HomeMy WebLinkAboutOpening Of Proposals - Ewing Trail Proj No 125-063 - DLZDear Selection Committee,
The City of South Bend is making impressive advancements in economic development and revitalization of its neighborhoods. Whether its the progress made on the City’s 10-year improvement plan to rebuild its streets, or following the State of Indiana’s guide to create safe transportation options that promote more active lifestyles, the City of South Bend is taking proactive steps to improve safety and quality of life within the community!
Your DLZ Project Manager will be Anthony Glenn. Anthony, a South Bend native, understands the needs and constraints of this project and has been directly responsible for the design of many pedestrian projects in northern Indiana. Anthony has worked with the City successfully before on projects like Bendix Drive and Kennedy Academy Safe Routes to School which included sidewalks and pedestrian access. Anthony excels in his communication and ability to closely monitor costs and schedule. He is proactive in suggesting solutions to stay within the funding availability constraints.
We have assembled an experienced transportation design team of engineers, surveyors and environmental specialist who are dedicated to completing this project for the City. DLZ has a strong local presence with over 100 employees located right here in the City of South Bend. We live and work in your community. Our office is only 2 miles from the South Bend City Hall and within 5 miles of the project location. Being local, our designers are only 10 minutes from meeting with you at your office or at the project site.
The DLZ team excels at seeing the whole picture and not just a curb ramp or sidewalk. We have successfully delivered innovative solutions that have saved our clients time and money on similar projects. We work diligently to anticipate issues, from funding to drainage, and present you with cost effective solutions you can use immediately.
City of South Bend|Ewing Trail
Ewing Trail - PE Services | 1
DLZ2211 E. Jefferson Blvd
South Bend, IN 46615
574.236.4400 | www. dlz.com
Project Manager
Anthony Glenn, PE574.236.4400 | aglenn@dlz.com
Authorized NegotiatorLaurie D. Johnson, PE | Vice President574.904.7221 | ljohnson@dlz.com
Communicate with you, working towards successful completion of your project.
Understand your construction budget and strive to meet or beat your goals.
Work with you to determine the most beneficial project scope and areas of reconstruction
that will optimize development potential.
Successfully deliver this project on time. Additionally, we’re ready to accelerate the
schedule, if funding becomes available earlier.
ADDITIONALLY, OUR TEAM WILL:
$
DLZ is a multi-disciplinary State certified minority-owned business enterprise (MBE), with offices located in South Bend, Fort Wayne, Indianapolis, Munster, Merrillville, and Burns Harbor. Our fully-staffed South Bend office is located 4.6 miles from the project location. Our ability to quickly access the project sites will enhance our services by allowing us to verify existing conditions, hold public meetings, interview key stakeholders as well as coordinate with City personnel.
QualificationsDLZ has completed design and construction of projects similar to yours which have involved the planning and construction of sidewalks, American Disabilities Act (ADA) ramps, and trails. Your project requires following INDOT/LPA standards and procedures, of which DLZ is thoroughly proficient. Our personnel have a full understanding of INDOT’s federal aid design criteria, standards and practice relating to sidewalk and ADA ramp plan development.
DLZ has successfully completed the design and construction of neighborhood ADA ramp replacement projects, as well as over 100 miles of trails, greenways, and sidewalks for numerous types of federal-aid projects.
YOUR VISION | OUR COMMITMENT AND
EXPERIENCE
The City of South Bend has funding to construct a new 10-foot multi-use path along Ewing Avenue. This provides you with an excellent opportunity to connect the recently constructed path east of Gertude Street and the path along the east side of Olive Street, improving the neighborhood and addressing areas of non-ADA compliant sidewalk and curb ramps. We have the experience and commitment to help bring this project through design and into construction. We will serve as an extension of the City’s staff and deliver a quality
project for the City.
Together, we will make a difference.In addition to training our staff, DLZ wants our clients to be informed on the requirements of the ADA. As mentioned earlier, we have utilized our expertise to assist numerous clients with ADA compliance by providing a variety of training opportunities at no cost. DLZ sponsored full day informational seminars entitled “The ADA and Your Community” in Indianapolis, South Bend, and Fort Wayne, that provided clients and public agencies with a variety of information on the requirements of the ADA on Title II entities.
As recognized authorities on the ADA, DLZ staff are requested to present at conferences on ADA topics. DLZ has presented at the annual Accelerate Indiana Municipalities conference, Purdue Road School, Indiana Society of Professional Engineers, Michigan Public Transit Association, Ohio Transportation Engineering Conference, County Commissioners Association of Ohio, Ohio Townships Association, Kentucky American Public Works Association, and Transport Chicago.
ADA Compliance SpecialistsDLZ has several staff that perform the specialized services of ADA compliance evaluation and design. This expertise has been developed over many years by our lead ADA specialists, and that experience is passed on to others as new staff join our team to meet the needs of our clients.
Recognized Leader
in ADA Requirements
Ewing Trail - PE Services | 2
Identification & Qualifications
DLZ’s ADA Specialist Stephen Metzer presenting at the Ohio Transportation Engineering Conference (OTEC)
Team Participation
DLZ Indiana, LLC
97% | 5.2, 6.1, 8.1, 11.1, 12.1, 16.1
Metropolitan Abstracting Consultants, LLC
1% | 12.2
Vale Appraisal Group1% | 12.4
Rita Ann Gabriel & Associaes, Inc.
1% | 12.5
Metric Environmental, LLC 5.9 5.10 (As needed)
Ewing Trail - PE Services | 3
Anthony Glenn, PE
PROJECT MANAGER
Anthony’s history with the City of South Bend and direct experience as Project Manager and lead designer of several similar projects, makes him the ideal choice to make this a successful project for the City!
Representative experience includes, but not limited to, the
following:
• Kennedy Academy Safe Routes to School, South Bend, IN
• Bendix Drive, Lathrop to Nimtz, South Bend, IN
• Bendix Drive, Voorde to Lathrop, South Bend, IN
Anthony has 18 years of experience in transportation engineering and design working on projects including sidewalk
and trail construction, road reconstruction, new alignments, intersection improvements, and feasibility studies. Over
the course of his career, his responsibilities have ranged from project engineer to lead engineer to construction
observer to project manager, giving Anthony extensive experience at all stages of project development.
Anthony is the ideal person to lead this project. As a life-long resident of the South Bend area, Anthony has a vested
interest in improving the quality of life and infrastructure in the City. He is actively working with the City on the Bendix
Drive project and recently completed the Kennedy Academy Safe Routes to School project, both federally funded
projects through INDOT’s project development process.
• Prioritize communication
• Track schedule using Critical Path
Method for key deliverables
• Coordinate the design team and
subconsultants
• Address challenges & propose
solutions
• Propose cost saving solutions
• Deliver milestones ahead of
schedule
Design
Team
Ewing Trail
Other Projects
Anthony
Glenn
• Responsive to the City and INDOT
• Ensure project stays within the
specified scope and budget
• Potato Creek Trail, North Liberty, IN
• Douglas Road Reconstruction, St. Joseph County, IN
• Oakland Avenue, Projects A, B, & D, Elkhart, IN
Anthony’s Project Management Approach Staff Capacity
Ewing Trail - PE Services | 4
Key Staff
PROJECT MANAGERAnthony M. Glenn, PEPROJECT PRINCIPALLaurie D. Johnson, PE
5.2 Environmental document preparation - CEJason StoneDaniel Stevens
6.1 Topographical Survey11.1 Right of Way Plan DevelopmentSteven A. Jones, PS, CFEDS
8.1 Non-complex roadway designMichael Geiger, PEScot Ferkull, EIEmma Koch, EIPaul Foster
12.1 Project Management for Acquisition Services16.1 Utility CoordinationQasim Asghar
12.2 Title SearchMetropolitan Abstracting Consultants, LLC
12.4 AppraisalVale Appraisal Group
12.5 Appraisal ReviewRita Ann Gabriel & Associaes, Inc.
AS NEEDED SERVICES
5.9 Archaeological Survey5.10 Historical/Architectural InvestigationsMetric Environmental, LLC
QUALITY MANAGERRyan A. Carrington, PE
CITY OF SOUTH BENDSENIOR ENGINEERNifemi Oluwatomini
Michael has contributed to the layout, geometric design, pavement design, and drainage design of roadway and site projects, as well as lift station design for a few
wastewater projects.
