Loading...
HomeMy WebLinkAboutAccess Agreement - WWTP Solar Utility Pipe Access Proj No Proj 124-015 - Veregy LLC1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS August 12, 2025 Mr. John Emmet Veregy, LLC 6406 Castleway Ct., Suite 100 Indianapolis, IN 46250 Jemmetkveregy com RE: Access Agreement Dear Mr. Emmet: At its August 12, 2025 meeting, the Board of Public Works approved the above referenced agreement for removal of electrical and solar equipment that encroaches within the designed 30' pipe setback area for the WWTP Solar Guaranteed Energy Saving Contract, Project No. 124-015. Enclosed please find a copy of the agreement for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, Is/Hillary Horvath Hillary Horvath, Clerk Enclosures HH ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MIcou VEREGY ,0`04VER EGY7 > Ui4�1t1i_Y JUH`:SUY MLLL�H 90 VJ71:iF5 Date: 4/15/25 To: City of South Bend South Bend, IN 46628 Subject: Letter of Agreement — Stormwater Utility Pipe Setback Access Dear Gemma, 6406 Castleway Ct. #100 Indianapolis, IN 46250 This letter serves as a formal agreement between Veregy and the City of South Bend regarding our project located at the South Bend Wastewater Treatment plant at 3113 Riverside Drive. We acknowledge the presence of a city -owned stormwater utility pipe within the project area, and we understand that a setback has been established to ensure access for future maintenance and repairs. Per this agreement, we hereby commit to the following: • In the event that the City of South Bend requires access to the stormwater utility pipe for maintenance, repairs, or any other operational purpose, we will promptly remove any electrical or solar equipment that encroaches within the designated pipe setback area. • We agree to complete such removal within 48 hours of receiving written notice (email is acceptable) from an authorized representative of the city. • This removal will be conducted at our own expense, during the guarantee period or service contract period, and in coordination with the City's schedule to avoid unnecessary delays or disruptions. • We further acknowledge that we are solely responsible for reinstalling or relocating the equipment, and we waive any claims against the City for damages, costs, or losses resulting from the removal or temporary disconnection of said equipment. Please acknowledge acceptance of this agreement by signing below. Sincerely, John Emmet Project Manager I1 Veregy Signatur.��7,z_ P,9�_ Date: CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member Joseph R. Molnar, Vice President Breana Micou, Member dulf411 Murray L. Miller, Member Attest: Hillary R. Horvath, Clerk Date: August 12, 2025 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 8/l/2025 Name: Gemma Stanton Department of Public Works — Engineering Division BPW Date: 8/12/2025 Phone Extension: 9083 Required Prior to Submittal to Board BPW Attorney Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ❑� Check the Appropriate Item Type — Required. for All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution M Other: Access Agreement n Ease./Encroach uired Information Company or Vendor Name Veregy, LLC New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description U Yes U If Yes, Approved by Purchasing ❑ No E] MBE Yes ❑ WBE Completed E-Verify Form Attached ❑❑ No WWTP Solar Guaranteed Energy Savings Contract (GESC) 124-015 PO-35380 Veregy agrees to remove any electrical or solar equipment that encroaches within designed 30' pipe setback area For Change Orders Onl Amount of Increase $ ❑ Decrease ($ ) Previous Amount $ Current Percent of Change New Amount Total Percent of Change: Time Extension Amount: New Completion Date: Increase % Decrease ( %) Increase % Decrease ( %1