Loading...
HomeMy WebLinkAboutOpening of Bids - Cleanup of South Bend Range, Phase Proj No 125-020AR - Dore & AssociatesCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Cleanup of South Bend Range, Phase I Project No. 125-020AR For Bids Due Tuesday, September 23, 2025 @ 9:00 A.M. (E.D.T.) PART I (Must be completed for all bids. Please type or print) Date: 9/23/2025 Bidder (Firm): Dore & Associates, Inc. Address: PO Box 338 City/State/Zip: Bay City, MI 48707 Telephone Number: ( 989 ) 684-8411 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Cleanup of South Bend Range, Phase I — Building Demolition [Rebid] the City of South Bend, Indiana, in accordance with plans and specifications prepared by: City of South Bend, Enqineerinq Division and dated 08/29/2025 for the sum of (enter the Total Bid as shown on the Proposal) Five hundred seventy five thousand dollars and no / 100 ($ 575,000.00 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City_ -of -South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a se )ara_ t�e�ch�_._ B - _ (Signature) J son C. Dore, President (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member 23rd day of September 20 25 Joseph R. Molnar, Vice President Breana N. Micou, Member Murray L. Miller, Member Attest: Hillary Horvath, Clerk Version 07/19/2023 Contractor's Bid for Public Works - 2 SpL� I l3 L j CITY OF SOUTH BEND, INDIANA iee CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Cleanup of South Bend Range, Phase I Project No. 125-020AR For Bids Due Tuesday, September 23, 2025 @ 9:00 A.M. (E.D.T.) From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check x or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely x executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments x with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and x WBE-2.1]. x Acknowledge Receipt of Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Dore & Associates, Inc. By Authorized RepresentatiGe Signature: r— Print Name & Title: Jason C. Dore, President Date: 9/23/2025 Version 07/19/2023 Contractor's Bid for Public Works - 1 Document A31 OTM -2010 Bid Bond CONTRACTOR: Name, legal status and address) DORE & ASSOCIATES, INC PO Box 338 Bay City, MI 48707 OWNER: (Nante, legal status and address) City of South Bend, Indiana, Board of Public Works 227 West Jefferson Blvd South Bend, IN 46601 SURETY: (Name, legal status and principal place of business) NGM Insurance 100WSt Keene, NH 03431 BOND AMOUNT: FIVE PERCENT OF ATTACHED BID (5%) This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. PROJECT: 125-020AR Demolition & clean up of South Bend Range, Phase 1 located at 133 Cherry St., South Bend, IN 46601 (Name, location or address, and Project number, if an)) The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (I) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 23rd day of September (Witness) Dennis a ecretary (Witness) 2025 . 1,17 tdpa�i)DO & AT ES, INC (Seal) "l ••vme. Tide Jas a�_ .orePreside _ ) L_�.Df ` UaOF (Surety) NGM Insurance (` 1923 (Name & Tide) Michael G. Zervos , ATTORNEY -IN -FACT AIA Document A310 T"' - 2010. Copyright C 1963, 1970 and 2010 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Init. Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce tcn (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, c-mail The American Institute of Architects' legal counsel, copyright@aia.org. 061110 CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured STREETMAIN "ER" INSURANCE POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That NGM Insurance Company, a Florida corporation having its principal office in the City of Jacksonville, State of Florida, pursuant to Article IV, Section 2 of the By -Laws of said Company, to wit: "Article IV, Section 2. The board of directors, the president, any vice president, secretary, or the treasurer shall have the power and authority to appoint attorneys -in -fact and to authorize them to execute on behalf of the company and affix the seal of the company thereto, bonds, recognizances, contracts of indemnity or writings obligatory in the nature of a bond, recognizance or conditional undertaking and to remove any such attorneys -in -fact at any time and revoke the power and authority given to them. " does hereby make, constitute and appoint Gus E. Zervos, Karen Guthrie, Michael G. Zervos, Stephanie A. Dinco, Stephen M. Zervos its true and lawful Attorneys -in -fact, to make, execute, seal and deliver for and on its behalf, and as its act and deed, bonds, undertakings, recognizances, contracts of indemnity, or other writings obligatory in nature of a bond subject to the following limitation: 1. No one bond to exceed Five Million Dollars ($5,000,000) and to bind NGM Insurance Company thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of NGM Insurance Company; the acts of said Attorney are hereby ratified and confirmed. This power of attorney is signed and sealed by facsimile under and by the authority of the following resolution adopted by the Directors of NGM Insurance Company at a meeting duly called and held on the 2nd day of December 1977. Voted: That the signature of any officer authorized by the By -Laws and the company seal may be affixed by facsimile to any power of attorney or special power of attorney or certification of either given for the execution of any bond, undertaking, recognizance or other written obligation in the nature thereof; such signature and seal, when so used being hereby adopted by the company as the original signature of such office and the original seal of the company, to be valid and binding upon the company with the same force and effect as though manually affixed. IN WITNESS WHEREOF, NGM Insurance Company has caused these presents to be signed by its Secretary and its corporate seal to be hereto affixed this 9th day of October, 2024. it NGM INSURANCE COMPANY By: t State of Wisconsin, Lauren K. Powell County of Dane. Vice President, Corporate Secretary On this 9th day of October, 2024, before the subscriber a Notary Public of State of Wisconsin in and for the County of Dane duly commissioned and qualified, came Lauren K. Powell of NGM Insurance Company, to me personally known to be the officer described herein, and who executed the preceding instrument, and she acknowledged the execution of same, and being by me fully sworn, deposed and said that she is an officer of said Company, aforesaid: that the seal affixed to the preceding instrument is the corporate seal of said Company, and the said corporate seal and her signature as officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Company; that Article IV, Section 2 of the By -Laws of said Company is now in force. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at Madison, Wisconsin this 9th day of October, 2024. My Commission Expires May 21, 2027 €: Q°TRe" gyam. J80 r I, Nathan Hoyt, Assistant Vice President of NGM Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by said Company which is still in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company at Madison, Wisconsin this 23rd day of September , 2025 0�7R)R 114� — I Nathan Hoyt Assistant Vice President WARNING: Any unauthorized reproduction or alteration of this document is prohibited. TO CONFIRM VALIDITY of the attached bond please call 1-603-354-5281. TO SUBMIT A CLAIM: Send all correspondence to 55 West Street, Keene, NII 03431 Attn: Bond Claim Dept. or call our Bond Claim Dept. at 1-603-358-1437. PART KU (For projects of$1UO.O0Oormore —IC3S-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its, bid. Attach additional pages for each section aaneeded. SECTION | EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior tothe date ofthe current bid. 2. Attach alisting ofpublic works projects curpent|y|npnocaeoofoonmtruotionbvyour organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION UPLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach on explanation of your plan or layout for performing proposed work. (Examples could include o narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City ufSouth Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed port of the work) that you have used on public works projects during the past five (5) years along with obrief description ofthe work done bveach subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each auboontrauLor, equipment to be used by the gubcortraotor, and whether you will require a bond. Hovvever, if you are unable to currently provide e |istinQ, please understand a listing must beprovided prior tocontract approval. Until the completion ofthe proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use msubcontractor onthe proposed project. 