Loading...
HomeMy WebLinkAboutChange Order No. 2 Sewer and Manhole Rehabilitation Proj No 122-019 - Visu-Sewer LLC ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS June 10, 2025 Mr. Josh Regner Visu-Sewer, Inc. W230 N4855 Betker Dr. Pewaukee, WI 53072 joshr@visu-sewer.com RE: Change Order No. 2 – Sewer and Manhole Rehabilitation – Project No. 122-019 Dear Mr. Regner: At its June 10, 2025 meeting, the Board of Public Works approved the above referenced Change Order be increased by $304,750, bringing the revised contract amount to $1,875,173.25. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/hh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Sarah Barber, Director of Engineering Services SUBJECT: Change-Order #2 Point Repair & Maintenance Allowance 122-019 Sewer & Manhole Rehabilitation DATE: June 10, 2025 The Division of Engineering requests the Board of Public Works approval of Change Order No. 2 for Project No. 122-019 Sewer & Manhole Rehabilitation. Change Order No. 2 addresses the repair of a collapse discovered at the Lindsey Avenue sewer rehabilitation location between N. Scott Street and Cushing Street. The collapse was discovered during cleaning of the conduit by the project contractor and was determined to be damaged beyond the extent of being able to Curried-In-Place-Pipe (CIPP) line this segment. The contractor has given an estimate instead of an exact cost due to the inability to see the entire pipe beyond the collapse point. The extent of the repair will be determined after excavation and the collapse can better be visually assessed. The change order amount requested to be approved by BPW is for the allowance for a worst- case scenario cost of needing to replace the entirety of the line segment and will be less if only a partial replacement is needed. This change-order is a time and materials contract format so unspent allowance by the end of the repair and project will return to wastewater capital funding to support other projects. No additional time is needed to be added to the Sewer & Manhole Rehabilitation project for this work. Original Contract Amount: $1,529,590.50 Previous Change Order No. 1: $40,832.75 Current Change Order No. 2: $304,750.00 Percentage Increase by Change Order No. 2: 19.41% Total change for entire project: 22.59% New Project Total: $1,875,173.25 Additional Time: 0 days New Completion Date: 3/17/2026; same as original contract For questions regarding this BPW change order request, please contact Sarah Barber (sbarber@southbendin.gov; 574-235-9805) at the Division of Engineering. 2 $1,529,590.50 $40,832.75 $1,570,423.25 X $ $1,875,173.25 19.41 % 22.59 % 0 days RECOMMENDED FOR APPROVAL Extension of date/time by previous change orders Date/time extension by this change order 0 days New completion date/time 3/17/2026 CONTRACTOR The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time 3/17/2026 The contract sum prior to this change order By this Change Order, the project amount is Increased 304,750.00Decreased The original contract sum Net change by previously authorized change orders 122-019 Sewer and MH Rehab 7/16/2024 PCR #1-Point Repair and Maintenance Allowance CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE:6/2/2025 PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: Approved Date: President Member Member Printed Name and Title Visu-Sewer, Inc. Company Name W230 N4855 Betker Dr Address BOARD OF PUBLIC WORKS Pewaukee, WI 53072 City, State, Zip Contractor Signature CONSTRUCTION MANAGER CITY OF SOUTH BENDJosh Regner Estimator/Project Manager June 10, 2025 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 06/03/2025 Name Sarah Barber Department Public Works BPW Date 06/10/2025 Phone Extension 9805 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Mickey Lovey Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Visu-Sewer, LLC New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Sewer and Manhole Rehabilitation 2024 Project Number 122-019 Funding Source Sewage Works Capital, Project 299, PO 13623 Account No. 642-509-442003 Amount $304,750.00 Terms of Contract Unit Prices Purpose/Description Sewer rehabilitation in form of a point repair and maintenance allowance to repair the currently identified point repair need and others that may arise through the contract from unforeseen conditions. This is time and materials based so unspent allowance will return to the capital funds. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: 2 304,750.00 1,570,423.25 19.41 1,875,173.25 22.59 0 days same completion date of 3/17/2026