Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - Garmong
tom- 1865 fit' Aw Mau w1�1 wV& C. H. Garmong & Son, Inc. 1502 Magnavox Way, Suite 240, Fort Wayne, IN 46804 260.279.2220 GARMONG.NET IT, !►11�1 1502 Magnavox Way, Suite 240, Fort Wayne, IN 46804 260.279.2220 August 26, 2025 City of South Bend, Indiana 227 W. Jefferson Blvd., 13th Floor South Bend, IN 46628 RE: Proposal for Construction Manager as Constructor (CMc) Services: Kennedy Park Renovation, Project Number 123-008 To the Selection Committee: The City of South Bend has made a strong commitment to enhancing Kennedy Park as a vibrant, intergenerational destination for recreation, inclusion, and community gathering. This renovation —anchored by a new aquatics center, upgraded park amenities, and sustainable improvements —reflects the City's mission to deliver services that empower all residents to thrive. The City's goals of accountability, innovation, and sustainability are clear, and Garmong Construction (Garmong) will bring that vision to life. Garmong is uniquely qualified to support these goals. We bring decades of experience delivering complex municipal, recreational, and aquatic projects across Indiana, with recent examples including the Deaconess Aquatic Center in Evansville, Toyota Indiana YMCA in Princeton which includes an aquatic center, and the Vigo County Aquatic Center in Terre Haute. These projects demonstrate our ability to balance community priorities with cost control and schedule discipline, an approach that aligns with the City's $13 million budget target. For Kennedy Park, Garmong will assign a dedicated team experienced in aquatic and park facility construction. Our collaborative process emphasizes value engineering, constructability reviews, and transparent communication, ensuring that each design decision contributes to long-term sustainability and manageable operating costs. We will work closely with DLZ Corporation and City staff to evaluate project elements based on cost -benefit, helping the City maximize impact while maintaining fiscal responsibility. Equally important, Garmong is committed to supporting local labor and broadening participation. We will engage minority-, women-, and veteran -owned business enterprises throughout the project lifecycle, and follow a fair and open subcontractor prequalification process. This approach not only meets the City's project -specific goals but also builds economic opportunity for South Bend's workforce. Enclosed are the required proposal documents, including company qualifications, project team resumes, financial and insurance information, relevant project experience, and detailed project costs. We look forward to partnering with the City of South Bend to deliver a Kennedy Park renovation that reflects the City's vision and serves the community for generations to come. Thank you for your consideration. Sincerely, Paul Okeson Principal -in -Charge pokeson@garmong.net 317.682.1001 Primary Contact 1h GARMONG Lance Gassert Project Executive Igassert@garmong.net 812.234.3714 Secondary Contact Kennedy Park Renovation I Garmong Construction SECTION COVER PAGE TABLE OF CONTENTS FIRM BACKGROUND/TEAM/EXPERIENCE PROJECT APPROACH MBE AND WBE PARTICIPATION PROJECT COSTS NON -COLLUSION NON -DEBARMENT AFFIDAVIT NON-IRAN FORM CERTIFICATE OF INSURANCE AND BONDING lh GARMONG PAGE 2 3-8 9-12 13 14-15 16-18 19-20 Kennedy Park Renovation I n Garmong Construction L 'il'IN ;It11Il l L41 Firm Summary Founded in 1923, and guided by fourth generation leadership, Garmong Construction specializes in the construction management, design -build, and general contracting delivery systems for both public and private sector clients. Garmong is a privately -held corporation. MISSION STATEMENT For over a century, our company has been built on more than just the quality of our work —it's the lasting relationships we've cultivated along the way. We are committed to delivering excellence while fostering trust, collaboration, and meaningful connections that stand the test of time. Garmong recently completed the Martin Luther King Jr. Dream Center in South Bend, a transformational community and recreation hub. Through this project, we built strong relationships with the local labor force and deepened our ties within the community. Aquatic center construction brings unique challenges that demand precision — from specialized mechanical and water systems to expansion joints, waterproofing, structural loads, soil conditions, and groundwater management. With more than one million gallons of water constructed across our portfolio of aquatic projects, Garmong brings the expertise needed to anticipate and address the complexities of these facilities. Number of Employees & Annual Volume of Projects Headquartered in Indiana with offices in Fort Wayne, Indianapolis, Terre Haute, and Evansville, our 200+ professionals bring deep expertise in Construction Manager as Constructor (CMc) delivery. We have partnered with cities across the state to deliver projects that enhance public spaces, improve quality of life, and create lasting community impact. Annually, we deliver more than $300 million in construction projects. Awards fr Certifications Garmong has been repeatedly recognized for growth, culture, and excellence, including being named one of the Best Places to Work in Indiana and receiving the Governor's Century Award for our commitment to service and staying power. 