HomeMy WebLinkAboutOpening Of Proposals - Ewing Trail Proj No 125-063 - A&Z EngineeringC I T Y O F S O U T H B E N D
E W I N G A V E N U E T R A I L & S T R E E T S C A P E
I N D O T D E S .2 5 0 0 0 5 3 | L A P O R T E D I S T R I C T
Authorized Negotiator
Jamal Anabtawi, P.E.
Principal-in-Charge | Co-Founder/Owner
jamal@az-engineering.net
A&Z PROJECTS WITHIN THE CITY
OF SOUTH BEND INCLUDE:
Watermain Replacements
Drainage Studies & Improvements
Intersection Improvements
Sidewalks
Roadway Reconstruction
Streetscape
RESPONSIBLE OFFICE
1220 Ruston Pass | Fort Wayne, IN 46825
SUPPORTING OFFICE
11052 Marsh St, Suite B | Valparaiso, IN 46385
O U R C O M M I T M E N T
T O S O U T H B E N D
Efficiency & Continuity | A single team experienced in trail
design and LPA/INDOT coordination.
Integrated Services | Survey, roadway design, ROW, and
utility coordination completed within A&Z for schedule and
cost control.
Environmental Compliance | Seamless coordination with
Metric to achieve CE Level 2 documentation and required
Section 106 and 4(f) reviews.
Prioritizing the City’s Vision | Continuing our successful
relationship with City staff to deliver projects that support the
Rum Village Neighborhood Plan and the City’s active
transportation goals.
Indiana Department of Transportation, LaPorte District | Des. 2500053
EWING TRAIL & STREETSCAPE
CITY OF SOUTH BEND, INDIANA
Dear Selection Committee:
A&Z Engineering is pleased to submit our Letter of Interest to provide Preliminary
Engineering services for the Ewing Avenue Trail project. For over two decades, A&Z
has partnered with municipalities to deliver joint INDOT/LPA trail and roadway
improvements that enhance safety, mobility, and neighborhood character. Our
team understands the City’s commitment to connectivity and quality of life—and the
coordination needed to administer federally funded projects efficiently through the
INDOT process.
This project will be designed and managed from our Fort Wayne Office, providing the
City with a single, responsive point of contact from concept through design and
construction. Well known to city staff, Nitin Timble, PE, PS, will serve as Project
Manager and lead our multidisciplinary team. A&Z will manage roadway, survey,
utility, and right-of-way efforts internally, with trusted subconsultants supporting
specialized services:
Metric Environmental (DBE) – Environmental Document Preparation (5.2)
Dodd Title Corporation (DBE) – Title Research (12.2)
Perry & Associates – Appraisal (12.4)
JAY Real Estate Services – Appraisal Review (12.5)
Percentages
A&Z : 89%
Dodd Title Corp.: 1%
JAY Real Estate Services: 1%
Metric Environmental (Metric): 5%
Perry & Associates: 4%
A&Z has successfully teamed with these firms on previous trail and right-of-
way projects, including those requiring environmental documentation and
property acquisition under federal requirements. Together, our team brings a
proven record of compliance, coordination, and quality plans.
Page 1
QA/QC
WARREN ZWICK, PE
MARK VOSS, VP | A&Z
YEAR S O F
EXP E RIENCE
LE ADER WITH STRONG
PARTNERSH I PS IN
SOUTH BEND AN D INDOT
PROJ ECT EXPE RIENCE
PROJECT MANAGER
NITIN TIMBLE, PE, PS | A&Z*
APPRAISAL
TIM PERRY | PERRY & ASSOCIATES
UTILITY COORDINATION
WESLEY DOWNING | A&Z*
LANDON GROGG, EI | A&Z
A&Z’s assigned project team is prepared to begin work immediately
upon notice to proceed. Current workloads are balanced, and key
staff recently completed similar INDOT and LPA projects—ensuring
full capacity, focused attention, and timely delivery from kickoff
through construction.
