HomeMy WebLinkAboutOpening of Bids - Cleanup of South Bend Range, Phase Proj No 125-020AR - Dore & AssociatesCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Cleanup of South Bend Range, Phase I
Project No. 125-020AR
For Bids Due Tuesday, September 23, 2025 @ 9:00 A.M. (E.D.T.)
PART I
(Must be completed for all bids. Please type or print)
Date: 9/23/2025 Bidder (Firm): Dore & Associates, Inc.
Address: PO Box 338
City/State/Zip: Bay City, MI 48707 Telephone Number: ( 989 ) 684-8411
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Cleanup of South Bend Range, Phase I — Building Demolition [Rebid]
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
City of South Bend, Enqineerinq Division
and dated 08/29/2025 for the sum of (enter the Total Bid as shown on the Proposal)
Five hundred seventy five thousand dollars and no / 100 ($ 575,000.00
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City_ -of -South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a se )ara_ t�e�ch�_._
B - _
(Signature)
J son C. Dore, President
(Printed Name of Person Signing)
ACCEPTANCE
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
23rd
day of
September
20 25
Joseph R. Molnar, Vice President
Breana N. Micou, Member
Murray L. Miller, Member Attest: Hillary Horvath, Clerk
Version 07/19/2023 Contractor's Bid for Public Works - 2
SpL� I l3 L j
CITY OF SOUTH BEND, INDIANA iee
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Cleanup of South Bend Range, Phase I
Project No. 125-020AR
For Bids Due Tuesday, September 23, 2025 @ 9:00 A.M. (E.D.T.)
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
x or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
x executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
x with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good
Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and
x WBE-2.1].
x
Acknowledge Receipt of Addendum(s) included with the bid.
All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Dore & Associates, Inc.
By Authorized RepresentatiGe
Signature: r—
Print Name & Title: Jason C. Dore, President
Date: 9/23/2025
Version 07/19/2023 Contractor's Bid for Public Works - 1
Document A31 OTM -2010
Bid Bond
CONTRACTOR:
Name, legal status and address)
DORE & ASSOCIATES, INC
PO Box 338
Bay City, MI 48707
OWNER:
(Nante, legal status and address)
City of South Bend, Indiana, Board of Public Works
227 West Jefferson Blvd
South Bend, IN 46601
SURETY:
(Name, legal status and principal place of
business)
NGM Insurance
100WSt
Keene, NH 03431
BOND AMOUNT: FIVE PERCENT OF ATTACHED BID (5%)
This document has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or other
party shall be considered plural
where applicable.
PROJECT: 125-020AR Demolition & clean up of South Bend Range, Phase 1 located at 133 Cherry St., South Bend, IN 46601
(Name, location or address, and Project number, if an))
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor
and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided
herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the
bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (I)
enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be
specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise
acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material
furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between
the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to
perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect.
The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner
may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate
beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's
consent for an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be
deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any
provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions
conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent
is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this 23rd day of September
(Witness) Dennis a ecretary
(Witness)
2025 .
1,17 tdpa�i)DO & AT ES, INC (Seal)
"l ••vme. Tide Jas a�_ .orePreside
_ ) L_�.Df
` UaOF
(Surety) NGM Insurance (` 1923
(Name & Tide) Michael G. Zervos , ATTORNEY -IN -FACT
AIA Document A310 T"' - 2010. Copyright C 1963, 1970 and 2010 by The American Institute of Architects. All rights reserved. WARNING: This AIA®
Init. Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are
permitted to reproduce tcn (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, c-mail The American Institute
of Architects' legal counsel, copyright@aia.org. 061110
CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that
changes will not be obscured
STREETMAIN
"ER"
INSURANCE
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That NGM Insurance Company, a Florida corporation having its principal
office in the City of Jacksonville, State of Florida, pursuant to Article IV, Section 2 of the By -Laws of said Company, to wit:
"Article IV, Section 2. The board of directors, the president, any vice president, secretary, or the treasurer
shall have the power and authority to appoint attorneys -in -fact and to authorize them to execute on behalf of
the company and affix the seal of the company thereto, bonds, recognizances, contracts of indemnity or
writings obligatory in the nature of a bond, recognizance or conditional undertaking and to remove any such
attorneys -in -fact at any time and revoke the power and authority given to them. "
does hereby make, constitute and appoint Gus E. Zervos, Karen Guthrie, Michael G. Zervos, Stephanie A. Dinco, Stephen M.
Zervos
its true and lawful Attorneys -in -fact, to make, execute, seal and deliver for and on its behalf, and as its act and deed, bonds,
undertakings, recognizances, contracts of indemnity, or other writings obligatory in nature of a bond subject to the following
limitation:
1. No one bond to exceed Five Million Dollars ($5,000,000)
and to bind NGM Insurance Company thereby as fully and to the same extent as if such instruments were signed by the duly
authorized officers of NGM Insurance Company; the acts of said Attorney are hereby ratified and confirmed.
This power of attorney is signed and sealed by facsimile under and by the authority of the following resolution adopted by the
Directors of NGM Insurance Company at a meeting duly called and held on the 2nd day of December 1977.
Voted: That the signature of any officer authorized by the By -Laws and the company seal may be affixed by facsimile to
any power of attorney or special power of attorney or certification of either given for the execution of any bond,
undertaking, recognizance or other written obligation in the nature thereof; such signature and seal, when so used being
hereby adopted by the company as the original signature of such office and the original seal of the company, to be valid
and binding upon the company with the same force and effect as though manually affixed.
IN WITNESS WHEREOF, NGM Insurance Company has caused these presents to be signed by its Secretary and its corporate
seal to be hereto affixed this 9th day of October, 2024. it
NGM INSURANCE COMPANY By: t
State of Wisconsin, Lauren K. Powell
County of Dane. Vice President, Corporate Secretary
On this 9th day of October, 2024, before the subscriber a Notary Public of State of Wisconsin in and for the County of Dane duly
commissioned and qualified, came Lauren K. Powell of NGM Insurance Company, to me personally known to be the officer described
herein, and who executed the preceding instrument, and she acknowledged the execution of same, and being by me fully sworn, deposed
and said that she is an officer of said Company, aforesaid: that the seal affixed to the preceding instrument is the corporate seal of said
Company, and the said corporate seal and her signature as officer were duly affixed and subscribed to the said instrument by the authority
and direction of the said Company; that Article IV, Section 2 of the By -Laws of said Company is now in force.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at Madison, Wisconsin this 9th day of October, 2024.
My Commission Expires May 21, 2027 €: Q°TRe"
gyam. J80 r
I, Nathan Hoyt, Assistant Vice President of NGM Insurance Company, do hereby certify that the above and foregoing is a true and correct
copy of a Power of Attorney executed by said Company which is still in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company at Madison, Wisconsin this
23rd day of September , 2025
0�7R)R
114� — I
Nathan Hoyt Assistant Vice President
WARNING: Any unauthorized reproduction or alteration of this document is prohibited.
TO CONFIRM VALIDITY of the attached bond please call 1-603-354-5281.
TO SUBMIT A CLAIM: Send all correspondence to 55 West Street, Keene, NII 03431
Attn: Bond Claim Dept. or call our Bond Claim Dept. at 1-603-358-1437.
PART KU
(For projects of$1UO.O0Oormore —IC3S-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its, bid.
Attach additional pages for each section aaneeded.
SECTION | EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior tothe date ofthe current bid.
2. Attach alisting ofpublic works projects curpent|y|npnocaeoofoonmtruotionbvyour
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION UPLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach on explanation of your plan or layout for performing proposed work. (Examples could
include o narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City ufSouth Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed port of the work) that you have used on public works
projects during the past five (5) years along with obrief description ofthe work done bveach
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
auboontrauLor, equipment to be used by the gubcortraotor, and whether you will require a
bond. Hovvever, if you are unable to currently provide e |istinQ, please understand a listing
must beprovided prior tocontract approval. Until the completion ofthe proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use msubcontractor onthe proposed project.
4. Attach a|isting of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach on explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project ifovvordad.
VosionU78Q/2O23 Contractor's Bid for Public Works '3
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Michigan )
) SS:
Bay COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
I. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended frorn time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 07/19/2023 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 07/19/2023 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 23rd day of September 20 25
Subscribed and sworn to before me this 23rd
My Commission Expires
06/27/2031
County of Residence
Dore & Associates, Inc.
Contractor/Bidder,(Firm)
signature r o1, Cont ctor/Bidder or Its Agent
Jason C. Dore, President
Printed Name and Title
.day of September 20 25
1v i ��i,V 1 t'��tq -
Notary �Ptkic Kylie R. Dore
rP
KYLIE R. DORE
NOTARY PUBLIC, STATE OF MICHICAN
COUNTY OF BAY
My Commission Expires 06-27-2031
Acting t : a C�,mry of
Version 07/19/2023 Contractor's Bid for Public Works - 6
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Cleanup of South Bend Range, Phase I
Project Number: 125-020AR
For Bids Due: Tuesday, September 23, 2025 @ 9:00 A.M. (E.D.T.)
Contractor Name: Dore & Associates. Inc.
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
Lump Sum price to complete building
1
demolition, asbestos abatement, and
1
LSUM
$540,000.00
fence removal and replacement as
intended by these Specifications
2
Environmental Allowance
1
LSUM
$25,000
$25,000
3
Crate Allowance
1
LSUM
$10,000
$10,000
BASE BID TOTAL $575,000.00
Bidder (Firm): Dore & Associates, Inc.
Address: PO Box 338
City/State/Zip: Bay City, MI 48707 Telephone Number: 989 684-8411
By
(Signature)
Jason C. Dore, President
(Printed Name of Person Signing)
Version 07/19/2023 Contractor's Bid for Public Works - 7
CITY OF SOUTH BEND'
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-1.0
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number: 125-020AR Project Name: Cleanup of South Bend Range, Phase I
Bidder: Dore & Associates, Inc. Base Bid Amount: $575,000.00 MBE Goal: 1.3%
Page of
Name & Address of MBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of MBE
Component
Percentage
of Total
Bid/Proposal
1st Class Logistics, LLC.
Bernard Coutee
574-993-0071
Trucking/HaulingcJ%
$28,750.00
Submitted by: Jason C. Dore, President `
Print Name Sign ure
***Goals should be calculated based on the Base Bid only.***
Version 07/19/2023 Contractor's Bid for Public Works - 8
9/23/2025
Date
LTH Qom.
CITY OF SOUTH BEND`
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN '� ?r'
FORM WBE-1.0x-
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number:
Bidder:
125-020AR Project Name: Cleanup of South Bend Range, Phase I
Dore & Associates, Inc.
Base Bid Amount: $575,000.00
WBE Goal: 4.7%
Page of
Name & Address of WBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of WBE
Component
Percentage
of Total
Bid/Proposal
5%
Submitted by:
Jason C. Dore, President
Print Name
9/23/2025
Sig.. ture Date
***Goals should be calculated based on the Base Bid only.***
Version 07/19/2023 Contractor's Bid for Public Works - 9
7_
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: —1 26-020AR Date: 9/2312025
Project Name: —Cleanup of South Bend Range, Phase I
Bidder: Dore & Associates, Inc.
Contact Person: Jason C. Dore, President
Address: PO Box 338
Telephone: 989-684-8411
City: Bay City State: Michigan Zip: 48707
Email: est@doreassoc.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: tla://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
X
Indiana Minority and Women Business Enterprises, found on their website
(hftp://www.in.gov/idoa),
I affirm that I have made good faith efforts to select portions of the contract work to be
X
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
X
means the interest of all MBEs in the scopes of work of the contract.
X
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
X
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
X
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
X
I affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
X
with adequate information about the plans, specifications and other requirements of the
subcontract.
X
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 07/19/2023 Contractor's Bid for Public Works - 10
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
X
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
x
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
"Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 07/19/2023 Contractor's Bid for Public Works - 11
f,`/z�yL Ott xF
CITY OF SOUTH BEND�i
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN �4
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 125-020AR Date: 9/23/2025
Project Name: Cleanup of South Bend Range, Phase I
Bidder: Dore & Associates, Inc.
Contact Person: Jason C. Dore, President Telephone: 989-684-8411
Address: PO Box 338
City: Bay City State: Michigan Zip: 48707
Email: est@doreassoc.com
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: hftp://www.in.22v/idoa/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
X
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
X
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation.
X
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all WBEs in the scopes of work of the contract.
X
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
X
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
X
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively.
X
I affirm that I followed up on initial solicitations with interested WBEs.
X
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
X
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 07/19/2023 Contractor's Bid for Public Works - 12
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested WBEs in obtaining
X
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
X
I affirm that I did not reject any WBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 07/19/2023 Contractor's Bid for Public Works - 13
CITY OF SOUTH BEND
AM —
'.
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
�F
FORM MBE-2.1
N1 .
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE OF
Project Number: 125-020AR MBE Participation Goal 1.3%
Project
Name;--) Cleanup of South Bend Range, Phase I
Bidder: Dore & Associates, Inc.
By:' _ r - President 9/23/2025
nature) - _ ' (Title) (Date)
MBE Firm 1st Class Logistics, LLC.
Owner or Contact at MBE Firm Bernard Coutee
Telephone: 574-993-0071 Fax: Email: lstclasslogistics20l3@gmail.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Trucking/Hauli
RESULTS OF CONTACT WITH THE MBE FIRM:
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 07/19/2023 Contractor's Bid for Public Works - 14
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.1
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE OF
Project Number: 125-020AR WBE Participation Goal 4.7%
Project Name: Cleanup of South Bend Range, Phase I
Bidder- -Dore &Associates, Inc.
By: :�'. �� President 9/23/2025
(Signature) (Title) (Date)
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Trucking/Hauling
RESULTS OF CONTACT WITH THE WBE FIRM:
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Version 07/19/2023 Contractor's Bid for Public Works - 15
ACCW?ff CERTIFICATE OF LIABILITY INSURANCE
DATE(MWDOIYWY)
9116/2024
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the poilcy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement On
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
ArthurJ. Gallagher Risk Management Services, LLC
Hampton Place
Saginaw MI 48604
gMTE CT Lisa Stoner
PHONElAtC. $04-$75•$395 F No:9$9-607.6$O2
E-MA5311
ADDRESS: Iisa stoner a" .com
INSURER S) AFFORDING COVERAGE
NAIC A
INSURER A: Nautilus Insurance Company
17370
LI en3 f!: R- 7 1
INSURED DORE&AS-02
Dore & Associates Inc.
INSURER a : AmeriSure Insurance Company
19488
JNSURER c: Great Divide Insurance Company
25224
P.O.Box 338
INSURER D: CNA Insurance Companies
20435
Bay City, Mi 48707
INSURER E :
INSURER F :
c:UvtKACUtb CERTIFICATE NUMBER* 711-123d7R+S REW!S!0M tVi MPER-
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INTR
TYPE OF INSURANCE
A
POLICY NUMBER
MMJDUm F
POLICY EXYPY
LIMITS
A
X
COMMERCIALGENERALLIABILITY
CLAIMS -MADE o OCCUR
ECP203SO2913
9/16/2024
9116/2025
EACH OCCURRENCE
52,000,000
A A (a TEU-
PREMISESS(Ea occurrence) occurratca)
$T00,000
X
MED EXP (Arty one person)
S 5,000
10.0D0
PERSONAL & ADV INJURY
S 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
X POLICY � JECT LOC
GENERAL AGGREGATE
$2,000,000
PRODUCTS -COMPIOP AGO
$2,000,000
S
OTHER:
6
AUTOMOBILE
LIABILITY
CA21251830007
1130/2024
113012025
EOMBINED a accident)SINGLE
S T,000,000
ANY AUTO
BODILY INJURY (Per person)
5
OWNED SCHEDULED
AUTOS ONLY AUTOS
6001LY INJURY {Per atsJdOnt)
$
X
AUTOS ONLY X ALITOS VNLDY
P r dnt)PROPERTYOAMAHIRED
__.....___._.
$
A
X
UMBRELLAUAB
X
IOCCUR
FFX203583013
9/16/2024
9116/2025
EACHOCCURRENCE
$10,000,000
EXCESS UAB
CLAIMS -MADE
AGGREGATE
510,000,000
DED I I RETENTIONS
I
S
C
WORKERS COMPENSATION
AND EMPLOYERS'LIABILITY YIN
ANYPROPRIETORIPARTNERIEXECUTIVE
OFFICER/MEMBER EXCLUDED? D
NIA
WCA204465910
9/16/2024
9/16/2025
X H'
T TUT R
E.L. EACH ACCIDENT
51,000,ODO
E.L. DISEASE -EA EMPLOYEE
__..�._._._.
S 1,000,000
(Mandatory In NH)
if yes, desaibe under
DESCRIPTION OF OPERATIONS below
I
E.L. DISEASE - POLICY LIMIT
------
$1,000,000
D
A
Leased a Rented Equipment
Pollution LiabilityECP203582913
C 7039608524
5/26/2024
9116/2024
512612025
911612025
S3W.DD0 Limit
SZO00,000 Limit
$1,000 Deductible
S10,000 Deductibbe
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached It more spice Is required)
1+M1\yGl-LN
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS,
BIDDING PURPOSE ONLY
AUTHORIZED REPRESENTATIVE
1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD
CERTIFICATE OF QUALIFICATION
to provide
CONSTRUCTION SERVICES
for
PUBLIC WORKS PROJECTS
to the
STATE OF INDIANA
This Certification Board, having duly considered application for qualification in terms of apparent experience and financial
resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a
Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to:
DORE & ASSOCIATES INC
900 TRUMAN PKWY
PO BOX 338
BAY CITY MI 48707
Phone 989-684-8411
Fax 989-684-6663
Company Official
JASON DORE
for the twenty-seven month period stated herein, unless revoked by this Board for cause,
and in the classifications of services stated below. This certificate supersedes any previous certificate.
1795.01 Demolition of Buildings and Other Structures
1799.01 Asbestos Remediation
CERTIFICATION DATE 4/29/2022
EXPIRATION DATE 7/29/2024
THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD,
402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA 46204,
ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION,
Tracy L. Cross, EEx4tive Secretary
Certification Board
DAPW PQ2 State Form 3983R Rev. 07106
Nationwide Specialty Contractor - Demolition I Abatement I Remediation
0PASS"ORCIATrEgSinc. P.O. Box 338 -Bay City, M1 48707-0338 -ph 989.684.8411 -fax 989,684.6663 - www.doreassoc,com
ALL EQUIPMENT LISTED BELOW IS SOLEY OWNED AND FULLY PAID FOR BY Dore
& Associates, Inc.
1 — Volvo EC 400 Ultra High Reach Excavator
2 — Komatsu PC 350-11
2 — CAT 350L Excavators
5 — CAT 345 Excavators BL & C
9 — CAT 330L Excavators B & C
2 — CAT 320L Excavators
1 — CAT 312L Excavator
1 — Link Belt Crane, 70 Ton
1 — Case Vibratory Roller
1 — CAT D4 Bulldozer
1 — CAT IT28 Wheel Loader
18 — Bobcats & 2 — Bobcat Trailers
2 — CAT Mini Excavators
5 — CAT Skid Steer Loaders
2 — Brok Remote Demo Robots
2 — Excel Track Concrete Crusher Plants
2 — Labounty MSD70R Shears
1 — Labounty MSDSOR Shear
6 — Excavator Grapples
1 — 60 Ton American 7260 Crane
1 — 1973 GMC Tank Truck (Water)
12 — Excavator Hydraulic Hammers
0
GRE
Nationwide Specialty Contractor • Demoli11 tio11 n I Abatement I Remediation
& ASSOCIATES, Ir1C. P.O. Box 338 • Bay City, MI 48707-0338 ph 989.684,6411 • fax 989.684.6663 • miw.doreassoc com
September 23, 2025
City of South Bend, Indiana, Board of Public Works
227 West Jefferson Blvd.
South Bend, IN 46601
Subj: Qualifications & Experience
To whom it may concern,
Pursuant to the Bid Instructions, Dore & Associates is providing your office with relevant project contact and
brief statement of Dore's experience. Jason C. Dore, President, of Dore & Associates, Inc. is authorized by the
corporation to sign all proposal and bids on behalf of the corporation. Dore's correspondence information is
as follows:
Dore & Associates, Inc. P.O. Box 338, Bay City, MI 48707, Phone: 989-684-8411 Fax: 989-684-6663 Email:
est@doreassoc.com
Dore & Associates is proud of its reputation of 45+ years in the demolition and environmental industry, and is
eager to share its background with potential clients. The management of Dore & Associates has more than
forty years of expertise. Its management has razed over 50,000 structures throughout the United States and
has evolved into a "single source" contractor. Dore has the ability to provide you with a total, comprehensive
and cost-effective package, eliminating the problem of multiple layers of contractors. Our full range of
services includes:
EXPLOSIVE OR CONVENTIONAL DEMOLITION, FLOOR TILE REMOVAL, COMMERCIAL DEMOLITION,
INTERIOR/EXTERIOR RENOVATION, MARKETING/SALES OF USEABLE EQUIPMENT, ENVIRONMENTAL
REMEDIATION, ASBESTOS & LEAD ABATEMENT, SITE EXCAVATION & RESTORING, and MINE & PLANT CLOSURES
Though our main office is located in Bay City, Michigan, satellite offices in Ohio, Pennsylvania and Florida,
enable Dore & Associates the ability to provide services to a diverse geographic business clientele. Should you
need additional information please feel free to contact me or visit our web site at www.doreassoc.com.
Please see Certificate of Insurance & resumes attached. SOM Wrecking License No. 272000038, exp
5/31/2026.
Sine rely,
_ason, ore, Presides
DORE & ASSOCIATES, INC.
b8, ASSOCIATES, iinE
Nationwide Specialty Contractor • Demolition I Abatement I Remediation
P.O. Box 338 • Bay City, MI 48707-0338 • ph 989.684,8411 • fax 969.684.6663 • www.doreassoc.com
May 7, 2020 (Policy Enacted)
Re: HUB, Section 3, MWBE Participation on Projects Awarded
Subj: Corporate Policy
To whom it may concern;
Dore & Associates, Inc. is a nationwide contractor who bids numerous projects throughout the United
States on an annual basis. With this being said, it is Dore & Associates policy and standard practice to
adhere to all goals set forth by various local, State, Federal and private agencies and companies
throughout the United States for Historically Underutilized Businesses, Section 3 Participation (HUD
Funded), Minority Owned Businesses, Women Owned Businesses, Disadvantaged Business, Veteran
Owned Businesses, etc.
When bidding on projects Dore & Associates addresses the goals for various types of participation in the
specification and researches directories available and contacts agencies in the particular locale Dore is
bidding that match our criteria of participation,
Various participation Dore & Associates seeks is as follows:
- Hauling & Disposal
- Suppliers of Safety Equipment
- Supplies of Asbestos Equipment
- HVAC
- Plumbing
- Electrical
- Sand/Gravel/Fill Materials
Dore & Associates realizes participation percentages vary wide throughout the United States but as a
corporation that supports participation from the types of companies stated above, it is our policy to
participate fully and utilize these various firms' services to the fullest.
Th you,
u �,�
Jason_C. Dore
r.
President
7i7s
■
Nationwide Specialty Contractor • Demolition j Abatement I Remediation
P.O. Box 338 • Bay Cdy, MI 48707-0338 ph 989.684.8411 • fax 989.684.6683 • www.doreassoc.com
r - Mfire r r
r
Demolition Management Plan
The following plan is for example purposes only and is not project specific.