• Bendix Drive Reconstruction: Voorde Drive to Lathrop Street, South Bend, Indiana• Oakland Avenue LTCP Project D, Elkhart, Indiana• Niles Avenue Reconstruction, Mishawaka, Indiana
• Transit Oriented Development (TOD) Downtown Trail, Valparaiso, Indiana
Jason has 30 years of experience in the preparation of NEPA compliance documents including, Environmental Impact Statements (EIS), Environmental Assessments /
Findings of No Significant Impact (EA/FONSI), Categorical Exclusions (CE) and numerous Section 106/Section 4(f)
Analyses, primarily for Federal, State and Municipal transportation and site development projects. In addition, he has managed interagency coordination and review processes, performed resource inventories, impact assessments, and prepared numerous environmental
permit documents, coordinating these efforts with project development milestones.
Ryan’s experience includes various highway and roadway design projects. His experience also includes feasibility studies, horizontal and vertical alignment design, storm
water management systems, traffic analysis, erosion control plans, signing plans, urban drainage design, basin
design, utility coordination, and right of way engineering.
• Cassopolis Street Sidewalk, Elkhart, Indiana• Angela Blvd Roadway & Pedestrian Improvements, South Bend, IN
• Sidewalk and Pedestrian Improvements, University of Notre Dame, Notre Dame, Indiana
Quality Manager
Ryan Carrington, PE Roadway & Path Design
Michael Geiger, PE
Environmental Document Preparation
Jason Stone
A team built for success.
Ewing Trail - PE Services | 5
Road Side Topography: Grading or a retaining
wall would be required behind the new path
Church in NW Corner: Limited room for the
path in front of the church.
Stairs and/or retaining walls behind sidewalk,
consistently throughout project area
Missing, damaged, or overgrown sidewalk
Crosswalk & Ramp Geometrics: Pavement
tapers create challenging ramp geometrics
and may require a sliver of R/W Missing or out of compliant ADA ramps
Safe Pedestrian Crossing is needed. Skewed
intersection, and Prairie St is free-flowing.Gaps in sidewalk continuity New Path East of Gertrude StOlive StOlive StBrookfield StBrookfield StGertrude StGertrude StDorothy StDorothy StGlen StGlen StEmerson Emerson Forest PkwyForest PkwyPrairie
St (
S
R
2
3)
Prairie
St (
S
R
2
3)
Prairie
St (
S
R
2
3)
Prairie
St (
S
R
2
3)
N
Ewing AveEwing Ave
Ewing AveEwing Ave
1
1
2
2
2
3
3
4
4
8 5
5
6
6
7
7
8
8
6 7 9
9
7
Project Issues Map
Ewing Trail - PE Services | 6
The City of South Bend was recently awarded
federal funds to construct a new multi-use path
and pedestrian safety features for Ewing Avenue, between Gertrude Street and Olive Street. This
stretch will allow the City to connect the recently
completed path east of Gertrude Street to the recently completed path along the east side of
Olive Street. It also provides the opportunity
to repair/replace existing sidewalk and curb
ramps that may not be in good condition. DLZ has identified five main focus elements for this
project:
• New Multi-Use Path Location• Pedestrian crossing of Prairie Street
• Curb bump-outs and landscaping at Ewing
Avenue crossings• Addressing ADA compliance
• Additional sidewalk repair, replacement, or
construction
These five priority elements are intertwined
and addressing them will improve the quality of
place for residents along Ewing Avenue as well as those that use Rum Village Park, at the east
end of the project.
