquisition or easements • Permitting • Funding limitations • For each stage of the project, HWC will also prepare: • An opinion of probable cost • An updated project schedule through the rest of design and construction 5' Sidewalk Varies 8' Parking Lane 11' Travel Lane 11' Travel Lane 8' Parking Lane Varies 10' Sidewalk PROPOSED TYPICAL SECTION Ewing AvenuePrairie Ave. to Gertrude St. (Facing East) Utility relocations are probable but will be minimized; if overhead utilities must remain, alternative tree selections will be made to accommodate 10' Sidewalk Varies 8' Parking Lane 11' Travel Lane 11' Travel Lane 8' Parking Lane Varies 5' Sidewalk PROPOSED TYPICAL SECTION Ewing Avenue Olive St. to Prairie Ave. (Facing East) City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 9 A review for potential red flags in the project area has been completed by qualified environmental staff from HWC using IndianaMap, Indiana StreamStats, National Park Service data, and the Indiana State Historic Architectural and Archaeological Research Database (SHAARD). Environmental documentation and regulatory permits anticipated are summarized below: • A Level 2 or Level 4 Categorical Exclusion (CE) document is anticipated for the project based on the outcome of the Section 106 process and/or impacts to an existing City park and public trail present within project limits. • A notable historic property is located in the southwest quadrant of the Ewing/Gertrude intersection. Due to the presence of this property and the proposed scope of work, completion of the full Section 106 process will be required, with a “No Adverse Effect” or an “Adverse Effect” finding expected. • The Rum Village Park and an existing public use trail are located within the limits of the proposed project, both of which require protection under Section 4(f). Connection of these properties will be an enhancement to their function, with impacts and/or property acquisition being avoided, if possible. Environmental staff will work closely with the design team to minimize impacts considered a “use” to reduce the need for lengthy Section 4(f) evaluations or mitigation resulting from the proposed trail development. • New permanent R/W of 0.5 acres or more will require the opportunity for the public to request a public hearing for the project. Should a hearing be necessary, the public involvement process will be completed prior to the final approval of the CE document. • Land disturbance meeting or exceeding 1.0 acre will require a Construction Stormwater General Permit for sediment and erosion control. Detailed construction limits will be determined during project design. •••• •••• •••• •••••••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• LEON CT BALTIMOREDR DOWNINGCIR FAIRVIEW STGRANTST EDWARDST MAGYAR CT BALEY CT INVST 6 SHERRILL DONMOYER AV MARY CT PROSPECT STMCPHERSON STGARST ST DOUGLAS STCHAPINSTOLIVER STHILLSIDE VICTORIA ST FAIRVIEW ST WEBSTER STDOUGLAS STARNOLD STOLIVER STCALVERT ST INV ST 8INDUSTRIAL AVDUBAIL AV YOUNGS C TJACLYN CTCOTTERST KALEY STARNOLD STDORTHY STMAPLE RDCALVERT ST WABASH STMORRIS STGLEN STWEBSTER STWALNUT STTUCKER DR JACKSON STPULASKI STMAGNOLIA STASSUMPTION DR EMERSONFORESTPKWYDUBAIL AV NASH STMEADE STPHILLIPPA STBROOKFIELD STBRUCE ST GERTRUDE STSWYGARTSTEDWARD ST WARREN STGRANT STDELAWARE STCARLISLE STCHAPIN STCATALPA STDUBAIL AV NEW ENERGY DRWALNUT STKEMBLE AVKENDALL STDONALD ST LINDEN RDLOCUST RDOLIVE STCALVERT ST INDIANA AV EWING BLVD ••••23 ••••20 ST JOSEPH 36 38 37 •• Red Flag Investigation - Hazardous Material ConcernsRoad and DescriptionDes. No. , Type of WorkCounty, Indiana This map is intended to serve as an aid in graphicrepresentation only. This information is not warrantedfor accuracy or other purposes. Sources:Non OrthophotographyData - Obtained from the State of Indiana Geographical Information Office LibraryOrthophotography - Obtained from Indiana Map Framework Data(www.indianamap.org) Map Projection: UTM Zone 16 N Map Datum: NAD83 0.19 0 0.19Miles Interstate State Route US Route Local Road Toll•• ••••Septage Waste Site••••Restricted Waste Site ••••Superfund ••••Solid Waste Landfill ••••State Cleanup Site ••••Waste Transfer Station ••••Underground Storage Tank ••••RCRA Generator/TSD ••••Voluntary Remediation Program Tire Waste Site Notice of Contamination ••••Brownfield ••••Confined Feeding Operation ••••Construction/Demolition Site ••••Leaking Underground Storage Tank••••Manufactured Gas Plant ••••Open Dump Waste Site ••••NPDES Facilities••NPDES Pipe Locations ••••RCRA Corrective Action Sites ••••••Infectious/Medical Waste Site County Boundary Half Mile Radius Project Area Institutional Controls Landfill Boundaries •••• •••• •••• •••••• •••••••• •• •• •• •• •• LEON CT BALTIMOREDR DOWNINGCIR AC C E S S RD 6GOODHEWDR FAIRVIEW STGRANTSTGRANTST EDWARDST MAGYAR CT BALEY CT INVST 6 FISHER ST SHERRILLWARRENST DONMOYER AV GRANT STMARY CT CARLISLE STFISHERST PROSPECT STBROOKFIELD STREVERE PL MCPHERSON STGARST ST DOUGLAS STCHAPINSTOLIVER STPHILLIPPA STHILLSIDE VICTORIA ST FISHER ST CATALPA STKOSCIUSKO STFAIRVIEW ST JACKSON STPULASKI STWEBSTER STDOUGLAS STARNOLD STKERRST OLIVER STCALVERT STHUMPHREY'SCTTRIL L I U M DR INV ST 8 DUBAIL AV YOUNGS C T MEADESTJACLYN CTCOTTERST CHAPIN STARNOLD STHARRIS STCHIPPEWA AVINDUSTRIAL AVKALEY STKALEYSTARNOLD STBENDIX DRCAMDEN STLIBERTY STDUNDEE STFISHERSTLAKE STDORTHY STMAPLE RDKENTUCKYSTCALVERT ST WABASH STMORRIS STKERIA TRGLEN STWEBSTER STWALNUT STWEBSTER STTUCKER DR JACKSON STPULASKI STOLIVE STEXTENSION MAGNOLIA STASSUMPTI O N D R EMERSONFORESTPKWYDUBAIL AV NASH STMEADE STPHILLIPPA STBROOKFIELD STBRUCE ST GERTRUDE STSWYGARTSTEDWARD ST WARREN STGRANT STDELAWARE STCARLISLE STCHAPIN STCATALPA STDUBAIL AV NEW ENERGY DR DURHAM ST KEMBLE AVDUNHAMST KENDALL STDONALD STWALNUT STLINDEN RDLOCUST RDCALVERT ST INDIANA AVOLIVE STEWING BLVD SAMPLE ST ••••23 ••••20 ST JOSEPH 36 38 37 •• Red Flag Investigation - InfrastructureRoad and DescriptionDes. No. , Type of WorkCounty, Indiana This map is intended to serve as an aid in graphicrepresentation only. This information is not warrantedfor accuracy or other purposes. Sources:Non OrthophotographyData - Obtained from the State of Indiana Geographical Information Office LibraryOrthophotography - Obtained from Indiana Map Framework Data(www.indianamap.org) Map Projection: UTM Zone 16 N Map Datum: NAD83 0.19 0 0.19Miles Project Area Half Mile Radius Toll Interstate State Route US Route Local Road ••Religious Facility ••Private Airport••Public Airport••Misc. Airport••Cemeteries••••Hospital••••School ••Recreation Facility Pipeline Railroad Railroad, Abandoned Trail, Open Trail, Planned Trail, Potential Trail, Under Development Managed Lands County Boundary •••• •••• •••• •••••• •••••••• •• •• •• •• •• LEON CT BALTIMOREDR DOWNINGCIR AC C E S S RD 6GOODHEWDR FAIRVIEW STGRANTSTGRANTST EDWARDST MAGYAR CT BALEY CT INVST 6 FISHER ST SHERRILLWARRENST DONMOYER AV GRANT STMARY CT CARLISLE STFISHERST PROSPECT STBROOKFIELD STREVERE PL MCPHERSON STGARST ST DOUGLAS STCHAPINSTOLIVER STPHILLIPPA STHILLSIDE VICTORIA ST FISHER ST CATALPA STKOSCIUSKO STFAIRVIEW ST JACKSON STPULASKI STWEBSTER STDOUGLAS STARNOLD STKERRST OLIVER STCALVERT STHUMPHREY'SCTTRIL L I U M DR INV ST 8 DUBAIL AV YOUNGS C T MEADESTJACLYN CTCOTTERST CHAPIN STARNOLD STHARRIS STCHIPPEWA AVINDUSTRIAL AVKALEY STKALEYSTARNOLD STBENDIX DRCAMDEN STLIBERTY STDUNDEE STFISHERSTLAKE STDORTHY STMAPLE RDKENTUCKYSTCALVERT ST WABASH STMORRIS STKERIA TRGLEN STWEBSTER STWALNUT STWEBSTER STTUCKER DR JACKSON STPULASKI STOLIVE STEXTENSION MAGNOLIA STASSUMPTI O N D R EMERSONFORESTPKWYDUBAIL AV NASH STMEADE STPHILLIPPA STBROOKFIELD STBRUCE ST GERTRUDE STSWYGARTSTEDWARD ST WARREN STGRANT STDELAWARE STCARLISLE STCHAPIN STCATALPA STDUBAIL AV NEW ENERGY DR DURHAM ST KEMBLE AVDUNHAMST KENDALL STDONALD STWALNUT STLINDEN RDLOCUST RDCALVERT ST INDIANA AVOLIVE STEWING BLVD SAMPLE ST ••••23 ••••20 ST JOSEPH 36 38 37 •• Red Flag Investigation - InfrastructureRoad and DescriptionDes. No. , Type of WorkCounty, Indiana This map is intended to serve as an aid in graphicrepresentation only. This information is not warrantedfor accuracy or other purposes. Sources:Non OrthophotographyData - Obtained from the State of Indiana Geographical Information Office LibraryOrthophotography - Obtained from Indiana Map Framework Data(www.indianamap.org) Map Projection: UTM Zone 16 N Map Datum: NAD83 0.19 0 0.19Miles Project Area Half Mile Radius Toll Interstate State Route US Route Local Road ••Religious Facility ••Private Airport••Public Airport••Misc. Airport ••Cemeteries ••••Hospital••••School ••Recreation Facility Pipeline Railroad Railroad, Abandoned Trail, Open Trail, Planned Trail, Potential Trail, Under Development Managed Lands County Boundary Hazardous Materials Map Infrastructure Map Environmental Considerations •••• •••• •••• •••••••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• •••• LEON CT BALTIMOREDR DOWNINGCIR FAIRVIEW STGRANTST EDWARDST MAGYAR CT BALEY CT INVST 6 SHERRILL DONMOYER AV MARY CT PROSPECT STMCPHERSON STGARST ST DOUGLAS STCHAPINSTOLIVER STHILLSIDE VICTORIA ST FAIRVIEW ST WEBSTER STDOUGLAS STARNOLD STOLIVER STCALVERT ST INV ST 8INDUSTRIAL AVDUBAIL AV YOUNGS C TJACLYN CTCOTTERST KALEY STARNOLD STDORTHY STMAPLE RDCALVERT ST WABASH STMORRIS STGLEN STWEBSTER STWALNUT STTUCKER DR JACKSON STPULASKI STMAGNOLIA STASSUMPTION DR EMERSONFORESTPKWY DUBAIL AV NASH STMEADE STPHILLIPPA STBROOKFIELD STBRUCE ST GERTRUDE STSWYGARTSTEDWARD ST WARREN STGRANT STDELAWARE STCARLISLE STCHAPIN STCATALPA STDUBAIL AV NEW ENERGY DRWALNUT STKEMBLE AVKENDALL STDONALD ST LINDEN RDLOCUST RDOLIVE STCALVERT ST INDIANA AV EWING BLVD ••••23 ••••20 ST JOSEPH 36 38 37 •• Red Flag Investigation - Hazardous Material ConcernsRoad and DescriptionDes. No. , Type of WorkCounty, Indiana This map is intended to serve as an aid in graphicrepresentation only. This information is not warrantedfor accuracy or other purposes. Sources:Non OrthophotographyData - Obtained from the State of Indiana Geographical Information Office LibraryOrthophotography - Obtained from Indiana Map Framework Data(www.indianamap.org) Map Projection: UTM Zone 16 N Map Datum: NAD83 0.19 0 0.19Miles Interstate State Route US Route Local Road Toll•• ••••Septage Waste Site••••Restricted Waste Site ••••Superfund ••••Solid Waste Landfill••••State Cleanup Site ••••Waste Transfer Station ••••Underground Storage Tank ••••RCRA Generator/TSD ••••Voluntary Remediation Program Tire Waste Site Notice of Contamination ••••Brownfield ••••Confined Feeding Operation ••••Construction/Demolition Site ••••Leaking Underground Storage Tank••••Manufactured Gas Plant ••••Open Dump Waste Site ••••NPDES Facilities••NPDES Pipe Locations ••••RCRA Corrective Action Sites ••••••Infectious/Medical Waste Site County Boundary Half Mile Radius Project Area Institutional Controls Landfill Boundaries Maintenance of Traffic The preferred construction method is to use a full roadway closure throughout construction. The posted detour will be coordinated with INDOT and is anticipated to utilize SR 23 to Sample Street to S Main Street; however, there will be numerous routes taken throughout the neighborhood by locals. If a full closure is not preferred, then construction will be completed in three phases to keep the roadway open to traffic. City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 10 Stage 1 Plans (Dec. 2026) Stage 2 Plans (Dec. 2027) CE Approval (Feb. 2028) Stage 3 Plans, Utility Coordination (March 2030) PFC (April 2027) R/W Acquisition (Feb. 2028 through June 2030) Permit Approval (Jan. 2030) Tracings (July 2030) RFC Deadline (Aug. 2030) Letting (Nov. 14, 2030) Construction (Spring 2031) Notice to Proceed (Jan. 2026) UTILITIES • AEP Distribution • AT&T • ChoiceLight • Comcast • South Bend Sanitary • South Bend Water Works • NIPSCO Gas GEOTECHNICAL Unknown subsurface conditions come with large risks and potential for expensive corrective action if not properly identified during the design process. HWC has included AES on our team to provide subsurface exploration and design recommendations based on the findings for the proposed roadway reconstruction. The presence of existing retaining walls and steep slopes adjacent to the public R/W may also require further geotechnical review if the new trail cannot be constructed without affecting the walls and slopes. Akhtar Zaman and his team will provide geotechnical services to avoid costly change orders during construction. This segment of Ewing Trail through the Rum Village neighborhood is primarily residential, leading to numerous utility companies with facilities in the area. HWC has identified several potential utility conflicts through a preliminary site visit. Potential utility impacts include, but are not limited to, utility pole and guy wire relocation, new and/or updated storm sewer based on the proposed design and drainage patterns, and fire hydrant relocation. HWC’s own Bethany Holmes will engage all utilities as soon as the project begins and will remain in continual coordination with them throughout the design process and construction. HWC will minimize risk and project delays caused by utilities through constant utility coordination and engagement. Utilities & Geotechnical Considerations Project Schedule City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 11 Relevant Experience Fall Creek Trail Indianapolis, IN HWC designed the Fall Creek Trail Extension Project. The trail is a shared-use path running from Skiles Test Park to Fort Benjamin Harrison Park in Indianapolis. The 10’-wide path winds along the scenic Fall Creek corridor and includes portions of trail within the floodway, allowing trail users to experience the flowing waters of the creek. Work included construction of a sidewalk across the Shafter Road Bridge, which provided a critical connection to Fort Benjamin Harrison State Park. Project design included coordination with community partners, including the Boy Scouts of America Crossroads Council, the Indiana Department of Transportation, and the Indiana Department of Environmental Management. Silver Creek Trail New Albany, IN HWC provided survey, design, and construction services for the new Silver Creek Landing and Trail facilities in New Albany, Indiana. Historically a popular gathering spot for over 100 years, the project provides additional safety for existing area users through bank stabilization. Providing connectivity between the trailhead on Providence Way and the Ohio River Greenway near the Loop Island Wetland Park, the approximate half-mile, shared-use concrete walkway opens accessibility to the waterway for all users. Located along the existing Ohio River levee, the project provides safe access for various uses including the new kayak/canoe launch point and the overlook for Ohio River/Silver Creek scenic viewing. Downtown Loop Trail Crawfordsville, IN The Crawfordsville Downtown Loop Trail is an INDOT- funded multi-use path that, when all phases are complete, will connect Crawfordsville’s culturally significant destinations, neighborhoods, and downtown shops in one complete loop. This local trail also will connect to the regional Sugar Creek Trail making downtown Crawfordsville a more accessible destination. The first phase, completed in 2019, connects Wabash College to the library, Pike Street Market, Pike Place Pocket Park and Fusion 54, the downtown workshare community center. The trail consists of a 10’-wide concrete path with custom pavers, new ornamental lighting, rest nodes with benches and trash receptacles, and trees and sod. City of South Bend: Ewing Trail (Des # 2500053) | HWC Engineering 12 We appreciate your consideration of HWC and look forward to working with the City of South Bend on this project. Relevant Experience Walker Field Connectivity South Bend, IN In general, the scope of services for this project consisted of HWC assisting the City of South Bend with the implementation of better pedestrian connectivity between Walker Field Park, Rum Village Park, and the surrounding neighborhoods. Design services included survey and schematic design (30% plans) in an initial phase. Construction documents (60%, 90%, and 100% plans), bidding, and construction administration design services were provided as a second phase. The project features included a road diet along W. Ewing Avenue between S. Walnut Street and Webster Street, which will include new sidewalk and curbs, road resurfacing, curb extensions to protect a parking lane on the north side of the street, raised intersections, a mid-block crossing, and special paving treatments at crosswalks. A concrete multiuse trail also extended along the south side of W. Ewing Avenue from S. Gertrude Street to the Rum Village Park Road entrance along W. Ewing Avenue. Pedestrian connections into Rum Village Park as well as Walker Field Park are also included in the scope. The project budget, including both design and construction, was $1.9 million and construction was completed earlier this year. Downtown Streetscape Attica, IN HWC assisted the City of Attica with the completion of survey, construction documents, bidding, construction administration, and INDOT permitting services for the Downtown Streetscape and Parking Lot Improvements project. The project consisted of four project areas: S. Perry Street, Mill Street, Jackson Street, and a new parking lot and drive to support a new City farmers’ market and vendor plaza for various events. The project also included significant landscaping and other pedestrian amenities. HWC assisted the City with utilizing multiple funding sources, including INDOT’s Community Crossings Matching Grant (CCMG) program to fund the $2.5 million project. Monon South Freedom Trail New Albany, IN When complete, this regional trail will connect five counties and nine communities via 68 miles of abandoned rail. The first phase will include approximately 1.46 miles of trail and connect the existing Ohio River Greenway trail to central New Albany. It consists of three segments: a half-mile west of the Conrail Easement, a half-mile north through the downtown area, and a half-mile north along the west side of Fairview Cemetery. HWC is currently working on the schematic design for the first phase which is being based on conceptual ideas developed during the New Albany Trails Feasibility Study completed in April 2020, as well as conversations with the City in the years since. The project will be funded with a combination of Next Level Trails and local New Albany Redevelopment Authority funding.