Loading...
HomeMy WebLinkAboutDenied Traffic Control Device - 452 S Illinois St1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA46601-1830 Ms. Vicki Cano 452 S. Illinois St. South Bend, IN 46619 PHONE 574/235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS September 9, 2025 RE: Request for Traffic Control Device - Handicapped Accessible Parking Space Sign Dear Cano: At its September 9, 2025 meeting, the Board of Public Works denied your request for the installation of a handicapped accessible parking space sign at 452 S. Illinois St., as it does not meet the requirements. After review of your application and the area in front of your home, it was determined that there is a driveway that will provide better access directly to the backdoor. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk Enclosures HH ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARYA. GILOT MURRAY L. MILLER BREANA N. MICOU OUTH 8Ls' I51 a BOARD OF PUBLIC WORKS Request for Approval of Traffic Control Device(s) Date: August 26, 2025 Date: September 9, 2025 I hereby submit the following installation or change of traffic control devices for review: ® New Installation ❑ Removal ❑ Revision ❑ Stop Sign ❑ Stop Sign ❑ Stop Sign ❑ Yield Sign ❑Yield Sign ❑ Yield Sign ❑ Speed Limit,_mph ❑ Speed Limit,_mph ❑ Speed Limit,_mph ® Other, List ❑ Other, List ❑ Other, List Residential Handicapped Parking Location(s): 452 S Illinois St This has been submitted: ® In response to request by a citizen/ neighbor/ passerby: Resident ❑ In response to contracted reconstruction or improvements ❑ In response to developer -provided reconstruction or improvement ❑ In response to an internally -generated concern from Remarks: Ms. Vicky Cano has not met all the requirements as she has a paved driveway with direct access into her home that is in decent condition. Submitted by: (Field Checked 07/25/2025) C4'eWIZ Caitlin Wyant, EI 61 Project Engineer ❑APPROVED CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member Murray L. Miller, Member Distribution: Bureau of Traffic and Lighting Police Department Traffic Division Recommend Approv enial: Reviewed by: eslie Biek, PE Assistant City Engineer DENIED Joseph R. Molnar, Vice President ins . /l(p Breana Micou, Member 4vaAL Attest: Hillary R. Horvath, Clerk Date: September 9, 2025 HANDICAPPED PARKING REQUEST Ms. Vicky Cano 452 S Illinois St Field Checked: 07/25/2025 Field Checked By: Caitlin Wyant, El liUY 5 �cess )pears to oe unused for venicle access • Backdoor is directly accessible from driveway • Parking allowed on both sides of S Illinois • Ramp recently added to front of house • 1 handicap space already existing on 400 block S Illinois St BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 08/12/2025 Name Caitlin Wvant, EI Department Public Works BPW Date 08/26/2025 09/09/2025 Phone Extension 7483 Required Prior to Submittal to Board BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ❑ Check the Appropriate Item Type — Re uired or All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ® Traffic Control: ❑ Resolution Residential Handicap Parking ❑ Other: ❑ Ease./Encroach Required Information Company or Vendor Name New Vendor ❑ Yes ❑ If Yes, Approved by Purchasing ❑ No MBE/WBE Contractor ❑ WBE Completed E-Verify Form Attached ❑❑ Nos Project Name 452 S Illinois St Residential Handicap Parking Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Recommend Denial For Change Orders Only Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount Increase Current Percent of Change: Decrease New Amount $ Increase Total Percent of Change: Decrease Time Extension Amount: New Completion Date: