HomeMy WebLinkAboutTitle Sheet - SRTS Kennedy Academy Proj No 123-017WESTMOOR STGOODLAND AVE
OLIVE ST
JOHNSON ST LINCOLN WAYLINCOLN WAYBENDIX DRFREMONT ST
BERTRAND STLONGLEY AVEFREDRICKSON STPRAST BLVDHARTZER STBONDS AVEGREENE STBONDS AVEPRAST BOULEVARDFREDRICKSON STLONGLEY AVEWERWINSKI STROGER STKENWOOD AVEBENDIX DR
RUPEL STWERWINSKI STCOLLEGE ST
BROOKFIELD ST
WILBUR ST LONGLEY AVEROGER STELMER ST
HUEY ST
O'BRIEN ST
ELLIOT ST
ECLI
P
S
E
P
L
ECLIPSE PL
MEADE ST
LINDEN AVEECLIPSE PLACE
MEADE
ACADEMYKENNEDYSCHOOLBOARD OF PUBLIC WORKSELIZABETH A. MARADIK, PRESIDENTJOSEPH R. MOLNAR, VICE PRESIDENTGARY A. GILOT, MEMBERDATEDATEDATEMURRAY L. MILLER, MEMBERDATEDESIGNATIONSHEETSofPROJECTCONTRACTSURVEY BOOK 2201237R-447762201237172ELECTRONICLOCATION MAPNOT TO SCALE2201237CONTRACTPROJECT2201237DESIGNATIONPROJECT LOCATION SHOWN BYAND CURRENT SUPPLEMENTS THERETO,STANDARD SPECIFICATIONS DATED 2024TO BE USED WITH THESE PLANSR-44776OF TRANSPORTATIONINDIANA DEPARTMENTSIDEWALK PLANCONST.R/WP.E.PROJECT NO. 2201237OAAATINT
FTRNS
P
ORT A T I O N NADEPRMENDIINDOTST. JOSEPH COUNTYMAX. GRADE:TOTAL LENGTH:NET LENGTH:GROSS LENGTH:5.10%1.994 MI.LATITUDE 41°41'04" LONGITUDE 86°17'01"INDIANA DEPARTMENT OF TRANSPORTATIONDATE(574) 236-4400PLANS PREPARED BY:DLZ INDIANA, LLC2211 EAST JEFFERSON BOULEVARDSOUTH BEND, INDIANA 46615LDZ1.775 MI.1.994 MI.PLANSPREPAREDBY:CERTIFIED BY:APPROVEDFOR LETTING:DATEPHONE NUMBERDLZ INDIANA, LLCTRAFFIC DATAA.A.D.T. (2025)N/AD.H.V. (2045 PROJECTED)N/ADIRECTIONAL DISTRIBUTIONN/ATRUCKSN/AN/ADESIGN DATADESIGN SPEEDN/APROJECT DESIGN CRITERIAPROWAG (DATED 08.08.2023)ROADWAYSLOCAL ROADRURAL/URBANURBAN (INTERMEDIATE)TERRAINLEVELACCESS CONTROLNONEDate: Jul 08, 2025, 11:11amFile: X:\Projects\2023\2361\298950 South Bend Kennedy SRTS\01_ConstDocs\CAD\Dwg\2989CV10.dwg Model Tab: Plan Set BREANA N. MICOU, MEMBERDATEHILARY HORVATH, CLERKDATEERIC HORVATH. EXECUTIVE DIRECTORDATELESLIE BIEK, ASSISTANT CITY ENGINEERDATECITY ENGINEERING DEPARTMENTKENNEDY ACADEMY - SAFE ROUTES TO SCHOOLHUD 12: 040500012207NOTE: SIDEWALK PAVING EXCEPTIONS NOT SHOWN IN LOCATION MAP.REFER TO PLAN SHEETS FOR SIDEWALK RECONSTRUCTION LIMITSR-2-ER-2-ET-37-NT-37-NSIDEWALK RECONSTRUCTION ON GOODLAND AVENUE, JOHNSON STREET, BERTRAND STREET,FREMONT STREET, AND LONGLEY AVENUE IN SECTION 3, T-37-N, R-2-E, CITY OF SOUTH BEND,PORTAGE TOWNSHIP, ST. JOSEPH COUNTY, INDIANA .END CONSTRUCTIONP.I. 123+65.49 'PR-L-RT'END CONSTRUCTIONP.I. 126+13.02 'PR-L-LT'BEGIN CONSTRUCTIONP.O.T. 120+23.23 'PR-L-RT'BEGIN CONSTRUCTIONP.O.T. 120+24.90 'PR-L-LT'BEGIN CONSTRUCTIONP.I. 100+11.75 'PR-J-RT'BEGIN CONSTRUCTIONP.I. 100+11.75 'PR-J-LT'END CONSTRUCTIONP.I. 114+22.23 'PR-J-RT'END CONSTRUCTIONP.O.T. 114+48.94 'PR-J-LT'END CONSTRUCTIONP.I. 31+31.82 'PR-G-LT'END CONSTRUCTIONP.I. 31+31.52 'PR-G-RT'BEGIN CONSTRUCTIONP.I. 11+02.54 'PR-G-LT'BEGIN CONSTRUCTIONP.I. 11+02.87 'PR-G-RT'END CONSTRUCTIONP.O.T. 83+53.21 'PR-F-LT'END CONSTRUCTIONP.O.T. 83+53.15 'PR-F-RT'BEGIN CONSTRUCTIONP.O.T. 80+62.79 'PR-F-LT'BEGIN CONSTRUCTIONP.O.T. 80+62.92 'PR-F-RT'END CONSTRUCTIONP.O.T. 77+43.34 'PR-B-LT'END CONSTRUCTIONP.O.T. 78+29.32 'PR-B-RT'BEGIN CONSTRUCTIONP.I. 70+17.15 'PR-B-LT'BEGIN CONSTRUCTIONP.I. 71+08.20 'PR-B-RT'DATEDLZ INDIANA, LLCCERTIFIED BY:DATEREGISTER PROFESSIONAL ENGINEER STATE OF INDIANA NO. PE10100213(COVERING GENERAL CIVIL DESIGN)REGISTER PROFESSIONAL ENGINEER STATE OF INDIANA NO. PE11200672(COVERING CIVIL DESIGN)CERTIFIED BY:DLZ INDIANA, LLC574-236-4400( X )( )( )07-03-202507-03-2025
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 7-2-2025
Name: Gemma Stanton Department of Public Works – Engineering Division
BPW Date: 7-8-2025 Phone Extension: 9083
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Indiana Department of Transportation
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name SRTS Kennedy Academy
Project Number 123-017 DES# 2201237
Funding Source
Account No.
Amount
Terms of Contract
Special Contract Provisions
Purpose/Description Title sheet for INDOT-LPA project Safe Routes to School at Kennedy
Academy
For Change Orders Only
Amount of Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date:
July 8, 2025