HomeMy WebLinkAboutAccess to Separate Storm Sewer Agreement DP24-030 - Momentum Development Group
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU
1316 COUNTY-CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
June 10, 2025
Mr. Mark Neal
Momentum Development Group, LLC
510 South Main Street
South Bend, IN 46601
markwneal@gmail.com
RE: Access to Separate Storm Sewer Agreement
Dear Mr. Neal:
At its June 10, 2025 meeting, the Board of Public Works approved the above
referenced agreement for connection to the separate storm sewer for the Momentum Project at
510 S. Main St.
Enclosed please find the original of the agreement for your signature. Please sign and
return the agreement to hhorvath@southbendin.gov. Please retain a copy for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/hh
-1-
ACCESS TO SEPARATE STORM SEWER AGREEMENT
THIS ACCESS TO SEPARATE SEWER AGREEMENT (“Agreement”) is entered into
as of the 10th day of June, 2025, by the City of South Bend, Indiana, acting through its Board
of Public Works (“City”) and Momentum Development Group, LLC located at 510 South Main
Street, South Bend, IN 46601s (“Momentum”) and its successors, assigns and transferees.
WHEREAS, Momentum is redeveloping an existing facility in South Bend, Indiana;
WHEREAS, Momentum’s property located at 510 South Main Street, South Bend, IN
46601 (“the Property”) has one existing storm sewer connection on the north side of the
Property and one combined sewer connection on the south side of the Property;
WHEREAS, Momentum desires to separate their combined sewer line to transfer surface
water drainage from the Property to a conduit of the City’s separate storm sewer system from
Exhibit A and continue to use the existing storm connection on the north side of the Property;
WHEREAS, City owns the separate storm sewer system on South Main Street, which
ultimately connects to the Saint Joseph River; and
WHEREAS, at the time of execution of this Agreement, City has capacity in its separate
storm sewer system.
NOW, THEREFORE, for and in consideration of other good and valuable
consideration, the receipt and sufficiency of which is hereby acknowledged, it is agreed as
follows:
1.City agrees to grant Momentum access to the City’s separate storm sewer system which
directly abuts the Property for the limited purpose of discharging stormwater runoff from
the Property to said separate storm sewer system.
2. Momentum, at its sole expense, shall construct, install, and maintain whatever piping and
erosion protection infrastructure is necessary to drain its stormwater runoff into the City’s
separate storm sewer system. Momentum shall be permitted temporary access to
construct and maintain said infrastructure. However, such infrastructure, and its location,
must be designed and constructed in a manner approved by City, and such approval may
be withheld for any reason. Future development and/or redevelopment which may alter
the volume of stormwater discharge or layout of stormwater infrastructure beyond the
terms of this Agreement and shown in Exhibit A must be designed, constructed, and
approved by the City in accordance with local ordinances in effect at the time of such
future development and/or redevelopment.
-2-
3. Momentum , at its sole expense, must construct a post-construction stormwater quality
best management practice plan in order to prevent any illegal discharge of pollutants
from entering the separate storm sewer system.
4. City reserves the right to charge a reasonable fee to Momentum for annual use of its
separated storm system as defined by present and future local ordinances.
5. City reserves the right to terminate this Agreement in its sole discretion upon twelve (12)
month notice to Momentum and revoke any access to the separate storm sewer system. If
the City elects to terminate this Agreement and such termination is not based upon
Momentum’s negligence or illegal discharge into the City’s storm sewer, the City shall
work collaboratively to identify and relocate Momentum’s storm water discharge to a
suitable location. Under such a scenario, the costs to relocate storm water discharge shall
be shared equally between the parties. Should Momentum elect to terminate this
Agreement, it shall be Momentum’s sole responsibility to find an alternative means to
discharge its surface water which complies with all local ordinances or state laws.
Should Momentum terminate this Agreement, it shall be responsible for all expenses
related to its disconnect from the City’s separate storm sewer system.
6. Momentum agrees and undertakes to indemnify and hold City, and its respective agents,
employees, successors, and assigns, harmless from any liability, loss, costs, damages or
expenses, including attorneys’ fees, which City may suffer or incur as a result of any
claims or actions which may be brought by any person or entity arising out of this
Agreement or any claims or actions brought against the City for an alleged illicit
discharge from Momentum or the Property into the City’s storm sewer system. If any
action is brought against City or its respective agents, employees, successors, or assigns,
in connection with this Agreement, Momentum agrees to defend such action or
proceedings at its own expense and to pay any judgment rendered therein.
7. This Agreement may not be assigned by Momentum without the express written consent
of City which such consent may be withheld for any reason. Any violation of this
limitation shall terminate this Agreement and forfeit Momentum’s rights under this
Agreement.
8. This Agreement shall be construed and interpreted according to the laws of the State of
Indiana.
9. This Agreement sets forth the entire agreement and understanding between the parties as
to the subject matter hereof, and merges and supersedes all prior discussions, agreements,
and understanding of any and every nature between them.
10. The person signing on behalf of Momentum represents that he/she has been duly
authorized to execute this Agreement on behalf of Momentum.
-3-
IN WITNESS WHEREOF, City and Momentum, through their duly authorized
representatives, have caused this Agreement to be executed as of the day and year first written
above. The parties have read and understand the foregoing terms of this Agreement and do, by
their respective signatures hereby agree to its terms.
Date: _________________________ Date: _________________________
Momentum Development Group, LLC CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
______________________________ ______________________________
Its____________________________ Elizabeth A. Maradik, President
______________________________
Gary A. Gilot, Member
______________________________
Joseph R. Molnar, Member
______________________________
Murray L. Miller, Member
______________________________
Breana N. Micou, Member
Member Attest:
______________________________
Theresa Heffner, Clerk
Board of Public Works
June 10, 2025
Stormwater Pollution Prevention
Maintenance Guidelines for Post-Construction BMPs
Post-Construction Agreement
Property Address or Parcel Number:
510 S. Main Street, South Bend, Indiana; 018-3017-0618
Post-Construction BMP Maintenance Activity Schedule
Storm Inlets and
Structures
Inspect storm inlets and structures and remove built-up
vegetation, trash, and debris.
Monthly; as
needed.
Storm Inlets, Structures,
and Pipes
Inspect pipes located within the structures for signs of
clogging or damage, repair as needed.
Annually; as
needed.
OWNER’S ACKNOWLEDGEMENT:
The owner of the above property agrees to implement maintenance of the above listed post-construction
stormwater best management practices. The owner understands that this is a requirement by the municipality,
the federal Clean Water Act, and the Indiana Department of Environmental Management. As part of the
agreement, the owner understands that they must allow access to the property by the stormwater inspector.
Upon occupancy and/or post-construction inspections, the owner agrees to accept responsibility for the
maintenance of any practices found to be in violation by the inspector.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 6/2/2025
Name: Gemma Stanton Department of Public Works – Engineering Division
BPW Date: 6/10/2025 Phone Extension: 9083
Required Prior to Submittal to Board
BPW Attorney X Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Access to Separate
Storm Sewer Agreement
Ease./Encroach
Required Information
Company or Vendor Name Momentum Development Group
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Momentum Project at 510 South Main St
Project Number DP24-030
Funding Source
Account No.
Amount
Terms of Contract
Special Contract Provisions
Purpose/Description Agreement to connect to separate storm sewer
For Change Orders Only
Amount of Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: