HomeMy WebLinkAboutOpening of Bids - Cleanup of South Bend Range, Phase I Proj No 125-020A - Dore & Associates IncCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Cleanup of South Bend Range, Phase I
Project No. 125-020A
For Bids Due Tuesday, August 12, 2025 @ 9:00 A.M. (E.D.T.)
Date:
Address:
City/State/Zip
PART I
(Must be completed for all bids. Please type or print)
8/12/2025 Bidder (Firm): Dore & Associates, Inc.
PO Box 338
Bay City, MI 48707
Telephone Number: (989 ) 684-8411
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Cleanup of South Bend Range, Phase I — Building Demolition
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
City of South Bend, Engineering Division
and dated 07/11/2025 for the sum of (enter the Total Bid as shown on the Proposal)
($ 549, 700.00 )
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be show sep ate attachment.
By
Jason C. Dore, Preside lntature)
(Printed Name of Person Signing)
ACCEPTANCE
The above bid is accepted this 12th day of
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
August
20 25
Joseph R. Molnar, Vice President
Gary A. Gilot, Member Breana N. Micou, Member
Murray L. Miller, Member Attest: Hillary Horvath, Clerk
Version 07/19/2023 Contractor's Bid for Public Works - 2
Bond No.: B 1338196
Selective Insurance Company of America
40 Wantage Avenue
Branchville, New Jersey 07890
973-948-3000
AIA Document A310
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we
Dore & Associates Inc
P O Box 338 Bay City, MI 48707 (Here insert full name and address or legal title of contractor)
as Principal, hereinafter called the Principal, and Selective Insurance Company of America
a corporation duly organized under the laws of the State of New Jersey
as Surety, hereinafter called the Surety, are held and firmly bound unto
City of South Bend, IN, Board of Public Works
227 W Jefferson Blvd. South Bend, IN 46601 (Here insert full name and address or legal title of owner)
as Obligee, hereinafter called the Obligee, in the sum of
5'/6 Percent of the Total Bid ($ 5% Percent)
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors,
administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for
125-020A Demolition & Cleanup of South Bend Range, Phase 1 located at 133 Cherry St., South Bend, IN 46601
(Here insert full name and address and description of project)
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in
accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good
and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the
prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall
pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for
which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null
and void, otherwise to remain in full force and effect.
Signed and Sealed this 12th day of August 2025
(Witness) Dennis C. Dore, Secretary
(Witness)
Dore & Associates Inc
(Prin 'p (Sea?)
i
(Title on C. Dore, rresidenc
SELECTIVE INSURANCE COMPANY OF AMERICA
(Surety)
Title /Attome in -Fact ' �.
Michael G. Zervos
"Printed in cooperation with the American Institute of Architects (AIA) by the Selective Insurance Company of America. The
language in this document conforms exactly to the language used in AIA Document A310, February 1970 edition."
AIA DOCUMENT A310•BID BOND-AIA ® • FEBRUARY 1970 ED•THE AMERICAN
INSTITUTE OF ARCHITECTS,1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006
B-203 (12/92)
a
O
Q
W
w
F-
W
U
+a z Selective Insurance Company of America
SELECTIVE 40 Wantage Avenue
Branchville, New Jersey 07890
INSURANCE® 973-948-3000 BondNo.B 1338196
POWER OF ATTORNEY
SELECTIVE INSURANCE COMPANY OF AMERICA, a New Jersey corporation having its principal office at 40
Wantage Avenue, in Branchville, State of New Jersey ("SICA"), pursuant to Article VII, Section 1 of its By -Laws, which
state in pertinent part:
The Chairman of the Board, President, Chief Executive Officer, any Executive Vice President,
any Senior Vice President or any Corporate Secretary may, from time to time, appoint attorneys
in fact, and agents to act for and on behalf of the Corporation and they may give such appointee
such authority, as his/her certificate of authority may prescribe, to sign with the Corporation's
name and seal with the Corporation's seal, bonds, recognizances, contracts of indemnity and
other writings obligatory in the nature of a bond, recognizance or conditional undertaking, and
any of said Officers may, at any time, remove any such appointee and revoke the power and
authority given him/her.
does hereby appoint: Michael G. Zervos
, its true and lawful attorney(s)-in-fact, full authority to execute on SICA's behalf fidelity and surety bonds or undertakings
and other documents of a similar character, including but not limited to Proposal Bonds, Letters of Surety, and Consents of
Surety, issued by SICA in the course of its business, and to bind SICA thereby as fully as if such instruments had been duly
executed by SICA's regularly elected officers at its principal office, in amounts or penalties not exceeding the sum
of Fifteen Million Dollars ($15,000,000.00) . This certifies that this Power
of Attorney is in full force and effect as of the date of said fidelity and surety bonds or undertakings and other documents of a
similar character, including but not limited to Proposal Bonds, Letters of Surety, and Consents of Surety.
Signed this 12th day of August 2025 OU COyp'
SELECTIVE INSURANCE COMPANY OF AMER1CWAi�, ,,b,,
W . SEAL m
G 1926 "
By: `i ,
rian C. Sarisky+ - JE
Its SVP, Chief Underwriting Officer, Commercial Uhn * _
STATE OF NEW JERSEY:
:ss. Branchville
COUNTY OF SUSSEX
On this 12th day of August 2025 before me, the undersigned officer, personally appeared Brian C. Sarisky, who
acknowledged himself to be the Sr. Vice President of SICA, and that he, as such Sr. Vice President, being authorized so v r;1E •,,
executed the foregoing instrument for the purposes therein contained, by signing the name of the corporation by h'tmsokAt: !� n
Vice President'and that the same was his free act and deed and the free act and deed of SICA. �:><}aej : v=
=a
CHRISTINE MkRIE LAWSON �G
NOTARY PUSUCvlfl-
STATE OF NEW JERSEY Z
My ;;{Knr 5 �31 g15. ifYt9 Notary PublicCoVW%1.,,"C! 7&S�.�``
The power of attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by
the Board of Directors of SICA at a meeting duly called and held on the 6th of February 1987, to wit:
"RESOLVED, the Board of Directors of Selective Insurance Company of America authorizes and approves the use of a
facsimile corporate seal, facsimile signatures of corporate officers and notarial acknowledgements thereof on powers of
attorney for the execution of bonds, recognizances, contracts of indemnity and other writing obligatory in the nature of a
bond, recognizance or conditional undertaking."
01.E HI LGIMI1 M0
I do hereby certify as SICA's Corporate Secretary that the foregoing extract of SICA's By -Laws and Resolution are still
force and effect and this Power of Attorney issued pursuant to and in accordance with the By -Laws is valid. 4 p�°��.
Y
.fi SEAL
Signed this 12th day of August 2025 ^ 1926
i'
M1
Michael H. Lanza, SIf A Corporate Secretary
Important Notice: If the bond number embedded within the Notary Seal does not match the number in the upper right-hand B91 (5-25)
comer of this Power of Attorney, contact us at 973-948-3000.
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Cleanup of South Bend Range, Phase I
Project No. 125-020A
For Bids Due Tuesday, August 12, 2025 @ 9:00 A.M. (E.D.T.)
Contractor Name: Dore & Associates, Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
**THIS FORM ONLY APPLIES TO BIDS GREATER THAN $250,000. **
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
71 of The Responsible Bidding Ordinance No. 10975-23 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") within twelve (12) months of obtaining pre -qualified standing. If the status of any item changes
within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -
qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the
time prescribed above shall result in automatic removal of the designation, effective immediately following
the twelve (12) months of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-71 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-71 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 5/20/2024 General Conditions - 11
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(iii) X By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(iv) X By checking this box, I hereby acknowledge that all subcontractors performing
work greater than $250,000 also meet the qualifications of the Responsible Bidder
Ordinance.
(b) Attachments:
(i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) X_ Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) X For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization. This includes, but may not be limited
to, letters from apprenticeship coordinators detailing the bidder's association with
the program, and the United States Department of Labor Office of Apprenticeship
Certificates of Registration of Apprenticeship Programs for each type of work to be
performed on the project.
Version 5/20/2024 General Conditions - 13
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) X
By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) X
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) x
By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) X
By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(v) X
By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(vi) X
By checking this box, I hereby acknowledge that all subcontractors performing
work greater than $250,000 also meet the qualifications of the Responsible Bidder
Ordinance.
(b) Attachments:
(i) x
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) X
List identifying all former business names.
(iii) x
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
X
years.
(iv)
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) x
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(v) X
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization. This includes, but may not be limited
to, letters from apprenticeship coordinators detailing the bidder's association with
Version 5/20/2024 General Conditions - 14
the program, and the United States Department of Labor Office of Apprenticeship
Certificates of Registration of Apprenticeship Programs for each type of work to be
performed on the project.
(vi) X Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(vii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
(viii) X Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(ix) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due
Date: 8/12/2025
ere) -
Jason C. Dore, President
(Print Name Here)
Dore & Associates, Inc.
(Name of Company)
900 Harry S. Truman Parkway
(Address of Company)
Bay Cif_
(City)
Michigan 48706
(State)
989-684-8411
(Telephone Number)
Version 5/20/2024 General Conditions - 15
J O,
yP A�T
CITY OF SOUTH BEND, INDIANA x ien
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Cleanup of South Bend Range, Phase I
Project No. 125-020A
For Bids Due Tuesday, August 12, 2025 @ 9:00 A.M. (E.D.T.)
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
X Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good
Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and
X WBE-2.1].
X Acknowledge Receipt of 1 Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Dore & Associates, Inc. Date: 8/12/2025
By Authorized Represent
11�Signature:
Print Name & Title: son C. Dore, President
Version 07/19/2023 Contractor's Bid for Public Works - 1
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Michigan )
) SS:
Bay COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 07/19/2023 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the perfonnance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (LC. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 07/19/2023 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 12th day of AuguSt 2025
Subscribed and sworn to before me this
My Commission Expires 06/27/2031
Dore & Associates, Inc.
Con idde (Firm}
s' ature of Co or Mdder or Its Agent
Jason C. Dore, President
Printed Name and Title
12th day of August , 2025
Notary 19lic Kylie R. Dore
County of Residence
KYLIE R. DORE
NOTARY PUBLIC, STATE OF MICHIGAN
COUNTY OF BAY
My Commission Expires 06.27-2031
Ading in the County of
Bay
Version 07/19/2023 Contractor's Bid for Public Works - 6
Project Name:
Project Number:
For Bids Due:
Contractor Name:
BASE BID
BID/PROPOSAL
CITY OF SOUTH BEND A-
Cleanup of South Bend Range, Phase I ' JM65
125-020A
Tuesday, August 12, 2025 @ 9:00 A.M. (E.D.T.)
Dore & Associates. Inc.
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
Lump Sum price to complete building
1
demolition, asbestos abatement, and
1
LSUM
$524,700.00
fence removal and replacement as
intended by these Specifications
2
Environmental Allowance
1
EA
$25,000
$25,000
BASE BID TOTAL $549,700.00
Bidder (Firm): Dore & Associates, Inc.
Address: PO Box 338
City/State/Zip: Bay City, MI 48707 Telephone Number: ( 989 ) 684-8411
By
(Signature)
Jason C. Dore President
(Printed Name of Person Signing)
Version 07/19/2023 Contractor's Bid for Public Works - 7
CITY OF SOUTH BEND '
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-1.0 ,
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number: 125-020A Project Name: Cleanup of South Bend Range, Phase
Bidder: Dore & Associates, Inc. _ _ _ Base Bid Amount: $549,700.00 MBE Goal: 1.3%
Page of
Name 8 Address of MBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of MBE
Component
Percentage
of Total
Bid/Proposal
1st Class Logistics, LLC.
Bernard Coutee
574-993-0071
Trucking/Hauling
$24,485.00
5%
Submitted by:
Jason C. Dore, President
Print Name
ature - -�
***Goals should be calculated based on the Base Bid only.***
Version 07/19/2023 Contractor's Bid for Public Works - 8
8/12/2025
Date
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 125-020A Date: 8/12/2025
Project Name: Cleanup of South Bend Range, Phase
Bidder: Dore & Associates, Inc.
Contact Person: Jason C. Dore, President Telephone: 989-684-8411
Address: PO Box 338
City: Bay City State: Michigan Zip: 48707
Email: est@doreassoc.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: http://www.in.g2y/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
x
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
x
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
x
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MBEs in the scopes of work of the contract.
x
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
x
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
x
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
x
I affirm that I followed up on initial solicitations with interested MBEs.
x
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
x
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 07/19/2023 Contractor's Bid for Public Works - 10
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
X
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
X
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 07/19/2023 Contractor's Bid for Public Works - 11
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN -
FORM MBE-2.1 �M _
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE OF
Project Number: 125-020A MBE Participation Goal 1.3%
Project Name: Cleanup of South Bend Ra
Bidder• Dore & Associates, Inc.
By:
(Wfiature)
MBE Firm 1st Class Logistics, LLC.
Owner or Contact at MBE Firm Bernard Coutee
Telephone: 574-993-0071 Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Trucking/Hauling
RESULTS OF CONTACT WITH THE MBE FIRM:
e, Phase I
President
8/12/2025
Email: 1 stclasslogistics20l3@gmail.com
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 07/19/2023 Contractor's Bid for Pub is Works - 14
1316 COUNTY-Crrr BUILDING
227 W.JEFFERsoN BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 5741235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND, JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: July 29, 2025
To: All Planholders
From Hillary Horvath, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name: 125-020A
Project Number: Cleanup of South Bend Range, Phase I - Building Demolition
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: 8/11 /2025
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by including with your electronic bid submission.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Dore & Associates, Inc.
Authorized Signature-
eson G. Dore, President
Date: 8/12/2025
STATE OF INDIANA
Eric J. Holcomb, Governor
October 16, 2023
Mr. Bernard Coutee
Ist Class Logistics L.L.C.
2213 Saint Charles Ave
South Bend, IN 46614
Subject: Request for amendment to MBE certification
Dear Mr. Coutee,
DEPARTMENT OF ADMINISTRATION
Division of Supplier Diversity
Indiana Government Center South
402 West Washington Street, Room W462
Indianapolis, IN 46204
(317) 232 - 3061
A request for amendment of the UNSPSC code(s) assigned to 1st Class Logistics L.L.C. was received on
October 5, 2023. After a thorough review, the Indiana Department of Administration, Division of Supplier
Diversity has determined the firm is eligible for an amendment to the previously granted UNSPSC code(s).
This determination is based on information submitted to us, which indicates that the company provides a
commercially useful function in the areas listed below, which will be added to its certification listing.
Below is a full listing of the UNSPSC code(s) it is now currently certified in:
UNSPSC CODE(S)
Code
Description
25101600
Product and material transport vehicles
25101601
Dump trucks
25101604
Delivery trucks
30111800
Aggregates
72153507
Construction site haul away service
78101801
Local area trucking services
78101802
Regional or national trucking services
78101808
Road transport of dry bulk
This certification is valid through November 30, 2025. Although your certification is valid for a three-year
period, you are required to submit an annual Affidavit of Continued Eligibility, which reflects updates
regarding the issues critical to maintaining your certification. However, you must notify us immediately if
any changes occur. Failure to notify us of changes or to provide the Affidavit of Continued Eligibility form
annually will result in the revocation of your certification. Changes include, but are not limited to:
• Change in location or contact information (address, phone number, e-mail address, etc.)
• Change in services provided (amendment to certification)
• Change in ownership
• Change in control
Page 1 of 2
Reference: 1st Class Logistics L.L.C.
While this letter serves as notification of certification, it does not serve to prove continued eligibility. Please
visit litti)://\vww.in.gov/icloa/inwbe/274-'),Iitiii to verify your certification status. Please contact our office at
(317) 232-3061 or mwbe@idoa.in.gov if you have any questions or concerns about your letter. if you have
any other questions.
Sincerely,
19.¢2 157d1�64;f-
Peter Sobun, Director of Certification
Indiana Department of Administration
Division of Supplier Diversity
PS
Page 2 of 2
* State of Indiana Certified MBE -DBE *
2213 St Charles Ave.
South Bend IN 46614
FIN 46-3085979
Date: 7/16/2025
Project: Cleanup Of South Bend Range Phase I
Project Location: Cherry St... City of South Bend
Project No. 125-020A
Quote prepared for: Dore and Associates
2025 Tri-axle rates
Regular rate... $128.00
Overtime rate... $146.00
2025 Quad -axle rates
Regular rate ... $132.00
Overtime rate... $150.00
• Overtime consists of anything over 8 hours daily and all -day Saturday
• Travel time added to each truck's time ticket daily
• Night rates add $15.00 per hr to all rates per truck. 8 hour minimum per truck
• Sunday and holidays add $36.00 per hr to overtime rates, per truck. 8 hr minimum per truck
• Minimums apply: 2, 4 & 8 hours for all dump trucks
• Minimum 4, 8 hours for flatbeds, local hauling only
• All dumps, flatbeds: Legal loads only
• Trucks will be upon availability because 1st Class does not have control of the project scheduling
• To avoid 2 hr show up charge call our dispatch 2 hrs before start time for any cancellations
• 1st Class shall be compensated for all time spent on the jobsite
• Invoices due NET 30
• Fuel surcharge applied if diesel costs rise above $4.25 a gallon, based on Midwest PADD 2
• Signatory to Local 364 union
• MBE certified supplier of aggregates
• Please notify our office if this project is awarded and if our quote will be used
Bernard Coutee President 8/11/2025
CERTIFICATE OF LIABILITY INSURAWalz—
�•---- "
DATE(MMIDDIYYYY)
9/16/2024
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER -
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Arthur J. Gallagher Risk Management Services, LLC
5311 Hampton Place
Saginaw MI 48604
CONTACT
NAME: Lisa Stoner
PHONE — FAx
AIC No Ext : 800-875-8395 we No : 989-607-6802
ADDRESS: lira stoner a' .cam
INSURER(S) AFFORDING COVERAGE
NAIC #
INSURER A : Nautilus Insurance Company
17370
License#: BR-1791411
INSURED DORE&AS-02
Dore & Associates Inc.
y
INSURER a: Amerisure Insurance COm an
19488
INSURER C r Great Divide Insurance Company
25224
P.O-Box 338
-INSURER D: CNA Insurance Comoanies
20435
Bay City, Mi 48707
INSURER E;
_
INSURER F :
COVERAGES CERTIFICATE NUMBER: 211B2347n. REVICInm KnIMFtGG-
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADOL
SUER
POLICY NUMBER
POLICY EFF
MMIDD/YYYY
POLICY EXP
MMIDDIYYYYI
I LIMITS
A
X
COMMERCIALGENERALLIABILITY
CLAIMS -MADE El OCCUR
ECP203582913
9/16/2024
9/16/2025
EACH OCCURRENCE
52,000,000
DAMAGE'To RENTS'
PREMISES Ea occurrenceI
$100,000
X
MED EXP (Any one person)
S 5,000
10,000
PERSONAL & ADV INJURY
_
S2,000,000
AGGREGATE LIMIT APPLIES PER
POLICY JECT 1:1LOC
GENERAL AGGREGATE
52,000,000
GEN'L
X
PRODUCTS - COMPIOP AGG
S 2,000,000
$
OTHER'
B
AUTOMOBILE
LIABILITY
CA21251830007
1/30/2024
1/30/2025
EOa sB'INEOntSINGLE LIMIT
$ 1,000,000
ANY AUTO
BODILY INJURY (Per person)
S
OWNED SCHEDULED
AUTOS ONLY AUTOS
BODILY INJURY (Per accident)
S
X
HIRED X NON -OWNED
AUTOS ONLY AUTOS ONLY
PROPERTY DAMAGE
(Pet accident)
S
S
A
X
UMBRELLALIAB
X
GCCUR
FFX203583013
9/16/2024
9/16/2025
EACH OCCURRENCE
S 10.000.000
EXCESS LIAR
CLAIMS -MADE
AGGREGATE
510,000,000
DED RETENTIONS
$
C
WORKERS
AND EMPLOYERS' LABILIITY YIN MPENSATIONWCA204465910
ANYPROPRIETOR/PARTNERIEXECUTIVE
OFFICER/MEMBER EXCLUDED? ❑
N!A
9/16/2024
9/1612025
X gTATUTE EERH
E.L. EACH ACCIDENT
S 1,000,000
E.L. DISEASE • EA EMPLOYEE
—
$1,000,000
(Mandatory in NH)
If yes, describe Under
EL. DISEASE - POLICY LIMIT
S 1,000,000
DESCRIPTION OF OPERATIONS below
D
A
Leased & Rented Equipment
Pollution Liability
C 7039508524
ECP203582913
5126/2024
9/16/2024
5/26/2025
9/16/2025
S380,000 Limit
S2.000,000 Limit
$1,000 Deductible
$10,000 Deductibbe
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schndule, may be attached If more space is required)
4CK 1 IrIUA 1 C r1ULUCK CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
BIDDING PURPOSE ONLY AUTHORIZED REPRESENTATIVE
9)1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD
CERTIFICATE OF QUALIFICATION
to provide
CONSTRUCTION SERVICES
for
PUBLIC WORKS PROJECTS
to the
STATE OF INDIANA
This Certification Board, having duly considered application for qualification in terms of apparent experience and financial
resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a
Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to:
DORE & ASSOCIATES INC
900 TRUMAN PKWY
PO BOX 338
BAY CITY MI 48707
Phone 989-684-8411
Fax 989-684-6663
Company Official
JASON DORE
for the twenty-seven month period stated herein, unless revoked by this Board for cause,
and in the classifications of services stated below. This certificate supercedes any previous certificate.
1795.01 Demolition of Buildings and Other Structures
1799.01 Asbestos Remediation
CERTIFICATION DATE 4/29/2022
EXPIRATION DATE 7/29/2024
THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD,
402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA 46204,
ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION.
Tracy L. Cross, Ex utive Secretary
Certification Board
DAPW PQ2 State Form 3983R Rev. 07/06
Nationwide Specialty Contractor • Demolition Abatement Remediation
b&qASS0FC1AT!C=SqjnE. P.0. Box 338 • Bay City, MI 48707-0338 • ph 989.6111 84.8411 11 • fax 989.6184.6663 • www.dore assoc com
ALL EQUIPMENT LISTED BELOW IS SOLEY OWNED AND FULLY PAID FOR BY Dore
& Associates, Inc.
1— Volvo EC 400 Ultra High Reach Excavator
2 — Komatsu PC 350-11
2 — CAT 350L Excavators
5 — CAT 345 Excavators BL & C
9 — CAT 330L Excavators B & C
2 — CAT 320L Excavators
1— CAT 312L Excavator
1— Link Belt Crane, 70 Ton
1— Case Vibratory Roller
1— CAT D4 Bulldozer
1— CAT IT28 Wheel Loader
18 — Bobcats & 2 — Bobcat Trailers
2 — CAT Mini Excavators
5 — CAT Skid Steer Loaders
2 — Brok Remote Demo Robots
2 — Excel Track Concrete Crusher Plants
2 — Labounty MSD70R Shears
1— Labounty MSD50R Shear
6 — Excavator Grapples
1— 60 Ton American 7260 Crane
1— 1973 GIVIC Tank Truck (Water)
12 — Excavator Hydraulic Hammers
0& Nationwide Specialty Contractor • Demolition I Abatement I Remediation
ASSOCIATES, InC. P.O. Box 338 • Bay City, MI 48707-0338 • ph 989.684.8411 • fax 989.684.6663 • www.doreassoc.com
August 12, 2025
City of South Bend, IN, Board of Public Works
227 West Jefferson Blvd.
South Bend, IN 46601
Subj: Qualifications & Experience
To whom it may concern,
Pursuant to the Bid Instructions, Dore & Associates is providing your office with relevant project contact and
brief statement of Dore's experience. Jason C. Dore, President, of Dore & Associates, Inc. is authorized by the
corporation to sign all proposal and bids on behalf of the corporation. Dore's correspondence information is
as follows:
Dore & Associates, Inc. P.O. Box 338, Bay City, MI 48707, Phone: 989-684-8411 Fax: 989-684-6663 Email:
est@doreassoc.com
Dore & Associates is proud of its reputation of 45+ years in the demolition and environmental industry, and is
eager to share its background with potential clients. The management of Dore & Associates has more than
forty years of expertise. Its management has razed over 50,000 structures throughout the United States and
has evolved into a "single source" contractor. Dore has the ability to provide you with a total, comprehensive
and cost-effective package, eliminating the problem of multiple layers of contractors. Our full range of
services includes:
EXPLOSIVE OR CONVENTIONAL DEMOLITION, FLOOR TILE REMOVAL, COMMERCIAL DEMOLITION,
INTERIOR/EXTERIOR RENOVATION, MARKETING/SALES OF USEABLE EQUIPMENT, ENVIRONMENTAL
REMEDIATION, ASBESTOS & LEAD ABATEMENT, SITE EXCAVATION & RESTORING, and MINE & PLANT CLOSURES
Though our main office is located in Bay City, Michigan, satellite offices in Ohio, Pennsylvania and Florida,
enable Dore & Associates the ability to provide services to a diverse geographic business clientele. Should you
need additional information please feel free to contact me or visit our web site at www.doreassoc.com.
Please see Certificate of Insurance & resumes attached. SOM Wrecking License No. 272000038, exp
5/31/2026.
Si re ,
{�"1
J on Dore, Presi ent
ORE & ASSOCIATES, INC.
089,SOPCIATMeSinc..
Nationwide Specialty Contractor • Demolition I Abatement I Remediation
P.O. Box 338 • Bay City, MI 48707-0338 • ph 989.684,8411 • fax 989.684.6663 • www.doreassoc.com
May 7, 2020 (Policy Enacted)
Re: HUB, Section 3, MWBE Participation on Projects Awarded
Subj: Corporate Policy
To whom it may concern;
Dore & Associates, Inc. is a nationwide contractor who bids numerous projects throughout the United
States on an annual basis. With this being said, it is Dore & Associates policy and standard practice to
adhere to all goals set forth by various local, State, Federal and private agencies and companies
throughout the United States for Historically Underutilized Businesses, Section 3 Participation (HUD
Funded), Minority Owned Businesses, Women Owned Businesses, Disadvantaged Business, Veteran
Owned Businesses, etc.
When bidding on projects Dore & Associates addresses the goals for various types of participation in the
specification and researches directories available and contacts agencies in the particular locale Dore is
bidding that match our criteria of participation.
Various participation Dore & Associates seeks is as follows:
- Hauling & Disposal
- Suppliers of Safety Equipment
- Supplies of Asbestos Equipment
- HVAC
- Plumbing
- Electrical
- Sand/Gravel/Fill Materials
Dore & Associates realizes participation percentages vary wide throughout the United States but as a
corporation that supports participation from the types of companies stated above, it is our policy to
participate fully and utilize these various firms' services to the fullest.
Tha ,
5 Ore
President
om Am
NMI wo ���� ��������
"~"~�-~~~~-~---' '- -
INSURANCE ���8�CY
.,=~�~�"... �____ ____
m��m�wmm�x ---'------- -nnUsr anoop
m�� mcwasn op x�sn
Dore & Associates Inc.
P.O.Box 338
Bay City, M\487O7
RE: Worker's Compensation
Policy Number: 6KUB-OW47747-0-23
Effective dates: 5/13/2023 to 5113/2024
ToWhom kMay Concern,
Please be advised that your Michigan Experience Modification Factor for 3 years is as follows-,
05/13/2023-24 115
05/13/2022-23 1.0
05/13/2021-22 1.0
Sincerely,
.
im erly trtner
Account Manager
5311 Hampton Place, Saginaw, M| 480o�
Phone Number: (800u7�83g5 vw*w.meadowb�oxagenrycnm
N& ASSOPCIATrES EVIC
Nationwide 8pccioUyCoo�aomr^DrmnU�m|Aba�ment/Remod�Uon
�
PA BOX 338'Bay City, �48707-0338, ph 989,684 8411'fax w9,684,6663.xwwdoreassoc.com
September 7,2O23
RE: Letter ofExplanation for 2O23-2OJ4EK4RRating
Dore and Associates Inc. is a small, family owned business located in Bay City,K4iDue tnthe
low amount of employees we had on our payroll during the pandemic, the labor hours were
low and we had an incident with one of our shop people in the yard, Our current rating of 1.15
skewed because of this. We believe this EMKdoes not fairly represent the safety standards
Dore's management has prided itself on in the demolition and asbestos abatement industry.
Dore's current EMIR rating is the product of one in -shop incident during a time where there
were lower hours to report. When considering Dore and Associates, please also keep these
things in mind:
• Dore and Associates, Inc has not had any incidents out onajob sinceinceptinn.
* Dore insures all workers and supervisors attend extensive safety training both in-house
and those offered byK4|OSHA
w Dore utilizes a Job Site Analysis in our safety meetings to ensure the tasks at -hand are
addressed with all employees and others ioour work area.
* Dore's management will continue to make the safety of our employees our number one
priority.
Thank you for your consideration,
Sincerely,
ATTACHMENT 1.a.14.
MANAGEMENT / LEADERSHIP TEAM
DEMOLITION SERVICES
VENDOR NAME: Dore and Associates, Inc
Leader/Manager Name
Demolition and Asbestos`Abatement
Jason C. Dore
President
30
and Business:
Ad ministration/Management
Arthur M. Dore
Principal `
45
Demolition and Asbestos'Abatement
and Chief Estimator
Edward M. Dore
Treasurer
40
Demolition and Asbestos Abatement,
and. Chief Superintendent
Dennis C. Dore
Secretary
40
Demolition and Asbestos Abatement, .
and Waste Management
Rcnn ff1
Jason Dor
President
Contact
P.O. Box 338 Bay City, MI 48707
989-684-8411
Jason@doreassoc.com
Key Skills
Corporation President
Finance & Investment Expert
Equipment Acquisition Expert
Information Technology Expert
Experience
Jason started working on demolition and asbestos
abatement jobsites initially, until he realized he would
rather be on the administrative side of the family
business. Jason currently oversees all day to day
operations at Dore & Associates, Inc and helps to
manage and maintain several administrative avenues
within the corporation. With over 30 years of Financial
Management Job Cast, Financing & Investment, and
Equipment Acquisition Experience, he is a true asset to
the corporation.
Employer Summary
June 1991 - May 2020 - Dore & Associates Contracting
Inc. - Demolition and Asbestos Abatement Worker from
91-93. In 93, he began his career in Administration and
began working in the Finance Department,
May 2020 - Current - Dore Associates, Inc. - In addition to
the above, Jason is also the corporation's President,
oversees accounts payables/receivables, personnel
management, building maintenance management and
signs off on all estimations for the corporation.
Education
• 1989 - 1992 - Western High School - Diploma
• 1993 - 1994 - Northwood University
• 1995 - 1997 - Saginaw Valley State University -
Bachelor's Degree - Business Management
Arthur M. Dore
Principal/Chief Estimator
Contact
P.O. Box 338 Bay City, MI 48707
989-684-8411
amd@doreassoc.com
Key Skills
Demolition Expert
Asbestos Abatement Expert
Corporation Principal
Experience
Art has worked for the family business his entire adult life.
Starting as a young man doing any job he could to help out,
he worked his way from the field to supervision to estimating to
his current role as President in 1992. Art manages all aspects of
the company as well as producing project estimates. During
his career Art has obtained immense experience in the industry
and is considered a "Demolition Expert", Many of our
complicated and large projects are directed by means and
methods developed by Art, Dore's commitment to safety and
quality start at the top of the organization and are constantly
reinforced under Art's leadership.
Employer Summary
1979 - 2020 - Dore & Associates Contracting, Inc. -President of
the company responsible for all day-to-day operations.
2020 - present- Dore & Associates, Inc. - Corporation Principal
and Chief Estimator
2004 - 2015 - Hooters Restaurants - Owner of 3 restaurants
located in Bay City, Saginaw and Traverse City, Michigan.
2006 -2020 - Tri-City Icehawks - Team Owner of Teir 3 Junior A
Hockey Team.
Certifications / Affiliations
• Georgia Institute of Technology - Asbestos Industry
Practices
• National Demolition Association
• Asset Recovery Association
• Michigan Chamber of Commerce
• National Safety Council
• Bay City Chamber of Commerce
• Michigan Business & Professional Association
Dennis C. Dore
Secretary/Waste Management Director
Contact
P.Q. Box 338 Bay City, MI
48707
989-684-8411
Denniscdore@yahoo.com
Key Skills
Demolition Expert
Asbestos Abatement Expert
Waste Management
Corporation Secretary
Experience
Dennis has over 40 years of experience in the demolition
and asbestos abatement fields, He currently oversees all
waste management operations for Dore and Associates,
Inc. Dennis manages a team of operators to maintain
timely and efficient pick-up and delivery of dumpsters at
each job site. He manages the disposal of friable and
non -friable ACM while maintain compliance with all
federal and state guidelines.
Employer Summary
1981 - 2020 - Dore & Associates Contracting Inc. -- Job
site supervisor and handled waste management for the
company.
2020 - Current - Dore Associates, Inc. - In addition to the
above, Dennis is also the corporation's Secretary and
maintains all corporation meeting minutes and other
secretarial duties within the organization.
Certifications /Affiliations
• MIOSHA Accredited Asbestos Supervisor
• CDL
• Aerial Work Platform Permit
• Lead Awareness Accreditation
Edward M. Dore
Treasurer/Chief Superintendent
Contact
Experience
P.O, Box 338 Bay City, MI
Ed began his working career in the family business in 1987
48707
as a laborer and quickly moved to a field superintendent
989-684-841 1
in 1989, Advancement to General Superintendent came
emd@doreassoc.com
in 1992 as Dore continued to grow in both the
abatement and demolition divisions. Dore began
offering hazardous waste remediation in 1993 with Ed
serving as the company's remediation specialist. A well-
rounded work portfolio in demolition, abatement and
remediation allowed Ed to take on further responsibilities
of risk management as well as the corporate secretary,
Under the watchful eye and leadership of Ed, Dore has
projects underway in as many as 10 states on any given
day. His ability to manage personnel and Dore's
extensive fleet of heavy machinery has allowed the
company to grow into the industry leader it is today.
Key Skills
Employer Summary
Demolition Expert
1987 - 2020: Dore & Associates Contracting, Inc. -
Asbestos Abatement Expert
Laborer and Superintendent for both abatement and
Corporation Treasurer
demolition. Assumed roles of Risk Manager, corporate
Secretary, and Vice President of Operations. Manages
an extremely talented team of project managers.
Equipment and material logistics,
2020 - current - Dore & Associates, Inc. - Corporation
Treasurer, Chief Superintendent, Risk Management, and
Safety Officer,
Project Highlights
• Viking Die Cast, Kalamazoo, Michigan - Project
Facilitator, Preparation of Work Plan and Health &
Safety Plan. Characterization and verification
sampling. Removal and disposal of hazardous
soils.
• RCS Evans Site, Gagetown, Michigan - Project
Facilitator, Preparation of Work Plan and Health &
Safety Plan, Characterization and verification
sampling. Removal and disposal of 23,000 tons of
non -hazardous soil and 2,000 tons of hazardous
soil along with building demolition.
• Sunrise Landfill, Plainwell, Michigan -
Characterization and verification sampling.
Removal and disposal of hazardous and non-
hazardous soil and drums from former landfill.
• Buckeye Oil Field, Gladwin, Michigan -
Characterization and verification sampling. Soil
washing of soil, solidification and hauling of oil
field contaminated soils, Backfill and site
restoration.
• State of Michigan - Multi -Site - Contract C,
Detroit, Michigan - Asbestos Abatement and
demolition of former foundry. Characterization
and verification sampling and removal of foundry
sand. Dewatering of pits and excavations.
Solidification of sludge material and site
restoration,
Certifications /Affiliation s
• Building Inspector
• Supervision of Asbestos Abatement
• Supervision of Hazardous Waste Remediation,
Certificate of Completion & Approved Trainer
• Controlled Substance Abuse & Alcohol Misuse
Training for Transportation Supervisors
Jeffrey C. Teagarden
VICE PRESIDENT -SPECIAL PROJECTS
Jeff has provided his immense experience, leadership and impeccable work ethic to the Dore
organization for the past 38 years. Our clients have come to expect a safe and predictable result with
Jeff at the helm. Difficult abatement and demolition projects all over the world have been successfully
completed by Jeff and his resume is second to none in the industry. The challenges of large projects on
tight time lines are all in a days work for Jeff.
EMPLOYER SUMMARY
2022 to Present — Vice President — Special Projects/Senior Project Manager - Organize, plan, schedule
and control field work to expedite large projects to be completed within time and cost limitations.
Direct and coordinate the activities of employees and subcontractors in following the engineer's plans
and specifications. Responsible for ensuring compliance with quality control goals and safety plans.
Empowered for overall responsibility of major projects and exceeding client expectations.
2017 to 2022: Nasdi, LLC - Vice President - Provides leadership and guidance to advance the company's
position in the industry. Develops strategies and tactics to increase revenue profitability and
organization growth. Oversees corporate operations to ensure efficiency, quality and customer service.
Evaluates performance of management and field operations for compliance with policy, procedure and
objectives. Responsible for ensuring compliance with quality control goals and safety.
1986 to 2017: Dore & Associates Contracting, Inc. — Vice President — Special Projects/Senior Project
Manager. Organize, plan, schedule and control field work to expedite large projects to be completed
within time and cost limitations. Direct and coordinate the activities of employees and subcontractors
in following the engineer's plans and specifications. Responsible for ensuring compliance with quality
control goals and safety plans. Empowered for overall responsibility of major projects and exceeding
client expectations.
1984 to 1986: Asbestos Abatement of America, Inc. — Operations Manager. Assembled, reviewed and
negotiated government and private contracts, Developed project administration procedures.
Implemented safety and training programs for supervisory personnel. Established company procedures
to ensure corporate compliance with applicable safety regulations,
CERTIFICATIONS
University of South Florida, Tampa, Florida
Bachelor of Arts/Business Administration
University of Maryland, Munich, Federal Republic of Germany
Associate in Arts/Business
Qualifier for State of Florida Class "A" General Contractor, CJ C057489
Qualifier for State of Nevada Demolition/Asbestos Contractor 0042942
Qualifier for State of North Carolina General Contractor License 17486
State of Indiana Class "A" Wrecking Contractor W0000150
John Bernelis
ON -SITE PROJECT MANAGER, SAFETY REPRESENTIVE
John brings his 20 years of demolition experience to every project he manages and represents Dore's
safety program throughout the Company, John began his career as an industrial supplier and soon
became directly involved in safety gear and equipment being properly placed and used on projects, In
2000, John began his "official" safety position as this important role was beginning to be a focus and
take on more prominence with contractors, Currently John plays a key role here at Dore as a major
project director and our on•site safety representative, He is responsible for consulting on means and
methods used for specific demolition projects, writing and enforcing our safety plan and client
satisfaction, John's strong communication skills allow him to direct the safety effort to ensure Dore
maintains Its stellar safety record,
EMPLOYER SUMMARY
2007 to present: Dore & Associates Contracting Inc, Say City Michigan - Safety Representative/Project
Manager, Responsible for safety plan and performance, job audits, rigging, site logistics, field crews and
training, Major project involvement for means and methods resulting in safe demolition practices,
1992 to 2006: Bierlein Companies, Midland Michigan - 1992; purchasing and warehouse coordinator for
construction equipment, safety supplies and materials, 1994; company Safety Representative
performing safety audits, maintenance of all metering devices, documentation, safety reviews, safety
meetings, and safety plans, 2000: added responsibility of project management for certain projects,
1987 to 1991: Jenison Industrial Sales, Bay City Michigan, Sales of industrial hardware to the
construction, demolition and Industrial markets across the Midwest region,
PROJECT HIGHLIGHTS
State of Missouri — St, Louis Psychiatric Rehabilitation Center, Project Involved removal of asbestos
containing material, PCBs, CFC's and various hazardous wastes prior to complete demolition of a large
patient building, power plant and stack, Mr, Bernelis performed oversight for the safety program,
asbestos abatement and demolition services, Contract amount; $1,290,000.00
Waste Water Treatment Plant, Saginaw Michigan, Safety Representative/Project Manager — Removal of
asbestos containing material, preparation and removal of various incinerators and large mechanical
components for the Interior renovation, Contract.amount; $112,000,00
Midland Regional Medical Center, Midland Michigan. Safety representative/Project manager— removal
of asbestos containing material from an occupied and functioning hospital, All work was performed in a
strict and regulated fashion to ensure the non -disturbance of patients and staff. Contract amount;
$105,000,00
Michigan Sugar Company, Carrollton Michigan, Safety Representative/Project Manager— demolition of
various buildings and structures at the operational sugar processing facility, The client needed several
pieces of manufacturing equipment salvaged for re -use which were located at various locations
throughout the 5 story plant. This requirement resulted in a "surgical" type of extraction and demolition
of the 100 year old structure, The project, which lasted one year, was very successful and 100% safe,
Contract amount; $2,000,000,00
Ford Motor Company, General Motors, Chrysler Corp, Project Manager and Safety Representative —
various projects within the Midwest.