Dore & Associates, Inc. (Dore) will perform demolition of (location/description of project)
Following is the planned sequence of demolition:
Section I
Equipment (example — not project specific)
Two (2) 330 CAT excavators
Two (2) 345 CAT excavators
Two (2) Bobcats (skid loaders)
Assorted machine attachments - grapple, concrete pulverizer, hydraulic hammer, scissor lifts
Assorted environmental equipment
Section 2
General Information (not project specific)
a. Dore will obtain all the required state and local permits (i.e. demolition permit, hydrant
permit, etc.) for demolition of buildings as stated above.
b. Dore will make the necessary _ One Call for locating utilities.
c. Dore will hire a certified rodent exterminator for rodent control,
d. Dore will secure the site.
e. Dore will install compost sock and storm drain protection around perimeter of demolition
site to stop any migration of silt onto surrounding properties, or infiltration into storm
drains.
f. Dore will be responsible for disconnecting and capping all utilities necessary.
g. Dore will perform interior demolition in order to access areas for asbestos abatement
and areas with lead contamination.
h. Dore will remove all asbestos, hazardous materials, and lead contaminated materials
from the buildings prior to demolition.
L Dore will clean and neutralize the sulfuric acid inside the storage tanks and dispose of
the tanks.
j. Dore will perform interior clean -out of the buildings removing wood, carpet, paper, etc.
k. Dore will demolish buildings down to slab on grade (or as may be described in project
specifications) and haul away all ferrous and non-ferrous material and demolition debris,
I. Dore will fracture slab on grade to allow for proper drainage.
m. Dore will use existing clean masonry and brick to fill in pits and sumps and to grade to
surrounding grade, only if approved by state DHEC/Permiffing,
n. Dore will suppress dust emissions during demolition by using water form fire hoses
connected to fire hydrants (weather permitting).
o. Dore will implement a recycling program to recycle and document material to maximize
the reuse of material from the demolition.
p. Dore will implement a post project site grading erosion control plan.
Section 3
Project Phases (phases described are not project specific)
Dore will perform demolition in the following phases.
o Phase I — Site Security
o Phase 11 — Environmental Decontamination
o Phase III — Equipment Salvage
o Phase IV — Demolition
o Phase V — Recycling
o Phase VI — Site Grading
Phase I — Site Security
a. Dore will secure the site, restricting access. All employees and visitors must use the
log book (located in the Project Office Trailer) to sign -in and sign -out, and attend a site specific
Safety Orientation,
Phase 11 — Environmental Decontamination
Reference Dore's Asbestos Abatement Plan, Lead Contaminated Material Removal Plan,
and the Hazardous Material Management Plan.
Phase III — Equipment Salvage
Dore employees trained in salvage for reuse will remove any equipment (i.e. transformers,
electrical switch gear, electrical buzz bar, and assorted wiring prior to demolition.
Phase IV — Demolition
1. Dore will ensure all utilities have been capped and disconnected.
2. Dore will perform interior demolition removing as much non -recyclable material as
possible.
3. Demolition of building will begin on east end of plant moving west.
4. Demolition will occur using a 345cat excavator with grapple. The building will be
demolished in manageable pieces, from the roof downward, pulling out predetermined
columns in a manner creating a controlled collapse.
5. Using a 330cat excavator with grapple, Dore will separate non -recyclable material from
concrete and masonry (ferrous and non-ferrous material, any other remaining non -
recyclable debris).
6. Dore will clear building materials, and fracture the concrete slab on grade. This will be
done using an excavator with hydraulic hammer.
7. Dore will backfill and compact voids, pits, and sumps with clean masonry material
installing in 8" lifts.
8. Dore will perform site grading to ensure proper drainage.
Phase V — Recycling
Dore will process and transport materials to a recycling center. All steel will be transported to
a steel mill where it will be melted for reuse.
If any material is deemed non -recyclable, material will be transported to a DEP licensed
landfill.
Phase VI — Site Grading
Dore will haul in clean, compactable soil (if applicable) to fill voids in 8" compactable lifts.
Section 4
Substantial Completion and Demobilization
Thirty days prior to the contract end date, Dore and the owner's representative will walk the
site for the purpose of listing any items that may need to be completed by Dore before the
contract end date.
Dore will demobilize and remove all equipment from the site.
ATTACHMENT 1.a.14.
MANAGEMENT / LEADERSHIP TEAM
DEMOLITION SERVICES
VENDOR NAME. Oo_re and'Assocate , inc ;:'
(Leader/Manager Name
Dernolitlon and Asbestos'Abatement ,
Jason C. Dore
President
30
andBusiness "
A, ministratign/Management.
Arthur M. Dore
Principal '
q
D.amoIWo� and Asbestos,Abatemeat
, and.Chief'Estimator
Edward M. Dore
Treasurer
40,
sbos
Demolition and AestAWi6ient,
and, Chief Superintendent':
Dennis C. Dore
.Secretary
qp
Remo►ition and Asbestos Abatenier t,
and`Waste Maha ement
pcnn al
Jason C. Dore
pres
ident
Contact
PI\Box 338Bay City, MI487O7
989-684-8411
Key Skills
Corporation President
Finance & Investment Expert
Equipment Acquisition Expert
Information Technology Expert
Experience
Jason started working ondemolition and asbestos
abatement ]obxitesinitially, until harealized howould
rather be on the administrative side ofthe family
business, Jason currently oversees all day today
operations atDore & Associates, Inc and helps tP
manage and maintain several administrative avenues
wit hinthe corporation. With over 3Dyears ofFinancial
Management Job Cast, Financing & Investment, and
Equipment Acquisition Experience, heis atrue asset to
the corporation,
| Employer Summary
June /PV/-May 2O2O-Dore & Associates Contracting
hlc.-DenloitionondAsbesfcmAbohvmentYYorkerfrum
91-93. |n93.hebegan his career inAdministration and
began working inthe Finance Department.
May 202O-Current - Dore Associates, Inc, -|naddition hz
the above, Jason balso the corporation's President,
oversees accounts poyob|es/vaceivob|em,personnel
management, building maintenance management and
signs off on all estimations for the corporation.
Education
0 /909-/v92-Western High School -Diploma
0 /Pg3-/V94-Northwood University
° /99J-/p97-Saginaw Valley State University -
Bachelor's Degree - Business Management
Arthur M . Dore
Principal/Chief Estimator
Contact
P.O. Box 338 Bay City, MI 48707
989-684-8411
omd@doreassoc,com
Key Skills
Demolition Expert
Asbestos Abatement Expert
Corporation Principal
Experience
Art has worked for the family business his entire adult life.
Starting as a young man doing any job he could to help out,
he worked his way from the field to supervision to estimating to
his current role as President in 1992, Art manages all aspects of
the company as well as producing project estimates. During
his career Art has obtained immense experience in the industry
and is considered a "Demolition Expert". Many of our
complicated and large projects are directed by means and
methods developed by Art. Dore's commitment to safety and
quality start at the fop of the organization and are constantly
reinforced under Art's leadership,
Employer Summary
1979 - 2020 - Dore & Associates Contracting, Inc, -President of
the company responsible for all day-to-day operations,
2020 - present- Dore & Associates, Inc, - Corporation Principal
and Chief Estimator
2004 -2015 - Hooters Restaurants - Owner of 3 restaurants
located in Bay City, Saginaw and Traverse City, Michigan.
2006 - 2020 - Tri-City Icehawks - Team Owner of Teir 3 Junior A
Hockey Team.
Certifications/ Affiliations
• Georgia Institute of Technology - Asbestos Industry
Practices
• National Demolition Association
• Asset Recovery Association
• Michigan Chamber of Commerce
• National Safety Council
• Bay City Chamber of Commerce
• Michigan Business & Professional Association
Dennis C. Dore
Secretary/Waste Management Director
Contact
P.O. Box 338 Bay City, MI
48707
989-684-8411
Denniscdore@yohoo.com
Key Skills
Demolition Expert
Asbestos Abatement Expert
Waste Management
Corporation Secretary
Experience
Dennis has over 40 years of experience in the demolition
and asbestos abatement fields. He currently oversees all
waste management operations for Dore and Associates,
Inc. Dennis manages a team of operators to maintain
timely and efficient pick-up and delivery of dumpsters; at
each job site. He manages the disposal of friable and
non -friable ACM while maintain compliance with all
federal and state guidelines.
Employer Summary
1981 - 2020 - Dore & Associates Contracting Inc. - Job
site supervisor and handled waste management for the
company.
2020 - Current - Dore Associates, Inc, - In addition to the
above, Dennis is also the corporation's Secretary and
maintains all corporation meeting minutes and other
secretarial duties within the organization.
