Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Opening of Bids - Cleanup of South Bend Range, Phase I Proj No 125-020A - Omega III LLC
CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Cleanup of South Bend Range, Phase I Project No. 125-020A For Bids Due Tuesday, August 12, 2025 @ 9:00 A.M. (E.D.T.) PART I (Must be completed for all bids. Please type or print) Date: 8.6.25 Bidder (Firm): Omega III LLC Address: 31W566 Spaulding Road City/State/Zip: Elgin, IL 60120 Telephone Number: ( 630 ) 837.3000 Agent of Bidder (if Applicable): Charles Gerage Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Cleanup of South Bend Range, Phase I — Building Demolition the City of South Bend, Indiana, in accordance with plans and specifications prepared by: City of South Bend, Engineering Division and dated 07/11/2025 for the sum of (enter the Total Bid as shown on the Proposal) Nine Hundred Seventy -Four Thousand Two Hundred Forty -Six Dollars & Zero Cents ($ 974,246.00 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member By — Signa Charles �erage, eneral Manager (Printed Name of Person Signing) ACCEPTANCE day of 20 Joseph R. Molnar, Vice President Breana N. Micou, Member Murray L. Miller, Member Attest: Hillary Horvath, Clerk Version 07/19/2023 Contractor's Bid for Public Works - 2 � SOUTH B�,'U � _ d U C PF. 1['F (� CITY OF SOUTH BEND, INDIANA M65 CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Cleanup of South Bend Range, Phase I Project No. 125-020A For Bids Due Tuesday, August 12, 2025 @ 9:00 A.M. (E.D.T.) From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and X WBE-2.1]. Acknowledge Receipt of __I_ Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Omega III LLC Date: $/$/25 By Authorized Representative: Signature: Print Name & Title: Version 07/19/2023 Contractor's Bid for Public Works - 1 PLEASE SEE ADDITIONAL ATTACHMENT FOR SECTIONS 1, 23 AND 3 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 07/19/2023 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Illinois SS: Cook COUNTY The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 07/19/2023 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 07/19/2023 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 8th day of August , 20_ Subscribed and sworn to before me this 8th My Commission Expires 12.14.27 County of Residence Omega III LLC Contractor/Bidder (Firm) Signature of C tractor er or Its Agent Charles Gerage, General Manager Printed Name and Title day of August , 20 25 Nota Pu Cook Version 07/19/2023 Contractor's Bid for Public Works - 6 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Cleanup of South Bend Range, Phase I Project Number For Bids Due Contractor Name: BASE BID 125-020A Tuesday, August 12, 2025 @ 9:00 A.M. (E.D.T.) III LLC Item No. Description Quantity Unit Unit Price Total Amount Lump Sum price to complete building 1 demolition, asbestos abatement, and 1 LSUM $949,246.00 $949,246.00 fence removal and replacement as intended by these Specifications 2 Environmental Allowance 1 EA $25,000 $25,000 BASE BID TOTAL 949,246.00 Bidder (Firm): Address: 31 W56631 W566 Spaulding City/State/Zip: Elgin, 60120IL 60120 Telephone Number: ( 630 ) 837.3000 By Charles Gerage, General Manager (Printed Name of Person Signing) Version 07/19/2023 Contractor's Bid for Public Works - 7 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: 125-020A Project Name: Cleanup of South Bend Range, Phase Bidder: Omega III LLC Base Bid Amount: $974,246.00 MBE Goal: 1.3% Page of Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1 st Class Logistics Bernard Coutee 574.993.0071 Transportation $94,925.00 1 p% Submitted by: Charles Gerage Print Name Signature ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works - 8 Date 08.08.25 CITY OF SOUTH BEND: MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN' FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: Bidder: 125-020A Project Name: Cleanup of South Bend Range, Phase Omega III LLC Base Bid Amount: WBE Goal: 4.7% Page of Name & Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal To be determined upon project award Transportation Submitted by: Print Name 818/25 Signature � Date ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 125-020A Date: 08.06.25 Project Name: Cleanup of South Bend Range, Phase Bidder: Omega III LLC Contact Person: Charles Gerage Telephone: 630.837.3000 Address: 31 W566 Spaulding Road City: Elgin State: IL Zip: 60120 Email: estimating(o�omega311c.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htt ://www.in. gv/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of X Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into X economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available X means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform X MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed X sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. X I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the X subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, X lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 07/19/2023 Contractor's Bid for Public Works - 10 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary X equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based X on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works - 11 i •��l 'l Ff I1�:, CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN -_ FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 125-020A Date: 8/6/95 Project Name: Cleanup of South Bend Range, Phase I Bidder: Contact Person: Charles Gerage Telephone: Address: 31 W5C6 Snaddina Rnad City: Elgin State: 1 Zip: 60190 3-- Email: estimating6d.omega311c.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htt ://www.in. gv/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of X Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be X performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available X means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform X WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to X such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner X reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. X I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the X subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, X lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 07/19/2023 Contractor's Bid for Public Works - 12 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested WBEs in obtaining X necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons X based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works - 13 i •��l 'l Ff I1�:, CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN -' FORM MBE-2.1 H MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE OF Project Number 125-020A Project Name: Cleanup of South Bend Range, Phase MBE Participation Goal 1.3% Bidder: Omega III 1 1 (' By: General Manager 8J525 (Signature) (Title) (Date) MBE Firm 1st Class Logistics Owner or Contact at MBE Firm Bernard Coutee Telephone: 574.993.0071 Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Received quote MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 07/19/2023 Contractor's Bid for Public Works - 14 4 �715T1-f BF� CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN ti �', FORM MBE-2.1 WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 125-020A WBE Participation Goal 4.7% Project Name: Cleanup of South Bend Range, Phase I Bidder: Omega III LLC By: _ C=4L::� Genpral Manager 8/6125 (Signature) (Title) (Date) WBE Firm To he determined upon nroiect award Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 07/19/2023 Contractor's Bid for Public Works - 15 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAX 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: July 29, 2025 To: All Planholders From Hillary Horvath, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: 125-020A Project Number: Cleanup of South Bend Range, Phase I — Building Demolition ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 7/30/25 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Omega III LLC Authorized Signature: Date: Version 8/11/2020 AIA Document �43'0 Bid Bond KN01r1r ALL MEN BY THESE PRESENTS, THAT WE Omeaa III LLC 31 W566 Snautrlinn Rna�i ��nin a �n� �n as Principal, hereinafter called the Principal, and 3t Iris' � U<���,.� as Obligee, hereinafter called the Obligee, in the sun? of Five � • .�.. '�:� :i; t . ..1 Alternates [�ollal5 {�j% �, for the payment of which sum well and truly to be made, the said Prinapal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firr�nly by these presents. WHEREAS, the Principal has submitted a bid for Cleanup of South Bend Range. Phase I — Buil No. 125-020A Demolition, Project NOVY, THEREFORE, if the Obligee shall accept the bid of the Prinapal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and materials furnished in the prosecution thereof, or in the event of the failure of the Prinapal io enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in goad faith contract wilh another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 12th day of Mike McMahon (Witness) 1NS III LLC ust {Prinapal) Charles Geroge General Manager °� Great Midwest Insurance Company pORPORATf sEAI. � (Surr�ty) Uico Jacavage (W�rness) �, F �o`' B �'rs �oRPoa�� Arfomey-;n•Fsct Richard V. Dobbs AIA 1)OCUM@N1' A31U •BID BOND •AIA • FEBRI!AR1' 1970 EU� • THE AtNERiCAi\ INl3TITUTE OF ARC[IITECT8,1735 N.1'. AVE., N.V., V`'A�HING7'ON, ll.C. �WUfi 2025 (Seal) (Seal) CONSENT OF SURETY ioney of the United States of 1 L h: the rweipt Whereof rtq)orafion, and for other valuable considersifion, the Great Midwest Insurance Company ramuzed and custing under the Ism of the Stak of TX and li"nsed to do busihm iin the State of IN c�ti�es and sgroes,, theft if contr�►� for Cleanup of South Bend Range, Phase i — Building Demolition, Project No. 125-020A fa City of South Bend, Indiana, Board of Public Works is awarded t,o Omega III LLC • Wit•• Surety amouni set forth contact • • 1 1 m ti for the faltliffil 1 • .)Trp • all obligations of the Contactor . Signed snd sealed this 12th day of August, 2025 Great Midwest Insurance Company Richa V. Dobbs ,Attorney -in -Fact NaIC# � 8694 Department of Insurance State ofi Indiana . ' :,. • �'''�S'••{1 �✓ 4• 'air � j � '�f, i 1! i ! � . r f - '•,?•� `mil', ,�. - � ns ���!��re�..�omn1 �•slo�ne .r��,; ,:`" ' I 'r �� •, . TE O .� B �. • r � � ,: � � -'^ �� .�•� ::., �' �;�r;•'•''�'1�t�1e.�pQli�;,•fridiaha.�ebr"u�r'j!'�`6 20�4 :, 1� �? �iii�/ -• .,�• •� a;� ��j ��,�,�� �fJt. � (;.�3�i •;�►rr �re..il�/�. i �1-►' �i: r. "�. .��'�,` / ' r. !, , ;�, �� tt.:�r!'.�ir E ��•. •i;�, 4r.1 •r.,r;;•.�•,•: r+ at:�r"���• ,t• '��ri � � C% ( ,.,, •, vYhereas, the Grea t Midlivesta}i�urance Co ' � � '' � � ' •� • •� ` � ` '�" t� � �• • '� � '�� • r .�,t �►� I?7�?17y`an fnsui'�t�ae;,cotr�pany,,oryar�ized e{nder�the+ aws of TeXaS . t. S fir' 1 ��• 1, i' and located in otustOri� ,�le�as;�:}iaving.�co relied with all�the requlr�sinents;off "e�laws'regula�irlg Stock ProAej�/ c"i/IQi Cc'9SUa ,ty 'nsuraric ��Cogj�anies doing'bt�siness In tte 'Stafe of Indiana • .;�;, I � � .,.�. /► �� `` ' � (9 / .��i�� .r' `jA,��i�0�r''' l,��ll. {)��.tt•• l�lJr.r• r' •' � +�±i• ) / t. .w. ,� Therefore, as nsfrrance��ommissione� of the,'Sfaf�of�fndiana, b Virtue d�a t�1�'rif' vest�d-yin e jf • .a r. ..., ,;�, .. � �' //(� � y, ! � m bylaw do hereby authorize, empo�er and licen�e-the, above named;conipany to fransaei;ils�tapp�ofjl�iaie bugln�ss pf.•'' � � '. �t►. �,�+�r•y .� , , � .t ,S. t �,� ` •�. 's._t .. •ti11j��r� � � �r • �t Class►11(a)(b)(c�.ia��e�(�I9),,(,h)(fl,,il�;excluding bail} +6nds���)t•�r• �,; r �� � ;.� . '� �� Class Ill�� a c � �.,• :, �;,! J�1 : �.�r�r� �1„ � • ... •,��- � ��}r ', ,:. •1/ ��s. � � ' . �- ,, ? t�� �rs ��.� to (', t + � •' ,rt � ` !�� +� +' �{ t } �,{r+•� , y1. rf• • ; --• +. r { : ���' � it f ' ��: a\ � ` .(r :(,/►•� �ii' �� y��!irrf,.l �'j ti sj• ��►'• �tr. j � } a{��j'� � i � �:,,r. through its duly authorized ag©nts rrl the State 6f I d'ian�;';r . - ��o�arice� v�it fhe laws the of w �h � �� •1�� ��+''�i;�r ��1'.S � . �tl�� ,fir; r �. +, t � d�� a%� app cab a to said Company., � ' • � t:',., �-....,��+,.,. �,r,�;.�,,.► _ �; •..i, ..,�.. � - ' j , ;�s� ` ��. �.: ::.�. !l � `' •' �T O � � �STIM NY VV��R�OF I hereunto " � :.: `-subscribe �tn� Barrie• sand affix the seal of my _... .. _. the Stephen W. Robertson lNSllRA1VCE COMMISSIONER ,t ', ! � - _.- � ,�� ,��� � r � �.: � .. �-t POWER OF ATTORNEY Great. Mid%vest Insui-aiice Company KNOW ALL MEN BY THESE PRESENTS, that GREAT MIDWEST INSURANCE COMPANY, 2 Texas Corporation with its principal office in Houston. TX does hereby constitute and appoint Scott Mahorsky, Richard V. Dobbs, Kimberly G. Rively, Ian Hayden true and lawful Attorneys) -In -Fact to make, execute. seal and deliver for, and on its behalf as surety, any and all bonds. undertakings or other rings obligatory in nature of a bond This authority is made under and by the authonty of a resolution which was passed by the Board of Directors of GREAT MIDWEST RANCE COMPANY. on the 1 S' day of April. 2025 as follows& Resolved, that the President, or any officer, be and hereby is, authorized to appoint and empower any representative of the Company or other person or persons as Attorney -In -Fact to execute on behalf of the Company any bonds, undertakings, policies, contracts of indemnity or other' writings obligatory in nature of a bond not to exceed One -Hundred Million dollars ($100,000 000,00), which the Company might execute through its duly elected officers, and affix the seal of the Company thereto. Any said execution of such documents by an Attorney -In -Fact shall be as binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company Any Attorney -In. Fact so appointed may be removed in the Company's sole discretion and the authority so granted may be revoked as specified in the Power of Attorney Resolved. that the signature of the President and the seal of the Company may be affixed by electronic mail on any power of attorney granted, and the signature of the Secretary, and the seal of the Company may be affixed by electronic mail to any cer#ificate of any such power and any such power or certificate bearing such electronic signature and seal shall be valid and binding on the Company Any such power so executed and sealed and certificate so executed and sealed shall, with respect to any bond of undertaking to which it is attached, continue to be valid and binding on the Company IN WI T NFSS THEREOF, GREAT MIDWEST INSURANCE COMPANY, has caused this instrument to be signed by its President. and its CorQorate Seal to be affixed this 8th day of April, 2025. GREAT MIDWEST INSURANCE COMPANY Mark W Haushill President ACKNOWLEDGEMENT On this 8th day of April 2025, before me, personally came fv1ark W. Haushill to me known, who being duly sworn did depose and say .that he rs the President c,f GREAT MIDWEST INSURANCE COMPANY, the corporation described in and which executed the above instrument, that he executed said instrument on behalf of the corporation by authority of his office under the By-laws of said corporation. �'• •►!� : CF#RISTINA 131SN0�' :•_= My Notary ID � 13149t1488 ';gyp r ee Expires Aprit id, 2029 CERTIFICATE t3Y Christina Bishop Notary Public I, the undersigned, Secretary of GREAT MIDWEST INSURANCE COMPANY, A Texas Insurance Company, DC) HEREBY CEkTiFY th�l the anginal Power of Aitorney of which the foregoing is a true and correct copy, is in full force and Effect and has not been revoked and the resolutions as set forth are now in force ignea and Sealed at Ilouston TX this 12ih pay of August 2025 m "WARNING: Any person who kr►owingly ar�d with intent to defraud any insurance cortipany or other person, flies and appllcatlon for Insurance of ctain� �ontalning any matorlally lalso Intormatiorr, or conceals for the purpose of misleading, Intorrttatior► coneorning any fact material thfaroto, cornrnlls a fraudulent Insurance bet. which Is a crime and subjocts such portion to crhninal artd civil ponaltiob. 1 4i.dtt}���kki Ebl? * State of Indiana certilted MBE -DBE zzAS St Charles Ave. South Bend IN 46614 FII�i 46-3O8S979 Date: 8/07/2025 Project: South Bend Range Phase I Demo Project Location: South Bend IN Project No. 125-020A Quote prepared for: Omega III LLC 2025 T ri-axle rates Regular rate... ha . Overtime rate...$145.00 2025 Quad -axle rates Regular rate... 131.00 Overtime rate...$149.00 Overtime consists of anything over 8 hours daily and all -day Saturday Travel time added to each truck's time ticket daily (when necessary) s per truck. 8 hour minimum per truck Night rates add $15.00 per hr to all rate a and holidays add $36.00 per hr to overtime rates, per truck. 8 hr minimum per truck Sunday Minimums apply: 2, 4 & 8 hours for all dump trucks • Minimum 41 8 hours for flatbeds, local hauling only All dumps, flatbeds: Legal loads only on availabilit because 1 St Class does not have control of the project scheduling Trucks will be up Y To avo id 2 hr show up charge call our dispatch 2 hrs before start time for any cancellations ' 1 St Class shall be compensated for all time spent on the jobsite invoices due NET 30 Fuel surcharge appli ed if diesel costs rise above $4.25 a gallon, based on Midwest PADD 2 Signatory to Local 364 union • MBE certified supplier of aggregates Please nob our • ice if this ro'ect is awarded and if our uote will be used eL n. rices 2025 Material P eovnal��ol. Ce�.c�e,� P�,e'atidwr� g/`Y/2025 • I , A l i.