New Multi-Use Path Location
A case can be made for the new path to be constructed on either side of Ewing Avenue. Both sides have existing sidewalk, and appear to have enough right of way to construct a new path with minimal additional right of way needed. While the path could alternate sides, if necessary, it would
be more desirable to stay consistently along the
same side. Here are some preliminary criteria for consideration when determining which side is recommended:
Preliminarily, the south side is more favored due
to the consistency with the path to the east and
compatibility with a crossing of Prairie Street, but these criteria will be evaluated in more
detail during design, along with the anticipated
construction costs, in order to select a preferred location.
Project
Understanding
and Approach
Criteria North Side South Side
R/W Available ✓✓
Compatible with Prairie St Crossing ✓
Consistent with Path to the east ✓
Addresses existing sidewalk in poor condition
✓
Avoid utility conflicts ✓✓
Curb Ramp at Emerson Forest Pkwy
Ewing Trail - PE Services | 7
Pedestrian Route Option 1: The skewed intersection results in approximately 80 feet of crosswalk for a pedestrian crossing Prairie Street, parallel to Ewing Avenue. Moving the crosswalk approximately 50-60 feet southwest, along Prairie Street allows the crossing to be perpendicular to traffic and shortens the length to less than 30 feet. In addition to this placement, piano key crosswalk markings, pedestrian signage, and Rapid Rectangular Flashing Beacons (RRFB) are recommended to alert drivers of the pedestrian crossing.
Pedestrian Route Option 2: With the high volume of traffic along Prairie Street, a pedestrian crossing at a signalized intersection is preferred. Keeping this in mind, the recommended route for a pedestrian along the new path is to follow along the southeast side of Prairie Street and cross at the Olive Street traffic signal. With this option, it is recommended that the 10-foot path be constructed along Prairie Street between Ewing Avenue and Olive Street to make this connection.
Ewing AveEwing Ave
Prairie
St
Prairie
StOlive StOlive StN
Raised Intersection on Ewing Avenue, East of
Gertrude StreetPedestrian Route Across Prairie Street
Option 2: X-ing at the Traffic Signal (Recommended)
Parallel X-ing (Not recommended)
Option 1: Perpendicular X-ing
Curb Bump-Outs and
Pedestrian CrossingsTraffic is free-flowing along Ewing Avenue between Gertrude Street and Prairie Street, with five intersections from local side streets. Each intersection provides an opportunity for pedestrians to cross Ewing Avenue in route to using the proposed new path. East of Gertrude Street, the City recently completed construction of raised intersection and pedestrian crossings.
These improvements enhance safety by calming traffic as well as alerting drivers of the pedestrian crossings. Similar enhanced pedestrian crossings are recommended at the intersections of Brookfield Street, Glen Street, and Dorothy Street.
Benefits of an Enhanced Intersection:• Raised intersection is traffic calming• Concrete pavement and colored concrete crosswalk to contrast the existing asphalt pavement• Curb bump-outs are traffic calming and reduce the length of crossing for the pedestrian.• Curb bump-outs also provide opportunity to stripe for on-street parking.• Landscaping opportunity to enhance the aesthetics along Ewing Avenue.
Pedestrian Crossing of Prairie StreetA safe pedestrian crossing is needed at Prairie Street; however the intersection is skewed, and Prairie Street is free-flowing, with a flashing yellow light at Ewing Street.
From a safety perspective, Option 2 is preliminarily recommended, but we will look into both options, evaluating safety, cost, and right of way impact, to determine the preferred option.
Ewing Trail - PE Services | 8
ADA ComplianceConstruction of a new multi-use path and crosswalks will include construction of pedestrian facilities to meet ADA guidelines for public right of way. This should also include improving existing sidewalk and curb ramps that are not in compliance.
Based on a site visit, there are several areas of sidewalk and curb ramps that are out of compliance:• Missing or out of compliance curb ramps at Glen Street, Dorothy Street, Brookfield Street, and Emerson Forest Parkway• Overgrown sidewalk on the north side of Ewing Avenue• Heaved and broken concrete sidewalk at various locations within the project• Gaps of missing sidewalk• Deteriorated driveway concrete
Aside from the recently constructed curb ramps at Gertrude Street, it is anticipated that new curb ramps will need to be replaced at all other locations within the project limits. As part of early data collection, all existing ramps will be evaluated for compliance.