Certifications /Affiliations
• MIOSHA Accredited Asbestos Supervisor
• CDL
• Aerial Work Platform Permit
• Lead Awareness Accreditation
Edward M. Dore
Treasurer/Chief Superintendent
Contact
Experience
P,O, Box 338 Bay City, MI
Ed began his working career in the family business in 1987
48707
as a laborer and quickly moved to a field superintendent
989-684-8411
in 1989. Advancement to General Superintendent come
emd@doreassoc.com
in 1992 as Dore continued to grow in both the
abatement and demolition divisions. Dore began
offering hazardous waste remediafion in 1993 with Ed
serving as the company's remediotion specialist. A well-
rounded work portfolio in demolition, abatement and
remedlation allowed Ed to take on further responsibilities
of risk management as well as the corporate secretary.
Under the watchful eye and leadership of Ed, Dore has
projects underway in as many as 10 states on any given
day. His ability to manage personnel and Dore's
extensive fleet of heavy machinery has allowed the
company to grow into the industry leader it is today.
Key Skills
Employer Summary
Demolition Expert
1987 - 2020: Dore & Associates Contracting, Inc. -
Asbestos Abatement Expert
Laborer and Superintendent for both abatement and
Corporation Treasurer
demolition. Assumed roles of Risk Manager, corporate
Secretary, and Vice President of Operations. Manages
an extremely talented team of project managers.
Equipment and material logistics.
2020 - current - Dore & Associates, Inc. - Corporation
Treasurer, Chief Superintendent, Risk Management, and
Safety Officer.
Project Highlights
• Viking Die Cost, Kalamazoo, Michigan - Project
Facilitator, Preparation of Work Plan and Health &
Safety Plan. Characterization and verification
sampling. Removal and disposal of hazardous
soils.
° RCS Evans Site, Gagetown, Michigan -Projact
Facilitator, Preparation ofWork Plan and Health &
Safety Plan. Characterization and verification
sampling, Removal and disposal of23.00Otons of
non -hazardous soil and 2'000tons ofhazardous
soil along with building demolition.
° Sunrise Landfill, Ploinwell, Michigan -
Characterization and verification sampling,
Removal and disposal of hazardous and non-
hazardous soil and drums from former landfill.
* Buckeye Oil Field, Gkzdw//n' Michigan -
Characterization and verification sampling, Soil
washing of soil, solidification and hauling o[oil
field contaminated soils. Bookfi||and site
restoration.
° Shzheof/wichigon-Multi-Site-ControotC.
Detroit, Michigan - Asbestos Abatement and
demolition offormer foundry, Chovootadzot|nn
and verification sampling and removal offoundry
sand, DewoterinOofpits and excavations.
Solidification ofsludge material and site
Certifications /Affiliations
* Building Inspector
• Supervision of Asbestos Abatement
° Supervision ofHazardous Waste Remedia#on.
Certificate ofCompletion & Approved Trainer
w Controlled Substance Abuse & Alcohol Misuse
Jeffrey C. Teagarden
VICE PRESIDENT -- SPECIAL PROJECTS
Jeff has provided his immense experience, leadership and impeccable work ethic to the Dore
organization for the past 38 years. Our clients have come to expect a safe and predictable result with
Jeff at the helm. Difficult abatement and demolition projects all over the world have been successfully
completed by Jeff and his resume is second to none in the industry. The challenges of large projects on
tight time lines are all in a days work for Jeff.
EMPLOYER SUMMARY
2022 to Present — Vice President —Special Projects/Senior Project Manager- Organize, plan, schedule
and control field work to expedite large projects to be completed within time and cost limitations.
Direct and coordinate the activities of employees and subcontractors In following the engineer's plans
and specifications. Responsible for ensuring compliance with quality control goals and safety plans.
Empowered for overall responsibility of major projects and exceeding client expectations.
2017 to 2022: Nasdi, LLC - Vice President - Provides leadership and guidance to advance the company's
position in the industry. Develops strategies and tactics to increase revenue profitability and
organization growth. Oversees corporate operations to ensure efficiency, quality and customer service.
Evaluates performance of management and field operations for compliance with policy, procedure and
objectives. Responsible for ensuring compliance with quality control goals and safety.
1986 to 2017: Dore & Associates Contracting, Inc. — Vice President — Special Projects/Senior Project
Manager. Organize, plan, schedule and control field work to expedite large projects to be completed
within time and cost limitations. Direct and coordinate the activities of employees and subcontractors
in following the engineer's plans and specifications. Responsible for ensuring compliance with quality
control goals and safety plans. Empowered for overall responsibility of major projects and exceeding
client expectations.
1984 to 1986: Asbestos Abatement of America, inc. — Operations Manager. Assembled, reviewed and
negotiated government and private contracts. Developed project administration procedures,
implemented safety and training programs for supervisory personnel. Established company procedures
to ensure corporate compliance with applicable safety regulations.
CERTIFICATIONS
University of South Florida, Tampa, Florida
Bachelor of Arts/Business Administration
University of Maryland, Munich, Federal Republic of Germany
Associate in Arts/Business
Qualifier for State of Florida Class "A" General Contractor, C1 C057489
Qualifier for State of Nevada Demolition/Asbestos Contractor 0042942
Qualifier for State of North Carolina General Contractor License 17486
State of Indiana Class "A" Wrecking Contractor W0000150
ON -SITE PROJECT MANAGER, SAFETY REPRESENTIVE
John brings his 20 years of demolition experience to every project he manages and represents Dore's
safety program throughout the Company, John began his career as an Industrial supplier and soon
became directly Involved In safety gear and equipment being properly placed and used on projects, In
2000, John began his "official" safety position as this Important role was beginning to be a focus and
take on more prominence with contractors, Currently John plays a key role here at core as a major
project director and our ornslte safety representative. He Is responsible for consulting on means and
methods used for specific demolition projects, writing and enforcing our safety plan and client
satisfaction. John's strong communication skills allow him to direct the safety effort to ensure Dore
maintains Its stellar safety record.
EMPLOYER SUMMARY
2007 to present: Dore & Associates Contracting Inc. Bay City Michigan - Safety Representative/Project
Manager, Responsible for safety plan and performance, job audits, rigging, site logistics, field crews and
training, Major project Involvement for means and methods resulting In safe demolition practices,
1992 to 2006: Blerlein Companies, Midland Michigan - 1992; purchasing and warehouse coordinator for
construction equipment, safetysupplles and materials, 1994; company Safety Representative
performing safety audits, maintenance of all metering devices, documentation, safety reviews, safety
meetings, and safety plans. 2000; added responsibility of project management for certain projects.
1987 to 1991:1enison Industrial Sales, Bay City Michigan. Sales of Industrial hardware to the
construction, demolition and Industrial markets across the Midwest region.
PROJECT HIGHLIGHTS
State of Missouri — St. Louis Psychiatric Rehabilitation Center, Project Involved removal of asbestos
containing material, PCBs, CFC's and various hazardous wastes prior to complete demolition of a large
patient building, power plant and stack. Mr, Bernelis performed oversight for the safety program,
asbestos abatement and demolition services. Contract amount; $1,290,000.00
Waste Water Treatment Plant, Saginaw Michigan, Safety Representative/Project Manager — Removal of
asbestos containing material, preparation and removal of various Incinerators and large mechanical
components for the Interior renovation. Contract,amount; $112,000,00
Midland Regional Medical Center, Midland Michigan. Safety representative/Project manager — removal
of asbestos containing material from an occupied and functioning hospital, All work was performed in a
strict and regulated fashion to ensure the non•dlsturbance of patients and staff. Contract amount;
$105,000.00
Michigan Sugar Company, Carrollton Michigan, Safety Representative/Project Manager— demolition of
various buildings and structures at the operational sugar processing facility, The client needed several
pieces of manufacturing equipment salvaged for reuse which were located at various locations
throughout the 5 story plant. This requirement resulted in a "surgical" type of extraction and demolition
of the 100 year old structure, The project, which lasted one year, was very successful and 100°%safe,
Contract amount; $2,000,000.00
Ford Motor Company, General Motors, Chrysler Corp, Project Manager and Safety Representative —
various projects within the Midwest,
CERTIFICATIONS
Licensed Asbestos Contractor/Supervisor In Michigan, Ohio, Missouri, Illinois
HAZWOPER Training
Hazard Communication, Lead and Silica
Safe2work Safety Training Program
CPR and First Aid Training
Confined Space and Entry Rescue Training
OSHA 510
OSHA 500
MIOSHA 30 hour
Great Lakes Safety Training Dow Chemical and Delphi Site Clearance Training
Scott Cianek
PROJECT SUPERINTENDENT
Scott has been a key player on the Dore team for over a decade and has been Involved in dozens of
large, complicated projects. Scott has risen through the ranks of our organization staring as a laborer,
and now takes on superintendent duties on abatement and demolition projects throughout the country.