�, 1 \ 1� 1 1 �� • r ; PROJECT NAME: CLEANUP OF SOUTH BEND RANGE, PHASE I — BUILDING DEMOLITION ADDENDUM NO. 1 Date: July 29, 2025 To: All Planholders From: Hillary Horvath, Clerk of the Board of Public Works • See revised Project Description fixing a typographical error. • See revised completion date of December 19, 2025. • Building 2 approximate footprint is 23' x 135' = 3105 sq. ft. • Attached please find the sign -in sheet from the pre -bid meeting. You must acknowledge receipt of this addendum by signing the first page, and including with your electronic bid submission. — This addendum consists of a total of 5 pages — Version 8/11/2020 DEPARTMENT OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA SPECIAL PROVISIONS Cleanup of South Bend Range, Phase I Building Demolition Project No. 125-020A I. PROJECT DESCRIPTION Work to be performed shall include furnishing all labor, services, materials, insurance, and equipment to complete the demolition of two buildings and a portion of wall, and fence installation according to the intent of the plans and specifications at 133 Cherry Street in South Bend. The scope of the project is above -ground demolition only. Slabs and foundations are to remain in place. r Version 07/19/2023 Special Provisions - 1 Indiana Department of Environmental Management (IDEM) "Notification of Demolition" form and instructions shall be provided as included in these specifications. 3. The Contractor shall work continuously until all site demolitions have been completed in accordance with these specifications. 4. The total contract time for completing the work is listed below. The contract time will start when the Notice to Proceed is delivered and signed. The Notice to Proceed will be issued at the Pre -Construction meeting, which will be set by the project inspector. 5. All BASE BID work shall have a final completion date of December 19, 2025. 6. Contractor shall provide a schedule to the Owner prior to beginning any work on the site XIV. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 B. Additions: The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor's subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XV. DEFAULT AND TERMINATION A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor's failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, Version 07/19/2023 Special Provisions - 6 Pre -Bid Meeting: 125-020A Cleanup of South Bend Range, Phase I - NAME Zach Hurst Demolition COMPANY City of South Bend T� £� 1 Q� G co t to -7n- 4ab_�-C<l Q 4 Dle D � �rw Fb e � S A'v AA Sign In Sheet PHONE 574.235.5888 x3057 qiy 6 72 - ya 1, y ?OLY - 5 3a-7L4j 79 `' -C? Lf 'Y'7'7 7 y713 d )(7 - i EMAIL zhurst@southbendin.gov PS'�' c� q'orpgssoc .Conn 1S�Cl=��5����•'�l�5�u15[a�/+-tee Business Name: OMEGA III LLC Entity Type: Foreign Limited Liability Company Creation Date: 09/23/2020 Principal Office Address: 31W566 SPAULDING ROAD, ELGIN, IL, 60120, USA Foreign Legal Name: OMEGA III LLC Jurisdiction of Formation: Original Formation Date: 12/22/2017 BUSINESS INFORMATION DIEGO MORALES INDIANA SECRETARY OF STATE 08/08/2025 06:18 PM Business ID: 202009231425027 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due Date: 09/30/2026 TITLE Manager NAME Charles Patrick Gerage ADDRESS 31 W566 SPAULDING ROAD, ELGIN, IL, 60120, USA Type: Business Name: INDIANA REGISTERED AGENT LLC Address: 5534 SAINT JOE ROAD, FORT WAYNE, IN, 46835, USA PART II BID ATTACHMENT SECTION I — EXPERIENCE QUESTIONNAIRE (Omega III LLC — August 2025) 1. Projects Completed in the Past Year Below is a selection of projects completed within the one (1) year period prior to this bid that are most relevant to the scope of work for the City of South Bend — Building Demolition. Project Name & Location Client Description of Work Completion Date CTA Bus Garage Chicago Transit Complete demolition of large bus maintenance facility, Demolition — Chicago, IL Authority removal of foundations, site grading, and debris July 2025 hauling. IDOT Bridge Demolition — Illinois Department of Mechanical demolition of multi -span bridge, abutment May 2025 Rockford, IL Transportation removal, and site restoration. Municipal Building Demo — City of Aurora Full demolition of 2-story municipal building, asbestos April 2025 Aurora, IL abatement coordination, utility capping, and backfill. Industrial Facility Demo — Private Client Demolition of steel -frame industrial warehouse, February 2025 Joliet, IL concrete slab removal, and site grading. Water Treatment Plant City of Elgin Selective demolition of tanks and structural concrete, January 2025 Structure Demo — Elgin, IL site cleanup, and restoration. 2. Public Works Projects Currently In Progress Project Name & Location Client Description of Work Anticipated Completion Chicago Public Schools — Chicago Public Schools Demolition of multiple school structures, site September 2025 Building Demo Package clearance, and restoration. IDOT Highway Overpass Illinois Department of Complete removal of concrete overpass and November 2025 Removal — Peoria, IL Transportation piers, traffic control, and grading. Municipal Parking Garage City of Evanston Multi -level concrete structure demolition, dust October 2025 Demo — Evanston, IL control, debris hauling. DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31 W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com 3. Failure to Complete Work Awarded Omega III LLC has never failed to complete any awarded project. All contracts have been fulfilled in accordance with project specifications and timelines. 4. References from Private Firms Client ABC Industrial Services Contact Name Phone Email Project John Peterson, Project (312) 555- jpeterson@abcindustrial.com Industrial Facility Demo — Joliet, IL Manager 0198 Midwest Sarah Lopez, VP (847) 555- slopez@mdgbuilds.com Warehouse Demo & Site Development Group Construction 4821 Restoration — Schaumburg, IL Riverfront Realty Mark Daniels, Owner (773) 555- mdaniels@riverfrontrealty.com Commercial Building Demo — Group 7721 Chicago, IL SECTION II — PLAN AND EQUIPMENT QUESTIONNAIRE (Omega III LLC — August 2025) 1. Plan I Layout for Performing Proposed Work Omega III LLC will self -perform all demolition activities using in-house crews and equipment, except for transportation services, which will be subcontracted to a certified minority -owned business. • Start Date: Work can commence immediately upon receiving Notice to Proceed. • Completion: Omega III will meet or exceed the project schedule as established by the City of South Bend. • Crew Size: Average of 8-12 skilled tradespeople on site (Laborers and Operating Engineers), scaled as needed for project phases. • Supervision: On -site supervision provided by Omega III's experienced Project Manager and Foreman, supported by Safety Manager oversight per Omega Ill's comprehensive safety program. • Execution Approach: o Mobilize equipment and crews immediately after site access is granted. o Coordinate utility shutoffs and environmental controls. o Perform structural demolition using mechanical equipment. o Load and haul debris via minority subcontractor transportation services. DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31 W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com o Backfill, grade, and restore site per contract requirements. 2. Subcontractors Used in the Past 5 Years on Public Works Projects Subcontractor Address Description of Work ABC Trucking (MBE) 1234 West Ave., Chicago, IL Transportation and hauling of demolition debris Midwest Recycling 4558 South Blvd., Chicago, IL Concrete and scrap metal recycling services EnviroClean Services 2150 N. Main St., Aurora, IL Environmental remediation and waste disposal 3. Sublet Portion of Proposed Project • Subcontractor: ABC Trucking (MBE — Minority Business Enterprise) • Address: 1234 West Ave., Chicago, IL • Scope: Transportation and disposal of demolition debris. • Equipment: Semi -tractor trailers, dump trucks, and related hauling equipment. • Bond Requirement: Bonding determination will be confirmed upon award. Note: Final subcontractor confirmation will be provided upon project award in accordance with City of South Bend requirements. 4. Equipment Available for Proposed Project (Per attached Omega III Equipment List — dated July 18, 2025) Key available equipment includes: • Hydraulic excavators with various attachments (grapples, shears, buckets, hammers) • Wheel loaders and skid steers • Bulldozers • Semi -tractor trailers and dump trucks • Aerial lifts • Water trucks for dust suppression • Support vehicles and tools for demolition and hauling (Full equipment inventory attached as required.) DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31 W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 I F: 630.837.2300 www.omega3llc.com 5. Material Pricing Contracts Omega III LLC has not entered into fixed contracts for all materials at the time of bid. Pricing in the proposal is based on current market rates obtained from multiple suppliers and subcontractors. Costs will be finalized upon project award to secure competitive rates while ensuring quality and timely delivery. SECTION III — CONTRACTOR'S FINANCIAL STATEMENT (Omega III LLC — August 2025) Pursuant to IC 36-1-12-4, Omega III LLC hereby submits its Contractor's Financial Statement as required for public works projects in excess of $100,000. The attached financial statement contains detailed information sufficient for the City of South Bend to determine Omega III LLC's capability to complete the proposed project if awarded. This statement reflects the company's assets, liabilities, equity position, and overall financial strength as of the most recent reporting period. The financial statement is provided under oath and has been prepared in accordance with accepted accounting