HomeMy WebLinkAboutOpening of Bids - South Well Field WTP Improvements - Bid Package 2 Div A Proj No 117-059A - R YoderCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name South Well Field, Water Treatment Plant, and Distribution System Improvements
Contract A — Well Field and Water Treatment Plant Improvements (Bid Packaae 2 - Division A - Rebid
Project No. 117-059A
For Bids Due June 10, 2025
PART I
(Must be completed for all bids. Please type or print)
Date: 6/10/2025 Bidder (Firm): R. Yoder Construction, Inc.
Address: 27453 CR 150
City/State/Zip: Telephone Number: ( 574 ) 773-3502
Agent of Bidder (if Applicable): N/A
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
South Well Field, Water Treatment Plant, and Distribution System Improvements Contract A - Bid Pkg. 2 - Division A (Rebid
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Donohue & Associates, Inc.
and dated 2/28/2025 for the sum of (enter the Total Bid as shown on the Proposal)
Three Million, Six Hundred Seventy Thousand, Two Hundred Ninety Seven Dollars ($ 3,670,297.00 )
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of th Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a s p ate attachment.
By
�eJ (Signature)
Brad Yo
(Printed Name of Person Signing)
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
ACCEPTANCE
day of
Joseph R. Molnar, Vice President
Breana Micou, Member
Murray L. Miller, Member Attest: Theresa Heffner, Clerk
Version 09/29/2021 Contractor's Bid for Public Works - 2
,ill lH 6f
BID/PROPOSAL
CITY OF SOUTH BEND '
Project Name: South Well Field, Water Treatment Plant, and Distribution System Improvements
Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Re
Project Number: 117-059A
For Bids Due: June 10, 2025
Contractor
Name: R. Yoder Construction, Inc.
BASE BID — DIVISION A
Item
No.
Description
Total Amount
BASE BID — DIVISION A
I
Covers all Well Field and Water Treatment Plant
$3,670,297.00
Improvements (Division A only), according to the intent of
the Plans and Specifications.
DIVISION A BASE BID TOTAL $3,670,297.00
This Public Bid work is divisible. Contractors submitting a public bid may provide pricing for Base Division
A, . The Board reserves the right to reject any or all bids or to accept a full or partial
award of the bid or bids which, in its judgment, will be to the best interests of the City of South Bend. If the
Board elects to award the Base Divisi^^ A. and/or. Base DivisieR R, the Board will look at the totality of the
cost per each division when determining the lowest, responsive, and responsible bid(s).
Bidder (Firm):
R. Yoder Construction, Inc.
Address: 27453 CR 150
City/State/Zip:
Nappanee, IN 46550
Telephone Number: 574 773-3502
By
(Signature)
Brad Yoder
(Printed Name of Person Signing)
Version 09/29/2021 Contractor's Bid for Public Works - 7
Project Name:
Project Number:
For Bids Due:
Contractor
Name:
Y i� I ti sF t-
l
BID/PROPOSAL >
CITY OF SOUTH BEND
South Well Field, Water Treatment Plant, and Distribution System Improvements s ,
Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Re...,.,
117-059A
June 10, 2025
R. Yoder Construction, Inc.
Uem DesGription Total Amount
Govern all %Nell Field and VVate - TFeat! 18Rt RIARt
I..,PFeV81T18 tS (Di„ ioign R GRIY) aGGE)FrdiRg tG the iRt8l1+ Gf
the Plan6 and 9P8GifiGatieP,&-.
uJ
Version 09/29/2021 Contractor's Bid for Public Works - 8
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
R. Yo
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
) SS:
Elkhart COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 09/29/2021 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 09/29/2021 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 10th day of June 2025
R. Yoder Construction, Inc.
Contractor/Br
Signatu of ntractor/Bidder or Its Agent
Brad Yoder, VP of Operations
Printed Name and Title
Subscribed and sworn to before me this 10th day of June 20 25
My Commission Expires March 30,2032
otary Pub c
County of Residence Kosciusko
oSHELLY J BRIGHAM
Ay.' P�s� :; Notary Public, State of Indiana
° Kosciusko County
Commission Number NP0682724
My Commission Expires
March 30, 2032
Version 09/29/2021 Contractor's Bid for Public Works - 6
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 09/29/2021 Contractor's Bid for Public Works - 3
Document A310 TM - 2010
Conforms with The American Institute of Architects AIA Document 310
Bid Bond
CONTRACTOR:
('1�'mue, legrrl.c/aRry and rrddresti)
R. Yoder Construction, Inc.
27453 County Road 150
Nappanee, IN 46550
OWNER:
(,ware, legal status arrd address)
South Bend Board of Public Works
227 West Jefferson Boulevard
South Bend, IN 46601
BOND AMOUNT: S 5%
SURETY:
(einue,legalsfamsantiprincipalplace cfArn'inees)
Euler Hermes North America Insurance Company
100 International Drive, 22nd Floor
Baltimore, MD 21202
Five Percent of Amount Bid
This document has important
legal consequences. Consultation
with an attorney is encouraged
with respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
PROJECT:
(,vaare, location or address. and!'rgjectnrnuGcr. ifmpj
South Well Field & Water Treatment Plant Improvements Bid Package 2 - Division A (Rebid)
Contract No. 117-059A
South Bend, IN
The Contractor and Surety are bound to the Otvncr in the antount set forth above, for the payment of which file Contractor and Surety bind
themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, ns provided herein. The conditions of this
Bond are such that if the Owner accepts the bid of file Contractor within the time specified in the bid documents, or within such time period
as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with
the teruls of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted ill
the inrisdiction of the t'roject and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt
payment of labor and material furnished in the prosecution thereof: or (2) pays to the Owner the difference, not to exceed the amount of
this Bond, bct%vicett file amount specified in said bid and such larger amount for which the Owner may in good faith contract with another
party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and ellect. The
Surety hereby wfaives any notice oan agreement between the Owner and Contractor to extend the time in which the Owner may accept the
R bid. raiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time lbr
acceptance ol'bids specified in the bid documents, and the Owner and Contrachlr shall obtain the Surety's consent lbran extension beyond
sixty (60) days.
If this Bond is issued in confection with a subcontractor's bid ton Contractor. the tcnn Contractor in this Bond shall be deemed to be
Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been lircnished to comply with a statutory or other legal requirement in the location of the Project. any provision in
this Bond conflicting with said stalutory or Icgal requirement shall be deemed deleted herelrom and provisions coulifmting to such
statutory or other legal requirement shall be deemed incorporated herein. When so famished, the intent is that this Bond shall be construe'
as a statutory bond and not as a common law bond.
Signed and scaled this 10th day of June, 2025
i�tlriress) '
R. Yoder Construction, Inc.
(Principnl) (Seal)
By: Q�
(Title) X46,014ak
`,Illtll llf!//If
Euler Hermes North America Insurance Company ` .............
.mer/ep/',.
0
(Il inlexe) Patfi K. Lindsby � ?� `pSEAL`�
BY: 611 OL.`(/Yl12003 Gd � 's y�'?'sane?°'l
(TitleRamela M. And6rson Attorney -in -Fact
'l.l,Ittll'`
S-0054/AS 8/10
iii: rii7i?
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN v
FORM MBE-1.0`, ,
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
Project Number: 117-059A Project Name
Bidder: R. Yoder Construction, Inc.
South Well Field, Water Treatment Plant, and Distribution System Improvements
Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 — Division A - Rebid)
Total Bid Amount: $3,670,297.00 MBE Goal: 1.11 %
Page 1 of 1
Name & Address of MBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of MBE
Component
Percentage of
Total
Bid/Proposal
1st Class Logistics
2213 St. Charles Ave.
South Bend, IN 46614
Bernard Coutee
574-993-0071
Trucking
$10,000.00
0.272
Submitted by: Brad Yoder
Print Name Signature
Version 09/29/2021 Contractor's Bid for Public Works - 9
06/10/2025
Date
/�tiTFI H\
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN',,I
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number:
Project Name:
Bidder:
Contact Person:
117-059A Date: 06/10/2025
South Well Field, Water Treatment Plant, and Distribution System Improvements
Contract A — Well Field and Water Treatment Plant Improvements (Bid Packaae 2 - Division A - Re
R. Yoder Construction, Inc.
Brad Yoder Telephone: 574-773-3502
Address: 27453 CR 150
City: Nappanee
State: I N
Zip:
46550
Email: Brad&ryoderconstruction.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the
City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at:
http://www.in.ggy/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
BY
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MWBEs, including, where appropriate, breaking out contract work items into
BY
economically feasible units to facilitate MBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
BY
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
BY
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
BY
concerning subcontract opportunities and allowed MBEs reasonable time to respond to such
advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient
BY
time for MBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested MBEs.
BY
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
BY
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
BY
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 09/29/2021 Contractor's Bid for Public Works - 11
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
BY
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
BY
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 12
�Spl3TH,.
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANE
FORM MBE-2.1 J865
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 2
Project Number: 117-059A MBE Participation Goal 1.11
South Well Field, Water Treatment Plant, and Distribution System Improvements
Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid)
Bidder: R. Yoder Construction, Inc.
By: VP of Operations 6/10/25
(Signature) (Title) (Date)
MBE Firm Wolverine Electrical
Owner or Contact at MBE Firm Ryan Mitchell
Telephone: 269-601-7972 Fax: Email: ryan@wolverineelectrical.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Electrical
RESULTS OF CONTACT WITH THE MBE FIRM: Not Bidding
MBE Firm Precision Mechanical Contractors
Owner or Contact at MBE Firm Nelson Jordan
Telephone:260-482-4600 Fax: Email: njordan@precisionmechanical.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Plumbing/HVAC
RESULTS OF CONTACT WITH THE MBE FIRM: Not Bidding
Version 09/29/2021 Contractor's Bid for Public Works - 15
CITY OF SOUTH BEND
,I„I
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
\
FORM MBE-2.1
-=
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE 2 OF 2
Project Number: 117-059A MBE Participation Goal 1.11
South Well Field, Water Treatment Plant, and Distribution System Improvements
Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid)
Bidder: R. Yoder Construction, Inc.
By: VP of Operations 6/10/25
(Signature) (Title) (Date)
MBE Firm D.A. Dodd
Owner or Contact at MBE Firm Jacob Miller
Telephone: 219-778-4302 Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Email: iacobmiller(ndadodd.com
Plumbina/HVAC
RESULTS OF CONTACT WITH THE MBE FIRM: Not Bidding
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 09/29/2021 Contractor's Bid for Public Works - 15
CITY OF SOUTH BEND jl;}
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-1.0
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
Project Number:
Bidder:
South Well Field, Water Treatment Plant, and Distribution System Improvements
117-059A Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid)
R. Yoder Construction, Inc. Total Bid Amount: $3,670,297.00 WBE Goal: 4.24%
Page 1 of 1
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
Percentage of
Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Pro osal
Slusser's Green Thumb
John Williamson
Seeding
$6,500.00
125 Montgomery St.
574-772-3102
0.177
Logansport, IN 46947
Construction Field Services
Christopher D' An
onio Materials Testing
$12,000.00
0.327
8762 Louisiana St.
219-750-9138
Merriville, IN 46410
Coleman Insulation
Melissa Coleman
Piping Insulation
$7,800.00
0.213
890 Wabash Ave.
219-929-6492
Chesterton, IN 46304
Submitted by:
Brad Yoder
Print Name
Signature
Version 09/29/2021 Contractor's Bid for Public Works - 10
06/10/2025
Date
/�tiTFI H\
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN',,I
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 117-059A Date: 06/10/2025
South Well Field, Water Treatment Plant, and Distribution System Improvements
Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid)
Bidder: R, Yoder Construction, Inc.
Contact Person: Brad Yoder Telephone: 574-773-3502
Address: 27453 CR 150
City: Nappanee State: IN Zip: 46550
Email: Brad@ryoderconstruction.com
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the
City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at:
http://www.in.ggy/idoa/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
BY
Indiana Minority and Women Business Enterprises, found on their website
http://www.in. ov/idoa .
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
BY
economically feasible units to facilitate WBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
BY
means the interest of all WBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
BY
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to such
BY
advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient
BY
time for WBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested WBEs.
BY
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
BY
subcontract.
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
BY
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 09/29/2021 Contractor's Bid for Public Works - 13
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary
BY
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any WBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
BY
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 14
CITY OF SOUTH BEND
,I„I
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
\
FORM MBE-2.1
-=
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 2
Project Number: 117-059A WBE Participation Goal 4.24%
South Well Field, Water Treatment Plant, and Distribution System Improvements
Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid)
Bidder: R. Yoder Construction, Inc.
