Loading...
HomeMy WebLinkAboutOpening of Bids - South Well Field WTP Improvements - Bid Package 2 Div A Proj No 117-059A - Bowen EngineeringCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name South Well Field, Water Treatment Plant, and Distribution System Improvements Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid) Project No. 117-059A For Bids Due June 10, 2025 PART I (Must be completed for all bids. Please type or print) Date: 06/10/2025 Bidder (Firm): Bowen Engineering Corporation Address: 8802 North Meridian Street City/State/Zip: Indianapolis, IN 46260 Telephone Number: ( 317 ) 842-2616 Agent of Bidder (if Applicable): N/A Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: South Well Field, Water Treatment Plant, and Distribution System Improvements Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid) the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Donohue & Associates, Inc. and dated May 2025 for the sum of (enter the Total Bid as shown on the Proposal) Four Million Fifteen Thousand and Zero Cents r,-� 4,015,000.00 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the C o South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown n a s p rate attachment. By Llz�� (Signature) Doug Stout, Estimating Manager (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member 20 Joseph R. Molnar, Vice President Breana Micou, Member Murray L. Miller, Member Attest: Theresa Heffner, Clerk Version 09/29/2021 Contractor's Bid for Public Works - 2 Project Name: Project Number: For Bids Due: Contractor Name: �. or rii\irF. BID/PROPOSAL CITY OF SOUTH BEND�� South Well Field, Water Treatment Plant, and Distribution System Improvements - Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Re....,, 117-059A June 10, 2025 BASE BID — DIVISION A Bowen Engineering Corporation Item No. Description Total Amount BASE BID — DIVISION A I Covers all Well Field and Water Treatment Plant 4,015,000.00 Improvements (Division A only), according to the intent of the Plans and Specifications. DIVISION A BASE BID TOTAL 4,015,000.00 This Public Bid work is divisible. Contractors submitting a public bid may provide pricing for Base Division A, . The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award , the Board will look at the totality of the cost per each division when determining the lowest, responsive, and responsible bid(s). Bidder (Firm): Address: Bowen Engineering Corporation 8802 North Meridian Street City/State/Zip: Indianapolis, IN 46260 Telephone Number: 842-2616 By (Signature) Doug Stout, Estimating Manager (Printed Name of Person Signing) Version 09/29/2021 Contractor's Bid for Public Works - 7 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS: Marion COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 09/29/2021 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. l understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this OS`0 day of Jut46 , 20Z n Engineering Corporation Co ractor/ idder (Firm) Signs of Contractor/Bidder or Its Agent Doug Stout, Estimating Manager Printed Name and Title Subscribed and sworn to before me this os"' day of TvN& , 20A5 My Commission Expires OGTDU-9- V7, -26'Aa LAVRA C—AWC— f�" Notary Public County of Residence Marion .%01 i""'// LAURA ELAINE DABNEY `1PPY Vd'$ Notary Public, State of Indiana Marion County ` Commission Number NP0759420 My YOctober 17,r2032r83 Version 09/29/2021 Contractor's Bid for Public Works - 6 x x CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name South Well Field, Water Treatment Plant, and Distribution System Improvements Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 -Division A - Rebid) Project No. 117-059A For Bids Due June 10, 2025 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and X WBE-2.1]. X Acknowledge Receipt of 1 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Bowen Ern ineering Corporation Date: 06/10/2025 By Authorized Representative: Signature: Print Name & Title: Doug Stout, Estimating Manager Version 09/29/2021 Contractor's Bid for Public Works - 1 Docusign Envelope ID: 3A72AFF0-7DAE-4B16-9F4C-5318F57A928D CNA SURETY CONTRACTOR: (Name, legal status and address) Bowen Engineering Corporation 8802 North Meridian Street Indianapolis, IN 46260 OWNER: (Name, legal status and address) City of South Bend, Indiana, Board of Public Works 227 West Jefferson Blvd. South Bend, IN 46601 Bond No. N/A SURETY: Continental Casualty Company (Name, legal status and principal place of business) 151 N. Franklin Street 17th Floor Chicago, IL 60606 BOND AMOUNT: Five Percent of the Maximum Amount of the Total Bid (5%) This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. PROJECT: (Name, location or address, and Project number, if any) South Well Field Water Treatment Plant and Distribution System Improvements; Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 — Division A - Rebid); Project No. 117-059A The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 10th day of June FE Signed by: �. Ae D-&e-1 (Witness) 5 DocuSigned by: (Witness) 2025 Bowen Erb' gtgig ,Qorporation (Princip l) WL d I' (Seal) (Title) Carey e e�o-4CFO Conti nenj§LgasMe Ityt,Company (Surety) (Title) , Attorney -in -Fact (Seal) Signed by: Printed in cooperation with the American Institute of Architects (AIA). The language in this document conforms to the language used in AIA Document A310 - Bid Bond - 2010 Edition. Docusign Envelope ID: 3A72AFF0-7DAE-4B16-9F4C-5318F57A928D POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know All Men By These Presents, That Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company (herein called "the CNA Companies"), are duly organized and existing insurance companies having their principal offices in the City of Chicago, and State of Illinois, and that they do by virtue of the signatures and seals herein affixed hereby make, constitute and appoint Jason D McEldowney, Katie Pikula, John W Hannon III, Robert L Sherfick, Individually of Carmel, IL, their true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on their behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their insurance companies and all the acts of said Attorney, pursuant to the authority hereby given is hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By -Laws and Resolutions, printed below, duly adopted, as indicated, by the Boards of Directors of the insurance companies. In Witness Whereof, the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto affixed on this 23rd day of September, 2023. N,GAS Ug4l %NSUpq MvpNYOA Continental Casualty Company �P FxP� NSF ° National Fire Insurance Company of Hartford Z OORPORArf O z i M `HOORPORA c:. American Casualty Company of Readin Pennsylvania Z > O JULY 31. .2z, oU SEAL s lsoz aT Olc b � tgg7 HAR�F� Larry Kasten Vice President State of South Dakota, County of Minnehaha, ss: On this 23rd day of September, 2023, before me personally came Larry Kasten to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is a Vice President of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company described in and which executed the above instrument; that he knows the seals of said insurance companies; that the seals affixed to the said instrument are such corporate seals; that they were so affixed pursuant to authority given by the Boards of Directors of said insurance companies and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said insurance companies. ..................,..,.,.,.,.. . ` My commission expires S M. BENT NOTARY PUBLIC sMN s i Jc SOUTH DAKOTA March 2, 2026.,,,,,,......,.,................. M. Bent Notary Public CERTIFICATE I, D. Johnson, Assistant Secretary of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company do hereby certify that the Power of Attorney herein above set forth is still in force, and further certify that the By -Laws and Resolutions of the Board of Directors of the insurance companies printed below are still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said insurance companies this 10th day of June 2025 P�GASUq, 04SURgt MP NM OFP� Continental Casualty Company Z OORPORArf `NCORP°RgT 0 t j. Z a O �� a n JULY 31, c Ou SEAL s �d lsoz a� 1897 HARIF sky 0 ca National Fire Insurance Company of Hartford American Casualty Company of Reading, Pennsylvania D. Johnson Assistant Secretary Authorizing By -Laws and Resolutions ADOPTED BY THE BOARD OF DIRECTORS OF EACH OF CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA (as defined above, the "CNA Companies"): This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of each of the above CNA Companies at a meeting held on May 12, 1995: "RESOLVED: That any Senior or Group Vice President may authorize an officer to sign specific documents, agreements and instruments on behalf of the Company provided that the name of such authorized officer and a description of the documents, agreements or instruments that such officer may sign will be provided in writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective." This Power of Attorney is signed by Larry Kasten, Vice President, who has been authorized pursuant to the above resolution to execute power of attorneys on behalf of each of the CNA Companies. This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of each of the above Companies by unanimous written consent dated the 25L' day of April, 2012: "Whereas, the bylaws of the Company or specific resolution of the Board of Directors has authorized various officers (the "Authorized Officers") to execute various policies, bonds, undertakings and other obligatory instruments of like nature; and Whereas, from time to time, the signature of the Authorized Officers, in addition to being provided in original, hard copy format, may be provided via facsimile or otherwise in an electronic format (collectively, "Electronic Signatures"); Now therefore be it resolved: that the Electronic Signature of any Authorized Officer shall be valid and binding on the Company." This Power of Attorney may be signed by digital signature and sealed by a digital or otherwise electronic -formatted corporate seal under and by the authority of the following Resolution adopted by the Board of Directors of each of the above CNA Companies by unanimous written consent dated the 27th day of April, 2022: "RESOLVED: That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify and confirm the use of a digital or otherwise electronic -formatted corporate seal, each to be considered the act and deed of the Company." Go to www.cnasurety.com > Owner / Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity. Form F6853-6/2023 tip\:fll �tF. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN,; FORM MBE-1.0 -- �dr, MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Project Number: Bidder: 117-059A South Well Field, Water Treatment Plant, and Distribution System Improvements Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 — Division A - Rebid) Bowen Engineering Corporation Total Bid Amount: 4,015,000.00 MBE Goal: 1.11 % Page of Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal AMGI LLC 2345 S Briarwood Drive New Palestine, IN 46163 Marlon Gill 317-447-1524 Equipment Rental and Construction Material Supplier 52,500.00 1.31 % Submitted by: Doug Stout, Estimating Manager Print Name 06/10/2025 SignatLwDate Version 09/29/2021 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND ti a MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN J< FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number Bidder: South Well Field, Water Treatment Plant, and Distribution System Improvements 117-059A Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid) Bowen Engineering Corporation Total Bid Amount: 4,015,000.00 WBE Goal: 4.24% Page of Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Total Energy Solutions Company, LLC Mark Bovel Construction and Piping Material Supplier 181,650.00 4.52% 9955 Crosspoint Blvd, Suite 100 317-537-2410 Indianapolis, IN 46256 Service pipe Justin Bennett Pipe Material Supplier 7,000.00 0.17% 302 South New Jersey St. 317-639-9308 Indianapolis, IN. 46204 Submitted by Doug Stout, Estimating Manager Print Name Vure Version 09/29/2021 Contractor's Bid for Public Works - 10 Date 06/10/2025 /IiTH yF, �t L CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 1 ;, EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 117-059A Date: 06/10/2025 South Well Field, Water Treatment Plant, and Distribution System Improvements Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid) Bidder: Bowen Engineering Corporation Contact Person: Doug Stout, Estimating Manager Address: City: Indianapolis Email: Telephone: 317-842-2616 8802 North Meridian Street State IW4 Zip: 46260 To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htt ://www.in. ov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of 5 Indiana Minority and Women Business Enterprises, found on their website /4 (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be TM performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform TInS MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such �M advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. 1 affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. PM-5 I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 11 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary .Lj equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 12 CITY OF SOUTH BEND ., MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 117-059A Date: 06/10/2025 South Well Field, Water Treatment Plant, and Distribution System Improvements Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid) Bidder: Bowen Engineering Corporation Contact Person: Doug Stout, Estimating Manager Telephone: 317-842-2616 Address: 8802 North Meridian Street City: Indianapolis State: IN zip: 46260 Email: STOUT@BowenEngineering.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htt ://www.in. ov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be S performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available L�)NLS means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform �jyls WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications ,DM concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner —D116 reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs -D� with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, D�� lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 13 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS 11111111110 I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary "D/yLs equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons based P/v1.5 I on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number, 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 14 l l gF 1" CITY OF SOUTH BEND o!' MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 `ice MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 117-059A MBE Participation Goal 1.11 % South Well Field, Water Treatment Plant, and Distribution System Improvements Project Na e: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid) Bidder: Bowen Engineering Corporation By; Doug Stout, Estimating Manager 06/10/2025 (Si fi ture) (Title) (Date) MBE Firm PLEASE SEE ATTACHED LIST Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm PLEASE SEE ATTACHED LIST Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 15 CITY OF SOUTH BEND This completed form is an adapted Form MBE-2.1 MBE Contacted Form that is supplied with Bids taht MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE FORM TO BE ATTACHED TO BE MBE-2.1 qualifications. Project Number: 117-059A-2 MBE Participation Goal 1.11% Project Name: South Well Field, Water Treatment Plant, and Distribution System ImprovementsContract A- Well Field and Water Treatment Plant Improvements (Bid Package 2 -Division A- Rebid) Bidder: Bowen Engineering Corporation SEE FRONT PAGE FOR SIGNATURE MBE FIRM OWNER/CONTACT PHONE FAX EMAIL TYPE OF WORK RESULTS OF CONTACT 1st Class Logistics LLC Bernard Coutee (574) 993-0071 lstclasslogistics2013@gmail.com Trucking Accepted ABK Services Burton Jung (614) 325-6126 (614) 569-0087 burt.jung@abkservices.net Trucking Declined AD Distribution LLC Marlon Gill ADdistribution@usa.com Construction Material Supply Invited Adams Trucking Inc. of Ohio R Adams radams67914@gmail.com Trucking Declined Electrical, Communications Services, Process Aequitas Power Company, LLC Juan Flynn (502) 257-3518 juan.flynn@aequitaspower.com Control Networks Declined AF Transport (Indianapolis, IN) Estimating Department (317) 281-1894 info@aftransportinc.com Trucking Invited Affordable Quality Painters Affordable Quality (614) 327-5399 agpainters@hotmail.com Painting and Coating Declined All Access Door Systems Pheng Sok (614) 507-5336 phengsok@allaccessusa.com Doors Invited All J Steel, Inc. Estimating Dept. (630) 991-0376 all.jsteel@gmail.com Rebar Declined AlphaJak Sealcoating LLC Andre Jackson (574) 214-6827 ajackson@alphajak.com Sealcoating Declined American Utility Supply Charles Garcia (317) 362-0645 crgarcia@americanutilitysupply.com Piping Declined Electrical, Communications Services, Process Ampere Electric Company Ltd. Shan Bakhtiari (630) 893-1400 (630) 893-2400 shanbakhtiari@gmail.com Control Networks Declined Apogee Construction LLC Matt Rosemond (317) 982-7234 (317) 982-7234 matt@buildapogee.com Construction Material Supply Declined Architectural Concrete Solutions Brian (614) 940-5399 brians@acs-oh.com Concrete Declined Electrical, Communications Services, Process ATEC, Inc. Shelby Creech (765) 482-8926 (765) 482-8936 s.creech@atec-electric.com Control Networks Declined Barnett Mechanical Services, LLC John Barnett (614) 438-7556 (614) 438-2626 jbarnett@barnettmechanicalservices.com Mechanical Invited Battle Axe Construction Joseph Jackson (513) 874-4695 (513) 874-4694 jackjoe@battleaxeconstruction.com Demolition Declined Heating, Ventilating, and Air Conditioning Bison Services, LLC Estimating Estimating Dept. (606) 747-0322 (606) 747-0324 office@bison-services.com (HVAC) Declined BizTech Solutions, LLC Est Estimating kathytatum@biztechsolutions.org.com Advertising Declined Blau Mechanical Inc. Jason Bach (859) 291-3159 (859) 581-3022 jasonb@blaumech.com Mechanical Invited BridgeCo Construction, LLC Estimating Department (614) 253-7332 mbridges@bridgestrucking.com Trucking Declined Bridges Brothers Trucking, LLC Michael Bridges (614) 253-7332 (614) 253-0971 mbridges3899@sbcgloba1.net Trucking Declined Bridges Hauling Est Estimating way2bridges@yahoo.com Trucking Invited Brownwood Roofing Ohio Tamara Brown (614) 592-0094 brownwoodroofingohio@gmail.com Roofing Invited B-Steel Erectors, Inc. Bob Pendleton (330) 745-7100 (330) 745-7272 rpendleton@akronrebar.com Rebar Invited Buckner & Sons Masonry, Inc. Estimating Department (614) 279-9777 (614) 279-7855 bsminc9l@gmail.com Masonry Invited C & K United Sheet Metal and Mechanical, Inc. Maurice E. Coates, Jr. (812) 423-5090 (812) 423-5499 m.coatesjr@ckunited.com Rebar Invited C&C Reinforcing LLC Clifford Jones (513) 479-5508 General Construction Invited C. Lee Construction Services, Inc. J Fruehling (219) 888-9554 (219) 888-9564 jfruehling@cleecsi.com General Construction Invited C.N.B. Construction A Edwards (219) 313-0507 aedwards@cnbconstructionllc.net Masonry Invited Cap City Comfort LLC Estimating Department (614) 852-2580 service@capcitycomfort.com Rebar Invited Circle City Rebar, LLC Corey McLendon (317) 917-8566 (317) 917-8729 cmclendon@circlecityrebar.com Rebar Invited Bases, Ballasts, and Paving, Asphalt Paving, Concrete Paving, Curbs and Gutters, Seal City Wide Paving, Inc. Estimating Department (317) 241-7502 (317) 241-7304 paving@cwpaving.com Coats, Concrete Declined Claude Stewart Claude Stewart dynastytrucking9@gmail.com Trucking Declined Heating, Ventilating, and Air Conditioning Clive Stephens Plumbing Estimating department (614) 207-2232 clivealive1972s@peoplepc.com (HVAC), Plumbing Invited Electrical, Communications Services, Process Cochran Electric, Inc Dan Walker (614) 847-0036 (614) 847-1227 bill@cochran-electric.com Control Networks Invited Heating, Ventilating, and Air Conditioning Coleman Spohn Corporation Estimating Department (216) 431-8070 (216) 431-6924 d.radalia@colemanspohn.com (HVAC), Plumbing Invited Coler Trucking Ltd Est Estimating colertruckingltd@outlook.com Trucking Declined Columbus Haul All, Ltd. Est Estimating columbus.haulallltd@yahoo.com Trucking Declined Conchita.com LLC Emanuel Newman (330) 951-5145 e.t.newman5656@gmail.com Trucking Invited Consolidated Services and Management Mark 4markwalker@gmail.com Seeding Proposed Cook Paving & Construction Co., Inc. Alex Ploetz (216) 267-7705 (216) 267-7595 Alex.Ploetz@cookpaving.com Paving Declined CRC Enterprises, LLC Est Estimating crcenterprises6993@sbcgloba1.net Trucking Invited D Big Dog Trucking Est Estimating dbigdog54@gmail.com Trucking Declined D&S Lawn Management Brandon Sethna (614) 258-9680 info@dnslawnmgt.com Seeding Declined D.A. Dodd, LLC Ben Mikel (574) 968-0589 (574) 968-0590 BenMikel@dadodd.com Mechanical Declined D-4 Construction Anthony Hudson Jr. (614) 946-9369 (614) 946-9369 ash-jr@hotmail.com Masonry, Unit Masonry Declined Dixon, Inc. Elmer. (313) 535-6534 (313) 535-6850 elmer@dixon99.com Masonry Declined DJX Construction Company, LLC James Stocks (513) 577-2323 jstocks@djxconstruction.com General Construction Declined DKM Constructive Maintenance LLC Dorsey Montgomery (317) 407-4015 dorseymontgomery@yahoo.com General Construction Invited Instrumentation and Control for Process Dmytryka Jacobs Engineers Mike Beeman - BEC POC (419) 380-4900 (419) 380-4907 mbeeman@djeinc.com Systems, Process Integration Declined DRC Corporation Estimating Department (574) 233-1904 biddre@sbcglobal.net HVAC Invited E & M Construction Inc. Eddie Cox (317) 590-9636 eddiecox38@yahoo.com Masonry Invited Eastside Trucking Emanuel Rhodes Jr. (317) 283-6779 (317) 283-6785 Aggregates for Earthwork, Dump Trucks Declined Ebony Construction Co Chad Hartman (419) 841-3455 CHartman@ebonyco.com Paving Invited Instrumentation and Control for Process Eclipse Controls, Inc. Brad Smaldone (317) 259-7420 (414) 228-1305 bsmaldone@eclipsecontrols.com Systems, Process Integration Declined Flu -Allen Trucking, LLC Est Estimating fluallentrucking@gmail.com Trucking Invited Fortified Development Group LLC Dale Pruitt (866) 892-6816 fortified_devgroup@att.net General Construction Declined Fox Contractors Corp. Don Adamson (260) 747-7461 (260) 747-7717 info@foxcontractors.com Utility Invited FRANKIE D TATUM DBA TATUM LANDSCAPING Est Estimating tatumka@tatumbiz.com Seeding Declined Frazier One Enterprises LLC Est Estimating frazieronellc@gmail.com Trucking Declined Fuller Lawn Care LLC C Fuller cfuller@fuller-lawncare.com Seeding Invited Genesis Environmental Solutions, Inc. Tim Johnes (314) 725-5800 (314) 725-5800 tjohnes@genesisindustrial.com Painting and Coating Declined Gray Guy Group LLC Estimating Department (614) 984-5821 jgray@grayguygroup.com General Construction Declined Green Steel, Inc. Theodore Green 111 (317) 531-7899 tedgreen47@yahoo.com Procurement and Contracting Requirements Invited Concrete Reinforcing, Structural Steel Framing, Rebar Placement, Rebar Material, Harmon Steel, Inc. Kevin Inman (317) 780-5025 (317) 780-5030 kevin.inman@harmonsteel.com Reinforcing Steel Erection, Steel Erection Declined Henry Trucking aka DHA Trucking Henry Trucking (317) 698-8473 (317) 924-1218 henrytrucking@att.net Trucking Invited Indiana Bridge, Inc. Ted Sander (765) 288-1985 (765) 287-1985 ted.sander@indianabridge.net General Construction Declined Indy Force Incorporated Gerado Puente (317) 997-0889 indyforce@gmail.com General Construction Undecided Intemperance Preservation & Restorations LLC Est Estimating kimyahta@me.com Paving Declined J. Stone Trucking LLC Joe Stone (614) 440-2032 jstonetrucking@gmail.com Trucking Invited Jeffersons Trucking LLC Est Estimating rjeffersonl@msn.com Trucking Invited Jostin Construction, Inc. Justin Smitherman (513) 559-9390 (513) 559-1997 jusmitherman@jostinconstruction.com Concrete, Cast -In -Place Concrete Declined Just In The Nick of Time Estimating Department (614) 772-9080 charles@justinthenickoftimepainting.com Painting and Coating Declined K and K Expediting Services Karri Lewis (502) 552-4815 (502) 552-4815 info@kandkexpeditingservices.com Trucking Declined Kennedy Expressline Inc Marcus Northern (574) 876-8881 kennedyexpressline@yahoo.com Trucking Declined KLE Construction Company Bob Richards (330) 786-5264 (330) 786-5264 brichards1963@live.com General Construction Invited Lars Properties Estimating Department (614) 655-8500 1stokes@larsproperties.com General Construction Declined Electrical, Communications Services, Process LCR Electrical Services, Inc Luis Cisneros (317) 862-1693 Icrindy@gmail.com Control Networks Declined Leroy & Kurt Construction, LLC Est Estimating IIj527@sbcglobal.net Trucking Declined Liggon Transport, Inc Keith White (812) 437-3311 (812) 437-4292 gary@liggonlogistis.com Trucking Invited Lionel Construction Company Vanetia Watiker (740) 453-7502 vanetia.watiker@lionelinc.com Paving Declined M & LTaylor-Made Trucking, LLC Lasheen Taylor (269) 876-7856 lasheen.taylor@aol.com Trucking Declined M.U. Trucking John Harris (614) 867-5335 jharris@mutruckinginc.com Trucking Declined Malone Five Star Concrete, LLC Mike Malone fi5estarconcrete@yahoo.com Concrete Declined Mann Roofing and Construction, LLC Estimating Department (614) 778-6479 mannroofing@gmail.com Roofing Declined Market Contracting Services J. Antonio Oliva (773) 475-9640 x109 (773) 475-9003 antonio@marketcontracting.com General Construction Declined MARQUIS E RUSSELL Est Estimating marquisrusse1167@gmail.com Seeding Declined Material Hauling, Ltd. Est Estimating rwtinsley51@qmail.com Trucking Invited McCord Landscape Est Estimating mccordlawncare@gmail.com Seeding Invited McDaniel's Construction Corp., Inc Keith Mathias (614) 252-5852 (614) 258-3097 kmathias@mcdanielsconstruction.com General Construction Invited Miles -McClellan Construction Co.,lnc. Josh Atwell (614) 487-7744 josh.atwell@mmbuildings.com General Construction Declined Morin Services LLC Estimating Department (740) 207-7306 morinservicesllc@gmail.com HVAC Invited Oatts Trucking, Inc. Nadina Edwards (317) 546-7005 (317) 546-7022 nedwards@oattstrucking.com Trucking Invited PBKN Hauling LLC Kathy Adams (740) 808-3251 pkbnhaulingllcdeb@gmail.com Trucking Invited Penn Services, LLC Estimating Dept. (314) 655-3767 info@pennservicesllc.com Concrete Reinforcing Declined PL Mechanical, LLC Bobby Brown (937) 626-8817 (937) 233-6732 plmechanical@woh.rr.com Mechanical Invited Electrical, Communications Services, Process Prime State Electric Ralph Landers (614) 276-2200 (614) 276-2203 primestateelectric@sbcglobal.net Control Networks Invited Quality Interiors Dave Williams (317) 713-7050 (317) 713-7055 dwilliams@qiico.com General Construction Invited RCP Metals, Inc Richard Poindexter, Sr (614) 221-5384 rpoindexter@rcpmetals.com Metals Declined RICHTURN LLC Est Estimating richturn4u2@gmail.com Seeding Declined Robert Haines Company, Inc. Jim Pridgen (317) 547-5271 (317) 542-0679 jim@roberthainesco.com Coating Declined Concrete Reinforcing, Structural Steel Rod-Techs, Inc. Larry Packer JR. (513) 227-327 (513) 522-1234 Iarrypackerjr@rodtechs.org Framing, Reinforcing Steel Erection Declined Russell Roofing LLC Estimating Department (614) 638-4014 trussel2@columbus.rr.com Roofing Invited S.A.M.M. Trucking and Excavating Stephen Harris (812) 459-4802 sammtrucking@yahoo.com Trucking Declined Service Transport & Contracting Nadina Edwards (317) 546-7005 nedwards@stcindy.com Trucking Invited Sexson Mechanical John Gutzwiller (317) 884-0010 (317) 884-0040 johng@sexsonmechanical.com HVAC Invited Solis Construction Company Estimating . (773) 735-2372 (773) 735-2362 solisco@sbcglobal.net General Construction Declined T&K Trucking Kevin Robinson (618) 410-3083 (618) 410-3084 tandktrucking27@yahoo.com Trucking Undecided Team Cruiser Supply & Logistics Christopher Barney (317) 423-2430 (317) 423-8963 cbarney@teamcruiser.com Construction Material Supply Invited The Carpenter's Son, LLC Maurice Dunn (317) 348-1769 (317) 348-1769 maurice@buildtcs.com General Construction Declined Thomas A. Mason Co., Inc. Thomas A. Mason (414) 271-6688 (414) 289-9363 tamco@tamason.com General Construction Invited T-N-T Tabler Construction Corporation Tabler Beetle (330) 895-4891 tabler_beetle@yahoo.com General Construction Invited Miscellaneous Existing Conditions, Fire Suppression Utility Water Distribution Piping, Heating, Ventilating, and Air Conditioning Trinity Mechanical Kerry Jones (317) 624-9546 (317) 624-9547 trinitymech@msn.com (HVAC) Proposed Earthwork, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Heating, Ventilating, and Air Conditioning (HVAC), Triton Services, Inc. Estimating Department (513) 679-6800 (513) 679-6808 estimating@tritonservicesinc.com Plumbing, Project Title Page, Miscellaneous Opted Out Electrical, Communications Services, Process Ullman Electric Ron Ullman (216) 432-5777 (216) 432-5782 ron@ullmanelectric.com Control Networks Invited Universal Masonry & Construction Chris Martinez (614) 702-3869 umcmartinez@yahoo.com Masonry Invited Electrical, Communications Services, Process Universe Electric, LLC David Henry (614) 670-4679 dhenry@universalelectricllc.com Control Networks Declined Vibo Construction Andy Baxter (614) 210-6780 (614) 210-6782 andy@vibo-construction.com General Construction Invited VSG Trucking Virgil Camp (614) 332-4063 (888) 972-8006 vsgtrucking@yahoo.com Trucking Invited WD3 Associates Larry Whitaker (847) 630-6049 (847) 630-6049 I.whitaker@wd3assoc.com Concrete Reinforcing Declined Wells Trucking Macheo Wells (317) 250-2616 (317) 288-4239 Trucking Invited X-L Contracting, Inc. Estimating . (636) 970-2722 (636) 397-1035 mthornton@xlcontracting.com Utility Declined Zoie, LLC Dana Howard (618) 779-1070 (618) 857-8444 dhoward@zoiellc.com Paving Declined "soc_rft F\� G CITY OF SOUTH BEND ` MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN-z? FORM MBE-2.1 WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 117-059A WBE Participation Goal 4.24% South Well Field, Water Treatment Plant, and Distribution System Improvements Project Name: Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid) Bidder: Bowen Engineering Corporation By: Doug Stout, Estimating Manager 06/10/2025 ( ig ature) (Title) (Date) WBE Firm PLEASE SEE ATTACHED LIST Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm PLEASE SEE ATTACHED LIST Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 16 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM TO BE ATTACHED TO BE WBE-2.1 This completed form is an adapted Form MBE-2.1 MBE Contacted Form that is supplied with Bids taht pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Project Number: 117-059A-2 WEE Participation Goal ProjectName: South Well Field, Water Treatment Plant, and Distribution System ImprovementsContract A- Well Field and Water Treatment Plant Improvements (Bid Package 2 -Division A- Rebid) Bidder: Bowen Engineering Corporation SEE FRONT PAGE FOR SIGNATURE 4.24% WBE FIRM OWNER/CONTACT PHONE FAX EMAIL TYPE OF WORK RESULTS OF CONTACT A New Dawn Painting Estimating Department (614) 491-9965 andp5@webcomet.com Painting Invited A.G. Maas Company Bids Estimating (317) 632-8315 (317) 632-8322 bids@agmass.com Architectural Finishes Invited Al Excavating LLC Amy Spires (812) 508-1129 alexcavating@yahoo.com Trucking Declined Advanced Caulking, LLC Sherry Malott (513) 528-4285 (513) 528-1937 smalott@advancedcaulking.com Caulking Invited AF Transport (Indianapolis, IN) Estimating Department (317) 281-1894 info@aftransportinc.com Trucking Invited Ahrens Contracting, Inc. Doug Jewell (314) 631-7799 pm@ahrenscontracting.com Construction General Declined AJ & S Trucking, Inc Annette Perz (219) 313-0617 Trucking Declined AK Services, LLC Kristin Kaufman (270) 556-0053 akseNices502@gmail.com Damproofing Declined Akron Rebar Co. Bob Pendleton (330) 745-7100 (330) 745-7272 rpendleton@akronrebar.com Rebar Declined American Transport Ken Paulan Jr (219) 939-2177 kenpaulanjr@steeltransportinc.com Trucking Declined Anderson Decorating Estimating Department (614) 891-4336 (614) 891-4395 andersondecoratinginc@hotmail.com