Loading...
HomeMy WebLinkAboutAward Quote - WWTP Admin Office Proj No 124-037 - Larson-Danielson (2)1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA46601-1830 PHONE 574/235-9251 FAX 574/ 235-9171 CITYOFSOUTH BEND DAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS August 26, 2025 Mr. Brian T. Larson Larson -Danielson Construction Co., Inc. 302 Tyler Street LaPorte, IN 46350 cmb@ldconstruction.com RE: Quotation Award - Wastewater Treatment Plant Administration Building 15 Office Remodel - Project No. 124-037 Dear Mr. Larson: At its August 26, 2025 meeting, the Board of Public Works awarded the above referenced quotation to you in the amount of $115,830. Please forward the following documents in one submittal by September 9, 2025 to my attention for Board of Public Works approval at hhorvath@southbendin.gov : 5) One (1) signed original of the Contract (enclosed); and 6) Certificate of Insurance naming the City of South Bend as an additional insured. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Hillary Horvath Hillary Horvath, Clerk Enclosures HH ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARYA. GILOT MURRAY L. MILLER BREANA N. MICOU BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA PUBLIC WORKS CONTRACT This Agreement is made and entered into this 261" Day of August, 2025, by and between Larson -Danielson Construction Co., Inc., (the "Contractor"), and the Board of Public Works (the "Board"). The Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: PROJECT NO. 124-037 DESCRIPTION: WASTEWATER TREATMENT PLANT ADMINISTRATION BUILDING 15 OFFICE REMODEL COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $115,830 FUNDING: SEWAGE WORKS ACCT. 641-06-605-514-439001 The unit prices for this improvement were those prices as received and accepted by the Board on the 26th Day of August, 2025. The Contractor further agrees to notify the assigned Engineer when this improvement is completed. This notification shall be in the form of a Project Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractor's final estimate will be presented to the Board for final Payment with one (1) copy of the Project Completion Affidavit and one (1) copy of a Waiver of Lien. Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has the authority to bind the named person or entity to this Agreement. CITY OF SOUTH BEND, INDIANA LARSON-DAN I ELSON BOARD OF PUBLIC WORKS CONSTRUCTION CO., INC. Elizabeth A. Maradik, President Gary A. Gilot, Member Murray L. Miller, Member `// Joseph R. Molnar, Vice President Breana Micou, Member dvk� f 4�� Attest: Hillary R. Horvath, Clerk Date: August 26, 2025 Printed Name Signature o�SouTH% INTER -OFFICE MEMORANDUM a u o �R ,? DEPARTMENT OF PUBLIC WORKS 1865 DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk Michael Schmidt, Assistant City Attorney Board of Public Works FROM: Jacob M. Klosinski, Assistant City Engineer SUBJECT: Award Project No. 124-034 (DFO PROJ00000559) Wastewater Treatment Plant Administration Building 15 Office Remodel DATE: August 18, 2025 On August 12, 2025, the Board of Public Works opened and read quotes for the above project, which consisted of a base bid. One contract submitted a quote for the subject project and the quote documents appear to be complete. Refer to quote review comments below. The bidders ranked as follows: Contractor Base Quote Amount 1. Larson -Danielson Construction Co., Inc. LaPorte, Indiana $115,830.00 The Division of Engineering and Division of Wastewater recommend award of Protect No. 124- 037 Wastewater Treatment Plant Administration Building 15 Office Remodel to the lowest responsive / responsible bidder, Larson -Danielson Construction Co., Inc. in the amount of $115,830.00. Sufficient funds have been appropriated from Sewage Works — Wastewater