DESIGN TEAM
LANDON GROGG, EI | A&Z*
ANNA KMEC, EI
PAMELA DAVENPORT
PAUL HOWARD
CITY OF SOUTH BEND, IN
NIFEMI OLUWATOMINI, SENIOR ENGINEER
ENVIRONMENTAL DOCUMENT PREPARATION
SUSAN CASTLE | METRIC*
AMY NOEL, PWS
TITLE RESEARCH
DODD TITLE CORPORATION
TOPOGRAPHIC SURVEY & ROW PLAN DEVELOPMENT
AARON SPRINGER, PS | A&Z*
KEVIN POLETTE | A&Z
MARTIN ROSSMAN | A&Z
MICHAEL MURRAY | A&Z
TEAM CAPACITY
REPRESENTATIVE TRAIL, SIDEWALK & INTERSECTION EXPERIENCE
Union Chapel Trail, Phase I | Fort Wayne, IN | $0.75M Const. Cost | Project Manager for a 1.5
mile multi-use trail corridor integrating roadway reconstruction, drainage, and ADA-compliant
crossings. Nitin led design, survey, and ROW plan development, ensuring seamless coordination
between the County, INDOT, and utility stakeholders.
Mishawaka Avenue Streetscape | South Bend, IN | $3.2M Const. Cost | Led urban corridor
improvements to create a safer, more walkable environment with lane reductions, protected bike
lanes, upgraded storm sewer, and decorative hardscaping.
Drake Road Reconstruction & Pedestrian Upgrades, Phases I & II | Kendallville, IN | $11.0M
Const. Cost | Project Manager for multi-phase reconstruction including new sidewalks, multi-use
path, signal design, drainage upgrades, intersection improvements and extensive ROW
acquisition. | INDOPT/LPA Project Des.1702731 and 1902750
Heritage Trail | Winona Lake, IN | $2.4M Const. Cost. | Project Manager for multiple segments
of the Winona Lake Heritage Trail (totaling approximately four miles), delivering a mix of 8- to 10-
foot wide asphalt shared-use paths, drainage enhancements, and connections to residential,
business and institutional areas.
Landin Road Reconstruction, Intersection Improvements, and Pedestrian Upgrades | New
Haven, IN | $8.6M Const. Cost | Project Manager for full corridor reconstruction, including four
intersections, new sidewalks, storm sewer upgrades, roadway resurfacing, and multi-use trail
design. Coordinated right-of-way, utilities, and drainage to improve safety, accessibility, and
neighborhood connectivity. | INDOT/LPA Project Des. 1400694, 1702731, 1902750.
PROJECT MANAGER
NITIN TIMBLE, PE, PS
Education
MS, Project Management
MTech, Structural Engineering
BE, Civil Engineering
Certifications & Registrations
PE & PS: Indiana and Ohio
INDOT Prequalified: 8.1, 8.3, 9.1,
10.2, 11.1, 12.1
With over 40 years of engineering and surveying experience, Nitin provides the technical
leadership and coordination expertise needed to deliver federally funded trail projects. He is
prequalified in required work types and has successfully led similar trail and right-of-way efforts
throughout northern Indiana. Nitin’s familiarity with the City of South Bend, INDOT LaPorte District,
and the LPA process ensures responsive communication, well-coordinated documentation, and
efficient project delivery from preliminary design through acquisition.
In preparation for this proposal, Nitin has studied past phases on Ewing Ave. and
made site visits. All photos in this LOI are from Nitin’s recent site visits.
TEAM ORGANIZATION
& KEY STAFF
Page 2
APPRAISAL REVIEW
JIM YOTT | JAY REAL ESTATE SERVICES
*Key staff resumes featured in this proposal.