Construction of the new path will inherently address areas of sidewalk and curb ramps that already need to be replaced along the route, and it is recommended that the other ramps and sidewalk out of ADA compliance or in poor condition be replaced as well, pending availability of funds.
Additional Sidewalk ReplacementOnce the preferred path alignment is selected, there may also be additional areas of sidewalk replacement that would improve pedestrian accessibility along Ewing Avenue.
An example of this is the north side of Ewing Avenue, west of Prairie Street. There is evidence that sidewalk facilities used to exist on the north side, in fact, there are still remnants of concrete sidewalk within the right of way. Over time, the sidewalk has not been maintained well and has either deteriorated or been overgrown with grass and other vegetation, to the point that it is hard to tell sidewalk existed at all. Even if the proposed path route follows the south side of Ewing Avenue and Prairie Street, reconstruction of the sidewalk west of Prairie Street would add to the quality of place for residents along Ewing Street.
If the preferred path alignment follows the south side of Ewing Avenue, additional sidewalk replacement is recommend at the following locations:• North side of Ewing Avenue, Olive Street to Prairie Street• North side of Ewing Avenue, Prairie Street to Brookfield Street• Other spot locations to address heaved or broken sidewalk
As the path alignment is developed, DLZ will coordinate with the City to determine how much additional sidewalk can be reconstructed within the funding available.
Pedestrian Maintenance of TrafficImprovements to existing sidewalk and curb ramps will require a plan for maintaining pedestrian traffic during construction. With both sides of Ewing Avenue having sidewalk, it is anticipated that routing pedestrians to the other side will be necessary; however, we also know that portions of the existing sidewalk are not ADA compliant. Because of this, DLZ will evaluate the pedestrian route and determine the necessary sequencing of improvements. It may require curb ramps and spot sidewalk improvements be completed on the opposite side of the road before the new path is constructed.
Deteriorated Driveway at Sidewalk CrossingMissing Curb Ramp at Dorothy Street Broken Sidewalk
Ewing Trail - PE Services | 9
Utility CoordinationUtility Coordination is an important aspect of all
projects, and we believe it is a critical component of design to maintain schedule, even on sidewalk and trail projects. Our experience and preliminary observation of the project area indicates that utility conflicts will likely be present. It is anticipated that a majority of these conflicts can be avoided through detailed and creative design.
We are prepared to take a proactive approach to avoid delays and issues during construction.
Utility coordination activities will include:
• Initial notice to utilities and verification of
facilities
• Periodic status and plan updates of the project to keep utilities informed• Correspondence and meetings with utilities to discuss potential conflicts and resolutions, if necessary.• Obtaining utility work plans, including
relocation plans, when necessary.
Utilities will be designed around, when
possible.
Environmental Documentation
The project’s use of federal funding triggers compliance with National Environmental Policy Act (NEPA)
documentation requirements. DLZ has conducted a field visit and preliminary reviews of GIS data available
on the IndianaMap website, IDNR’s Indiana Buildings, Bridges, and Cemeteries Map website and other information to identify potential “red flag” resources or issues that may need to be considered in the project’s
design. Noteworthy resource/issues include a public park, a potentially historic property, a religious facility
and a hazardous materials site. No features anticipated to impede project development were identified.
NEPA Element Preliminary Findings
Section 106 - Historic Properties
The project proposes work types which may be approved under Category B, Items 1 and 8 of the Minor Projects Programmatic Agreement (MPPA). MPPA applicability will expedite completion of the NEPA documentation.
INDOT may reject use of the MPPA due to the presence of a potentially historic property, in which case, a standard Section 106 review would be required. Qualified professional cultural subconsultant services would facilitate this review.
Section 4(f) Resources
Rum Village Park and a potentially historic property are located at the project’s east terminus. No new right of way is required from either property; therefore, Section 4(f) uses are not anticipated.
