HomeMy WebLinkAboutOpening of Bids - Grand Trunk Railroad Water Main Replacement Greenlawn & 30th St Proj No 122-041 - Selge Construction CO., Incr' 1I
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name G&T Western Water Main Replacement at Greenlawn Avenue and S. 30th
Street
Project No. 122-041
For Bids Due July 22, 2025
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
x executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
x Certification of use of United States Steel Products or Foundry Products.
Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good
Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and
X WBE-2.1].
x Acknowledge Receipt of 1 Addendum(s) included with the bid.
x All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
x printed or typed underneath signature.
x This checklist submitted with the Bid
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Selge Construction Co., Inc.
By Authorized Representative:
Signature:
Print Name & Title: Robert P. Kuhns, PE, VP Estimating
Date: July 22, 2025
Version 07/19/2023 Contractor's Bid for Public Works - 1
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name G&T Western Water Main Replacement at Greenlawn Avenue and S.30"' Street
Project No. 122-041
For Bids Due July 22, 2026
Date:
Address:
City/State/Zip:
PART I
(Must be completed for all bids. Please type or print)
July 22, 2025 Bidder (Firm): Selge Construction Co., Inc.
2833 South 11 th Street
Niles, MI 49120
Telephone Number: 269 684-0842
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
G & T Western Water Main Replacement at Greenlawn Avenue and S. 30th Street Project No. 122-041
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
A & Z Engineering, LLC
and dated July 22, 2025
for the sum of (enter the Total Bid as shown on the Proposal)
One Million Eight Hundred Fourteen Thousand Five Dollars and Zero Cents ($ 1,814,005.00
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a sep rat attachment.
ByP
(Signature)
Robert P. Kuhns, PE, VP Estimating
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray L. Miller, Member
ACCEPTANCE
day of
(Printed Name of Person Signing)
20
Joseph R. Molnar, Vice President
Breana N. Micou, Member
Attest: Theresa Heffner, Clerk
Version 07/19/2023 Contractors Bid for Public Works - 2
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid. SEE ATTACHED
2. Attach a listing of public works projects currently in process of construction by your
organization. SEE ATTACHED
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof. None
4. Attach references from private firms for which you have performed work.
SEE ATTACHED
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.) Work will be completed in an orderly manner, according to specifications
and as best suits the Owner and its Engineer.
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor. SEE ATTACHED
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
Subcontracts list to be determined. Bond not required
4. Attach a listing of equipment you have available to use for the proposed project.
SEE ATTACHED
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed. YES
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded. SEE ATTACHED
Version 07/19/2023 Contractors Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Michigan )
) SS:
Berrien COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty '
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 07/19/2023 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A fmding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 07/19/2023 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 22nd day of July ' 2025
Subscribed and sworn to before me this 22nd
My Commission Expires
10/27/2027
County of Residence
Selge Construction Co., Inc.
Contractor/Bidder (Firm)
Signature of Contractor/Bidder or Its Agent
Robert P. Kuhns, PE, VP Estimating
Printed Name and Title
July — _ 2025
Notary Public
COUNTY OF EFRRIEN
�,
Berrien
_ ; MYCommissonEt,�,3s
� Odaber27, 2p27 �
Aao9 in ge Connyof
OF
Version 07/19/2023 Contractor's Bid for Public Works - 6
BID/PROPOSAL s
CITY OF SOUTH BEND
Project Name: G&T Western Water Main Replacement at Greenlawn Avenue and S. 30' +�•.
Street
Project Number: 122-041
For Bids Due: July 22, 2025
Contractor Name: Selge Construction Co., Inc.
DIVISION 1 BID: Grand Trunk Western Water Main Replacement at Greenlawn Avenue
Item f Description
No.
Quantity
Unit
Unit Price
1
1
Total Amount
1
Mobilization and Demobilization
1
LS
$ 44,000.00
$ 44,000.00
2
Clearing Right of Way
1
LS
$ 47,500.00
$ 47,500.00
$ 31,100.00
3
4
Maintenance of Traffic
1
LS
$ 31,100.00
Erosion Control
1
LS
$1,000.00
$1,000.00
5
6
Launching and Receiving Jack and Bore
Pit Excavation
1
LS
$117,000.00
$ 117,000.00
Structural Backfill, Type II
143
CYS
$ 67.00
I
$ 9,581.00
7
8
HMA for Patching, Full Depth, Type B
79
SYS
$ 228.00
$ 18,012.00
HMA Surface, Type B
199
SYS
$ 26.00
$ 5,174.00
9
Asphalt for Tack Coat
2
TON
$ 49.00
$ 98.00
10
Milling, Asphalt, 1.5 IN.
199
SYS
SYS
$ 20.00
$ 3,980.00
$1,232.00
11
Subgrade Treatment, Type II
11
$ 112.00
12
13
Subgrade Treatment, Type IC
Compacted Aggregate, No. 73
79
SYS
$174.00
$ 13,746.00
1
TON
$ 150.00
$ 150.00
14
PCCP for Approaches, 6 IN.
11
SYS
I
$ 250.00
$ 2,750.00
15
Mulched Seeding, U 5
SYS
$ 190.00
I
I $ 950.00
16
Topsoil, 2 IN
1
CYS
$ 100.00
$ 100.00
17
Line, Thermoplastic, Solid, Yellow, 4 IN.
188
4 LFT
$ 4.00
$ 752.00
Version 07/19/2023 Contractor's Bid for Public Works - 7
BID/PROPOSAL
CITY OF SOUTH BEND
G&T Western Water Main Replacement at Greenlawn Avenue and S. 30th
Project Name: Street
Project Number: 122-041
For Bids Due: July 22, 2025
Contractor Name: Selae Construction Co.. Inc.
DIVISION 1 BID: Grand Trunk Western Water Main Replacement at Greenlawn Avenue
18
1 Line, Thermoplastic, Solid, White, 4 IN.
372
LFT
$ 4.00
$ 1,488.00
19
Transverse Marking, Thermoplastic,
59
LFT
Stop Line, White, 24 IN.
$ 15.00
$ 885.00
20
Pavement Message Marking,
2
EA
Thermoplastic, RXR, 8 FT.
$ 1,000.00
:$ 2,000.00
21
Sign, Sheet, with Legend, 0.100 IN.
3
SFT
$ 41.00
$ 123.00
Sign Post, Type I, Reinforced Anchor
21
LFT
22
Base
$ 23.00
$ 483.00
23
Water Main, Ductile Iron, 6 IN,
127
LFT
$ 430.00 54,610.00
24
Pipe, Steel Casing, Jack and Bore, 12
102
LFT
IN.
6 IN., 45 Degree Bend, Ductile Iron
$2,964.00 $ 302,328.00
25
4
EA
Fitting
$ 840.00 i$ 3,360.00
26
6 IN. Gate Valve
4
EA
$ 2,960.00
$ 11,840.00
27
6IN. Plug
Coupler for Existing Water Main
2
EA
$ 680.00
$ 1,360.00
28
2
EA
Connection
1
$ 1,300.00
$ 2,600.00
29
Pipe Abandonment, Flowable Fill, Non-
CYS
200.00
$ 200.00
Removable
Inspection Hole, 3 FT Deep or Less
$
30
5
$ 600.00
$ 3,000.00
31
Inspection Hole, Deeper Than 3 FT
5
EA
$ 1,100.00
$ 5,500.00
DIVISION 1 TOTAL $ 686,902.00
Version 07/19/2023 Contractor's Bid for Public Works - 8
Project Name:
Project Number:
For Bids Due:
BID/PROPOSAL
CITY OF SOUTH BEND
G&T Western Water Main Replacement at Greenlawn Avenue and S. 3011
Street
122-041
July 22, 2025
Contractor Name: Selae Construction Co-, Inc -
DIVISION 2 BID: Grand Trunk Western Water Main Replacement at S30th Street
Item
No.
Description
Quantity
Unit
LS
Unit Price
Total Amount
1
Mobilization and Demobilization
1
$48,000.00
$ 48,000.00
2
Clearing Right of Way
1
LS
$ 53,000.00
$ 53,000.00
3
Maintenance of Traffic
1
LS
$ 39,700.00
$ 39,700.00
4
Erosion Control
1
LS
$ 1,000.00
$ 1,000.00
5
Launching and Receiving Jack and Bore
Pit Excavation
1
LS
$ 103,000.00
$103,000.00
6
Excavation, Common
8
CYS
$ 50.00
$ 400.00
7
Structural Backfill, Type II
332
CYS
$ 67.00
$ 22,244.00
8
9
HMA for Patching, Full Depth, Type B
169
SYS
$ 132.00
$ 22,308.00
HMA Surface, Type B
403
SYS
$ 16.00
$ 6,448.00
10
Asphalt for Tack Coat
3
TON
$ 67.00
$ 201.00
11
Milling, Asphalt, 1.5 IN-
403
SYS
$ 20.00
$ 8,060.00
$ 1,302.00
12
Subgrade Treatment, Type II
21
SYS
$ 62.00
13
Subgrade Treatment, Type IC
169
SYS
$ 99.00
$ 16,731.00
14
PCCP for Approaches, 6 IN.
21
SYS
$ 200.00
$ 4,200.00
$ 2,775.00
15
Curb, Concrete, 6 IN.
37
LFT
$ 75.00
16
Curb, Concrete, Remove
37
LFT
$ 5.00
$ 185.00
17
Concrete, Remove
23
SYS
$ 5.00
$ 115.00
Version 07/19/2023 Contractor's Bid for Public Works - 9
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: G&T Western Water Main Replacement at Greenlawn Avenue and S. 301
Street
Project Number: 122-041
For Bids Due: July 22, 2025
Contractor Name: Sel a Construction Co., Inc.
DIVISION 2 BID: Grand Trunk Western Water Main Replacement at S30th Street
` 18 f Compacted Aggregate, No. 53
5
TON
$ 100.00
$ 500.00
19 Mulched Seeding, U
�
81
SYS
$ 140.00
$ 11,340.00
20 Topsoil, 2 IN.
5
CYS
$ 100.00
$ 500.00
456
LFT
$ 4.00
:$ 1,824.00
$ 1,632.00
21 Line, Thermoplastic, Solid, Yellow, 4 IN.
22
Line, Thermoplastic, Solid, White, 4 IN.
408
LFT
$ 4.00
Transverse Marking, Thermoplastic,
92
LFT
23
Stop Line, White, 24 IN.
$ 15.00
$ 1,380.00
24
Pavement Message Marking,
2
EA
Thermoplastic, RXR, 8 FT.
Sign, Sheet, with Legend, 0.100 IN.
7
$ 1,000.00
$ 2,000.00
25
SFT
$ 41.00
$ 287.00
26
Sign Post, Type 1, Reinforced Anchor
42
LFT
Base
$ 23.00
$ 966.00
27
Water Main, Ductile Iron, 6 IN.
283
LFT
$ 430.00
$ 121,690.00
28 Pipe, Steel Casing, Jack and Bore, 12 115
IN.
29 6 IN., 45 Degree Bend, Ductile Iron 8
Fitting
30 6 IN. Tee 1
31
6 IN. Cross I 1
1
32
6 IN. Gate Valve
_
6
33
6 IN. Plug
4
34
Coupler for Existing Water Main
4
Connection
35
Pipe Abandonment, Flowable Fill, Non-
2
Removable
Fire Hydrant and Gate Valve Assembly,
1
36
Remove
LFT
$ 2,964.00
$ 340,860.00
EA $ 840.00
;$ 6,720.00
EA $ 1,000.00
$ 1, 000.00
EA
$ 1,500.00
$ 1,500.00
EA
$ 2,960.00
$ 17,760.00
EA
$ 680.00
$ 2,720.00
EA
$ 1,300.00
$ 5,200.00
CYS
$ 200.00
$ 400.00
i
EA $ 250.00
$ 250.00
Version 07/19/2023 Contractor's Bid for Public Works - 10
[f.
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: G&T Western Water Main Replacement at Greenlawn Avenue and S. 30th
Street
Project Number: 122-041
For Bids Due: July 22, 2025
Contractor Name: Selge Construction Co., Inc.
DIVISION 2 BID: Grand Trunk Western Water Main Replacement at S30th Street
37
Fire Hydrant Valve and Assembly
1
EA $10,000.00
$ 10,000.00
38
Water Service Line, 1.0 IN.
41
LFT
$ 115.00
$ 4,715.00
39
Water Service Line, Remove
38
LFT
$ 5.00
$ 190.00
40
Inspection Hole, 3 FT Deep or Less 5
EA
$ 600.00
$ 3,000.00
41
Inspection Hole, Deeper Than 3 FT 5
EA
$ 1,100.00
$ 5,500.00
Bidder (Firm):
Selge Construction Co., Inc.
Address: 2833 South 11th Street
City/State/Zip: Niles, MI 49120
DIVISION 2 TOTAL $ 871,603.00
Telephone Number: 269 684-0842
By
(Signature)
Robert P. Kuhns, PE, VP Estimating
(Printed Name of Person Signing)
Version 07/19/2023 Contractors Bid for Public Works - 11
Project Name
Project No.
For Bids Due
�r�r rrr�rF.
BID/PROPOSAL =
CITY OF SOUTH BEND
1Yh�
G&T Western Water Main Replacement at Greenlawn Avenue
and S. 30t" Street
122-041
July 22, 2025
ALTERNATE #1: Darden Road Hvd rant Installation
Item
Total
[Description
Quantity
Unit
Unit Price
Amount
1
Five (5) HYDRANT INSTALLATIONS on
Darden Rd
1
LS
F$131,500.00
$ 131,500.00
ALTERNATE #1 TOTAL $ 131, 500.00
ALTERNATE #2: Lexington Ave and Ardmore Trail H
Item Description Quantity
No.
Three (3) HYDRANT INSTALLATIONS
2 on Lexington Ave and One (1) on
Ardmore Trail
Bidder (Firm): Selge Construction Co., Inc.
Address: 2833 South 11th Street
City/State/Zip: Niles, MI 49120
drant Installations
Unit I Unit Price
Total
Amount
1 LS $ 124,000.00 $ 124,000.00
ALTERNATE #2 TOTAL $ 124,000.00
Telephone
Number: (269 ) 684-0842
(Signature)
Robert P. Kuhns. PE, VP Estimatincl
(Printed Name of Person Signing)
Version 07/19/2023 Contractors Bid for Public Works - 12
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN _=
FORM MBE-1.0
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number: 122-041 Project Name: G&T Western Water Main Replacement At Greenlawn Avenue and S. 30"Street
Total Bid Division 1 - $ 686.902.00
Bidder: Selge Construction Co., Inc. Amount: Division 2 - $ 871,603.00 MBE Goal: 1.82%&1.75%
Name &Address of MBE Primary Contact Person Scope of Work to be Performed
(Name/Telephone) (Attach scope/schedule if you need additional space)
1st Class Logistics
2213 St. Charles Ave
South Bend, IN 46614
Submitted by:
Bernard Coutee Trucking
574-993-0071
Robert P. Kuhns, PE, VP Estimating
Print Name
Page 1 of 1
DollarAmount of MBE Percentage of
Total
Component Rirl/Prnnne�l
Division 1 - $12,996.001 Div. 1 - 1.89%
Division 2 - $24,064.00 1 Div. 2 - 2.76%
1 July 22, 2025
Signature Date
Version 07/19/2023 Contractor's Bid for Public Works - 13
CITY OF SOUTH BEND = l
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-1.0
WBE UTILIZATION PLAN
***Goals should be calculated based on the Base Bid only.***
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number: 122-041 Project Name: G&T Western Water Main Replacement At Greenlawn Avenue and S. 30"' Street
Total Bid Division 1 - $ 686,902.00
Bidder: Selge Construction Co., Inc. Amount: Division 2 - $ 871,603.00 WBE Goal: 4.46%&4.35%
Page 1 of 1
Name & Address of WBE Primary Contact Person
(NamelTelephone)
BUC Construction Supply
PO Box 4153
Lafayette, IN 47903
State Barricading, Inc.
24963 US 20 West
South Bend, IN 46628
Teresa Butler
765-412-3484
Esther Michalski
574-287-2078
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Pipe & Fittings
Dollar Amount of WBE Percentage of
Component Total
Bid/Proposal
Division 1 - $16,855.20 Div. 1 - 2.45%
Division 2 - $36,598.40 Div. 2 - 4.20%
Maintenance of Traffic Divison 1 - $14,120.10 Div. 1 - 2.06%
Division 2 - $11,420.70 Div. 2 - 1.31%
Submitted by: Robert P. Kuhns, PE, VP Estimating s'� July 22, 2025
Print Name Signature Date
Version 07/19/2023 Contractor's Bid for Public Works - 14
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN 'r '
FORM WBE-1.0
WBE UTILIZATION PLAN
***Goals should be calculated based on the Base Bid only.***
Version 07/19/2023 Contractor's Bid for Public Works - 15
-sov u
CITY OF SOUTH BEND
J p�I
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN 5
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 122-041 Date: July 22, 2025
Project Name:
Bidder:
Contact Person:
Address:
City:
Grand Trunk Western Water Main Replacement At Greenlawn Avenue and
S. 30th Street
Selge Construction Co., Inc.
Robert P. Kuhns, PE, VP Estimating
2833 South 11 th Street
Niles State: Michigan
bk h @sel econstruction com
Telephone: 269-684-0842
Zip: 49120
Email: U nS g
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: http.,//www.in.-gov/idoal.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MWBEs, including, where appropriate, breaking out contract work items into
�7
K
economically feasible units to facilitate MBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
01,11
nTp-
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed -
sufficient time for MBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested MBEs.
p�
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
Qom/
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 07/19/2023 Contractor's Bid for Public Works - 16
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN V.. T,-.
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
04r equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on f
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for I
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 07/19/2023 Contractor's Bid for Public Works - 17
!p4 1
CITY OF SOUTH BEND U
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN t"
FORM WBE-2.0
,ace
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 122-041 Date: July 22, 2025
Grand Trunk Western Water Main Replacement At Greenlawn Avenue and
Project Name: S. 301h Street
Bidder: Sel a Construction Co. Inc.
Contact Person: -Robert-P. Kuhns PE VP Estimating Telephone: 269-684-0842
Address: 2833 South 11 th Street
City: Niles State: Michigan Zip: 49120
Email: bkuhns@selgeconstruction.com
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: http://www.in-govlidosl.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
�YI�r
Indiana Minority and Women Business Enterprises, found on their website
htt:Ihvww.in. ovfidoa .
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all WBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
vow
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested WBEs.
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
Dr —subcontract.
Version 07/19/2023 Contractor's Bid for Public Works - 18
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
I affirm that I have made good faith efforts to assist interested WBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
I affirm that I did not reject any WBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 07/19/2023 Contractor's Bid for Public Works - 19
CITY OF SOUTH BEND y
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.1
rays
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 1
Project Number: 122-041 MBE Participation Goal 1_82%&1.75%
Grand Trunk Western Water Main Replacement At Greenlawn Avenue And S.
Project Name: 30th Street
Bidder^ j Selge Construction Co., Inc.
By: ,� 1 Robert P. Kuhns, PE, VP Estimating July 22, 2025
(Signature) (Title) (Date)
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
"*Please see attached list of the South Bend Certified Directory"*
RESULTS OF CONTACT WITH THE MBE FIRM:
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 07/19/2023 Contractor's Bid for Public Works - 20
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN ' r': '1
FORM MBE-2.1
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 1
Project Number: 122-041 WBE Participation Goal 4.46%&4.35°Ca
Grand Trunk Western Water Main Replacement At Greenlawn Avenue And S.
Project Name: 30th Street
Bidder: Selge Construction Co., Inc.
By�4� Robert P. Kuhns PE, VP Estimating July 22, 2025
(Signature) (Title) (Date)
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
"Please see attached list of the South Bend Certified Directory"
RESULTS OF CONTACT WITH THE WBE FIRM:
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Version 07/19/2023 Contractor's Bid for Public Works - 21
Selge Construction Co., Inc.
SELGE _1 2833 S. 11th St. Project: G&T Western Water Main Replacement at Greenlawn Avenue and
Niles, MI 49120 S. 30th Street- Project No. 122-041
269-684-0842
Contract Goals MBE WBE
1.82% & 1.75% 4.46% & 4.35%
GOOD FAITH EFFORTS WORKSHEET
Date Response
Goods/Services
Result (Include Price
Company Name & Address
MBE
WBE
VBE
Type of Contact
Date of Contact
Due
Requested
Quote)
BUC Construction Supply
Email
7.11.25 @
07.18.25 @
Pipe & Fittings
Quote Received: See
Teresa Butler
4:01pm
12:00pm
Attached
PO Box 4153
X
Lafayette, IN 47903
765-412-3484
1st Class Logistics
Email
7.11.25 @
07.18.25 @
Trucking
Quote Received: See
2213 St. Charles Ave
4:01pm
12:00pm
Attached
South Bend, IN 46614
X
istclassiogistics2Ol3@gmall.com
State Barricading, Inc
Email
7.11.25 @
07.18.25 @
Maintenance of
Quote Received: See
24963 US 20 West
4:03pm
12:00pm
Traffic
Attached
South Bend, IN 46628
X
574-287-2078 statebarricadel@aol.com
MBE/WBE/VBE Barrier
Advertisement
Agency Assistance
Other Criteria INDOT DBE Listin
cei Dkedwy as or IN=
IMME.
6t; 6 ��� I
SEEM
]MIEN
MIEN.
'ElmoIF
is
Iili
MOEN
IWEIIIJIMMINWIN
0116-01111,601111
��i
moll
AMEA-ZEN
- - -
- - - - - -
6-&Qa
-
...... . . . . . . .
k ii, 1 11
...
........
OWN
r
QIMM.. M
OM
41
QIII
C
Mall
0111111111111
NOMINEES
W096WO
Crissy Frickson
From: South Bend Legals <legals@sbtinfo.com>
Sent: Tuesday, July 15, 2025 1:20 PM
To: Crissy Frickson
Subject: Thank you for placing your order with us.
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
THANK YOU for your ad submission!
This is your confirmation that your order has been submitted. Below are the details of your transaction. Please save this confirmation for your
records.
We appreciate you using our online self-service ads portal, available 24/7. Please continue to visit South Bend Tribune's online Classifieds
HERE to place your legal notices in the future.
Deadlines vary by publication, changes and/or cancellations may not be honored due
to deadline restrictions.
Job Details
Order Number:
LSBN0334747
Classification:
Public Notices
Package:
General Package
Additional Options:
1 Affidavit $12.50
Base amount:
$77.66
Service fee:
$3.10
Cash/Check/ACH
Discount:
-$0.00
Total payment:
$80.76
As an incentive for customers, we prov
a discount off the total order cost equal
the 3.99% service fee if you pay with
Cash/Check/ACH. Pay by
Cash/Check/ACH and save! In no ever
are service fees refundable.
Payment Type:
visa
Account Details
Selge Construction Co., Inc.
2833 S 11th St, Niles, Michigan 49120
NILES, MI ❑ 49120
269-684-0842
cfrickson@selgeconstruction.com
Selge Construction Co., Inc.
Credit Card - visa ************1267
REQUEST FOUR QUOTE
Selge Construction Co., Inc
is requesting subcontractor
bids from qualified MBE/BE/
VBE subcontractors, suppliers,
manufacturers, and truckers
for the CITY OF SOUTH BEND
- GRAND TRUNK WESTERN
IATERMAIN REPLACEMENT AT
GREENLAWN AVE & S. 30TH ST.
Interested businesses please
contact our main office at
(269) 684-0842. Proposals will
be accepted until noon, Friday,
July 18, 2025.
HSPALP
July 17, 18 2025
LSBNO334747
z
Crissy Frickson
From: Crissy Frickson
Sent: Friday, July 11, 2025 4:01 PM
To: Teresa Butler; Bernard Coutee
Subject: RFQ: South Bend Grand Trunk Western WM
Good afternoon,
We are bidding the South Bend Grand Trunk Western WM Replacement project. We would like you to quote us on
this project. Please forward your quote to 11#tn C�selgeconstruUbiLoarn by July 18, 2025. Please see the
Links belowforthe plans, specs, and proposal.
Plans, Specs, and Addendum 1:
Plans - Grand Trunk Western Greenlawn.30th Pro' No 122-041- WM Re lace. df
Proposal Sheet.pdf
Specs - Grand Trunk Western Greenlawn.30th Pro' No 122-041- WM Re lace. df
Thank you,
Crissy Frickson
E
LG� Office Manager
Project Management Administrator
Selge Construction
2833 S. 11th St. Niles, MI 49120
(w)269-684-0842
www.selgeconstruction.com
Crissy Frickson
From: Crissy Frickson
Sent: Friday, July 11, 2025 4:03 PM
To: James Michalski; jbarnes@jpr1source.com; jwarner@wcgrp.com; Scott Bazinet; Tim
Mattice; Heidi Geissinger; epilipow@milestonelp.com; dave@dblservicesinc.com;
john.walter@ferguson.com
Subject: RFQ: South Bend Grand Trunk Western WM
Good afternoon,
We are bidding the South Bend Grand Trunk Western WM Replacement project. We would like you to quote us on
this project. Please forward your quote to estimatingeselgeconstruction.com by July 18, 2025. Please seethe
links below for the plans, specs, and proposal.
Plans, Specs, and Addendum 1:
Plans - Grand Trunk Western Greenlawn.30th Proi No 122-041- WM Re lace. df
Proposal Sheet.pdf
Specs - Grand Trunk Western Greenlawn.30th Pro' No 122-041- WM Re lace. df
Thank you,
Crissy Frickson
Office Manager
Project Management Administrator
Selge Construction
2833 S. 11th St. Niles, MI 49120
(w)269-684-0842
www.selgeconstruction.com
SAW
Affifesdins
In
The Road To Success Is Always Under Construction'
24963 US 20 West
South Bend, Indiana, 46628
Phone: 574 287-2078
Fax. 574 287-1744
Quote
Rate: 7/17/2025
Job Crated Trunk Western
Watermain Replacement
At Creenlown AYenue a S.
30" St. Project Me.122-
041. City Of South ReAME
TO All Bidders
Qdl Line Dom # Description
Una Price
Una Total
Division 1 Bid: Greenlawn Ave
1 LS 3 Maintenance Of Traffic- As Shown
$11,024.00 Lump Sum
$11,024.00
On Plan, Consists Of:
4 EA- Type III Barricade W/ Sign
6 EA- Type I II Barricade
10 EA- Construction Sign, A
26 EA- Detour Route Marker
Assembly
Labor For One (1) Initial Set Up &
One (1) Final Pick Up. 30 CID
Closure Duration
Dims, Daily Rental, /fNeeded
$1.25 Per Day, Each
3 SFT 21 Sign, Sheet, With Legend, 0.100
$40.50 Per SFT
$121.50
21 LFT 22 Sign Post, Type I, Reinforced
$22.60 Per LFT
$474.60
Anchor Base
RE -BID
WBE/DBE*Equal OpportunityEmployers*Indiana L abolvIs *A TSSA
Certified* Page
1 Off
Subtotal
no
Banfeediss,
/NCO
'The Road To Success Is Always Under Construction"
24963 US 20 West
South Bend, Indiana, 46628
Phone. 574 287-2078
Fax.- 574 287-1744
Quote
Date: 7/17/2025
Job Grand Trunk Western
Watermain Replacement At
Greenlown Avenue a S. 3011
SL Project No.122-041. ON
Of South fiend, IN.
TO All Bidders
QtV Line Item # nescriptlen Unit Price Line Total
Division 2 Bid: S. 301h Street
1 LS 3 Maintenance Of Traffic- As Shown $10,188.00 Lump Sum $10,188.00
On Plan, Consists Of:
4 EA- Type I II Barricade W/ Sign
6 EA- Type I II Barricade
10 EA- Construction Sign, A
22 EA- Detour Route Marker
Assembly
Labor For One (1) Initial Set Up &
One (1) Final Pick Up. 30 CID
Closure Duration
Drums, Daily Rental, /fNeeded $1.25Per Day, Each
7 SFT 25 Sign, Sheet, With Legend, 0.100 $40.50 Per SFT $283.50
42 LFT 26 Sign Post, Type I, Reinforced $22.60 Per LFT $949.20
Anchor Base
WBE/DBE*Equal OpportunityEmp/oyefS11nd/ana Labofie/s*ATSSA
Ceftriied* Page
2 Of2
Subtotal
Thank you for your business!
Quotation prepared by:
This is a quotation on the goods named, subject to the conditions noted below: (Quotation Valid For 60C/D's From Initial Quotation, Any Equipment
Not Listed Herein, Or Requested By Contractor Will Be Charged Out As Extra, At Contractors Expense.)