ADDITIONAL EXPERIENCE
MANAGING PROJECTS WITH THE CITY OF SOUTH BEND
Lincoln Way East & Miami Rd. Intersection Improvement
Ireland Rd. & Ironwood Dr. Intersection Improvement
Cleveland Rd. & Hickory Rd. Intersection Improvement
Miami Rd. Improvements
Southwood Rd. Improvements
Greenlawn Ave. & South 30th Watermain Replacement
KEY STAFF
EWING TRAIL & STREETSCAPE | DES. 2500053
Page 3
YOU CAN
C O U N T O N
A&Z applies a two-tiered QA/QC process designed to
ensure every deliverable meets INDOT and City
standards. The first level includes internal peer and
discipline-specific reviews focusing on accuracy,
completeness, and coordination across roadway, utility,
and environmental components. The second level
provides an independent constructability review,
confirming plans are clear, buildable, and aligned with
field realities.
QUALITY
Relevant Experience & Expertise:
Over 40 years of relevant engineering experience
Specializes in Complete Streets and streetscape
design, with emphasis on drainage, pedestrian safety,
and corridor aesthetics
Extensive QA/QC oversight for roadway, utility, and
multimodal improvement projects
Performed QA/QC for multiple successful South Bend
projects, including corridor and intersection
improvements
Founder and co-owner of A&Z Engineering, ensuring
firmwide accountability for quality and consistency
Relevant Experience & Expertise
Over 20 years of INDOT and LPA construction
management experience
Proven record of constructability reviews ensuring
buildable, cost-effective designs
Expertise in staging, MOT, ADA compliance, and
drainage review
Coordinates with design and inspection teams to
confirm constructability before bid
Head of A&Z’s Construction Inspection Department,
bringing field-tested insight to design and
constructability reviews.
WARREN ZWICK, PE
41 YEARS OF EXPERIENCE
QA/QC ADMINISTRATOR
MARK VOSS
24 YEARS OF EXPERIENCE
CONSTRUCTABILITY REVIEWS
SUSAN CASTLE
ENVIRONMENTAL LEAD
19+ YEARS OF EXPERIENCE
Susan brings extensive experience in
NEPA compliance and environmental
Select Experience
All projects featured below were completed in partnership
with A&Z.
INDOT Des. 2003073 | Wayne Trace & Monroeville
Rd. Roundabout | Allen County, IN
INDOT Des. 1600788 | Argonne Rd./Kings Hwy
Roundabout | Winona Lake, IN
INDOT Des.1400694, 1702731, 1902750 | Landin Rd.
& Pedestrian Improvements | New Haven, IN
Education & Training
Senior Project Manager: NEPA
Services
documentation for INDOT projects statewide. She
specializes in Categorical Exclusion (CE) preparation,
early risk identification, and coordination with INDOT
Environmental Services to achieve timely clearances. Her
familiarity with district-level review procedures supports
efficient, compliant delivery for South Bend.
WESLEY DOWNING
UTILITY COORDINATION LEAD
38 YEARS OF EXPERIENCE
projects involving drainage, storm sewers, roadway
reconstruction and pedestrian facilities. He excels at early
conflict resolution, documentation, and stakeholder
coordination with providers and permitting agencies.
Select Experience
Ameritech Dr. & Cleveland Rd, Intersection
Improvements | South Bend, IN
Ireland Rd. and Ironwood Dr. Intersection
Improvements | South Bend, IN
Coldwater Rd. Widening | Fort Wayne, IN
INDOT Des. 2301100 | SR 930 Sidewalk & Trail | Fort
Wayne, IN
Union Chapel Trail | Fort Wayne, IN
Education & Training
INDOT Certified Utility
Coordinator
Wes has led utility coordination efforts
for dozens of municipal and INDOT
LANDON GROGG, EI
DESIGN LEAD
11+ YEARS OF EXPERIENCE
Landon Grogg, EI, will lead roadway and trail/sidewalk
design efforts, bringing extensive experience in
intersection geometry, drainage, and constructability. He
has successfully collaborated with this exact team on
numerous projects, ensuring efficient coordination and
consistent, high-quality plan delivery.