4. Attach a|isting of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach on explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project ifovvordad. VosionU78Q/2O23 Contractor's Bid for Public Works '3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Michigan ) ) SS: Bay COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: I. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended frorn time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 07/19/2023 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 07/19/2023 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 23rd day of September 20 25 Subscribed and sworn to before me this 23rd My Commission Expires 06/27/2031 County of Residence Dore & Associates, Inc. Contractor/Bidder,(Firm) signature r o1, Cont ctor/Bidder or Its Agent Jason C. Dore, President Printed Name and Title .day of September 20 25 1v i ��i,V 1 t'��tq - Notary �Ptkic Kylie R. Dore rP KYLIE R. DORE NOTARY PUBLIC, STATE OF MICHICAN COUNTY OF BAY My Commission Expires 06-27-2031 Acting t : a C�,mry of Version 07/19/2023 Contractor's Bid for Public Works - 6 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Cleanup of South Bend Range, Phase I Project Number: 125-020AR For Bids Due: Tuesday, September 23, 2025 @ 9:00 A.M. (E.D.T.) Contractor Name: Dore & Associates. Inc. BASE BID Item No. Description Quantity Unit Unit Price Total Amount Lump Sum price to complete building 1 demolition, asbestos abatement, and 1 LSUM $540,000.00 fence removal and replacement as intended by these Specifications 2 Environmental Allowance 1 LSUM $25,000 $25,000 3 Crate Allowance 1 LSUM $10,000 $10,000 BASE BID TOTAL $575,000.00 Bidder (Firm): Dore & Associates, Inc. Address: PO Box 338 City/State/Zip: Bay City, MI 48707 Telephone Number: 989 684-8411 By (Signature) Jason C. Dore, President (Printed Name of Person Signing) Version 07/19/2023 Contractor's Bid for Public Works - 7 CITY OF SOUTH BEND' MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: 125-020AR Project Name: Cleanup of South Bend Range, Phase I Bidder: Dore & Associates, Inc. Base Bid Amount: $575,000.00 MBE Goal: 1.3% Page of Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1st Class Logistics, LLC. Bernard Coutee 574-993-0071 Trucking/HaulingcJ% $28,750.00 Submitted by: Jason C. Dore, President ` Print Name Sign ure ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works - 8 9/23/2025 Date LTH Qom. CITY OF SOUTH BEND` MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN '� ?r' FORM WBE-1.0x- WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: Bidder: 125-020AR Project Name: Cleanup of South Bend Range, Phase I Dore & Associates, Inc. Base Bid Amount: $575,000.00 WBE Goal: 4.7% Page of Name & Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal 5% Submitted by: Jason C. Dore, President Print Name 9/23/2025 Sig.. ture Date ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works - 9 7_ CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: —1 26-020AR Date: 9/2312025 Project Name: —Cleanup of South Bend Range, Phase I Bidder: Dore & Associates, Inc. Contact Person: Jason C. Dore, President Address: PO Box 338 Telephone: 989-684-8411 City: Bay City State: Michigan Zip: 48707 Email: est@doreassoc.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: tla://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of X Indiana Minority and Women Business Enterprises, found on their website (hftp://www.in.gov/idoa), I affirm that I have made good faith efforts to select portions of the contract work to be X performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available X means the interest of all MBEs in the scopes of work of the contract. X I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications X concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner X reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. X I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs X with adequate information about the plans, specifications and other requirements of the subcontract. X I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 07/19/2023 Contractor's Bid for Public Works - 10 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS X I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based x on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. "Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works - 11 f,`/z�yL Ott xF CITY OF SOUTH BEND�i MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN �4 FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 125-020AR Date: 9/23/2025 Project Name: Cleanup of South Bend Range, Phase I Bidder: Dore & Associates, Inc. Contact Person: Jason C. Dore, President Telephone: 989-684-8411 Address: PO Box 338 City: Bay City State: Michigan Zip: 48707 Email: est@doreassoc.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: hftp://www.in.22v/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise X Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be X performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. X I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. X I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications X concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner X reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. X I affirm that I followed up on initial solicitations with interested WBEs. X I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. X I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 07/19/2023 Contractor's Bid for Public Works - 12 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested WBEs in obtaining X necessary equipment, supplies, materials, or related assistances or services, where appropriate. X I affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works - 13 CITY OF SOUTH BEND AM — '. MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN �F FORM MBE-2.1 N1 . MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 125-020AR MBE Participation Goal 1.3% Project Name;--) Cleanup of South Bend Range, Phase I Bidder: Dore & Associates, Inc. By:' _ r - President 9/23/2025 nature) - _ ' (Title) (Date) MBE Firm 1st Class Logistics, LLC. Owner or Contact at MBE Firm Bernard Coutee Telephone: 574-993-0071 Fax: Email: lstclasslogistics20l3@gmail.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Trucking/Hauli RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 07/19/2023 Contractor's Bid for Public Works - 14 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 125-020AR WBE Participation Goal 4.7% Project Name: Cleanup of South Bend Range, Phase I Bidder- -Dore &Associates, Inc. By: :�'. �� President 9/23/2025 (Signature) (Title) (Date) WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: Trucking/Hauling RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 07/19/2023 Contractor's Bid for Public Works - 15 ACCW?ff CERTIFICATE OF LIABILITY INSURANCE DATE(MWDOIYWY) 9116/2024 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the poilcy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement On this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER ArthurJ. Gallagher Risk Management Services, LLC Hampton Place Saginaw MI 48604 gMTE CT Lisa Stoner PHONElAtC. $04-$75•$395 F No:9$9-607.6$O2 E-MA5311 ADDRESS: Iisa stoner a" .com INSURER S) AFFORDING COVERAGE NAIC A INSURER A: Nautilus Insurance Company 17370 LI en3 f!: R- 7 1 INSURED DORE&AS-02 Dore & Associates Inc. INSURER a : AmeriSure Insurance Company 19488 JNSURER c: Great Divide Insurance Company 25224 P.O.Box 338 INSURER D: CNA Insurance Companies 20435 Bay City, Mi 48707 INSURER E : INSURER F : c:UvtKACUtb CERTIFICATE NUMBER* 711-123d7R+S REW!S!0M tVi MPER- THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INTR TYPE OF INSURANCE A POLICY NUMBER MMJDUm F POLICY EXYPY LIMITS A X COMMERCIALGENERALLIABILITY CLAIMS -MADE o OCCUR ECP203SO2913 9/16/2024 9116/2025 EACH OCCURRENCE 52,000,000 A A (a TEU- PREMISESS(Ea occurrence) occurratca) $T00,000 X MED EXP (Arty one person) S 5,000 10.0D0 PERSONAL & ADV INJURY S 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: X POLICY � JECT LOC GENERAL AGGREGATE $2,000,000 PRODUCTS -COMPIOP AGO $2,000,000 S OTHER: 6 AUTOMOBILE LIABILITY CA21251830007 1130/2024 113012025 EOMBINED a accident)SINGLE S T,000,000 ANY AUTO BODILY INJURY (Per person) 5 OWNED SCHEDULED AUTOS ONLY AUTOS 6001LY INJURY {Per atsJdOnt) $ X AUTOS ONLY X ALITOS VNLDY P r dnt)PROPERTYOAMAHIRED __.....