My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Etna
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Etna
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:35:00 PM
Creation date
9/9/2025 2:29:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
yl <br />OUTH BEND INDIANA <br />ivl <br />CITY OF S <br />FO9_P_V_P4_1—CW P. ^-rn 01 4Z nt I CITE �M <br />Project Name The Pointe at Riverwalk Ut'litv Materials <br />Project No. 124-06 M Local Time <br />For Bids Due September uth, 4V4 <br />(Must be completed for all quotes. Please type or print) <br />1118115—— Firrn: -N A 5 uu <br />Date: <br />,address: S - �,,T'7q)'ZT'7,St 6l3Z <br />nl 4 ber: Telephone Number: <br />citylstatelzip: 60��(A pkv 00yn <br />Oslo C6J_ r <br />Email Address: <br />Agent of Bidder (if Applicable): d/or material necessar 0 complete the <br />Pursuant to notices given, the undersigned offers to furnish labor an <br />public works protect of: <br />VIA, <br />T ?0 1 n ke ifications prepared by: <br />the City of South Bend, Indiana, in accordance with plans and spec <br />South _qq Depart —'Vent Of <br />and dated <br />'Sum of Total au'ote' plus <br />for the sUrn 0 Z— <br />f (enter the Tot.11 Quote as shown on 4 the proposal) <br />17 <br />��ho�wnon Proposal) <br />quotes apply, the undersigned submits a proposal for each <br />If alternative ;4;,gw referenced at the applicable page- <br />_'��c`(Numevialj <br />in accordance with, the notice- Any <br />rn <br />addendus attached will be spec) must be the same as that shown <br />If additional units of material included, in the contract are needed, the cost of units MU warded on a unit basis, the <br />in the original contract if accepted by the City of South Bend. It the quote is to be a <br />itemization of the units shall be shown on a separate attachment. <br />BY (,Signature} <br />ning) <br />ACCEPTANCE <br />The above quote is accepted this day of <br />SkIblecl to the following conditions: <br />BOARD OF PUBLIC WORKS, <br />President <br />Members <br />20 — <br />Public, W0Tk5 QU4t0 <br />version 1,03f2025 <br />Page, - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.