Select Experience
Western Ave. Roadway & Pedestrian Improvements |
South Bend, IN
Locust Rd. Reconstruction| South Bend, IN
INDOT Des. 2301100 |SR 930 Sidewalk & Trail | Fort
Wayne, IN
Stellar Sidewalk & Trail | Woodburn, IN
Stellar Sidewalk, Trail & Pedestrian Bridge |
Monroeville, IN
Education & Training
BS, Civil Engineering | Purdue
University
INDOT Certified Utility
Coordinator
AARON SPRINGER, PS
SURVEY & R/W LEAD
37+ YEARS OF EXPERIENCE
As A&Z’s Survey and Right-of-Way Department
Manager, Aaron oversees all survey coordination and
parcel documentation for INDOT and LPA projects. He
brings extensive experience in topographic mapping,
parcel research, and right-of-way engineering—ensuring
accurate, coordinated data that supports efficient design
and property acquisition.
Select Experience
Lathrop Water main & Street Reconstruction | South
Bend, IN
Miami and Lincoln Way East intersection
Improvements | South Bend, IN
Coldwater Road Widening | Fort Wayne, IN
Jefferson St. Trail | Fort Wayne, IN
Union Chapel Trail | Fort Wayne, IN
Education & Training
Professional Surveyor: Indiana
INDOT Certified R/W Engineering
PROJECT UNDERSTANDING & APPROACH
EWING TRAIL & STREETSCAPE | DES. 2500053
EASTERN TERMINUS AT GERTRUDE ST.
Page 4
A study of the intersection at Ewing and Prairie Ave. will
be conducted and an Engineers Assessment presented
to determine the best design for improvements. Further
discussion of the intersection found on page.
INTERSECTION
EARLIER PHASESSETTING THE STANDARD
Key Features
10-foot asphalt multi-use trail along the south side of
Ewing Avenue. and targeted sidewalk construction on
the north side.
Roadway reconstruction including curb, bump-outs, ADA
ramps, and targeted drainage improvements.
Enhanced pedestrian safety with shorter crossings,
lower vehicle speeds, and improved sight distance.
Community Impact
Encourages active physical activity and supports healthy
lifestyles.
Enhances neighborhood identity and contributes to long-
term property value and quality of life.
PURPOSE & NEED, UNDERSTANDING
The City of South Bend continues to invest in safe,
connected corridors linking neighborhoods to Walker Field
and Rum Village Park by extension of the Ewing Trail. This
phase between Olive Street and Gertrude Street advances
the Rum Village Neighborhood Plan, supporting a more
walkable, livable, safe, and sustainable community.
Context
Strengthens one of three key east–west connectors
between Main Street and Prairie Avenue.
Builds upon earlier phases that introduced traffic
calming, raised intersections, and pedestrian upgrades
east of Gertrude Street.
Earlier Ewing Avenue improvements east of Gertrude Street transformed the
corridor into a safer, more walkable neighborhood street. Bump-outs, raised
crossings, and landscaped greenspace calmed traffic and enhanced accessibility.
Pictured: Completed segment near Walker Field—Despite a rainy site visit,
the corridor reflects the City’s vision for a connected and inviting
neighborhood street.
EXISTING CONDITIONS
Phases I and II along Ewing Avenue established the
foundation for this phase of work. Those efforts narrowed
the roadway, introduced bump-outs and raised pedestrian
crossings, and added the trail and sidewalks- enhancing
safety and accessibility.
Within the current project limits:
Sidewalks exist on both sides of the corridor, with
varying widths and conditions.
Driveway aprons and curb ramps are inconsistent and
often non-compliant with ADA standards.
Drainage structures are limited, resulting in ponding near
intersections and low points.
Utilities are present within the right-of-way, including
power poles, hydrants, and light poles likely in conflict
with proposed bump-outs.