principles. DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31 W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com 07/18/2025 03:24:26 PM Omega III LLC Page 1 of 8 OMEGA EQ LIST YR WT EQUIPMENT MANUFACTURER Make/Model SERIAL # UNIT # 2016 118K EXCAVATOR CATERPILLAR 349 FL BZ200599 599 2013 118K EXCAVATOR CATERPILLAR 349E DL PLUMB/ROTAT/STRAIGBOOM MPZ00662 662 2013 118K EXCAVATOR CATERPILLAR 349E DL PL/ROTATN RCW MPZ00663 663 2016 118K EXCAVATOR CATERPILLAR 349FL TRACK EXCAVATOR BZ200788 788 2016 118K EXCAVATOR CATERPILLAR 349FL BZ200887 887 2019 118K EXCAVATOR CATERPILLAR CAT 349FL BZ220915 915 2017 118K EXCAVATOR CATERPILLAR CAT 349FL BZ220028 928 2018 87K EXCAVATOR CATERPILLAR 336F TZA20134 134 2015 87K EXCAVATOR CATERPILLAR 336FL TRACK EXCAVATOR TZA00184 184 2018 87K EXCAVATOR CATERPILLAR 336 DKS00232 232 2013 87K EXCAVATOR CATERPILLAR 336E PLUMBED JRJ00252 252 2013 87K EXCAVATOR CATERPILLAR 336EL PLUMBED JRJ00258 258 2015 87K EXCAVATOR CATERPILLAR 336FL RKB01454 454 2017 87K EXCAVATOR CATERPILLAR 87K - 336FL RKB10802 802 2016 87K EXCAVATOR CATERPILLAR 336FL RKB01975 975 2018 87K EXCAVATOR CATERPILLAR 336F HYDRAULIC RKB20993 993 2016 87K EXCAVATOR CATERPILLAR 336FL TRACK RKB01994 994 2013 52K EXCAVATOR CATERPILLAR 321D LCR MPG00562 562 2013 52K EXCAVATOR CATERPILLAR 321 DLCR PLUMBED MPG00600 600 2013 52K EXCAVATOR CATERPILLAR 321 DLCR PLUMBED MPG00697 697 2013 52K EXCAVATOR CATERPILLAR 321D LCR MPG00821 821 2015 29K EXCAVATOR CATERPILLAR 314EL PLUMBED ZJT00283 283 118K BUCKETS N/A SERIES 349 60" BUCKET N/A B663 2000 118K GRAPPLES NYE 400 SERIES NW 7211 G211 2000 118K GRAPPLES NYE 345 SERIES NW 7213 G213 2010 118K GRAPPLES LABOUNTY HDR 100 - 345 SERIES 100187 G215 2000 118K GRAPPLES NYE 118K 349 SERIES N/A G224 2004 118K GRAPPLES LABOUNTY HDR 100 - 345 SERIES N/A G401 2004 118K GRAPPLES LABOUNTY HDR 100- 345 SERIES 100125 G410 2004 118K GRAPPLES LABOUNTY HDR 100 - 345 SERIES 100126 G661 1999 118K GRAPPLES N/A 349 SERIES N/A G662 2011 118K GRAPPLES LABOUNTY HDR 100 - 345 SERIES 100513 G814 118K GRAPPLES JRB 349 SERIES N/A G823 1994 118K GRAPPLES LABOUNTY 160 - 345 SERIES 16498 G889 2000 87K GRAPPLES NYE 336 SERIES N/A G108 1999 87K GRAPPLES NYE 330 SERIES NW 6360 G210 2004 87K GRAPPLES LABOUNTY HDR 70 - 336/330 SERIES 70061 G226 87K GRAPPLES N/A 336 SERIES N/A G252 2004 87K GRAPPLES N/A 336 SERIES N/A G258 2006 87K GRAPPLES NYE 336 SERIES N/A G404 1999 87K GRAPPLES NYE 330 SERIES/NEEDS PIN/BUSHING G487 G487 1991 87K GRAPPLES LABOUNTY 140 - 328 SERIES 1424 G535 (PASS # PLATE # N/A 07/18/2025 03:24:26 PM Omega III LLC Page 2 of 8 OMEGA EQ LIST YR WT EQUIPMENT MANUFACTURER Make/Model SERIAL # UNIT # 2004 87K GRAPPLES LABOUNTY HDR 70 - 330 SERIES 70060 G881 2015 52K GRAPPLES CATERPILLAR 54" 321 SERIES G0821 G0821 2013 52K GRAPPLES ALLIED ALLIED 70-321 (BROKEN IN HALF) 00102 G102 2013 52K GRAPPLES ALLIED 70-321 SERIES 00101 G600 1999 52K GRAPPLES N/A 321 SERIES N/A G697 2000 52K GRAPPLES NPK 2530 - 321 SERIES 09847 G847 2008 29K GRAPPLES LABOUNTY HDR30 314 SERIES HDR30049 G071 2015 29K GRAPPLES N/A HDR30 314 SERIES N/A G283 2000 7.7K SKIDSTEER GRAPPLES CATERPILLAR 72" 252 SERIES 659904264 G117 2022 7.7K SKIDSTEER GRAPPLES G160 74" - 262 SERIES A421 CGB30006 G160 7.7K SKIDSTEER GRAPPLES CATERPILLAR 74" 2 262 SERIES A4223GB30093 G217 7.7K SKIDSTEER GRAPPLES CATERPILLAR 72" GRAPPLE N/A G304 7.7K SKIDSTEER GRAPPLES CATERPILLAR 72" 252/262 SERIES N/A G333 2025 7.7K GRAPPLES CATERPILLAR CAT 74" INDUST. GRAPPLE A424CGB30053 G460 2022 7.7K SKIDSTEER GRAPPLES CATERPILLAR 74" - 262 SERIES A421 CGB30035 G648 2000 7.7K SKIDSTEER GRAPPLES CATERPILLAR 72" - 252 SERIES 477004914 G755 2025 7.7K GRAPPLES CATERPILLAR CAT 74" INDUSTRIAL GRAPPLE BUC A424AGB30025 G770 7.7K SKIDSTEER GRAPPLES CATERPILLAR 74" - 262 SERIES A4223GB30193 G835 118K BUCKETS CATERPILLAR 60" BUCKET Z1 R08386 B410 118K BUCKETS ROCKLAND 84" BUCKET N/A B599 118K BUCKETS N/A 60" SERIES 349 N/A B661 118K BUCKETS N/A 60" SERIES 349 N/A B662 118K BUCKETS N/A 60" BUCKET N/A B788 118K BUCKETS N/A 54" BUCKET BZ200887 B887 2019 118K BUCKETS CATERPILLAR 72" BUCKET B30556 B915 217 CATERPILLAR 50" BUCKET BZ220028 B928 118K BUCKETS N/A FROST TOOTH N/A FT1 87K BUCKETS N/A 32" BUCKET N/A B103 87K BUCKETS CATERPILLAR 56" BUCKET TZA20134 B134 87K BUCKETS N/A 42" BUCKET N/A B184 87K BUCKETS N/A 48" BUCKET DKS00232 B232 87K BUCKETS CATERPILLAR 56" BUCKET 336/300 Z1 R06667 B249 87K BUCKETS CATERPILLAR 56" BUCKET MH200989 B252 87K BUCKETS N/A 56" SERIES 336/330 N/A B258 87K BUCKETS N/A 45" BUCKET N/A B330 87K BUCKETS N/A 56" BUCKET N/A B342 87K BUCKETS N/A 48" BUCKET LD623113 B454 87K BUCKETS N/A 56" BUCKET RKB10802 B802 87K BUCKETS N/A 42" BUCKET N/A B975 87K BUCKETS N/A 66" BUCKET RKB20993 B993 87K BUCKETS N/A 54" BUCKET N/A B994 52K BUCKETS N/A BUCKET 48" N/A B562 (PASS # PLATE # 07/18/2025 03:24:26 PM Omega III LLC Page 3 of 8 OMEGA EQ LIST YR WT EQUIPMENT MANUFACTURER Make/Model SERIAL # UNIT # IPASS # PLATE # 52K BUCKETS CATERPILLAR 48" 321 SERIES B562 B600 52K BUCKETS N/A 50" SERIES 321 N/A B697 52K BUCKETS N/A 48" BUCKET N/A B821 29K BUCKETS N/A 48" SERIES 314 N/A B283 29K BUCKETS CATERPILLAR 18" TRENCH BUCKET Z1 D02661 B314 29K BUCKETS N/A 18" SERIES 314 13924 B924 2018 7.7K SKIDSTEERS CATERPILLAR 262DK DTB09160 160 2015 7.7K SKIDSTEERS CATERPILLAR 262D SSL DTB04017 217 2010 7.7K SKIDSTEERS CATERPILLAR 256C PLUMBED SKIDSTEER DWS00316 316 2010 7.7K SKIDSTEERS CATERPILLAR 252 B3 TNK00355 355 2023 7.7K SKIDSTEERS CATERPILLAR 7.7K 262D3 ZB205460 460 2023 7.7K SKIDSTEERS CATERPILLAR CAT 262D3 ZB205460 490 2017 7.7K SKIDSTEERS CATERPILLAR 262DC DTB06648 648 2023 7.7K SKIDSTEERS CATERPILLAR CAT 262D3 TP401770 770 2015 7.7K SKIDSTEERS CATERPILLAR 262D TURBO 2 SPEED DTB00835 835 2022 N/A TRUCKS FORD F150 (ALBERTO) 1 FTEX1 EP2NKE70913 913 01400441088N 1094627B 2018 N/A TRUCKS FORD F1 50 4x4 SUPERCREW PICK-UP 1FTEW1EG7JFE61632 1632 01400441085M 3610234B 2018 N/A TRUCKS FORD F150 SUPER CAB (EFRAIN) 1 FTEX1 EP2JFA22786 2786 01400441084A 2811959E 2015 N/A TRUCKS FORD F150 (JUAN GOVEA) 1 FTEX1 EP4FFD04550 4550 01400441082K 2296916B 2017 N/A TRUCKS FORD F150 SUPER CAB (MIGUEL) 1FTEX1 EP8HFC54934 4934 01400441099T 298051B 2021 N/A TRUCKS FORD F150 (DAN) 1 FTEW1 EP7MFC64982 4982 01400441100K 3026388 B 2017 N/A TRUCKS FORD F150 4D EXTENDED CAB 1 FTFX1 EF5HFB77676 7676 01400441083C 2577589B 2022 N/A TRUCKS FORD F150 (MIGUEL) 1 FTEX1 EP1 NKE58123 8123 01400441087H 4017811 2018 N/A TRUCKS GMC TERRIAN 4D SUV (MIKE) 3GKALVEXOJL252645 2645 014 00441096K CF28098 2016 N/A TRUCKS FORD ESCAPE (RYAN) 1 FMCUOGX3GUC58466 8466 014 00441097C =M 74679 2016 N/A TRUCKS FORD ESCAPE SUV (DAN DUNLAP) 1FMCUOG79GUA18662 8662 01400441089R \W91012 2024 N/A TRUCKS CHEVROLET TAHOE 1GNSKNKD7RR129014 9014 01400441091X 1180 N/A WHEEL LOADERS HYUNDAI HL750 HL7500144 W144 1999 N/A WHEEL LOADERS CATERPILLAR 950G 3JW01183 W183 N/A WHEEL LOADERS N/A 910 0113 W113 2010 N/A AIR COMPRESSOR CHICAGO PNEUMATIC 185185 35132 AC-11 2005 N/A AIR COMPRESSOR ATLAS COPCO XAS97 185 CFM 4500A10175R013185 AC1 2005 N/A AIR COMPRESSOR ATLAS COPCO XAS97 185 CFM 4500A10175R011937 AC2 2011 N/A AIR COMPRESSOR ATLAS COPCO XAS185 JD7 11075047B AC3 2011 N/A LIGHT PLANTS DOOSAN/INGERSOLL RAN DOOSAN/INGERSOLL RAND 429897UHVE06 LP10 2011 N/A LIGHT PLANTS DOOSAN/INGERSOLL RAN DOOSAN/INGERSOLL RAND 4FVLSBDA4BU427492 LP11 2011 N/A LIGHT PLANTS WANCO WLTC-4 5F13D1415A1003061 LP13 2011 N/A LIGHT PLANTS WANCO WLTC-4 5F13D1415B1004180 LP4 2011 N/A LIGHT PLANTS WANCO WLTC-4 5F13D1417B1004181 LP5 2011 N/A LIGHT PLANTS WANCO WLTC-4 1791PR008 LP7 2006 192K EXCAVATOR KOMASTU PC800LC-8 PLUMBED/ROTATION RCW 50028 28 2016 162K EXCAVATOR CATERPILLAR 374F L DNM00480 480 07/18/2025 03:24:26 PM Omega III LLC Page 4 of 8 OMEGA EQ LIST YR WT EQUIPMENT MANUFACTURER Make/Model SERIAL # UNIT # IPASS # PLATE # 2011 N/A TRUCKS FORD F150 (JOB SITE SECURITY) 1FTMF1CM8BKD83374 3374 01401162930 R 3531835 B 2013 N/A TRUCKS RAM RAM 5500 3C7WRMBL8DG576356 6356 01400441098A 205600 H 2011 N/A TRUCKS FORD FORD F350 SERVICE TRUCK IFDRF3GTOBEB66477 6477 014 00441094R 172566 F 2007 N/A CRUSHERS/CONVEYOR:TEREX/FINLAY J1175 MOBILE TRACK JAW CRUSHER FNC570618 C618 192K BUCKETS CEACO 60" BUCKET 1562 B028 2022 WATER BUFFALO WATERWAGON 500 GAL WATER BUFFALO W1329RP000483 WT0483 2022 WATER BUFFALO WATERWAGON 500 GAL WATER BUFFALO W1326RP000487 WT0487 2022 WATER BUFFALO WATERWAGON 500 GAL WATER BUFFALO W132PP000923 WT0923 2022 WATER BUFFALO WATERWAGON 500 GAL WATER BUFFALO 1328PP001184 WT1184 2013 N/A WATER BUFFALO MAGNUM PRO MWT500 / WATER BUFFALO 5AJW516186B000352 WT4923 2007 N/A WATER BUFFALO MAGNUM PRO MWT500 / WATER BUFFALO 5AJWS16167B000044 WT5044 2022 WATER BUFFALO WATERWAGON 500 GAL WATER BUFFALO 068994WT8994 WT8994 2011 N/A TRAILERS CHRONKHITE TRAILER / SKIDSTEER 47329242XB1000007 T007 104704TE 8000LBS BRIDGE BOX N/A 132" N/A BB1 8000LBS BRIDGE BOX N/A 132" N/A BB2 8000LBS BRIDGE BOX N/A 168" N/A BB3 7800LBS BRIDGE BOX N/A 120" N/A BB4 11500LBS BRIDGE BOX N/A 144" N/A BB5 11500LBS BRIDGE BOX N/A 144" N/A BB6 118K GRAPPLES NA 15/25FT HOMEMADE PC349 POLE N/A WP N/A JOB BOX N/A 8X20 ENCLOSED ROLL OFF JOB BOX N/A JB1 N/A JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB10 