1h GARMONG Together with the South Bend community, Garmong's project team marched from the Civil Rights Heritage Center to the new MLK Dream Center on the anniversary of Dr. King's assassination to commemorate the Dream Center's grand opening. TOP: Jim Donaldson, Project Superintendent, interacts with the community during the open house portion of the ribbon cutting ceremony. Kennedy Park Renovation I A Garmong Construction 3 FIRM BACKGROUND/TEAM/EXPERIENCE Project Team The key individuals presented below are committed to providing exemplary CMc services for the City of South Bend and design team for the renovation of Kennedy Park. The primary contact for this project is Paul Okeson, Principal -in -Charge, while the secondary contact is Lance Gassert, Project Executive. They will provide executive oversight of this project from start to finish. Under the leadership of Josh Springer, Project Manager, the on -site team will consist of Jim Donaldson, Project Superintendent, and Josh Hocker, Project Engineer. Resumes for these key individuals are presented on the following pages. PAUL OKESON Principal -in -Charge LANCE GASSERT Project Executive JOSH SPRINGER Project Manager JIM DONALDSON JOSH HOCKER Project Superintendent Project Engineer 1h GARMONG Kennedy Park Renovation I Garmong Construction FIRM BACKGROUND/TEAM/EXPERIENCE h GARMONG Paul Okeson Principal -in -Charge As President of Garmong Construction, Paul leverages 20 years of business expertise and extensive government experience to drive successful construction projects. His roles in state and local government — including Chief of Staff for Indianapolis, Chair of the Indiana Election Commission, and leadership in the Daniels and Rokita administrations —give him deep insight into public safety infrastructure and funding. Paul's strong relationships with county officials, and state leaders ensure seamless project execution, positioning Garmong as a trusted partner in delivering secure, efficient public safety facilities across Indiana. EDUCATION B.A., History & Political Science, Indiana University Fort Wayne Lance Gassert Project Executive Lance has over 20 years of experience in the construction industry. He will provide comprehensive and strategic oversight, guaranteeing that all objectives are efficiently and effectively met. Lance's dedication to achieving project success, coupled with his ability to adapt to evolving construction technologies and methodologies, ensures that every project he undertakes is executed with precision. With his experience, Lance will ensure the city of South Bend's vision comes to life, providing a safe place for all throughout construction and following construction EDUCATION B.S., Civil Engineering, Rose -Hinman Institute of Technology PROJECT EXPERIENCE Martin Luther King Jr. Dream Center South Bend, IN Vigo County Aquatic Center Terre Haute, IN Tri-North Middle School Bloomington, IN Vigo County Jail and Sheriff's Office Terre Haute, IN Josh Springer Project Manager With over 13 years in the construction industry, Josh is an invaluable asset to our team. His expertise lies in a range of key areas, including cost control, estimating, value engineering, systems analysis, quality control, project coordination, project phasing, safety, expediting, purchasing, and scheduling. With his wide-ranging skill set and wealth of experience, Josh will ensure project success by effectively managing every aspect from start to finish. EDUCATION B.S., Architecture, Ball State University M.S., Construction Management, Florida International University PROJECT EXPERIENCE Martin Luther King Jr. Dream Center South Bend, IN Taylor University Upland, IN Indiana Tech Zollner Engineering Renovation and Addition Fort Wayne, IN Kennedy Park Renovation 15 C Garmong Construction J FIRM BACKGROUND/TEAM/EXPERIENCE h GARMONG Jim Donaldson Project Superintendent Jim has over 34 years of experience and will provide full-time, onsite supervision, and coordinate day- to-day operations and communication. He ensures