August 12, 2025
Mr. Rick Anderson
Veregy, LLC
6406 Castleway Ct., Suite 100
Indianapolis, IN 46250
randersongveregy com
RE: Substantial Completion Certificate — WWTP Solar Guaranteed Energy Savings Contract
—Project No. 124-015
Dear Mr. Anderson:
At its August 12, 2025 meeting, the Board of Public Works approved the Substantial
Completion Certificate for this project dated March 1, 2025.
Enclosed please find the original of the certificate for your signature. Please sign and
return the certificate to hhorvath(ksouthbendin.gov. Please retain a copy for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
Is/Hillary Horvath
Hillary Horvath, Clerk
Enclosures
HH
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MIcou
AIA Document G704 - 2000
Certificate of Substantial Completion
PROJECT: (A'ame and adcb-ess) PROJECT NUMBER: 71-24-696 OWNER
City of South Bend Waste Water CONTRACT FOR: HVAC
Treatment Plant 3113 Riverside ARCHI'ECT
Drive South Bend, IN 46628 CONTRACT DATE: 12/10/2024 CONTRACTOR
TO OWNER: (Name and address) TO CONTRACTOR: (Name and address) FIELD
City of South Bend Waste Water Treatment Veregy IN, LLC (fka Johnson Melloh Solutions
Plant LLC dba Veregy) OTHER
3113 Riverside Drive South Bend, IN 46628
6406 Castleway Court, #100 0
Project or portion of the Project designated for partial occupancy or use shall include:
1.Provide a 2-ton mini -split style air conditioning unit, wall mounted inside unit, and refrigerant piping to cool the office/lab in the
sludge building.
o KIWAI tolnrlr
The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and
belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or
designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize
the Work for its intended use. The date of Substantial -Completion of the Projector portion designated above is the date of
issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the
Contract Documents, except as stated below:
Warranty Dale of Commencement
Per Manufactures Specifications 5/31/2025
N/A N/A N/A
ARCHITECT BY (Signature) DATE OF ISSUANCE
A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the
responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to
in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final
Certificate of Payment or the date of final payment.
Cost estimate of Work that is incomplete or defective: $ 0
The Contractor will complete or correct the Work on the list of items attached hereto within 0
( 0 ) days from the above date of Substantial Completion.
Veregy IN, LLC
CONTRACTOR BY (Signaure) DATE
The Owner accepts the Work or designated portion as substantially complete and will assume full possession at
5:OOprrt (time) on 3/1/2025 (date).
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
DATE
ntenance, heat, utilities, damage to the Work and insurance
Elizabeth A. Maradik, President Joseph R. Molnar, Vice President
a � Id determine and review insurance requirements and corerage.)
Gary A. Gilot, Member Breana Micou, Member
4 At fu
Murray L. Miller, Member Attest: Hillary R. Horvath, Clerk eKan insFluite of Arn[tecls. All rights reserved. WARNING: This
Date: August 12, 2025 Inaulhorized reproduction or distribution of this AfA� Document,
prosecuted to the maximum extent possible under the law 'his
document was created on 10126/2011 13 48:56 under the terms of AIA Documents -on -Demand" order no 2008340437 . and is not for resale This
document is licensed by the Amencar, Institute of Architects for one-time use only, and may not be reproduced prior to its completion.
��0p11 AIADocument G704TM - 2000
Certificate of Substantial Completion
PROJECT: (Name and adcb-ess)
PROJECT NUMBER: 71-24-696
OWNER
City of South Bend Waste Water
CONTRACT FOR: HVAC
Treatment Plant 3113 Riverside Drive
ARCHITECT
South Bend, IN 46628
CONTRACT DATE: 12/10/2024
CONTRACTOR
0✓
TO OWNER: (Name and address)
TO CONTRACTOR: (Name and address)
FIELD
City of South Bend Waste Water Treatment Plant
Veregy IN, LLC (fka Johnson Melloh Solutions
3113 Riverside Drive South Bend, IN 46628
LLC dba Veregy)
OTHER
❑
6406 Castleway Court, #100
Project or portion of the Project designated for partial occupancy or use shall include:
1.Provide a 2-ton mini -split style air conditioning unit, wall mounted inside unit, and refrigerant piping to cool the office/lab in the
sludge building.
o nlo,e, MI—le
The'v'`'ork performed underthis Contract has been reviewed and found, to the Architect's best knowledge, information and
belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or
designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize
the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of
issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the
Contract Documents, except as stated below:
Warranty Date of Commencement
Per Manufactures Specifications 5/31/2025
N/A N/A
ARCHITECT BY (Stgna/ure)
N/A
DATE OF ISSUANCE
.A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the
responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to
in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final
Certificate of Payment or the date of final payment.
Cost estimate of Work that is incomplete or defective: $ 0
The Contractor will complete or correct the Work on the list of items attached hereto within 0
( 0 ) days from the above date of Substantial Completion.
Veregy IN, LLC
CONTRACTOR BY (.Signaflwe) DATE
The Owner accepts the Work or designated portion as substantially complete and will assume full possession at
5:OOPM (time) on 3/1/2025 (dale).
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS E
Elizabeth A. Maradik, President
Gary A. Gilot, Member
po", 4 7�
Murray L. Miller, Member
12 I_
Vl
utilities, damage to the Work and insurance
Joseph R. Molnar, Vice President i review insurance requiremenu and coverage.)
Breana Micou, Member
d�� f #,/"�
Attest: Hillary R. Horvath, Clerk
Date: August 12, 2025
c*iite.:s An rights reserved. WARNING: Thrs
tuclion or disvibulion of this AIA Ovcumeni.
maximum extent possible under the law. his
)rder no 2008340437 and is not for resale This
uced prior to its completion
0
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 8/l/2025
Name: Gemma Stanton Department of Public Works — Engineering Division
BPW Date: 8/12/2025 Phone Extension: 9083
Required Prior to Submittal to Board
BPW Attorney Attorney Name
Dept. Attorney ❑ Attorney Name
Purchasing
❑�
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ® PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
uired Information
Company or Vendor Name Veregy, LLC
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Amount of ❑
Previous Amount
Current Percent of Change
New Amount
Total Percent of Change:
Time Extension Amount:
New Completion Date:
U Yes U If Yes, Approved by Purchasing
❑ No
E] MBE ❑ WBE Completed E-Verify Form Attached El Yes
n No
WWTP Solar Guaranteed Energy Savings Contract (GESC)
124-015
PO-35380
Substantial completion for ECMs 3 and 5
Increase $
Decrease ($ )
Increase %
Decrease
Increase %
Decrease