By. VP of Operations 6/10/2025
(Signature) (Title) (Date)
WBE Firm Circle R Mechanical
Owner or Contact at WBE Firm
Telephone: 219-787-5566 Fax:
Eric Heckman
Email: eheckman(aD-circlermechanical.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Plumbing/HVAC
RESULTS OF CONTACT WITH THE WBE FIRM: Not Bidding
WBE Firm FloSource
Owner or Contact at WBE Firm Eric Sessions
Telephone:765-342-1360 Fax: Email: esessions@flosource.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Valves
RESULTS OF CONTACT WITH THE WBE FIRM: Not Bidding
Version 09/29/2021 Contractor's Bid for Public Works - 16
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN ,I„I
FORM MBE-2.1 \ -=
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE 2 OF 2
Project Number: 117-059A WBE Participation Goal 4.24%
South Well Field, Water Treatment Plant, and Distribution System Improvements
Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid)
Bidder: R. Yoder Construction, Inc.
By. VP of Operations 6/10/2025
(Signature) (Title) (Date)
WBE Firm Ritschard Bros., Inc.
Owner or Contact at WBE Firm Don Ritschard
Telephone: Fax: Email: ritl204@datacruz.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Excavation
RESULTS OF CONTACT WITH THE WBE FIRM: Recieved bid but Was incomplete
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Version 09/29/2021 Contractor's Bid for Public Works - 16
THANK YOU for your submission!
Your notice has been submitted for publication. Below is a confirmation of your order. You will also
receive an email confirmation.
ORDER DETAILS
Order Number:
LSBN0307618
Order Status:
Submitted
Classification:
Govt Bids & Proposals
Package:
General Package
Base amount:
153.68
Service fee:
6.13
Cash/Check/ACH
Discount:
-0.00
Total payment:
159.81
As an incentive for customers, we provide a
discount off the total order cost equal to the
3.99% service fee if you pay with
Cash/Check/ACH.Pay by Cash/Check/ACH and
savel In no event are service fees refundable.
Payment Type:
visa
User ID:
L0030304
External User ID:
971864
PREVIEW FOR AD NUMBER LSBN03076180
PUBLIC BID NOTICE
SEEKING MBE/WBIE SUB -
.CONTRACTORS - R. Yoder
,Construction an EEO Employ-
er, is seeking qualified MBE/
!WBE Subcontractors for the
following proiect. City of South
Bend _ South Well Field, Water
,Treatment Plant, and Distri-
bution System Improvements
Contract A. (Bid Package 2 -
division A - Rebid)
Bid Gate: 6/10/2025 - Time:
9:OOAM. All bids must be
received by R. Yoder
'Construction no later than
12:OOPM on 6/9/2025.
Anyone interested in bidding
ion this proiect should call:
574-773-3502 or email:
estlmratingOryoderconstruc-
tlon,com for plans and speci-
fications
HSPALP
,June 1, 2, 3 2025
LSBN0307618
ACCOUNT INFORMATION << Click here to print a printer friendly version >>
R. Yoder Construction, Inc.
27453 County Road 150
Nappanee, IN 46550
574-773-3502
shelly@ryoderconstruction.com
R. Yoder Construction, Inc.
Contract ID:
ReYODER
C 0 H 5 T R U C T 1 0 N
BID NOTICE
SEEKING MBE/WBE SUB -CONTRACTORS R. Yoder Construction, Inc.,
an EEO Employer, is seeking qualified MBE/WBE Subcontractors for the
following project. City of South Bend — South Well Field, Water Treatment
Plant, and Distribution System Improvements — Contract A. (Bid Package 2 —
Division A — Rebid)
Bid Date: 6/10/2025 - Time: 9:OOAM. All bids must be received by R. Yoder
Construction no laterthan 12:OOPM on 6/9/2025. Anyone interested in bidding
on this project should call: 574-773-3502 or email:
estimating(a-)_ryoderconstruction.com for plans and specifications.
ww.ryodercon sttruction.com
P E r" ' Page 11
From:
Van Wagner. Austin
To:
Shelly Brigham
Subject:
RE: South Bend, South Well Field Water Treatment Plant - Rebid
Date:
Thursday, May 29, 2025 1:01:18 PM
Good afternoon, Shelly,
Hope all is well.
Thank you for your advertising with IDOA DSD.
We confirm receipt of your request. Your bid has been posted.
If you have any questions, please let us know. Thank you.
Kind regards,
Austin Van Wagner
Business Development and Outreach Manager
Indiana Department of Administration
317-234-8921
i 9:30 AM - 3:00 PM EST
402 W. Washington Street
Indianapolis, IN 46204
From: Shelly Brigham <shelly@ryoderconstruction.com>
Sent: Thursday, May 29, 2025 11:27 AM
To: IDOA Minority and Women Business Enterprise <mwbe@idoa.IN.gov>
Subject: South Bend, South Well Field Water Treatment Plant - Rebid
EXTERNAL EMAIL: This email was sent from outside your organization. Exercise caution
when clicking links, opening attachments or taking further action, before validating its
authenticity.
Good Morning,
We have the attached bid opportunity available for anyone who's interested in bidding. Can
you please post on the IDOA website for me?
Thanks so much
Shelly
R.YODER
C O N S T R U C T I O N
Shelly Brigham
Project Manager Assistant
+ O: 574.773.3502
ryoderconstruction.com
Legal Disclaimer: This email message, including any attachment(s), is intended only for the named recipient(s) and may
contain confidential, proprietary or legally privileged information. Unauthorized individuals or entities are not permitted
access to this information. Any dissemination, distribution, or copying of this information is unauthorized and strictly
prohibited. If you have received this message in error, please advise the sender by reply email, and delete this message and any
attachments.
Enterprise Bid
Timestamp Company Name Email Type Package Communi Subject Bidding Status
May 27, 2025 at 11:35 AM EDT
Wolverine Electrical Contracting
Ryan Mitchel ryan(awolverineelectrical. Minority Busines: Electrical
Bid Invite
Invitation to Bid NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
Wolverine Electrical Contracting
Ryan Mitchel ryan(awolverineelectrical. Minority Busines! Electrical
Message
Pictures NOT —BIDDING
Jun 5, 2025 at 2:30 PM EDT
Wolverine Electrical Contracting
Ryan Mitchel ryan(awolverineelectrical. Minority Busines: Electrical
Message
Addendum 01 NOT —BIDDING
May 27, 2025 at 11:36 AM EDT
Precision Mechanical Contractors, Inc.
Nelson jorda njordan(aprecision mecha Minority Busines! HVAC
Bid Invite
Invitation to Bid NOT —BIDDING
May 27, 2025 at 11:36 AM EDT
Precision Mechanical Contractors, Inc.
Victor Galicia vgalicia@precisionmechai Minority Busines: HVAC
Bid Invite
Invitation to Bid NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
Precision Mechanical Contractors, Inc.