Wetlands, Streams and Water Quality Impacts
No water resources were noted in the project area. Water resource impacts are not anticipated.
Threatened and Endangered Species
Programmatic consultation for bat species of concern using the on-line USFWS IPaC system, which streamlines the consultation process, is anticipated. A “No Effect” determination, or a “May Affect, Not Likely to Adversely Affect” determination is expected based on the project setting. Tree trimming/removal may require a seasonal tree clearing restriction.
Hazardous Materials Sites
A recorded leaking underground storage tank (LUST) site/Institutional Controls site is present at the Prairie Avenue/Locust Road intersection. Remediation is ongoing. Groundwater flow appears to be to the west, away from the project.
CE Document A Level 1 CE Document is anticipated to be appropriate; however, if right of way acquisition exceeds 0.5 acres and/or a standard Section 106 review is required, a CE-2 may be required.
Ewing Trail - PE Services | 10
Schedule
INDOT/LPA PROJECT DEVELOPMENT PROCESS
It is our understanding, this project is to have a letting in Fiscal Year (FY) 2031, and we have developed a
schedule showing July 2030 as the letting date. Based on a review of MACOG’s 2026-2030 Transportation Improvement Plan (TIP), we understand Preliminary Engineering funding is split over FY 2026 and 2027, and
Right of Way funding is allocated for FY 2029. We will work with the City to line up the design and right of way
work with the funding availability.
As the City is a Certified LPA, DLZ will submit directly to the City for preliminary milestones through Stage 3. The milestone dates shown for Stage 3 and Final Tracings
follow INDOT’s letting schedule; however, we are committed to beating those dates.
As can be seen on the schedule, there is a lot of float between NEPA Approval and Stage 3. This provides flexibility in accelerating the Stage 3 and Final Tracings
milestones, if funding were to become available in an earlier fiscal year.
During the first 90 days after being given Notice to Proceed, the DLZ Team will get started
with the following tasks:
• Conduct a project kickoff meeting with the City to establish project goals, discuss
schedule, and confirm our lines of communication.
• Identify and coordinate with the City on locations for curb bump-outs and landscaping
• Complete field visits for documenting environmental resources, if necessary.
• Perform topographic survey, verify existing right of way, and initiate any property
surveys as required.
• Initiate Early Coordination with State and Federal environmental resources.
• Initiate coordination with all utilities to confirm locations within the project area.
ACTION PLAN FOR FIRST 90 DAYS Right of Way
Based upon our preliminary research of the GIS
property lines, it appears that the construction
can generally stay within the existing right of way. In our experience, however, there may
still be the need to acquire small amounts of
right of way in order to appropriately construct the proposed improvements. Additionally,
federal funding requires that appropriate
documentation of right of way be on record. As such, DLZ will perform title research to confirm
the existing right of way. If there are areas of
insufficient documentation, or where additional
right of way may be needed, DLZ will lead the right of way engineering and acquisition phase,
as necessary. We have assembled a team to
successfully deliver on any right of way needs that this project has.20262027202820292030Notice to Proceed Final Tracings
Letting
NEPA Approval R/W Acquisition, If Required
Stage 3Preliminary Field Check Plans
Stage 2 (for NEPA)Preliminary Review Mtg*
J J JJJJ JJ AAAAAJOOOO JFFFFAAAAMMMMMFNNNNMMMMSSSSJJJJJMDDDD
* The Preliminary Review Meeting is proposed to coordinate the
location of pedestrian crossings, curb bump-outs, and landscaping
Ewing Trail - PE Services | 11
Often a project like sidewalks, curb ramps, and trails are viewed as “just a small project.” At
DLZ, we work diligently to ensure a high-quality
project, regardless of size, that will serve your
community for many years to come. Our team has significant experience with pedestrian
centered projects that have allowed us to
navigate through many different issues that commonly arise. When designing a roadway,
most projects are focused on the roadway while
peripheral pieces and obstacles are moved to suit the new corridor. With pedestrian projects,
DLZ HAS THE EXPERIENCE YOU NEED
it’s a very different approach. Sidewalks, curb ramps, and path construction must fit
into existing situations and avoid obstacles
while still meeting the required standards. For
example, on the Town of South Whitley project there was one intersection where there was
very little space between the roadway and
house and a three-foot drop in elevation. Our project engineer was able to design a solution
that worked for both the homeowner and the
town while still being ADA compliant.