___._. $ A X UMBRELLAUAB X IOCCUR FFX203583013 9/16/2024 9116/2025 EACHOCCURRENCE $10,000,000 EXCESS UAB CLAIMS -MADE AGGREGATE 510,000,000 DED I I RETENTIONS I S C WORKERS COMPENSATION AND EMPLOYERS'LIABILITY YIN ANYPROPRIETORIPARTNERIEXECUTIVE OFFICER/MEMBER EXCLUDED? D NIA WCA204465910 9/16/2024 9/16/2025 X H' T TUT R E.L. EACH ACCIDENT 51,000,ODO E.L. DISEASE -EA EMPLOYEE __..�._._._. S 1,000,000 (Mandatory In NH) if yes, desaibe under DESCRIPTION OF OPERATIONS below I E.L. DISEASE - POLICY LIMIT ------ $1,000,000 D A Leased a Rented Equipment Pollution LiabilityECP203582913 C 7039608524 5/26/2024 9116/2024 512612025 911612025 S3W.DD0 Limit SZO00,000 Limit $1,000 Deductible S10,000 Deductibbe DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached It more spice Is required) 1+M1\yGl-LN SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS, BIDDING PURPOSE ONLY AUTHORIZED REPRESENTATIVE 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD CERTIFICATE OF QUALIFICATION to provide CONSTRUCTION SERVICES for PUBLIC WORKS PROJECTS to the STATE OF INDIANA This Certification Board, having duly considered application for qualification in terms of apparent experience and financial resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to: DORE & ASSOCIATES INC 900 TRUMAN PKWY PO BOX 338 BAY CITY MI 48707 Phone 989-684-8411 Fax 989-684-6663 Company Official JASON DORE for the twenty-seven month period stated herein, unless revoked by this Board for cause, and in the classifications of services stated below. This certificate supersedes any previous certificate. 1795.01 Demolition of Buildings and Other Structures 1799.01 Asbestos Remediation CERTIFICATION DATE 4/29/2022 EXPIRATION DATE 7/29/2024 THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD, 402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA 46204, ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION, Tracy L. Cross, EEx4tive Secretary Certification Board DAPW PQ2 State Form 3983R Rev. 07106 Nationwide Specialty Contractor - Demolition I Abatement I Remediation 0PASS"ORCIATrEgSinc. P.O. Box 338 -Bay City, M1 48707-0338 -ph 989.684.8411 -fax 989,684.6663 - www.doreassoc,com ALL EQUIPMENT LISTED BELOW IS SOLEY OWNED AND FULLY PAID FOR BY Dore & Associates, Inc. 1 — Volvo EC 400 Ultra High Reach Excavator 2 — Komatsu PC 350-11 2 — CAT 350L Excavators 5 — CAT 345 Excavators BL & C 9 — CAT 330L Excavators B & C 2 — CAT 320L Excavators 1 — CAT 312L Excavator 1 — Link Belt Crane, 70 Ton 1 — Case Vibratory Roller 1 — CAT D4 Bulldozer 1 — CAT IT28 Wheel Loader 18 — Bobcats & 2 — Bobcat Trailers 2 — CAT Mini Excavators 5 — CAT Skid Steer Loaders 2 — Brok Remote Demo Robots 2 — Excel Track Concrete Crusher Plants 2 — Labounty MSD70R Shears 1 — Labounty MSDSOR Shear 6 — Excavator Grapples 1 — 60 Ton American 7260 Crane 1 — 1973 GMC Tank Truck (Water) 12 — Excavator Hydraulic Hammers 0 GRE Nationwide Specialty Contractor • Demoli11 tio11 n I Abatement I Remediation & ASSOCIATES, Ir1C. P.O. Box 338 • Bay City, MI 48707-0338 ph 989.684,6411 • fax 989.684.6663 • miw.doreassoc com September 23, 2025 City of South Bend, Indiana, Board of Public Works 227 West Jefferson Blvd. South Bend, IN 46601 Subj: Qualifications & Experience To whom it may concern, Pursuant to the Bid Instructions, Dore & Associates is providing your office with relevant project contact and brief statement of Dore's experience. Jason C. Dore, President, of Dore & Associates, Inc. is authorized by the corporation to sign all proposal and bids on behalf of the corporation. Dore's correspondence information is as follows: Dore & Associates, Inc. P.O. Box 338, Bay City, MI 48707, Phone: 989-684-8411 Fax: 989-684-6663 Email: est@doreassoc.com Dore & Associates is proud of its reputation of 45+ years in the demolition and environmental industry, and is eager to share its background with potential clients. The management of Dore & Associates has more than forty years of expertise. Its management has razed over 50,000 structures throughout the United States and has evolved into a "single source" contractor. Dore has the ability to provide you with a total, comprehensive and cost-effective package, eliminating the problem of multiple layers of contractors. Our full range of services includes: EXPLOSIVE OR CONVENTIONAL DEMOLITION, FLOOR TILE REMOVAL, COMMERCIAL DEMOLITION, INTERIOR/EXTERIOR RENOVATION, MARKETING/SALES OF USEABLE EQUIPMENT, ENVIRONMENTAL REMEDIATION, ASBESTOS & LEAD ABATEMENT, SITE EXCAVATION & RESTORING, and MINE & PLANT CLOSURES Though our main office is located in Bay City, Michigan, satellite offices in Ohio, Pennsylvania and Florida, enable Dore & Associates the ability to provide services to a diverse geographic business clientele. Should you need additional information please feel free to contact me or visit our web site at www.doreassoc.com. Please see Certificate of Insurance & resumes attached. SOM Wrecking License No. 272000038, exp 5/31/2026. Sine rely, _ason, ore, Presides DORE & ASSOCIATES, INC. b8, ASSOCIATES, iinE Nationwide Specialty Contractor • Demolition I Abatement I Remediation P.O. Box 338 • Bay City, MI 48707-0338 • ph 989.684,8411 • fax 969.684.6663 • www.doreassoc.com May 7, 2020 (Policy Enacted) Re: HUB, Section 3, MWBE Participation on Projects Awarded Subj: Corporate Policy To whom it may concern; Dore & Associates, Inc. is a nationwide contractor who bids numerous projects throughout the United States on an annual basis. With this being said, it is Dore & Associates policy and standard practice to adhere to all goals set forth by various local, State, Federal and private agencies and companies throughout the United States for Historically Underutilized Businesses, Section 3 Participation (HUD Funded), Minority Owned Businesses, Women Owned Businesses, Disadvantaged Business, Veteran Owned Businesses, etc. When bidding on projects Dore & Associates addresses the goals for various types of participation in the specification and researches directories available and contacts agencies in the particular locale Dore is bidding that match our criteria of participation, Various participation Dore & Associates seeks is as follows: - Hauling & Disposal - Suppliers of Safety Equipment - Supplies of Asbestos Equipment - HVAC - Plumbing - Electrical - Sand/Gravel/Fill Materials Dore & Associates realizes participation percentages vary wide throughout the United States but as a corporation that supports participation from the types of companies stated above, it is our policy to participate fully and utilize these various firms' services to the fullest. Th you, u �,� Jason_C. Dore r. President 7i7s ■ Nationwide Specialty Contractor • Demolition j Abatement I Remediation P.O. Box 338 • Bay Cdy, MI 48707-0338 ph 989.684.8411 • fax 989.684.6683 • www.doreassoc.com r - Mfire r r r Demolition Management Plan The following plan is for example purposes only and is not project specific. Dore & Associates, Inc. (Dore) will perform demolition of (location/description of project) Following is the planned sequence of demolition: Section I Equipment (example — not project specific) Two (2) 330 CAT excavators Two (2) 345 CAT excavators Two (2) Bobcats (skid loaders) Assorted machine attachments - grapple, concrete pulverizer, hydraulic hammer, scissor lifts Assorted environmental equipment Section 2 General Information (not project specific) a. Dore will obtain all the required state and local permits (i.e. demolition permit, hydrant permit, etc.) for demolition of buildings as stated above. b. Dore will make the necessary _ One Call for locating utilities. c. Dore will hire a certified rodent exterminator for rodent control, d. Dore will secure the site. e. Dore will install compost sock and storm drain protection around perimeter of demolition site to stop any migration of silt onto surrounding properties, or infiltration into storm drains. f. Dore will be responsible for disconnecting and capping all utilities necessary. g. Dore will perform interior demolition in order to access areas for asbestos abatement and areas with lead contamination. h. Dore will remove all asbestos, hazardous materials, and lead contaminated materials from the buildings prior to demolition. L Dore will clean and neutralize the sulfuric acid inside the storage tanks and dispose of the tanks. j. Dore will perform interior clean -out of the buildings removing wood, carpet, paper, etc. k. Dore will demolish buildings down to slab on grade (or as may be described in project specifications) and haul away all ferrous and non-ferrous material and demolition debris, I. Dore will fracture slab on grade to allow for proper drainage. m. Dore will use existing clean masonry and brick to fill in pits and sumps and to grade to surrounding grade, only if approved by state DHEC/Permiffing, n. Dore will suppress dust emissions during demolition by using water form fire hoses connected to fire hydrants (weather permitting). o. Dore will implement a recycling program to recycle and document material to maximize the reuse of material from the demolition. p. Dore will implement a post project site grading erosion control plan. Section 3 Project Phases (phases described are not project specific) Dore will perform demolition in the following phases. o Phase I — Site Security o Phase 11 — Environmental Decontamination o Phase III — Equipment Salvage o Phase IV — Demolition o Phase V — Recycling o Phase VI — Site Grading Phase I — Site Security a. Dore will secure the site, restricting access. All employees and visitors must use the log book (located in the Project Office Trailer) to sign -in and sign -out, and attend a site specific Safety Orientation, Phase 11 — Environmental Decontamination Reference Dore's Asbestos Abatement Plan, Lead Contaminated Material Removal Plan, and the Hazardous Material Management Plan. Phase III — Equipment Salvage Dore employees trained in salvage for reuse will remove any equipment (i.e. transformers, electrical switch gear, electrical buzz bar, and assorted wiring prior to demolition. Phase IV — Demolition 1. Dore will ensure all utilities have been capped and disconnected. 2. Dore will perform interior demolition removing as much non -recyclable material as possible. 3. Demolition of building will begin on east end of plant moving west. 4. Demolition will occur using a 345cat excavator with grapple. The building will be demolished in manageable pieces, from the roof downward, pulling out predetermined columns in a manner creating a controlled collapse. 5. Using a 330cat excavator with grapple, Dore will separate non -recyclable material from concrete and masonry (ferrous and non-ferrous material, any other remaining non - recyclable debris). 6. Dore will clear building materials, and fracture the concrete slab on grade. This will be done using an excavator with hydraulic hammer. 7. Dore will backfill and compact voids, pits, and sumps with clean masonry material installing in 8" lifts. 8. Dore will perform site grading to ensure proper drainage. Phase V — Recycling Dore will process and transport materials to a recycling center. All steel will be transported to a steel mill where it will be melted for reuse. If any material is deemed non -recyclable, material will be transported to a DEP licensed landfill. Phase VI — Site Grading Dore will haul in clean, compactable soil (if applicable) to fill voids in 8" compactable lifts. Section 4 Substantial Completion and Demobilization Thirty days prior to the contract end date, Dore and the owner's representative will walk the site for the purpose of listing any items that may need to be completed by Dore before the contract end date. Dore will demobilize and remove all equipment from the site. ATTACHMENT 1.a.14. MANAGEMENT / LEADERSHIP TEAM DEMOLITION SERVICES VENDOR NAME. Oo_re and'Assocate , inc ;:' (Leader/Manager Name Dernolitlon and Asbestos'Abatement , Jason C. Dore President 30 andBusiness " A, ministratign/Management. Arthur M. Dore Principal ' q D.amoIWo� and Asbestos,Abatemeat , and.Chief'Estimator Edward M. Dore Treasurer 40, sbos Demolition and AestAWi6ient, and, Chief Superintendent': Dennis C. Dore .Secretary qp Remo►ition and Asbestos Abatenier t, and`Waste Maha ement pcnn al Jason C. Dore pres ident Contact PI\Box 338Bay City, MI487O7 989-684-8411 Key Skills Corporation President Finance & Investment Expert Equipment Acquisition Expert Information Technology Expert Experience Jason started working ondemolition and asbestos abatement ]obxitesinitially, until harealized howould rather be on the administrative side ofthe family business, Jason currently oversees all day today operations atDore & Associates, Inc and helps tP manage and maintain several administrative avenues wit hinthe corporation. With over 3Dyears ofFinancial Management Job Cast, Financing & Investment, and Equipment Acquisition Experience, heis atrue asset to the corporation, | Employer Summary June /PV/-May 2O2O-Dore & Associates Contracting hlc.-DenloitionondAsbesfcmAbohvmentYYorkerfrum 91-93. |n93.hebegan his career inAdministration and began working inthe Finance Department. May 202O-Current - Dore Associates, Inc, -|naddition hz the above, Jason balso the corporation's President, oversees accounts poyob|es/vaceivob|em,personnel management, building maintenance management and signs off on all estimations for the corporation. Education 0 /909-/v92-Western High School -Diploma 0 /Pg3-/V94-Northwood University ° /99J-/p97-Saginaw Valley State University - Bachelor's Degree - Business Management Arthur M . Dore Principal/Chief Estimator Contact P.O. Box 338 Bay City, MI 48707 989-684-8411 omd@doreassoc,com Key Skills Demolition Expert Asbestos Abatement Expert Corporation Principal Experience Art has worked for the family business his entire adult life. Starting as a young man doing any job he could to help out, he worked his way from the field to supervision to estimating to his current role as President in 1992, Art manages all aspects of the company as well as producing project estimates. During his career Art has obtained immense experience in the industry and is considered a "Demolition Expert". Many of our complicated and large projects are directed by means and methods developed by Art. Dore's commitment to safety and quality start at the fop of the organization and are constantly reinforced under Art's leadership, Employer Summary 1979 - 2020 - Dore & Associates Contracting, Inc, -President of the company responsible for all day-to-day operations, 2020 - present- Dore & Associates, Inc, - Corporation Principal and Chief Estimator 2004 -2015 - Hooters Restaurants - Owner of 3 restaurants located in Bay City, Saginaw and Traverse City, Michigan. 2006 - 2020 - Tri-City Icehawks - Team Owner of Teir 3 Junior A Hockey Team. Certifications/ Affiliations • Georgia Institute of Technology - Asbestos Industry Practices • National Demolition Association • Asset Recovery Association • Michigan Chamber of Commerce • National Safety Council • Bay City Chamber of Commerce • Michigan Business & Professional Association Dennis C. Dore Secretary/Waste Management Director Contact P.O. Box 338 Bay City, MI 48707 989-684-8411 Denniscdore@yohoo.com Key Skills Demolition Expert Asbestos Abatement Expert Waste Management Corporation Secretary Experience Dennis has over 40 years of experience in the demolition and asbestos abatement fields. He currently oversees all waste management operations for Dore and Associates, Inc. Dennis manages a team of operators to maintain timely and efficient pick-up and delivery of dumpsters; at each job site. He manages the disposal of friable and non -friable ACM while maintain compliance with all federal and state guidelines. Employer Summary 1981 - 2020 - Dore & Associates Contracting Inc. - Job site supervisor and handled waste management for the company. 2020 - Current - Dore Associates, Inc, - In addition to the above, Dennis is also the corporation's Secretary and maintains all corporation meeting minutes and other secretarial duties within the organization. Certifications /Affiliations • MIOSHA Accredited Asbestos Supervisor • CDL • Aerial Work Platform Permit • Lead Awareness Accreditation Edward M. Dore Treasurer/Chief Superintendent Contact Experience P,O, Box 338 Bay City, MI Ed began his working career in the family business in 1987 48707 as a laborer and quickly moved to a field superintendent 989-684-8411 in 1989. Advancement to General Superintendent come emd@doreassoc.com in 1992 as Dore continued to grow in both the abatement and demolition divisions. Dore began offering hazardous waste remediafion in 1993 with Ed serving as the company's remediotion specialist. A well- rounded work portfolio in demolition, abatement and remedlation allowed Ed to take on further responsibilities of risk management as well as the corporate secretary. Under the watchful eye and leadership of Ed, Dore has projects underway in as many as 10 states on any given day. His ability to manage personnel and Dore's extensive fleet of heavy machinery has allowed the company to grow into the industry leader it is today. Key Skills Employer Summary Demolition Expert 1987 - 2020: Dore & Associates Contracting, Inc. - Asbestos Abatement Expert Laborer and Superintendent for both abatement and Corporation Treasurer demolition. Assumed roles of Risk Manager, corporate Secretary, and Vice President of Operations. Manages an extremely talented team of project managers. Equipment and material logistics. 2020 - current - Dore & Associates, Inc. - Corporation Treasurer, Chief Superintendent, Risk Management, and Safety Officer. Project Highlights • Viking Die Cost, Kalamazoo, Michigan - Project Facilitator, Preparation of Work Plan and Health & Safety Plan. Characterization and verification sampling. Removal and disposal of hazardous soils. ° RCS Evans Site, Gagetown, Michigan -Projact Facilitator, Preparation ofWork Plan and Health & Safety Plan. Characterization and verification sampling, Removal and disposal of23.00Otons of non -hazardous soil and 2'000tons ofhazardous soil along with building demolition. ° Sunrise Landfill, Ploinwell, Michigan - Characterization and verification sampling, Removal and disposal of hazardous and non- hazardous soil and drums from former landfill. * Buckeye Oil Field, Gkzdw//n' Michigan - Characterization and verification sampling, Soil washing of soil, solidification and hauling o[oil field contaminated soils. Bookfi||and site restoration. ° Shzheof/wichigon-Multi-Site-ControotC. Detroit, Michigan - Asbestos Abatement and demolition offormer foundry, Chovootadzot|nn and verification sampling and removal offoundry sand, DewoterinOofpits and excavations. Solidification ofsludge material and site Certifications /Affiliations * Building Inspector • Supervision of Asbestos Abatement ° Supervision ofHazardous Waste Remedia#on. Certificate ofCompletion & Approved Trainer w Controlled Substance Abuse & Alcohol Misuse Jeffrey C. Teagarden VICE PRESIDENT -- SPECIAL PROJECTS Jeff has provided his immense experience, leadership and impeccable work ethic to the Dore organization for the past 38 years. Our clients have come to expect a safe and predictable result with Jeff at the helm. Difficult abatement and demolition projects all over the world have been successfully completed by Jeff and his resume is second to none in the industry. The challenges of large projects on tight time lines are all in a days work for Jeff. EMPLOYER SUMMARY 2022 to Present — Vice President —Special Projects/Senior Project Manager- Organize, plan, schedule and control field work to expedite large projects to be completed within time and cost limitations. Direct and coordinate the activities of employees and subcontractors In following the engineer's plans and specifications. Responsible for ensuring compliance with quality control goals and safety plans. Empowered for overall responsibility of major projects and exceeding client expectations. 2017 to 2022: Nasdi, LLC - Vice President - Provides leadership and guidance to advance the company's position in the industry. Develops strategies and tactics to increase revenue profitability and organization growth. Oversees corporate operations to ensure efficiency, quality and customer service. Evaluates performance of management and field operations for compliance with policy, procedure and objectives. Responsible for ensuring compliance with quality control goals and safety. 1986 to 2017: Dore & Associates Contracting, Inc. — Vice President — Special Projects/Senior Project Manager. Organize, plan, schedule and control field work to expedite large projects to be completed within time and cost limitations. Direct and coordinate the activities of employees and subcontractors in following the engineer's plans and specifications. Responsible for ensuring compliance with quality control goals and safety plans. Empowered for overall responsibility of major projects and exceeding client expectations. 1984 to 1986: Asbestos Abatement of America, inc. — Operations Manager. Assembled, reviewed and negotiated government and private contracts. Developed project administration procedures, implemented safety and training programs for supervisory personnel. Established company procedures to ensure corporate compliance with applicable safety regulations. CERTIFICATIONS University of South Florida, Tampa, Florida Bachelor of Arts/Business Administration University of Maryland, Munich, Federal Republic of Germany Associate in Arts/Business Qualifier for State of Florida Class "A" General Contractor, C1 C057489 Qualifier for State of Nevada Demolition/Asbestos Contractor 0042942 Qualifier for State of North Carolina General Contractor License 17486 State of Indiana Class "A" Wrecking Contractor W0000150 ON -SITE PROJECT MANAGER, SAFETY REPRESENTIVE John brings his 20 years of demolition experience to every project he manages and represents Dore's safety program throughout the Company, John began his career as an Industrial supplier and soon became directly Involved In safety gear and equipment being properly placed and used on projects, In 2000, John began his "official" safety position as this Important role was beginning to be a focus and take on more prominence with contractors, Currently John plays a key role here at core as a major project director and our ornslte safety representative. He Is responsible for consulting on means and methods used for specific demolition projects, writing and enforcing our safety plan and client satisfaction. John's strong communication skills allow him to direct the safety effort to ensure Dore maintains Its stellar safety record. EMPLOYER SUMMARY 2007 to present: Dore & Associates Contracting Inc. Bay City Michigan - Safety Representative/Project Manager, Responsible for safety plan and performance, job audits, rigging, site logistics, field crews and training, Major project Involvement for means and methods resulting In safe demolition practices, 1992 to 2006: Blerlein Companies, Midland Michigan - 1992; purchasing and warehouse coordinator for construction equipment, safetysupplles and materials, 1994; company Safety Representative performing safety audits, maintenance of all metering devices, documentation, safety reviews, safety meetings, and safety plans. 2000; added responsibility of project management for certain projects. 1987 to 1991:1enison Industrial Sales, Bay City Michigan. Sales of Industrial hardware to the construction, demolition and Industrial markets across the Midwest region. PROJECT HIGHLIGHTS State of Missouri — St. Louis Psychiatric Rehabilitation Center, Project Involved removal of asbestos containing material, PCBs, CFC's and various hazardous wastes prior to complete demolition of a large patient building, power plant and stack. Mr, Bernelis performed oversight for the safety program, asbestos abatement and demolition services. Contract amount; $1,290,000.00 Waste Water Treatment Plant, Saginaw Michigan, Safety Representative/Project Manager — Removal of asbestos containing material, preparation and removal of various Incinerators and large mechanical components for the Interior renovation. Contract,amount; $112,000,00 Midland Regional Medical Center, Midland Michigan. Safety representative/Project manager — removal of asbestos containing material from an occupied and functioning hospital, All work was performed in a strict and regulated fashion to ensure the non•dlsturbance of patients and staff. Contract amount; $105,000.00 Michigan Sugar Company, Carrollton Michigan, Safety Representative/Project Manager— demolition of various buildings and structures at the operational sugar processing facility, The client needed several pieces of manufacturing equipment salvaged for reuse which were located at various locations throughout the 5 story plant. This requirement resulted in a "surgical" type of extraction and demolition of the 100 year old structure, The project, which lasted one year, was very successful and 100°%safe, Contract amount; $2,000,000.00 Ford Motor Company, General Motors, Chrysler Corp, Project Manager and Safety Representative — various projects within the Midwest, CERTIFICATIONS Licensed Asbestos Contractor/Supervisor In Michigan, Ohio, Missouri, Illinois HAZWOPER Training Hazard Communication, Lead and Silica Safe2work Safety Training Program CPR and First Aid Training Confined Space and Entry Rescue Training OSHA 510 OSHA 500 MIOSHA 30 hour Great Lakes Safety Training Dow Chemical and Delphi Site Clearance Training Scott Cianek PROJECT SUPERINTENDENT Scott has been a key player on the Dore team for over a decade and has been Involved in dozens of large, complicated projects. Scott has risen through the ranks of our organization staring as a laborer, and now takes on superintendent duties on abatement and demolition projects throughout the country. Many projects have seen Scott as the project manager as he continues his professional development at Dore. A trademark of Scott's projects Is his organizational skills, excellent client communication and project dellvery within the schedule, EMPLOYER SUMMARY 2001— present: Dore & Associates Contracting, Inc., Bay City, Michigan —Superintendent and project management, Responsible for large abatement and demolition projects within the United States, Project safety plan implementation, field crew supervision, subcontractor management, project logistics, client meetings and documentation. Since joining Dore as a laborer in 2001, Scott has successfully completed over 75 projects in over a dozen states. 1991— 2002: 21" Century Tool + Die, Munger, Michigan — Machine Operator. Operated machine tool equipment, project layout, proto-type, project supervision, shop production, and inventory control, PROJECT HIGHLIGHTS Logansport State Hospital, Logansport, Indiana — Multiple buildings of 5, 3 and 2 stories was removed from the center of this medical campus, in addition, a 150 FT stack from a former boiler was taken down by hand due to its sensitive location. Over 200,000 SF of structures was Involved in the project. Contract amount; $1,650,000,00 T,C. Light & Power, Traverse City, Michigan —This water front power producing facility sat near the historic downtown district. Parts of the plant were disassembled and shipped to Guatamalia for re -use, The remainder of the site was recycled and properly converted to public green space. Contract amount; $1,100, 000.00 Champion Paper Company, Hamilton, Ohio - Abatement and demolition of a 3-story,175,000 5F manufacturing facility, At one point In this structures history, locomotives were produced resulting in massive below grade concrete machine pads that had to be excavated, The heavy duty building was constructed of steel and concrete which was recycled and crushed on site, Contract amount; $625,000.00 YMCA, Port Huron, Michigan — As part of a 4 building abatement and demolition project, the 5-story, riverfront structure was demolished and returned to green space, This building was a community landmark for decades. Along with this building, a large jail facility and 2 administrative buildings were also removed, Contract amount; $615,000,00 Indiana University, Gary, Indiana — In the center of campus was a fine arts and administration building that were 4 stories tall requiring a "surgical" type extraction, The land was reverted back to green space for the University, Not only was this project 100% safe, It was on time and within budget, Contract amount; $650,000,00 Detroit Foundry, Detroit, Michigan — Extensive environmental clean-up was Involved with this demolition of the 200,000 SF Industrial structure. Over 60,000 cubic yards of foundry sand had to be remedlated along with asbestos containing materials, The site was one of 4 projects removed for the City of Detroit under the same contract, All sites were returned to green space, Contract amount; $ 2, 000, 000,00.00 CERTIFICATIONS 40-hour Haa-wopper Confined Space Training CPR/First Aid Asbestos Abatement Supervisor- Licensed in Multiple States OSHA 30 Hour Storm Water Management ABATEMENT PROJECT MANAGER Dan started his career in the asbestos abatement Industry as a laborer in 1988. He has learned this business from the ground up and has become an "expert" in the field. Dan advanced within the company as his skills grew and quickly became a supervisor in 1989, Now with 100 projects to his record, Dan is our most seasoned and respected abatement project manager. Dan is known for demanding excellence and performance from his team and keeps a rigorous schedule to ensure safe and on -time results for Dore and our clients. EMPLOYER SUMMARY 1988 to present: Dore & Associates Contracting, Inc., Bay City, Michigan — Project Manager/Abatement Speciailst. Responsible for all aspects of commercial/industrial abatement projects Including; safety program enforcement, scheduling, field staff, training, equipment, documentation and disposal, Experienced demolition project management on various projects within the United States, 1983 to 1988: US Army, Fort Brag, North Carolina, Berlin, Germany —Computer Technician for historical and administrative support, honorable discharge. PROJECT HIGHLIGHTS Fairview Gardens, Warren, Ohio —Asbestos Abatement of 18 apartment buiidings in preparation for demolition, Contract amount: $850,000.00 Mercy Hospital, Joplin, Missouri —Asbestos Abatement of an 8-story, tornado -damaged hospital structure. The remaining structure was demolished. Contract amount: $728,000,00 Industrial Warehouse, Berwick, Pennsylvania — Asbestos Abatement of a 75,000 SF warehouse In advance of demolition. Contract amount; $264,000= Springfield High School, Akron, Ohio — Asbestos Abatement of a large high school In preparation of renovation. Contract amount: $400,000,00 General Motors Plant, Dayton, Ohlo —Asbestos Abatement of 1,000,000 SF retired auto plant in advance of demolition, Contract amount; $3,000,000.00 Prudential Building, Chicago, flllnoIS— Asbestos Abatement of a downtown landmark skyscraper to prepare for renovation, Contract amount; $1,700,000,00 CERTIFICATIONS Asbestos Hazard Abatement Specialist Certification — Ohio Asbestos Professional license — Illinois, Missouri Asbestos Project Supervisor License — Indiana Asbestos Contractor/Supervisor Accredited — Michigan Pennsylvania Asbestos Certification Environmental Safety Training Center, Regulation Exam — Missouri 40 —Hour Hazwopper Training Confined Space Training OSHA 30 Hour'Training CPR/First Alr/AED Adult Scaffold Training WEINLANDER FITZHUGH DORE & ASSOCIATES, INC. BAY CITY MICHIGAN FINANCIAL STATEMENTS DECEMBER 31 2021 Current NA_,a, Nationwide Specialty Contractor • Demolition I Abatement ( Remedia ton CURRENT PROJECTS `1ATE i a P.o. Box 338. By City, MI 48707-0338 • Ph 989 .6&3.8411 fax 989.&84.6663 3• www.doreassoc.com Description of Project Duration of Project Reference Contact Info Location Contract Amou1111111nt Project Name Rock County Purchasing Janesville, $406,088.00 Demo Rock County Jail Start 4/27/2022 Rock County Jail Division Wl Estimated Completion 51 S. Main St. 1/15/2025 Demo Janesville, WI 53454 Brad Kwasny - Contract Amount Descri tion of Prajeil p Duration of Project Project Name Reference Contact Info Location $ 287,700.00 Demo Midland County ESA Start ? Midland County ESA Midland County Midland, MI End ? 3917 Jefferson Ave. Demo Midland, MI 48640 Thom Laney tlaney@trccompany.com Description of Project Duration of Project Reference Contact Info Location Contrail Amount ? Project Name The City of Bay City Bay City, MI $324,800.00 Demo Treatment Plant Bay City WWTP Wastewater Demo 301 Washington Ave. Trickling filter - Bay City, Ml 48708 Susan Carmien 989-894-8115 scarmie n@ baycitymi.gav 1 Current Contrail Amount Description of Project P Duration of Project project Name Reference Contact Info Location $,853,744 1 Demolition Start 6/16/2025 Atherton Apts Flint Housing Commission Hint, MI Atheronton East bldg Apts. 3820 Richfield Road Demo Flint, Ml 48506 Doug Peters dpeters@fiinthc.org 810-736-3134 Contract Amount Description of Project Duration of Project Reference Contact info Location Project Name Demolition 93%Completed Demo 5580 Lancaster Rd. Croswell, Ml 48422 City Hall Croswell, M4 $262,950.00 5580 Lancaster Rd. 100 N. Howard Ave. Croswell, MI 48422 - Croswell, MI 48422 Joseph Benjamin jbenjamin@fveng.com 616-977-1000 Contract Amount Description of Project Duration of Project Reference Contact Info location Project Name Ellwood City Area School Ellwood City, $722,900.00 Asbestos Abatement 10% Complete AA Lincoln High School i Dstrict PA Lincoln High School Start Date 4(8/2025 501 Crescent Ave. 501 Crescent Ave. 501 Crescent Ave. Estimated Completion Ellwood City, PA 16117 Ellwood City , PA 16117 Ellwood City, PA 16117 6/1/2026 ScottKorba info@novaenvsol.com 412-939-1622 Contract Amount Description of Project Duration of Project Reference Contact Info Location Project Name Mount Demolition 0% Complete Demo CMU Northwest Central ntral Michigan University Pleasant, MI $2,658,570.00 Northwest Apartments 300 W. Bellows Street 1204 S. Franklin Street 300 W. Bellows St. Mount Pleasant, Ml 48858 Mount Pleasant, Ml 48859 Mount Pleasant, MI 48858 Conor Bradley - cbradley @ cla rkcc.com 2 Completed COMPLETED PROJECTS Nationwide Specialty Contractor • Demolition j Abatement I Remediation & A550GlATes. m'1C. P.Q. Box 338 •bay City, M148747 {?338 • ph 989.684.8411 -fax 989.584.6663 • wNrw_dareassoc.cam Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Ball State University Ball State University Muncie, IN $3,390,360.00 Abestos/Haz Abatement Start 7/7/2022 Abestos/HazMat 2000 W. University (AD208) & complete demolition Completed 2023 Abatement and Complete Muncie, IN 47306 LaFollete Complex & Site Demolition of LaFollete Ryan Koenker Restoration - EX 32,345 SF 75% Dore Workforce Complex Phase 3 Phone: 765-285-5082 Asb Floor Tile 12,920 SF Carpet rrkoenkerPbsu.edu Thermal Insulation, ect. 100,000 SF Bldg Project Name Reference Contact info Location Contract Amount Description of Project Duration of Project Asbestos Abatement & City of Three Rivers Three Rivers, MI $848,600.00 Asbestos Abatement & Start - 7/2022 Complete Demolition 333 West Michigan Demoliton of 5 Story (approx. 55,000 SF Bldg(s) attached Completed 4/2023 of Old Three Rivers Three Rivers, MI 49093 Switched to ordered Hospital Contact. David A. Stegink, VP Demo 9/2022 Envirologic Tech- Project 100% Dore Workforce Manager 269-615-1009 dstep,ink(@fishbeck.com Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project New Bloomington Demolition Marion County New Bloomington, OH $241,241.00 Ordered demolition of old Start-12/1/2022 115 N. Street 222 West Center Street school building 100% Complete Marion, Ohio 43302 Completed-1/20/2023 Rich Fender, Regional Planning 25% Dore Workforce 740-223-4140 Completed rfender@co.marion.oh.us Project Name Reference Contact Info Location Contract Amount Description of Project' Duration of Project AA 720 Fuller Ave & Demo 1101 Ball Ave. County of Kent Grand Rapids, MI $498,800.00 Demolition of building and all other structures located at Start Date 12/6/2023 Grand Rapids, MI 300 Monroe Ave. 720 Fuller Ave., & 1101 Ball Ave. Grand Rapids, MI 49503 NE, Grand Rapids, MI 49503 Calvin Brinks Completion Date purchasing@kentcountvmi.gav 1/31/24 616-632-7720 Project Name Reference Contact info Location Contract Amount Description of Project Duration of Project Demolition of Niles Theatre Trumbull County Niles, OH $340,800.00 Demo and AA of Niles Theatre Start Date-11-27-2023 42-46, 54-58 736 Mahoning Ave. and connected buildings South Main St. Warren, OH 44483 completion date Niles, OH 330-469-6828 1/31/2024 Ashley Yuhasz ashley(cEitnpwarren.org 100% Dore Workforce Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Richland City Jail Interior County of Richland Mansfield, OH $262,705.00 Demolish Interior of Existing Jail Start - 12/13/2021 Demolition 50 Park Ave. East within the Courthouse & leave Completed April 2022 Mansfield, OH 44902-1896 workspace ready for future 100% Complete Contact: Alvin J. Berger, PE renovations 419-564-1644 95% Dore Workforce aberggrt@aib-eng,com Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Demolition of the 1936 Girls City of Cave Springs Cave Springs, GA $147,100.00 Complete Demolition Start -1/19/2022 Dormintory- Former 10 Georgia Ave. and Site Restoration of Completed April 2022 GA School of the Deaf Cave Springs, GA 30124 Former Girls Dormitory 100% Complete Completed Project Name Demolition of Two (2) Residential Houses project Name Demolition PRMX Elementary School Project Name Asbestos Abatement & Demolition CCA Elem Sch 1200 Chess Street Monongahela, PA project Name Demolition of Vincetian Academy 8100 Mcknight Rd. Pittsburgh, PA Contact: Joe Watkins, Architect email@carterwatkins.com Reference Contact Info City of Bay City ;;301 asing Office, Room 402 Washington Ave. Bay City, MI 48708 Contact: Susan Carmien 989-894-8115 scarmientasbavcitvmi.ore Reference Contact Info Detroit Public Schools Community District Erich Watry 248-924-5092 ewatry@rockfordconstruction.co m Reference Contact Info Commonwealth Charter Academy One Innovation Way___ R g, PA 17110 Rosky38-4086annol.comContact Infontracting &ental Servicescknight Rd.gh, PA 15237 Chris Sciulli 412-939-1622 Location I Contract Amount Bay City, MI 1 $21,600.00 Location i Contract Amount Detroit, MI 1 $582,300.00 Location Contract Amount Mononhahela, PA $1,224,600.00 Location Contract Amount Pittsburgh, PA $575,000.00 Description of Project Demolition of Two (2) Residential Houses - 2322 Fitzhugh & 150911th St. Description of Project Building Demolition Description of Project Asbestos Abatement and Demolition Elementary School Description of Project Demo and AA Vincentian Academy 85% Dore Workforce Duration of Project State - 12/20/2021 Completed April 2022 100% Complete 100% Dore Workforce Duration of Project 3/3/2025 l00% Dore Workforce Duration of Project 4/17/23 - 100% Dore Workforce Duration of Project Started October'23 In progress Completion c,nrine '24 3 Completed novae i a msn.com Demolition of former YMCA City of Clinton, IA Clinton, IA $426,000.00 Removal/Disposal of Structures 1/13/25 - 3/31/25 480 S. Clinton St. 611 S. 3rd St. Clinton, IA 52732 Clinton, IA 52732 100% Dore Workforce Jason Craft 563-244-3423 Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Demo Bob's Bar Board of the County Road Commissioners, County of Bay, Michigan Bay City, MI $33,900.00 Demolition 8/8/23 509 N. Tuscola (M-15) Hampton Township 2600 East Beaver Rd. Bay City, M148708 Kawkawlin, M148631 100% Dore Workforce Jim Lillo 989-686-4610 jlillo@baycoroad.org Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Demo 2862 Stone School Rd. Ann Arbor Public Schools Ann Arbor, MI $176,300.00 Demolition 100% Dore workforce Ann Arbor, MI 48104 2555 South State Street 2862 Stone School Rd. Ann Arbor, MI 48104 Ann Arbor, MI 48104 Steve Koop skoop@clarkcc.com Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Demoliton of Central High Champaign Unit 4 School District Champaign, IL $654,930.00 Demolition of High School & 150' 7/15/2020-11/6/2020 School 703 South New Street Stack superstructure & foundation Champaign, IL 61820 elements & restoration of ground surface 80% Dore Workforce Cory Hoke chokena osheabuilders.com 217-210-0174 Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Completed Asbestos Abatment at Lincoln Park Schools Lincoln Park, MI $1,089,450.00 Asbestos Abatment at Crowley & 5/20/2020 - 8/7/2020 Crowley & Mixter Elementary 1650 Champaign Mixter Schools Schools Lincoln Park, MI 48146 100% Dore Workforce Ron Revoir (313)363-0506 Ronald. Revoiraa)I p�s.info Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Demolition Marquette Land Bank Marquette, MI $582,300.00 Demolition Start Former National Mine School 234 W. Baraga Ave. National Mine School End-12/31/24 800 County Rd. Marquette, M149855 100% Dore Workforce Ishpeming, MI 49849 Anne Giroux agiroux@mqtco.org Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Demolition of NOVA Contracting & Environmental Services Duquense, PA $284,300.00 Demolition Start January 2023 708 Duquense Blvd. 4550 McKnight Rd. Duquense, PA 15110 Pittsburgh, PA 15237 100% Dore Workforce Chris Sciulli novaesi@msn.com Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project AA & Demo Bishop Hall Ferris State University Bid Rapids, MI $487,400.00 Asbestos Abatement & Demolition 100% Complete 1349 Cramer Circle 111 W. Knollview Bishop Hall Bid Rapids, MI 49307 Big Rapids, MI 49307 1349 Cramer Circle Evan Misener Bid Rapids, MI 49307 630-956-6254 Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Demolition City of Bay City Bay City, MI $19,300.00 Demolition Start Wastewater Treatment Plant 301 Washington Ave. WWTP Generator Replacement End Bay City, MI 48708 1001Y. Dore Workforce Susan Carmien Completed 989-894-8115 scarmien@baycitymi.gov Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project AA Ryder Center Saginaw Valley State University Saginaw, MI ? Asbestos Abatament Starts 5/15/2024 7400 Bay Rd. 7400 Bay Rd. Ryder Center University Center, MI 48710 University Center, MI 48710 7400 Bay Rd. Michael Pazdro University Center, MI 48710 989-964-4841 Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project INDUSTRY Detroit - Interior Selective Demolition Makers Line, LLC Detroit, MI $1,828,915.00 interior Demolition of Multi -Store Building May-21 3001 Brighten Blvd. Complete Denver, CO 80216 Phased Work Emily Hayter Estimated Completion emily()makersline_com July, 2023 100` a Dore Workforce Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project City of Akron - 655 Broadway City of Akron (OH) Akron, OH $221,700 Asbestos Abatement and August 2023 to Demolition Project 166 S. High Street Demolition October 2023 Akron, OH 44308 Victor Botosan, Operations Support 25% Dore Workforce City of Akron (OH) 330-375-2355 akronengineeringPakronohio.eo v Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Commonwealth Charter Commonwealth Charter Monongahela, PA $1,534,153 Asbestos Abatement in old Start - 4/17123 Academy Academy elementary school and demolition 10% complete Asbestos Abatement and One Innovation Way of one of the buildings onsite Estimated Completion of Demolition Harrisburg, PA 17110 Univ Waste also present 7/31/2023 Completed Nick Rosky, Project Manager Shannon Construction 100% Dore Workforce 412-977-6231 nickCd)shannonl.com Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Clinton, IA - 212 4th Ave. Demo City of Clinton (Iowa) Clinton, IA $195,700 Demolition of old pool hall Start - 4/30/23 611 S. 3rd Street Estimated Completion Clinton, IA 52732 6/30/2023 City of Clinton - Eng. Dept. Leah Woods 563.244.3423 100% Dore Workforce IeahwoodsCx?cityofcHntoniowa.us Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Main Street, Greenville City of Greenville Greenville, PA $238,290.00 Demolition of old store -front 98% Complete Demolitions 125 Main St. buildings; weather-proof of May, 2023 (seeding/grading) 132 & 173-175 Main St. Greenville, PA 16125 adjoining wall not demolished Kevin Creagh, Engineer KLH Engineers, Inc. 85% Dore Workforce (412) 494-0510 kcreagh(@klhen ig neers.com Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project City of Midland Currie Stadium Demolition City of Midland Midland, MI $83,000.00 Complete demolition of old Start-11/10/2022 1300 W. Main St. 333 W. Ellsworth St. stadium; salvage of cement pillars Midland, MI 48640 Tyler Abbs, Facilities Manager Estimated Completion 989-837-3370 May, 2023 (seeding/grading) tabbsPmidland-mi.org 100% Dore Workforce Project Name Reference Contact Info Location Contract Amount Description of Project I Duration of Project Completed Demolition Vanlandingham Carol 1 Bay City, M1 $16,800.00 Demolition Start - 4/30/2023 2683 Royal Oak Dr. 611 S. 3rd Street Estimated Completion Bay City, M148707 Clinton, IA 52732 6/30/2023 David Degrow 989-684-7203 dave@degrow.com 100% Dore Workforce Project Name Reference Contact info Location Contract Amount Description of Project Duration of Project Asbestos Abatement Kraemer North America Bay City, MI ? AA Independence Bridge Start March 2023 Independence Bridge 100% Dore Workforce Brent Freeman / Kevin Kruger bfreeman@kraemerna.com kevin.kruger@gcinc.com 608-434-4713 Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Asbestos Abatement & Rock County Courthouse Janesville, WI $424,600.00 Asbestos Abatement & Start 2024 Demolition of Rock County Purchasing Demolition of Rock County Jail & LES 51 South Main St. Jail & LES % Complete Janesville, WI 53545 Complete Removal of Ben Bobzien, PM Pinehurst Bldg. Completion 1P Cullen - General Contractor Sanitorium - ACM/Haz. 608-751-8733 Mat. - Rock County Jail & ben.bobzien@jpcullen.com LES Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Centerline Public School Centerline Public Schools Center Line, MI $243,258.00 Asbestos Abatement & Start 9/2022 Asbestos Abatement & Admininistration Building Demolition of Central Office Selective Demolition at 26400 Arsenal 95% Complete Central Office Center Line, MI 48015 Estimated Completion Kara & Tyler Lenling 2024 Consultant -TEK Environmental Phone: 734-878-5588 100% Dore Workforce der@ tekenvironmental.com kara@tekenvironment�l.cam Completed Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Asbestos Abatement Mechanicsburg Area School Mechanicsburg, PA $407,623.00 Asbestos Abatement at Start 6/28/2022 Mechanicsburg Area District Mechanicsburg Area High High School 600 South Norway St., 2nd Fi School 80% Complete Mechanicsburgh, PA 17055 Full Completion - 2024 J. Brian Haines, AIA, LEED AP Crabtree, Rohrbaugh & Assoc. 100% Dore Workforce Architects 717-458-0272 BHainesCeDcra-architects.com Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project AA Potter Elementary School Flint Community Schools Flint, MI $493,600.00 AA removal Start Date-11-20-2023 2500 N_ Averill Ave. 923 E. Kearsley St. Phased job Flint, MI Flint, MI 48503 completion date Roosevelt Austin 111 1/31/2024 rosevC& a rchenverouo.com 248-426-0165 Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Roscommon Range DTMB, state of Michigan St. Helen, MI $84,700.00 Contract #Y24002 September - Demo and AA Brian Watkins Demo, AA amd UST Removal November 2023 PO Box 30026 Complete Lansing, MI 48821 517-242-7882 100% Dore Workforce watkinsbl@michigan.gov Project Name Reference Contact Info Location Contract Amount Description of Project Duration of Project Former First Merit Plaza Redevelopment Building Authority of Lawrence County New Castle, PA $624,600.00 Demo and Abate Former First Merit Plaza start 9/18/2023 Demo AA 400 Court St. 5 story Bldg with basement 100% Complete New Castle, PA Phased work Amy Mckinney Estimated completion amckinneyCc7lawrencecountyaa.gov April, 2024