Operations, Other Contractual Services Account 641-06-605-514-439001. Quote review comments: The MBE project goal is 1.8%. Larson Danielson provided 6.7% utilization plan for MBE. The WBE goal is 2.8%. Larson -Danielson provided a 1.05% utilization plan for WBE. It appears that Performance Plus (a WBE) was counted under the MBE and WBE utilization plans. The M/WBE combined project goal is 4.6%. Although the individual WBE goal does not appear to be met, their total utilization plan provides 6.7% M/WBE utilization which exceeds the combined goal. A waiver may be needed for the WBE goal. From our review, it appears that all good faith efforts have been met. For question regarding this agenda request, please contact Jacob M. Klosinski, PE, Assistant City Engineer at the Division of Engineering at Ext. 9496. Enc. Quote Documents Page 1 of 1 J CITY OF SOUTH BEND, INDIANA rnr• CONTRACTOR'S QUOTE FOR PUBLIC WORK PROJECT NAME: Wastewater Treatment Plant Administration Building 15 Office Remodel PROJECT NO. 124-037 QUOTES DUE Tuesday, july 22 August 12, 2025, by 9:00 a.m. Local Time. Sealed electronic quote shall be submitted to bpwbidsC&southbend in.gov (Must be completed for all quotes. Please type or print) Date: August 12, 2025 Firm: Larson -Danielson Construction Co., Inc. Address: 302 Tyler Street City/State/Zip: LaPorte, IN 46350 Telephone Number: ( 219 ) 608-9899 Email Address: cmb@Idconstruction.com Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of- 124-037 Wastewater Treatment Plant Administration Building 15 Office Remodel the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend. Department of Public Works and dated July 2025 for the sum of (enter the Total Quote as shown on the Proposal) One Hundred Fifteen Thousand Eight Hundred Thirty & 00/100 Dollars ($ 115,830.00 } (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. By — -Z/- Y LARSON-DANIELSON (Signature) CONSTRUCTION CO, INC Brian T. Larson, President (Printed Name of Person Signing) The above quote is accepted this Subject to the following conditions: ACCEPTANCE day of CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President �j—�v Gf sl-rit t Gary A. Gilot, Member Murray L. Miller, Member Version 3/15/2024 20 1,4; 2— PI Joseph R. Molnar, Vice President BreanaMjicou, Member h ( f 4dd1/ Attest: Hillary R. Horvath, Clerk Date: 8126/2025 PROJECT NAME PROJECT NO. QUOTE/PROPOSAL CITY OF SOUTH BEND Wastewater Treatment Plant Administration Building 15 Office Remodel 124-037 Tuesday, July 22 August 12, 2025, by 9:00 a.m. Local Time. Sealed QUOTES DUE electronic quotes shall be submitted to b wbids southbendin. ov BASE QUOTE Item No. Description Quantity Unit Unit Price Total Amount 1 Mobilization and Demobilization Demolition (Counter, HVAC, Misc) 1 LS $ $ 3,532.00 2 1 LS $ $ 2,260.00 3 Flooring Installation, Materials and Labor 1 LS $ $ 6,465.00 Modular Office Units, Materials and Labor Circle One: A. Prefabricated Wall System, or (Manufacturer) 4 B. Metal Curtain Wall System (16 Gauge) 1 LS $ $ 54,462.00 Larson Danielson Const. (Manufacturer) Attach Product Data to Quote 5 Electrical, Lighting & Communication, 1 LS $ $ 31,243.00 Materials Labor 6 Heating Ventilation and Cooling, Materials 1 LS $ $ 5,868.00 and Labor 7 Painting and Coatings, Allowance 1 LS $ 2,000.00 $ 2,000.00 (Owner -Directed) 8 Office Furniture and Closet, Allowance 1 LS $ 10,000.00 j $ 10,000.00 (Owner -Directed) —1 $ 115,830.00 Total Amount of Quote Firm: Larson -Danielson Construction Co., Inc. Address: 302 Tyler Street City/State/Zip: LaPorte, IN 46350 Telephone Number: 219 ) 362-2127 Fax Number: ( 219 ) 362-2848 LARSON-DANIELSON CONSTRUCTION CO, INC By �g� (Signature) Brian T. Larson, President (Printed Name of Person Signing) Version 3/15/2024 Page - 22 Public Works Quote