CERTIFICATIONS
Licensed Asbestos Contractor/Supervisor in Michigan, Ohio, Missouri, Illinois
HAZWOPER Training
Hazard Communication, Lead and Silica
Safe2work Safety Training Program
CPR and First Aid Training
Confined Space and Entry Rescue Training
OSHA 510
OSHA500
MIOSHA 30 hour
Great Lakes Safety Training Dow Chemical and Delphi Site Clearance Training
Scott Cianek
PROJECT SUPERINTENDENT
Scott has been a key player on the Dore team for over a decade and has been Involved, in dozens of
large, complicated projects, Scott has risen through the ranks of our organization staring as a laborer,
and now takes on superintendent duties on abatement and demolition projects throughout the country,
Many projects have seen Scott as the project manager as he continues his professional development at
Dore, A trademark of Scott's projects Is his organizational skills, excellent client communication and
project delivery within the schedule,
EMPLOYER SUMMARY
2001— present, Dore & Associates Contracting, Inc„ Bay City, Michigan — Superintendent and project
management, Responsible for large abatement and demolition projects within the United States,
Project safety plan implementation, field crew supervision, sub -contractor management, project
logistics, client meetings and documentation, Since joining Dore as a laborer in 2001, Scott has
successfully completed over 75 projects in over a dozen states.
1991 — 2002 21" Century Tool + Die, Munger, Michigan — Machine Operator, Operated machine tool
equipment, project layout, proto-type, project supervision, shop production, and inventory control,
PROJECT HIGHLIGHTS
Logansport State Hospital, Logansport, Indiana — Multiple buildings of 5, 3 and 2 stories was removed
from the center of this medical campus, In addition, a 150 FT stack from a former bolter was taken
down by hand due to its sensitive location, Over 200,000 SF of structures was involved in the project,
Contract amount; $1,650,000,00
T,C, Light & Power, Traverse City, Michigan —This water front power producing facility sat near the
historic downtown district, Parts of the plant were disassembled and shipped to Guatamalla for re -use,
The remainder of the site was recycled and properly converted to public green space, Contract amount;
$1,100,000,00
Champion Paper Company, Hamilton, Ohio -Abatement and demolition of a 3-story, 175,000 5F
manufacturing facility, At one point In this structures history, locomotives were produced resulting in
massive below grade concrete machine pads that had to be excavated, The heavy duty building was
constructed of steel and concrete which was recycled and crushed on site. Contract amount;
$625,000,00
YMCA, Port Huron, Michigan --As part of a 4 building abatement and demolition project, the 5-story,
riverfront structure was demolished and returned to green space, This building was a community
landmark for decades, Along with this building, a large jail facility and 2 administrative buildings were
also removed, Contract amount; $615,000.00
Indiana University, Gary, Indiana — In the center of campus was a fine arts and administration building
that were 4 stories tall requiring a "surgical' type extraction. The land was reverted back to green space
for the University, Not only was this project 100% safe, it was on time and within budget. Contract
amount; $650,000,00
Detroit Foundry, Detroit, Michigan — Extensive environmental clean-up was involved with this
demolition of the 200,000 SF Industrial structure. Over 60,000 cubic yards of foundry sand had to be
remedlated along with asbestos containing materials. The site was one of 4 projects removed for the
City of Detroit under the same contract, All sites were returned to green space, Contract amount;
$2,000,000,00,00
CERTIFICATIONS
40-hour Haz-wopper
Confined Space Training
CPRJFIrst Aid
Asbestos Abatement Supervisor- licensed in Multiple States
OSHA 30 Hour
Storm Water Management
Daniel Dore
ABATEMENT PROJECT MANAGER
Dan started his career in the asbestos abatement industry as a laborer in 1988, He has learned this
business from the ground up and has become an "expert" In the field. Dan advanced within the
company as his skills grew and quickly became a supervisor in 1989, Now with 100 projects to his
record, Dan is our most seasoned and respected abatement project manager, Dan is known for
demanding excellence and performance from his team and keeps a rigorous schedule to ensure safe and
on -time results for Dore and our clients.
EMPLOYER SUMMARY
1988 to present: Dore & Associates Contracting, Inc., Bay City, Michigan — Project Manager/Abatement
Specialist, Responsible for all aspects of commercial/Industrial abatement projects Including, safety
program enforcement, scheduling, field staff, training, equipment, documentation and disposal,
Experienced demolition project management on various projects within the United States,
1983 to 1988: US Army, Fort Brag, North Carolina, Berlin, Germany — Computer Technician for historical
and administrative support, honorable discharge,
PROJECT HIGHLIGHTS
Fairview Gardens, Warren, Ohio —Asbestos Abatement of 18 apartment buildings in preparation for
demolition, Contract amount: $850,000,00
Mercy Hospital, Joplin, Missouri — Asbestos Abatement of an 8-5tory, tornado -damaged hospital
structure, The remaining structure was demolished. Contract amount: $728,000,00
Industrial Warehouse, Berwick, Pennsylvania — Asbestos Abatement of a 75,000 SF warehouse In
advance of demolition. Contract amount: $264,000,00
Springfleld High School, Akron, Ohio — Asbestos Abatement of a large high school in preparation of
renovation. Contract amount: $400,000,00
General Motors Plant, Dayton, Ohio —Asbestos Abatement of 1,000,000 SF retired auto plant in advance
of demolition. Contract amount: $3,000,000,00
Prudential Building, Chicago, Illinois —Asbestos Abatement of downtown landmark skyscraper to
prepare for renovation, Contract amount; $1,700,000.00
CERTIFICATIONS
Asbestos Hazard Abatement Specialist Certification — Ohio
Asbestos Professional License — Iliinals, Missouri
Asbestos Project Supervisor License — Indiana
Asbestos Contra ctor/Su pe rviso r Accredited -- Michigan
Pennsylvania Asbestos Certification
Environmental Safety Training Center, Regulation Exam — Missouri
40 —Hour Hazwopper Training
Confined Space Training
OSHA 30 Hour'Training
CPR/First Air/AED Adult
Scaffold Training
c
L
L
M
to
u
0
U
U
'
0
N
o
a
Ln
o
0
a`
E
0
N
CO)
0
C
,a
-p
Ln
0
LnF
y
ro
ro
m
ro
to
O
�
3
7
W
Q
=
L
u
B
u
W
u
C-
O
O
C
O
s
a
a
o
a
O
V
O
U
0
O
W
O
O
O
@
O
E
a
a
7A
•�
O
u
C.
CL
O
v
u
.0
u
u
u
?�
kn
cu
a
a
O
a7
a
c
c
c
00
O
O
O
O
p
E
oo
E
O
E
o
4
o
Q
�
+t
C
u
W
u
h
u
0
0
0
u
u
u
c
a
c
c
0
°r
=
>
o
r
0
u
u
v
U
J
J
J
(Tp
m
O
O
E
O
O
C
C
O
0
C
a
pp
u
'u
M
i-
v
Q
T
O
0
a 0
.m
>
cv,
0
U
to
E
c
m
�A
L
c9
u
V
�>
3:
V
'O
a
J
O
V
O
CJ
Q�
v
c >
a
-a
y
c
-d
E
u
d
>
c
op
@j
u
C
�O O
'v'1'{
—
_
<o
-O
a
rCa
t
L
�''
@J
C
C)
j
U
`n
o�0
cu
m
a
f-
a
>.-a
V)
tl0!
y-
u
m
O
M
CO
Q
v
W
E
E
E
Z
O
f4
Z
j
O
R
Z
lS
O
E
O
E
E
v
a
41
u
a
v
v°
o
aui
-a
o
ar
°O
v
o
c
T
a`
�
m
Current
Project Name
Reference Contact Info
location
Contract Amount
Description of Project
Duration of Project
Atherton Apts
Flint Housing Commission
Flint, MI
$1,853,700
Demolition
Start 6/16/2025
Demo
3820 Richfield Road
Atheronton East bldg Apts.