the project is built in accordance with drawings and specifications. EDUCATION OSHA 10 OSHA 30 Wayne State University United States Army Corps of Engineers United States Air Force PROJECT EXPERIENCE Martin Luther King Jr. Dream Center South Bend, IN Trinity Commons Apartments Durham, NC 721 Tucker Street Apartments Raleigh, NC Arboretum Apartments Cary, NC Josh Hocker Project Engineer Josh brings b years of construction experience and will assist with day-to-day responsibilities for project delivery, including material delivery logistics, RFIs/submittals, meeting coordination and recording and subcontractor management. Josh has worked on several CMc projects, possessing valuable insights into the unique challenges and requirements of construction management. His input will be instrumental in driving the success of the Kennedy Park Renovation, ensuring that the project is completed efficiently and effectively, meeting all stakeholder expectations. EDUCATION B.S., Construction Management, Purdue University PROJECT EXPERIENCE Martin Luther King Jr. Dream Center South Bend, IN Fort Wayne Children's Zoo, Red Panda Ridge Fort Wayne, IN Fort Wayne Children's Zoo, Adventure Play Ropes Course Fort Wayne, IN Marion General Hospital Gas City, IN Kennedy Park Renovation I L Garmong Construction V FIRM BACKGROUND/TEAM/EXPERIENCE Firm Experience In the last five (5) years, Garmong has completed dozens of CMc projects for public entities in the State of Indiana. Several of these projects are described below. Toyota Indiana YMCA of Gibson County Princeton, IN Garmong served as Construction Manager for the remodel of a 60,000-square- foot building. This remodel included new additions of an entryway, aquatic facility, auxiliary gymnasium, locker rooms, offices, a STEM lab, a teaching kitchen, and community spaces, among other amenities. This project was completed in 2025. Project Cost: $19M Challenges & Successes: As a renovation project, there were many unknowns regarding the state of the building. To successfully navigate this challenge, the Garmong team performed extensive diagnostics to determine the current state of the building in order to minimize unexpected site and building conditions. Reference: Johnathan Pope 812.459.7219 Deaconess Aquatic Center Evansville, IN Garmong served as Construction Manager for the 75,000-square-foot Deaconess Aquatic Center. The center is located on the north side of Evansville's downtown in Garvin Park, next to the historic Bosse Field. It houses a stretch 50-meter, Olympic - sized competition pool, a leisure pool, an outdoor spray park, men's and women's locker rooms, and a 1,100-square-foot meeting room. This project was completed in 2021. Project Cost: $28M Challenges & Successes: Utilizing a Stretch 50 design where the lap lanes and diving well coexist created design and construction efficiencies for this project. Reference: Lloyd Winnecke 812.423.2020 Martin Luther King Jr. Dream Center South Bend, IN Garmong Construction served as Construction Manager for the new MLK Dream Center which includes a community center and park. The building is approximately 42,000-square-feet and included a community meeting space, indoor playground, administrative offices, computer room, and gym. This project was completed in 2025. Project Cost: $24M Challenges & Successes: As the first CMc project for the City of South Bend, Garmong took extra care when it came to involvement with the City and answering questions regarding the delivery process. Reference: Eric Horvath 574.233.0311 h GARMONG Kennedy Park Renovation I Garmong Construction FIRM BACKGROUND/TEAM/EXPERIENCE Building Information Modeling (BIM) Capabilities By combining Building Information Modeling (BIM) with OpenSpace's 3600 photo documentation, Garmong can merge design intent with real -world site conditions. This integration enables: Real-time insights: Compare BIM models with current job site images to track progress and spot issues early. Clear communication: Visual records improve collaboration and reduce misunderstandings. Data -driven decisions: Identify schedule risks, safety concerns, and quality issues proactively. Better closeout: Deliver a "digital twin" for facility operations and long-term asset management. This approach enhances efficiency, accuracy, and client satisfaction by bridging the gap between the design office and the job site. BIM coordination is included in our proposed fees. LEFT: Garmong is currently leveraging BIM and OpenSpace technology to manage construction of the $1.2 billion Westville Correctional Facility in Westville, Indiana. Spanning 774 acres with 14 million square feet under roof, the project benefits from enhanced coordination, real- time progress