Trees and landscaping will require selective removal or
relocation to accommodate trail and curb construction.
The existing ROW appears to be 76 feet, providing
sufficient width for proposed improvements, minimizing
anticipated property impacts.
PROJECT UNDERSTANDING & APPROACH
EWING TRAIL & STREETSCAPE | DES. 2500053
R ff b I l t U/S
The existing intersection
geometry creates limited
sight distance and awkward
turning movements. Several
design scenarios will be
evaluated to improve safety,
visibility, and traffic flow.
Pictured: View from the east
approach of Ewing Ave. into
Prairie Ave. intersection.
ALIGNMENT
The current two-way flashing
beacon presents safety
challenges. Traffic signal
and control options will be
reviewed as part of the
INDOT Engineering
Assessment process.
Pictured: Existing traffic
signal at Prairie & Ewing.
TRAFFIC CONTROL
Pedestrian Safety Features
Options such as refuge
areas or raised crossings
will be reviewed for
feasibility and consistency
with previous Ewing Avenue
phases.
Pictured: Curb ramp with no
destination or crosswalk
ACCESSIBLE
CONNECTIVITY
Field observations during
rainfall revealed localized
ponding near curb returns.
Future design will refine inlet
placement and grading to
improve drainage
performance throughout the
corridor. Pictured: Apron with
more than 2% slope towards
building, west of intersection.
DRAINAGE
Maintains existing geometry. CONCEPTUALSCENARIO ONE
CONCEPTUAL SCENARIO THREE Pedestrian refuge islands and dedicated right turn lane at the eastbound approach.
Modified eastbound approach and pedestrian refuge islands.
CONCEPTUAL SCENARIO TWO
Page 5
DESIGN CONSIDERATIONS: EWING AVENUE AT PRAIRIE AVENUE
The intersection of Ewing Avenue and Prairie Avenue presents one of the corridor’s most critical design challenges: balancing
multimodal safety with efficient traffic operations. The existing 60-degree skew, limited sight distance, and flashing beacon
create uncertainty for drivers and pedestrians alike. As part of the Engineering Assessment process, A&Z will evaluate
multiple design scenarios to enhance safety, improve visibility, and ensure ADA-compliant connectivity through this key
junction. Potential improvements such as traffic control upgrades, geometric refinements, and enhanced pedestrian
accommodations will be reviewed.
PROJECT UNDERSTANDING & APPROACH
EWING TRAIL & STREETSCAPE | DES. 2500053
R ff b I l t U/S
Consistent with previous Ewing Avenue
phases, raised crossings will be
considered at strategic intersections to
reinforce neighborhood traffic calming
and improve visibility. Pictured: raised
crosswalk at Walker Field Crossing.
Location further east on Ewing Ave.
SAFETY
Designed to shorten pedestrian
crossings, reduce turning speeds, and
improve driver awareness at all
approaches. Landscaped bump-outs
also provide clear separation between
vehicles, pedestrians, and on-street
parking zones. Pictured Bump-outs with
parking at Walker Field.
SAFETY
Subtitle/Clarification.
Targeted sidewalk improvements on
the north side will replace
deteriorated or missing sidewalk
segments to provide continuous,
ADA-compliant access. Pictured right:
existing sidewalk conditions, north
side.
ACCESSIBLE CONNECTIVITY
Page 6
DESIGN CONSIDERATIONS: TRAIL AND SIDEWALK
This phase of Ewing Avenue continues the City’s complete corridor vision, balancing accessibility, safety,
drainage, and neighborhood character within the existing 76-foot right-of-way. A&Z’s design approach
minimizes property impacts while creating a continuous, ADA-compliant pedestrian corridor that extends
improvements established in previous phases.
All curb ramps and aprons
reconstructed for accessibility and
improved drainage performance.
Pictured: existing sidewalk with non-
compliant curb ramp and ponding
water.
ACCESSIBLE CONNECTIVITY
Concrete trail replaces existing
sidewalk, linking Gertrude Street to
Prairie Ave. and connecting residents
to Walker Field and Rum Village Park.
Pictured: Multiuse path from earlier
phase of Ewing St. corridor
improvements.
ACCESSIBLE CONNECTIVITY
New and adjusted inlets, curb grading,
and surface re-contouring will be
evaluated corridor-wide to eliminate
ponding and improve runoff toward
existing storm infrastructure. Pictured:
Ponding water identified at field visit.
DRAINAGE
Category Anticipated Action
Environmental
Document
Categorical Exclusion (CE) Level 2 is anticipated, with potential elevation to CE Level 4 if
adverse effects to historic properties or Section 4(f) impacts are identified.
Section 106
One Outstanding, one Notable, and one National Register-listed property nearby.
Coordination with INDOT/FHWA/SHPO will confirm eligibility for Minor Projects Programmatic
Agreement (MPPA), likely Category B-8 (trail) and B-1 (curbs/ramps).
Waters of the U.S.No mapped streams or wetlands. A delineation will verify and determine if 404/401 permitting
is needed.
Hazardous Materials One NPDES facility near Prairie Avenue. A Red Flag Investigation will confirm no
contamination concerns.
Protected Species
(Bats)
Bat coordination through USFWS IPaC and INDOT’s Programmatic Consultation; inspect any
bridges/culverts for roosting.
Page 7
RIGHT OF WAY (ROW) IMPACTS
The Ewing Avenue corridor width is 76-foot apparent right-of-way, accommodating
approximately 40 feet of roadway for two travel lanes and limited on-street parking,
with the remaining 36 feet available for greenspace, curb, and pedestrian facilities. No
permanent right-of-way acquisition is anticipated- except at the Ewing Ave. and Pairie
Ave. Intersection.
Minor temporary easements may be required for grading transitions, driveway tie-ins,
and tree trimming or removal where vegetation extends beyond the ROW line. These
areas will be verified through a survey and coordinated with affected property owners
early in design to minimize disturbance.
Driveway aprons on the south side will be reconstructed as part of trail installation,
while aprons on the north side will be evaluated and replaced as needed based on
field review. Conflicting trees are anticipated at sidewalk and trail locations and will be
addressed through selective removal or trimming coordinated with the City.
PR O V EN
S UC C E SS
PROJECT UNDERSTANDING & APPROACH
EWING TRAIL & STREETSCAPE | DES. 2500053
ENVIRONMENTAL
Tree and hydrant on the north
side of Ewing Ave. near the
Prairie Ave. intersection will
need to be removed and
relocated.
We anticipate the need to reconstruct curb ramp,
relocate light pole w/street signs, subdivision sign
and median adjustments, tree removal/trimming
at the entrance to Woodhaven Subdivision
(pictured).
LANDIN RD. | NEW HAVEN, IN
WINONA AVE. | WINONA LAKE, IN
UTILITY COORDINATION
Utility coordination will be managed concurrently with design to
identify and resolve conflicts within the project limits. Anticipated
adjustments include fire hydrant relocations and minor pole or lighting
shifts in areas of proposed bump-outs and trail construction.
Driveway aprons on the south side will be replaced as part of trail
installation, and north-side aprons will be evaluated and
reconstructed where necessary based on field conditions.
A&Z will coordinate directly with City of South Bend Utilities, NIPSCO,
and other providers to confirm alignments, relocation limits, and
staging needs. Utility information will be verified in the field and
incorporated into plan development in accordance with INDOT’s
Utility Coordination Manual.
A&Z Engineering and Metric Environmental (DBE) will coordinate
all environmental documentation in accordance with INDOT and
FHWA procedures. Our approach emphasizes early coordination,
clear documentation, and proactive communication with review
agencies to maintain schedule and ensure compliance through CE
approval.
with INDOT/LPA Projec t s
Our team is experienced in assisting local agencies with INDOT
submittal requirements, milestone tracking, and documentation to
maintain federal-aid eligibility and project schedules.
Before and After: Corridor reconstruction improvements included
drainage upgrades, sidewalk and trail construction, and full right-of-way
and utility coordination—mirroring the scope and process proposed for
Ewing Avenue.
Before and After: Multi-leg roundabout and trail design, improving
safety, traffic flow, and pedestrian connectivity. The project required
complex drainage design, utility coordination, and constructability
planning—skills directly applicable to the Ewing Avenue intersection
and trail corridor.
Our team has completed over 15 corridor
and intersection improvement projects
through INDOT’s LPA program since 2019.
PROJECT UNDERSTANDING & APPROACH
EWING TRAIL & STREETSCAPE | DES. 2500053
POTENTIAL MOT PLAN
Continuous access for
local, emergency, and
service vehicles.
Pedestrian access will be maintained throughout
construction in full compliance with INDOT and
federal ADA requirements for temporary routes and
accessibility. Clear signage, stable walking
surfaces, and safe crossings will be provided in all
active work zones, ensuring residents, students,
and park users can continue accessing
neighborhood destinations along Ewing Avenue
during each construction phase.
PEDESTRIAN MOT
DETOUR: THROUGH
TRAFFIC
During trail, sidewalk, and
roadway construction,
through traffic would be
directed on this 3 mile
detour.
QUESTIONS
Page 8TURNING
MAINTENANCE OF TRAFFIC (MOT)
A&Z will develop a phased maintenance of traffic plan that maintains local access and emergency response while
minimizing disruption to residents and businesses.
During construction, local, emergency, and service vehicles will have continuous access within the project limits.
Through traffic on Ewing Avenue may be detoured approximately 3 miles using Prairie Avenue (SR 23), Sample
Street (SR 23), and Main Street (US 31 Business).
At the Ewing Avenue / Prairie Avenue intersection, Prairie Avenue through traffic will remain open, while Ewing
Avenue may require temporary closure to reconstruct the intersection safely. Local traffic will be detoured using Olive
Road and Brookfield Street to reach Prairie Avenue during this work.
The MOT plan will include signage, phasing, and communication measures coordinated with the City of South Bend,
INDOT LaPorte District, emergency services, and local residents. Pedestrian and cyclist access will be preserved
where feasible through temporary surface connections and clear wayfinding signage.
Into Confidence.
CONSTRUCTION ZONE
Local, Emergency, and
Service Vehicle access will
be maintained along with
pedestrian access.
DETOUR:
INTERSECTION WORK
During intersection
improvements, Ewing Ave.
may require closure.
Traffic on Prairie Ave. will
be maintained throughout
construction.
A&Z supports municipalities with clear, accessible
communication tools—like custom maps, project graphics, and
social media content that keep residents informed and
engaged. By helping communities visualize what’s ahead, we
reduce uncertainty, build trust, and keep everyone moving
safely through active work zones. Pictured Below: Social
media content created to assist Town of Winona Lake in
communicating with residents. PRAIRIE AVE.W. SAM PL E ST. (SR 2 3 )MAIN ST. (BUS. US 31)EWING AVE.
INDOT DES. 2001665, 2001675
MAPLECREST ROAD IMPROVEMENTS | FORT WAYNE, IN
Pedestrian facilities were added along Maplecrest
Road as part of larger complete streets design to
enhance urban connectivity, safety, and drainage
performance, featuring ADA-compliant sidewalks,
multi-use paths, crosswalks at four major
intersections, and upgraded storm infrastructure to
manage runoff more effectively.
INDOT DES. 1902750, 1702731
DRAKE RD. RECONSTRUCTION & PEDESTRIAN FACILITIES | KENDALLVILLE, IN
A&Z designed and now provides inspection for this
multi-phase corridor improvement project, enhancing
safety and connectivity along Drake Road and
across SR 3. Work includes pavement
reconstruction, roadway widening, curb and gutter,
pedestrian facilities with school crosswalks and a
multipurpose path, ornamental lighting, and storm
sewer upgrades. During construction, A&Z has
coordinated closely with the school district and city
staff to manage public communication and maintain
safe traffic flow.
A&Z has led, designed, and inspected more than
thirty SRTS and CCMG projects, improving small
town pedestrian safety through new sidewalks,
ADA-compliant upgrades, and enhanced
crosswalks and signage. Some of our longstanding
partnerships include:
South Bend
Columbia City
Warsaw
Winona Lake
Logansport
Avilla
St. Joe
Angola
CCMG, SRTS, AND LOCALLY FUNDED PEDESTRIAN AND INFRASTRUCTURE PROJECTS | INDIANA
Our repeat clients reflect
A&Z’s reputation for
dependable delivery and
local understanding.
RELEVANT EXPERIENCE AND EXPERTISE
EWING TRAIL & STREETSCAPE | DES. 2500053
MISHAWAKA AVE. STREETSCAPELUDWIG RD. AND OAKBROOK PARKWAY | FORT WAYNE, IN
Locally funded project that, in addition to
roundabout, included pedestrian facilities, a multi-
use path, ADA curb ramps, crosswalks, signal
upgrades at Coldwater Road, and extensive
drainage improvements. Coordination with Fort
Wayne Community Schools and the airport along
with public outreach were key components of this
project’s success.
W O R K I N G W I T H
S O U T H B E N D , I N
EXPERIENCE
A&Z has partnered with the City of South Bend on multiple
transportation and corridor improvement projects focused
on safety, connectivity, and neighborhood character. Our
team is familiar with the City’s design standards, utility
coordination processes, and review expectations,
ensuring smooth project delivery from concept through
construction. Some of our notable projects include:
Ameritech Drive- Cleveland Road | Intersection and
signal improvements
Ireland Rd. & Ironwood Dr. | Intersection improvement
with pavement reconstruction, curb realignment, upgraded
traffic signals
Lincoln Way E. & Miami St. | Intersection Improvement
with pedestrian facilities.
Community Crossings Matching Grant Projects | On
several streets throughout South Bend, A&Z has provided
roadway, drainage, and pedestrian improvements.
Mishawaka Avenue Streetscape | Corridor reconstruction
with protected bike lanes, raised intersection, storm sewer
upgrades, and pedestrian-focused streetscape amenities.
Page 9
RELEVANT EXPERIENCE AND EXPERTISE
EWING TRAIL & STREETSCAPE | DES. 2500053
Lake City Greenway Trail
Winona Lake, IN
Grace College Trail
Kosciusko County, IN
T R A I L S , P A T H S ,
& S I D E W A L K S
ADDITIONAL Page 10
Pufferbelly Trail | Fort Wayne, IN | Inspection & design of 1.6 miles of 12' wide shared-use
asphalt trail along former rail corridor. Extensive inspector/supervisor coordination to include
amenities such as benches and a spur to connect to Franke Park along with refurbishing
pedestrian bridge.
Monroeville Stellar Trail & Sidewalk | Monroeville, IN | Inspection & design of multifaceted
project that included pedestrian bridge, boardwalk and ADA compliant ramps and crosswalks
in addition to the sidewalks and approx. 1 mile of 10' wide HMA trail connecting to other
pedestrian networks.
Woodburn Trail & Sidewalk | Woodburn, IN |
Inspection & design of 10' wide HMA trail,
sidewalks, curb ramps, crosswalks, and storm
sewer improvements.
A&Z is no stranger to pedestrian MOT and safety! Much of our federally
funded work with municipalities has included pedestrian MOT.
Conklin Bay Trail
Syracuse, IN
Resting Node on Pokabache Trail
Waterloo, IN Segment