Flint, Ml48506
Doug Peters
dpeters@flinthc.org
810-736-3134
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demo 5580 Lancaster Rd.
Croswell, MI 48422
City Hall
Croswell, MI
$262,950.00
Demolition
93%Completed
100 N. Howard Ave.
5580 Lancaster Rd.
Croswell, MI 48422
Croswell, MI 48422
Joseph Benjamin
jbenjamin@fveng.com
616-977-1000
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
AA Lincoln High School
Ellwood City Area School
District
Ellwood City,
PA
$722,900.00
Asbestos Abatement
10% Complete
501 Crescent Ave.
501 Crescent Ave.
Lincoln High School
Start Date 4/8/2025
Ellwood City, PA 16117
Ellwood City, PA 16117
501 Crescent Ave.
Estimated Completion
Scott Korba
Ellwood City, PA 16117
6/1/2026
info@novaenvsol.com
412-939-1622
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demo CMU Northwest
Apartments
Central Michigan University
Mount
Pleasant, MI
$2,658,570.00
Demolition
0% Complete
300 W. Bellows Street
1200 S. Franklin Street
Northwest Apartments
Mount Pleasant, MI 48858
Mount Pleasant, MI 48859
300 W. Bellows St.
Conor Bradley
Mount Pleasant, MI 48858
cbradley@clarkcc.com
2
Completed
COMPLETED PROJECTS
0
& ASSOCIATES_ InC.
Nationwide Specialty Contractor • Demolition I Abatement Remediation
P.O. Box 338 • Bay City, Mi 48707-0338 • ph 989.684.8411 • fax 989.684.6663 • www.doreassoo.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Ball State University
Ball State University
Muncie, IN
$3,390,360.00
Abestos/Haz Abatement
Start 7/7/2022
Abestos/HazMat
2000 W. University (AD208)
& complete demolition
Completed 2023
Abatement and Complete
Muncie, IN 47306
LaFollete Complex & Site
Demolition of LaFollete
Ryan Koenker
Restoration - EX 32,345 SF
75% Dore Workforce
Complex Phase 3
Phone: 765-285-5082
Asb Floor Tile 12,920 SF
Carpet
rrkoenker@bsu.edu
Thermal Insulation, ect.
100,000 SF Bldg
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement &
City of Three Rivers
Three Rivers, MI
$848,600.00
Asbestos Abatement &
Start - 7/2022
Complete Demolition
333 West Michigan
Demoliton of 5 Story (approx.
55,000 SF Bldg(s) attached
Completed 4/2023
of Old Three Rivers
Three Rivers, MI 49093
Switched to ordered
Hospital
Contact: David A. Stegink, VP
Demo 9/2022
Envirologic Tech- Project
100% Dore Workforce
Manager
269-615-1009
dstegink(@fishbeck.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
New Bloomington Demolition
Marion County
New Bloomington,
OH
$241,241.00
Ordered demolition of old
Start - 12/1/2022
115 N. Street
222 West Center Street
school building
100% Complete
Marion, Ohio 43302
Completed - 1/20/2023
Rich Fender, Regional Planning
25% Dore Workforce
740-223-4140
Completed
rfender@co.marion.oh.us
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
AA 720 Fuller Ave & Demo 1101 Ball
Ave.
County of Kent
Grand Rapids, MI
$498,800.00
Demolition of building and all
other structures located at
Start Date 12/6/2023
Grand Rapids, MI
300 Monroe Ave.
720 Fuller Ave., & 1101 Ball
Ave.
Grand Rapids, MI 49503
NE, Grand Rapids, MI 49503
Calvin Brinks
Completion Date
purchasinRPkentcountymi.gov
1/31/24
616-632-7720
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition of Niles Theatre
Trumbull County
Niles, OH
$340,800.00
Demo and AA of Niles
Theatre
Start Date - 11-27-2023
42-46, 54-58
736 Mahoning Ave.
and connected buildings
South Main St.
Warren, OH 44483
completion date
Niles, OH
330-469-6828
1/31/2024
Ashley Yuhasz
ashley(@tnpwarren.org
100% Dore Workforce
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Richland City Jail Interior
County of Richland
Mansfield, OH
$262,705.00
Demolish Interior of Existing
Jail
Start - 12/13/2021
Demolition
50 Park Ave. East
within the Courthouse &
leave
Completed April 2022
Mansfield, OH 44902-1896
workspace ready for future
100% Complete
Contact: Alvin J. Berger, PE
renovations
419-564-1644
95% Dore Workforce
aberge'�aib-ens corn
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition of the 1936 Girls
City of Cave Springs
Cave Springs, GA
$147,100.00
Complete Demolition
Start - 1/19/2022
Dormintory - Former
10 Georgia Ave.
and Site Restoration of
Completed April 2022
GA School of the Deaf
Cave Springs, GA 30124
Former Girls Dormitory
100% Complete
Completed
Contact: Joe Watkins, Architect
email carterwatkins.com
8S% Dore Workforce
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition of Two (2)
City of Bay City
Bay City, MI
$21,600.00
Demolition of Two (2)
Residential
State - 12/20/2021
Residential Houses
Purchasing Office, Room 402
Houses - 2322 Fitzhugh &
1509 11th St.
Completed April 2022
301 Washington Ave.
100% Complete
Bay City, MI 48708
Contact: Susan Carmien
100% Dore Workforce
989-894-8115
scarmienftaycitymi.org
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition
Detroit Public Schools
Community District
Detroit, MI
$582,300.00
Building Demolition
3/3/2025
PRMX Elementary School
Erich Watry
248-924-5092
100% Dore Workforce
ewatry@rockfordconstruction.co
m
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement & Demolition
Commonwealth Charter
Academy
Mononhahela, PA
$1,224,600.00
Asbestos Abatement and
Demolition
4/17/23 -
CCA Elem Sch
One Innovation Way
Elementary School
1200 Chess Street
Harrisburg, PA 17110
100% Dore Workforce
Monongahela, PA
Nick Rosky
412-438-4086
nick@shannol.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition of Vincetian Academy
NOVA Contracting &
Environmental Services
Pittsburgh, PA
$575,000.00
Demo and AA
Started October'23
8100 Mcknight Rd.
4550 Mcknight Rd.
Vincentian Academy
In progress
Pittsburgh, PA
Pittsburgh, PA 15237
Completion
Chris Sciulli
Spring'24
412-939-1622
Completed
novaesi2msn.com
Demolition of former YMCA
City of Clinton, IA
Clinton, IA
$426,000.00
Removal/Disposal of
Structures
1/13/25 - 3/31/25
480 S. Clinton St.
611 S. 3rd St.
Clinton, IA 52732
Clinton, IA 52732
100% Dore Workforce
Jason Craft
563-244-3423
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demo Bob's Bar
Board of the County Road
Commissioners, County of Bay,
Michigan
Bay City, MI
$33,900.00
Demolition
8/8/23
509 N. Tuscola (M-15) Hampton
Township
2600 East Beaver Rd.
Bay City, MI 48708
Kawkawlin, MI 48631
100% Dore Workforce
Jim Lillo
989-686-4610
jlillo@baycoroad.org
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demo 2862 Stone School Rd.
Ann Arbor Public Schools
Ann Arbor, MI
$176,300.00
Demolition
100% Dore workforce
Ann Arbor, MI 48104
2555 South State Street
2862 Stone School Rd.
Ann Arbor, MI 48104
Ann Arbor, MI 48104
Steve Koop
skoop@clarkcc.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demoliton of Central High
Champaign Unit 4 School District
Champaign, IL
$654,930.00
Demolition of High School &
150'
7/15/2020 - 11/6/2020
School
703 South New Street
Stack superstructure &
foundation
Champaign, IL 61820
elements & restoration of
ground surface
80% Dore Workforce
Cory Hoke
choke6Dosheabuilders.com
217-210-0174
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Completed
Asbestos Abatment at
Lincoln Park Schools
Lincoln Park, MI
$1,089,450.00
Asbestos Abatment at
Crowley &
5/20/2020 - 8/7/2020
Crowley & Mixter Elementary
1650 Champaign
Mixter Schools
Schools
Lincoln Park, MI 48146
100% Dore Workforce
Ron Revoir
(313) 363-0506
Ronald.Revoir@ R s.info
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition
Marquette Land Bank
Marquette, MI
$582,300.00
Demolition
Start
Former National Mine School
234 W. Baraga Ave.
National Mine School
End - 12/31/24
800 County Rd.
Marquette, MI 49855
100% Dore Workforce
Ishpeming, MI 49849
Anne Giroux
agiroux@mgtco.org
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition of
NOVA Contracting &
Environmental Services
Duquense, PA
$284,300.00
Demolition
Start January 2023
708 Duquense Blvd.
4550 McKnight Rd.
Duquense, PA 15110
Pittsburgh, PA 15237
100% Dore Workforce
Chris Sciulli
novaesi@msn.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
AA & Demo Bishop Hall
Ferris State University
Bid Rapids, MI
$487,400.00
Asbestos Abatement &
Demolition
100% Complete
1349 Cramer Circle
111 W. Knollview
Bishop Hall
Bid Rapids, MI 49307
Big Rapids, MI 49307
1349 Cramer Circle
Evan Misener
Bid Rapids, MI 49307
630-956-6254
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Demolition
City of Bay City
Bay City, MI
$19,300.00
Demolition
Start
Wastewater Treatment Plant
301 Washington Ave.
WWTP Generator
Replacement
End
Bay City, MI 48708
100% Dore Workforce
Susan Carmien
Completed
989-894-8115
scarmien@baycitymi.gov
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
AA Ryder Center
Saginaw Valley State University
Saginaw, MI
?
Asbestos Abatament
Starts 5/15/2024
7400 Bay Rd.
7400 Bay Rd.
Ryder Center
University Center, MI 48710
University Center, MI 48710
7400 Bay Rd.
Michael Pazdro
University Center, MI 48710
989-964-4841
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
INDUSTRY Detroit - Interior Selective
Demolition
Makers Line, LLC
Detroit, MI
$1,828,915.00
Interior Demolition of
Multi -Store Building
May-21
3001 Brighten Blvd.
Complete
Denver, CO 80216
Phased Work
Emily Hayter
Estimated Completion
emily(@makersline.com
July, 2023
100% Dore Workforce
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
City of Akron - 655 Broadway
City of Akron (OH)
Akron, OH
$221,700
Asbestos Abatement and
August 2023 to
Demolition Project
166 S. High Street
Demolition
October 2023
Akron, OH 44308
Victor Botosan, Operations
Support
25% Dore Workforce
City of Akron (OH)
330-375-2355
akronen ig neeringPakronohio.go
y
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Commonwealth Charter
Commonwealth Charter
Monongahela, PA
$1,534,153
Asbestos Abatement in old
Start - 4/17/23
Academy
Academy
elementary school and
demolition
10% complete
Asbestos Abatement and
One Innovation Way
of one of the buildings onsite
Estimated Completion
of
Demolition
Harrisburg, PA 17110
Univ Waste also present
7/31/2023
Completed
Nick Rosky, Project Manager
Shannon Construction
100% Dore Workforce
412-977-6231
nick(@shannonl.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Clinton, IA - 212 4th Ave. Demo
City of Clinton (Iowa)
Clinton, IA
$195,700
Demolition of old pool hall
Start - 4/30/23
611 S. 3rd Street
Estimated Completion
Clinton, IA 52732
6/30/2023
City of Clinton - Eng. Dept.
Leah Woods
563.244.3423
100% Dore Workforce
ieahwoods(@cityofclintoniowa.us
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Main Street, Greenville
City of Greenville
Greenville, PA
$238,290.00
Demolition of old store -front
98% Complete
Demolitions
125 Main St.
buildings; weather-proof of
May, 2023
(seeding/grading)
132 & 173-175 Main St.
Greenville, PA 16125
adjoining wall not
demolished
Kevin Creagh, Engineer
KLH Engineers, Inc.
85% Dore Workforce
(412) 494-0510
kcreaghtuklhengineers.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
City of Midland Currie Stadium
Demolition
City of Midland
Midland, MI
$83,000.00
Complete demolition of old
Start - 11/10/2022
1300 W. Main St.
333 W. Ellsworth St.
stadium; salvage of cement
pillars
Midland, MI 48640
Tyler Abbs, Facilities Manager
Estimated Completion
989-837-3370
May, 2023
(seeding/grading)
tabbsPmidland-mi.or
100% Dore Workforce
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Completed
Demolition
Vanlandingham Carol J
Bay City, MI
$16,800.00
Demolition
Start - 4/30/2023
2683 Royal Oak Dr.
611 S. 3rd Street
Estimated Completion
Bay City, MI 48707
Clinton, IA 52732
6/30/2023
David Degrow
989-684-7203
dave@degrow.com
100% Dore Workforce
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement
Kraemer North America
Bay City, MI
?
AA Independence Bridge
Start March 2023
Independence Bridge
100% Dore Workforce
Brent Freeman / Kevin Kruger
bfreeman@kraemerna.com
kevin.kruger@gcinc.com
608-434-4713
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement &
Rock County Courthouse
Janesville, WI
$424,600.00
Asbestos Abatement &
Start 2024
Demolition of Rock County
Purchasing
Demolition of Rock County
Jail & LES
51 South Main St.
Jail & LES
% Complete
Janesville, WI 53545
Complete Removal of
Ben Bobzien, PM
Pinehurst Bldg.
Completion
JP Cullen - General Contractor
Sanitorium - ACM/Haz.
608-751-8733
Mat. - Rock County Jail &
ben .bobzienPipculien .com
LES
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Centerline Public School
Centerline Public Schools
Center Line, MI
$243,258.00
Asbestos Abatement &
Start 9/2022
Asbestos Abatement &
Admininistration Building
Demolition of Central Office
Selective Demolition at
26400 Arsenal
95% Complete
Central Office
Center Line, MI 48015
Estimated Completion
Kara & Tyler Lenling
2024
Consultant - TEK Environmental
Phone: 734-878-5588
100% Dore Workforce
ttvler(@ tekenvironmental.corn
kara@tekenvironmentalcom
Completed
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Asbestos Abatement
Mechanicsburg Area School
Mechanicsburg,
PA
$407,623.00
Asbestos Abatement at
Start 6/28/2022
Mechanicsburg Area
District
Mechanicsburg Area High
High School
600 South Norway St., 2nd FI
School
80% Complete
Mechanicsburgh, PA 17055
Full Completion - 2024
J. Brian Haines, AIA, LEED AP
Crabtree, Rohrbaugh & Assoc.
100% Dore Workforce
Architects
717-458-0272
BHaines(@cra-architects.com
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
AA Potter Elementary School
Flint Community Schools
Flint, MI
$493,600.00
AA removal
Start Date - 11-20-2023
2500 N. Averill Ave.
923 E. Kearsley St.
Phased job
Flint, MI
Flint, MI 48503
completion date
Roosevelt Austin III
1/31/2024
roseySaarchenv2rouo.com
248-426-0165
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Roscommon Range
DTMB, state of Michigan
St. Helen, MI
$84,700.00
Contract #Y24002
September -
Demo and AA
Brian Watkins
Demo, AA amd UST
Removal
November 2023
PO Box 30026
Complete
Lansing, MI 48821
517-242-7882
100% Dore Workforce
watkinsb1 @michigan.gov
Project Name
Reference Contact Info
Location
Contract Amount
Description of Project
Duration of Project
Former First Merit Plaza
Redevelopment Building Authority
of Lawrence County
New Castle, PA
$624,600.00
Demo and Abate Former First
Merit Plaza
start 9/18/2023
Demo AA
400 Court St.
5 story bldg with basement
100% Complete
New Castle, PA
Phased work
Amy Mckinney
Estimated completion
amckinnevPlawrencecountypa.gov
April, 2024