tracking, and improved efficiency across all phases of construction. Safety Garmong's safety record goes beyond the goal of ensuring that everyone goes home each day injury -free. It also provides you with the peace of mind knowing that our construction hot zone does not pose any risks to our staff and visitors. We boast an EMR of 0.60, highlighting strict adherence to safety procedures and effective risk management practices. Garmong has achieved CCS Certified status, meeting or exceeding national safety standards and demonstrating commitment through achieving at least 50% of Best Practices for both a Safety Program Review (SPRS) and a Home Office Audit, with no OSHA - cited fatalities. SAFETY RECORD EMR 0.60 0.65 0.79 TRIR 0 0 0 DART 0 0 0 LTI R 0 0 0 Total Recordable Cases 0 0 0 Away from Work Cases 0 0 0 Days Away 0 0 0 Transfers/Restrictions 0 0 0 h GARMONG Kennedy Park Renovation I Garmong Construction Local Labor Garmong is committed to advancing the City's goal of employing local labor as well as a diverse workforce. We have a proven track record in this regard, as demonstrated on the MLK Dream Center project in downtown South Bend. For the Kennedy Park Renovation, we will leverage this experience by prioritizing first -tier subcontractors from the South Bend region and ensuring local workforce engagement in all major trades. On the MLK project Garmong was able to achieve over 15% XBE participation, exceeding the State of Indiana's goals. Our prequalification process for first -tier subcontractors will include targeted outreach events to engage qualified local firms, comprehensive capability assessments to evaluate technical expertise, detailed safety record reviews, financial stability checks to ensure long-term viability, verification of local presence to support staffing the project and reference checks from previous projects to validate performance history. It will also be imperative to confirm each subcontractor meets the City's Responsible Bidder Ordinance No. 10594-18. This approach ensures that selected partners meet or exceed Garmong's standards for quality and safety. Approach to City/Owner Project Specific Goals The City/Owner Project Specific Goals as listed in Section C, page 6 of the RFP are as follows: 1. E-Verify Affidavits Garmong Construction is fully committed to complying with all federal and state requirements regarding employment eligibility verification, including the use of the E-Verify program. In accordance with Indiana Code § 22-5-1.7-11, Garmong ensures that all newly hired employees are verified through the E-Verify system and does not knowingly employ unauthorized aliens. To further demonstrate our commitment: • Affidavit Compliance: Garmong will sign and submit all required affidavits affirming our enrollment in and active participation with the E-Verify program, as well as affirming that we do not knowingly employ unauthorized workers. • Subcontractor Oversight: We require all subcontractors of any tier to comply with E-Verify requirements through our subcontract language. This ensures full compliance across all levels of the project team. • Internal Auditing: Garmong maintains internal controls and periodic audits to ensure ongoing compliance with E-Verify obligations and to prepare for any external review or agency audit. This proactive approach reflects our dedication to legal compliance, workforce integrity, and responsible contracting practices. Our commitment to being compliant with E-Verify is simple, if we are not compliant, we would expect the City to withhold our payments until we were in compliance. 2. Fair Bidding Process In compliance with the City's request, Garmong will not be bidding any of the trade packages on the project to self -perform the work. Garmong will ensure that the City's Responsible Bidders Ordinance is included in the bid documents for all first tier subcontractors. 1h GARMONG Kennedy Park Renovation I n Garmong Construction 7 PROJECT APPROACH 3.Sustainability Garmong recognizes the City of South Bend's vision for Kennedy Park as a long-lasting, inclusive, and environmentally responsible community asset. As CMc, we will actively support sustainable decision -making throughout design, preconstruction, and construction phases. Our approach includes: Material and System Selection for Longevity Aquatics Center: We will recommend and validate the specifications include UV -resistant, anti -corrosive materials for pool structures, shade systems, and seating to withstand seasonal weather and chlorinated environments. Pool mechanical systems will be evaluated for energy efficiency, low maintenance, and long-term reliability, including variable frequency drives (VFDs), high -efficiency pumps, and