This is not just a path project. We understand
that there is much more involved in order to
truly be ADA compliant. It is necessary to look at the entire intersection when constructing
curb ramps. In many instances, we see curb
ramps that end in a low spot with the road surface which causes water to pond, creating
an undesirable situation.
DLZ has ADA specialists on staff that truly
understand the ever-changing requirements
and standards. These specialists have often
developed creative solutions that are more economical than traditional solutions. For
example, on the Mishawaka Safe Routes to
School project where an existing retaining wall would have required the installation of
handrail and other costly modifications, our
ADA specialist worked directly with the design engineer to adjust the design, creating a more
economically feasible solution to the issue.
It’s this type of service that makes DLZ such a great partner for the City of South Bend.
Broken and overgrown sidewalk
Creative solutions in the
Town of South Whitley where proximity between sidewalk and roadway prevented a traditional curb ramp design.
After
Before
Ewing Trail - PE Services | 11
Ewing Trail - PE Services | 12
Similar Project Experience
Bendix Drive
South Bend, Indiana
The City of South Bend retained DLZ for design and
engineering services for the reconstruction of Bendix
Drive from north of Lathrop Street to the Indiana Toll
Road for approximately 4500’. A road diet was performed
to reduce the four-lane road down to a three-lane
section with an 8-foot path along the east side of the
reconstructed roadway.
Cassopolis Street (SR 19) Sidewalk
Elkhart, Indiana
Approximately 1.75 miles of sidewalk along the west side
of Cassopolis Street (SR 19). The project included traffic
signal upgrades to accommodate pedestrian traffic and
three mid-block crosswalks with refuge island and RRFB’s
to improve safety as the pedestrians crossed the five-lane
roadway. The project initially started as an INDOT/LPA
project and was then consolidated with a paving project
through INDOT.
South Bend Safe Routes to Kennedy
Academy School
South Bend, Indiana
DLZ provided engineering design for over 9,600 feet
of sidewalk and 30 curb ramps on various City of South
Bend local roadways near Kennedy Academy School. The
purpose of the project was to improve pedestrian and
bicyclist mobility, accessibility, and safety through the
area. A thorough and detailed Pedestrian Maintenance
of Traffic Plan was required to ensure that access was
maintained through the neighborhood and to the school.
Northview Safe Routes to School
Valparaiso, Indiana
DLZ provided professional consulting design services for
a sidewalk project in the Northview area of the City of
Valparaiso. The project included the design of sidewalk
gaps to the pedestrian facilities that had challenging
issues. Locations included a mixture of curb and gutter or
shoulder. In many cases, gravel parking areas had been
created at the edge of the roadway, prohibiting walking.
DLZ worked with the City and property owners to find
creative solutions in addressing various issues.
Tamarack Multi-use Trail
North Liberty, Indiana
DLZ was retained by the Town of North Liberty to provide
design services for a multi-use trail along the abandoned
railroad from Wabash Avenue to the north side of the VFW
park. Work included the installation of ADA compliant
infrastructure with the path being 10 feet wide and hard-
surfaced HMA pavement. The approximate length of the trail
was 4,600 feet and connected the North Liberty Community
Center to the North Liberty Youth League Ballpark.
Angela Boulevard Roadway & Pedestrian
Improvements
South Bend, Indiana
The City of South Bend and the University of Notre Dame
partnered to improve pedestrian safety along Angela
Boulevard. The project focused on pedestrian safety by
reducing Angela Boulevard from four travel lanes to two
through the Notre Dame campus limits and improving
the pedestrian crossing locations. These improvements
included extending the existing sidewalk west to SR 933,
curb bumpouts to reduce the crosswalk length, traffic
signal upgrades, and a pedestrian crosswalk with LED
flashing beacon.