To accept this quotation, sign here and return: Name: _ _ Company
Christian Baybutt
From: Bernard Coutee<lstclasslogistics20l3@gmaii.com>
Sent: Monday, July 21, 2025 7:00 AM
To: Christian Baybutt
Subject: Re: South Bend Greenlawn Ave and S 30th Grand Trunk Western Water Main
Replacement
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Good morning Christian
Please add the following price for 53 limestone to our quote. Price includes trucking.
53 Limestone ... $27.50 a ton
Thanks!
On Fri, Jul 18, 2025 at 1:13 PM Christian Baybutt < i > wrote:
Bernard,
Are you able to quote either #53 gravel or limestone? I don't believe South Bend will accept the use of #53
crushed concrete.
Thanks
Christian Baybutt, P.E.
Project Engineer, Selge Construction Co., Inc.
(w) 269-684-0842 (m) 630-449-8689 1 www.seigeconstruction.com
2833 S. 11th St. Niles, MI 49120
From: Bernard Coutee<lstclassloeistics2013ftrnail.com>
Sent: Friday, July 18, 2025 7:00 AM
To: Christian Baybutt <cba butt sel econstruction.com>; Estimating <Estimatin sel econstruction.com>; Crissy
Frickson <cfrickson seleeconstruction.com>
Subject: Re: South Bend Greenlawn Ave and S 30th Grand Trunk Western Water Main Replacement
CAUTION: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Good morning
Please find our quote attached. Let me know if you have any questions
Thanks
On Thu, Jul 17, 2025 at 10:36 AM Christian Baybutt < l truct' m> wrote:
Hi Bernard,
Would you please quote delivery of the following crushed stone aggregate to these two projects?
Greenlawn Ave — #53 — 360 Tons
S 30`h St Project — #53 — 800 Tons
Please call with any questions. Thank you!
Christian Baybutt, P.E.
Project Engineer, Selge Construction Co., Inc.
(w) 269-684-0842 (m) 630-449-8689 1 vrww.selgeconstruction-com
2833 S. 11th St. Niles, MI 49120
Bernard Coutee
Chief Executive Officer
t C s i ti LL
South Bend, IN.
5749930071
wt-Qla'5—$M0 stics.org
Bernard Coutee
Chief Executive Officer
1 st Class Logistics LLC
South Bend, IN.
5749930071
1 stclasstogLgjc�
*State of Indiana Certified MBE -DBE*
2213 St Charles Ave.
South Bend IN 46614
FIAT 46-3085979
Date: 7/18/2025
Project: Grand Trunk Watermain at Greenlawn and 30th St
Project Location: City of South Bend
Project No. 122-041 R
Quote prepared for: Selge Construction
2025 Tri-axle rates
Regular rate... $125.00
Overtime rate... $143.00
2025 Quad -axle rates
Regular rate... $129.00
Overtime rate... $147.00
• Overtime consists of anything over 8 hours daily and all -day Saturday
• Travel time added to each truck's time ticket daily
• Night rates add $15.00 per hr to all rates per truck. 8 hour minimum per truck
■ Sunday and holidays add $36.00 per hr to overtime rates, per truck. 8 hr minimum per truck
■ Minimums apply: 2, 4 & 8 hours for all dump trucks
■ Minimum 4, 8 hours for flatbeds, local hauling only
• All dumps, flatbeds: Legal loads only
• Trucks will be upon availability because 1st Class does not have control of the project scheduling
• To avoid 2 hr show up charge call our dispatch 2 hrs before start time for any cancellations
■ 1 st Class shall be compensated for all time spent on the jobsite
• Invoices due NET 30
Fuel surcharge applied if diesel costs rise above $4.25 a gallon, based on Midwest PADD 2
• Signatory to Local 364 union
• MBE certified supplier of aggregates
• Please notify our office if this PLgiect is awarded and if our cluote will be used
BeAm,ab ci, Cep ctm PvAi,d ems 7/21/20 25
2025 Aggregate Prices
#53 crushed concrete ... $19.50 per ton
Unscreened topsoil ... $18.45 per ton
*Prices include trucking*
Selim aA Cave e, Pk e/a.� 7/21/20 25
li l Quote Date: 7/18/2025 Page 1
BUCExpiration Date: 8/17/2025
BUC Construction Supply Quote
BUC Terms and Conditions - See Page 2
Project: G&T Western Water Main Replacement DIVISION 1 BID:
Grand Trunk Western Water Main Replacement at Greenlawn
Avenue Quote Valid: 30 Days
Item # IDesicription QTY Unit I Price I Ext. Price
23 6" DIP CL 50/350 Tyton Joint 140 LFT $ 26.78 $ 3,749.2U
24A 6" x 24" End Seals 2 EA $ 115.00 $ 230.00
24B 6" x 24" Casing Spacers 14 EA $ 212.00 $ 2,968.00
25 6' MJ 45 Bend w/ Mega Lugs 4 EA $ 257.00 $ 1,028.00
26 6" MJ Gate Valve w/ Mega Lugs & Box 4 EA $ 1,703.00 $ 6,812.00
27 6" MJ Plug 4 EA $ 103.00 $ 412.00
Misc 6" MJ LSS w/ Mega Lugs
2 EA $
267.00
$ 534.00
Misc 6" MJ Cap w/ Mega Lug
3 EA $
146.00
$ 438.00
Misc 6" Field Lok Gaskets
6 EA $
114.00
$ 684.00
Total
$ 16,855.20
BUC Construction Supply, Inc. Terms & Conditions
WBE Supplier/Distributor-60%
1. ALL Materials are BABA Compliant. Materials purchased after expired quote date of 8/17/25 are subject to
yearly escalation clause. Full truckload freight included with purchase of entire quote. All materials will need to
ship by Spring of 2026. Ductile Iron Pipe will need to be shipped by 5/1/2026 to secure pricing. Quote is based
on BUC's interpretation of plans/specs contractor to determine final materials and/or quantities.
2. If BUC quote is utilized for WBE Spend Goal, contact BUC ASAP to secure pricing by sending P.O. Any
materials purchased after 8/17/25 and/or 2026 are at market price. After P.O. is executed, any returned
materials will have a 25% restocking fee.
3. BUC shall not be held liable or responsible to the other party nor be deemed to have defaulted under or
breached this quote for failure or delay in fulfilling or performing any term of this quote to the extent and for so
long as, such failure or delays caused by or results from causes beyond the reasonable control of BUC,
including supply chain delays, pandemics, quarantines &weather.
Total: WBE 60% Spend Goal: $10,113.12
ACCEPTED BY:
Contractor
BUC Construction Supply, Inc.
Date:
Date:
A, Quote Date: 7/18/2025
BUC Expiration Date: 8/17/2025
BUC Construction Supply Quote
RUC Terms and Conditions - See Daae 2
Page 1
Project: G&T Western Water Main Replacement DIVISION 2 BID:
Grand Trunk Western Water Main Replacement at S30th Street
Quote Valid: 30 Days
Item #
Desicription
QTY
JUnit
I Price
I Ext. Price
27
6" DIP CL 50/350 Tyton Joint
340
LFT
$
26.78
$
9J05.20
28A
6" x 24" End Seals
2
EA
$
115.00
$
230.00
28B
6" x 24" Casing Spacers
15
EA
$
212.00
$
3,180.00
29
6" MJ 45 Bend w/ Mega Lugs
8
EA
$
257.00
$
2,056.00
30
6" MJ Tee w/ Mega Lugs
1
EA
$
421.00
$
421.00
31
6" MJ Cross w/ Mega Lugs
1
EA
$
694.00
$
694.00
32
6" MJ Gate Valve w/ Mega Lugs & Box
6
EA
$ 1,703.00
$ 10,218.00
33
6" MJ Plug
6
EA
$
103.00
$
618.00
37
Fire Hydrant Assembly
1
EA
$ 6,177.00
$
6,177.00
38A
1" Type K Copper
60
LFT
$
13.82
$
829.20
38B
1" Corp/Curb/Box
2
LFT
$
345.00
$
690.00
38C
1" Comp. Coupling
2
LFT
$
38.00
$
76.00
Misc
6" MJ LSS w/ Mega Lugs
4
EA
$
267.00
$
1,068.00
Misc
6" MJ Cap w/ Mega Lug
3
EA
$
146.00
$
438.00
Misc
6" Field Lok Gaskets
7
EA
$
114.00
$
798.00
Total $ 36,598:4$
11111
BUC
BUC Construction Supply, Inc. Terms & Conditions
WBE Supplier/Distributor-60%
1. ALL Materials are BABA Compliant. Materials purchased after expired quote date of 8/17/25 are subject to
yearly escalation clause. Full truckload freight included with purchase of entire quote. All materials will need
to ship by Spring of 2026. Ductile Iron Pipe will need to be shipped by 5/1/2026to secure pricing. Quote is
based on BUC's interpretation of plans/specs contractor to determine final materials and/or quantities.
2. If BUC quote is utilized for WBE Spend Goal, contact BUC ASAP to secure pricing by sending P.O. Any
materials purchased after 8/17/25 and/or 2026 are at market price. After P.O. is executed, any returned
materials will have a 25% restocking fee.
3. BUC shall not be held liable or responsible to the other party nor be deemed to have defaulted under or
breached this quote for failure or delay in fulfilling or performing any term of this quote to the extent and for so
long as, such failure or delays caused by or results from causes beyond the reasonable control of BUC,
including supply chain delays, pandemics, quarantines & weather.
Total: WBE 60% Spend Goal: $21,959.04
ACCEPTED BY:
Contractor
BUC Construction Supply, Inc.
Date:
Date:
III
Part II, Section I Experience Questionnaire
1. What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid?
CONTRACT
WHEN
NAME AND ADDRESS
AMOUNT
CLASS OF WORK
COMPLETED
OF OWNER
$3,298,976.00
WWTP REGION B, PH II, CONTR B LIFT STATION
2023
LaGRANGE COUNTY REGIONAL UTILITY DISTRICT, LAGRANGE, IN
$1,712,876.00
WWTP REGION B, PHASE II CONTRACT
2023
LaGRANGE COUNTY REGIONAL UTILITY DISTRICT, LAGRANGE, IN
$4,106,202.00
SW QUADRANT ROADWAY, SEWER & WM EXT
2023
TOWN OF MIDDLEBURY / 418 N MAIN ST, MIDDLEBURY. IN 46540
$1,115,879.00
WWTP CONTRACT A
2023
ST JOSEPH COUNTY BOARD OF PUBLIC WORKS / 612 E MAIN ST, CENTERVILLE, MI 49032
$1,294,195.00
LIFT STATION IMPROVEMENTS CONTRACT B
2023
ST JOSEPH COUNTY BOARD OF PUBLIC WORKS / 612 E MAIN ST, CENTERVILLE, MI 49032
$960,541.00
LIFT STATION 51, 52, 53
2023
NEW BUFFALO TWP / 17425 RED ARROW HIGHWAY, NEW BUFFALO MI 49117
$124,980.00
CSO 16 BACKWATER VALVE REPLACEMENT
2023
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216
$4,966,945.00
NORTHSHORE/EASTSHORE COLLECTION SYSTI
2023
TURKEY CREEK REG. SEWER DISTRICT / 4852 N. 1200 W, CROMWELL, IN 46732
$2,825,901.00
CITYWIDE WATER SERVICE REPLACE - ZONE 1(
2023
CITY OF BENTON HARBOR / 200 E WALL ST, BENTON HARBOR, MI 49022
$149,225.00
AUTEN RD WATER MAIN REPLACEMENT
2023
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216
$71,043.00
BIG & TALL SEWER EXTENSION
2023
CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471
$123,264.00
ENTRANCE DRAINAGE IMPR (POTAWATOMI ZO(
2023
JONES PETRIE RAFINSKI / 325 S. LAFAYETTE BLVD., SOUTH BEND, IN 46601
$1,976.699.00
INDOT BIKE & PED FACILITIES
2024
INDOT R38064 - LOCATION: MISHAWAKA, IN
$3,215,159.00
INTERSECTION IMPR FRONT, MAIN & CHURCH :
2024
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618
$888,813.00
AUTEN RD BIKE & PIED FACILITIES
2024
INDOT R37502A - LOCATION: SOUTH BEND, IN
$6,514,745.00
3RD STREET SEWER IMPROVEMENTS
2024
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618
$1,938,859.00
VETERANS PARK LIFT STATION
2024
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA. IN 46545 - 574-258-1618
$15,669,614,00
CHAPMAN LAKES SEPTIC ELIMINATION -A
2024
TIPPECANOE & CHAPMAN REGIONAL SEWER DISTRICT / NORTH WEBSTER, IN 46555
$1,939,039.00
INDOT COAL LINE TRAIL PHASE 2
2024
INDOT R38065C - LOCATION: MISHAWAKA. IN
$12,703,046.00
MEC SMART PARK DEVELOPMENT
2024
MIDWEST ENERGY & COMMUNICATIONS/ CASSOPOLIS, MI 49031
$384,624.00
LIFT STATION 13 REPLACEMENT
2024
CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471
$128,000.00
SEWER POINT REPAIRS
2024
VISUSEWER - DOWAGIAC, MI
$2,022,247.00
HILL & FIRST ST PARKING IMPROVEMENTS
2024
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618
$224,090.00
NADEL AVE. GROUNDWATER LS IMPROVEMENT
2024
CITY OF ELKHART / 229 S. 2ND ST.. ELKHART, IN 46516 574-294-5471
$2,070,805.00
2023 TRAFFIC CALMING PROJECT
2024
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216
$236,663.40
JOHNSON/FELLOWS INTERSECTION DRAIN
2024
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216
$176,986.40
ONTARIO TRAILHEAD IMPROVEMENTS
2024
CITY OF NILES/ SECOND STREET., NILES, MI 49120- 269-683-4700
$176,000.00
SANITARY SEWER RESTORATION
2024
SJ COUNTY BOARD OF PUBLIC WORKS/ WHITE PIGEON, MI 49099
$509,253.00
SR 331 WATER MAIN IMPROVEMENTS
2024
TOWN OF BREMEN/ 111 S. CENTER ST., BREMEN IN 46505
$330,014.00
2023 CDBG INFRASTRUCTURE PHASE IX
2024
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618
$1,297,078.00
RIVER CROSSING EMERGENCY REPAIR
2024
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216
$57,500.00
REGION A PUMP STATION 12 & 13
2025
LAGRANGE COUNTY REGIONAL UTILITY DISTRICT, LAGRANGE, IN
2. Attach a listing of public works projects currently in process of construction by your organization.
Contract Amount
290 120
Class of Work
Elkhart CnIX Courthouse Pro'
Expected
Completion Date
Summer 2023
Name and Address of Owner
Elkhart Coun IN 710
5 797 216
Conrail LS & Interceptor Im r
Spring 2025
Benton Charter T MI 720
11 253,814
WW CoIlection Systems — C
Summer 2025
TCRSD — N.Webster. IN 732
3.790 495
5 152 096
Pump Stations 1.2.&9 Im r - A
CSO 39 Sewer Separation
Summer 2025
Spring 2025
Angola, IN 738
Ci of Elkhart. IN 754
2.427 759
Contract 3: Booster Station
Summer 2025
Town of N. Libe . IN 755
l 465.715
Contr 4:.LS Rehab/NM Lining
Summer 2025
Town of N. Libe IN 756
] 257 275
Contract 5: Equalization Tank
Summer 2025
Town of N. Libe IN 757
532.150
Contr 6: Decomm/Well Closure Fall 2025
Town of N. Libea, IN758
7 549.973
Contr C — East Service Area
Spring 2027
SLRWD - Angola. IN 759 '
829 648
Lift Station #20 Re lacement
Summer 2025
Cily of Elkhart IN 760
786 235
Elkhart Amazon Proiect
Summer 2025
Service Elects --Ft Wa ne 762
299 250
Lift Station # 13
Summer 2025
SLRWD — Angola, jN (763).