automated chemical dosing systems. Playground and Sports Amenities: We will guide selection of impact -resistant surfacing, powder -coated steel structures, and weatherproof coatings to reduce replacement cycles and maintenance costs Energy and Water Efficiency Aquatics Operations: We will support the integration of high -efficiency filtration systems, low -flow fixtures, and solar - ready infrastructure to reduce energy and water consumption. We will also suggest heat recovery systems for pool water heating. Concessions and Restrooms: Recommendations will include LED lighting, occupancy sensors, and low -flow plumbing fixtures to reduce utility costs. Electric Vehicle (EV) Infrastructure: We will recommend conduit installation for future EV charging stations, aligning with South Bend's sustainability goals. Landscape and Site Sustainability Native Plantings: We will coordinate with DLZ to ensure low -maintenance native species are used, reducing irrigation needs and supporting biodiversity. Tree Planting and Shade: Over 200 trees will be planted to provide natural cooling, reduce heat island effects, and enhance long-term park aesthetics. Planting trees in the fall is considered a best practice because cooler temperatures and increased soil moisture help roots establish before winter dormancy, promoting healthier growth in the spring. Stormwater Management: We will support the use of permeable paving, bioswales, and rain gardens to manage runoff and improve water quality. Lifecycle Cost Analysis and Maintenance Planning Garmong will work directly with DLZ to provide pricing for comparative products and the associated lifecycle cost expectations for major systems and materials, helping the City make informed decisions that balance upfront investment with long-term savings. We will collaborate with City maintenance teams to ensure selected systems align with available resources and staffing, minimizing future burdens. This approach ensures that Kennedy Park remains a resilient, cost-effective, and environmentally responsible space for generations. 1h GARMONG Kennedy Park Renovation I 0 Garmong Construction PROJECT APPROACH 4. GMP Garmong recommends establishing the Guaranteed Maximum Price (GMP) after the competitive bidding process has been completed. This approach aligns with the City of South Bend's cost/benefit objectives by providing greater cost certainty and transparency. By waiting until subcontractor bids are received, we can: Reduce Contingencies: With actual bid data in hand, we can minimize the need for broad estimating assumptions, resulting in a more accurate and lean GMP. Clarify Scope and Alternates: The City will have a clear understanding of which scope items and alternates are included in the GMP, allowing for informed decisions on value engineering opportunities and scope adjustments prior to GMP finalization. Enhance Owner Confidence: Establishing the GMP post -bid ensures that the Owner enters into the agreement with full visibility into market pricing, subcontractor qualifications, and the impact of any design refinements. Support Competitive Pricing: This timing allows Garmong to leverage competitive tension among bidders, ensuring the City receives the best value for each trade package. Contingency Approach: Garmong will structure contingency to reflect the actual risk profile of the project at the time of GMP development. We would anticipate a construction contingency of 3% for a project of this size with a GMP execution after bidding. 5. Project Schedule Garmong is fully prepared to meet the City of South Bend's project schedule for the Kennedy Park Aquatics and Recreation Center. We understand the importance of beginning construction in early 2026 and achieving substantial completion by fall 2027, contingent on state approvals. Our team will work proactively during preconstruction to align design development, permitting, and bidding milestones with the overall schedule. We will also implement detailed construction phasing and sequencing strategies to ensure timely delivery of both the aquatics center and park amenities. Approach to Final CMC Contract Garmong is pleased to confirm that, having recently completed the MILK Dream Center Project for the City of South Bend using the CMc delivery method, we are fully familiar with and supportive of the City's standard CMc contract format. In fact, we would be willing to utilize the exact same contract as previously drafted and executed by the City. As a result, no negotiation phase would be necessary, and we could be under contract in less than one day following selection. This streamlined approach eliminates delays, ensures alignment with City expectations, and allows the project to move forward efficiently. Should any adjustments be required, our team is prepared to collaborate promptly with City representatives to finalize the CMc agreement. Based on our prior experience, we estimate that even with minor revisions, the contract could be reviewed, approved, and executed within 5 business days of selection. Communication Garmong maintains a structured and transparent communication process throughout all phases of a project. Our team will provide consistent updates to the Owner through weekly progress meetings, detailed monthly reports, and collaborative project management platforms. All communication will be aligned with the City's requests and expectations. The bottom line is that we work for you — if you have questions or concerns, we will be there to answer them and make sure you are never surprised. 1h GARMONG Kennedy Park Renovation I Garmong Construction PROJECT APPROACH Community & Media Engagement Regarding community and media engagement, Garmong will only engage with the public or media at the direct request of the Owner. We understand the importance of maintaining a unified message and will defer all external communications to the City unless otherwise directed. If requested, we are prepared to support public outreach efforts, including participation in community meetings, media coordination, and informational materials. Risk Management Our risk management approach includes early identification of potential risks during preconstruction, development of mitigation strategies, and continuous monitoring throughout construction. We maintain a comprehensive risk log and work closely with the Owner and design team to proactively address issues before they impact schedule or budget. Technology In terms of technology, Garmong utilizes industry -leading tools such as Procore for project management, document control, and real-time collaboration. We also employ BIM coordination, Microsoft Project for scheduling, and cloud -based cost tracking systems (Viewpoint) to enhance efficiency, accuracy, and transparency across all project stakeholders. Cost Estimating From day one, Garmong applies a rigorous estimating process built on detailed quantity take -offs, subcontractor quotes, and our extensive historical cost database. This enables us to "trend" and report design progress against the budget in real time. Our methodology supports early value engineering and provides clear trade -by -trade cost breakdowns thereby giving the City full transparency in decision -making. We will analyze current and projected market conditions to identify cost drivers, assess escalation risks, and recommend cost - saving alternatives without compromising quality or functionality. Throughout the design process, we prequalify subcontractors and prepare bidder lists for City approval, ensuring that all participants are capable and aligned with project objectives. Schedule Management For Kennedy Park, our scheduling strategy will be collaborative and milestone -driven. Early in the project, we will host a schedule development workshop with the City, DLZ, and key trade partners to create a Master Target Project Schedule. This schedule becomes the benchmark for all subsequent updates and progress tracking. We use Microsoft Projects to maintain a Master Control Schedule that incorporates resource loadings, cost account data, and major milestones. Monthly updates will clearly show progress, allowing the City to identify potential risks early and make informed adjustments. Our process accounts for critical path items such as: Design deliverables from the architect and engineer Permitting requirements Long -lead materials and equipment (e.g., pool filtration and play structures) Seasonal construction constraints Coordination between site and building work to minimize disruption to the surrounding neighborhood 1h GARMONG Kennedy Park Renovation I 1'' Garmong Construction L ���!1►�II1���I���J!1'�1[NIJ!11[1 Garmong Construction has embraced the responsibility to not only meet but to exceed the State's goals for engaging MBE/ WBE/VBE (XBE) enterprises. We have made significant strides in the development and inclusion of companion organizations from diverse backgrounds in recent years. Throughout our 102-year history, we have embraced partnerships with firms that have combined talent and varying backgrounds. This deliberate effort to bring diversity to our projects has been a measurable deliverable for the past decade. Over the past five years, we have consistently met or exceeded XBE participation goals. For the Martin Luther King Jr. Dream Center, Garmong secured a 21 % XBE participation rate. Similarly, we completed a $12 million police station in Lawrence, Indiana, and we were