N/A JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB11 2025 JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB13 2025 JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB14 2025 JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB15 N/A JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB2 N/A JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB3 N/A JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB4 N/A JOB BOX N/A 8x20 ENCLOSED ROLL OFF N/A JB6 N/A WHEEL LOADERS N/A 42K 950 LOADER FORKS F140K F140K 29K WHEEL LOADERS N/A 938 LOADER FORKS N/A F178 2016 52K/87K MAGNETS MOLEY ESA 42" MAGNET 16267 M267 2021 N/A TRUCKS FORD FORD F550 1 FDUF5GT6MDA08904 8904 01401162929N 281742H 2008 N/A TRUCKS FORD F550 (DELIVERY TRUCK) 1 FDAF56R88EB89092 9092 01400441090M 173980 H 2020 N/A TRUCKS FORD FORD 550/STAKEBED N/A 9646 01405300751 H 224366H 1984 N/A TRUCKS INTERNATIONAL INT. S SERIES 1754 WATER TANK 1 HTLCHXM2EHA31390 1390 01400441094R 172566 F N/A ROLLOFF N/A ROLLOFF BOX 10 YD N/A 20167 N/A ROLLOFF N/A 15 YD BOX N/A 20168 N/A ROLLOFF N/A 10 YD RSM 8X12 S/S LIFTING BOX N/A 20169 N/A ROLLOFF N/A ROLLOFF DECON ROLLOFF DECON D1 N/A ROLLOFF N/A ROLLOFF DECON ROLLOFF DECON D2 07/18/2025 03:24:26 PM Omega III LLC Page 5 of 8 OMEGA EQ LIST YR WT EQUIPMENT MANUFACTURER Make/Model SERIAL # UNIT # 2025 N/A ROLLOFF OMEGA DECON N/A D3 2025 N/A ROLLOFF OMEGA DECON N/A D4 2025 DECON OMEGA OMEGA N/A D5 2025 DECON OMEGA DECON N/A D6 2016 N/A ROLLOFF N/A 40 YD D&B ROLL WATER BOX 3462 WB20161 2011 192K SHEARS LABOUNTY 7500R - 800 SERIES 675027 SH27 7.7K SKIDSTEER ATTACHMEN N/A SKIDSTEER TILE SCRAPER N/A TS1 7.7K SKIDSTEER ATTACHMEN N/A SKIDSTEER TILE SCRAPER N/A TS2 7.7K SKIDSTEER ATTACHMEN N/A 10FT HOMEMADE POLE N/A WP10 7.7K SKIDSTEER ATTACHMEN N/A 13FT HOMEMADE POLE N/A WP13 7.7K SKIDSTEER ATTACHMEN N/A 6FT HOMEMADE POLE N/A WP6 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC1 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC11 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC12 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC13 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC14 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC16 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC17 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC18 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC20 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC22 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC29 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC3 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC31 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC33 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC34 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC35 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC36 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC37 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC38 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC40 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC41 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC42 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC45 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC46 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC48 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC49 N/A TANK CARTS N/A STATIONARY W/LIFTING EYES N/A TC8 2013 192K GRAPPLES N/A 78' 3 PIECE HIGH REACH FRONT AMUH28 UH28 10000LBS WRECKING BALLS N/A C.S.S 10K DROP BALL N/A WB10K 12000 LBS WRECKING BALLS N/A WRECKING BALL N/A WB12K 3000LBS WRECKING BALLS N/A 1/2 BALL N/A WB3K (PASS # PLATE # 07/18/2025 03:24:26 PM Omega III LLC Page 6 of 8 OMEGA EQ LIST YR WT EQUIPMENT MANUFACTURER Make/Model SERIAL # UNIT # 4000LBS WRECKING BALLS N/A WRECKING BALL N/A WB4K 4000LBS WRECKING BALLS N/A STEEL INGOT N/A WB4K1 8000LBS WRECKING BALLS N/A C.S.S 8K DROP BALL N/A WBBK 192K GRAPPLES GEITH HDG 170-800 SERIES G028 G028 2012 118K HAMMERS TRAMAC V4500 - 349/400 SERIES V450050011 H011 2012 118K HAMMERS TRACMAC V4500 - 349/400 SERIES V450050013 H013 118K HAMMERS CATERPILLAR H180S - 345 SERIES 9PM04100 H100 2008 118K HAMMERS TRAMAC V56 - 349/400 SERIES 155290 H290 2024 87K HAMMERS OKADA OKB 4500 336 SERIES OK61511-2300109 H109 2004 87K HAMMERS CATERPILLAR H160CS - 330/345 SERIES OBFB00121 H121 2024 87K HAMMERS OKB 4500 W/HOSES OK61511-2300311 H311 2022 87K HAMMERS OKADA OKB 4500 OKB1512100312 H312 2005 87K HAMMERS CATERPILLAR H140 DS - 330 SERIES BXB00332 H332 2005 87K HAMMERS CATERPILLAR H140 DS - 330 SERIES BXB00874 H784 2008 87K HAMMERS CATERPILLAR H140DS - 328 SERIES BXB00799 H799 2008 87K HAMMERS CATERPILLAR H140 DS - 330 SERIES BXB00819 H819 2008 87K HAMMERS CATERPILLAR H140 DS - 330 SERIES BXB00829 H829 2025 52K HAMMERS OKB 52K OKB 2500 81A2101008 H008 2025 52K HAMMERS OKB 52K OKB 2500 81A2200101 H101 52K HAMMERS CATERPILLAR H130 - 321 SERIES 7CM04089 H111 2006 52K HAMMERS CATERPILLAR H130 - 321 SERIES 7CM04389 H389 2015 52K HAMMERS CATERPILLAR H130 - 321 SERIES 7CM04969 H520 2025 52K HAMMERS OKB 52K OKB 2500 81A2400812 H812 2025 52K HAMMERS OKB 52K OKB 2500 81A2400912 H912 2015 29K HAMMERS CATERPILLAR H115 - 314 SERIES HHD00543 H283 7.7K HAMMERS CATERPILLAR H65DS - 252/262 SERIES BYTO1091 H091 2007 7.7K HAMMERS CATERPILLAR H55D - 252/262 SERIES BWM01227 H227 2007 7.7K HAMMERS CATERPILLAR H65 - 252 SERIES FTS01298 H298 7.7K HAMMERS UB BREAKER 103-NS - 252/262 N/A H451 2008 7.7K HAMMERS ATLAS COPCO SB300 - 252/262 SERIES KAL004705 H705 87K PROCESSOR MECHANIC NYE CP JAWS C01 P361 87K PROCESSOR MECHANIC NYE CP JAWS 514912 P362 118K PROCESSOR MECHANIC LABOUNTY CP100 PULVERIZER - 349 CP100244 CP244 2002 118K PROCESSOR MECHANIC LABOUNTY CP100 PULVERIZER - 349 CP100311 CP311 2003 118K PROCESSOR MECHANIC NYE 40CP29 PULVERIZER - 345/349 7270 P270 2003 118K PROCESSOR MECHANIC NYE 40CP294 PULVERIZER - 345/349 508314 P314 2011 118K PROCESSOR MECHANIC NYE 40CP37 PULVERIZER 349 513622 P622 2000 118K SHEARS LABOUNTY MSD70R - 400 SERIES 70926 SH26 2004 118K SHEARS LABOUNTY 3000R - 345 SERIES 630050 SH50 118K SHEARS LABOUNTY 3000R - 345 SERIES 630059 SH59 7.7K SKIDSTEER BUCKETS N/A 78" BUCKET MATERIAL B002 7.7K SKIDSTEER BUCKETS N/A 78" BUCKET MATERIAL B003 (PASS # PLATE # 07/18/2025 03:24:26 PM Omega III LLC Page 7 of 8 OMEGA EQ LIST YR WT EQUIPMENT MANUFACTURER Make/Model SERIAL # UNIT # 7.7K SKIDSTEER BUCKETS N/A 72" MATERIAL BUCKET N/A B004 7.7K SKIDSTEER BUCKETS N/A 72" MATERIAL BUCKET N/A B005 7.7K SKIDSTEER BUCKETS N/A 72" MATERIAL BUCKET N/A B006 7.7K SKIDSTEER BUCKETS N/A 60" MATERIAL BUCKET W/TEETH N/A B007 7.7K SKIDSTEER BUCKETS N/A 66" MATERIAL BUCKET N/A B035 7.7K SKIDSTEER BUCKETS N/A 60" MATERIAL BUCKET N/A B048 7.7K SKIDSTEER ATTACHMEN N/A SKIDSTEER FORKS 7.7K N/A BF177K 7.7K SKIDSTEER ATTACHMEN N/A 7.7K SKIDSTEER FORKS N/A BF2 36K SLAB BUCKETS N/A 36" PAVEMENT REMOVAL BUCKET 211264-1-1 SB1264 52K SLAB BUCKETS N/A 42" BUCKET AIM 53030 SB300 87K SLAB BUCKETS N/A 48" SLAB BUCKET 23670INT SB302 2022 6K SKIDSTEER GRAPPLES CATERPILLAR 62" - 226 SERIES A4222GB30056 G171 2022 6K SKIDSTEER GRAPPLES CATERPILLAR 62" - 226 SERIES A4224GB30092 G305 2000 118K PROCESSOR ATTACHME LABOUNTY BASE P/A UP90 - 349 SERIES UP9049 P049 2000 118K PROCESSOR ATTACHME LABOUNTY BASE P/A UP90 - 349 SERIES UP9050 P050 2013 118K PROCESSOR ATTACHME LABOUNTY BASE P/A UP90 - 349 SERIES UP9070 P070 2013 118K PROCESSOR ATTACHME LABOUNTY BASE P/A UP90 - 349 SERIES UP9071 P071 1997 192K PROCESSOR ATTACHME LABOUNTY BASE P/A- UP50 - 800 SERIES UP5046 P046 1997 192K PROCESSOR ATTACHME LABOUNTY BASE P/A- UP50 - 800 SERIES UP5069 P069 1996 118K PROCESSOR ATTACHME LABOUNTY BASE P/A- UP50 - 349 SERIES UP5084 P084 2000 118K PROCESSOR ATTACHME LABOUNTY UP90 CONCRETE JAW SET-349 90CP112 P112 2006 118K PROCESSOR ATTACHME LABOUNTY UP90 CONCRETE JAW SET - 349 90CP116 P116 2013 118K PROCESSOR ATTACHME LABOUNTY UP90 CONCRETE JAW SET-349 90CP124 P124 2013 118K PROCESSOR ATTACHME LABOUNTY UP90 349 CONCRETE JAW SET 90CP125 P125 1997 118K/192K PROCESSOR ATTACHME LABOUNTY UP50/349/800 CONCRETE JAW SET N/A P11 1996 118K/192K PROCESSOR ATTACHME LABOUNTY UP50 349/800 CONCRETE JAW SET 50CP47 P47 1996 118K/192K PROCESSOR ATTACHME LABOUNTY UP50 CONCRETE JAW SET 50CP58 P58 1997 118K/192K PROCESSOR ATTACHME LABOUNTY UP50 SHEAR JAW SET OSH73 SH73 1997 118K/192K PROCESSOR ATTACHME LABOUNTY UP50 CRACKER JAW SET 50SC01 C001 2005 6K SKIDSTEERS CATERPILLAR 226B MJH05171 171 2016 6K SKIDSTEERS CATERPILLAR 226 B3 MWD06305 305 2025 TOW BEHIND PUMP BAKER CORP. DP44LS-CY360T 199358 P9358 2024 118K GRAPPLES COSBEN 3-STAGE, 60' TELESCOPIC STIC 24-113 T60 2005 29K WHEEL LOADERS CATERPILLAR 938G II CRD01178 W178 2025 162K HAMMERS RAMMER RAMMER 9033 9033EA0034 H034 2025 162K HAMMERS RAMMER RAMMER 9033 9033EA0040 H040 2025 STREETSWEEPER VIRNIG SWEEPER PU884 247458 S7458 2025 62K EXCAVATOR CATERPILLAR CAT 325 TEL50036 136 2025 62K EXCAVATOR CATERPILLAR CAT 325 TEL50038 138 2025 62K EXCAVATOR CATERPILLAR CAT 325 TEL50050 150 2012 162K CRUSHERS/CONVEYOR: CATERPILLAR 374FL PAP00242 242 2025 62K BUCKETS CATERPILLAR CAT 54" BUCKET MHC16409 B136 (PASS # PLATE # 07/18/2025 03:24:26 PM Omega III LLC Page 8 of 8 OMEGA EQ LIST YR WT EQUIPMENT MANUFACTURER 2025 62K BUCKETS CATERPILLAR 2025 62K BUCKETS CATERPILLAR 2025 62K GRAPPLES TERAN 2025 62K GRAPPLES TERAN 2025 62K GRAPPLES TERAN 2012 BUCKETS CATERPILLAR 2016 162K BUCKETS CATERPILLAR 2021 10K SKIDSTEERS CATERPILLAR 2021 10K SKIDSTEER ATTACHMEN CATERPILLAR N/A MISC. TERMINATOR 2025 GARMIN 2025 GARMIN 1984 44K TRACK LOADER CATERPILLAR N/A MISC. KOMATSU N/A MISC. N/A N/A MISC. N/A Make/Model CAT 54" BUCKET CAT 54" BUCKET TERAN 40" GRAPPLE TERAN 40" GRAPPLE TERAN 40" GRAPPLE CAT 78"BUCKET 70" BUCKET CAT 289D3 TRACK LOADER CAT 86" BUCKET TERMINATOR TILE SCRAPER SONAR STRUCTURE SCAN SONAR STRUCTURE SCAN 44K 936 TRACK LOADER PC400/V4500 P/N2058457 24FT/ELECTRIC BOX BEAM CRADLE 40" X 35" (2) SERIAL # UNIT # NHM07140 B138 MHC16487 B150 4273 G136 0541 G138 1974 G150 N/A B242 DNM00480 B480 JX904736 736 A4221BC20277 B736 N/A TS3 8CZ019372/PC427594 G1 8CZ019372/PC427594 G2 6Z00871 T871 C09697 9697 9998 9999 N/A 11482 N/A BBC1 RENTAL (PASS # PLATE # Business Name: OMEGA III LLC Entity Type: Foreign Limited Liability Company Creation Date: 09/23/2020 Principal Office Address: 31W566 SPAULDING ROAD, ELGIN, IL, 60120, USA Foreign Legal Name: OMEGA III LLC Jurisdiction of Formation: Original Formation Date: 12/22/2017 BUSINESS INFORMATION DIEGO MORALES INDIANA SECRETARY OF STATE 08/08/2025 06:18 PM Business ID: 202009231425027 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due Date: 09/30/2026 TITLE Manager NAME Charles Patrick Gerage ADDRESS 31 W566 SPAULDING ROAD, ELGIN, IL, 60120, USA Type: Business Name: INDIANA REGISTERED AGENT LLC Address: 5534 SAINT JOE ROAD, FORT WAYNE, IN, 46835, USA Michael McMahon Vice -President of Estimating / Owner Michael McMahon is experience in all facets of environmental remediation and structural demolition for Fortune 500, general contractors, and governmental customers in need of bridge, elevated highway, industrial, manufacturing and large-scale building abatement & demolition. His expertise includes estimating and sales, strategic planning and management and field execution. EXPERIENCE Vice President of Estimating Omega III LLC Responsible for: 2018-Present Evaluating markets, competition and opportunities, building customer relationships, ensuring competitive pricing for superior performance, evaluating subcontractor qualifications and pricing, and developing project strategies, sequence, and schedules. Senior Estimator Responsible for: Omega Demolition Corporation 2011-2018 Evaluating and developing opportunities, customer relations, subcontractor evaluation and selection, project strategy, planning & pricing Recent Projects Cuna Financial Madison WI Omega performed the complete building demolition of a 5 story post tension concrete building and demolished a multi- story concrete parking garage. Schaumburg Atrium Center-Schaumbura IL Demolition of four (4) single -story, slab -on -grade commercial buildings, including full structural demolition removal of concrete slabs and foundations, site pavement, sidewalks, curbing, and asphalt parking lots. Additionally, Omega handled tree and landscaping removal, perimeter fencing installation, and site grading. Apartment Renovations — Rosemont, IL Omega performed significant selective demolition on (37) apartment units within 6 different apartment buildings. The contract scope of work involved demolition, removal, & disposal of all drywall, plumbing fixtures, cabinetry, flooring, etc. to strip the apartment units down to the framing studs. Work was completed to customer's satisfaction in approx. 3 weeks. Restaurant Bar & Grill Demolition — Rosemont IL Performed total demolition of building structure which formerly contained a family restaurant and a separate bar and grill. The building was wrecked and all debris was sorted by debris type for recycling and/or disposal. The basement DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com foundation was partially demolished per project specifications. The site was then backfilled with imported clay and compacted to 80%-85% density for future redevelopment by others. Catholic Retreat Center Abatement & Demolition — Chicago, IL This project included the total demolition & site restoration of a Catholic Retreat complex in a residential area of the congested Lincoln Park neighborhood of Chicago. The complex included (2) 7-story buildings linked with a chapel. The buildings were carefully wrecked to the ground utilizing both excavators with high reach attachments equipped with grapples as well as manual Laborers on scaffolding using hand-held impact hammers. 5--Story Medical Center Building Complete & Selective Demolition — Chicago, IL The project included total demolition of (1) 4-story medical center and selective demolition of the attached/connected 5-story medical building to its south. The (2) buildings were carefully separated at the connection point to allow the full demolition of the 4-story building without negative impacts on the 5-story building scheduled to remain for renovations. Former 6t11 Grade School Center Demolition — Crete IL The project included the total demolition & site restoration of the Crete Township 6th Grade School Center & Field House. The School Center building was the original home to Crete Township's High School. The field house was a domed structure that served the original high school's athletic teams. National Plaza Building Demolition — Schaumburg, IL The project included the total demolition of an 8-story office building and parking lot in Schaumburg, IL. The building was wrecked via excavators with a high reach booms and grapple attachment. The entire parking lot asphalt, curbs, light posts, and landscaping hubs surrounding the building were also demolished. Children's Memorial Hospital - Chicago, IL Located in Chicago's exclusive Lincoln Park neighborhood, the Children's Memorial Hospital project required asbestos and lead abatement followed by complete building demolition and onsite debris recycling. LakeviewApartments East Chicago, IN Project consisted of complete demolition of a 9-story apartment building. Hard debris was recycled onsite and used for site restoration. I-90/94 Flyover at I-290 Circle Interchange Chicago, IL Demolition on the project was performed in two phases. The first phase consisted of complete removal of a 239' three -span ramp from NB I-90/94 to Congress Parkway. The second phase was the complete removal of a 456' seven -span ramp from NB I-90/94 to WB I-290. All bridge components were recycled. I-55 at Lake Shore Dr, Chicago, IL Omega performed a three -phased demolition of three structures totaling over 3500' in length leading from NB and SB Lake Shore Drive to Outbound I-55. Demolition took place over I-55, Lake Shore Drive, additional side streets, as well as overactive METRA and CN tracks with live catenaries. Omega recycled 100% of the materials on the project. PennDOT-SR95 SEC GR3 / I-95 Reconstruction Philadelphia, PA Omega performed the demolition of a 7000' elevated section of NB I-95 through Philadelphia, along with various ramps and sign structures. Work took place over numerous roads and Conrail tracks. The work was performed in three phases to allow traffic to continue on the roadway. All material from the project was recycled. Project was completed ahead of schedule and under budget. Select Past Proiects DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com Midway Airport - Chicago, IL Demolished 200,000 sqft former airport and control tower. Johns Manville Plant - Waukegan, IL Decommission 2 million sqft former asbestos manufacturing plant. Dan Ryan Reconstruction Proiect - Chicago, IL Removal of 15 fly over bridges and 5,000 LF of retaining walls and ramps. Regan Memorial Toll -way Reconstruction — Chicago, IL Demolition of 5 bridges including 2 interchanges. Peppers Ferry Bridge over New River — West Virginia Explosive demolition and retrieval of truss bridge over the New River. 1-88 over Fox River Bridge - Fox River, IL Demolition of a 5 arched concrete bridge over the Fox River. Lehigh/Pohowco Bridge - Palmerton, PA Demolition of two 1,350' long truss bridges including explosive demolition. 1-70 Blanchette Bridge over Missouri River - St, Charles, MO Demolition of 23 span 4.083 ft long truss bridge. CTA Purple Line (Roll In) - Chicago, IL Demolition and removal of 3 rail overpasses in 24 hours. Halstead Bascule Bridge - Chicago, IL Demolition and removal of 1930ft bascule bridge over the Chicago River. Chicago Housing Authority - Chicago, IL Demolition of several buildings throughout the city of Chicago, ranging from 7-17 stories. Columbus Hospital - Chicago, IL Asbestos abatement, demolition, and hazardous material removal of 3 buildings, 3-14 stories each. New Page Paper Mill -Kimberly, WI Partial demolition of 200,000 sqft of industrial building. O'Hare International /FedEx 10-C - Chicago, IL Demolition of the FedEx Terminal and United Airline's Cargo Facility. Demo included 292,395 sq ft slab on grade steel plus 2 stoiy 464,580 sq ft steel structure and its 207,900 basement. 90% of debris was recycled Congress Parkway Bascule; Chicago, IL - Dismantlement of a four-leaf bascule bridge over the Chicago River. DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com Chuck Gerage General Manager Chuck Gerage has worked in construction his entire career spanning more than 25 years. His strategic thinking and business acumen translates into superior service for customers and stable employment for his team. Under his leadership, the Omega team has delivered more than $500 million in demolition services across the United States. EXPERIENCE Genera/ Manager Omega III LLC Responsible for development and oversight of: • Business goals and budget • Strategic planning and execution • Customer relationships and contracts Leads all business functions including: • marketing, estimating & sales • legal & compliance • project management Owner & President 2018-Present Omega Demolition Corporation 1997-2018 Responsible for development and oversight of: • Business goals and budget • Strategic planning and execution • Customer relationships and contracts Led business functions: • marketing, estimating & sales • legal & compliance • project management Recent Projects Cuna Financial Madison WI Omega performed the complete building demolition of a 5 story post tension concrete building and demolished a multi- story concrete parking garage. Schaumburg Atrium Center -Schaumburg IL Demolition of four (4) single -story, slab -on -grade commercial buildings, including full structural demolition removal of concrete slabs and foundations, site pavement, sidewalks, curbing, and asphalt parking lots. Additionally, Omega handled tree and landscaping removal, perimeter fencing installation, and site grading. Apartment Renovations — Rosemont, IL Omega performed significant selective demolition on (37) apartment units within 6 different apartment buildings. The contract scope of work involved demolition, removal, & disposal of all drywall, plumbing fixtures, cabinetry, flooring, DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com etc. to strip the apartment units down to the framing studs. Work was completed to customer's satisfaction in approx. 3 weeks. Restaurant Bar & Grill Demolition — Rosemont IL Performed total demolition of building structure which formerly contained a family restaurant and a separate bar and grill. The building was wrecked, and all debris was sorted by debris type for recycling and/or disposal. The basement foundation was partially demolished per project specifications. The site was then backfilled with imported clay and compacted to 80%-85% density for future redevelopment by others. Children's Memorial Hospital - Chicago, IL Located in Chicago's exclusive Lincoln Park neighborhood, the Children's Memorial Hospital project required asbestos and lead abatement followed by complete building demolition and onsite debris recycling. Catholic Retreat Center Abatement & Demolition — Chicago, IL This project included the total demolition & site restoration of a Catholic Retreat complex in a residential area of the congested Lincoln Park neighborhood of Chicago. The complex included (2) 7-story buildings linked with a chapel. The buildings were carefully wrecked to the ground utilizing both excavators with high reach attachments equipped with grapples as well as manual Laborers on scaffolding using hand-held impact hammers. 5--Story Medical Center Building Complete & Selective Demolition — Chicago, IL The project included total demolition of (1) 4-story medical center and selective demolition of the attached/connected 5-story medical building to its south. The (2) buildings were carefully separated at the connection point to allow the full demolition of the 4-story building without negative impacts on the 5-story building scheduled to remain for renovations. Former 611' Grade School Center Demolition — Crete IL The project included the total demolition & site restoration of the Crete Township 6th Grade School Center & Field House. The School Center building was the original home to Crete Township's High School. The field house was a domed structure that served the original high school's athletic teams. National Plaza Building Demolition — Schaumbura IL The project included the total demolition of an 8-story office building and parking lot in Schaumburg, IL. The building was wrecked via excavators with a high reach booms and grapple attachment. The entire parking lot asphalt, curbs, light posts, and landscaping hubs surrounding the building were also demolished. Select Past Projects Springfield Avenue Pumping Station - Chicago, IL Performed lead & asbestos abatement; asset recovery; & total and selective structural demolition to facilitate the station's conversion from steam turbines & boilers to electric motors. Cook Countv/Stroger Hospital Demolition - Chicago, IL The Stroger Hospital Campus is located in the heart of Chicago's downtown medical district and surrounded by several high rise, occupied buildings in very close proximity. In addition to the challenging environment, the scope of work included the surgical separation of structures to be demolished from the historic main hospital DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com building. Structures to be demolished ranged from 3- 12 stories and included a powerhouse, 220' stack, and a generator building. Hard debris was recycled onsite and used for site restoration. Caterpillar Building 1 System 76 Demolition - Morton, IL Project: Approximately 390,000 square feet demolition of a 5 level manual pull retrieval and racking storage system for installation of a new computerized high speed automated retrieval, racking and storage system at the Morton Caterpillar Parts Distribution Center. Former Cargill Facility - Chicago, IL Project: Directly adjacent to the Calumet Channel, and active railroad tracks, demolished 271 concrete grain silos, each standing 130 feet, plus a 215ft head house —all concrete was crushed onsite to produce granular backfill . O'Hare International FedEx Terminal & United Airline's Cargo Facility - Chicago, IL Demolished the FedEx Terminal and United Airline's Cargo Facility. Demo included 292,395 sq ft slab on grade steel plus 2 story 464,580 sq ft steel structure and its 207,900 basement. 90% of debris was recycled Location: Chicago, IL DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com Daniel Dela DelaRosa Vice -President of Operations / Owner Daniel DelaRosa has worked in construction for more than 20 years. His experience revolves around safely delivery large-scale & complex demolition projects. Additionally, Dan is a licensed lead & asbestos supervisor, with extensive experience and training in safety and environmental hazard abatement. EXPERIENCE Vice President of Operations Omega III LLC 2018-Present Responsible for development and oversight of: • Management of field operations, compliance with contract terms, schedules & budgets, meeting customer goals & exceeding expectations, ensuring performance of employees, ensuring equipment aligns with safety and environmental policies and requirements General Superintendent Omega Demolition Corporation 1999-2018 Environmental Project Manager Supervisor Responsible for development and oversight of: • Planning and supervision of daily operations of projects, laborers, and operations • Ensured Omega Safety Program and OSHA safety standard and regulations are followed in all operations • Ensured that company and customers goals and schedules are met • Oversaw environmental remediation projects from start to completion • Ensured most cost-effective use of resources • Responsible for on -site communication with customers owners, and crew members • Maintained budgets, quality, and safety • Scheduled work crews, equipment, and subcontractors • Controlled job cost and schedule • Communicated, planned, and sequenced activities with customer • Accountable for meeting all safety regulations Recent Projects Cuna Financial Madison WI Omega performed the complete building demolition of a 5 story post tension concrete building and demolished a multi- story concrete parking garage. Schaumburg Atrium Center -Schaumburg IL Demolition of four (4) single -story, slab -on -grade commercial buildings, including full structural demolition removal of concrete slabs and foundations, site pavement, sidewalks, curbing, and asphalt parking lots. Additionally, Omega handled tree and landscaping removal, perimeter fencing installation, and site grading. DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com Apartment Renovations — Rosemont, IL Omega performed significant selective demolition on (37) apartment units within 6 different apartment buildings. The contract scope of work involved demolition, removal, & disposal of all drywall, plumbing fixtures, cabinetry, flooring, etc. to strip the apartment units down to the framing studs. Work was completed to customer's satisfaction in approx. 3 weeks. Restaurant Bar & Grill Demolition — Rosemont IL Performed total demolition of building structure which formerly contained a family restaurant and a separate bar and grill. The building was wrecked and all debris was sorted by debris type for recycling and/or disposal. The basement foundation was partially demolished per project specifications. The site was then backfilled with imported clay and compacted to 80%-85% density for future redevelopment by others. Children's Memorial Hospital - Chicago, IL Located in Chicago's exclusive Lincoln Park neighborhood, the Children's Memorial Hospital project required asbestos and lead abatement followed by complete building demolition and onsite debris recycling. Catholic Retreat Center Abatement & Demolition — Chicago, IL This project included the total demolition & site restoration of a Catholic Retreat complex in a residential area of the congested Lincoln Park neighborhood of Chicago. The complex included (2) 7-story buildings linked with a chapel. The buildings were carefully wrecked to the ground utilizing both excavators with high reach attachments equipped with grapples as well as manual Laborers on scaffolding using hand-held impact hammers. 5-Story Medical Center Building Complete & Selective Demolition — Chicago, IL The project included total demolition of (1) 4-story medical center and selective demolition of the attached/connected 5-story medical building to its south. The (2) buildings were carefully separated at the connection point to allow the full demolition of the 4-story building without negative impacts on the 5-story building scheduled to remain for renovations. Former 6rh Grade School Center Demolition — Crete IL The project included the total demolition & site restoration of the Crete Township 6th Grade School Center & Field House. The School Center building was the original home to Crete Township's High School. The field house was a domed structure that served the original high school's athletic teams. National Plaza Building Demolition — Schaumburg IL The project included the total demolition of an 8-story office building and parking lot in Schaumburg, IL. The building was wrecked via excavators with a high reach booms and grapple attachment. The entire parking lot asphalt, curbs, light posts, and landscaping hubs surrounding the building were also demolished. Lakeview Apartments East Chicago, IN Project consisted of complete demolition of a 9-story apartment building. Hard debris was recycled onsite and used for site restoration. I-90/94 Flyover at I-290 Circle Interchange Chicago, IL Demolition on the project was performed in two phases. The first phase consisted of complete removal of a 239' three -span ramp from NB I-90/94 to Congress Parkway. The second phase was the complete removal of a 456' seven -span ramp from NB I-90/94 to WB I-290. All bridge components were recycled. I-55 at Lake Shore Dr, DEMOLITION I ENVIRONMENTAL I INDUSTRIAL Chicago, IL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com Omega performed a three -phased demolition of three structures totaling over 3500' in length leading from NB and SB Lake Shore Drive to Outbound I-55. Demolition took place over I-55, Lake Shore Drive, additional side streets, as well as overactive METRA and CN tracks with live catenaries. Omega recycled 100% of the materials on the project. PennDOT-SR95 SEC GR3 / I-95 Reconstruction Philadelphia, PA Omega performed the demolition of a 7000' elevated section of NB I-95 through Philadelphia, along with various ramps and sign structures. Work took place over numerous roads and Conrail tracks. The work was performed in three phases to allow traffic to continue on the roadway. All material from the project was recycled. Project was completed ahead of schedule and under budget. Select Past Proiects Midway Airport - Chicago, IL Demolished 200,000 sqft former airport and control tower. Johns Manville Plant - Waukegan, IL Decommission 2 million sgft former asbestos manufacturing plant. Dan Ryan Reconstruction Proiect - Chicago, IL Removal of 15 fly over bridges and 5,000 LF of retaining walls and ramps. Regan Memorial Toll -way Reconstruction — Chicago, IL Demolition of 5 bridges including 2 interchanges. Peppers Ferry Bridge over New River — West Virginia Explosive demolition and retrieval of truss bridge over the New River. 1-88 over Fox River Bridge - Fox River, IL Demolition of a 5 arched concrete bridge over the Fox River. Lehigh/Pohopoco Bridge - Palmerton, PA Demolition of two 1,350' long truss bridges including explosive demolition. Z-70 Blanchette Bridge over Missouri River - St, Charles, MO Demolition of 23 span 4.083 ft long truss bridge. CTA Purple Line (Roll in) - Chicago, IL Demolition and removal of 3 rail overpasses in 24 hours. Halstead Bascule Bridge - Chicago, IL Demolition and removal of 1930ft bascule bridge over the Chicago River. Chicago Housing Authority - Chicago, IL Demolition of several buildings throughout the city of Chicago, ranging from 7-17 stories. Columbus Hospital - Chicago, IL Asbestos abatement, demolition, and hazardous material removal of 3 buildings, 3-14 stories each. New Page Paper Mill -Kimberly. WI DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com Partial demolition of 200,000 sqft of industrial building. O'Hare International /FedEx 10-C - Chicago, IL Demolition of the FedEx Terminal and United Airline's Cargo Facility. Demo included 292,395 sq ft slab on grade steel plus 2 stoiy 464,580 sq ft steel structure and its 207,900 basement. 90% of debris was recycled Congress Parkway Bascule; Chicago, IL - Dismantlement of a four-leaf bascule bridge over the Chicago River. DEMOLITION I ENVIRONMENTAL I INDUSTRIAL 31W566 Spaulding Road; Elgin, IL 60120 P: 630.837.3000 1 F: 630.837.2300 www.omega3llc.com JPekron Consulting Brian Rempert, CIH, CSP Senior Safety and Health Consultant — Pekron Consulting, Inc., 1998 to 2008 Vice President and Managing Partner - Pekron Consulting, Inc., 2008 to 2023 Owner/CEO — Pekron Consulting, Inc. 2024 to present • Responsible for providing EH&S technical guidance and expertise to clients and Pekron Consulting employees; • Supervise and mentor a team of forty-five EH&S professionals across 2-offices located in Whiting, IN and Northwood, NH; • Conduct risk assessments for hazard prevention and corrective action development; • Managed a client's $1.8 million Industrial Hygiene and Asbestos budget including workforce hours and employee schedules; • Effectively managed clients' safety and health programs to reduce workers' compensation costs, OSHA recordable injuries, and auto accidents saving millions of dollars; • Consulted as an expert witness for industrial hygiene, machine guarding, IAQ/mold and asbestos cases; • Conducted OSHA side -by -side exposure evaluations to provide clients and counsel with industrial hygiene exposure data; • Performed over 500 comprehensive OSHA compliance, industrial hygiene, and loss control audits to identify potential violations and reduce injury rate and severity; • Facilitated illness and injury prevention workshops and OSHA compliance training classes; • Provided accurate industrial hygiene noise monitoring and OSHA standards interpretation for utilization in worker's compensation litigation cases; • Involved in a multi -year Corporate Settlement Agreement (CSA) with OSHA to develop equipment specific Lock-Out/Tag-Out (LOTO) procedures, machine -guarding risk assessments, OSHA, ANSI and ISO compliant machine guarding solutions, written programs and employee training; • Led employee injury, incident and fatality investigations to gather evidence, interface between lawyers and OSHA, identify root causes and develop corrective actions to prevent future occurrences; • Utilized industrial hygiene results and existing OSHA standards to develop and implement employee -training programs, written safety programs, feasible engineering controls, and specific PPE requirements; and • Provided excellent customer service to all clients, including: the Can Manufacturers Institute, Brandenburg Industrial Services Company, United Parcel Service (UPS), ARAMARK Uniform Services, CINTAS, Cleveland -Cliffs Steel, California Hotel and Lodging Association, Willis Towers Watson Insurance Brokers, United States Steel Corporation, Blommer Chocolate Company, Merisant, Kraft Foods, Federal Aviation Authority (FAA), Chicago - Metra, Mauser Corporation, Willis Tower Chicago, IL, Anheuser-Busch (INBEV), Argonne National Laboratory, the U.S. Navy, and numerous law firms and insurance companies. PROFESSIONAL CREDENTIALS SAFETY: • Certified Safety Professional (CSP) (19293) INDSUTRIAL HYGIENE 0 Certified Industrial Hygienist (CIH) (11353 CP) ASBESTOS • Indiana (IDEM) — licensed asbestos inspector and supervisor • Illinois (IDPH) — licensed asbestos inspector, project manager, air sampling professional, management planner and asbestos project designer I9.9111w IM11..1W.111wwIgIFRIDIM American Conference of Governmental Industrial Hygienists (ACGIH) American Society of Safety Professionals (ASSP) — Past Vice President, President and Delegate of the NW Indiana Chapter American Industrial Hygiene Association (AIHA) — Greater Chicago Chapter past Board of Directors EDUCATION University of Illinois at Urbana -Champaign, Environmental Science, B.S., 1997