Loading...
HomeMy WebLinkAboutOpening of Bids - Demolition of Rabbi Shulman Apartments Proj No 125-014 - Indiana EarthCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Rabbi Shulman Apartment Building Demolition Project No. 125-014 For Bids Due 9:00am September 9, 2025 PART I (Must be completed for all bids. Please type or print) / Date: �iBidder (Firm)L "4:GI /4��C,., Address: City/State/Zip: Td ephone Number: (5 Email Address: eS d- )Ol a, ai( Agent of Bidder (if Applicable): kel-�(i r?5 Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project off 4vlm-n -, 1, 4.0,4do"dw�' ofui�e" Pw the City of South Bend, Indiana, in accordanFe with plans and specifications piepared by: and dated 9 _g 'p�a�J for the sum of (enter the Total Bid as shown on the Proposal) hit(� �, 7 7 ) (Enter sum of Total Base Bid plus 91ternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on ep4rate atori6qj. „ By The above bid is accepted this _ Subject to the following conditions: (Pri ACCEPTANCE day of BOARD OF PUBLIC WORKS President Members me of Perjon Signing) 20 Version 5/20/2024 Contractor's Bid for Public Works - 2 rJ' CITY OF SOUTH BEND, INDIANA Wo, CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Rabbi Shulman Apartment Building Demolition Project No. 125-014 For Bids Due 9:O0am September 9, 2025 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. / Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of MMBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good / Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and v WBE-2.1 ]. Acknowledge Receipt of / Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read andd comply with / tthhe specifications. Bidder: � flana� G�Gi/ If1 - �l\141— Date: 9" g'� By Authorized Repri Signature: Print Name & Title: Version 5/20/2024 Contractor's Bid for Public Works - 1 PART 11 (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 5/20/2024 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF "nal ) S�. Jere A COUNTY SS: The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 5/20/2024 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 5/20/2024 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. i� Dated this day of P lf, 2Q.1 of Cont)Tctor/Bidder of Its Agent "a eal Printed Name and Title Subscribed and sworn to before me this day of :� ,tt, 20� My Commission Expires It " ?a ` 7-03% County of Residence �y Public ElYy)0,(\- J,AMES BRAATZ Notary y , State of Indiana Elkhart County Commission Number NP0752954 My Commission Expires Nov 21, 2031 Version 5/20/2024 Contractor's Bid for Public Works - 6 Project Name: Project Number: For Bids Due: Contractor Name: BASE BID BID/PROPOSAL CITY OF SOUTH BEND Rabbi Shulman Apartment Building Demolition 125-014 9:O0am September 9, 2025 , r►ellAna far Item No. Description Quantity Unit Unit Price Total Amount 1 Demolish Rabbi Shulman Apartment Building at 628 Western Avenue with 1 7�����, 1 Sump IMaq Asbestos Abatement Bidder (Firm): r1/ Address: City/State/Zip: Aeey n LAC I elephone N VA BASE BID TOTALP7L?J,AM.�j (Printed Name of Person Signing) Version 5/20/2024 Contractor's Bid for Public Works - 7 CITY OF SOUTH BEND Vill MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: 125-014 Project ,N,ame: Rabbi Shulman Apartment Building Demolition Bidder: ,Z/j j,4/ ,4 4r fA+.�W Total Bid Amount: %� 79-/ � ('00 � QO MBE Goal: 1.3% aa Page___L_of 1 Name &Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you reed additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal Ketifid 10.4 re ✓5 f Al Submitted by: Ile /" /r i 4ntme 1JSighatur4.00, Date ***Goals should be calculated based on the Base Bid only.*** Version 5/20/2024 Contractor's Bid for Public Works - 8 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: 125-014 Project Name: Rabbi Shulman Apartment Demolition Bidder: �n �� f?/Jt df f /11 .L/VL Total Bid Amount: T�(1D . 0(7 WBE Goal: 4.7% Page__L_of Name &Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal An a 0o vc _ rug � � � 15-5 oo �, /Al rt Submitted by: Print ame Signatur Date ***Goals should be calculated based on the Base Bid only.*** Version 5/20/2024 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 125-014 Date: Project Name: Rabbi Shulman Apartment Building — Demolition Bidder: Ill r 4n1A ZAP" —) (_ Contact Person: l /jj Telephone: Address: �� �%� l/l/e City: DSttOI ate: / n Zip: Email: �1 r i iAelt ,® To determine whether a bidder has demonstrated good faith efforts to rea the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan, 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: httr)://www.ip.. ov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (hftp://www.in.gov/idoa). A I affirm that I have made good faith efforts to select portions of the contract work to be `�h•�` performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. A .I� I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform �11 MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. - M1 I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, YV ` lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 5/20/2024 Contractor's Bid for Public Works - 10 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number, 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 5/20/2024 Contractor's Bid for Public Works - 11 i, CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 125-014 Date: Project Name: Rabbi Shulman Apartment Demolition / Bidder: dt QfV Contact Person: V711 1014 Telephone: ,�',7'y_1 �/ q,&c,,, Address: City: Ofl a State: Zip: � 1 e Email: $ / Gt r►0 I GlY1,!1 r To determine whether a bidder has demonstrated good faith efforts to reach the&VBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. A I\ I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform W` WBEs of contracting and subcontracting opportunities. A* I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. /*I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 5/20/2024 Contractor's Bid for Public Works - 12 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. "Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 5/20/2024 Contractor's Bid for Public Works - 13 1. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN '. FORM MBE-2.1 MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE O OF Project Number: 125-014 MBE Participation Goal 1.3% Project Name: Rabbi Shulman Apartment Demolition / Bidder: 17n. Ar. L By: (Si ature) (Title) (Date) MBE Firm a Owner or Contact at MBE Firm lea alvf Telephone: S7L/.e,G.i� Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: S MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 5/20/2024 Contractor's Bid for Public Works - 14 I, CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 125-014 WBE Participation Goal 4.7% Project Name: Rabbi Shulman Apartment Building Demolition Bidder: w By: '14- (Si ature) (Title) (Date) A WBE Firm Owner or Contact at WBE Firm Telephone: �GD • �� .� Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: le .� WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 5/20/2024 Contractor's Bid for Public Works - 15 1316 COUNTY -CITY BUILDING PHONE 574/ 235-9251 227 W.JEFFERSON BOULEVARD FAX 574/235-9171 SOUTH BEND, INDIANA 46601-1830 TDD 574/ 235-5567 CITY OF SOU'ri-I BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: To: From Subject August 18, 2025 All Planholders Hillary Horvath, Clerk, Board of Public Works Addendum Number: 1 Project Name: 125-014 Project Number: Demolition of Rabbi Shulman Apartments ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 9 - S-7✓ !/ This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature: Date: „� �a� .T/V Version 8/11/2020 All Document A31 oT"" — 2010 CONTRACTOR: (Name, legal status and address) Indiana Earth, Inc. 10343 McKinley Highway Osceola, IN 46561 OWNER: (Name, legal status and address) City of South Bend 227 West Jefferson Boulevard South Bend, IN 46601 SURETY: (Name, legal status and principal place of business) Swiss Re Corporate Solutions America Insurance Corporation 1200 Main Street, Suite 800 This document has important legal Kansas City, MO 64105 consequences. Consultation with an attorney is encouraged with respect to its completion or modification. BOND AMOUNT: ***FIVE PERCENT OF AMOUNT BID*** PROJECT: (Name, location or address, and Project number, if any) Rabbi Shulman Apartment Demo, Project No. 125-014 Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions c orming to such statutory or other legal requirement shall be deemed incorporated herein. When so fumished,jIle intent is tho/this Bond shall be construed as a statutory bond and not as_a cgtnmon kw gtld� sealed this 9th day of September 11 .,�1 C _ _, Indiana Earth, C'n P], I IJ �u J &ryl (With s) (Principal) (Seal) (Title)ZrDorap Iwiss ReSo� luti erica Insurance corporation (Surety) (Seal L (Title) Todd Schaap, Attorney-ir.-Fact Init. AIA Document A310- — 2010. Copyright @ 1963, 1970 and 2010 by The American Institute of Architects. All rights reserved, WARNING: this AIA® Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of th+s A1A* Dociimertt; or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. / Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documeots; a -mail The American Institute of Architects' legal counsel, copyright@aia.org. eaIllj SWISS RE CORPORATE SOLUTIONS SWISS RE CORPORATE SOLUTIONS AMERICA INSURANCE CORPORATION (-SRCSAIC") SWISS RE CORPORATE SOLUTIONS PREMIER INSURANCE CORPORATION ("SRCSPIC-) WESTPORT INSURANCE CORPORATION ("WIC-) GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, THAT SRCSAIC, a corporation duly organized and existing under laws of the State of Missouri, and having its principal office in the City of Kansas City, Missouri, and SRCSPIC, a corporation organized and existing under the laws of the State of Missouri and having its principal office in the City of Kansas City, Missouri, and WIC, organized under the laws of the State of Missouri, and having its principal office in the City of Kansas City, Missouri, each does hereby make, constitute and appoint: THOMAS O. CHAMBERS, TODD SCHAAP, KIMBERLY S. RASCH, and PAULJACOBSEN JOINTLY OR SEVERALLY Its true and lawful Attomey(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the amount of UNLIMITED This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both SRCSAIC and SRCSPIC at meetings duly called and held on the 18th of November 2021 and WIC by written consent of its Executive Committee dated July 18, 2011. "RESOLVED, that any two of the President, any Managing Director, any Senior Vice President, any Vice President, the Secretary or any Assistant Secretary be, and each or any of them hereby is, authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Corporation bonds, undertakings and all contracts of surety, and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Corporation; and it is FURTHER RESOLVED, that the signature of such officers and the seal of the Corporation may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Corporation when so affixed and in the future with reeard to anv bond, undertaking or contract of surety to which it is attached." N,aanaNN,rW�� �rgaJ11 P R`- P IN B �4.; • u Y ♦ SEAI. S E A L' s Erik Janrsen,, Senior Vice President of SRCSAIC &Senior Vice President --..SEAL*,--!, of SRCSPIC &Senior Vice President of WIC 1973 Sso�= 11i t Tt •.,`Ju?`••Z. = BY — Gerald y/ 8 alr •r Jagroaeki,VicePresidento!SRCSAIC& Vice President of SRCSPIC •* H NNlrl,rN, & Vice President of WIC IN WITNESS WHEREOF, SRCSAIC, SRCSPIC, and WIC have caused their official seals to be hereunto affixed, and these presents to be signed by their authorized officers this 10 day of NOVEMBER 20 22 Swiss Re Corporate Solutions America Insurance Corporation State of Illinois ss Swiss Re Corporate Solutions Premier Insurance Corporation County of Cook Westport Insurance Corporation On this 10 day of NOVEMBER 20 22 , before me, a Notary Public personally appeared Erik Janssens , Senior Vice President of SRCSAIC and Senior Vice President of SRCSPIC and Senior Vice President of WIC and Gerald Jagrowski , Vice President of SRCSAIC and Vice President of SPCSPIC and Vice President of WIC, personally known to me, who being by me duly swom, acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies. OFFKXACF�i1ST1NA M MOtAV�' tiY PtnRlta tfUirEN�[tiINOR bi AGO 1, Jeffrey Goldberg, the duly elected Senior Vice President and Assistant Secretary of SRCSAIC and SRCSPIC and WIC, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said SRCSAIC and SRCSPIC and WIC, which is still in full force and effect. IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this 9th day of September , 2025 , Jeffrey Goldberg, Senior Vice President & Assistant Secretary of SRCSAIC and SRCSPIC and WIC s!w� STATE OF WISCONSIN ) COUNTY OF Racine ) ON THIS 9th day of September 2025 , before me, a notary public, within and for said County and State, personally appeared _ Todd Schaap to me personally known, who being duly sworn, upon oath did say that he is the Attorney -in -Fact of and for the Swiss Re Corporate Solutions America Insurance Corporation , a corporation of Missouri created, organized and existing under and by virtue of the laws of the State of Missouri ; that the corporate seal affixed to the foregoing within instrument is the seal of the said Company; that the seal was affixed and the said instrument was executed by authority of its Board of Directors; and the said Todd Schaap did acknowledge that he/she executed the said instrument as the free act and deed of said Company. Mario Criplean Notary Public, Racine County, Wisconsin My Commission Expires 6/13/2028 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Rabbi Shulman Apartment Building Demolition Project No. 125-014 For Bids Due 9:00am September 9, 2025 Contractor Name: �/1d�4►/1a. a. a ';' The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. "THIS FORM ONLY APPLIES TO BIDS GREATER THAN $250,000. " INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 71 of The Responsible Bidding Ordinance No. 10975-23 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") within twelve (12) months of obtaining pre -qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre - qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-71 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-71 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 5/20/2024 General Conditions - 11 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-72 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows.- 1 . All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least two -hundred fifty thousand dollars ($250,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder for projects greater than $250,000 and all subcontractors performing work greater than $250,000 on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 5/20/2024 General Conditions - 12 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. By checking this box, I hereby acknowledge that apprenticeship and training programs that I participate in have graduated at least five (5) apprentices in each of the past five (5) years. (iv) _ By checking this box, I hereby acknowledge that all subcontractors performing work greater than $250,000 also meet the qualifications of the Responsible Bidder Ordinance. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _ Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) _ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) _ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. This includes, but may not be limited to, letters from apprenticeship coordinators detailing the bidder's association with the program, and the United States Department of Labor Office of Apprenticeship Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project. Version 5/20/2024 General Conditions - 13 PRE -QUALIFICATION CHECKLIST ;t �4 BINDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements (i) V By checking this bco! r­t)y ,)(,knowledge that I am not a pre -qualified bidder with the City of South ! ,,i By checking this box c:rooy ,,.acknowledge that the City reserves the right to request supplemeni�:torn ation, additional verification of any information provided and may unduct random inquiries of my current and prior customers The Gity red the right to utilize all information provided in this submission and all ;nit rtion obtained in inquiries or requests to determine if a bidder is responsive i responsible Additionally, I acknowledge that all information provided! ;.; ty shall be regarded as public records. (iii) ✓ By checking this h; - oreby acknowledge that copies of all Applicable apprenticeship certiti, .; . ,r, standards for training programs applicable to the work performed on the � - �lect stay be requested at any time and shall be furnished / upon request (iv) By checking this bc�, n=ire>.by acknowledge and ensure that I and all sub- contractor s. from whc r+ we: accepted a bid and/or intend to hire to perform work on the public work pmjl taw properly licensed. Furthermore, I acknowledge my understanding that i+ rr-�sponsibility to ensure that all sub -contractors have the necessary Been.,, Wdertake the work called for in this bid. If a sub- contractor loses the:i, iise at any point, it is the responsibility of that sub- contractor to notify the (v) By checking this boz teioby acknowledge that apprenticeship and training programs that I partif ; .:, n i,ave graduated at least five (5) apprentices in each �of the past five:. (f,) yt,. (vi) _.. By checkurg this bear !,f+y acknowledge that all subcontractors performing work greater than 1' ; i; , ilso meet the qualifications of the Responsible Bidder Ordinaric:F (b) Attachments (i) .! Indiana `;e( rrtary of , )n line records (re. Business verification) dated within sixty (60) days of ili« of said document showing that business is in existence curreni viii lmjwnti Secretary of State's Business Entity Report, and eligible for i cew, ,>i good standing. (Not applicable to individuals, sole proprietors or partner: i. (ii) _ List identifying all foino ismess names. (iii) ✓ Any determinations i.�,- ourt or governmental agency any violations of federal state, or Icx;al laws nu f ci but not limited to, violations of contracting or antitrust laws, tax or licensing ­; environmental laws. Occupational Safety and Health Act (OSHA) or feller;-r i, , Bacon and related Acts, within the preceding five (5) years (iv) Statement ahout start r-inabilities, including labor sources. This statement indicates and ensure.: +ve suffrrient ernployees on staff to complete the work I am bidding on Off (Wiwi liow I intend to meet the staffing needs of the work, (v) Statement that indivifJ �,h() will work on the public work project on my behalf will hey [-)io Jc;, ,, aurci as art ernployee or as an independent contractor under all applicable si, : inci federal laws and local ordinances. (v) " For every project. soil, -iclerice of participation in apprenticeship and training programs applic:ablL i,c, work to be performed on the project, which are approved by and iegisi: with fire United States Department of Labors Office, of Apprenticeship or its �-!ssor organization. This includes, but may not be limited to, letters from apprcr ;Fit, coordinators detailing the bidder's association with Version 5/20/2024 o i, A;uns - 14 the progian! and thr. , i Gates Department of Labor Office of Apprenticeship Certificates of Hegi,-,W , ot Apprenticeship Programs for each type of work to be perfommeo on the prcrlt (vi) L - Copy of a written plait ,!nployee drug testing that covers all of my employees who will perform won i _; � they public; work project and meets or exceeds the requirements set forth c 4 13 18-5 or IC 4-13-18-6. (vii) V/ Evidence that I am i;h:iq ;m surety company which is on the Bureau of fiscal Service Department i ;u y :, Listing of Approved Sureties" as required in the bid specifications or r ; wl (viii) V/ Written statement of state or local tax liens or tax delinquencies owed / to any federal state n ; ii taxing body in the preceding three years. (ix) V List of protects of sinw. e and scope of work performed in all areas, including the State of Indiana vvo rnree (3) years prior to the date on which the bid is due Date. (Sign Here) '.. (Print Name Here) _. wRMA (Name of Company) (Address Company)._._ (City) (State) (Telephone Number) Version 5/20/2024 Gen( : � )I ditions - 15 City of South Bend Bidding Pre -Qualification checklist items: - Indiana Earth, Inc. has no former business names - Indiana Earth, Inc. has no determinations by a governmental agency of any violations. - Indiana Earth has the crew and staff to complete this project. - Indiana Earth partners with the Local 150 operators union and the Local 645 Laborers union for training and apprentices. - Those that work on this project will be employees of Indiana Earth or of a hired subcontractor which are under all applicable state and federal laws and local ordinances. - Operators and Laborers drug screening are performed through the BCRC Building Construction Resource Center at BCRCNET.com - Teamsters drug screening are performed during the pre -employment and by random selection through Figment Group with quarterly random requirements. - Indiana Earth, Inc. has no current tax liens. - Projects similar to this one: • Campus