able to secure an impressive 17% participation from XBEs. Similarly, we secured a remarkable 54% XBE participation on the Purdue University Brees Academic Center. These participation rates exceeded the ordinance -based goal for the municipality and Purdue's expectations for campus -based projects, respectively. The concept of inclusion has been ingrained in our company culture for years. We have played a vital role in the development and implementation of a diversity internship program in partnership with the Vigo County School Corporation. This program provides real work experience to minority high school students, allowing them to gain awareness about higher education and career opportunities in the Wabash Valley. The six- week, paid internship offers students both office and field experiences, contributing to their personal and professional growth. Garmong has supported the Vigo County School Corporation with various construction projects, including the Aquatics Center (shown below). Furthermore, as a union contractor signatory to the Carpenters, Laborers, and Cement Finishers, our tradespeople are not only skilled contributors but also products of the union's active programs and hiring practices designed to increase participation for minorities and women in the construction industry. Our office workforce boasts 23% representation of professional construction women in our Project Management group, while our corporate office staff is comprised of 27% women. We actively encourage engagement in industry organizations such as the National Association of Women in Construction and have provided financial support in past years. WIN ON .UNN 1h GARMONG dodo . Kennedy Park Renovation I Garmong Construction Summary of Compensation Expectations & Cost Structure Garmong is committed to delivering the Kennedy Park Aquatics and Recreation Project within the City's established maximum budget of $13 million, inclusive of all construction and CMc services. Below is a breakdown of our compensation expectations and cost structure: 1. Preconstruction Services (Engagement at 60% Design) Fixed Cost: $10,000 Includes: Constructability reviews Value engineering recommendations Cost estimating and budget validation Phasing and logistics planning Bid package development and public bidding Schedule development and refinement GMP Development 2. CMc Fee Expected Fee: 3.25% of the cost of construction Includes: CMc overhead and profit Executive oversight 3. Owner -Responsible Costs These are costs outside the CMc scope and typically managed directly by the Owner. They may include: Design and engineering fees (DLZ) Permitting and utility tap fees Legal and administrative costs Furniture, fixtures, and equipment (FF&E) Owner contingency 1h GARMONG 4. General Conditions (assuming a 12 month construction schedule) Estimated Range: 4%-6% Includes: On -site supervision, project management and project engineer Temporary utilities and site security Sanitary Facilities/Portable Toilets Safety program implementation Temporary traffic barriers Job site trailers and equipment Temporary fencing Temporary project signage Technology and communication systems Daily cleanup and waste management Transportation and Travel Insurance and bonding Kennedy Park Renovation I A 4 Garmong Construction PROJECT COSTS Cost Overruns, Delays, Incentives, and Contingencies Garmong's CMc contract structure is designed to protect the Owner from cost overruns. Once the GMP is established (post - competitive bidding), any costs exceeding the Guaranteed Maximum Price (GMP) are the responsibility of Garmong unless due to Owner -directed changes or unforeseen conditions as defined by the contract. Delays We proactively manage schedule risks through detailed planning and weekly updates. If delays occur due to Garmong's performance, we take full accountability and implement corrective actions immediately. Incentives We do not expect any incentives to be written into the contract, but we are open to discussing performance -based incentives tied to schedule, budget savings, or quality benchmarks, if desired by the City. On other public projects, we have contract clauses that designate a portion of GMP savings to be shared with Garmong when certain metrics are achieved around timely punch list completion, XBE participation, safety, etc. Construction Contingency We would anticipate a construction contingency of 3% for a project of this size with a GMP execution after bidding. h GARMONG Kennedy Park Renovation I C Garmong Construction J When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -rime. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. 12Page Kennedy Park Renovation GARMONG Garmong Construction 116 NOWCOLLUSION NOWDEBARMENT AFFIDAVIT NONmIRAN FORM Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation 131Page 1h GARMONG Kennedy Park Renovation I Garmong Construction NOWCOLLUSION NOWDEBARMENT AFFIDAVIT NOWIRAN FORM and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this August day of 25 2025 Garmong Construction Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Paul Okeson, President Printed Name and Title Subscribed and sworn to before me this 25th day o AU I Ust 20 25 My Commission Expires 7-11-2031 Notary Public Lori S. Webster County of Residence Clay County LORI S. WEBS ;F+ • e HOtary fubli49. Stag Wf In/it a r$EAI F'rz CIAY County zy • Mz Cnmrhimii6h N61hhN NP4704071 u G�kM ti r YCommiaRian E 'irt■ 4'• AdY 11. 2031 141Page Ih Kennedy Park Renovation GARMONG Garmong Construction 118 1311011 Lk ACRISURF January 24, 2025 RE: C.H. Garmong & Son, Inc. Garmong Construction Services 5988 N. Michigan Road Indianapolis, IN 46228 To Whom It May Concern We, Acrisure, Inc. and Nationwide Mutual Insurance Company have a relationship with the above referenced contractor. We have the highest regard for the contractor and are willing to consider any and all requests submitted to us by the contractor, subject to normal underwriting conditions. The account has a surety line of credit of $250,000,000 per project and a maximum bonding capacity of $500,000,000 with Nationwide Mutual Insurance Company. Please note that these limits can be exceeded on an individual basis. Nationwide Mutual Insurance Company is listed as an acceptable surety in the US Treasury Department Circular No. 570 and has an AM Best rating of A+ Superior XV. They are licensed to do business in all 50 states. If you have any questions, please contact me at 1-800-235-9347. Regards, Nationwide Mutual InsuranceCompany Jason D. mwe`ll Attorney- n-Fact 2307 River Road • Suite 200 • Louisville • KY 40206 502-636-9191 • wwwAcrisure.com 1h GARMONG Kennedy Park Renovation I A Garmong Construction 7 CERTIFICATE OF INSURANCE AND BONDING Client#: 35548 CHGARMO ACORDT�, CERTIFICATE OF LIABILITY INSURANCE D 12/02/202YYY) TE 12/02/2024 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAME, Victoria Wagner EPIC Insurance Midwest 925 Wabash Ave. Ste 200 PHONE 317 706-9825 FAX A/C No Ext : A/C No): E-MAIL ADDRESS: g P Victoria.Wa ner@e Icbrokers.com Terre Haute, IN 47807 INSURERS) AFFORDING COVERAGE NAICa INSURER A: The Phoenix Insurance Company 25623 INSURED INSURER B: Travelers Property Casualty Co of Amer 25674 C. H. Garmong & Son, Inc. Farmington Casual Company INSURER C : 9 Casualty P Y 41483 Attn: Greg Bishop 3050 Poplar Street Terre Haute, IN 47803 INSURER D: INSURER E: INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. �Tq TYPE OF INSURANCE NSR ADDLSUBR POLICY NUMBER MIODLICY EFF MMO/LDICY EXP LIMITS A X COMMERCIALGENERALLIABILITY X X DTC01W321910PHX23 12/31/2024 12/31/2025 EACH OCCURRENCE $1000000 CLAIMS -MADE OCCUR PREMISES Eaoxurance $1,000,000 MED EXP (Any one person) $10 000 PERSONAL & ADV INJURY $1,000,000 AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 GEN'L POLICY X JECOT LOG PRODUCTS - COMP/OP AGO $2,000,000 $ OTHER: B AUTOMOBILE LIABILITY X X 8101W3188622226G 12/31/202412/31/202 EO BINEDSINGLE LIMIT 1,000r000 BODILY INJURY (Per person) $ X ANY AUTO OWNED SCHEDULED AUTOS ONLY AUTOS HIRED NON -OWNED X AUTOS ONLY X AUTOS ONLY BODILY INJURY (Par accident) $ PROPERTY DAMAGE Per accident $ B UMBRELLA LIAB X OCCUR X X CUP5W10694822NF 12/31/2024 12/31/2025 EACH OCCURRENCE $20000000 AGGREGATE $20000 OOO EXCESS LIAB CLAIMS -MADE DED X RETENTION$$10000 $ C WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y/ N ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory In NH) N/A X UB1W321067 IV31/2024 12Ml/2025 X PER OTH- E.L. EACH ACCIDENT $1 000 000 E.L. DISEASE - EA EMPLOYEE $1 OOO 000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE -POLICY LIMIT 1 $1,000,000 B Installation OT6301W892718TIL23 12/31/2024 12/31/2025 $1,000,000 Limit Floater $250,000 Temp Storage $2,500 Deductible DESCRIPTION OF OPERATIONS / LOCATIONS/ VEHICLES (ACORD 101, Additional Remarks Schedule, maybe attached If more space Is required) GL Blanket Additional Insured - Automatic Status if Required by Written Contract Per Phoenix/Travelers Form CG D6 04 02 19 GL Designated Project General Aggregate Limit per Phoenix /Travelers Form CG D2 11 01 04 GL Primary/Non-Contributory Insurance If Required per Written Contract Per Phoenix/Travelers Form CG T1 00 02 19 (See Attached Descriptions) CERTIFICATE HOLDER CANCELLATION Sample SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) 1 of 2 The ACORD name and logo are registered marks of ACORD #S7061707/M7061706 VWA02 Ih Kennedy Park Renovation GARMONG Garmong Construction 120