Many projects have seen Scott as the project manager as he continues his professional development at
Dore. A trademark of Scott's projects Is his organizational skills, excellent client communication and
project dellvery within the schedule,
EMPLOYER SUMMARY
2001— present: Dore & Associates Contracting, Inc., Bay City, Michigan —Superintendent and project
management, Responsible for large abatement and demolition projects within the United States,
Project safety plan implementation, field crew supervision, subcontractor management, project
logistics, client meetings and documentation. Since joining Dore as a laborer in 2001, Scott has
successfully completed over 75 projects in over a dozen states.
1991— 2002: 21" Century Tool + Die, Munger, Michigan — Machine Operator. Operated machine tool
equipment, project layout, proto-type, project supervision, shop production, and inventory control,
PROJECT HIGHLIGHTS
Logansport State Hospital, Logansport, Indiana — Multiple buildings of 5, 3 and 2 stories was removed
from the center of this medical campus, in addition, a 150 FT stack from a former boiler was taken
down by hand due to its sensitive location. Over 200,000 SF of structures was Involved in the project.
Contract amount; $1,650,000,00
T,C. Light & Power, Traverse City, Michigan —This water front power producing facility sat near the
historic downtown district. Parts of the plant were disassembled and shipped to Guatamalia for re -use,
The remainder of the site was recycled and properly converted to public green space. Contract amount;
$1,100, 000.00
Champion Paper Company, Hamilton, Ohio - Abatement and demolition of a 3-story,175,000 5F
manufacturing facility, At one point In this structures history, locomotives were produced resulting in
massive below grade concrete machine pads that had to be excavated, The heavy duty building was
constructed of steel and concrete which was recycled and crushed on site, Contract amount;
$625,000.00
YMCA, Port Huron, Michigan — As part of a 4 building abatement and demolition project, the 5-story,
riverfront structure was demolished and returned to green space, This building was a community
landmark for decades. Along with this building, a large jail facility and 2 administrative buildings were
also removed, Contract amount; $615,000,00
Indiana University, Gary, Indiana — In the center of campus was a fine arts and administration building
that were 4 stories tall requiring a "surgical" type extraction, The land was reverted back to green space
for the University, Not only was this project 100% safe, It was on time and within budget, Contract
amount; $650,000,00
Detroit Foundry, Detroit, Michigan — Extensive environmental clean-up was Involved with this
demolition of the 200,000 SF Industrial structure. Over 60,000 cubic yards of foundry sand had to be
remedlated along with asbestos containing materials, The site was one of 4 projects removed for the
City of Detroit under the same contract, All sites were returned to green space, Contract amount;
$ 2, 000, 000,00.00
CERTIFICATIONS
40-hour Haa-wopper
Confined Space Training
CPR/First Aid
Asbestos Abatement Supervisor- Licensed in Multiple States
OSHA 30 Hour
Storm Water Management
ABATEMENT PROJECT MANAGER
Dan started his career in the asbestos abatement Industry as a laborer in 1988. He has learned this
business from the ground up and has become an "expert" in the field. Dan advanced within the
company as his skills grew and quickly became a supervisor in 1989, Now with 100 projects to his
record, Dan is our most seasoned and respected abatement project manager. Dan is known for
demanding excellence and performance from his team and keeps a rigorous schedule to ensure safe and
on -time results for Dore and our clients.
EMPLOYER SUMMARY
1988 to present: Dore & Associates Contracting, Inc., Bay City, Michigan — Project Manager/Abatement
Speciailst. Responsible for all aspects of commercial/industrial abatement projects Including; safety
program enforcement, scheduling, field staff, training, equipment, documentation and disposal,
Experienced demolition project management on various projects within the United States,
1983 to 1988: US Army, Fort Brag, North Carolina, Berlin, Germany —Computer Technician for historical
and administrative support, honorable discharge.
PROJECT HIGHLIGHTS
Fairview Gardens, Warren, Ohio —Asbestos Abatement of 18 apartment buiidings in preparation for
demolition, Contract amount: $850,000.00
Mercy Hospital, Joplin, Missouri —Asbestos Abatement of an 8-story, tornado -damaged hospital
structure. The remaining structure was demolished. Contract amount: $728,000,00
Industrial Warehouse, Berwick, Pennsylvania — Asbestos Abatement of a 75,000 SF warehouse In
advance of demolition. Contract amount; $264,000=
Springfield High School, Akron, Ohio — Asbestos Abatement of a large high school In preparation of
renovation. Contract amount: $400,000,00
General Motors Plant, Dayton, Ohlo —Asbestos Abatement of 1,000,000 SF retired auto plant in advance
of demolition, Contract amount; $3,000,000.00
Prudential Building, Chicago, flllnoIS— Asbestos Abatement of a downtown landmark skyscraper to
prepare for renovation, Contract amount; $1,700,000,00
CERTIFICATIONS
Asbestos Hazard Abatement Specialist Certification — Ohio
Asbestos Professional license — Illinois, Missouri
Asbestos Project Supervisor License — Indiana
Asbestos Contractor/Supervisor Accredited — Michigan
Pennsylvania Asbestos Certification
Environmental Safety Training Center, Regulation Exam — Missouri
40 —Hour Hazwopper Training
Confined Space Training
OSHA 30 Hour'Training
CPR/First Alr/AED Adult
Scaffold Training
WEINLANDER FITZHUGH
DORE & ASSOCIATES, INC.
BAY CITY MICHIGAN
FINANCIAL STATEMENTS
DECEMBER 31 2021
Current
NA_,a,
Nationwide Specialty Contractor
• Demolition I Abatement ( Remedia ton
CURRENT PROJECTS `1ATE i a P.o. Box 338. By City, MI 48707-0338 • Ph 989
.6&3.8411 fax 989.&84.6663 3• www.doreassoc.com
Description of Project
Duration of Project
Reference Contact Info
Location
Contract Amou1111111nt
Project Name
Rock County Purchasing
Janesville,
$406,088.00
Demo Rock County Jail
Start 4/27/2022
Rock County Jail
Division
Wl
Estimated Completion
51 S. Main St.
1/15/2025
Demo
Janesville, WI 53454
Brad Kwasny
-
Contract Amount
Descri tion of Prajeil
p
Duration of Project
Project Name
Reference Contact Info
Location
$ 287,700.00
Demo Midland County ESA
Start ?
Midland County ESA
Midland County
Midland, MI
End ?
3917 Jefferson Ave.
Demo
Midland, MI 48640
Thom Laney
tlaney@trccompany.com
Description of Project
Duration of Project
Reference Contact Info
Location
Contrail Amount
?
Project Name
The City of Bay City
Bay City, MI
$324,800.00
Demo
Treatment Plant
Bay City WWTP
Wastewater
Demo
301 Washington Ave.
Trickling filter
-
Bay City, Ml 48708
Susan Carmien
989-894-8115
scarmie n@ baycitymi.gav
1
Current
Contrail Amount
Description of Project
P
Duration of Project
project Name
Reference Contact Info
Location
$,853,744
1
Demolition
Start 6/16/2025
Atherton Apts
Flint Housing Commission
Hint, MI
Atheronton East bldg Apts.
3820 Richfield Road
Demo
Flint, Ml 48506
Doug Peters
dpeters@fiinthc.org
810-736-3134
Contract Amount
Description of Project
Duration of Project
Reference Contact info
Location
Project Name
Demolition
93%Completed
Demo 5580 Lancaster Rd.