View Apartments Demo • Elkhart WWTP • Kamm Island Apartments • Drewery Brewery • Goshen Hospital • North Liberty Church • Granger Storage • Portage School • Madison Center LaPorte Co Courthouse - All subcontractors working for Indiana Earth are qualified under EC 4-13.4 or IC 8- 23-10 10343 McKinley Hwy. • Osceola, IN 46561 • (574) 674-6488 • FAX (574) 674-6480 BUSINESS INFORMATION DIEGO MORALES INDIANA SECRETARY OF STATE 09/05/2025 06:56 AM Business Details Business Name: INDIANA EARTH, INC. Business ID: 1990031137 Entity Type: Domestic For -Profit Corporation Business Status: Active Creation Date: 03/22/1 "0 Inactive Date: Principal Office Address: 10343 MCKINLEV HWY., OSCEOLA, IN, Expiration Date; Perpetual 46561 - 9756, USA .jurisdiction of Formation: Indiana Business Entity Report Due 03/31/2026 Date: Years Due: Governing Person Information Title Name Address President MARK L OSLER 10343 McKinley Hwy., Osceola, IN, 46561, USA Registered Agent Information type: Individual Name: MARK OSLER Address: 10343 MCKINLEN' HWY., OSCEOLA, IN, 46561 - 9756, USA INDEX ARTICLE I - COVERAGE ............................................................................................ ARTICLEII - FOREMEN............................. ................................................................. 7 ARTICLE III - EMPLOYERS BARGAINING AGENT ............................................... 7 ARTICLE IV - UNION SECURITY .............................................................................. 7 ARTICLE V - WORKING DUES CHECK -OFF .......................................................... 8 ARTICLE VI - EQUAL EMPLOYNIFNTOPPORTUNITY ........................................ 9 ARTICLE V11 - SELECTION OF LABOR -EMPLOYMENT REGULATIONS ......... 9 ARTICLE VIII - WELFARE TRUST FUND ............... _ ............................................ I I ARTICLE IX - PENSION TRUST FUND ........................... ....................................... 11 ARTICLE - IX -A - DEFINED CONTRIBUTION TRUST FUND ............................ 11 ARTICLE X - TRAINING TRUST FUND .................................................................. 12 ARTICLE XI - NOTIFICATION ................................................................................. 12 ARTICLE XII - PRE -JOB CONFERENCE ................................................................. 12 ARTICLE XIII - WORKING HOURS AND OVERTIME ......................................... 13 ARTICLE XIV - SHIFT WORK .................................................................................. 16 ARTICLEXV - STEWARD ............... ........................................................................ 16 ARTICLE XVI - NON -VIOLATION .......................................................................... 17 ARTICLEXVII - PAY-DAY ....................................................................................... 17 ARTICLE XVIII - SAFETY ........................................................................................ 18 ARTICLE XIX - WORKER'S COMPENSATION ..................................................... 18 ARTICLE XX - ELIMINATION OF RESTRICTIONS .............................................. 18 ARTICLE XXT - SUB -CONTRACTOR- .................................................................... 18 ARTICLE XXII - GRIEVANCE PROCEDURE ..................................... I ................... 19 ARTICLE XXIII - GENERAL PROVISIONS ............................................................ 20 ARTICLE XXIV - BCRC - DRUG & ALCOHOL POLICY ...................................... 21 ARTICLE XXV - INDUSTRY FUND .... .................................................................... 21 ARTICLE XXVI - LOCAL UNION COVERAGE ..................................................... 22 AR'11CLE XXVII - SCHEDULE OF FRINGE BENEFIT CONTRIBUTIONS......... 22 ARTICLE XXVIII - HOURLY WAGE RATES ......................................................... 22 ARTICLE XXIX - BONDING ..................................................................................... 27 ARTICLE XXX - GENERAL SAVINGS CLAUSE ................................................... 28 ARTICLE XXXI - MANAGEMENT RIGHTS ........................................................... 28 ARTICLE XXXII - UNIFORMITY ............................................................................. 28 ARTICLE XXXIII - MEMORANDUM OF MARKET RECOVERY ........................ 29 ARTICLE XXXIV - INDEMNITY... ............ .............................................................. 31 ARTICLE XXXV - EFFECTIVE DATE ............................................................... I .... 1.31 DIRECTORY LABORERS' INTL UNION OF NORTH AMERICA OFFICES...... 33 DIRECTORY LABORERS'INT'I. UNION OF NORTH AMERICA ....................... 34 DIRECTORY OF LOCALS BY COU NTI I"S .............................................................. 40 /Section 7. Any Contractor who signs this Agreement to perform work covered by this Agreement has the option of signing any other Agreement negotiated by the State of Indiana District Council of Laborers and any other Employer Group covering any and all work of the Construction Industry covered by the Laborers and pay the applicable wages, fringes and other conditions contained. therein. Section 8. High Pay: Forty ($.40) cents per hour for men working forty (40) feet or more subject to free fall. Section 9. In the event of an on the job -site injury, the Employee shall receive up to eight (8) hours pay even though the Employee may not be able to perform eight (8) hours work for that day. Section 10. Employees shall be given a sufficient amount of time to pick up tools at the end of a scheduled work day. However, no Employee shall be permitted to leave the job until quitting time. ARTICLE XXIV — BCRC - DRUG & ALCOHOL POLICY Section 1. Various Employer Associations and the Union members are of Building and Construction Resource Center, Inc. (hereinafter "BCRC"), a non-profit corporation that was formed to provide services in the construction industry, including, but not limited to, education and referral services concerning alcohol, drug, and other substance abuse, which purposes are more fully defined in the Articles of Incorporation and By -Laws of said BCRC and Fund Trust Agreement and Declaration of Trust. Section 2. Each Employer under this Agreement shall pay to BCRC the amount specified in the wage and fringe benefit section of the Agreement which is fifteen cents ($.15) per hour for each hour worked by its Employees covered by this Agreement. Each Employer is obligated to make such contributions, regardless of whether or not such Employer is a member of BCRC. Section 3. Payments required to be made to BCRC shall be deemed to be governed by the provisions of this Agreement pertaining to the collection of the Health and Welfare and Pension payments r,,quired to be made by the Employers and thus, may be enforced in the same manner. Section 4. The Board of Directors of BCRC will have full audit authority of the Employer's books and records as they pertain to this contribution. Section 5. The Employees covered by this Agreement will abide by the provisions of the BCRC substance abuse program when required by the owner. ARTICLE XXV - INDUSTRY FUND Section 1. Each Employer signatory to this Agreement hereby agrees to contribute to the Industry Fund, established July 1, 1980 twenty-five cents ($0.25) per hour for each hour worked by the Employees covered by this Agreement, it being understood and agreed that the enforcement, administration, etc., is solely the responsibility of the Employer, through the Michiana Area Construction Industry Advancement Fund, known as the "MACIAF", in accordance with all Federal and State laws and regulations covering such Trust Funds. 21 Section13 - Long Boom Pay .............................................. __..................................................... .................................. 14 Section14 - Capacity Pay................................................................................................................................................14 Section15 - Augers and Drill Rigs...............................................................................................................................15 Section16 - Tunnel, Shaft and Enclosed Underground.....................................................................................15 Section17 - Concrete Conveyor Systems................................................................................................................15 Section18 - Creter Cranes. ............................ ............ ___ ................................. .............................................. ............. 15 Section 19 - Truck Mounted Concrete Pumps.......................................................................................................15 Section20 - Helicopters..................................................................................................................................................15 Section21- Bobcats..........................................................................................................................................................15 Section22 - Forklifts.........................................................................................................................................................15 Section23 - Self -Erecting Tower Cranes.................................................................................................................16 Section 24 - Craft Foreman and/or Master Mechanic.......................................................................................16 Article VI Section 1 - Wage Rates and Fringe Benefits..........................................................................................................16 Section 2 - Wages and Fringe Benefits for Apprentices in all Counties....................................................19 Article VI Section1 - (A) Welfare Fund....................................................................................................................................... 20 (B) Retiree Medical Savings Plan........................................................................................................ 21 Section2 - (A) Pension Fund....................................................................................................................................... 21 Section3 - Vacation Fund.............................................................................................................................................. 22 Section 4 - Retirement Enhancement Fund.......................................................................................................... 23 Section 5 - Apprenticeship and Skill Improvement Fund............................................................................... 24 Section 6 - Industry Advancement Fund................................................................................................................ 25 Section 7 - Employee Check -Off (A) Dues Check Off..................................................................................................................................... 26 (B) Local 150 - Federal PAC Check-Off............................................................................................. 26 Section 8 - Construction Industry Research & Service Trust Fund............................................................. 27 Article Vlll Section1- Grievance and Arbitration...................................................................................................................... 28 Section2 - Jurisdictional Award.................................................................................................................................29 Article IX Section1 Affirmative Action...................................................................................................................................... 29 Section2 - No Discrimination...................................................................................................................................... 29 Article X Section1 - Savings Clause............................................................................................................................................. 29 Section2 - Uniformity ..................................................................................................................................................... 29 Article XI CreditUnion Deductions................................................................................................................................................. 30 Article XIl BusinesslOperationsDisclosure..................................................................................................................................30 Article Xlll EntireAgreement of the Parties.................................................................................................................................. 30 Article XIV Agency..................................................................................................................................................................................... 30 Article XV Effective Termination Dates and Notification....................................................................................................... 31 Building and Construction Resource Center Inc Drug/Alcohol Program ................................................. 32 _ 1 r� 1 C �D MICHIANA BUILDERS ASSOCIATION INC Final DFAGAN.JGARDNER.NCLI N E June 22, 2023 mic CONTRIBUTIONS TO BUILDING AND CONSTRUCTION RESOURCE CENTER, INC. Various Employer Associations under this Agreement and the Union are members of Building and Construction Resource Center, Inc. (hereinafter 'BCR(:"), a non-profit corporation, that was formed to provide services in the construction industry concerning alcohol, drug and other substance abuse. Effective June 1, 2023, each Employer under this Agreement shall pay to BCRC the sum of fifteen cents ($0.15) per hour for each hour worked by each of its employees covered by this Agreement. Each Employer is obligated to make such contributions, regardless of whether such Employer is a member of BCRC. Payments required to be made to BCRC shall be deemed to be governed by the provisions of this Agreement pertaining to the collection of the Health & Welfare and Pension payments required to be made by the Employers and thus, may be enforced in the same manner. Payments shall be payable to Building and Construction Resource Center, Inc. (BCRC), 6050 Southport Suite B, Portage, Indiana 46368. The Board of I)irectors of BCRC will have full audit authority of the Employer's books and records as they pertain to this contribution. BCRC shall notify the Union of any failure to test under this Article and of any positive test result. MICIIIANA [BUILDERS ASSOCIATION INC Final DFAGAN.JGARDNER.NCLINE June 22, 2023 mlc ,/i112CJ19 Employee Policy Manual INDIANA EARTH, INC. 10343 McKinley Hwy. Osceola, IN 46561 (574) 674-6488 E-Mail: earth921nc@sbcglobal.net Index Employment Statement: Attendance: pg. 05 Policy 100-01 Absences pg. 06 Policy 100-02 Tardiness pg. 06 Policy 100-03 Sickness / Personal Leave pg. 06 Policy 100-04 Bereavement pg. 07 Policy 100-05 Jury Duty pg. 07 Benefits: Policy 200-01 Vacation pg. 07 Policy 200-02 Holiday pg. 08 Policy 200-03 Personal Days pg. 08 Policy 200-04 Insurance / Health Care pg. 09 Policy 200-05 Insurance / Cobra pg. 09 Policy 200-06 Insurance / Worker's Compensation pg. 09 Conduct: Policy 300-01 Employee Code of Ethics pg. 10 Policy 300-02 Gift Acceptance Rule pg. 11 Policy 300-03 Dress Code pg. 11 Policy 300-04 Eye Protection pg. 12 Policy 300-05 Footwear pg. 12 Technological Standards & Uses: Policy 400-01 Standard for Use pg. 12 Policy 400-02 Shareware, Games & Programs pg. 13 Policy 400-03 Passwords pg. 13 Policy 400-04 E-Mail pg. 13 Policy 400-05 Internet pg. 13 Policy 400-06 Improper Use pg. 13 Substance Abuse: Policy 500-01 Substance Abuse pg. 14 Policy 500-02 Drug Testing pg. 15 �/ original is strictly forbidden. ,Ise of e-mail for non -business purposes. This includes internal mail as well as internet mail. "Chatting", "Chain Letters", and other non -business "broadcasts" (e.g. jokes, pictures, programs, etc.) to multiple users not only use the company's network resources, but the sender and recipients' time and are prohibited. Transferring information to a flash drives, CDs or DVDs without the permission of the Office Manager. • Personal uses such as advertisements and notices. • Mass e-mail, unless for official business. • Sending images or documents that can be offensive or inappropriate. • No visiting chat rooms, shopping sites, X-rated sites, advertising sites, sports centers, news stories, etc. during business hours and this includes lunchtime. etc. Substance Abuse Substance Abuse: Policy 500-01 Revised 6-20-19 Indiana Earth, Inc. supports all efforts to create a drug free workplace and has instated a policy which prohibits all employees from using, selling or transferring drugs, alcohol or any other illegal substances on or around the jobsite and at the company facility. All employees shall carry themselves in a respectable manner at all times (on and off the jobsite) in order to promote the good image of Indiana Earth, Inc. Drug and alcohol abuse is a serious concern and Indiana Earth, Inc. recognizes this problem. Maintaining a safe, efficient, and healthy working environment to benefit the company and its employees is of the greatest importance to Indiana Earth, Inc. Participating in any jobsite activities while under the influence of drugs or alcohol poses a serious risk to jobsite safety and therefore will not be tolerated. In order to protect the health and safety of all Indiana Earth, Inc. employees and any other individuals involved in the construction process, the following policy regarding substance abuse in the workplace has been instated as vital to Indiana Earth, Inc. From the time you leave home, until such time as you return home on completion of work, or until the homeward journey is broken, Indiana Earth, Inc., prohibits the use, possession or distribution on its premises, facilities or work places of any of the following: alcoholic beverage, intoxicants and narcotics, illegal or unauthorized drugs (including marijuana), "look -alike" (simulated) drugs, and related drug paraphernalia. Company employee must not report for duty while under any drug, alcoholic beverage, intoxicant or narcotic or other substance (including legally prescribed drugs and medicines), which will in any way adversely affect their working ability, alertness, coordination, response or adversely affect the safety of others on the job. Using or possessing illegal drugs will not be tolerated and will be grounds for immediate dismissal and no unemployment benefits will be granted. 14 ,)rug Testing: Policy 500-01 Revised 7-23-15 Indiana Earth, Inc. permits the testing for the use of illegal substances or alcohol at any time including, but not exclusive to the stages listed below. Pre -Employment Testing: Applicants for employment with Indiana Earth, Inc. may be required to participate in a �y pre -employment drug urinalysis and/or blood test. Applicants who test positive without previous direct explanation will be immediately removed from employment consideration. Any individual who refuses to participate in a drug screen will not be considered for employment. Reasonable Suspicion: Any employee displaying evidence of being in violation of the Substance Abuse Policy set up by Indiana Earth, Inc. may be subjected to a drug test. Former Conviction: If an employee has a history of drug or alcohol abuse, Indiana Earth, Inc. may request a drug test to ensure the safety of all employees on the jobsite Random Testing. - Employees of Indiana Earth, Inc. could periodically be selected to submit a drug test to ensure the safety of all employees. * A positive test will lead to immediate termination of employment. Refusal to participate in a drug test will be treated as a positive test result and will lead to immediate termination of employment ,A Transportation, Equipment, Tools & Property Company Owned: Revised 6-20-19 Employees are expected to use the company vehicles and equipment in the conduct of all Indiana Earth, Inc. business. Personal use of company vehicles or Equipment is not permitted. The privilege of company vehicle use is extended only to those with both a valid state driver's license and an admirable driving record. Insurability is a condition of employment for those whose work involves driving. The use of company vehicles or equipment shall be restricted to work related activities and/or during normal working hours. Superintendents and foremen are expected to be diligent in keeping company vehicles clean and in good repair. All vehicles are not allowed at any bars, exotic dancing places, adult bookstores, or liquor stores. If driving a company vehicle, you must possess a valid drivers license. If you do not have one then you are not allowed to drive our vehicles and you could be terminated if you drive a company vehicle without a 15 INTN:RNATIONAI. UNION 1' IO \ ( 11" t)PERATING ENCTINEERS LOCAL UNION NO. 150, 150B. ISOA, 150C, 150RA, 150D, ISOG, I50M ARPILIATEO WITH THE A-VL -I: 1 .. nN 51—DING TRADES DEPA14IMENT JAMES M. SWEENEY PRESIDENT BUSINESS MANAGER Date: 9-3-2025 To whom it may concern: (7081 462-6800 FAX 17081 482.7186 6200 JOLIET ROAD COUNTRYSIDE. IL 60525-3992 Countless individuals; businesses, and t.Innmunities in the private and public sector, alike — recognize the added value of doing husiness with contractors who support Workforce Development through their participation in I iniicd States Department ofLabor (USDOIJapproved apprenticeship programs. USDOI.