Nelson jorda njordan(aprecision mecha Minority Business HVAC
Message
Pictures NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
Precision Mechanical Contractors, Inc.
Victor Galicia vgalicia@precisionmechai Minority Busines: HVAC
Message
Pictures NOT —BIDDING
Jun 5, 2025 at 2:30 PM EDT
Precision Mechanical Contractors, Inc.
Nelson jorda njordan(aprecision mecha Minority Business HVAC
Message
Addendum 01 NOT —BIDDING
Jun 5, 2025 at 2:30 PM EDT
Precision Mechanical Contractors, Inc.
Victor Galicia vgalicia@precisionmechai Minority Busines: HVAC
Message
Addendum 01 NOT —BIDDING
May 27, 2025 at 11:36 AM EDT
D.A. Dodd, LLC
Justin Steinb justinsteinbeck(adadodd.( Minority Business HVAC
Bid Invite
Invitation to Bid NOT —BIDDING
May 27, 2025 at 11:36 AM EDT
D.A. Dodd, LLC
Jacob Miller jacobmiller(adadodd.com Minority Busines: HVAC
Bid Invite
Invitation to Bid NOT —BIDDING
May 27, 2025 at 11:36 AM EDT
D.A. Dodd, LLC
Kevin Sheffiei kevinsheffield(ddadodd.c( Minority Business HVAC
Bid Invite
Invitation to Bid NOT —BIDDING
May 27, 2025 at 11:36 AM EDT
D.A. Dodd, LLC
Tony Ranega tonyranegar(adadodd.cor Minority Busines: HVAC
Bid Invite
Invitation to Bid NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
D.A. Dodd, LLC
Justin Steinbljustinsteinbeck(adadodd.( Minority Business HVAC
Message
Pictures NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
D.A. Dodd, LLC
Jacob Miller jacobmiller(adadodd.com Minority Busines: HVAC
Message
Pictures NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
D.A. Dodd, LLC
Kevin Sheffiei kevinsheffield(ddadodd.c( Minority Business HVAC
Message
Pictures NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
D.A. Dodd, LLC
Tony Ranega tonyranegar(adadodd.cor Minority Busines: HVAC
Message
Pictures NOT —BIDDING
May 27, 2025 at 11:36 AM EDT
Circle R Mechancial
Eric Heckma eheckman(acirclermecha Women Busines! HVAC
Bid Invite
Invitation to Bid NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
Circle R Mechancial
Eric Heckma eheckman(acirclermecha Women Busines! HVAC
Message
Pictures NOT —BIDDING
Jun 5, 2025 at 2:30 PM EDT
Circle R Mechancial
Eric Heckma eheckman(acirclermecha Women Busines! HVAC Message
Addendum 01
NOT —BIDDING
May 27, 2025 at 11:37 AM EDT
FloSource, Inc.
Eric Sessions esessions(aflosource.corr Women Busines! Process Pipii Bid Invite
Invitation to Bid
NOT —BIDDING
May 27, 2025 at 11:37 AM EDT
FloSource, Inc.
glucas(aflosource.com Women Busines! Process Piph Bid Invite
Invitation to Bid
NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
FloSource, Inc.
Eric Sessions esessions(aflosource.corr Women Busines! Process Pipii Message
Pictures
NOT —BIDDING
Jun 4, 2025 at 4:26 PM EDT
FloSource, Inc.
glucas(aflosource.com Women Busines! Process Piph Message
Pictures
NOT —BIDDING
Jun 5, 2025 at 2:30 PM EDT
FloSource, Inc.
Eric Sessions esessions(aflosource.corr Women Busines! Process Pipii Message
Addendum 01
NOT —BIDDING
Jun 5, 2025 at 2:30 PM EDT
FloSource, Inc.
glucas(aflosource.com Women Busines! Process Piph Message
Addendum 01
NOT —BIDDING
May 27, 2025 at 11:39 AM EDT
Ritschard Bros., Inc.
Don Ritschar rit1204(adatacruz.com Women Busines! Earthwork & Bid Invite
Invitation to Bid
BID NOT COMPLETE
Jun 4, 2025 at 4:26 PM EDT
Ritschard Bros., Inc.
Don Ritschar rit1204(adatacruz.com Women Busines! Earthwork & Message
Pictures
BID NOT COMPLETE
Jun 5, 2025 at 2:30 PM EDT
Ritschard Bros., Inc.
Don Ritschar rit1204(adatacruz.com Women Busines! Earthwork & Message
Addendum 01
BID NOT COMPLETE
Allianz Ali
EULER BERMES NORTH AMERICA INSURANCE COMPANY
100 International Drive, 22nd Floor • Baltimore, Maryland 21202
The number of persons authorized by this
Power of Attorney is not more than:
POWER OF ATTORNEY
ALLianz
Trade
KNOW ALL MEN BY THESE PRESENTS: That EULER HERMES NORTH AMERICA INSURANCE COMPANY (EULER BERMES), a
corporation organized and existing under the laws of the state of Maryland, does hereby nominate, constitute, and appoint the person or persons
named below, each individually if more than one is named, its true and lawful attorney -in -fact, for and in its name, place, and stead to execute on
behalf of EULER HERMES, as surety, any and all bonds, undertakings, and contracts of suretyship, or other written obligations in the nature thereof;
provided that the liability of EULER HERMES on any such bond, undertaking, or contract of suretyship executed under this authority shall not
exceed the limit stated below.
NAME ADDRESS LIMIT OF POWER
Pamela M. Anderson
225 North Shore Drive, Suite 300
Pittsburgh, PA 15212
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above.
UNLIMITED
IN WITNESS WHEREOF, EULER HERMES has caused these presents to be signed and attested by its appropriate
officers and its corporate seal hereunder affixed ibisIst day of December , 20 23 .
Z��46
James Daly, President and CEO -The Americas
State of Maryland, County of Baltimore
Nicholas P. Verna 11, Senior Vice President
and Regional Head of Surety and
Guarantee, Americas
On this 1st day of December , 20 23 , before me personally appeared Nicholas P. Verna 11, to me known, being duly sworn, deposes and
says that he resides in Southeastern, PA; that he is Senior Vice President and Regional Head of Surety and Guarantee, Americas of Euler Hermes
North America Insurance Company, the Company described herein and which executed the above instrument; that he know the seal of EULER
HERMES; that the seal affixed to said instrument is such corporate seal; that it was so affixed by authority of the Board of Directors of EULER
HERMES; and that he, signed his name thereto by like authority.
Notary Publ'
~ w This Commission Expires February 2, 202b
Notarial Sealti i t
This Pdwfr.'of Attorney ranted by authority of the following resolutions adopted by the Board of Directors of EULER HERMES
NORTH AIyfERIC.A.I TSURQ;NCE COMPANY (Company) by unanimous consent on October 1, 2015.
RESOLVED: That the President, Executive Vice President, Senior Vice President, Vice President, Secretary, and Assistant Vice Secretary, be and
hereby are authorized from time to time to appoint one or more Attomeys-in-Fact to execute on behalf of the company, as surety, and any and all
bonds, undertakings and contracts of suretyship, or other written obligation in the nature thereof; to proscribe their respective duties and all respective
limits of their authority; and to revoke any such appointment at any time.
RESOLVED FURTHER: That the Company seal and signature of the aforesaid officers and may be affixed by facsimile to any
Power of Attorney given for the execution of any bond, undertaking, contract of suretyship, or other written obligations in the nature thereof,
such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the
original seal of the Company, to be valid and binding upon the Company with the same force and effect as thought manually affixed.
CERTIFICATION
1, Nicholas P. Verna It, Senior Vice President and Regional Head of Surety & Guarantee, Americas of EULER HERMES NORTH AMERICA
INSURANCE COMPANY, do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of October 1,
2015, have not been revoked and are now in full force and effect.
Signed and sealed this I Oth day of June 12025
oe
SEAt.�'
=•�'.,,,aE' Nicholas P. Verna 11, Senior Vice President and Regional
I lead of Surety and Guarantee, Americas
Finer Hermes North America Insurance Company and its affiliated debt collection company are part of the Alliatu group and market their products and services using tlte'Allianr Trade trademark.
06/05/2025 12:50PM FAX 3178414258 ESTIMATING IN001/0001
1 16 Cot. N i r-C rs Ili a niv.
227 W. IrrrrRiiiN LAIALLI MW
sui in Ri-No. INni i❑ -IG6U 1-I$_U
PnOur- 474123,5-y_51
t Aa 574/ 2.35-9171
1 DD S741235_5567
CITY m SotrLn 131_ND JA If., Mt 11_LLR, MnYolt
BOARD OF PUBLIC WORKS
Date: 06-05-2025
To: All Planholders
From Theresa Heffner, Clerk. Board of Public Works
Subject Addendum Number: 1
117-059A-2 South Well Field Water Treatment Plant and Distribution
Project Name: Systemlimprovements (Bid Package 2 — Division A Rebid)
Project No.:
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: 06/05/2025
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Signature:
Date:
ineering Corporation
06/05/2025
1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAX 574/235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND .TAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: 06-05-2025
To: All Planholders
From Theresa Heffner, Clerk, Board of Public Works
Subject Addendum Number: 1
117-059A-2 South Well Field Water Treatment Plant and Distribution
Project Name: System Improvements (Bid Package 2 — Division A Rebid)
Project No.:
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: 06/05/2025
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
R. Yoder Construction, Inc.
Authorized Signature:
Date: 06/06/2025
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) V By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) _ For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 02/23/2022 General Conditions - 12
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) _ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) _ By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
(i) V
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) V
List identifying all former business names.
(iii) V
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv)
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) V
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
V
under all applicable state and federal laws and local ordinances.
(vi)
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
(vii) V
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii)
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 02/23/2022 General Conditions -13
(ix) V Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) V List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: 06/10/2025
(Sign Here)
Brad Yoder
(Print Name Here)
R, Yoder Construction, Inc.
(Name of Company)
P.O. Box 69
(Address of Company)
Nappanee
(City)
Indiana
(State)
574-773-3502
(Telephone Number)
Version 02/23/2022 General Conditions - 14
R. Yoder Construction, Inc.
Pre -Qualification Checklist Statements
South Bend Board of Public Works
South Well Field Water Treatment Plant,
and Distribution System Improvements
(b) Attachments
(i) See attached Indiana Secretary of State's on-line records business verification
showing R. Yoder Construction, Inc. is in existence, currently with the State of
Indiana Secretary of State's Business Entity Report, and eligible for a certificate
of good standing.
(ii) N/A
(iii) None
(iv) R. Yoder Construction, Inc. has sufficient labor staffing including employees on
staff, sub -contractors and reliable external staffing agencies to meet
requirements of all projects.
(v) All individuals who perform work on any public works project on my behalf will
be properly classified as an employee or as an independent contractor under all
applicable state and federal laws and local ordinances.
(vi) Evidence of participation in apprenticeship and training programs, approved by
and registered with the United States Department of Labor's office of
Apprenticeship or its successor organization attached.
(vii) A copy of the company written plan for employee drug testing is attached.
(viii) Evidence of surety company which is on the United States Department of
Treasury's Listing of Approved Sureties as required attached.
www.ryoderconstruction.com
R ~ lY T Page 11
(ix) See below a list of projects performed recently.
South Bend International Airport —Airport Carwash —4477 Progress Dr., South
Bend, IN.,46628
Penn Harris Madison Schools — Penn Fieldhouse -46100 Bittersweet Rd.,
Mishawaka, IN 46545
City of South Bend, Fire Station #8 — 2042 S. Twyckenham Dr.,
South Bend, IN 46601
www.ryoderconstruction.com
R T Page 12
I DO HEREBY AFFIRM UNDER THE PENATIES OF PERJURY THATTHE FACTS AND INFORMATION
CONTAINED IN THE FOREGOING STATEMENT ARE TRUE AND CORRECT.
DATED AT: 8:OOAM THIS 10th DATE OF June 2025.
(Title of Person Signing)
STATE OF Indiana
COUNTY OF Elkhart
Before me, a Notary Public, personally appeared the above -named Brad Yoder
and swore the statements contained in the foregoing document are true and correct.
Subscribed and sworn before me this10th day of June
My Commission Expires: March 30,2032
County of Residence: Kosciusko
2025.
SHELLY J BRIGHAM
�a�'% Notary Public, State of Indiana
2;SEAL.-"= Kosciusko County
*' *; Commission Number NP0682724
iIANP\SC My Commission Expires
March 30, 2032
www.ryoderconstruction.com
R_Y
Page 13
State of Indiana
Office of the Secretary of State
CERTIFICATE OF EXISTENCE
To Whom These Presents Come, Greeting:
I, DIEGO MORALES, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of
the State of Indiana, the custodian of the corporate records and the proper official to execute this
certificate.
I further certify that records of this office disclose that
R. YODER CONSTRUCTION, INC.
duly filed the requisite documents to commence business activities under the laws of the State of
Indiana on April 14, 1992, and was in existence or authorized to transact business in the State of
Indiana on June 06, 2025.
I further certify this Domestic For -Profit Corporation has filed its most recent report required by
Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of
withdrawal, dissolution, or expiration has been filed or taken place. All fees, taxes, interest, and
penalties owed to Indiana by the domestic or foreign entity and collected by the Secretary of State
have been paid.
.rMrw
i-M-6
In Witness Whereof, I have caused to be affixed my
signature and the seal of the State of Indiana, at the City
of Indianapolis, June 06, 2025
DIEGO MORALES
SECRETARY OF STATE
1992040594 / 20254453076
All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate
Expires on July 06, 2025.
BUSINESS INFORMATION
DIEGO MORALES
INDIANA SECRETARY OF STATE
05/23/2024 10:07 AM
Business Details
Business Name: R. YODER CONSTRUCTION, INC. Business ID: 1992040594
Entity Type: Domestic For -Profit Corporation Business Status: Active
Creation Date: 04/14/1992 Inactive Date:
Principal Office Address: 27453 CR 150, P.O. BOX 69, Nappanee, IN, Expiration Date: Perpetual
46550 - 9308, USA
Jurisdiction of Formation: Indiana Business Entity Report Due 04/30/2026
Date:
Years Due:
Governing Person Information'
Title Name Address
President
Jason Yoder
Vice -President (Operations)
Bradley Yoder
Vice -President (Sales)
Kevin Yoder
Secretary
Kevin Yoder
President
JASON E YODER
Vice President
Bradley YODER
Vice President
Kevin YODER
27453 CR 150, NAPPANEE, IN, 46550, USA
27453 CR 150, Nappanee, IN, 46550, USA
27453 CR 150, Nappanee, IN, 46550, USA
27453 CR I50, Nappanee, IN, 46550, USA
27453 CR 150, Nappanee, IN, 46550, USA
27453 CR 150, Nappanee, IN, 46550, USA
27453 CR 150, Nappanee, IN, 46550, USA
Secretary Kevin YODER 27453 CR 150, Nappanee, IN, 46550, USA
Registered Agent Information
Type: Individual
Name: JASON E YODER
Address: 27453 CR 150, P.O. BOX 69, NAPPANEE, IN, 46550, USA
RMODER
CONSTRUCTION
Staffing Statement
City of South Bend
Department of Public Works
R. Yoder Construction has sufficient labor staffing including employees on staff,
subcontractors and reliable external staffing agencies to meet the requirements
of this project.
27453 CR 150 i Nappanee, IN 146550 1 Tel: 574.773.3502 1 Fax: 574.773.4941
www.ryoderconstruction.com
i13CO
Associated Builders and Contractors
Indiana
Kentucky
Memorandum of Understanding
6/9/2025
Please accept this as verification R. Yoder Construction is a
member in good standing of Associated Builders & Contractors
of Indiana/Kentucky, Inc (ABC).
ABC's program is certified by the Federal Department of Labor,
Office of Apprenticeship and Training and by the National
Center for Constructions Education and Research (NCCER).
ABC uses the NCCER curriculum.
Michiana Contracting has 3 (three) students enrolled in the
Carpentry Apprenticeship training program.
Feel free to call me with any questions regarding our
apprenticeship program.
Regards,
Brianne Feeks
Elkhart Apprenticeship Coordinator
1710 Leer Dr. —Elkhart, Indiana 46514— 574-218-0340
brianne@abcindianakentucky.org
Dale
(gafffirair of Yt -of-rafivu
ASSOCIATED BUILDERS & CONTRACTORS OF INDIANA
INDIANAPOLIS, INDIANA
FOR THE OCCUPATIONS OF: BRICKLAYER (0052), CARPENTER (0067), CEMENT MASON (0075), ELECTRICIAN (0159), OPERATING ENGINEER (0365), PAINTER (0379),
PIPE FITTER (0414), PIPE FITTERSPRINKLER SYSTEMS (0404A), PLUMBER (0432), ROOFER (0480), SHEET METAL WORKER (0510), HVAC (0637), CONSTRUCTION
CRAFT LABORER (0661), ASSEMBLER -METAL BUILDING (0377), INSULATION WORKER (0909), GLAZIER (0221)
cce��'s�ere�as'par°,1 o�f�ae �%faon���j��renfaces��� �ro�r�rn
an ezccordrance cvY1Sfb1'e �6asYc sl ano�zr�s of���r°en ices g�
esfa,6-fis_,�'ecf�y 6ecre1a'r_30(' of.'a�6_or
REGISTERED MARCH 2,1982
REVISED JANUARY 612006
IN030060001
Xe9is/�alion xo.
a
cSecrelary of Gabor
`Jldminis/ra/or �Ippren/ices6ip .7i aininy, Cmp%yer andGv6or cSeruice r
testing.
3. Have no more than 3 moving violations in the previous 3 years, or more than
one within the last 12 months. No serious violations within the past 3 years. A
valid MVR must be reviewed before driver may operate Company equipment.
..............
4. Must pass a DOT required substance abuse screen.
5. Driver has no DWI, DUI, nor reckless driving convictions in the past 5 years.
6. Has had no more than 1 preventable vehicle accident in the past 5 years, no
..............
preventable accidents in the past 12 months.
7. Has had no accident involving a lawsuit that has not been settled.
8. Has had no preventable accident which involved a fatality.
9. Has no suspension of driving privileges within the past 5 years, excluding
suspension for not paying child support, medical card registration and/or
similar offenses.
10. Has taken and passed a Written Test and a Road Test.
11. Has NOT been assigned a Risk Rating Value of "Questionable" or "High".
If a new hire employee does not have a valid CDL license, R. Yoder Construction
will assist the employee with the necessary training and testing. Further, R.
..............
Yoder Construction will reimburse the employee for the first round of testing.
If the employee does not pass the first time, they will be responsible for all fees
for additional rounds of testing until they pass. R. Yoder Construction will also
reimburse for the employee's CDL Physical Examination. A copy of a valid physical
examination must be on file in the Company's office. Failure to receive a valid CDL
will result in disciplinary actions being taken.
5.9 Expense Reimbursement
..............
R. Yoder Construction will reimburse certain expenses incurred on behalf of the
..............
Company. Please contact Management for specific details.
..............
5.10 Jury Duty
..............
If you receive a court order to perform jury duty service or appear for a jury duty
service or appear for a jury examination during regular work hours, show the order
..............
to HR as soon as possible so adjustments may be arranged.
..............
R. Yoder Construction will continue providing current benefits for the term of the
jury duty absence. Any qualified vacation and holiday benefits will continue to
accrue during jury duty leave.
..............
In order to encourage a sense of civic responsibility, R. Yoder Construction will
continue the employee's average or normal daily compensation, up to 3 days within
a calendar year, while serving for jury duty. Jury duties that extend beyond that
will be at no pay, but an employee may use their paid time off in accordance with
company guidelines.
..............
..............
5.11 Substance Abuse
32 R. YODER CONSTRUCTION EMPLOYEE HANDBOOK
R. Yoder Construction has a strong commitment to its employees to provide a
safe work environment. This requires that personnel, equipment, and operating
practices be consistent with high standards of health and safety. R. Yoder
..............
Construction expects all employees to report for work free of alcohol and illegal
drugs. The presence of illegal drugs or alcohol on the job and the influence of these
..............
substances on employees are inconsistent with these objectives.
Our policy with respect to drugs is as follows:
..............
..............
1. R. Yoder Construction will conduct drug and/or alcohol testing under any of
the following circumstances: Pre -employment, Random, Reasonable Cause,
and Post -Accident Testing (see a fuller description of these circumstances on
..............
the next page for more information).
..............
2. The use, sale, distribution, possession, or being under the influence of
illegal drugs or alcohol by R. Yoder Construction employees while on the
..............
job or on R. Yoder Construction's property is prohibited. Likewise, you may
not distribute, misuse, or abuse any prescription medications on R. Yoder
..............
Construction premises or elsewhere during working time. Any individual
violating these rules will be subject to disciplinary action up to and including
immediate termination of employment.
..............
1 Individuals who appear to be under the influence of a controlled substance
will be removed from the job immediately and be subject to a drug or alcohol
test. An employee's refusal to comply with a drug or alcohol test will make
..............
them subject to automatic termination.
..............
..............
4. If an employee is injured on the job, the employee will be required to, at the
discretion of Management, submit to a drug and/or alcohol test. An employee
..............
testing positive for illegal drugs or found to be under the influence of alcohol
will be subject to disciplinary action up to and including termination. An
..............
employee's refusal to comply with a drug and alcohol test will make them
subject to automatic termination.
..............
..............
5. R. Yoder Construction's management reserves the right to authorize
inspections for possible policy violations. Any illegal substances will be
..............
turned over to the appropriate law enforcement and may result in criminal
prosecution.
..............
..............
NOTE EMPLOYEES USING A PRESCRIPTION DRUG that may impair their physical
..............
or mental ability and affect their ability to perform duties safely MUST REPORT
this to management before reporting to work after its use. A determination will be
made by the company if the employee's work assignment is affected. Failure to do
so will cause the employee to be subject to disciplinary action up to and including
immediate termination of employment.
..............
Following is a more complete description of the circumstances when R. Yoder
..............
Construction will conduct drug and/or alcohol testing:
EMPLOYEE BENEFITS & SERVICES 33
..............
+ PRE -EMPLOYMENT TESTING: Each individual offered employment must pass
a drug test as a condition of employment. Management has the right to waive
..............
this requirement on an individual basis.
+ RANDOM TESTING: Employees may be selected at random for drug testing at
..............
any interval determined by the Company.
..............
+ REASONABLE CAUSE TESTING: The Company may ask an employee to
..............
submit to a drug and/or alcohol test at any time it has reasonable cause
to believe that the employee may be under the influence of drugs or
..............
alcohol during working hours, including, but not limited to, the following
circumstances: observation of drug use, evidence of drugs or alcohol on or
about the employee's person or in the employee's vicinity during working
..............
hours, specific observations concerning the appearance, behavior, speech,
or body odors of an employee, unusual conduct on the employee's part as
..............
evidenced by the employee's work time actions, appearance, or conduct,
arrest or conviction for a drug- and/or alcohol -related offense (about which
employees are required to notify HR within 3 calendar days).
..............
+ POST -ACCIDENT TESTING: Any employee involved in an on-the-job accident
or injury that results in (a) death, (b) bodily injury that requires medical
treatment away from the scene of the accident, or (c) property damage of at
....
least $250.00 will be asked to submit to a drug and/or alcohol test. "Involved
..........
in an on-the-job accident or injury" means not only the one who was or could
have been injured but also any employee who potentially contributed to the
accident or injury event in any way. Near misses may be subject to testing
under this policy as well. An employee who does not report an injury on the
..............
day of occurrence and is required to seek medical assistance at a later date
. . . . . . . . . . may be subject to a drug test.
..............
..............
..
Voluntary Identification and Rehabilitation/Treatment
............
..............
..............
An employee who voluntarily says he has a drug- or alcohol -related problem
will not be subject to discipline for volunteering that fact. Instead, the employee
may request an unpaid leave of absence to undergo rehabilitation or treatment to
overcome dependence on drugs or alcohol or to participate in other programs
recommended by a substance abuse professional.
..............
This leave will be in accordance with the terms and conditions of leave policies.
..............
..............
Since the key to rehabilitation is the willingness to admit and seek to remedy the
problem, this provision is not available to one who requests help (1) after being
. . . asked to submit to testing or (2) after the employee's use of drugs or alcohol
..............
becomes a personnel issue based on direct observation or evidence obtained from
an arrest or criminal conviction for a drug- or alcohol -related offense. Further,
employees who volunteer such information and participate in a rehabilitation/
treatment program must still comply with rules concerning alcohol and drugs and
will be subject to discipline for a violation.
..............
34 R. YODER CONSTRUCTION EMPLOYEE HANDBOOK
Allianz
May 9, 2025
RE: R. Yoder Construction, Inc.
Surety Prequalification Letter
To Whom It May Concern:
Allianz
Trade
We hereby confirm that R. Yoder Construction, Inc. is a highly valued client of Euler Hermes North America
Insurance Company (operating under the Allianz Trade name), and that we have confidence in the financial
and operational strength of the firm. We are currently willing to support single bonds up to $60,000,000
with total aggregate capacity of $120,000,000.
As is customary within the surety industry, the issuance of any bid or final bonds is always contingent upon a
satisfactory underwriting review at the time a request for bonds is made. This review may include, but not be
limited to, acceptable terms, conditions, documents, bond forms, and confirmation of an acceptable financing
source and payment provisions. It should be understood that any arrangement for surety bonds is a matter
strictly between R. Yoder Construction, Inc. and Euler Hermes. We assume no liability to third parties or to
you by issuance of this letter.
Euler Hermes North America Insurance Company is Rated "A+" by A.M. Best with a Financial Classification of
"XV" ($2 billion or greater) and appears on the U.S. Treasury Department List of approved sureties.