Croswell, Ml 48422
City Hall
Croswell, M4 $262,950.00
5580 Lancaster Rd.
100 N. Howard Ave.
Croswell, MI 48422
-
Croswell, MI 48422
Joseph Benjamin
jbenjamin@fveng.com
616-977-1000
Contract Amount
Description of Project
Duration of Project
Reference Contact Info
location
Project Name
Ellwood City Area School
Ellwood City,
$722,900.00
Asbestos Abatement
10% Complete
AA Lincoln High School
i Dstrict
PA
Lincoln High School
Start Date 4(8/2025
501 Crescent Ave.
501 Crescent Ave.
501 Crescent Ave.
Estimated Completion
Ellwood City, PA 16117
Ellwood City , PA 16117
Ellwood City, PA 16117
6/1/2026
ScottKorba
info@novaenvsol.com
412-939-1622
Contract Amount
Description of Project
Duration of Project
Reference Contact Info
Location
Project Name
Mount
Demolition
0% Complete
Demo CMU Northwest
Central ntral Michigan University
Pleasant, MI $2,658,570.00
Northwest Apartments
300 W. Bellows Street
1204 S. Franklin Street
300 W. Bellows St.
Mount Pleasant, Ml 48858
Mount Pleasant, Ml 48859
Mount Pleasant, MI 48858
Conor Bradley
-
cbradley @ cla rkcc.com
2
Completed
COMPLETED PROJECTS
Nationwide Specialty Contractor • Demolition j Abatement I Remediation
& A550GlATes. m'1C. P.Q. Box 338 •bay City, M148747 {?338 • ph 989.684.8411 -fax 989.584.6663 • wNrw_dareassoc.cam
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Ball State University
Ball State University
Muncie, IN
$3,390,360.00
Abestos/Haz Abatement
Start 7/7/2022
Abestos/HazMat
2000 W. University (AD208)
& complete demolition
Completed 2023
Abatement and Complete
Muncie, IN 47306
LaFollete Complex & Site
Demolition of LaFollete
Ryan Koenker
Restoration - EX 32,345 SF
75% Dore Workforce
Complex Phase 3
Phone: 765-285-5082
Asb Floor Tile 12,920 SF
Carpet
rrkoenkerPbsu.edu
Thermal Insulation, ect.
100,000 SF Bldg
Project Name
Reference Contact info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement &
City of Three Rivers
Three Rivers, MI
$848,600.00
Asbestos Abatement &
Start - 7/2022
Complete Demolition
333 West Michigan
Demoliton of 5 Story (approx.
55,000 SF Bldg(s) attached
Completed 4/2023
of Old Three Rivers
Three Rivers, MI 49093
Switched to ordered
Hospital
Contact. David A. Stegink, VP
Demo 9/2022
Envirologic Tech- Project
100% Dore Workforce
Manager
269-615-1009
dstep,ink(@fishbeck.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
New Bloomington Demolition
Marion County
New Bloomington,
OH
$241,241.00
Ordered demolition of old
Start-12/1/2022
115 N. Street
222 West Center Street
school building
100% Complete
Marion, Ohio 43302
Completed-1/20/2023
Rich Fender, Regional Planning
25% Dore Workforce
740-223-4140
Completed
rfender@co.marion.oh.us
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project'
Duration of Project
AA 720 Fuller Ave & Demo 1101 Ball
Ave.
County of Kent
Grand Rapids, MI
$498,800.00
Demolition of building and all
other structures located at
Start Date 12/6/2023
Grand Rapids, MI
300 Monroe Ave.
720 Fuller Ave., & 1101 Ball
Ave.
Grand Rapids, MI 49503
NE, Grand Rapids, MI 49503
Calvin Brinks
Completion Date
purchasing@kentcountvmi.gav
1/31/24
616-632-7720
Project Name
Reference Contact info
Location
Contract Amount
Description of Project
Duration of Project
Demolition of Niles Theatre
Trumbull County
Niles, OH
$340,800.00
Demo and AA of Niles
Theatre
Start Date-11-27-2023
42-46, 54-58
736 Mahoning Ave.
and connected buildings
South Main St.
Warren, OH 44483
completion date
Niles, OH
330-469-6828
1/31/2024
Ashley Yuhasz
ashley(cEitnpwarren.org
100% Dore Workforce
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Richland City Jail Interior
County of Richland
Mansfield, OH
$262,705.00
Demolish Interior of Existing
Jail
Start - 12/13/2021
Demolition
50 Park Ave. East
within the Courthouse &
leave
Completed April 2022
Mansfield, OH 44902-1896
workspace ready for future
100% Complete
Contact: Alvin J. Berger, PE
renovations
419-564-1644
95% Dore Workforce
aberggrt@aib-eng,com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition of the 1936 Girls
City of Cave Springs
Cave Springs, GA
$147,100.00
Complete Demolition
Start -1/19/2022
Dormintory- Former
10 Georgia Ave.
and Site Restoration of
Completed April 2022
GA School of the Deaf
Cave Springs, GA 30124
Former Girls Dormitory
100% Complete
Completed
Project Name
Demolition of Two (2)
Residential Houses
project Name
Demolition
PRMX Elementary School
Project Name
Asbestos Abatement & Demolition
CCA Elem Sch
1200 Chess Street
Monongahela, PA
project Name
Demolition of Vincetian Academy
8100 Mcknight Rd.
Pittsburgh, PA
Contact: Joe Watkins, Architect
email@carterwatkins.com
Reference Contact Info
City of Bay City
;;301
asing Office, Room 402
Washington Ave.
Bay City, MI 48708
Contact: Susan Carmien
989-894-8115
scarmientasbavcitvmi.ore
Reference Contact Info
Detroit Public Schools
Community District
Erich Watry
248-924-5092
ewatry@rockfordconstruction.co
m
Reference Contact Info
Commonwealth Charter
Academy
One Innovation Way___
R
g, PA 17110 Rosky38-4086annol.comContact Infontracting &ental Servicescknight Rd.gh, PA 15237
Chris Sciulli
412-939-1622
Location I Contract Amount
Bay City, MI 1 $21,600.00
Location i Contract Amount
Detroit, MI 1 $582,300.00
Location Contract Amount
Mononhahela, PA $1,224,600.00
Location Contract Amount
Pittsburgh, PA $575,000.00
Description of Project
Demolition of Two (2)
Residential
Houses - 2322 Fitzhugh &
150911th St.
Description of Project
Building Demolition
Description of Project
Asbestos Abatement and
Demolition
Elementary School
Description of Project
Demo and AA
Vincentian Academy
85% Dore Workforce
Duration of Project
State - 12/20/2021
Completed April 2022
100% Complete
100% Dore Workforce
Duration of Project
3/3/2025
l00% Dore Workforce
Duration of Project
4/17/23 -
100% Dore Workforce
Duration of Project
Started October'23
In progress
Completion
c,nrine '24
3
Completed
novae i a msn.com
Demolition of former YMCA
City of Clinton, IA
Clinton, IA
$426,000.00
Removal/Disposal of
Structures
1/13/25 - 3/31/25
480 S. Clinton St.
611 S. 3rd St.
Clinton, IA 52732
Clinton, IA 52732
100% Dore Workforce
Jason Craft
563-244-3423
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demo Bob's Bar
Board of the County Road
Commissioners, County of Bay,
Michigan
Bay City, MI
$33,900.00
Demolition
8/8/23
509 N. Tuscola (M-15) Hampton
Township
2600 East Beaver Rd.
Bay City, M148708
Kawkawlin, M148631
100% Dore Workforce
Jim Lillo
989-686-4610
jlillo@baycoroad.org
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demo 2862 Stone School Rd.
Ann Arbor Public Schools
Ann Arbor, MI
$176,300.00
Demolition
100% Dore workforce
Ann Arbor, MI 48104
2555 South State Street
2862 Stone School Rd.
Ann Arbor, MI 48104
Ann Arbor, MI 48104
Steve Koop
skoop@clarkcc.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demoliton of Central High
Champaign Unit 4 School District
Champaign, IL
$654,930.00
Demolition of High School &
150'
7/15/2020-11/6/2020
School
703 South New Street
Stack superstructure &
foundation
Champaign, IL 61820
elements & restoration of
ground surface
80% Dore Workforce
Cory Hoke
chokena osheabuilders.com
217-210-0174
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Completed
Asbestos Abatment at
Lincoln Park Schools
Lincoln Park, MI
$1,089,450.00
Asbestos Abatment at
Crowley &
5/20/2020 - 8/7/2020
Crowley & Mixter Elementary
1650 Champaign
Mixter Schools
Schools
Lincoln Park, MI 48146
100% Dore Workforce
Ron Revoir
(313)363-0506
Ronald. Revoiraa)I p�s.info
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition
Marquette Land Bank
Marquette, MI
$582,300.00
Demolition
Start
Former National Mine School
234 W. Baraga Ave.
National Mine School
End-12/31/24
800 County Rd.
Marquette, M149855
100% Dore Workforce
Ishpeming, MI 49849
Anne Giroux
agiroux@mqtco.org
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition of
NOVA Contracting &
Environmental Services
Duquense, PA
$284,300.00
Demolition
Start January 2023
708 Duquense Blvd.
4550 McKnight Rd.
Duquense, PA 15110
Pittsburgh, PA 15237
100% Dore Workforce
Chris Sciulli
novaesi@msn.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
AA & Demo Bishop Hall
Ferris State University
Bid Rapids, MI
$487,400.00
Asbestos Abatement &
Demolition
100% Complete
1349 Cramer Circle
111 W. Knollview
Bishop Hall
Bid Rapids, MI 49307
Big Rapids, MI 49307
1349 Cramer Circle
Evan Misener
Bid Rapids, MI 49307
630-956-6254
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition
City of Bay City
Bay City, MI
$19,300.00
Demolition
Start
Wastewater Treatment Plant
301 Washington Ave.
WWTP Generator
Replacement
End
Bay City, MI 48708
1001Y. Dore Workforce
Susan Carmien
Completed
989-894-8115
scarmien@baycitymi.gov
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
AA Ryder Center
Saginaw Valley State University
Saginaw, MI
?
Asbestos Abatament
Starts 5/15/2024
7400 Bay Rd.
7400 Bay Rd.
Ryder Center
University Center, MI 48710
University Center, MI 48710
7400 Bay Rd.
Michael Pazdro
University Center, MI 48710
989-964-4841
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
INDUSTRY Detroit - Interior Selective
Demolition
Makers Line, LLC
Detroit, MI
$1,828,915.00
interior Demolition of
Multi -Store Building
May-21
3001 Brighten Blvd.
Complete
Denver, CO 80216
Phased Work
Emily Hayter
Estimated Completion
emily()makersline_com
July, 2023
100` a Dore Workforce
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
City of Akron - 655 Broadway
City of Akron (OH)
Akron, OH
$221,700
Asbestos Abatement and
August 2023 to
Demolition Project
166 S. High Street
Demolition
October 2023
Akron, OH 44308
Victor Botosan, Operations
Support
25% Dore Workforce
City of Akron (OH)
330-375-2355
akronengineeringPakronohio.eo
v
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Commonwealth Charter
Commonwealth Charter
Monongahela, PA
$1,534,153
Asbestos Abatement in old
Start - 4/17123
Academy
Academy
elementary school and
demolition
10% complete
Asbestos Abatement and
One Innovation Way
of one of the buildings onsite
Estimated Completion
of
Demolition
Harrisburg, PA 17110
Univ Waste also present
7/31/2023
Completed
Nick Rosky, Project Manager
Shannon Construction
100% Dore Workforce
412-977-6231
nickCd)shannonl.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Clinton, IA - 212 4th Ave. Demo
City of Clinton (Iowa)
Clinton, IA
$195,700
Demolition of old pool hall
Start - 4/30/23
611 S. 3rd Street
Estimated Completion
Clinton, IA 52732
6/30/2023
City of Clinton - Eng. Dept.
Leah Woods
563.244.3423
100% Dore Workforce
IeahwoodsCx?cityofcHntoniowa.us
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Main Street, Greenville
City of Greenville
Greenville, PA
$238,290.00
Demolition of old store -front
98% Complete
Demolitions
125 Main St.
buildings; weather-proof of
May, 2023
(seeding/grading)
132 & 173-175 Main St.
Greenville, PA 16125
adjoining wall not
demolished
Kevin Creagh, Engineer
KLH Engineers, Inc.
85% Dore Workforce
(412) 494-0510
kcreagh(@klhen ig neers.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
City of Midland Currie Stadium
Demolition
City of Midland
Midland, MI
$83,000.00
Complete demolition of old
Start-11/10/2022
1300 W. Main St.
333 W. Ellsworth St.
stadium; salvage of cement
pillars
Midland, MI 48640
Tyler Abbs, Facilities Manager
Estimated Completion
989-837-3370
May, 2023
(seeding/grading)
tabbsPmidland-mi.org
100% Dore Workforce
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project I
Duration of Project
Completed
Demolition
Vanlandingham Carol 1
Bay City, M1
$16,800.00
Demolition
Start - 4/30/2023
2683 Royal Oak Dr.
611 S. 3rd Street
Estimated Completion
Bay City, M148707
Clinton, IA 52732
6/30/2023
David Degrow
989-684-7203
dave@degrow.com
100% Dore Workforce
Project Name
Reference Contact info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement
Kraemer North America
Bay City, MI
?
AA Independence Bridge
Start March 2023
Independence Bridge
100% Dore Workforce
Brent Freeman / Kevin Kruger
bfreeman@kraemerna.com
kevin.kruger@gcinc.com
608-434-4713
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement &
Rock County Courthouse
Janesville, WI
$424,600.00
Asbestos Abatement &
Start 2024
Demolition of Rock County
Purchasing
Demolition of Rock County
Jail & LES
51 South Main St.
Jail & LES
% Complete
Janesville, WI 53545
Complete Removal of
Ben Bobzien, PM
Pinehurst Bldg.
Completion
1P Cullen - General Contractor
Sanitorium - ACM/Haz.
608-751-8733
Mat. - Rock County Jail &
ben.bobzien@jpcullen.com
LES
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Centerline Public School
Centerline Public Schools
Center Line, MI
$243,258.00
Asbestos Abatement &
Start 9/2022
Asbestos Abatement &
Admininistration Building
Demolition of Central Office
Selective Demolition at
26400 Arsenal
95% Complete
Central Office
Center Line, MI 48015
Estimated Completion
Kara & Tyler Lenling
2024
Consultant -TEK Environmental
Phone: 734-878-5588
100% Dore Workforce
der@ tekenvironmental.com
kara@tekenvironment�l.cam
Completed
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement
Mechanicsburg Area School
Mechanicsburg,
PA
$407,623.00
Asbestos Abatement at
Start 6/28/2022
Mechanicsburg Area
District
Mechanicsburg Area High
High School
600 South Norway St., 2nd Fi
School
80% Complete
Mechanicsburgh, PA 17055
Full Completion - 2024
J. Brian Haines, AIA, LEED AP
Crabtree, Rohrbaugh & Assoc.
100% Dore Workforce
Architects
717-458-0272
BHainesCeDcra-architects.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
AA Potter Elementary School
Flint Community Schools
Flint, MI
$493,600.00
AA removal
Start Date-11-20-2023
2500 N_ Averill Ave.
923 E. Kearsley St.
Phased job
Flint, MI
Flint, MI 48503
completion date
Roosevelt Austin 111
1/31/2024
rosevC& a rchenverouo.com
248-426-0165
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Roscommon Range
DTMB, state of Michigan
St. Helen, MI
$84,700.00
Contract #Y24002
September -
Demo and AA
Brian Watkins
Demo, AA amd UST
Removal
November 2023
PO Box 30026
Complete
Lansing, MI 48821
517-242-7882
100% Dore Workforce
watkinsbl@michigan.gov
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Former First Merit Plaza
Redevelopment Building Authority
of Lawrence County
New Castle, PA
$624,600.00
Demo and Abate Former First
Merit Plaza
start 9/18/2023
Demo AA
400 Court St.
5 story Bldg with basement
100% Complete
New Castle, PA
Phased work
Amy Mckinney
Estimated completion
amckinneyCc7lawrencecountyaa.gov
April, 2024