-approved apprenticeship programs ensure that the young people of Indiana have the oppOrtunity tO do y vlop a portable skill set that remains with them throughout their careers in the construction industry. ne training provided by these programs addresses the evolving concerns of communitic,:. businesses, and industry for the development of a quality skilled craft workforce that meets their needs, whether the projects are public or private in nature. To that end, please be advised that Indiana F:arth, Inc. is signatory to a collective bargaining agreement (C$A) with the International Union of' Operating Engineers Local 150. This CBA requires the above -referenced employer i1, participate in Local 150's USDOL-approved Apprenticeship and Skill Improvement Propr<wi. It is understood and agreed that the Employer shall be bound by the terms and pro\ ision�, ,, the Agreement and Declaration of Trust of the Apprenticeship Fund, and all amencintents lieu,.A1ltnre or hereafter made thereto, as though the same were fully incorporated herein. I he kniplo.I:r further agrees to be bound by the terms of the Apprenticeship Standards established hN Joini \ pprcmiceship Training Committee of the Northern Illinois and Northern Indiana Apprenticeshipxi,., Skill Improvement Program, as approved by the United States Department of Labor. Bureau,,' apprenticeship Training. Sincerely, �Iarnes Gardner Business Agent\ Organizer Operating Engineers Local 150, AFL-CIO District 6 1001 N. Michigan Street Lakeville, Indiana 46536 574/784-3694 office 574/784-8035 fax 574/215-8901 cell .1g:.►I'dilerar(r1cAl 1.` 0,onl,!. F----91UOE OPERATING ENGINEERS LOCAL 150 APPRENTICESHIPFUND A joint effort Labor and Management to further aim of Industry vy James M.Jweeneyl Chairman Wednesday, September9*ZO25 To whom it may concern, David M.JneUen/Secretary Indiana Earth, Inc. isasignatory contractor to the I.U.O.E Loca15Iand therefore, also participates inthe |.U/D[ Local 150 Apprenticeship and Skill Improvement Program, iASIP), located at 19800 W. South Arsenal Rd, in Wilmington, IL. The Local 150A6|P|sa D0LRegioe,ed Apprenticeship Program overseen bythe DOL'sOffice of Apprenticeship (OA). Listed below are the number of graduates of its program during the years 2020 — 2024. * 2024 Jl6 ° 2Ol3 ZO& * lO2Z'2Z8 ~ 2O21 1O0 ^ JU2O'l05 If there are any questions regarding the:! J O-E Local 150 Apprenticeship, please feel free to contact me directly. ff,a4d' A�9 X� Mark Kara Assistant Coordinator Operating Engineers Local 150Apprentiusmn 19800VV. South Arsenal Rd. Wilmington, u6Qu8z mkaa6uasiploca|l5Oor0 Tel: V15-7Z2-32O1x60UJ INDIANA LABORERS' ' TRAINING TR UST FUND David A. Frye Secretary -Treasurer Jerry J. Balk Chris Brickey Ricky Henson, Jr. Ramon Mendoza, Jr. Brian Short P.U. Box 758 - Bedford, Indiana 47421 (812)279-9751 September 2, 2025 To Whom It May Concern: Sean Couklet, Over -for John P. Brown Chairman Kelly Abet Michael Ferrara ,lade Painter Nick Timmerman Jim Wiseman FAX: (812) 279-5545 Toll Free (800) 742-4086 This letter is to confirm that "Indiana Earth, Inc." is a signatory contractor in good standing with the Indiana Laborers' Training Trust Fund. The abovementioned company is a participant in the Joint Apprenticeship and Training Committee through this Union and has been an active participant in good standing for each of the past five consecutive years and is currently eligible to use our apprentices on a project. Further, our organization's program is approved by the U.S. Veterans Administration to participate in the GI educational benefits program. A copy of our approval letters are attached. Please refer to the current collective bargaining agreement for the ratio of Journey Worker to Apprentice, if no ratio is prescribed in these documents, the ratio shall be one (1) Apprentice for every (5) Journey Workers and thereafter not employ more than (1) Apprentice for every (3) Journey Workers. Sincerely, f Sean Coakley, Director vvwt .indianaluborerstraining.org saw • ` d� KIM rl Sk 0 4 Apprentice Status Report By Indenture Date Apprentices Indentured Between 11112.020 And 12/31/2024 Apprentice Program: IN2 Year Apprentice Status Apprentices Percentage 2024 Active 920 80.07% Active Duty 1 0.09% Adv. to Journeyman 21 1.83% Deceased t 0.09% Graduated Med. Susp. 1 0.09% 2 0,17% Not Registered 1 0.09% Reinstate 55 4.79% Suspended 5 0.44% Terminated 138 12.01% ,Voluntary withdraw A 4 0.35% L Total Indentured 1149 Printed: Friday, February 7, 2025 Page 3 of 3 Apprentice Status Report By Indenture Date Apprentices Indentured Between 111/2020 And 12/31/2024 Apprentice Program: IN2 Year Apprentice Status Apprentices Percentage 2022 2023 Active 217 22.89% Adv. to Journeyman 75 7.91% Deceased 5 0.53% Graduated 95 10.02% Joumeyman - - - 1 0.11% Med. Susp. 3 0.32% Not Registered 1 0.11% Reinstate 6 0.63% Stvended 7 0.74% Terminated 498 52.53% Transferred Out 2 0.21% Voluntary withdraw 38 4.01% Total Indentured 948 AChh a 447 43.91% Adv. to Journeyman 55 — ... 2 5.40% 0.20% - Deceased Graduated 5 0.49% Journeyman � 3 0.29% Med. Susp. 1 0.10% Not Registered 5 0.49% Reinstate 25 2.46% Suspended _._. 7 0.69% Terminated 441 43.32% Voluntary withdraw 27 2.65% Total Indentured 1018 Printed: Friday, February 7, 2025 Page 2 of 3 Apprentice Status Report By Indenture Date Apprentices Indentured Between 1/1/2020 And 12/3112024 Apprentice Program: IN2 Year Apprentice Status Apprentices Percentage 1-1 2021 Active __..._� ._---- ------- 22 3.42% Adv. to Journeyman 73 11.34% Deceased 2 0.31% Graduated 64 9.94% loumeyman 1 0116% Not Registered 1 0.16% Reinstate 2 0.31% Suspended 1 0.16% Terminated 433 67.24% Voluntary withdraw 45 6.99% Total Indentured ...-._ 644 Active 53 7.13% Active Duty 2 0.27% Adv. to Journeyman 72 9.69% Deceased 4 0.54% Graduated 93 12.52% Med. Susp. 1 0.13% Reinstate 2 0.27% Suspended 1 0.13% Terminated 471 63.39% Voluntary withdraw 44 5.92% Total Indentured 743 Printed. Friday, February 7. 2025 Page i or 3 WE STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W-469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor James M. Brown, Director January 9, 2019 The Indiana State Approving Agency conducted a supervisory visit on 0I/8/201.9 at Indiana Laborers 'Training "Trust Fund -Apprenticeship. 