EULER HERMES NORTH AMERICA INSURANCE COMPANY
Pamela M. Anderson, Attorney -in -Fact
Euler Hermes North America Insurance Company and its affiliated debt collection company are part of the Allianz group and market their products and services using the
'Allianz Trade' trademark.
Allianz ili
EULER IIERMES NORTH AMERICA INSURANCE COMPANY
100 International Drive, 22nd Floor . Baltimore, Maryland 21202
The number of persons authorized by this
Power of Attorney is not more than: 13
POWER OF ATTORNEY
ALiianz
Trade
KNOW ALL MEN BY THESE PRESENTS: That EULER HERMES NORTH AMERICA INSURANCE COMPANY (EULER HERMES), a
corporation organized and existing under the laws of the state of Maryland, does hereby nominate, constitute, and appoint the person or persons
named below, each individually if more than one is named, its true and lawful attorney -in -fact, for and in its name, place, and stead to execute on
behalf of EULER HERMES, as surety, any and all bonds, undertakings, and contracts of suretyship, or other written obligations in the nature thereof;
provided that the liability of EULER HERMES on any such bond, undertaking, or contract of suretyship executed under this authority shall not
exceed the limit stated below.
NWenEEq ABri ht; Cheri L. Ritz; Natasha Kerr ADDRESS LIMIT OF POWER
Y. $ 225 North Shore Drive Unlimited
William M. Chapman; Madeline P. Lovett Suite 300
Barbara A. Leeper; Giavonna D. Tavelia Pittsburgh, PA 15212
Pamela M. Anderson; Nancy L. Arku; Krista M. Nagy
Patti K. Lindsey; Joshua Restauri; Kailee M. Rousseau
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above.
IN WITNESS WHEREOF, EULER IIERMES has caused these presents to be signed and attested by its appropriate
officers and its corporate seal hereunder affixed this 1st day of December , 20 23 .
z�-o
James Daly, President and CEO The Americas
State of Maryland, County of Baltimore
Nicholas P. Verna II, Senior Vice President
and Regional Head of Surety and
Guarantee, Americas
On this Ist day of December , 20_23 before me personally appeared Nicholas P. Verna II, to me known, being duly sworn, deposes and
says that he resides in Southeastern,PA; that he is Senior Vice President and Regional Head of Surety and Guarantee, Americas of Eider Hermes
North America Insurance Company, the Company described herein and which executed the above instrument; that he know the seal of EULER
HERMES; that the seal affixed to said instrument is such corporate seal; that it was so affixed by authority of the Board of Directors of EULER
HERMES; and,that hs#�ia$ned his name thereto by like authority.
4
Notary Pub]i
This Commission Expires February 2, 2026
Notarial S40.
This Pow. i r>3ft e� by authority of the following resolutions adopted by the Board of Directors of EULER HERMES
NORTH � CE COMPANY (Company) by unanimous consent on October 1, 201 S.
RESOLVED: That the President, Executive Vice President, Senior Vice President, Vice President, Secretary, and Assistant Vice Secretary, be and
hereby are authorized from time to time to appoint one or more Attorneys -in -Fact to execute on behalf of the company, as surety, and any and all
bonds, undertakings and contracts of suretyship, or other written obligation in the nature thereof; to proscribe their respective duties and all respective
limits of their authority; and to revoke any such appointment at any time.
RESOLVED FURTHER: That the Company seal and signature of the aforesaid officers and may be affixed by facsimile to any
Power of Attorney given for the execution of any bond, undertaking, contract of suretyship, or other written obligations in the nature thereof,
such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the
original seal of the Company, to be valid and binding upon the Company with the same force and effect as thought manually affixed.
CERTIFICATION
I, Nicholas P. Verna 11, Senior Vice President and Regional Head of Surety & Guarantee, Americas of EULER HERMES NORTH AMERICA
INSURANCE COMPANY, do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of October 1,
2015, have not been revoked and are now in full force and effect.
Signed and sealed this 9th day of May ,20 25
4�O "t
_ SEAL '•.�s
':`•.........�° Nicholas P. Verna II, Senior Vice President and Regional
�', daHead of Surety and Guarantee, Americas
Euler Hermes North America insurance Company and its affiliated debt collection company are part of the Allianz group and market their products and services using the'Allianz Trade' trademark.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 06-02-2025
Name: Jacob M. Klosinski Department of Public Works — Engineering Division
BPW Date: 06-10-2025 Phone Extension: Ext. 9496
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney ® Attorney Name Michael Schmidt
Purchasing ® Mickey Low / Tanner Liestman
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
® Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Special Contract Provisions
Purpose/Description
Amount of
Previous Amount
Information
U YesU If Yes, Approved by Purchasing
❑ No
❑❑ WBE Completed E-Verify Form Attached ❑❑ Nos
South Well Field, Water Treatment Plant, and Distribution System
Improvements — Bid Package #2 Division A
I I7-059A / DFO PROJ00000082
Southside TIF and Water Capital Fund
PR/PO #
The Division of Engineering and Division of Water request the Board of
Public Works receive and open public bids for the subject project at its
meeting on 06/10/2025. Bid Package #2 Division A is a rebid. Refer to Inter -
Office Memorandum for nroiect details.
❑ Increase
❑ Decrease
Current Percent of Change
New Amount
Total Percent of Change:
Time Extension Amount:
For Change Orders
Increase
Decrease
Increase %
Decrease ( %
New Completion Date:
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIV. OF ENGINEERING & DIV. OF WATER
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk of the Board of Public Works
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: Agenda Request —Bid Opening
South Well Field, Water Treatment Plant, and Distribution System
Improvements — Bid Package 2 Division A
Project No. 117-059A / DFO PROJ00000082
DATE: June 2, 2025
The Board of Public Works will receive public bids for the subject project at its Regular Meeting
on June 10, 2025. The Department of Public Works, Division of Engineering and Division of
Water Works request the Board open and read public bids into the record at the June 10, 2025,
meeting. The bids for Bid Package 2 Division A were rebid since no complete bids were
received at the previous bid opening.
The Division of Engineering and Division of Water will review of bids received during the rebid
of Project No. 117-059A South Well Field, Water Treatment Plant, and Distribution System
Improvements — Bid Package 2, Division A. At that time, the bids will be compared to determine
if Bid Package #1 or Bid Package 2 Division A and Division B present the most economical
construction project for the Division of Water and the improvements needed at the South Well
Field Water Treatment Plant site.
This project is funded out of the Southside TIF and Water Capital Fund.