$1.815.050
Contr B — WW Stabil Lagoon
Spring 2025
Village of Decatur MI 764
545 300
Lift Station Improvements
Spring 2025
New Paris Cons Distr. ITl 765
3 724 000
Fellows Booster Pump Station
Fall 2025
Ci1y of South Bend IN 768
l 72.1 950
Lead Service Contract A
Spring 2025
City of South Bend IN 769
6 193 284
Lead Service Contract A
Spring 2025
C4 of South Bend IN 770
2 090 519
Don Horne Park Res Subdvn
Summer 2025
Village of Casso olis MI 772
837 781
2024 Curb & Sidewalk
Summer 2025
City of South Bend IN 773
241 490
B 1 Lift Station Improvements
Spring 2025
SLAUA — Dowa iac MI 775
36 61S 968
Oakland Ave - B CSO Stora a
Winter 2026
City of ElkhartIN 776
155.245
6" HDD Steel Casing under RR Summer 2025
AEP — South Bend IN 77$1
4 250 512
Saugany Lake WWC System
Winter 2026
LaPorte RSWD IN 780
1 994 226
WM & Service Line Im r- B
Fall 2026
Town of Milford IN 781.
2 592 256
Wall St Improvements
Winter 2025
City of Sauth Bend IN 782
709 300
Shamrock Manor Subdvn
Winter 2025
DBF Properties. IN 783
1 364 782
2025 Curb & Sidewalk
Summer 2026
Cfty of South Bend IN 784
3 947 448
Stone Lake PH II Project
Winter 2025
Village of Casso olis MI 785
1 596 599
CSO 24 — Oaklev Ave Reconstr Fall 2026
Cily of Mishawaka IN 786
GOVERNMENTAL REFERENCES
Selge Construction
Eric Horvath, Director of Public Works
574-235-9251
City of South Bend
227 W. Jefferson Blvd., Ste 1300
South Bend, IN 46601
Toy Villa, Construction Manager
574-235-9251
City of South Bend
227 W. Jefferson Blvd.
1316 County -City Building
South Bend, IN 46601
Sky Medors, Engineer
574-235-9626
St. Joseph County
227 W. Jefferson Blvd.
South Bend, IN 46601
Tim Woodward
260-856-4341
Turkey Creek Regional Sewer District
4852 N. 1200 W
Cromwell, IN 46732
Steve Haversperger, Area Engineer
219-362-6125
INDOT, LaPorte District
PO Box 429
LaPorte, IN 46352
Brigid Forlenza
269-663-2347
Ontwa Township
PO Box 209
Edwardsburg, MI 49112
Mike Koch, Area Engineer
260-484-9541
INDOT, Fort Wayne District
5333 Hatfield Road
Fort Wayne, IN 46805
OVER
Chris Jamrose, Director of Engineering
574-258-1619
City of Mishawaka
600 East Third Street
Mishawaka, IN 46546-0363
Tory Irwin, Engineering Service Mgr.
574-293-2572
City of Elkhart
Municipal Building
229 S. Second Street
Elkhart, IN 46516
Dustin Sailor, Engineer
574-534-2201
City of Goshen
204 E. Jefferson St., Suite 1
Goshen, IN 46526
Mary Cripe, Town Manager
574-825-1499
Town of Middlebury
418 N. Main Street
Middlebury, IN 46540
Joe Ray, Director Public Works
269-683-4100
City of Niles
333 N. Second Street
Niles, MI 49120
Paul Warnke, Board President
574-586-7249
Koontz Lake Regional Sewer District
10870 Cherokee Rd.
PO Box 204
Walkerton, IN 46574
James Emans, P.E.
574-267-6885
City of Warsaw
102 S. Buffalo Street
Warsaw, IN 46580
ENGINEERING REFERENCES
Selge Construction
Rich Zielinski
317-547-5580
American Structurepoint
7260 Shadeland Station, Suite 100
Indianapolis, IN 46256
Jeremy Roschyk
574-288-4580
Donahue & Associates
100 N. Michigan, Ste 510
South Bend, IN 46601
Andy Lemberis
574-236-4400
DLZ Indiana, LLC
2211 East Jefferson Blvd.
South Bend, IN 46615
Paul Hummel
574-234-3167
Lawson Fisher Associates, P.C.
525 West Washington Avenue
South Bend, IN 46601
David Harvey
Fleis & Vanderbrink Engineering, Inc.
2960 Lucerne Drive, S.E.
Grand Rapids, MI 49546
Kenneth Jones
574-293-7762
Jones, Petrie, Rafinski, Inc.
200 Nibco Parkway Dr
Elkhart, IN 46516
Matt Davis
269-927-0100
Wightman and Associates, Inc.
2303 Pipestone Road
Benton Harbor, MI 49022
Jason Durr
574-282-8001
Christopher B. Burke Engineering, LLC
220 West Colfax Avenue, Suite 500
South Bend, IN 46601
Daryl Knip
574-232-8700
Abonmarche Consultants of IN, Inc.
750 Lincolnway East
South Bend, IN 46601
"Attachment
Section 1 No. 4 List references of private firms for which you have performed work.
South Bend Orthopedics Pokagon Gaming Authority
Elm Road Medical Campus 1111 Wilson Road
53880 Carmichael Drive New Buffalo, MI 49117
South Bend, IN 46635
AM General Precision Wall Systems
Rolland Miller Jim Mroz
13200 McKinley Highway 3801 S. Main St
Mishawaka, IN 46545 South Bend, IN 46601
South Bend Ethanol
M.A.A.C.
3201 W. Calvert Street
PO Box 262
South Bend, IN 46613
Niles, MI 49120
Notre Dame Federal Credit Union AEP Niles Service Center
Bob Green 2603 Walton Rd
PO Box 7818 Niles, MI 49120
Notre Dame, IN 46556
Flaherty & Collins Gospel City Church
Art Smith 52277 Hickory Road
One Indiana Square, Suite 3000 Granger, IN 46530
Indianapolis, IN 46204
Aeroplex Syracuse & Wawasee Park Foundation
FM Stone Real Estate Jerry Wright
421 S. Second St. 1013 N. Long Drive
Elkhart, IN 46516 Syracuse, IN 46567
DJ Landscaping C&S Machine
4436 Broadmoor Ave 2929 Sarratore Dr
Grand Rapids, MI 49512 Niles, MI 49120
Altera
David Kline
600-888 Dunsmuir Street
Vancouver, BC 6C3K4
SECTION II - PLAN AND EQUIPMENT QUESTIONNAIRE
2. SUBCONTRACTORS LIST WORD PERFORMED:
Bailey Aggregates Aggregate Trucking
12609 Indianapolis Rd
Yoder, IN 46798-9733
Brusky Construction Aggregate Trucking
70569 Elizabeth St
Niles, MI 49120
V & R Trucking Aggregate Trucking
1845 Elmer St
South Bend, IN46628
Niblock Excavating, Inc. Asphalt Construction
PO Box 211
Bristol, IN 46507
Rieth-Riley Construction Co., Inc. Asphalt Construction
PO Box 477
Goshen, IN 46527-0477
Milestone Contractors North Asphalt Construction
1700 E. Main St.
Griffith, IN 46319-2999
Michigan Paving & Materials Co. Asphalt Construction
2300 Gendenning
Kalamazoo, MI 49003
Abonmarche Consultants, LLC. Construction Engineering
750 Lincolnway East
South Bend, IN 46601
Jones Petrie Rafinski, Inc. Construction Engineering
412 S. Lafayette Blvd
South Bend, IN 46601
1
SUBCONTRACTOR LIST continued WORK PERFORMED
Wightman & Associates Construction Engineering
2303 Pipestone Rd
Benton Harbor, MI 49022
Deversified Dewatering Dewatering
9150 96"' Ave.
Zeeland, MI 49464
Bender Electric Electrical Wiring
PO Box 143
Cassopolis, MI 49031
Hawk Enterprises, Inc. Electrical/Signal/Signage
1850 E. North Street
Crown Point, IN 46307
Custom Fence Co Fencing
PO Box 526
Niles, MI 49120
Mike's Fencing Fencing
68021 SR 19 North
Nappanee, IN 46550
Milestone Fence Fencing
13399 McKinley Hwy
Mishawaka, IN 46545
C-Tech Corporation Guard Rails
5300 W. 100 N.
Boggstown, IN 46110-9706
Lowe Construction Jack and Bore
2535 Bader Road
Horton, MI 49246
Weaver Consultants, LLC Laboratory Testing
7121 Grape Rd
Granger, IN 46530
2
SUBCONTRACTOR LIST continued WORK PERFORMED
Acorn Landscaping, LLC Landscape/Restoration
24930 Kern Rd.
South Bend, IN 46614-9787
Fuerbringer Landscaping & Design, Inc. Landscape/Restoration
25530 Brick Road
South Bend, IN 46628
Slussers Green Thumb, Inc. Landscape/Restoration
PO Box 33
Logansport, IN 46947-0033
Turf Services Landscape/Restoration
57780 Sink Road
Dowagiac, MI 49047
Ferguson Waterworks #1934 Lift Station Installation
1077 Oliver Plow Ct
South Bend, IN 46601
Best Sweeping Specialists, Inc. Road Sweeping/Dust Control
632 S. Sixth Street
Goshen, IN 46526
A-1 Striping Service, Inc. Road Striping
56825 Spirea Rd.
New Carlisle, IN 46552
The Airmarking Co., Inc. Road Striping
1544 North State Road 25
Rochester, IN 46975
Michiana Contracting, Inc. Traffic Signal Work
PO Box 929
Plymouth, IN 46563
Rathco Traffic Control
6742 Lovers Lane
Portage, MI 49002
3
SUBCONTRACTOR LIST (continued) WORK PERFORMED
Give `Em A Brake Traffic Control
2610 Sanford Ave
Grandville, MI 49418
State Barricading, Inc. Traffic Control
24963 U.S. 20 West
South Bend, IN 46628
KC Tree Tree Removal
1320 Third Street
Osceola, IN 46561
Payne's Services Tree Removal
30296 Redfield St
Niles, MI 49120
Construction Video Media Video Taping
111 E. Newberry St.
Romeo, MI 48065
Watson Tree Service, Inc. Tree Removal
2953 E. Detroit Road
Niles, MI 49120
S/T Bancroft Electric Electrical
25020 SR 2
South Bend, IN 46619
4
Selge Construction Co., Inc.
Equipment List
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YEAR
2
CAT 930M
2024
1
D20X22111 DIR DRILL
2024
1 IVERMEER
MX125 MIX
2024
1
VERMEER BEHNKE 12T
2024
2
KUBOTA RTV 1100CRL-A
2023
1
YANMAR VIO100
2023
1
GODWIN WELL POINT PUMP
2023
1
JOHN DEERE GATOR
2023
1
CAT 374 EXCAVATOR
2023
1
US CARGO 7X12 ENCLOSED TRAILER
2023
1
JOHN DEERE 470G LC FT4 EXCAVATOR
2022
1
YANMAR SV100-2A EXCAVATOR
2022
2
JOHN DEERE 544L WHEEL LOADER
2021
1
VOLVO EWR170E WHEELED EXCAVATOR
2021
1
TRAIL KING TKT16 TILT
2021
1
TOWMASTER T16T DECKOVER TRAILER
2021
1
JOHN DEERE 245G LC EXCAVATOR
2020
1
VOLVO ECR355E EXCAVATOR
2020
1
IMPACT CONSTRUCTION TRAILER
2020
1
JOHN DEERE 345G LC EXCAVATOR
2020
1
2020 JOHN DEERE 650K II CRAWLER DOZER W/GPS
2020
1
VOLVO ECR145E EXCAVATOR
2020
1
DUAL SOCK TRACKER FOR JD EXCAVATOR
2019
1
YANMAR V1035 MINI EXCAVATOR
2019
2
JOHN DEERE 544K II 4WD LOADERS
2018
2
JOHN DEERE 624K II 4WD LOADERS
2018
2
MACK GU813 SEMI
2018
1
KENWORTH T880 DUMP
2018
1
2"-8" DIP BUTT FUSION MACHINE
2018
1
DCI FS FALCON LOATING SYSTEM
2018
1
VERMEER D40X55 S3 DIRECTIONAL DRILL
2018
2
HAMM H101 SMOOTH DRUM COMPACTOR/ ROLLER
2018
1
2018 BOMAD BW 120 COMPACTOR / ROLLER
2018
1
GODWIN CD150M TRASH/BY-PASS PUMP
2018
1
YANMAR V1055 MINI EXCAVATOR
2018
1
PETERBILT 567 DUMP
2017
1
ROFHDR ROADWIDENER
2017
1
JOHN DEERE 344K LOADER
2017
1
MULTIQUIP CONCRETE MIXER
2017
5
ARTIC HD 17 SNOW PLOWS
2017
1
ARTIC HD14 SNOW BOX
2017
1
ROAD WIDENER W/DUAL REMOVE
2017
1
VS 63-20-D Grout Machine
2016
2
VOLVO A30G ARTICULATING DUMP TRUCK
2016
1
YANMAR V1080 MINI EXCAVATOR
2016
1
KENWORTH T-800 CUMMINS TRACTOR
2016
1
DITCH WITCH TRACKER WITH BEACON/DISPLAY
2016
9
CATERPILLAR COMPACT TRACK LOADERS
2016
1
1 McLAUGHLIN VX30-500 VACUUM EXCAVATOR
2016
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YANMAR Vio35-6 MINI EXCAVATORS
YEAR
2
2016
1
YANMAR Vio45 MINI EXCAVATOR
2016
1
MACK DUMP TRUCK MODEL GU813
2015
1
ETNYRE TRAILER WITH 4TH FLIP AXLE
2015
1
JOHN DEERE 245 LC EXCAVATOR
2015
3
ARTIC SNOW PUSHER PLOWS W/QUICK COUPLERS
2015
2
YANMAR V1055 MINI EXCAVATOR
2015
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
WESTERN PLOWS
YEAR
3
2015
1
ISCO FUSION MACHINE
2014
2
JOHN DEERE 245 LC EXCAVATOR
2014
1
JOHN DEERE 544K 4WD LOADER
2014
2
MOVAX-SP60 HAMMERS
2013
1
JOHN DEERE 700K DOZER
2012
1
JOHN DEERE 650K DOZER
2012
3
JOHN DEERE 544K LOADERS
2012
1
CATERPILLAR CH 85E TRACTOR
2010
2
ROME SCRAPER PANS
2010
1
12" - 36" BUTT FUSION MACHINE
2009
1
VERMEER D100 X 120 NAVIGATOR W. ATTACHMENTS
2009
1
YAN MAR V1075 EXCAVATOR
2008
1
MR MANHOLE CUTTER EXTRACTOR & AUGER
2008
1
CATERPILLAR 321CLCR EXCAVATOR
2007
1
CATERPILLAR 314 CLCR EXCAVATOR
2007
1
D36X50 NAVIGATOR
2006
1
DUAL ELECTRIC MAST SYSTEM (LAZER FOR DOZER
2006
2
DITCH WITCH VAC SYSTEM W/TRAILER
2006
1
ROADTEC RX700-4 MILLING MACHINE
2006
1
IHI IC30-2 CRAWLER CARRIER
2006
1
JOHN DEERE 450D EXCAVATOR
2006
1
KENWORTH DUMP TRUCK
2006
1
DITCH WITCH JT27T2 WITH ATTACH./PIPE
2005
1
DITCH WITCH JT2020 WITH ATTACH./PIPE
2005
3
JOHN DEERE LOADERS MODEL 544J
2005
1
FELCO MINI CONVEYOR
2005
1
DITCH WITCH SK500 UNIT W/AUGER & TRENCHER
2004
2
FELCO COMPACTION BUCKETS
2004
1
SCISSOR LIFT
2004
1
CATERPILLAR CH85 CHALLENGER TRACTOR
2003
2
MISKIN SP-C17 SCRAPERS
2003
1
DYNA-PACK MODEL CC122 VIBRATORY ROLLER
2003
1
AMERICAN AUGER BORING MACHINE
2003
1
HEIL TANKER TRAILER
2002
1
KUBOTA L3010HST TRACTOR
2002
1
TRAILER EXPESS 18' FLATBED TANDEM AXLE TRAILER
2002
1
TC-600 TEXTURE/CURE MACHINE & ACCESSORIES
2002
1
CURB FORM C55629
2002
1
FELCO 30 X 60 COMPACTOR BUCKET
2002
1
KOMATSU WA120-3 WHEEL LOADER
2001
1
EASI-POUR COMPACT 880 SLIPFORM TRIMMER/PAVER
2001
1
BOBCAT SKID STEER LOADER, MODEL 773K
2001
1
TREMIX COMPACTOR MODEL MV80
2001
3
JOHN DEERE 1-650H, 2-550H CRAWLER DOZERS
2001
1
KENWORTH DUMP TRUCK
2001
1
FREIGHTLINER FL80 DUMP TRUCK
2000
1
FREIGHTLINER FL112 DUMP TRUCK
2000
1
PMD 800 VAC-TRON VACUUM
2000
1
VERMEER T-555 TRACK TRENCHER
2000
1
DITCH WITCH JT7020 BORING UNIT
2000
1
MCS-325 PORTABLE BENTONITE MIXING & RECYCLING SYSTEM
2000
1
VOLVO L70D WHEEL LOADER 3
2000
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YEAR
1
CATERPILLAR 930 WHEEL LOADER
2000
1
DITCH WITCH JET TRAC MODEL 920L W/ MUD MIXER, SUBSITE ATT,
1999
1
ROSCO RB48 SWEEPER, WITH SNOW PLOW
1999
1
920L DITCH WITCH DIRECTION BORE SYSTEM
1999
1
CHAMPION 730A VHP MOTOR GRADER
1999
1
CMI SF3002 SLIPFORM PAVER
1999
1
TEREX TA30 ARTICULATED DUMP TRUCK
1998
1
FORD F800 DUMP TRUCK
1998
1
CLEAN EARTH SFE-JET-VAC
1998
1
MCELROY #412 HYDRAULIC FUSION UNIT
1998
1
BELSHE T9 TRAILER
1998
1
NPK 8XA HYDRAULIC HAMMER
1998
1
FELCO VIBRATORY COMPACTOR BUCKET
1998
1
JCB 411 TOOL CARRIER, WITH FORKS
1998
1
INTERNATIONAL 4900 6 X 6 WATER TRUCK
1998
1
MACK CL713 TRACTOR
1997
1
VERMEER D-24x40 NAVIGATOR DIRECTIONAL BORE SYSTEM
1997
1
FINN HYDROSEEDER W/ ATTACH., GROUNDHOG
1997
1
MACK CL713 DUMP TRUCK
1996
1
MACK RD68 TRACTOR
1996
1
MACK TRACTOR MODEL CL713
1996
1
CATERPILLAR MODEL CS433 COMPACTOR
1996
1
PEMBERTON 72" DITCH CL. BUCKET FOR CAT 300LE
1996
1
PC200-6 KOMATSU EXCAVATOR
1996
1
MACK TRACTOR, MODEL CL713
1995
1
VERMEER 4" LW HAMMERHEAD MOLE
1995
1
VERMEER 3" HAMMERHEAD MOLE
1995
1
DITCH WITCH DIRECTIONAL BORE SYSTEM
1995
1
MELROE 853C BOBCAT
1995
1
CATERPILLAR HYD. EXCAVATOR MODEL 325L
1994
1
CATERPILLAR HYD EXCAVATOR MODEL 330L 3CY
1994
1
IJOHN DEERE 624G LOADER 3 1/2 YD.
1994
1
JOHN DEERE 955 4WD TRACTOR W/TILLER AND BROOM
1994
1
FELCO BEDDING CONVEYOR, STAND. SLIDER, W/2' EXTENSION
1994
1
FORD TRACTOR MODEL LN 8000
1993
1
GMC WHITE TRACTOR TRUCK
1993
1
CATERPILLAR D5C DOZER
1992
1
JOHN DEERE 955 TRACTOR W/TILLER, BOX SCRAPER, BROOM
1991
1
FELCO ROLLER BEDDING CONVEYOR W/6 CY HOPPER
1991
1
JOHN DEERE 544 RUBBER TIRE LOADERS
1990
1
JOHN DEERE 455G CRAWLER LOADER
1989
1
KOEHRING 6644 HYD. EXCAVATOR 3 1/2 YD.
1988
1
FORD F800 UTILITY TRAILER WITH HI RANGER
1985
1
JOHN DEERE 570A ROAD GRADER
1980
1
KOEHRING 866 HYD. BACK HOE 4 YD.
1979
1
CATERPILLAR D4C DOZER SERIES 3
1979
1
FERGUSON TANDEM DRUM VIBRATOR ROLLER
1979
1
HARTMAN FABCO CONVEYOR
1979
1
EARTH BORING MACHINE 48" AND ACCESSORIES
1975
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
INTERNATIONAL T.D. DOZER
YEAR
1
1972
1
BLAW-KNOX RW 195 ROAD WIDNER
1970
2
KOEHRING 505 HYD. BACK HOE 2 112 YD.
1969 & 70
WITH 6 CYLINDER HOPPER
1 150 KW CAT. GENERATOR, ELECTRIC PUMPS, DEEP WELLS,
HYDRAULIC CLAM, ETC., COMPLETE
1 ONAN 30 KW STANDBY POWER ENGINE GENERATOR, TRAILER
MOUNTED, W/CABLE & DIESEL FUEL TANKS, SUBMERSIBLE
SEWER PUMP
CEMENT SAWS, AIR COMPRESSORS, WELL POINT PUMPS, WELL
POINTING EQUIPMENT, 4000 GAL. WATER TANKER & JET PUMP,
BROOMS, SHOP TRAILERS, 3 FIELD OFFICE TRAILERS,
COMPACTORS, POWER MORTAR MIXERS, TAMPERS, LASER
BEAMS, SMALL TOOLS, 3 TANDEM DUMP TRUCKS, 1 SEMI -
DUMP TRAILER, 4 LOWBOY TRAILERS, 3 TRUCK TRACTORS,
PORTABLE TRAFFIC LIGHTS, PORTABLE FLASHING SIGN, STEEL
SHEETS, GENERATORS, PAVING BREAKERS, ROCK DRILLS,
TRENCH BOXES, WELLS CARGO PUMP TRAILER, 3 WELLS
CARGO TOOL TRAILERS, WELLS CARGO CYCLE WAGON,
1 FRUEHAUF TRAILER, HENDERSON BLADE RAKE, PROSSER PUMPS,
VIBRATORY ASPHALT PLATE, 1255HP DIALGRADE LASERS,
INGERSOLL-RAND LIGHT TOWER, TAG TRAILER, ROSCO SWEEPER,
FORKLIFT, CURB FORMS, DITCH WITCH SUB SITES, GENERATORS,
VARIOUS BUCKETS, DUAL ELECTRIC MAST SYSTEM (LAZER FOR
DOZER), VARIOUS TRAILERS, TEREX PAVING KIT, REROUND TOOL,
SCRAPER TOOL, ELECTRIC PROCESSOR, 24" DIPS INSERT SET,
HEATER ASSEMBLY FOR FUSION MACHINE, AUGER
VERMEER DIRECTIONAL DRILL, LOCATORS
5
Selge Construction Company, Inc.
Financial Report
February 28, 2025
Contents
Independent auditors report 1-2
Financial statements
Balance sheets
Statements of income
Statements of stockholders' equity
Statements of cash flows
Notes to financial statements
Supplementary information
7-16
Schedules of construction and general and administrative expenses 17
Independent Auditor's Report
Board of Directors
Selge Construction Company, Inc.
RSM US LLP
Opinion
We have audited the financial statements of Selge Construction Company, Inc. (the Company), which
comprise the balance sheets as of February 28, 2025 and February 29, 2024, the related statements of
income, stockholders' equity, and cash flows for the years then ended, and the related notes to the
financial statements.
In our opinion, the accompanying financial statements present fairly, in all material respects, the financial
position of the Company as of February 28, 2025 and February 29, 2024, and the results of its operations
and its cash flows for the years then ended in accordance with accounting principles generally accepted
in the United States of America.
Basis for Opinion
We conducted our audits in accordance with auditing standards generally accepted in the United States
of America (GARS). Our responsibilities under those standards are further described in the Auditor's
Responsibilities for the Audit of the Financial Statements section of our report. We are required to be
independent of the Company and to meet our other ethical responsibilities, in accordance with the
relevant ethical requirements relating to our audits. We believe that the audit evidence we have obtained
is sufficient and appropriate to provide a basis for our audit opinion.
Responsibilities of Management for the Financial Statements
Management is responsible for the preparation and fair presentation of the financial statements in
accordance with accounting principles generally accepted in the United States of America, and for the
design, implementation, and maintenance of internal control relevant to the preparation and fair
presentation of financial statements that are free from material misstatement, whether due to fraud or
error.
In preparing the financial statements, management is required to evaluate whether there are conditions or
events, considered in the aggregate, that raise substantial doubt about the Company's ability to continue
as a going concern within one year after the date that the financial statements are issued or available to
be issued.
Auditor's Responsibilities for the Audit of the Financial Statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are
free from material misstatement, whether due to fraud or error, and to issue an auditor's report that
includes our opinion. Reasonable assurance is a high level of assurance but is not absolute assurance
and therefore is not a guarantee that an audit conducted in accordance with GAAS will always detect a
material misstatement when it exists. The risk of not detecting a material misstatement resulting from
fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional
omissions, misrepresentations, or the override of internal control. Misstatements are considered material
if there is a substantial likelihood that, individually or in the aggregate, thev would influence the iudament
made by a reasonable user based on the financial statements.
THE POWER OF BEING UNDERSTOOD
ASSURANCE I TAX I CONSULTING
RSM US LLP is the US member firm of RSM International, a global network of independent assurance tax, and consulth. fi, ms
Visit rsmus.com/aboutus for more information regarding RSM US LLP and RSM International
In performing an audit in accordance with GAAS, we:
• Exercise professional judgment and maintain professional skepticism throughout the audit.
• Identify and assess the risks of material misstatement of the financial statements, whether due to
fraud or error, and design and perform audit procedures responsive to those risks. Such procedures
include examining, on a test basis, evidence regarding the amounts and disclosures in the financial
statements.
• Obtain an understanding of internal control relevant to the audit in order to design audit procedures
that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the
effectiveness of the Company's internal control. Accordingly, no such opinion is expressed.
• Evaluate the appropriateness of accounting policies used and the reasonableness of significant
accounting estimates made by management, as well as evaluate the overall presentation of the
financial statements.
• Conclude whether, in our judgment, there are conditions or events, considered in the aggregate, that
raise substantial doubt about the Company's ability to continue as a going concern for a reasonable
period of time.
We are required to communicate with those charged with governance regarding, among other matters,
the planned scope and timing of the audit, significant audit findings, and certain internal control -related
matters that we identified during the audit.
Other Matters
Our audit was conducted for the purpose of forming an opinion on the financial statements as a whole.
The accompanying supplementary schedule of construction and general and administrative expenses is
presented for purposes of additional analysis is not a required part of the financial statements. Such
information is the responsibility of management and was derived from and relates directly to the
underlying accounting and other records used to prepare the financial statements. The information has
been subjected to the auditing procedures applied in the audit of the financial statements and certain
additional procedures, including comparing and reconciling such information directly to the underlying
accounting and other records used to prepare the financial statements or to the financial statements
themselves, and other additional procedures in accordance with auditing standards generally accepted in
the United States of America. In our opinion, the information is fairly stated in all material respects in
relation to the financial statements as a whole.
,p-sR as ".)p
Mishawaka, Indiana
June 6, 2025
2
Selge Construction Company, Inc.
Notes to Financial Statements
Note 1. Nature of Business and Significant Accounting Policies
Nature of business: Selge Construction Company, Inc. (the Company) is a commercial contractor
specializing in the construction of underground sewer and water mains. The Company's contracts are
typically with businesses and municipalities in northern Indiana and southern Michigan.
Significant accounting policies:
Use of estimates: The preparation of financial statements in conformity with accounting principles
generally accepted in the United States of America requires management to make estimates and
assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets
and liabilities at the date of the financial statements and the reported amounts of revenues and expenses
during the reporting period. Accordingly, actual results could differ from those estimates.
Variable interest entity: The Company has elected an accounting alternative as provided for in
Accounting Standards Update (ASU) No. 2018-17, Consolidation (Topic 810): Targeted Improvements to
Related Party Guidance for Variable Interest Entities, issued by the Financial Accounting Standards
Board (FASB). Pursuant to this election, the Company did not apply the variable interest entity (VIE)
guidance in Accounting Standards Codification (ASC) 810 to assess certain entities under common
control for consolidation for the years ended February 28, 2025 and February 29, 2024. See Note 11 for
additional information.
Cash: The Company has cash on deposit in financial institutions which, at times, may be in excess of
Federal Deposit Insurance Corporation limits.
Certificates of deposit: The certificates of deposit consist of accumulated cash from operations and
range in maturity date from 90 days to one year. The Company accounts for the certificates of deposit at
cost.
Contract receivables: Contract receivables are carried at original invoice amount less an estimate made
for credit losses based on a review of all outstanding amounts on a monthly basis. Contract receivables in
the accompanying balance sheets at February 28, 2025 and February 29, 2024, are stated net of an
allowance for credit losses of $15,000. Management determines the allowance for credit losses by
identifying troubled accounts and by using historical experience applied to an aging of accounts. Contract
receivables are written off when deemed uncollectible. Recoveries of contract receivables previously
written off are recorded when received. A contract receivable is considered past due if any portion of the
receivable balance is outstanding for more than 30 days. The Company generally does not charge
interest on past due receivables.
Contract receivables represent amounts billed to customers under customary industry credit terms. In
accordance with construction industry practice, retainage is a portion of the final payment of a contract
that is withheld until the project is complete in accordance with the terms of the contract. The Company
records retainage receivables on long-term contracts as a component of receivables. Retainage amounts
outstanding at February 28, 2025 and February 29, 2024, are approximately $1,091,500 and $2,525,800,
respectively.
Property and equipment: Improvements and betterments are capitalized; routine maintenance and
repairs are charged to expense as incurred. When equipment is retired or otherwise disposed of, the cost
and related accumulated depreciation are removed from the respective accounts and any gains or losses
arising from the disposition are reflected in construction expenses.
Selge Construction Company, Inc.
Notes to Financial Statements
Note 1. Nature of Business and Significant Accounting Policies (Continued)
Depreciation of property and equipment is computed principally by the straight-line method over the
estimated useful lives of the related assets as follows:
Years
Buildings and improvements 5-39
Construction equipment 5-10
Automotive and trucks 5-7
Office equipment 3-15
Long-lived assets: In accordance with accounting standards, the Company reviews its long-lived assets
periodically to determine potential impairment by comparing the value of the long-lived assets with the
estimated future net undiscounted cash flows expected to result from the use of the assets, including
cash flows from disposition. Should the sum of the expected future net cash flows be less than the
carrying value of the related asset, the Company would recognize an impairment loss at that date. An
impairment loss would be measured by comparing the amount by which the carrying value exceeds the
fair value of the long-lived assets. During the years ended February 28, 2025 and February 29, 2024, the
Company determined that no impairment loss was necessary.
Revenue recognition: The Company utilizes the percentage -of -completion method for reporting revenue
on the majority of its construction contracts. Under this method, revenue is recognized based on the
Company's estimate of job completion. See Note 2 for further information on the Company's revenue
recognition.
Income taxes: The Company, with the consent of its stockholders, has elected to have its income taxed
under Section 1362 of the Internal Revenue Code and a similar section of the state tax laws which
provide that, in lieu of corporate income taxes, the stockholders account for their proportionate share of
the Company's items of income, deduction, losses and credits. It is the Company's intent to make
distributions to stockholders for their individual income tax liabilities relating from the Company's income.
Management has evaluated the Company's tax positions and concluded that the Company has taken no
uncertain tax positions that require adjustment to the financial statements to comply with the provisions of
accounting guidance for uncertainty in income taxes.
The Company files income tax returns in the U.S. federal, Indiana and Michigan jurisdictions. With few
exceptions, the Company is no longer subject to tax examinations by the U.S. federal, state or local tax
authorities for years before the Company's fiscal and tax year end of February 28, 2022.
The Company is required at times to make federal tax deposits in order to retain its fiscal year end. The
federal tax deposit of approximately $176,000 at February 28, 2025 and $798,000 at February 29, 2024,
is reflected as a long-term asset in the Company's accompanying balance sheets.
Leases: The Company determines if an arrangement is or contains a lease at inception, which is the date
on which the terms of the contract are agreed to, and the agreement creates enforceable rights and
obligations. A contract is or contains a lease when: (i) explicitly or implicitly identified assets have been
deployed in the contract and (ii) the Company obtains substantially all of the economic benefits from the
use of that underlying asset and directs how and for what purpose the asset is used during the term of the
contract. The Company also considers whether its service arrangements include the right to control the
use of an asset.
Selge Construction Company, Inc.
Notes to Financial Statements
Note 1. Nature of Business and Significant Accounting Policies (Continued)
The Company recognizes leases on its balance sheets as a right -of -use (ROU) asset representing the
right to use an underlying asset and a lease liability representing the obligation to make lease payments
over the lease term, measured on a discounted basis. Leases are classified as either finance leases or
operating leases based on certain criteria. Classification of the lease affects the pattern of expense
recognition in the income statement.
The Company made an accounting policy election available under Topic 842 not to recognize ROU
assets and lease liabilities for leases with a term of 12 months or less. For all other leases, ROU assets
and lease liabilities are measured based on the present value of future lease payments over the lease
term at the commencement date of the lease. To determine the present value of lease payments, the
Company made an accounting policy election available to non-public companies to utilize a risk -free
borrowing rate, which is aligned with the lease term at the lease commencement date.
Future lease payments may include fixed rent escalation clauses or payments that depend on an index
(such as the consumer price index), which is initially measured using the index or rate at lease
commencement. Subsequent changes of an index and other periodic market -rate adjustments to base
rent are recorded in variable lease expense in the period incurred. Residual value guarantees or
payments for terminating the lease are included in the lease payments only when it is probable they will
be incurred.
Reclassification: Certain prior -year amounts have been reclassified to conform with current -year
presentation. Such reclassifications had no effect on previously recorded net income.
Subsequent events: The Company has evaluated subsequent events for recognition and disclosure
through June 6, 2025, which is the date the Company's financial statements were available to be issued.
Note 2. Revenue Recognition
The Company primarily generates revenue from fixed -price contracts in the construction of underground
sewer and water mains. The Company recognizes revenue over time using the percentage -of -completion
method. The Company's contracts are generally considered to be a single performance obligation
because the Company provides a significant service of integrating a complex set of tasks and
components. Management has concluded performance obligations related to construction contracts are
satisfied over time because the Company's performance typically creates or enhances an asset that the
customer controls as the asset is created or enhanced. The Company recognizes revenue as
performance obligations are satisfied and control of the promised good and/or service is transferred to the
customer.
The Company's performance obligations are satisfied with the transfer of control utilizing the cost -to -cost
measure of progress. The cost of revenue includes all direct material, subcontracts, labor, and other
miscellaneous direct costs. General and administrative costs and those indirect costs related to contract
performance, such as indirect labor, supplies, tools, repairs and depreciation costs are charged to
expense as incurred. Pre -contract costs are generally expensed as incurred.
Changes in job performance and revisions in cost and profit estimates are reflected in the accounting
period in which the facts requiring the revisions become known. At the time a loss on a contract becomes
foreseeable, the entire amount of the estimated loss is accrued. Under the cost -to -cost approach, use of
estimated costs to complete each performance obligation is a significant variable in the progress of
determining and recognizing revenue and is a significant factor in the accounting for such performance
obligations.
Document A31OTM - 2010
Conforms with The American Institute of Architects AIA Document 310
Bid Bond
CONTRACTOR:
(Name, legal status and address)
Selge Construction Co., Inc.
2833 South 11 th Street
Niles, MI 49120
OWNER:
(Name. legal stales and address)
SURETY:
(Name, legal status and principal place l jhucdote v)
The Cincinnati Insurance Company
P.O. Box 145496
Cincinnati, OH 45250-5496
Mailing Address for Notices
Same as above
City of South Bend, Indiana, Board of Public Works
227 West Jefferson Boulevard
South Bend, IN 46601
BOND AMOUNT: 5% Five Percent of Amount Bid
PROJECT:
(.Vann locado►r oraddretx andl'rojectnumber, ifany)
This document has important
legal consequences. Consultation
with an attorney is encouraged
with respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
Grand Trunk Western Railroad Water Main Replacement at Greenlawn Avenue (Division 1) and S. 30th St
(Division 2) Project 122-041
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind
themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this
Bond arc such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period
as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract % ith the Owner in accordance with
the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract documents, with a surety admitted in
tim jurisdiction of the Project and otherwise acceptable to the Owtimer, for the faithful porformanec of such Contract and for the prompt
payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of
this Bond. between the anmount specified in said bid and such larger amount for which the Owner may in good faith contract with another
party to perform the work covered by grid bid, then this obligation shall be null and void, otherwise Um remain in full force and ell'ect. The
Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the
bid. Waiver ol'notice by the Surety shall not apply to any extension exceeding sixty (60) clays in the aggregate be)ind the time lbr
acceptance ol'bids %?ccilied in the bid documents, and the O«mmerand Contractor shall obtain the SureWs consent litran extension beyond
sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be
Subcontractor and tic term Owncr shall be deemed to be Contractor.
When this Ilanid has heeu furnished to comply iviih a %lalutory or other legal requirement in the location ol'lhe Pmjcel, any provision in
this Bond conliiating with said statutory or legal requirement shall be deemed deleted herefrom and provisions confor migg to such
slatutory or other legal requirement shall be deemed incorpontled herein. When so furnished, the intent is that this Band %hall be construed
as a %latulory bind and not a%a common law bond.
Signed and scaled this 22nd day of July, 2025.
_ L.
(l1=ll►►ess1 Allison Swinehart, Corp. Secretary
Sel a Construction Co., Inc.
(PHnelpal) (Seal)
By: l`�p 4��=
(-1rle) Robert P. Kuhns, PE, VP Estimating
The Cincinnati Insurance Company
(fBmaray) (.Belli) All CORPORATES
(ninaxe) David J. Roth S E A L
By:
Mde)Tracie House, Attorney -in -Fact
S-00541AS 8110
THE CINCINNATI INSURANCE COMPANY
THE CINCINNATI CASUALTY COMPANY
Fairfield, Ohio
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY and THE CINCINNATI CASUALTY
COMPANY, corporations organized under the laws of the State of Ohio, and having their principal offices in the City of Fairfield,
Ohio (herein collectively called the "Companies"), do hereby constitute and appoint Tracie House
its true and legal Attorney -in -Fact to sign and deliver on behalf of the Companies as Surety, at any place within the United States,
the following surety bond:
Surety Bond Number: Bid Bond
Principal; Selge Construction Co., Inc.
Obligee: City of South Bend, Indiana, Board of Public Works
This appointment is made under and by authority of the following resolutions adopted by the Boards of Directors of The Cincinnati
Insurance Company and The Cincinnati Casualty Company, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the President or any Senior Vice President be hereby authorized, and empowered to appoint Attorneys -in -Fact
of the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation, and
may authorize any officer or any such Attomey-in-Fact to affix the corporate seal; and may with or without cause modify or
revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the
Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company.
RESOLVED, that the signature of the President or any Senior Vice President and the seal of the Company may be affixed by
facsimile on any power of attorney granted, and the signature of the Secretary or Assistant Vice -President and the Seal of the
Company may be affixed by facsimile to any certificate of any such power and any such power of certificate bearing such
facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed and certified
by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid
and binding on the Company.
IN WITNESS WHEREOF, the Companies have caused these presents to be sealed with their corporate seals, duly attested by their
President or any Senior Vice President this 16th day of March, 2021.
e
e
STATE OF OHIO )SS:
COUNTY OF BUTLER )
THE CINCINNATI INSURANCE COMPANY
THE CINCINNATI CASUALTY COMPANY
On this 16th day of March, 2021 before me came the above -named President or Senior Vice President of The Cincinnati Insurance
Company and The Cincinnati Casualty Company, to me personally known to be the officer described herein, and acknowledged that the
seals affixed to the preceding instrument are the corporate seals of said Companies and the corporate seals and the signature of the
officer were duly affixed and subscribed to said instrument by the authority and direction of said corporations.
Keith Ctt, Attorney at Law
Notary Public — State of Ohio
My commission has no expiration date.
Section 147.03 O.R.C.
I, the undersigned Secretary or Assistant Vice -President of The Cincinnati Insurance Company and The Cincinnati Casualty Company,
hereby certify that the above is the Original Power of Attorney issued by said Companies, and do hereby further certify that the said
Power of Attorney is still in full force and effect.
Given under my hand and seal of said Companies at Fairfield, Ohio, this 22nd day of July 12025 .
dmvr� �aNsy��
{4
[DRPDRAiE _' Y [DRPQRAif
=SEAL' 'SEAL"
ox[a eaw
BN-1457-S (3121)
1316 COUNTY -CITY BUILDING %� -^ .� PHONE 574/ 235-9251
227 W. JEFFERSON BOULEVARD !t3iFi FAX 574/ 235-9171
SOUTH BEND, INDIANA 46601-1830 TDD 574/ 235-5567
CITY OF SOUTH BEND, JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: July 18, 2025
To: All Planholders
From Hillary Horvath, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name:
Grand Trunk Western Watermain Replacement at Greenlawn Avenue and S. 30111
Street
Project Number: 122-041
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
1' -- -.