'I lie purpose of the visit was to provide training to the Certifying Officials and review enrollment certifications, record retention and reporting procedures. The organization demonstrated proper record maintenance and record maintenance and reporting procedures. During the visit, we discussed the importance of reporting hours on a monthly basis, good record keeping techniques, and how to report a Ieave of absence or completion via VA Form 22-1999b. We also updated the Certifying Officials via VA Form 22-8794, work processes, and wage scale. If you need any assistance or have any questions regarding this technical visit please contact me directly at tgriffin(a)dva.in.gov or (317 ) 232-391 h. thank. you for the courtesy extended during my visit. The education and training opportunities that your organization continues to provide veterans and their dependents are appreciated. Sincerely, Taniqua 6ri ffi n Program. Director Phone (317)-234-6062 Toll Free (800yQ04520 Fay + ' ; I '%' i c DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W469 INDIANAPOL.IS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy .Brewer, Eric Holcomb, Governor James M. Brown, Director January 9, 2019 This will acknowledge receipt of your updated Wage Scale for the Construction Craft Laborer program offered by Indiana Laborers Training Trust Fund -Apprenticeship. The State Approving Agency has reviewed the document as listed below: Wage Scale: Construction Craft Laborer FACII.ITY CODE: 30004114 To the best of my knowledge Indiana Laborers Training Trust Fund -Apprenticeship does not utilize erroneous or misleading advertisement, either by actual statement, omission, or intimation. It is understood by Indiana Laborers Training Trust Fund -Apprenticeship that, they will maintain a complete record of all advertising utilized by or on behalf of the Indiana Laborers Training 'I"rust Fund -Apprenticeship in regards to their training programs during the preceding 12 months. Indiana laborers Training Trust Fund -Apprenticeship's advertising will be available for review by any and ,iI I future supervisory visits by the SAA, or the U.S. Department of Veteran Affairs. Please Review the entire packet for content and accuracy. Approval is granted pursuant to the provisions of Title 38, U.S. Code 3687, with an effective date of April 1, 2018. If you have any questions, please feel free to give me a call at 317-232-3916 or email me at tgriffin@dva.in.gov. Thank you for what you do for our Veterans, and have a great day! S I ucercly, Taniqua Griffin Program Director State Approving Agency Cc: VARO/ELR. Rf. r 9 STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGfON STREET ROOM W--469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship (loordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor James M. Brown, Director January 9, 2019 This will acknowledge receipt of your revised Work Processes for the Construction Craft Laborer program offered at Hoosier Energy, located in Bedford, Indiana. The State Approving Agency has reviewed the document as listed belc,w: TRAINING: PROGRAM LENGTH DOTCODE Construction Craft Laborer FACILITY CODE,: 30004114 4,000-7800 hours 47-2061.00 To the best of my knowledge Indiana laborers ' l r;> ir>jng; 'I rust Fund-Apprenticeshp does not utilize erroneous or misleading advertisement, either by a ii.ial statement, omission, or intimation. It is understood by Indiana Laborers Training Trust 1-tind-Apprenticeship that they will maintain a complete record of all advertising utilized by or on behalf of the company in regards to their training programs during the preceding 12 months. The company's advertising will be available for review by any and all future supervisory visits by the SAA., or the U.S. Department of Veteran Affairs. This approval is made pursuant to and under the provisions of Titie 38, U. S. Code 3687, with an effective date of January S, 2019. If you have any questions, please contact me at 317-232-3916. Sincerely, Taniqua Griffin Program Director State Approving Agency Cc: VAROfELR Phone (317)-234-6062 Tolt F-ee (8001-400-4521) FL, i 1 SURETY LICENSES c,f/: AL, AK, AZ, AR, CA, CO, CT, DE, DC, FL, GA, HI, ID, IL, IN, IA, KS, KY, LA, ME, MD, MA, MI, MN, MS, MO, MT, NE, NV, NH, NJ, NM, NY, NC, ND, OH, OK, OR, PA, RI, SC, SD, TN, TX, UT, VT, VA, WA, WV, WI, WY INCORPORATED IN: Texas SURETY BONDING COMPANY OF AMERICA (NAIC #24047) BUSINESS ADDRESS: 151 N. Franklin Street, C.HICAGO, IL 60606 PHONE: (312) 822-5000 UNDERWRITING LIMITATION b/: $489,000 SURETY LICENSES c,f/: AL, AZ, AR, CA, CO, DE, DC, GA, ID, IL, IN, KS, MN, MO, MT, NE, NV, NM, NY, ND, OK, OR, SC, SD, TN, TX, UT, WV, WY INCORPORATED IN: South Dakota /Swiss Re Corporate Solutions America Insurance Corporation (NAIC #29874) BUSINESS ADDRESS: 1200 MAIN ST. SUITE 800, KANSAS CITY, MO 64105 - 2478 PHONE: (816) 235-3700 UNDERWRITING LIMITATION b/: $113,786,000 SURETY LICENSES c,f/: AL, AK, AZ, AR, CA, CO, CT, DE, DC, FL, GA, GU, H1, ID, IL, IN, IA, KS, KY, LA, ME, MD, MA, MI, MN, MS, MO, MT, NE, NV, NH, NJ, NM, NY, NC, ND, OH, OK, OR, PA, PR, RI, SC, SD, TN, TX, UT, VT, VA, VI, WA, WV, WI, WY INCORPORATED IN: Missouri Swiss Re Corporate Solutions Premier Insurance Corporation (NAIC #32778) BUSINESS ADDRESS: 1200 MAIN ST. SUITE 800, KANSAS ci ry, MO 64105 - 2478 PHONE: (816) 235-3700 UNDERWRITING LIMITATION b/: $7,070,000 SURETY LICENSES c,f/: AL, AK, AZ, AR, CA, CO, CT, DE, DC, FL, GA, GU, HI, ID, IL, IN, IA, KS, KY, LA, ME, MD, MA, MI, MN, MS, MO, MT, NE, NV, NH, NJ, NM, NY, NC, ND, OH, OK, OR, PA, PR, RI, SC, SD, TN, TX, UT, VT, VA, VI, WA, WV, WI, WY INCORPORATED IN: Missouri Swiss Reinsurance America Corporation (NAIC #25364) BUSINESS ADDRESS: 175 KING STREET, ARMONK, NY 10504 1606 SHORE EST June 25, 2025 Re: Bonding L intits for Indiana Earth, Inc. To Whom It May Concern: Please be advised that Swiss Re Corporate Solutions America Insurance Corporation of Kansas City, MO has had the continuing privilege of providing bonding support to Indiana Earth, Inc. of Osceola, IN. Swiss Re Corporate Solutions America Insurance Corporation has a Best Insurance Guide rating of A+ XV. We currently have a bonding line established with single job limits of $10,000,000 and aggregate limitations of $20,000,000. By no means do these limits constitute maximums, as we will consider larger projects at the time a request is submitted to our company. We are of the opinion that Indiana Earth, Inc. is one of the finest managed contracting firms in the industry. They have consistently handled each of their projects in a professional manner and all projects have been satisfactorily completed. This letter is not all assumption of halhility not- is it a bond. Subject to a routine underwriting review of the contract, hood forms, confirmation of adequate project funding and current underwriting inIbi-matufn, we are prepared to arrange for the issuance of performance and payment bonds upon r4gUe5t. Please note that any decision regarding the extension of surety credit is bct\\ cc►i Swiss Re Corporate Solutions America Insurance Corporation and Indiana Earth, Inc., and no liability attaches to third parties. Should you have any questions, please do not hesitate to call. Sincerely, Thomas O. Chambers Attorney -in -Fact Swiss Re Corporate Solutions America Insurance Corporation MEMBER v�✓E:8 1 e