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
Tl-CIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized �ignature:
�` r L•
Date:
Version 4/2/2015
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Grand Trunk Western Water Main Replacement at S 30' St & Greenlawn
Avenue
Project No. 122-041
For Bids Due July 22, 2025
Contractor Name: SelQe Construction CO.. Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section
6-71 of The Responsible Bidding Ordinance No. 10975-23 (hereinafter, "Responsible Bidding
Ordinance") for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31st for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-71 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-71 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
,r:
Version 05/20/11 General Conditions - 11
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-72 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least two -hundred fifty
thousand dollars ($250,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder for projects greater than $250,000 and all subcontractors performing
work greater than $250,000 on a public works project are required to submit certified payroll
utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted
within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify
the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 05/20/12 General Conditions -12
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(iii) X By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(iv) X By checking this box, I hereby acknowledge that all subcontractors performing
work greater than $250,000 also meet the qualifications of the Responsible
Bidder Ordinance.
(b) Attachments:
(i) X Indiana Secretary of State's on-line records (ie. Business verification) dated
within sixty (60) days of the submission of said document showing that
business is in existence, current with the Indiana Secretary of State's Business
Entity Report, and eligible for a certificate of good standing. (Not applicable to
individuals, sole proprietors or partnerships).
X Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
x List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) X For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 05/20/13 General Conditions - 13
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(v) By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(vi) By checking this box, I hereby acknowledge that all subcontractors performing
work greater than $250,000 also meet the qualifications of the Responsible
Bidder Ordinance.
(b) Attachments:
Indiana Secretary of State's on-line records (ie. Business verification) dated
within sixty (60) days of the submission of said document showing that
business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 05/20/14 General Conditions - 14
(vii) Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in
the bid specifications or contract.
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(x) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: 7.22.25
(Sign Here)
Robert P. Kuhns, PE, VP Estimating
(Print Name Here)
Selge Construction Co., Inc.
(Name of Company)
2833 South 11 th Street
(Address of Company)
Niles
(City)
Michigan
(State)
269-684-0842
(Telephone Number)
Version 05/20/2024 General Conditions -15
ary OF Sou m BEND JAmEs MUEuJ R, MAYOR
DEPARTMENT OF PUBLIC WORKS
ERW HORVAM DBWX i'OR
December 19, 2024
Allison Swineha;rt
Selge Ccanstruction Company
aswinchart&e,lgeconsriuction.com
13E: Pre.Qujalification Verification
Deer Ms. Swkwheri;
This letter serves as verification of PzF Qualification status of your company for bidding
with the City of South Bend, This Pre -Qualification status is effective for twelve (12)
months fmm the date of dais letter. Thereafter you are required to re -submit a complete
appliratiaa fox oonii=tion ofpre _qualificatiaa status within twelve (12) months from the
date of this limber.
A copy of this verification Letter must be included with every bid exceeding $250,000
submitted to the City of South Bend Board Of Pubhe Work.% along with your Pre -Qualified
Bidder Checklist and attachments.
Yfyou have any hither questions zegarding this matter, Please call this office at (574) 235-
9251
sincerely, '
Tara Bussell, Permit Manager
State of Indiana
Office of the Secretary of State
Certified Copies
To Whom These Presents Come, Greeting:
I, DIEGO MORALES, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws
of the State of Indiana, the custodian of the corporate records and the proper official to execute
this certificate.
I further certify that this is a true and complete copy of this 2 page document consisting of the
following records filed in this office:
Certification Date:
Business Name:
Business ID:
Transaction
July 21, 2025
SELGE CONSTRUCTION CO INC
197203-307
Change of Governing Person
Date Filed
04/18/2025
Total No. of pages
No. of pages
2
2
""""• �'.•��s In Witness Whereof, I have caused to be affixed my
••':A� signature and the seal of the State of Indiana, at the
City of Indianapolis, July 21, 2025
- Z
F
•■•.••••••' DIEGO MORALES
SECRETARY OF STATE
197203-307 / 17953008
All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate
Expires on August 20, 2025.
Page 1 Of 3 CertificateID:17953008
APPROVED AND FILED
DIEGO MORALES
INDIANA SECRETARY OF STATE
04/18/2025 12:49 PM
CHAINGE OF GOVERNING PERSON
ME AND PRINCIPAL OFFICE ADDRE$$:
Ni
BUSINESS ID 197203-307
BUSINESS TYPE Foreign For -Profit Corporation
BUSINESS NAME SELGE CONSTRUCTION CO INC
PRINCIPAL OFFICE ADDRESS 2833 S. 1lth Street, NILES, MI, 49120, USA
EFFECTIVE DATE
EFFECTIVE TIME
04/18/2025
12:46PM
GOVERNING PERSON INFORMATION
TITLE Vice President
NAME Jim Boyles
ADDRESS 2833 S 11TH ST., NILES, MI, 49120, USA
TITLE Secretary
NAME Allison Swinehart
ADDRESS 2833 S. I Ith Street, Niles, MI, 49120, USA
TITLE Treasurer
NAME Marvin L Selge JR.
ADDRESS 2833 S. 11th Street, Niles, MI, 49120, USA
TITLE
President
NAME
Justin Butler
ADDRESS
2833 S. 1lth Street, Niles, MI, 49120, USA
I
Page 2 Of 3 CertificateID:17953008,
APPROVED AND FILED
DIEGO MORALES
INDIANA SECRETARY OF STATE
04/18/2025 12:49 PM
IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE
STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY April 18, 2025.
THE UNDERSIGNED ACKNOWLEDGES THAT A PERSON COMMITS.A CLASS A MISDEMEANOR BY SIGNING A
DOCUMENT THAT THE PERSON KNOWS IS FALSE IN A MATERIAL RESPECT WITH THE INTENT THAT THE DOCUMENT
BE DELIVERED TO THE SECRETARY OF STATE FOR FILING.
SIGNATURE ALLISON SWINEHART
TITLE
Secretary
Business ID : 197203-307
Filing No.: 10800200
Page 3 Of 3 CertificateID:17953008-
IL �E -.
�r
2833 S. 11 n, street
Niles, Michigan 49120
P:269.684.0842 F:269.684.0846
uwvnv.se} ecanstruclion.con,
Selge Construction Staffing Capabilities and Employee
Statement
Selge Construction Co., Inc. is proud to be part of the Christian Labor
Association (CLA), Local Union 10. Being part of the CLA provides an organized
workforce that has gone through rigorous training and provides premium pay and
benefits to everyone on staff. Our team is comprised of 85individuals (19 office
members and 66 field personnel). The team is made up of male, female, and
minority members. The average employee has been with Selge Construction for
17 years.
Each person on your project will be properly classified as an employee under all
applicable state and federal laws and local ordinances. Selge has never
defaulted on a contract, and we do not bid any work that we cannot complete.
Based on our current schedule and capabilities, we will utilize 100% Selge
employees and equipment for your project. We do not foresee any issues being
able to complete the project within the designated schedule. Let there be no
doubt that Selge Construction has sufficient employees and resources to
complete any work that is bid on.
SELGE CONSTRUCTION CO., INC.
COMPLETED PROJECT DESCRIPTIONS
Description:
MOT R38065C — Coal Line SJ Co. Bike & Ped Path Phase II (734) — Owner: Indiana
Department of Transportation. Bike and pedestrian path along the Coal Line Trail from
Northshore Drive to East Bank Trail Phase II in the City of South Bend. $1,939,039.00.
Completed: 2024.
Description:
MOT R37502A — Auten Road Bike & Ped Facilities (714) — Owner: Indiana Department of
Transportation. Bike and pedestrian path along Auten Road from Laurel Road to SR 933.
$888,813.00. Completed: 2024.
Description:
IIYDOT R38064A — Coal Line SJ Co. Bike & Ped Path (689) — Owner: Indiana Department of
Transportation. Bike and pedestrian path along the Coal Line Trail from Lincolnway West to
Riverside Drive. $1,976,699.00. Completed: 2024.
Description:
SR 331 Emergency Water Main Replacement (767) — Owner: Town of Bremen. Installation of
1230 feet of new water main, two new hydrant assemblies, approx. 500 SY of pavement
restoration, approx. 1200 CY of structural backfill, erosion control and restoration. $509,253.
Completed: 2024.
Description:
White Pigeon Sanitary Sewer Restoration (766) — Owner: SJ County Board of Public Works
Replacement of existing sanitary sewer, sidewalk replacement and restoration. $176,000. y
Completed: 2024.
Description:
NEC Smart Park Development (735) — Owner: Midwest Energy & Communications —
Cassopolis, Michigan. Construction of utilities (sanitary sewer & force main, sanitary lift station,
water main and storm sewer), large retention ponds, 8200 feet of roadway construction, and
associated site grading on an approx. 230 acre site. Additional improvements to surrounding
MDOT and county roads. $12,703,046. Completed: 2024.
Description:
Veterans Park Lift Station (725) — Owner: City of Mishawaka. Construction of a submersible
lift station including wet well, valve vault, meter vault, pumps, piping, valves, controls, auxiliary
generator, SCADA, site work and all associated appurtenances. Project also includes approx..
830 LF of force main, 85 LF sanitary sewer, 500 LF of watermain & associated surface
restoration. $1,938,859. Completed: 2024.
Description:
Ontario Trailhead Improvements (751) — Owner: Niles Charter Township. Enhance the
trailhead to the Michigan River Valley Trail at Ontario Street. Improvements consist of parking,
pathway, pavilion, hand pump and well and various appurtenances. $176,986.00. Completed:
2024.
Description:
Johnson/Fellows intersection Drainage Improvement Project (750) — Owner: City of South
Bend. Construction of storm sewer and drainage improvements. $236,663.00. Completed: 2024.
Description:
Nadel Ave Groundwater Lift Station Improvements (742) — Owner: City of Elkhart. New
submersible groundwater lift stations; approximately 10 LFT of 2-inch force main; lift station
piping and valves; connection to existing intake well; doghouse manhole; connection to existing
gravity network; All restoration and paving. $224,090.00. Completed: 2024.
Description:
Sewer Point Repairs 8 inch (740) — Owner: Visu-Sewer (City of Dowagiac). Sewer point
repair, 8-inch. $128,000.00. Completed: 2024.
Description:
Licit Station 13 Replacement (737) — Owner: City of Elkhart. Replacement of existing lift
station, sanitary sewer and force main installation Installation of a drive approach, road
reconstruction, earthwork, erosion control, demolition of the existing lift station and site
restoration. $384,624.00. Completed: 2024.
Description:
INDOT R38064A — Coal Line SJ Co. Bike & Ped Path (689) — Owner: Indiana Department of
Transportation. Bike and pedestrian path along the Coal Line Trail from Lincolnway West to
Riverside Drive. $1,976,699.00. Completed: 2024.
Description:
Gravity Sanitary Sewer Connection — Rolling Prairie Elementary School (749) — Owner:
Rolling Prairie United School District. Installation of 8" Gravity Sewer for 40OLF and associated
structures. $89,612.00. Completed: 2023.
Description:
Entrance Drainage Improvements (Potawatomi Zoo) (743) — Owner: Jones Petrie Rafmski.
Retention Pond excavation for storm water runoff. $123,264.00. Completed: 2023.
Description:
Big & Tall Sewer Extension (736) — Owner: City of Elkhart. Installation of new grinder tank
and 60OLF of 2" Low Pressure Sewer. $71,043.00. Completed: 2023.
Description:
2
Auten Road Watermain Replacement (733) — Owner: City of South Bend. Installation of new
12" Watermain 1,000LF. $149,225.00. Completed: 2023.
Description:
Citywide Water Service Replacement — Zone 10 (718) — Owner: City of Benton Harbor.
Complete replacement of approximately 400 new water services. Including 1200OLF of
Trenchless installation. All Landscape and Restoration. $2,825,901.00. Completed: 2023.
Description:
Northshore/Eastshore Collection System (708) — Owner: Turkey Creek Regional Sewer
District Installation of new gravity sewer system around lake. Installation of 1 O,000LF of 8"
Gravity sewer and associated structures. 280OLF of 4-8-inch Force main. Installation of new
pump stations and piping. All hard surface and restoration. $4,966,945.00. Completed: 2023.
Description:
CSO 18 Backwater Valve Replacement (707) — Owner: City of South Bend. Installation of
new back water check valve in existing structure. $124,980.00. Completed: 2023.
Description:
Lift Station 51, 52, 53 (699) — Owner: New Buffalo Township. Complete replacement and
installation of 3 new lift stations including wet well, valve vault, process and controls and all
restoration. $960,541.00. Completed: 2023.
Description:
Lift Station Improvements, Contract B (698) -- Owner: St. Joseph County Board of Public
Works. Replacement of two lift stations complete. Including new wet wells, valve vaults and
controls. 24 EA ARV replacements at misc. locations. $1,294,195.00. Completed: 2023.
Description:
WWTP, Contract A (697) — Owner. Improvements to the Existing Wastewater Treatment Plant
including Sludge Transfer Pump Replacement, Clarifier Improvements and Upgrades.
$1,115,879.00. Completed: 2023.
Description:
SW Quadrant Roadway, Sewer & Watermain Extension (687) — Owner: Town of
Middlebury. New Sanitary Sewer System and Lift Station including: 6300 LF of 8" Gravity
Sewer, 78 EA Lateral Connections at the main. New Lift Station and Valve Vault and all
appurtenances. Installation of approximately 3000 LF 6"-12" Watermain. Installation of 4000 LF
of 12" -18" Storm Sewer and structures. 12,000 LF of Curb. All restoration and paving.
$4,106,203.00. Completed: 2023.
Description:
LCRUD Lift Station Regional B Phase II, Contract B (683) — Owner: LaGrange County
Regional Utility District. Complete Installation of 4 new lift stations. Including: Wet Wells,
Valve Vaults, Generators, process piping and Controls. All Restoration and Hard surface
included. $1,712,876.00. Completed: 2023.
Description:
LCRUD WWTP Region B Phase 11, Contract A (682) — Owner: LaGrange County Regional
Utility District. Wastewater Treatment Plant Improvement. Installation of Sludge dewatering
Pad, Clarifier Equipment, UV Disinfection System, Aerobic Digesters, and all associated Piping.
Included new treatment plant buildings. $3,298,975.00. Completed: 2023.
Description:
Studebaker Fountain Water Improvement (722) - Owner: City of South Bend. Installation of
Water Service and Sanitary Lateral. Installation of new water softener and injection system for
pump house. All Restoration and Hard surface. $150,913.00. Completed: 2022.
Description:
Johnson St Sewer Extension (721) - Owner: City of Elkhart. Installation of 1400LF +/- of 12"
sanitary sewer and associated laterals. Including all grading, concrete flatwork, and complete
restoration. $1,393,846.00. Completed: 2022.
Description:
JA Drive Node Repair (719) — Owner: City of Elkhart. Installation of new Riprap diversion in
Elkhart River. $159,880.00. Completed: 2022.
Description:
Parking Lot & ADA Compliant Trail (717) — Owner: Indiana Dept. of Natural Resources.
Installation of approximately 1,400LF of gravel pathway. $159,850.00. Completed: 2022.
Description:
2021 Drainage Improvements - Kaley & Marion St (706) — Owner: City of South Bend.
Installation of new drainage structures, new concrete curb, and asphalt re -surfacing.
$246,810.00. Completed: 2022.
Description:
Laurel Woods Drainage Improvements (702) — Owner: City of South Bend. Excavation of
existing retention pond and site storm system. $125,142.00. Completed: 2022.
Description:
South Main Streetscapes Project (694) — Owner: City of Elkhart. Installation of 2700 LF of
24" perforated storm sewer and all appurtenances. Installation of 36" sanitary sewer. Complete
onstruction of new concrete sidewalks, driveways, and asphalt paving. $2,785,222.00.
Completed: 2022.
Description:
Buchanan - Yellow Lake Project (692) — Owner: Buchanan Land, LLC. Complete construction
of approximately 5 miles of gravel pathway through woods. $944,657.00. Completed: 2022.
4
Description:
Lift Station Replacement & Improvements (698) — Owner: Coloma Charter Township.
Installation of 6 new lift stations, including SCADA system upgrades. $1,928,234.00.
Completed: 2022.
Description:
Lakeside Sewer Relocation (674) — Owner: City of Laporte. Installation of 4500 LF of Low-
pressure sewer and 38 grinder pumps. One complete lift station replacement. $1,637,111.00.
Completed: 2022.
Description:
INDOT R41066A — Elkhart SR 19 Concrete Pavement (672) — Owner: Indiana Department of
Transportation. 12" Concrete paving patching on State Highway. $291729788.00. Completed:
2022
Description:
Contract 3 NE Section SS Improvements (669) — Owner: City of Benton Harbor. Complete
Construction of new Roadways including Sanitary Sewer, Storm Sewer, Water Main, Concrete
Curbs and Driveways. $4,554,745.00. Completed: 2022.
Description:
Park Shore Drive & East Street Improvements (668) — Owner: Village of Cassopolis.
Drainage improvements and new road reconstruction. $731,154.00. Completed: 2022.
Description:
Colfax Lift Station (665) — Owner: City of South Bend. Installation of new Lift Station and all
appurtenances. $449,064.00. Completed: 2022.
Description:
Crawford Park Connector Sewer (630) — Owner: City of Mishawaka. Complete Construction
of new combined sewer overflow structures and river outflow. $4,031,520-00 Completed: 2022
Description:
Cass Stone Lake Beach (659) — Owner: Village of Cassopolis. Complete Construction of new
public beach, pier, and pavilion. Brick Paving and Concrete Walls. $2,487,844.00. Completed:
2021
Description:
Cass Downtown Streetscapes (658) — Owner: Village of Cassopolis. Complete Reconstruction
of Roadway. Including: Storm Sewer and Water Main, Brick Paving, and all appurtenances.
$4,115,879.00. Completed: 2021
Description:
Steuben Lakes — NED Phase 1 WW Collection System (610) — Owner: LaGrange County
Regional Utility District. Installation of 120,000 LF of low-pressure sewer, 290 grinder pump
5
3117M 1216 PM
Partnership Agreements I OJT
7
HOMIE HELP CONTACT
Welcome ALLISON 9MNEHAP,T
Home I PartnershiR reements
Partnership Agreements
Firm Name•.
Selge Construction Co., Inc.
Year.
2025
Training Program:
OJT Prog[pm k Panne[ahlP AgreeIDe4P
Step 1:
Determine Total Number of Hours worked in High way construction trades on
INDOT federal-ald contracts(either as prime contractor
or sub contractor during the past three years. Do not include hours worked an
stata4unded and private work.)
Hours Worked During 2022 Hours 2023 Hours 2024 Hours
Total 12 12 12
Stop 2
Add the total number of hours from each yew and dMde it by three (3):
12 12 12 30 12
+ + 13 =
2022 2023 2024 Average Hours
Stop 3:
Multiply the "Average Hours" by ffve percent (5%):
12 5% 0
2025 Training
Average Hours Goal
Approved Training Program:
CLA bon r e gg Mery 2U24-�pnnM.2027..p
RagjtefadAnRM �$ldx.g�(
kS
work Process Ooerators.1a
I, jl I hem by agree ail the Innis and candiiuOn6 contained herein and elfin
L'-! under penalty and the prejury Met the irdorrilz0on staled above to true
end ecaeate.
Prepared on 1/211P02512:11:58 PM by S%MNEHART, AWSON
Approved on 1/22120261:19.47 PM by Daniels, Kathryn
• Fields with this color background are required
V2
h*.-Ki7ovdaDXJ doLtn.gavtHniVFMPaMurshipM:namcnlf admmNPAglWMWdDdab?ld=3743
U. & Department of Labor
Office of Apprenticeship
Emniovment & Traininrt Administratran
Date: December 4, 2024
From: Tiffanie L. Clawson
Michigan State Director
Office of Apprenticeship
Subject: Program Verification
To: Bruce Dickie
Selge Construction Company, Inc.
2833 South 11th Street
Niles, MI 49120
Thank you for participating in the National Apprenticeship Program. You have been
registered with the US Department of Labor, Office of Apprenticeship since 2009. Your
program has two occupations registered, Construction Craft Laborer and Heavy
Construction Equipment Operator. Both occupations have active apprentices registered
with the US DOL and utilize NCCER as the RTI Provider.
Thank you again for your participation in Registered Apprenticeship with the US
Department of Labor, Office of Apprenticeship. If I can provide additional information or
service, please feel free to contact me.
5i reely,
TiffA-ie L. Clawson
Michigan State Director
U.S. Department of Labor
Office of Apprenticeship
517-377-1747 — Office
269-601-2820 — Cell
clawson.tiffanie.l@dol.gov
US DOL / OA Phone: (517) 377-1747
315 W. Allegan Street, Rm 210 APPPENTICESHIPUSA MI Cell: (269) 601-2820
Lansing, MI 48933 Clawson.tiffanie.l@dol.gov
t{ y A Il f
� i T
sogir co n" Zma
�a
1� QOQ � Wig ISO A7 S&Ud�d Of 1OPMA& 1p
&vrdEaray of Ba6ar
Associated BuNdars and Contractors
Indiana
Kentucky
Memorandum of Understanding
3/21/25
Please accept this as verification that Selge Construction is a member
in good standing of Associated Builders & Contractors of Indiana/
Kentucky, Inc (ABC).
ABC's program is certified by the Federal Department of Labor.
Office of Apprenticeship and Training and by the National Center for.
Constructions Education and Research (NCCER). ABC uses the
NCCER curriculum. ABC had 238 apprentices graduate in 2024, of
the graduates, 3 were female, 19 were veterans, and 49 were from
diverse racial backgrounds.
Selge Construction currently has 12 (twelve) students enrolled in the
Construction Craft Laborer Apprenticeship training program.
Feel free to call me with any questions regarding our apprenticeship
program. w T
Regards,
Brianne Feeks
Elkhart Apprenticeship Coordinator
1710 Leer Dr. —Elkhart, Indiana 46514— 574-218-0340
brianne@abcindianakentucky.org
STATE OF INDIANA
OFFICE OF THE SECRETARY OF STATE
CERTIFICATE OF AUTHORIZATION
To Whom These Presents Come, Greetings:
I, TODD ROKI TA, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana,
the custodian of the corporate records, and proper official to execute this certificate.
I further certify that records of this office disclose that
SELGE CONSTRUCTION CO INC
duly filed the requisite documents to commence business activities under the laws of State of Indiana on March 15,1972, and
was in existence or authorized to transact business in the State of Indiana on February 10, 2010.
I further certify this For -Profit Foreign Corporation has filed its most recent report required by Indiana law with the Secretary
of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution or expiration has been filed or
taken place.
In Witness Whereof, I have hereunto set my hand
and affixed the seal of the State of Indiana, at the
city of Indianapolis, this Tenth Day of February, 2010.
TODD ROKITA, Secretary of State
197203-307 / 2010021072953'
+ iFLifhs % ilf�iF # 1�EIIIH ■ ellkl�y ''r '
po 44
am�� of �itmlifmawt
LSSUED BY
.31tAtlti 3Rep Ja'=1`tar=
INDIANAPOLIS, IN September 17, 2024
TO
SELGE CONSTRUCTION CO., INC.
NILES, MI
who has filed want the Department a Contractor's Statement of Experience and Financial Condition as
required under Indiana Code 8.23-10, is hereby qualified to bid at any Department of Transportation
letting in Classes of Work and within the amount and other limitation of each classification as fisted
below, for such period as the unovnpleted work on hand from all scarves does not exceed theAggregate
amount. Classification references by name or symbol are In accordance with the definitions In the
ContWor's Statement of Experience and Financial Condition_ This certificate supersedes any certificate
previously issued, but is subject to revision or revocation according to the law. rf and when changes
in the financial condition of the contracting firm or other facts juaffy such revision or revocation.
Valid September 20, 2024 Thru June 30, 2025
Aggregate Bidding Capacity:
119,359,000.1
0112 TRENCHLESS PIPE INSTALLATION................................................................................
$90,000,000.00
0188 FORCE MAINS AND LIFT STATIONS...............................................................................
$90,000,000.00
0290 SEWER AND PIPE CLEANING AND LINING...................................................................
$90,000,000.00
A(B) CONCRETE PAVEMENT: LIMITED...................................................................................
$20,000,000.00
C(A) HEAVY GRADING..............................................................................................................
$90,000,000.00
E(E) SMALL STRUCTURES AND DRAINAGE ITEMS..............................................................
$90,000,000.00
E(F) SURFACE MASONRY AND MISCELLANEOUS CONCRETE ...........................................
$20,000,000.00
E(H) DEEP SEWER AND/OR EXCAVATION..............................................................................
$90,000,000.00
E(T) DEMOLITION......................................................................................................................
$20,000,000.00
PREQUALIFICATION ENGINEER
SUL- Form 20506 (M Is-"
COMWSSIONER
�z-
Application Status set to Draft Application Status set to Draft 05/28t2O2510:34 AM
Application Status set to Submitted Application Status set to Submitted 06/242025 03:57 PM
Application Status set to Received Application Status set to Received 0612612025 07:55 AM
Application Status set to Specialist Review Application Status set to Specialist Review 061265f2025 08:49 AM
Application Status set to 5 pe0alist Approved Application Status set to Specialist Approved 06/26/2025 08:51 AM
SWINEHART, ALLISON
SWINENART ALLISON
Light, IGorin
Light, Korn
Light, Kos
051281202510:34:04 AM
0512412025 03:57:11 PM
06/26/2025 07:55'40 AM
06126/2025 08:49,39 AM
0 6/2612 025 08:51:45 AM
CONSENT RESOLUTIONS OF THE SHAREHOLDERS AND DIRECTORS
OF SELGE CONSTRUCTION CO., INC.
The Shareholders and Board of Directors of Selge Construction Co., Inc., a Michigan
corporation, take the following actions pursuant to Section 407 and Section 525 of the
Michigan Business Corporation Act:
1. Financial Statement
The financial statements have been reviewed by all shareholders and officers and
approved as presented.
2. Board of Directors
The following persons were elected to serve as directors of the Corporation until
the next annual shareholders meeting or until their successors are elected and take
office:
Justin E. Butler
3. Officers
The following person shall hold the offices set forth opposite their names until
their successors are elected and shall qualify:
Name Office
Justin E. Butler President
James Boyles Vice President
Allison Swinehart Secretary
Marvin L. Selge, Jr. Treasurer
4. Authorization to Sign Construction Documents
The President, Justin E. Butler, the Vice President, James Boyles, the Treasurer,
Marvin L. Selge, Jr., the Secretary, Allison Swinehart, and the Project
Managers, Robert P. Kuhns, Robert S. Riley, Christian Baybutt, Thomas A.
Lentz, Mathew Huss, Andrew Boyles, ]Kyle Silveus, Aaron Beckwith and
Chris Rader are all authorized to sign construction documents on behalf of the
Corporation. The signature of the President, the Vice President, the Treasurer, the
Secretary, or the Project Manager shall be sufficient to bind the Corporation as to
any construction documents submitted.
Ratification of Past Acts
The Shareholders and Directors hereby ratify and reaffirm all corporate actions of
the officers and directors of the Corporation taken between the date of the last
meeting and the date of this Resolution.
91
Authorization
The officers of the Corporation are authorized and empowered for and on behalf
of the Corporation to do any and all acts and things and execute any and all
additional instnments, papers or documents that may be or become necessary,
desirable, or appropriate to carry out, put into effect, and make operative any
portion of portions of these Resolutions.
DATED: January 29, 2025
"Shareholders"
"Director"
"
r
CERTIFIED RESOLUTION
1, ALLISON SWI EE[ART, hereby certify that I am the duly elected and acting
Secretary of SELGE CONSTRUCTION CO., INC., a Michigan corporation, and that
the following zesolution was duly adopted by unanimous consent of the Shareholders and
Directors of said Corporation, on January 29, 2025, and that said resolution is in full
force and effect:
1. Board of Directors. The following person was elected to serve as director of the
Corporation until the next annual shareholders meeting or until their successors
are elected and take office:
Justin E. Butler
2. Officers. The following persons shall hold the offices set forth opposite their
names until their successors are elected and shall qualify:
Name
Justin E. Butler
James Boyles
Allison Swinehart
Marvin L. Selge, Jr.
office
President
Vice President
Secretary
Treasurer
IN WITNESS WHEREOF, I have signed this Certified Resolution on this 29th day of
January, 2025.
r
1 w �ii
ALLISON SWINEHART