Painting Invited Anhalt Concrete & Site Restoration, LLC Chad Anhalt (317) 373-5720 anhalt.concrete@yahoo.com Paving Declined Applied Coatings, Inc. Jim Ellis (317) 546-5116 (317) 545-2784 jim@appliedcoatingsindy.com Painting Invited Architectural Avenues, LLC Sheryl London (614) 314-7111 sheryl@arch-avenues.com Construction General Invited B & B Contracting Jacob Brenner (317) 636-7459 (317) 636-7449 jbrenner@bbcontracting.net MOT Declined B & E Painting Keith Jones (317) 243-2233 (317) 248-2832 keith@idfloors.com Painting Invited Bellsom Electric, Inc. Kyle Krause (219) 554-1100 (219) 554-1101 kkrause@bellsom.com Electrical Invited Bomar Construction Inc Estimating Department (614) 875-1870 bomar@columbus.rr.com Construction General Invited Bott Mechanical Company, Inc. Chuck Griffin (260) 569-6777 (260) 563-2394 chuckgriffinjr@gmail.com Mechanical Invited Boyd Electric LLC Kathy Boyd (812) 457-9769 info@boydelectric.net Electrical Invited Boyer Electric Company Courtney Boyer (317) 662-4608 Electrical Invited Boyle Mechanical Solutions Cindy Boyle (937) 296-9820 cindy.boyle@boylemechanicalsolutions.com Mechanical Invited BUC Construction Supply Teresa Butler (765) 412-3484 Busch Landscaping, LLC Melodie Busch (812) 852-4920 Byer Steel Corporation Debi DeBellevue (513) 679-4251 C.A. Fulkerson, LLC Carol Fulkerson (812) 952-1777 Capital Door Solutions, Inc. Jamie Unknown (614) 796-4119 CAP -STONE & Associates Race Sherrett (614) 759-9800 CAS Transport Crystal Simonton (317) 967-0852 CBK Enterprises, Inc Krista Lee (260) 312-3397 Circle R Mechanical, Inc. Estimator. (219) 787-5566 Clausen Structures, Inc. Steven Bass (630) 257-6969 Claypool Electric, Inc. Christina Deem (740) 653-5683 Coleman Insulation Co. Mellissa Coleman (219) 929-6492 Concrafted Greg Beem (937) 668-1599 Cornerstone Interior Woodworking Trace Koble (260) 357-0754 Create A Space Michelle Hayes (317) 254-2600 Crew Corporation Justin Ehrgott @ Miller-Eads (317) 388-1992 (765)412-3484 tc@bucconstructionsupply.com (812) 852-5920 mabusch@nalu.net (513) 679-4796 DDeBellevue@byersteel.com cafulkersonllc@aol.com (614) 848-7899 jamie@capitaldoorsolutions.com (614) 759-9611 rsharrett@capasphalt.com crystal@castransportlic.com kbayl0@aol.com (219) 787-5567 bids@circlermechanical.com stevendbass@gmaii.com (740) 653-5729 cdeem@claypoolelectric.com colemaninsulation@frontier.com greg@concrafted.com (260) 357-0895 trace@cornerstoneinteriorwood.com (317) 254-2601 michelle@gocreateaspace.com (317) 317-7701 jehrgott@crewcorp.com Water Utilities, Water Utility Distribution Fire Hydrants, Water Utility Distribution Piping, Public Water Utility Distribution Piping, Ductile Iron Public Water Utility Distribution Piping, Cast Iron Public Water Utility Distribution Piping, Site Water Utility Distribution Piping Declined Seeding Declined Concrete Reinforcing, Structural Steel Framing, Rebar Material, Reinforcement Bars, Metal Fabrications Undecided Seeding Declined Doors Invited Paving Declined Trucking Declined Trucking Declined Mechanical Invited Construction General Declined Electrical Declined Insulation Invited Construction General Invited Construction General Invited Construction General Invited Heating, Ventilating, and Air Conditioning (HVAC), Electrical, Plumbing Invited Dalton Protection Ken Crouse (937) 219-1718 (937) 849-6134 kcrouse@daltonprotection.com Painting Declined Deco Coatings, Inc. Laura Blechl (317) 889-9290 (317) 889-0200 laurab@decocoatings.com Painting Declined Denier Electric Company, Inc Michelle Denoma (614) 338-4664 (614) 338-4663 sdenoma@denier.com Electrical Invited Dimension Four Painting, Inc. Estimating Department (231) 798-2474 (231) 798-1465 mike@dimensionfourpainting.com Painting Invited Door Services of Indiana, Inc. Matt Peterson (317) 780-3800 matt@dsi-wbe.com Doors Invited Dotlich Trucking & Excavating, Inc. Annie Dotlich (317) 852-2692 adotlich@gmail.com Trucking Declined Dudeck Roofing & Sheet Metal, Inc. Katy Dudek (574) 234-7912 (574) 234-2471 katy@dudeckroofing.com Roofing Accepted Earth Images, Inc. Estimating department (317) 865-1503 (812) 923-7505 davids@earthimagesinc.com Seeding Declined General Contractors, Testing and Inspecting Services, Tunneling and Mining, Utilities, Protective Covers, Central Cooling Equipment, Electrical, Packaged Generator Assemblies, Enclosed Switches And Circuit Breakers, Hazard Warning Lighting, Fire Detection and Alarm, Electronic Safety and Egizii Electric Inc. Bob Oxley (217) 528-4001 (217) 528-1677 boxley@eeiholding.com Security Invited Engel -Man Trucking, Inc. Sherry Engle (812) 689-3548 sherrye@epowerc.net Trucking Declined Facemyer Landscaping LLC A Facemyer afacemyer@facemyer.com Seeding Declined Fire -Seal, LLC Tina Bagnoli (614) 454-440 estimating@£reseal-Ilc.com Caulking Declined Flannery Painting, Inc. Taylor McCubbin (859) 261-6100 (859) 261-6378 taylor@flannerypainting.com Painting Declined Estimating Water & Waste FloSource, Inc. General Email (') (765) 342-1360 (765) 342-1361 wcg@flosource.com Valve Supply Invited Foundation Steel, LLC Greg Martin (419) 402-4241 (419) 402-4248 gregmartin@foundationsteel.net Rebar Invited Freedom Rebar & Concrete Supply, Inc. Jim Rhoads (574) 551-1545 jim@freedomrebar.net Rebar Accepted Genesis Farms Allen Donnelly (317) 773-2900 (317) 773-2910 adonnelly@genesisfarms.com Seeding Declined Hillebrand Construction, Inc. Sara Sokolik (563) 322-2009 (563) 322-5464 ssokolik@hillebrandconstruction.com Construction General Declined Holloway, Henderson, and Martin, LLC Matt Burlingame (614) 302-2610 (614) 302-2610 matt@hhmohio.com Masonry Declined Miscellaneous Existing Conditions, Testing and Inspecting Services, Site Construction Performance Requirements, Site Hoosier Equipment Service, Inc. Anne DaVega (317) 838-8988 (317) 838-8829 adavega@hoosierequipment.com Remediation, Demolition Declined J&S Industrial Services Bruce Kypta (920) 460-6581 bruce@jsindustrialservices.com Demolition Declined Jewel Contracting Peri Mason (574) 400-9194 peri@jewelcontractingllc.com Painting Declined J.'s Concrete Janet Wagler (812) 636-0173 jan@jjsconcrete.com Concrete Declined Miscellaneous Existing Conditions, Planting, John K. Leohner Company, Inc. Kendra Department (740) 756-7036 (740) 756-7065 sleohner@aol.com Landscaping Declined Journey Trucking, Inc Lisa Shively (260) 755-5825 (260) 755-5831 journeytrucking@frontier.com Trucking Declined J5T Enterprises LLC Est Estimating jstentllc@gmail.com Construction General Declined K & B Wonderland, Inc. Janet Heyn (219) 324-3456 kbwonderland@yahoo.com Construction General Invited K B Enterprise Kelsey Bolakowski (574) 303-4780 kelsey@kbenterprise.us Construction General Declined L&L Bulk Transport, Inc. Scott Newell (317) 474-0639 scott@llbulktrans.com Trucking Declined Existing Conditions, Fences And Gates, Specialties, Wire Mesh Partitions, Chain Link Lannis Fence Company Brent Downing (614) 237-7628 (614) 237-0533 bdowning@midwaystructural.net Fences and Gates, Exterior Improvements Invited LaPorte Construction Co, Inc. Lori Schrad (219) 393-5555 Ischrad@laporteconstruction.com Construction General Declined Laura Kopetsky Tri-Ax, Inc. Jana Chirico (317) 788-7825 (317) 780-6127 jana@laurakopetsky.com trucking Declined LCK Trucking LLC Nancy Knox (765) 348-3080 nancy@lcktrucking.com Trucking Declined LMR Construction Co., Inc. Shawn Lull (440) 286-2093 (440) 286-2095 SLuli@LMR-Construction.com Masonry Invited M.S. Trucking, Inc Julie Groves (740) 983-1117 mstrucking2@netzero.com Trucking Declined Mad River Construction, LLC Kim Whiteaker (937) 271-6075 (937) 253-5665 info@madriverconstruction.com Construction General Declined Martell Electric, LLC Andy West (574) 271-5000 x2326 (571) 271-4468 estimating@martellelectric.com Electrical Undecided McKinney Painting, Inc. Matt Gamlin (859) 873-6424 (859) 873-1312 matt@mckinneypainting.com Painting Declined McMann Electric, Inc Terri McMann (574) 674-5748 (574) 674-5739 terrimcmann@mcmannelectric.com Electrical Declined MDSolutions, Inc Estimating Department (614) 873-2222 (614) 873-2220 orders@md-signs.com Signs Invited Mid States Rebar and Supply,lnc. Anne Duffield (319) 446-7142 (319) 364-3938 anne@midstatesrebarsupply.com Rebar Declined Concrete Reinforcing, Plain Steel Reinforcement Bars, Post -Tensioned Concrete Preparation, Rebar Placement, Reinforcement Bars, Reinforcing Steel Midwest Reinforcing Contractors, Inc. Kathy Heinzen (937) 390-8998 (937) 399-9452 kathy@midwestreinforcing.com Erection Declined Midwest Rentals, Inc Ruth Schafer (765) 423-5541 (765) 807-0074 koleary@midwestrentalsinc.com Rentals Declined Montgomery Trucking, Inc. Karen Montgomery (260) 312-2632 karenmontgomery56@hotmail.com Trucking Declined Norwood Hardware & Supply Company Mike Babel (513) 733-1175 x207 (513) 733-8667 mbabel@norwoodhardware.com Doors Invited 011ier Masonry Paul Oldham (812) 934-3072 (812) 933-0813 poldham@olliermasonry.com Masonry Invited Painters USA, Inc. Patrick Jennings (630) 653-8715 (630) 653-8744 enichols@paintersusa.com Painting Invited Perry Interiors, Inc. Rick Perry (513) 761-9333 (513) 761-4039 rperry@perryinteriors.com Construction General Invited Pinnacle Metal Products John Campbell (614) 298-0305 jcampbell@pinnmetal.com Metals Declined Purchasing Enterprises, Inc. Mavis Kleckner (219) 787-8462 mavis@klecknerinteriors.com Construction General Invited Purdy Materials JeffSmaga jsmaga@purdymaterials.com Masonry Declined R&M Electric, Inc. Isaiah Thomas (317) 718-0487 x 1 (317) 718-8220 ithomas@randmelectricinc.com Electrical Declined Ralston Paving Corporation Nan Ralston (219) 462-5832 nancyralston@comcast.net Paving Opted Out Reece Rebholz Co., Inc. Jeff5croggins (317) 359-0633 (317) 359-0642 jeff@rebholzinc.com Painting Invited Reiss Structural and Architectural Products, LLC Erin Surnak (317) 925-2371 (317) 925-2375 erin@reissproducts.com Doors Invited Renascent Inc. Joshua Campbell (317) 783-1500 (317) 783-4860 jcampbell@renascentinc.com Demolition Declined Repaint LLC Estimating Department (614) 837-4288 repaintllc@gmail.com Painting Invited Ritschard Bros., Inc Don Ritschard (574) 288-4777 (574) 288-5438 rit1204@datacruz.com Utilities Declined Roberts Service Group Mike Bodyce (614) 276-0126 (614) 276-0510 mbodyce@robertssg.com Construction General Invited S & M Precast, Inc. Ed Mayfield (812) 294-3703 (812) 294-4862 emayfield@smprecast.com Precast Concrete Declined Sampson Maintenance Services, Inc. Nick Pontikos - POC (330) 533-5852 (330) 744-0043 sampsonmsys@gmail.com Maintenance Invited SAN Corporation Sandra Smith (219) 742-8287 (219) 662-2788 san_sancorporation@yahoo.com Trucking Accepted Scepter Steel, Inc. Janet Mitchell (317) 996-2103 sceptersteel@iendeavor.com Metals Declined Security Fence Group, Inc. Steve Deck (513) 681-3700 (513) 681-5487 steve@sfence.com Fence Declined SEPI Services Nathan Wutrick (740) 453-7374 (740) 455-8153 nate@sepiservices.com Trucking Declined Service Pipe and Supply Justin B (317) 639-9308 (317) 639-4567 JustinB@ServicePipe.com Pipe materials Declined Sisson Steel, Inc. Steph McGuire (812) 354-8701 (812) 354-9056 Steph@sissonsteel.com Rebar Invited Slusser's Green Thumb Frank Slusser (574) 722-3102 (574) 722-2993 fts@slussers.com Seeding Declined Smoot Construction Joe Smith (614) 253-9000 (614) 258-9998 jsmith@srsmoot.com Unit Masonry Invited Spectrum Commercial Coatings, LLC Estimating Department (614) 754-8143 cwalters@spectrumcoatings.biz Painting Invited Speelman Electric, Inc. Scott McCready (330) 633-1410 (330) 633-4244 scottm@speelmanelectric.com Electrical Invited St. Louis Roofing Chris. (314) 436-3788 chris@saintlouisroofing.com Roofing Invited Steel Erectors International, Inc. Estimating Department (614) 220-9371 carole@steet-erectors.com Steel Invited Steven Steel Supply Pat Millisor (614) 297-7833 (614) 297-0368 pmillisor@midwaystructural.net Steel Invited Sue -Win, Inc. Denise Garrett (317) 791-4000 (317) 791-4025 suewininc@att.net Architectural Finishes Invited Taylor Roofing (aka Jim Taylor, Inc.) Samantha Keleman (618) 233-2424 estimating@taylorroof.com Roofing Invited Tesco Solutions, LLC Don Humphrey, PE (317) 442-688 dhumphrey@tesco-solutions.com Rentals & Construction Material Supply Proposed The Fence Co., LLC Scott Braun (270) 259-3808 (273) 259-0300 thefencecoofky@gmail.com Fence Declined The Vallejo Company Lloyd Culpepper (216) 741-3933 Lculpepper@vallejoco.com Paving Declined TJ Materials LLC Terri Clark (219) 712-9579 terri.tjmaterials@yahoo.com Trucking Declined TMT, Inc. Suzy DuBois (317) 867-3691 (317) 867-5920 suzy@tmtincorporated.com Seeding Declined Triumph Construction LLC Pamela LeCount (317) 877-0382 pam.lecount@triumphconst.com Construction General Invited U.S. Utility Contractor Co., Inc. David Kanning (614) 471-7559 (614) 471-7559 dkanning@usutilitycontractors.com Electrical Invited Venus Painting, CO Tony Tsahas (219) 531-9364 tony@venuspainting.com Painting Invited Vic Power's, Inc. Vicki Roberson (765) 649-4864 vicpowersinc@sbcglobal.net Seeding Declined Joint Protection, Fluid -Applied Flooring, Concrete and Masonry Coatings, Epoxy - Resin Terrazzo Flooring, Polished Concrete VTI Contracting, Inc. Judy Montegomery (317) 398-7911 (317) 398-8788 jm@vtitotalsolutions.com Finishing Invited W.R. Beach, Inc. Tom Carman (317) 787-1591 (317) 787-2011 wrbeachinc@att.net Trucking Declined Welling, Inc. Sales Department (513) 793-6900 (513) 793-6988 sales@wellinginc.com Construction General Invited West Fairfield Inc Jordan Lee (740) 969-4335 Jordan@westfairfieldinc.com Construction General Declined Wilburn Construction Company, LLC Estimating Department (574) 315-8288 (866) 929-2137 estimating@wccbuilds.com Construction General Invited Xtreme Reinforcing, Inc. Tom Vogel (513) 317-0846 (513) 662-0086 xtreme@tds.net Rebar Declined Zalk Josephs Fabricators, LLC Sales Department (608) 873-6646 (608) 873-1694 sales@zalkjosephs.com Metals Invited 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULE\ ARD SOUTH BEND. INDIANA 46601-1830 PHONE 574/235-9251 F:\x 574/ 235-9171 TDD 574/ 235-5567 CITY OF Sou-ri-1 BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: 06-05-2025 To: All Planholders From Theresa Heffner, Clerk, Board of Public Works Subject Addendum Number: 1 117-059A-2 South Well Field Water Treatment Plant and Distribution Project Name: System Improvements (Bid Package 2 — Division A Rebid) Project No.: ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 06/05/2025 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature: Engineering Corporation Date: t_,/ 06/05/2025 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. SEE ATTACHED 2. Attach a listing of public works projects currently in process of construction by your organization. SEE ATTACHED 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. NOT APPLICABLE 4. Attach references from private firms for which you have performed work. SEE ATTACHED SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) SEEATTACHED 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. SEEATTACHED 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. BOWEN ENGINEERING CORPORATION WILL PROVIDE A LIST PRIOR TO CONTRACT APPROVAL, UPON REQUEST 4. Attach a listing of equipment you have available to use for the proposed project. SEE ATTACHED 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. BOWEN HAS NOT ENTERED INTO ANY AGREEMENTS BUT HAS RECEIVED BIDS TO BE ABLE TO SUBMIT A BID FOR THIS PROJECT. ONCE AWARDED, CONTRACTS TO SUBS WILL BE AWARDED. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. SEE ATTACHED 03029045.0000 0041 13-8 Section I: EXPERIENCE QUESTIONNAIRE COMPLETED PROJECTS TNAW Citico WTP Switchgear Replacement Oak Ridge, TN WTP Improvements Knoxville Utilities Board MBW WTP Filters Corix CWS Raleigh Wells to McKim & Creed CEG Cherry Tree WTP Clearwell BOWEN 2025 Active Project List: This list includes current active construction projects, with contracts in various stages of completion. Project Name Location Total Contracts CEG Si nia Steam and Chilled Water Lines Indianapolis, IN $3,500,000 NAVFAC Crane ULTF Crane, IN $83,000,000 TN American Water Citico Station Switch ear Chattanooga, TN $5,000,000 16 Tech Watermain Relocation Indianapolis, IN $2,500,000 Heartwell Renewables Valentine Hastings, NE $17,500,000 Cedar Rapids Iowa WWTP Expansion Cedar Rapids, IA $346,000,000 NJ American Water Camden Morris-Delair WTP PFAS Camden, NJ $20,000,000 City of Lafayette CSO High Rate Treatment Lafayette, IN $51,000,000 VA American Water Hopewell Sed. Basin Replacement Hopewell, VA $8,400,000 Aqua Ohio Lake Darby Parshall Flume Lake Darby $1,000,000 City of Nashville 81h Avenue Reservoir Ph. 2 Nashville, TN $40,000,000 City of Johnstown CMAR WWTP Upgrade Johnstown, OH $15,000,000 NJ American Water Canoe Brook PFAS Treatment Short Hills, NJ $41,000,000 Town of Cumberland WWTP Expansion & CSO Collections Cumberland, IN $35,000,000 NJ American Water Salem PFAS Salem, NJ $35,500,000 Kaiser Aluminum Wastewater Treatment Plant Newburgh, IN $9,000,000 City of Warrensburg, MO WWTP CMAR Warrensburg, MO $15,000,000 CEG Fall Creek CSO CCS Indianapolis, IN $54,000,000 Knoxville Utilities Board WTP Upgrades Knoxville, TN $66,000,000 City of Oak Ridge Water Treatment Plant Oak Ridge, TN $62,000,000 American Water Parkside D-B PFAS Removal Camden, NJ $8,800,000 Ameresco Norfolk Naval Shipyard CHIP & IWTP Norfolk, VA $50,400,000 CWS Danby WWTP Charlotte, NC $15,000,000 Knoxville Utility Board Water Treatment Plant Filters Knoxville, TN $65,000,000 OVEC/IKEC Clifty and Kyger ELG Projects Cheshire, OH / Madison, IN $28,000,000 Merrillville Conservancy District Madison St. Lift Station Merrillville, IN $4,500,000 Indiana American Water Winchester WTP Winchester, IN $23,000,000 City of South Bend WWTP CSO Basin & Clarifiers South Bend, IN $30,000,000 Fayette County, OH Honda Battery Plant WTP Fayette County, OH $28,000,000 CEG Elanco Steam Lines Indianapolis, IN $5,800,000 CEG IU School of Medicine Steam & Chilled Water Line Indianapolis, IN $8,300,000 Columbus Utilities Ph. 1 Elevated Tanks & Booster Station Columbus, OH $18,000,000 Georgia Power Plant Bowen Biological ELG Cartersville, GA $30,000,000 CEG Belmont and Southport Filter Replacement Indianapolis, IN $20,000,000 CEG Cherry Tree Water Treatment Tank Westfield, IN $5,100,000 Muncie Sanitary District Muncie, IN $4,500,000 TVA Gallatin Pre -Engineered Building Gallatin, TN $5,000,000 Bowen Capacity: Bowen's Backlog Under Contract is as follows: 2025: $564,417,935 2026: $372,567,550 2027: $115,303,993 Bowen has capacity/staff to build Excess of $750 Million Annually. The team continues to grow, adding 45 employees in the past year, with continued plans to hire. We are confident in the team's ability to effectively staff and build your project. Section I: EXPERIENCE QUESTIONNAIRE REFERENCES Indiana American Water Company - Greenwood Citizens Energy Group - Indianapolis Duke Energy Indiana - Indianapolis Jared Burnett 317.885.2428 Matt Thomas 812.664.2779 Adam Williams 812.664.277 BOWEN Section II: Plan and Equipment Questionnaire 1. Plan or layout for performing proposed work: The proposed jobsite was inspected by one of our Contract Managers during the pre -bid or prior to the bid submittal. During a jobsite visit, attention is directed to the existing conditions and site access. Bowen Engineering Corporation will provide additional information upon request. We intend to construct the job as follows: 1. Mobilize 2. Construct Initial Chlorination Vault 3. Construct Final Chlorination Vault 4. Site Work a. UG Electrical Ductbanks b. UG Piping S. Water Treatment Plant a. Piping Modifications b. Install Chemical Feed Upgrades c. Install HVAC Modifications d. Concrete Repairs 6. Once Process Equipment has been delivered a. Well 4A Upgrades b. Well 5 Upgrades c. Chemical Feed Upgrades 7. Electrical & Mechanical Completion 8. Startup 9. Final restoration BOWEN SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. WORK SUBCONTRACTOR NAME ADDRESS CITY STATE ZIP PHONE FAX Paving Calumet Asphalt 5266 E. 96th Street Indianapolis Indiana 46240 317.571.8900 317.571.8924 Paving Reith Riley 3425 O'Ferrall Road Lafayette Indiana 47905 765.447.2324 765.448.1053 Fence Capitol City Fence 920 E. Ohio Street Indianapolis Indiana 46202 317.638.3381 317.686.2233 Fence Imperial Fence 100 Academy Street Greenwood Indiana 46142 317.888.3241 317.881.1396 Landscaping Rose Seeding and Sodding 3718 Crescent Road Charlestown Indiana 47111 812.256.4323 812.256.5163 Landscaping Slusser's Green Thumb 125 Montgomery Street Logansport Indiana 46947 574.7223102 574.722.2993 Rebar Erection Harmon Steel 1002 W. Troy Street Indianapolis Indiana 46225 317.780.5025 317.780.5030 Rebar Erection Delta Steel 10860 Paddy's Run Road Harrison Ohio 45030 513.738.1232 513.738.1244 Masonry Purdy Masonry 7601 Indianapolis Road Zionsville Indiana 46077 317.769.4673 317.769.4693 Masonry Whaley 4810 West State Road 45 Bloomington Indiana 47403 812.825.5536 812.825.4137 Roofing Nu-Tec 5025 Emco Drive Indianapolis Indiana 46226 317.255.4464 317.255.0692 Doors and Windows Tri-County Glass and Mirror 231 Legends Creek Way,#205 Indianapolis Indiana 46229 317.626.0428 317.898.9866 Doors and Windows Architectural Sales 600 N. 6th Avenue Evansville Indiana 47706 812.423.6891 812.421.3788 Painting Howard Painting 1740 Spruce Street Defiance Ohio 43512 419.782.7786 419.782.0353 Instrumentation Integrity 7992 Black Oak Drive Plainfield Indiana 46168 317.839.1000 317.837.7418 Instrumentation Precision 501 TechneCenter Drive, Suite C Milford Ohio 45150 317.241.3000 317.247.6837 Instrumentation Scadaware 1602 Rhodes Lane Bloomington Illinois 61704 309.665.0135 309.665.0975 HVAC Bright Sheet Metal 4212 West 71 st Street Indianapolis Indiana 46268 317.291.7600 317.291.7604 HVAC CK United 5 East Riverside Drive, Suite 9 Evansville Indiana 47713 812.423.5090 812.423.5499 Electrical Miller-Eads Co, Inc. 4125 North Keystone Avenue Indianapolis Indiana 46205 317.545.7101 317.545.4660 Electrical Huston Electric 2723 Old Romney Road Lafayette Indiana 47909 765.474.6115 765.474.6071 Electrical Austgen Electric P.O. Box 195 Griffith Indiana 46319 219.922.2078 219.922.2788 Excavators • 2024 Caterpillar 352X • 2020 Caterpillar 323 X (2) • 2024 Caterpillar 308X • 2020 Caterpillar 336 X • 2024 Caterpillar 315X • 2019 Caterpillar 374FL • 2024 Caterpillar 340X (2) • 2019 Caterpillar 349 F • 2023 Caterpillar 340X • 2018 Caterpillar 336FL • 2023 Komatsu PC360L-CI • 2018 Caterpillar 336F (1) • 2023 Caterpillar 349X • 2018 Caterpillar 326F (1) 2023 Caterpillar 336X (2) • 2017 Caterpillar 336E (2) • 2022 Komatsu PC360L-CI • 2017 Caterpillar 320E • 2021 Caterpillar 336 X (4) • 2016 Caterpillar 326F • 2021 Caterpillar 308 T • 2016 Caterpillar 308E2 • 2021 Komatsu PC360L-CI • 2012 Caterpillar 305 E CR • 2021 Takeuchi TB-260-CL Wheeled and Track • 2024 Caterpillar 938M (8) • 2023 Caterpillar 938M (3) • 2022 Caterpillar 938M (3) • 2021 Caterpillar 938M • 2021 Caterpillar 930M • 2020 Caterpillar 930M Loaders • 2019 Caterpillar 963K • 2019 Caterpillar 930M (2) • 2018 Caterpillar 930M • 2017 Caterpillar 930M (3) • 2004 Caterpillar 961 C (2) Cranes • 2024 Grove 765E-2 (2) • 2023 Grove 765E-2 (2) • 2021 Grove 765E-2 (3) • 2019 Grove 765E-2 • 2017 Grove 765E-2 (2) • 2016 Grove 765E-2 • 2015 Manitowoc M-12,000 • 2015 Grove 765E-2 • 2014 Grove 765E-2 Rubber Tired Backhoes • 2021 Caterpillar 420F IT • 2019 Caterpillar 420F IT (4) • 2018 Caterpillar 420F IT (4) • 2015 Caterpillar 420F IT (5) • 2013 Caterpillar 420F IT Dozers and Skid Steers Drill Rigs • 2018 Caterpillar D5K LGP • 2024 Caterpillar 265 (7) • 2018 CZM EK125 Drill Rig • 2017 Caterpillar D5K (2) • 2024 Caterpillar 279D3 (2) • In -House Sheeting, • 2017 Caterpillar D6N LGP • 2023 Caterpillar 279D3 (6) Dewatering Services • 2023 Vermeer Walk Behind (3) • 2022 Caterpillar 279D3 • 2022 Takeuchi TLBRD (2) • 2021 Caterpillar 279D3 (2) • 2020 Caterpillar 279D3 (2) • 2020 Takeuchi TL10V2 • 2019 Caterpillar 279D3 (3) Compactors • 2017 Caterpillar CS44 • 2014 Caterpillar CS44 • 2004 Caterpillar CS433E Roller Water Trucks • Ford 2000 Gallon Water Trucks (3) ATV Trucks • 2020 CAT 730 (1) Trac Fusion Machine • 2023 McElroy - Series 2 (1) • 2022 McElroy - Series 2 (2) • 2021 McElroy - Series 2 (1) • 2020 McElroy - Series 2 • 2019 McElroy - Series 2 • 2018 McElroy - Series 2 In addition to the heavy equipment listed above, Bowen owns and maintains a significant fleet of medium tools including: Various implements, Generators, Trailers, Medium Tools Conexes, Welding Equipment, Fusion Machines, Trenchers, Shoring Systems, Sheeting Systems, Pumps, Concrete Vibrators, Heaters, Utility Carts, Radios, Troweling Machines, Scaffolding, Pipefitter Equipment, Hoists, Compressors, Field Worker Boxes. We're happy to provide more specific information upon request. ........................................................................................................................................ Suppliers Equipment is maintained and delivered to project sites from Bowen's Fairland, IN shop. By way of Bowen's Fleet of Highway Haul Trucks. In addition to Bowen owned equipment, we maintain a strong relationship with the following suppliers for equipment rentals. If you prefer, we are happy to work with equipment suppliers local to your project. 0 United SUNBELT I � MAL�M Rentals RENTALS ��ER OVER 65 YEYRS OF SERVICE Crane Works, L.P. BdWiEN Engineering Corporation � CONTRACTORS • ENGINEERS FINANCIAL STATEMENTS SEPTEMBER 30, 2024 AND 2023 CPAs iADVISORS "blue t"PA1 ADCI<NRk 'blue Blue & Ca,LLC : 12300 N Meridian Street, Suite 400 / CarineI, IN 46032 mnn 317 848.8920 !Jx 317,573.2458 wa,' bluedblueandco.com REPORT OF INDEPENDENT AUDITORS To the Board of Directors and Shareholder Bowen Engineering Corporation Indianapolis, Indiana Opinion We have audited the accompanying financial statements of Bowen Engineering Corporation (the Company), which comprise the balance sheets as of September 30, 2024 and 2023, and the related statements of income and comprehensive income, shareholder's equity, and cash flows for the years then ended, and the related notes to the financial statements. In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of the Company as of September 30, 2024 and 2023, and the results of its operations and its cash flows for the years then ended in accordance with accounting principles generally accepted in the United States of America. Basis for Or)inion We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Our responsibilities under those standards are further described in the Auditor's Responsibilities for the Audit of the Financial Statements section of our report. We are required to be independent of the Company and to meet our other ethical responsibilities in accordance with the relevant ethical requirements relating to our audits. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Responsibilities of Management for the Financial Statements Management is responsible for the preparation and fair presentation of the financial statements in accordance with accounting principles generally accepted in the United States of America, and for the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error. In preparing the financial statements, management is required to evaluate whether there are conditions or events, considered in the aggregate, that raise substantial doubt about the Company's ability to continue as a going concern within one year after the date that the financial statements are available to be issued. Auditor's Responsibilities for the Audit of the Financial Statements Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor's report REPORT OF INDEPENDENT AUDITORS (CONTINUED) that includes our opinion. Reasonable assurance is a high level of assurance but is not absolute assurance and therefore is not a guarantee that an audit conducted in accordance with generally accepted auditing standards will always detect a material misstatement when it exists. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control. Misstatements are considered material if there is substantial likelihood that, individually or in the aggregate, they would influence the judgment made by a reasonable user based on the financial statements. In performing an audit in accordance with generally accepted auditing standards, we: ■ Exercise professional judgment and maintain professional skepticism throughout the audit. ■ identify and assess the risks of material misstatement of the financial statements, whether due to fraud or error, and design and perform audit procedures responsive to those risks. Such procedures include examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. + Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control. Accordingly, no such opinion is expressed. ■ Evaluate the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluate the overall presentation of the financial statements. ■ Conclude whether, in our judgment, there are conditions or events, considered in the aggregate, that raise substantial doubt about the Company's ability to continue as a going concern for a reasonable period of time. We are required to communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit, significant audit findings, and certain internal control related matters that we identified during the audit. 16(ut LLL Carmel, Indiana January 21, 2025 2 From: South Bend Leaals To: Elaine Dabnev Subject: Thank you for placing your order with us. Date: Friday, May 16, 2025 11:14:13 AM This Message Is From an Untrusted Sender You have not previously corresponded with this sender. If the sender is an employee of Bowen Engineering, please consider the possibility of email phishing and validate with them directly before replying, clicking on links or opening attachments. THANK YOU for your ad submission! This is your confirmation that your order has been submitted. Below are the details of your transaction. Please save this confirmation for your records. We appreciate you using our online self-service ads portal, available 24/7. Please continue to visit South Bend Tribune's online Classifieds HERE fleaals.aannettclassifieds.coml to place your legal notices in the future. Deadlines vary by publication, changes and/or cancellations may not be honored due to deadline restrictions. Job Details Schedule for ad number LSBN03000280 Order Number: LSBN0300028 Toe May 20, 2025 Classification: Bids & Proposals South Bend Tribune Package: General Package Tue May 27, 2025 Additional Options: 1 Affidavit $12.50 South Bend Tribune Base amount: $150.06 Service fee: $5.99 Cash/Check/ACH A Discount: -$0.00 Total payment: $156.05 As an incentive for customers, we provide a discount off the total order cost equal to the 3.99% service fee if you pay with Cash/Check/ACH. Pay by Cash/Check/ACH and save! In no event are service fees refundable. Payment Type: mastercard Account Details Elaine Dabney 8802 North Meridian Street Indianapolis, IN ® 46260 317-842-2616 elaine.dabney@bowenengineering.com Bowen Engineering Corporation Credit Card - mastercard ************0293 All Zones All Zones NOTICE TO BIDDERS Bowen Engineering Corpora- tion (a General Contractor) n Equal Employment Oppor- tunity Employer is seeking Certified MBE/ B E awned business bids for the South Bend, IN South Well Field WTP Proiect ( Bid package 2A). Subcontracting opportu- nities are available for Demo- lition, Excavation, Truck- ing, Seeding, Landscaping, Paving, Fencing, Concrete, Reinforcing Steel Placement, Masonry, Waterproofing, Roofing, Interior Finishes, Painting, Instrumentation/ Controls, HVAC, and Electri- cal. Interested and Certified MBEIWBE business parties should contact Elaine Dabney at elaine.dabney@bowenen- gineering.com to discuss subcontracting opportunities. All bids and applicable MBE/ WBE documentation must be submitted on or before June 9th at 12:00P1111 EST. Plans are available for viewing at Bowen Engineering Corporation, at http ://su bs.boweneng i neeri ng. corn/p I a n roo m/ Job Name: southbend2a Password: south- bend2a HSPAXLP May 20, 27 2025 L S B N 0300028 `� (5 P. Resourcefu, Responsive Results BID DOCUMENT SIGNING RESOLUTION I HEREBY CERTIFY that I am the Secretary of Bowen Engineering Corporation and that on the date of February 1", 2023, and in accordance with the By -Laws, the Board of Directors of Bowen Engineering Corporation, a Corporation duly organized and existing under the laws of the State of Indiana, duly adopted a resolution that has not been rescinded or modified, and reads as follows: RESOLVED THAT, A. Douglas Bowen, and/or Aaron Purdue, and/or Ed Storrs, and/or John Dettman, and/or William Fyffe, and/or Jameson Pearson, and/or Jason Lemire, and/or Steve Gladding, and/or Chris Manges, and/or Matt Gentry, and/or Adam Kluemper, and/or Doug Stout, and/or Eric Beier are hereby employed to submit project bid documents less than $10,000,000 on behalf of Bowen Engineering Corporation. I FUTHER CERTIFY that the following named persons are the officers of said Corporation, duly qualified and now acting as such: PRESIDENT & CEO VICE PRESIDENT of OPERATIONS VICE PRESIDENT of OPERATIONS VICE PRESIDENT of OPERATIONS VICE PRESIDENT of OPERATIONS REGIONAL MANAGER REGIONAL MANAGER REGIONAL MANAGER OPERATIONS MANAGER OPERATIONS MANAGER ESTIMATING MANAGER ESTIMATING MANAGER ESTIMATING MANAGER A. Douglas Bowen Aaron Purdue, P.E. Ed Storrs John Dettman William Fyffe Jameson Pearson Jason Lemire Steve Gladding Chris Manges Matt Gentry Adam Kluemper Doug Stout Eric Beier IN WITNESS THEREOF, I have hereunto subscribed my name and affixed the seal of said corporation this 1" day of February 2023. Carey Weddle, Secretary / Treasurer 8802 North Meridian Street Indianapolis, Indiana 46260 State of Incorporation: Indiana 8802 North Meridian Street • Indianapolis, IN 46260 • P: 317.842.2616 • F: 317.841.4257 • www.bowenengineering.com CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name South Well Field, Water Treatment Plant, and Distribution System Improvements Contract A — Well Field and Water Treatment Plant Improvements (Bid Package 2 - Division A - Rebid) Project No. 117-059A For Bids Due June 10, 2025 Contractor Name: Bowen Engineering Corporation The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 02/23/2022 General Conditions - 10 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 02/23/2022 General Conditions - 11 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) N/A By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) N/A By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) N/A Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) N/A Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) N/A List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) N/A For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 02/23/2022 General Conditions - 12 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) X By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) X By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) N/A List identifying all former business names. (iii) X Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) X Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) X Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) X For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) X Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 02/23/2022 General Conditions - 13 (ix) N/A Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date 06/10/2025 y� (Sig ere) Doug Stout, Estimating Manager (Print Name Here) Bowen Engineering Corporation (Name of Company) 8802 N. Meridian Street, Indianapolis, IN 46260 (Address of Company) Indianapolis (City) IN (State) 317-842-2616 (Telephone Number) Version 02/23/2022 General Conditions - 14 State of Indiana Office of the Secretary of State CERTIFICATE OF EXISTENCE To Whom These Presents Come, Greeting: I, DIEGO MORALES, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records and the proper official to execute this certificate. I further certify that records of this office disclose that BOWEN ENGINEERING CORPORATION duly filed the requisite documents to commence business activities under the laws of the State of Indiana on September 05, 1967, and was in existence or authorized to transact business in the State of Indiana on April 01, 2025. I further certify this Domestic For -Profit Corporation has filed its most recent report required by Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution, or expiration has been filed or taken place. All fees, taxes, interest, and penalties owed to Indiana by the domestic or foreign entity and collected by the Secretary of State have been paid. D In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the City of Indianapolis, April 01, 2025 DIEGO MORALES SECRETARY OF STATE 194527-021 / 20254327373 All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate Expires on May 01, 2025. 2025 SAFETY OVERVIEW t �r +yn p ,,yam AN-t. PILLARS OF BOWEN'S SAFETY CULTURE ■ Genuine concern for others • Model the way / leadership by example ■ Use of STOPP (Stop. Think. Observe. Plan. Proceed) ■ Celebrate active reporting of near -miss and good catch • Don't Be A Spectator ■ SQP Lean Construction: planning, communication and accountability to drive safety into projects • Partnership with owners to learn and share lessons learned ■ Subcontractor participation in planning, orientation, daily meetings ■ Communication of safety events and trends across organization • Executive participation and ownership of safety 0.64 13 YRS 0.37 0.12 2024-2025 EMR TRIR < 1.0 2024 TRIR 2024 DART RATE BOWEN 4-4 2025 AREAS OF CONTINUOUS IMPROVEMENT • Participate in Contruction Safety Week - "Value Every Voice" • Expanded use of Good Catch and Near Miss reporting as primary safety metric within the organization • Digital QR Submission of Good Catch and Near Misses • Expanded use of technology and video to more clearly communicate lessons learned and best practices • Addition of full-time safety training manager • Improvement on 2024 Safety Hours Trained • Increased focus on the hazards of stored energy • Better digital tracking of Safety Training Records • Z Company -Wide superintendent meetings exclusively dedicated to reviewing near -miss events and implementing corrective measures &PRODUCTIONIU.UT1 325 SAFETY OVERVIEW e Ad& _djjijj1Mjjjjj& OSHA Metrics Total Hours 2022• 1,427,195 1,421,251 1,617,843 Number of OSHA Recordable Cases 5 4 3 OSHA Recordable Rate (TRIR) 0.70 0.56 0.37 Days Away & Restricted Time (DART) Cases 2 1 1 Days Away & Restricted Time (DART) Rate 0.28 0.14 0.12 Number of Days: Days Away & Restricted Time 105 180 180 Fatalities 0 0 0 ADDITIONAL DOCUMENTS AVAILABLE: Full Safety Manual, OSHA 300/300A Logs, EMR Letter, Training Overview, Drug and Alcohol Policy, Safety Culture Overview TRAININGS PROVIDED TO EMPLOYEES: OSHA 1OHR, OSHA 30HR, OSHA 500, Competent Person, CPR/First Aid, Incident Investigation, Hazard Identification, POCT, Job Site Orientation, New Hire Orientation, SQP Lean Construction, Hazard Recognition, FTE Competent Person Training ACTIVE ON PREQUALIFICATION SERVICES: * ��Wood ackenzie Ah, Avetta 0:�L 0-*4 . j Ar are some projects more successful than others? I �f n T � e Ll Don't just hire a contractor. Hire leadership to deliver results on your project. Alignment of individuals around a common goal A culture where people can be the most successful version of themselves -�_ ■ irw_ • � �■�■�■� �■- . �- � �� ®_....: _� •_ ����,■¥■ 111MOOR- illallsk,.� ,.._E ' ����-§�Z;a/ /. .. ■ . � �. � 2me: . �/� What if Vou had a construction partner : w h o could get eve rVo n e on t h e same page — a n d keep them there? � ENGINEERING AND CRAFT... BETTER TOGETHER Match degreed engineers with experienced craft to learn, grow and succeed together. True collaboration to solve problems with smart, safe and cost-effective solutions. Everyone contributes with an equal voice and the best approaches win. Site -Civil • Site work • Underground Piping • Concrete Foundations/Walls • Cast & Post Tensioned Tanks • Valve, Metering & Air Releases • Sheeting & Shoring Structural • Structural Steel • Pre -Engineered Metal Buildings • Handrail & Access Stairs • Critical Lift Planning & Design • Modular Pipe Racks & Equipment Skids BOWEN + LOCAL CRAFT... THRIVING TOGETHER Extensive recruitment network to find and hire the best local craft. Training on core values, operations, equipment and safety on day one. Mechanical / Boilermaker • Process Tanks & Stacks • Process Mechanical Piping • Chemical Feed /Aeration Piping • Process Instrumentation • Process Boilermaker Ductwork • Conveyors Focus on the single mission and a culture of involvement. Equipment • Process Equipment • Water Treatment Equipment • Power / Energy Equipment • Conveyors • Boilermaker / Burner Management fir.► � y�4ja RES y 721 � •ir� ate. _ i,` r . x What if you had a proactive construction partner that never ran away from a problem? K��1■ AHEAU . 4WEEK Wt.....�1ERa � a.weErt i00r .n .... .... _... � S^� f.. ow ISTRUCTURED COMMUNICATION F: THAT DRIVES ACCOUNTABILITY All client personnel have assigned Bowen counterparts. Single point of accountability for project control. Access to Bowen senior management through our project Executive Sponsors. Bowen strives for mutual trust and respect with customers, partners, and employees who share these values and practices. _Jk. IV Zero injury and genuine concern for others 1�f L.. CONNECTED CONSTRUCTION, A BETTER WAY TO BUILD Pads replace paper blueprints and documents to increase productivity, reduce rework, and keep our supervision at the workface. Real time updates and access to the latest project drawings and documents. Safety, quality and productivity status available via online k _ i 'n, reporting. IV Continuous improvement IV Enthusiastic teamwork & celebration IV Never walk away from a problem S R P QUALITY • Engaged from Beginning to End • Last 5% • Never Walk Away From a Problem SAFETY • Genuine Concern Model the Way STOPP I QUALITY PRODUCTION SQP. You need all 3. PRODUCTION • Engaged & Empowered Craft • Solution Focused • Culture of Continuous Improvement wen SQP is a proven repeatable lean construction )cess that eliminates waste and drives Results. u get a highly engaged, bought -in, d accountable team - and most importantly a great project outcome, every time. • 0 Operation Capable States EMPLOYEE THE TOP OWNED 400 CONTRACTORS ODING ENR 1967DATUEN NBIC Advanced Certified A-�_VjE S Stamp R Stamp Steel Erector PP Stamp NB Stamp p MARKETS • Municipal Water / Wastewater • Industrial Water / Wastewater • Fossil Power • Industrial • Renewable Energy • Mining & Metals • Oil, Gas & Chemical • Nuclear Energy WATER PROJECT TYPES • Physical Chemical Treatment • Biological Treatment • Ion Exchange • Membranes: OF/Nano/RO • Zero Liquid Discharge • Trace Metal Removal • Recycle/Reuse Water • Drinking Water Storage • PFAS Treatment • Chemical Piping • Cooling Towers • Anaerobic Digestion / Biogas • W/WW Outage Work • Pump Stations • Stormwater / CSO Management SELF -PERFORM CONSTRUCTION • Sitework • Underground Utilities • Concrete Foundations • Structural Steel • Equipment Setting • Process Mechanical • Boilermaker • Conveying Systems • Pile Driving • Sheeting • Dewatering ENERGY & INDUSTRIAL PROJECT TYPES • Air Quality Projects • Ash Conversions • Combined Heat and Power • ELG Wastewater Treatment • FGD Wastewater • Fuel Conversions • Gas Combined -Cycle • Gas Simple -Cycle • Industrial Process • Outage Work and Turnaround Work • SCR / Baghouse / Precip • Wind Farm Projects a • B6 IV % 5 Qv Resourceful. Responsive. Results. www.bowensgp.com WATER/WASTEWATER EXPERIENCE SELF PERFORM CONSTRUCTION CAPABILITIES MARKETS ■ Municipal Water • Municipal Wastewater ■ Fossil Energy • Mining ■ Oil, Gas & Chemical • Industrial Process ■ Steam and Chilled Water ASSOCIATED CAPABILITIES ■ Physical Chemical Treatment • Biological Treatment ■ Ion Exchange • Membranes: OF/Nano/RO ■ Zero Liquid Discharge (ZLD) ■ Gravity Sewer ■ Force Main BOWEN • Pump Station / Lift Station • Outage/Shutdown Work • Trace Metal Removal • Dam and Spillway • Drinking Water Storage • Flood Walls • EPA ELG Treatment ■ Stormwater Management • Chemical Piping • Ponds and Lagoons ■ Cooling Towers ■ CSO Management • Anaerobic Digestion Biogas • PFAS/PFOS/PFOA Removal Bowen has spent over 50 years providing critical water and wastewater infrastructure to communities and private owners across the country. We have worked with and installed every major technology, treatment process, and are ready to bring this expertise to your project. Wastewater Treatment Bowen consistently works with Physical, Chemical, Biological, Membrane, UV systems to provide new treatment facilities or critical upgrades to existing facilities. Sewer Infrastructure Bowen is at work across the country upgrading sewer infrastructure. Through stormwater/sewer water separation, or through holding tanks or basins, we are supporting communities in eliminating CSO events into community waterways. Bowen also supports upgrades and ongoing maintenance of collection systems to support population and community growth. Municipal Water Treatment and Distribution Bowen has constructed water treatment and distribution systems over 50 years. We have built new facilities and upgraded facilities nearing 100 years in age. In addition we have extensive experience with steam and chilled water lines. Bowen has extensive experience with PFAS/PFOS/PFOA removal. Industrial Water and Wastewater Bowen has built Industrial Water and Wastewater solutions for Mining, Chemical, Automotive, Food and Beverage, Pharmaceutical, Steel and Power markets. We have applied every available treatment process and have treated the toughest constituents. pr '' BdWENResourceful. Responsive. Results. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) PER (b) Attachment: (v) Bowen Engineering Corporation states that individuals who will perform work on the public work project on our behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. 8802 North Meridian Street • Indianapolis, IN 46260 • P: 317.842.2616 • www.bowensgp.com INDIANA LABORERS' TRAINING TR UST FUND David A. Frye Secretary -Treasurer Jerry J. Bolk Chris Brickey Ricky Henson, Jr. Ramon Mendoza, Jr. Brian Short P.O. Box 758 - Bedford, Indiana 47421 (812)279-9751 April 4, 2025 To Whom It May Concern: Sean Coakley, Director John P. Brown Chairman Kelly Abel Michael Ferrara Jade Painter Nick Timmerman Jim Wiseman FAX: (812) 279-5545 Toll Free (800) 742-4086 This letter is to confirm that "Bowen Engineering" is a signatory contractor in good standing with the Indiana Laborers' Training Trust Fund. The above -mentioned company is a participant in the Joint Apprenticeship and Training Committee through this Union and has been an active participant in good standing for each of the past five plus consecutive years, and is currently eligible to use our apprentices on a project. Further, our organization's program is approved by the U.S. Veterans Administration to participate in the GI educational benefits program. A copy of our approval letters are attached along with the collective bargaining agreement stating the ratios of Journey workers to Apprentices; which is one (1) Apprentice for every five (5) Journey workers and thereafter may not employ more that (1) Apprentice for every (3) Journey workers. Sincerely, Sean Coakley, Director SC:ap www.indianalaborerstraining.org tp k F1� Vureau of Apprrnttres4tV unb 01rutntng Trrttftratr of Reptstrattion INDIANA LABORER'S TRAINING TRUST FUND BEDFORD, INDIANA for the trade classification of CONSTRUCTION CRAFT LABORER Re yisfereo'( as parf o� Elie Xafional .Wppreniiceslip JTro_yram in accordance wifli I& basic slandarrdsr of apprenficeslip December 14, 1995 D.le esfa6lisl eo( 6y Elie c3ecrefarr, of Labor CSzm aig of -ns.c IN040-0528 ,y ,%2eyv1ra1ion X0. 1�1 eto¢, �u2cau of cff��,u�trc and'7�avetag STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor James M. Brown, Director January 9, 2019 This will acknowledge receipt of your updated Wage Scale for the Construction Craft Laborer program offered by Indiana Laborers Training Trust Fund -Apprenticeship. The State Approving Agency has reviewed the document as listed below: Wage Scale: Construction Craft Laborer FACILITY CODE: 30004114 To the best of my knowledge Indiana Laborers Training Trust Fund -Apprenticeship does not utilize erroneous or misleading advertisement, either by actual statement, omission, or intimation. It is understood by Indiana Laborers Training Trust Fund -Apprenticeship that they will maintain a complete record of all advertising utilized by or on behalf of the Indiana Laborers Training Trust Fund -Apprenticeship in regards to their training programs during the preceding 12 months. Indiana Laborers Training Trust Fund -Apprenticeship's advertising will be available for review by any and all future supervisory visits by the SAA, or the U.S. Department of Veteran Affairs. Please Review the entire packet for content and accuracy. Approval is granted pursuant to the provisions of Title 38, U.S. Code 3687, with an effective date of April 1, 2018. If you have any questions, please feel free to give me a call at 317-232-3916 or email me at tgriffin@dva.in.gov. Thank you for what you do for our Veterans, and have a great day! Sincerely, 1,2 Taniqua Griffin Program Director State Approving Agency Cc: VARO/ELR ` 9 2Qj� STq A STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W-469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor James M. Brown, Director January 9, 2019 The Indiana State Approving Agency conducted a supervisory visit on 01/8/2019 at Indiana Laborers Training Trust Fund -Apprenticeship. The purpose of the visit was to provide training to the Certifying Officials and review enrollment certifications, record retention and reporting procedures. The organization demonstrated proper record maintenance and record maintenance and reporting procedures. During the visit, we discussed the importance of reporting hours on a monthly basis, good record keeping techniques, and how to report a leave of absence or completion via VA Form 22-1999b. We also updated the Certifying Officials via VA Form 22-8794, work processes, and wage scale. If you need any assistance or have any questions regarding this technical visit please contact me directly at tgriffm@dva.in.gov or (317) 232-3916. Thank you for the courtesy extended during my visit. The education and training opportunities that your organization continues to provide veterans and their dependents are appreciated. Sincerely, Taniqua Griffin Program Director Phone (317)-234-6062 Toll Free (800)-400-4520 Fax (317)-234-8744 STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W-469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor James M. Brown, Director January 9, 2019 This will acknowledge receipt of your revised Work Processes for the Construction Craft Laborer program offered at Hoosier Energy, located in Bedford, Indiana. The State Approving Agency has reviewed the document as listed below: TRAINING PROGRAM LENGTH DOT CODE Construction Craft Laborer FACILITY CODE: 30004114 4,000-7800 hours 47-2061.00 To the best of my knowledge Indiana Laborers Training Trust Fund -Apprenticeship does not utilize erroneous or misleading advertisement, either by actual statement, omission, or intimation. It is understood by Indiana Laborers Training Trust Fund -Apprenticeship that they will maintain a complete record' of all advertising utilized by or on behalf of the company in regards to their training programs during the preceding 12 months. The company's advertising will be available for review by any and all future supervisory visits by the SAA, or the U.S. Department of Veteran Affairs. This approval is made pursuant to and under the provisions of Title 38, U. S. Code 3687, with an effective date of January 8, 2019. If you have any questions, please contact me at 317-232-3916. Sincerely, Taniqua Griffin Program Director State Approving Agency Cc:VARO/ELR Phone (317)-234-6062 Toll Free (800)-400-4520 Fax (317)-234-8744 Apprentice Status Report By Indenture Date Apprentices Indentured Between 1/1/2020 And 12/31/2024 Apprentice Program: IN2 Year Apprentice Status Apprentices Percentage 2024 Active 920 80,07% Active Duty 1 0.09% Adv. to ]ourneyman 21 1.83% Deceased 1 0.09% Graduated 1 0.09% Med. Susp. 2 0.17% Not Registered 1 0.09% Reinstate SS 4.79% Suspended 5 0.44% Terminated 138 12.01% Voluntary withdraw 4 0.35% Total Indentured 1149 Printed: Friday, February 7, 2025 Page 3 of 3 Apprentice Status Report By Indenture Date Apprentices Indentured Between 1/1/2020 And 12/31/2024 Apprentice Program: IN2 Year Apprentice Status Apprentices Percentage 2022 2023 Active 217 22.89% Adv. to Journeyman 75 7.91% Deceased 5 0.53% Graduated 95 10.02% Journeyman 1 0.11% Med. Susp. 3 0.32% Not Registered 1 0.11% Reinstate 6 0.63% Suspended 7 0.74% Terminated 498 52.53% Transferred Out 2 0.21% Voluntary withdraw 38 4.01% Total Indentured 948 Active 447 43.91% Adv. to Journeyman 55 5.40% Deceased 2 0.20% Graduated 5 0.49% Journeyman 3 0.29% Med. Susp. 1 0.10% Not Registered 5 0.49% Reinstate 25 2.46% Suspended 7 0.69% Terminated 441 43.32% Voluntary withdraw 27 2.65% Total Indentured 1018 Printed: Friday, February 7, 2025 Page 2 of 3 Apprentice Status Report By Indenture Date Apprentices Indentured Between 1/1/2020 And 12/31/2024 Apprentice Program: IN2 Year Apprentice Status Apprentices Percentage 2020 2021 Active 22 3.42% Adv. to Journeyman 73 11.34% Deceased 2 0.31% Graduated 64 9.94% Journeyman 1 0.16% Not Registered 1 0,16% Reinstate 2 0.31% Suspended 1 0.16% Terminated 433 67.24% Voluntary withdraw 451 6.99% Total Indentured 644 Active 53 7.13% Active Duty 2 0.27% Adv. to Journeyman 72 9.69% Deceased 4 0.54% Graduated 93 12.52% Med. Susp. 1 0.13% Reinstate 2 0.27% Suspended 1 0.13% Terminated 471 63.39% Voluntary withdraw 44 5.92% Total Indentured 743 Printed: Friday, February 7, 2025 Page i of 3 �riite� tatr5 Brpartwrut of f Olt (off irr of Apprrutt'robip Certift"tate Of Rrgiqtration of Rpprentirt.5bip Program INDIANA/KENTUCKY/OHIO REGIONAL COUNCIL OF CARPENTERS J.A.T.F. MERRILLVILLE, INDIANA FOR THE TRADE CLASSIFICATIONS: CARPENTER; MILLWRIGHT; RESIDENTIAL CARPENTER 7e91sfereol-¢s pdrf of 1-4'e XQflonczl 12joprenflcesal-lp 6ysfem In Qccoro(¢n ce rvAi� 1,& ,6¢slc sfdn o'drors o'f¢p, renflces &,l o esf��l s�eo��Jr 1,61-e 6ecrefdry of ca&." ���' ��� � ► r�! Fyn SEPTEMBER 24, 1952 Dale Revised: April 2, 2018 IN010520001 V •�� wey"ialralion Xo. �rJ.S'If;. , A r�minrslralar, Off — of �PprenlicesFirP ►r�u �ffue of apprenticoyip Certifitate of Regi!gtration of �prrntttr!gbtp grogram Operating Engineers Local #150 tlpprentice3 ,Fund wicMington, lainois For the grade -Operating Engineer �e9rsferea�¢s�ndrf o�f�e `.�Qfrondj�pprenfices�ip c�rJ. sfem in Qccoro(¢nce mif�i f ie OQSlc sf¢nafdr� o�dpprenlices-iP esfd�ls�ieo��rJ. fie c�ecrefQrJr, o���'a�or Registered -March i8, ig6g �4�� `�� glaye o Revised- June 23, 2021 92e7ls! alioa x. 6r�2,,5 ��� P' 7ld lnlsf atoms, Office f7lpprealeu6p ILoo8780173 United States 11 partment of il`abor triurunl of Apprenticeship and ariinin`l PIPEFITTERS ASSOCIATION U.A. LOCAL. #597 J,A.C. CHICAGO, ILLINOIS FOR THE TRADE OF � / PIPEFITTERR ,.1/dFC/.rrirr.��/r�rrt�%/�icinri�cl r/llml fr ���c/w�,l/ ✓ �tc:,f// rz �n� tfzafv CJIIF�1f;11dGPfA% �'�f�".���i.J�f,�P�CG91�',,P FEBRUARY 5, 1951 REVISED � _ APRN U MR mm �IIl�toirQ111'f:� $ECAETM. OF UBOB MBBCRiM. BU�aU Oi.APN1ENTICE$WVP •NO TpRIMMi PIPEFITTERS' TRAINING FUND, LOCAL UNION 597 10850 W. 187th Street, Mokena, IL 60448 708.326.9240 TRAINING@ HF59TORG 4/4/25 Haley Eckelbarger Payroll Specialist Bowen Engineering Corporation 8802 North Meridian Street, Indianapolis, IN 46260 Phone: 317-915-6873 www. Bowen Engineeri ng.com Haley: This letter verifies that The Pipefitters' Training Fund, Local Union 597, is registered with the United States Department of Labor, apprenticeship registration number IL017780093. This letter also verifies that Bowen Engineering Corp. is signatory to the Collective Bargaining Agreement and participates in the Pipe Fitters' Apprenticeship Program and is in good standing. Please call 708-326-9240 if you have any questions regarding this information. SinceriJ Match ajszak Pipe Fitters' Training Center Local Union 597 Ap•pren•tice -noun, 1.A helper of a professional; a worker in training. INDIANA/KENTUCKY/OHIO REGIONAL COUNCIL OF CARPENTERS JOINT APPRENTICESHIP AND TRAINING FUND 1565 EAST 70TH COURTNcn MERRILLVILLE, IN 46410 ADMINISTRATION OFFICE 711 Greenwood Springs Drive Greenwood, IN 46143 Phone:317-807-1112 Fax:317-807-1115 April 4, 2025 Grayson Campus 574 Carpenters Way Grayson, KY 41143 Phone:606-929-1362 Fax:606-929-5319 Indianapolis Campus 711 Greenwood Springs Drive Greenwood, IN 46143 Phone: 317-807-1116 Fax:317-807-1131 Lafayette Campus 2953 South Creasy Lane Lafayette, IN 47905 P64e:765-447-5959 Fax:'765-447-7676 Louisville Campus 1245 Durrett Lane Louisville, KY 40213 Phone:502-366-8668 Fax:502-366-8678 Merrillville Campus 1565 East 70th Court Merrillville, IN 46410 Phone:219-947-3348 Fax:219-947-1889 Muncie Campus 4121 East Centennial Avenue Muncie, IN 47303 Phone:765-288-9015 Fax:765-288-9298 Newburgh Campus 5400 Covert Court Newburgh, IN 47630 Phone:812-853-9312 Fax:812-853-9316 Terre Haute Campus 3099 South 6th Street Terre Haute, IN 47802 Phone:812-466-7899 Fax:812-466-9840 Warsaw Campus 1095 Mariners Drive Warsaw, IN 46582 Phone: 574-267-5264 Fax: 574-269-1464 Bowen Engineering Corporation 8802 North Meridian Street Indianapolis, IN 46260 To Whom It May Concern: This letter is in response to verification needed by Bowen Engineering Corporation for work to be performed on varies jobs. Bowen Engineering Corporation regularly employs a number of apprentices affiliated with our apprenticeship program and has done so for more than four years. We are registered with the United States Department of Labor, Bureau of Apprenticeship and Training and our registration number is 1205-0223. Our program participates in the Building Trades Associate Degree Program with Ivy Tech Community College and has done so since 1996. Bowen Engineering Corporation is a bona fide contractor in good standing as of this date with the Indiana/Kentucky/Ohio Regional Council of Carpenters Joint Apprenticeship and Training fund and is eligible to employ apprentice carpenters in the future. I have enclosed a copy of our certificate from the United States Department of Labor. If I can be of further assistance, please do not hesitate to give me a call. Sincerely, Chris Charters Area Training Coordinator IKORCCJATF — Merrillville, Lafayette & Warsaw Campuses CC/Imf Pasterers' & Cement Masons' Apprenticeship Coordinator Local Union #692 To Whom it May Concern: Phone: (21 9) 707-7767 Email: bkristoff@plcmlocal692.org April 4, 2025, This letter is to certify that Bowen Engineering, Inc.. is and has been a signatory contractor with OPCMIA Local 692 and has participated in the Plasterers & Cement Masons Apprenticeship Training Program for many years. Bowen Engineering, Inc. is a valued Contractor in good standing with Local 692 and the JATC. All our apprentices are registered with the United States Department of Labor. I may be reached at (219) 707-7767 if additional information is needed. Further, our organization's program is approved by the U.S. Veterans Administration to participate in the GI Education Benefit Program. Thank you, Brian Kristoff Apprentice Coordinator Plasterers & Cement Masons 9200 Louisiana Street ° Merrillville, Indiana 46410 ANDREW THOMAS COORDINATOR JATC (219) 962-7675 SCHOOL (219) 962-1615 FAX iw395jac@msn.com TRUSTEES -UNION- RON WARE, JR. Business Manager CHARLESCURRY President/Business Agent Organizer ERIK ATTEBERRY -CONTRACTORS- KEVIN COMERFORD Construction Advancement Foundation JEFF CARLSON Superior MICHAEL MACDONALD The Pangere Corp. IRONWORKERS JOINT APPRENTICE AND TRAINING COMMITTEE OF IRONWORKERS LOCAL UNION NO. 395 AND NORTHWEST INDIANA CONTRACTORS ASSOCIATION, INC. 890 EAST 25TH AVENUE • LAKE STATION, INDIANA 46405 To Bowen Engineering, We are an active apprenticeship program for Ironworkers Local 395, certified by The International Association of Ironworkers. We currently have 117 apprentices enrolled in our program varying in stages of the four program. Sincerely, Andrew Thomas, Apprenticeship Coordinator Ironworkers Local 395 Apprenticeship School BOWEN SAFETY POLICY MANUAL SECTION 3 - DRUG -FREE WORKPLACE POLICY 3.1 NOTICE TO SUPERVISION RE: Drug -Free Workplace Policy/Notice to Employees A. Post the Drug -Free Workplace Policy/Notice to Employees on your safety bulletin board. B. Have all new employees read policy and sign acknowledgment. C. Workplace Supervision is trained in drug and alcohol awareness and has the ability to execute the guidelines set forth in this section. 3.2 NOTICE TO EMPLOYEES REGARDING THE FEDERAL DRUG -FREE WORKPLACE ACT "Conviction" means a finding of guilt (including a plea of nolo contendere) or imposition of sentence, or both, by any judicial body charged with the responsibility to determine violations of the federal or state criminal drugstatutes. "Criminal drug statute" means a criminal statute involving manufacture, distribution, dispensation, use or possession of any controlled substance. "Controlled substance" means a controlled substance in schedules I though V of Section 202 of the Controlled Substance Act (21 U.S.C. 812). "Workplace" means a site for the performance of work done in connection with a specific grant or contract of a federal or state agency and any place a Bowen employee performs work. A. Bowen has contracts with the Federal Government and other State and Local Agencies, therefore, it is covered by the Drug -Free Workplace Act of 1988 and its Final Rule published May 25, 1990. We must certify to the Federal Government and other State and Local Agencies that we will provide a drug -free workplace. This Notice is given in compliance with the requirement. B. The unlawful manufacture, distribution, dispensation, possession or use of a controlled substance in our workplace is prohibited. Controlled substances are those identified in Schedules I though V of Section 202 of the Controlled Substance Act and in Regulation 21 C.F.R. Section 1308.11-15. C. Violations of this provision will result in discipline up to and including termination and/or a requirement that the employee satisfactorily participate in a drug abuse assistance or rehabilitation program approved by a federal, state or local agency. Last Revised: March 2018 Section 3 Page 1 BOWEN SAFETY POLICY MANUAL D. Bowen will establish an ongoing drug -free awareness program designed to inform employees of (a) the dangers of drug abuse in the workplace, (b) Bowen's policy of maintaining a drug -free workplace, (c) penalties that may be imposed for drug abuse violations. Bowen will establish an Employee Assistance Program (EAP) to include counseling for employees classified as part of Bowen management staff. E. If an employee is convicted of violating any criminal drug statute and that violation occurred in the workplace, the employee must notify Bowen in writing of this fact no later than five (5) calendar days after theconviction. F. Within ten (10) days after receiving such notice of the conviction, Bowen, in turn, must notify the contracting Federal and State and Local Agencies, in writing, of the employee's conviction. Bowen's notice will include the employee's name and position or title. Reference Form 003-3.2-01 Drug -free Workplace Act Criminal Drug Statue Violation. G. If an employee is convicted for a criminal drug statute violation that occurred in the workplace, within thirty (30) calendar days after receiving notice of that fact, Bowen will take appropriate personnel action against the employee up to and including termination, and/or will require the employee's satisfactory participation in a drug abuse assistance or rehabilitation program. Reference Form 003-3.2-02 Disciplinary Action Form for Convicted Employees. H. As a condition of continued employment with Bowen, employees must abide by the terms of this Notice. This policy and testing program is also designed to meet the substance abuse testing requirements for employees that operate vehicles that require a Commercial Driver's License (CDL). All CDL holders are required to be tested in accordance with DOT regulations, 49 CFR Part 40 and 382, as amended. All testing procedures for CDL holders will comply with DOT regulations. (state or federal) J. DOT covered employees are considered to be performing a DOT safety -sensitive function when they are performing, ready to perform, or immediately available to perform any of the following functions: a. All time spent at a company facility waiting to be dispatched. b. All time inspecting, servicing, or conditioning any commercial motor vehicle at anytime. C. All driving time or time spent at the driving controls of a commercial vehicle in operation. d. All time, other than driving, in or upon any commercial motor vehicle except time resting in a sleeper berth. Last Revised: March 2018 Section 3 Page 2 BOWEN SAFETY POLICY MANUAL e. All time spent loading or unloading a vehicle, supervising, or assisting in the loading or unloading, attending a vehicle being loaded or unloaded, remaining in readiness to operate the vehicle, or in giving or receiving receipts of shipments loaded and unloaded. f. All time repairing, obtaining assistance, or remaining in attendance upon on a disabled vehicle. 3.3 MANDATORY SUBSTANCE ABUSE TESTING POLICY FOR ALLUN AND NON -UNION SALARIED AND HOURLYEMPLOYEES A. Purpose 1. It is Bowen's policy to provide a safe working environment for all employees and to continue the tradition of the highest standards of quality in services. This policy has been established for several reasons. The use of drugs and alcohol lead to unsafe working conditions for workers; the "impaired worker" is a potential hazard to himself and for those working with him. The purpose of the program is to establish and maintain a drug -free, alcohol -free, safe, and healthy work environment for all workers. 2. Upon your agreement to participate you will be bound to the conditions and provisions in Section 3.2 of this policy, sub -parts B-J. 3. All employees presenting for a drug and/or alcohol screen must have a valid photo ID. 4. Form 003-3.3-01 Medical Services Authorization must be filled out and presented to the clinic for services needed. B. Policy 1. GENERAL PROVISIONS a. Pursuant to the Drug -Free Workplace Act of 1988, the unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance in the workplace is prohibited. Any employee who violates the above rule may be subject to disciplinary action, up to and including termination. DOT covered employees will not be permitted to perform safety - sensitive functions until a negative test results is reported and DOT rehabilitation requirements have been completed. Last Revised: March 2018 Section 3 Page 3 BOWEN SAFETY POLICY MANUAL b. Alcohol and other drug dependence are recognized as a serious condition requiring professional treatment. Consequently, any worker who is experiencing problems in their work or personal life due to alcohol and other drug abuse is encouraged to seek help through the Employee Assistance Program (EAP). C. The most efficient means of reducing the prevalence of substance abuse is through the provision of continuous education. Education and training will be conducted through formal and informal presentations, flyers and other educational materials. d. The misuse of any prescription, nonprescription or over-the- counter drug and/or medication is prohibited. e. Legally prescribed drugs and/or medications may be permitted on Bowen premises or workplaces provided the drugs are contained in the original prescription container or provide proof that they are prescribed by a medical practitioner for the current use of the person in possession of the drug and/or medication. f. The prescription must be presented at time of drug screen and/or within three (3) days of a non -negative result to the MRO. Failure to do so will be subject to disciplinary action per Section 3.3.D.2 of this policy. Bowen Management may ask employee to provide a release from a medical practitioner stating the employee meets the requirements of the job description and functional task analysis. g. An employee must notify their supervisor prior to reporting to work, if they are taking a legally prescribed, nonprescription or over-the-counter medication which displays warnings about adverse side effects that may affect job performance or impair an employee's mental or motor functions to safely perform their duties and responsibilities. Using or being under the influence of such a drug and/or medication is prohibited. Bowen reserves the right to determine whether an individual can safely perform their duties and responsibilities while taking the prescription or over-the-counter drugs and/or medications and in some cases may request, the employee obtain written documentation based on the job description, functional task analysis and workplace environment from their medical provider or prescribing physician that details as to how the medication may impair the Employee's workability and/or safety. ii. Should there be questions concerning the employee's ability to perform the job safely, the employee could be assigned other work, if, at the sole discretion of management, such duties are appropriate and available or the employee may be terminated. Last Revised: March 2018 Section 3 Page 4 BOWEN SAFETY POLICY MANUAL h. All employees, for annual and random drug tests, have a maximum of two (2) hours to provide a specimen from time of notification. Failure to provide the required specimen in the required time frame will be subject to Section C.9.a.v and disciplinary action per Section 3.3.D.2 of this policy. If a pre -employment, annual, random and post incident drug, regardless of testing method including alcohol test, initially produces a non -negative result and the specimen is sent to an MRO, the employee will be required to leave the workplace until the MRO investigates and makes a determination. If the MRO deems the specimen to be negative, then the time away from the workplace will be compensated to the employee at the employee's straight time rate. The hours will not exceed eight (8) hours per day or surpass forty (40) hours, regardless of the workplace work hours. For results that are confirmed to be non -negative by the MRO, employees must meet the requirements of Section 3.31D of this policy. If any employee or subcontractor's employee produces an unacceptable/non-negative test result and is not cleared by the MRO, the employee will not be eligible for placement on the original test workplace or any other Bowen controlled workplace, for Bowen or its subcontractors or vendors of any tier without proof of meeting the requirements of Section 3.31D of this policy and Owner/Client policies/procedures. 2. PRE-EMPLOYMENTTESTING a. All candidates who have received an offer of employment and all union craft workers will be required to participate in a pre- employment drug screen. Candidates and craft workers may be placed on the payroll and may be allowed to work pending receipt of a negative drug test result. Upon receipt of a non -negative result the newly hired employee will be terminated with documentation stating "employee unable to meet pre -hire requirements" and will be subject to disciplinary action per Section 3.3D.5.a of this policy. b. For candidates or craft workers not placed on the payroll and who produce a non -negative test result will not be hired for the open position or be eligible for employment and will be subject to disciplinary action per Section 3.3.D.5.a of this policy. C. Worksites accepting drug program cards, the drug card and test must be current and verified through the Safety Coordinator. Last Revised: March 2018 Section 3 Page 5 BOWEN SAFETY POLICY MANUAL d. Previously Employed Workers Employees that have not been employed by Bowen for period of three (3) months or longer, will be considered a new hire and be subject to fulfill the pre -employment requirements of this Policy. 3. OWNER MANDATED PRE-EMPLOYMENTTESTING a. Where pre -employment testing for drug and/or alcohol use is required by an owner in order to perform work on their site, those employees shall be tested in accordance with the owner program. The Owner may have different requirements and therefore employees may be required to be re -tested per the owners' requirements. 4. RANDOM TESTING a. All employees are subject to Bowen's policy to conduct unscheduled random drug testing (minimum of one (1) time per year or per owner requirement). Employees randomly selected will be required to report for testing. Dates for random selection will not be posted or announced prior to the selection. b. Union employees will be subjected to the above or per the terms and conditions of their union funded program. C. Union employees have the right to request their on -site steward be present, if available. If the steward is requested, the typically two (2) hour time frame for completing the test will not be hindered. This time frame shall start upon notification of test. Any and all union agreement provisions will also be adheredto. d. DOT covered employees will be subject to the random testing to meet the current FMCSA random rates and will be in a random pool that conducts random selections, at a minimum, on a quarterly basis. 5. REASONABLE/PROBABLE CAUSE TESTING a. Substance testing may be implemented when there is probable cause. Probable cause shall be defined as those circumstances, based on objective evidence about the worker's conduct in the workplace, which would cause a reasonable person to believe that the worker is demonstrating signs of impairment due to alcohol or drugs. The objective evidence giving rise to probable cause will be observed by at least two individuals, ideally two supervisors. Prior to engaging an employee for probable cause the Form 003-3.3-02 Reasonable, Probable Cause shall be completed. Last Revised: March 2018 Section 3 Page 6 BOWEN SAFETY POLICY MANUAL b. Union employees have the right to request their on -site steward be present, if available. If the steward is requested, the typically two (2) hour time frame for completing the test will not be hindered. This time frame shall start upon notification of test. Any and all union agreement provisions will also be adheredto. Reference Section 3.3.D for Disciplinary Procedures 6. POST ACCIDENT/INCIDENT TESTING a. Drug and Alcohol Testing may be requiredfor all employees involved in a workplace accident/incident based on resonible suspicion that meets the following definition: Accident- Any event caused by an employee, either directly or indirectly, resulting in injury to a person, to the extent the attention of a physician is required, or that resulted in damage to property. ii. Incident - An event which has all the attributes of an accident, except that no harm was caused to person or property. b. All post -accident alcohol tests shall be completed within two (2) hours to eight (8) hours or sooner following anaccident/incident. C. All post -accident drug tests shall be completed within twenty-four (24) to thirty-two (32) hours or sooner following an accident/incident. d. All post -accident drug tests will be sent to and evaluated by the MRO for results. Reference Section 3.3.D for Disciplinary Procedures 7. POST MOTOR VEHICLE ACCIDENTTESTING a. All employees operating Bowen owned vehicles or operatingtheir own vehicles while conducting company business maybe subjected to a post -accident drug and alcohol test based on resoniblr suspiction under the following circumstances: The driver receives a citation under state or local law for a moving violation arising from the accident. ii. A fatality occurs. iii. Bodily injury to a person, which requires medical treatment away from the scene of the accident. iv. One or more motor vehicles incur damage as a result of the Last Revised: March 2018 Section 3 Page 7 BOWEN SAFETY POLICY MANUAL accident. b. All post -accident alcohol tests shall be completed within two (2) hours to eight (8) hours or sooner following an accident. C. All post -accident drug tests shall be completed within twenty-four (24) to thirty-two (32) hours or sooner following an accident. d. DOT covered employees will be subject to a DOT drug and alcohol testing if the accident involves i. A fatality or ii. The employee receiving a citation under state or local law for a moving violation arising from the accident and either: a. There is bodily injury to a person which requires medical treatment away from the scene of the accident or b. One or more vehicles incur disabling damage as a result of the accident and must be towed from the accident scene. iii. DOT covered employees will be removed from duty until a negative drug and alcohol result is verified. Reference Section 3.3.D for Disciplinary Procedures 8. DOT - The following shall be considered "prohibited conduct" specifically for DOT covered employees: a. No employee shall report for duty or remain on duty requiring the performance of safety -sensitive functions while having an alcoholic concentration of .04 or greater. b. No employee shall be on duty or operate a commercial vehicle while the employee possesses alcohol. C. No employee shall use alcohol while performing safety -sensitive functions. d. No employee shall perform safety -sensitive functions within four (4) hours after using alcohol. e. No employee required to take a post -accident test shall use alcohol for eight (8) hours following the accident or until he or she undergoes a post -accident test, whichever occursfirst. Last Revised: March 2018 Section 3 Page 8 BOWEN SAFETY POLICY MANUAL f. No employee shall refuse to submit to a post -accident, random, reasonable suspicion, return -to -duty, or follow-up alcohol or drug test. g. An employee is prohibited from reporting for duty or remaining on duty when the employee uses any controlled substance, except when the use is pursuant to the written instruction of a physician who has advised the employee that the substance will not adversely affect their ability to safely perform theirduties. h. DOT covered employees that engage in prohibited conduct will be immediately removed from safety -sensitive functions and will be subject to discipline as outlined in the section. Rehabilitation including return to duty and follow-up testing will follow minimum DOT requirements if not as stringent as described in thissection. Reference Section 3.3.D for Disciplinary Procedures C. Testing Method Unless governed differently by applicable laws, employees will be subject to testing methods described below. 1. All non -negative tests for controlled substances and alcohol will be confirmed with a second reliable testing method. Initial testing for controlled substances will be of the immunoassay type, with all confirmation testing being by gas chromatography/mass spectrometry. Chemicals to be tested are listed in the SAMSHA Drug Screen Table below. 2. Bowen may choose to preform POCT (Point of Collection Test) drug tests for pre -employment and random testing. If a person receives a negative result, the person may begin work immediately. If a person receives a non negative result, the person shall not be eligible to work. The person shall remain ineligible until Bowen receives confirmation from the MRO (Medical Review Officer) that the specimen meets the guidelines of this policy. 3. Bowen reserves the right to test covered employees for additional substances including but not limited to substances listed on Schedules I through V of Section 202 of the Controlled Substance Act and in Regulation 21 C.F.R. Section 1308.11-15 (examples include synthetic marijuana and designer stimulants). Initial breath alcohol tests will be screened for .02 or higher. For results .02 or higher a confirmation test is required. Employees will be required to wait 15- 30 minutes to be re- tested. A breath alcohol test result of .04 or higher will be considered non - negative. Breath alcohol test results of .02 - .0399 will be considered negative, but employee will be asked to leave the job site until the next scheduled shift. The employee will be tested again at thattime. Last Revised: March 2018 Section 3 Page 9 BOWEN SAFETY POLICY MANUAL 4. All post -accident alcohol tests must be completed within two (2) hoursof the incident but if circumstances prevent the testing from occurring, an alcohol test can be administered up to eight (8) hours after the incident. 5. DOT covered employees will be required to be removed from duty for twenty four (24) hours, until a negative drug and alcohol result is verified and until their next scheduled work period, whichever is longer. Note: Limits for each of the substances will be as shown in the SAMSHA Drug Screen Table below or according to appropriate federal, state and DOT regulations as they are updated periodically. SAMSHA DRUG SCREEN (Bowen Thresholds) Table LAB DRUG SCREEN THRESHOLD Drug Screen Conf 6-monoacetlmorphine (Heroin) 10 10 Amphetamines/ Methamphetamines 500 250 Barbiturates 200 200 Benzodiazepines 200 200 Benzoylecgonine- Cocal ne 150 100 Extended Opiates 300 300 Marijuana 50 15 MDMA (Ecstasy) 500 250 PCP -Phencyclidine 25 25 Propoxyphene 300 300 Methaqualone 300 300 ALCOHOL (Breath Test) Abbreviation Substance Cut-off Level BAC Alcohol .04 Reference: Form 003-3.3-03 POCT Certification Procedure Form 003-3.3-04 Drug and Alcohol Test Result Log 6. Diluted Drug Test Results POCT (Point of Collection Test) INSTANT DRUG SCREEN Abr. Drug Scree i Conf. AMP Amphetamine 11000 1250 BAR Barbiturates 300 200 BZO Benzodiazepines 300 200 COC Cocaine 300 100 mAMP Methamphetamine 1000 250 MDM Ecstasy 500 250 MOR j Opiates 300 300 OXY Oxycodone 100 300 PCP Phencyclidine 25 25 THC Marijuana 50 15 a. A test result that produces a diluted specimen requires a retest. If the retest also produces a diluted specimen, it will carry the same consequences as a non -negative test result unless a valid Last Revised: March 2018 Section 3 Page 10 BOWEN SAFETY POLICY MANUAL medical reason exists. b. The collection for another test must be done the morningafter the employee has been notified. Instructions shall be given to the employee prior to retesting. C. Employee Instruction prior to retesting: i. Consume no fluids after 9:00 PM the night before the test. ii. Limit fluid intake to a minimum the day of thetest. iii. It is the employee's responsibility to monitor intake of fluids to prevent another dilutespecimen. d. If the employee has a medical condition that will cause a dilute specimen, the employee's physician must provide medical information in writing to the MRO forevaluation. e. For DOT covered employees, Bowen will require the driver to be re -tested if they have a diluted specimen and DOT protocol will be followed for the re -test. 7. Invalid Drug Test Results a. All specimens will undergo validity testing at the laboratory to identify whether a specimen was tampered with. The employee of a specimen that is confirmed to be adulterated or substituted will be disciplined per Section 3.3D of this policy. If the specimen is reported as invalid and is issued as a cancelled test, the employee may be required to provide another specimen under direct observation depending on the reason for the cancelled test. The MRO will make the proper recommendation to Bowen after the MRO review process has been completed. 8. Specimen Collection Problems a. All employees will be afforded privacy for the urine collection unless any of the situations listed below occur, and then the donor will be required to submit to an immediate second collection under direct observation. The collector observes evidence of an employee's attempt to tamper with a specimen, (e.g., collector observes materials brought to the collection site or the employee's conduct clearly indicates an attempt to tamper with a specimen). ii. The temperature on the original specimen was out of range. Last Revised: March 2018 Section 3 Page 11 BOWEN SAFETY POLICY MANUAL iii. The original specimen appeared to have been tampered with. b. In the case of a "non -negative" test result, the employee shall be so advised by the Medical Review Officer, on a confidential basis, prior to reporting of the results to Bowen. The employee has the right to discuss and explain the results, including the right to advise medical personnel of any medication prescribed by their own physician, which may have affected the results of thetest. C. Ingestion of products that contain hemp will not be an acceptable explanation for testing positive formarijuana. d. An employee who receives a "non -negative" test result shall have the right to have a portion of the same urine sample tested by an accredited laboratory (DHHS) of their choice at their expense. The result of the test must be released to Bowen within a maximum of ten (10) working days after notice of a non -negative test. The employee must have a negative test in order to comply with this Bowen policy. The employee will be required to re -test and their collection will be done under direct observation following DOT protocol. Reference Section 3.3.D for Disciplinary Procedures 9. Refusal to Test a. Refusing to submit to drug and alcohol tests required by Bowen will be grounds for refusal to hire employee/applicant(s) and to discipline existing employee(s) covered by this policy. A refusal to test would include, but not limited to, any of the following situations: i. Failing to appear for any test within a reasonable time after being directed to do so. ii. Failing to remain at the testing site until the testing process is completed. iii. Failure to provide a breath, hair, saliva or urine sample as directed. iv. Failure to permit, if the situation requires, the observation or monitoring of providing a urinespecimen. V. Failure to provide a breath, hair, saliva or urine specimen within required time frames may be considered a refusal. If an employee cannot provide a sufficient quantity of urine or breath, they will be directed to be evaluated by a physician of employer's choice. If the physician cannot find Last Revised: March 2018 Section 3 Page 12 BOWEN SAFETY POLICY MANUAL a legitimate medical explanation for the inability to provide a specimen (either breath or urine), it will be considered a refusal to test. In that circumstance the employee has violated one of the prohibitions of the DOT regulations and this policy. vi. Failure or decline to take an additional drug test Bowen or collector has directed you totake. vii. Failure to undergo a medical examination or evaluation, as directed by the MRO as part of the verification process, or as directed by the DER as part of a "shy bladder" or "insufficient breath" situation. viii. Failure to cooperate with any part of the testing process and/or conduct that would obstruct the proper administration of a test. (e.g., refusing to empty pockets when so directed by the collector, behave in a confrontational way that disrupts the collection process). ix. For an observed collection, fail to follow the observer's instructions to raise and lower clothing to permit the observer to determine if you have any type of prosthetic or other device that could be used to interfere with the collection process. X. Possess or wear a prosthetic or other device that could be used to interfere with the collection process. xi. Admit to the collector, MRO or supervisor that you adulterated or substituted the specimen. A report from the MRO that you have a verified adulterated or substituted test result. Reference Section 3.3.D for Disciplinary Procedures D. Discipline Policy 1. It is the intention of Bowen to comply with state and federal laws. Where state and federal law differ, Bowen will comply with federal law. For example, some state laws permit the use and possession of marijuana for medical and/or non -medical purposes. Federal law does not. Consistent with federal law, Bowen considers marijuana to be an illegal drug for purposes of this policy in all states — even those states that allow for medical and/or non -medical use. 2. Employees who test above the allowable measured amount of prohibited substances as indicated in SAMSHA Drug Screen Table of this Policy or as set by project's requirements while on duty will beterminated. Last Revised: March 2018 Section 3 Page 13 BOWEN SAFETY POLICY MANUAL 3. Pre -employment Testing a. For scenarios referenced in 3.3.13.2 a and b, candidates or craft workers producing a non negative specimen will not be eligible for employment for a period of six (6) months. If after six (6) months from date of the non -negative test result, the candidate successfully produces a negative test result, shows proof of a completed Substance Abuse Program (SAP), the candidate or craft workers may be considered for any openings that they would be qualified to seek. The candidate or craft workers may be hired but will be subject to periodic drug testing. The results will be released to the Safety Coordinator or the Human Resources Representative for all pre- employment testing. 4. Reasonable Cause a. When Bowen has reasonable cause to believe an employee is under the influence of a prohibited substance or alcohol, for reasons of safety, the employee will be suspended from duty until test results are available. 5. Refusal a. Employees who refuse to cooperate with testing procedures may be terminated and may not be eligible for rehire for a maximum of one (1) year. Employees must show proof of attending a rehabilitation program, have a negative drug test, and be subject to periodic drug testing. Employees that refuse a second (2" d) time will be permanently terminated. 6. Adulteration/Tampering a. Any adulteration or switching of urine is a breach of this program, and as such, will result in termination. The employee may not be eligible for rehire for a maximum of one (1) year. In the event of a second (2 d) offense, the employee may be permanently terminated 7. Offenses — (for random, reasonable suspicion/probable cause, DOT, non - DOT post accident/incident and post vehicle accident) a. For first (1st) offenses, Bowen's policy requires that employees who test non -negative will be suspended for thirty (30) days and must seek rehabilitation. Upon suspension completion, the employee will be allowed to re -test and must submit to Bowen and the testing facility, written documentation from a Substance Abuse Professional (SAP), stating they have successfully completed a rehabilitation program and be subject to periodic drug testing. Last Revised: March 2018 Section 3 Page 14 BOWEN SAFETY POLICY MANUAL The cost for re -testing will be at the expense of theemployee. b. In the event of a second (2n1) offense, the employee will be terminated for a minimum of one (1) year. Employee must show proof of attending a mandated Substance Abuse Professional (SAP), produce a negative drug test, and be subject to periodic drug testing. C. In the event of a third (3rd) offense, the employee will be permanently terminated. d. After a five (5) year period, from the date of the most resent offense, assuming no other offenses/events have taken place, employees will be granted one (1) reset period. (i.e. when an employee has their first event and does not have another event for a five (5) year period from the first, then the offenses resets.) 8. Workers refusing to use SAP services following a, first (15t) or second (2nd) offense, positive test result will be permanentlyterminated. 9. Any terminated employee due to substance abuse, will need to provide documentation of Counseling from an SAP and will be subject to frequent drug testing. 10. For Union Employees all aspects of this program shall be subject to the grievance procedure spelled out in their collective bargaining agreement. 11. Disciplinary procedures and rehabilitation guidelines for employees who participate in union funded programs may vary. Bowen, when signatory to a specific union, may recognize and comply with said procedures. 12. All of the above will be implemented and monitored by the Human Resources Manager. Bowen has given complete authority to the Human Resources Manager to implement the above stated steps. Any questions that may arise should be directed to the Human Resources Manager. E. Confidentiality 1. The identifying code for a test specimen(s) will be the employee's social security number. 2. A suspected non -negative test result will first be reported to the employee, and secondly to Bowen, by the Medical Review Officer(MRO). If the MRO is unable to contact an employee within a reasonable amount of time (not to exceed 72 hours) Bowen will be the only onecontacted. Last Revised: March 2018 Section 3 Page 15 BOWEN SAFETY POLICY MANUAL F. Employee Assistance Program — For Employees Classified as part of Bowen Management Staff 1. We recognize that it is sometimes difficult to cope successfully with the pressures that life puts on us, and that personal problems canadversely affect your ability to perform satisfactorily on thejob. 2. We have therefore, implemented an Employee Assistance Plan to provide counseling and referral services to employees who are having such problems and voluntarily choose to use this program. The employee or dependent does not have to notify Bowen for approval to contact this referral service. If treatment necessitates time away from work, Bowen may provide for the employee an unpaid leave of absence, not to exceed 30 days, for purposes of participation in an agreed upon treatment program. During this 30-day period an employee who seeks treatment, and successfully completes a rehabilitation program, or is in the process of completing such a program, may be reinstated to their former employment status, if work for which they are qualified is available at that time. For employees that choose to take a leave of absence prior to returning to work, must submit written documentation from a Substance Abuse Professional (SAP) of completion or the present participation in, a rehabilitation program, and submit a negative drugtest. 3. Confidentiality is of the highest concern at Bowen for those seeking help for their personal problems. Bowen encourages those in need to participate in this program. You may reach this service, at no cost to you, by placing a call to One to One Employee Assistance at 1-800-745-4838, in order to set an appointment. The cost of five (5) sessions is at nocharge. 4. You should understand, however, that our firm has no part in the operation of this program. It is an independent consulting agency, and we therefore assume no responsibility or liability for any of its acts or omissions. In the event of a non -negative drug or alcohol test result an initial mandatory referral to Bowen's EAP willoccur. 5. The cost of a rehabilitation program may be the responsibility of the employee. G. Conclusion 1. This program and policy statement is intended to protect our most valuable asset, our employees. The health and safety of all employees and the general public is of utmost concern. The above presented policy will help insure a safe DRUG -FREE WORKPLACE for all. 2. Employees shall read Bowen's Drug -Free Workplace Policy and sign Form 003-3.3-05 Drug Free Acknowledgment Receipt and Authorization for Release of Results. Last Revised: March 2018 Section 3 Page 16 Docusign Envelope ID: CF83FE34-FCDB-4FO5-AFOC-CB8FFB2C3096 CNASURETY January 27, 2025 RE: Bowen Engineering Corporation 8802 North Meridian Street Indianapolis, IN 46260 To whom it may concern: Bowen Engineering Corporation is a highly regarded and valued client of Continental Casualty Company. Continental Casualty Company has an A.M. Best Rating of A XV and is listed on the U.S. Treasury Department's List of Approved Sureties. We have had the privilege of providing surety bonds to Bowen Engineering Corporation for many years. Based on their current financial position, we would consider providing Performance and Payment Bonds up to $350,000,000 single project and support a $1,250,000,000 total work program. Naturally, we would expect that the execution of any final bonds would be subject to a review of the final contract terms, conditions, and financing by our client and ourselves. Any arrangement for bonds required by the contract is a matter between Bowen Engineering Corporation and Continental Casualty Company and we assume no liability to you or third parties if for any reason we do not execute these bonds. If you have any questions regarding this company and their performance history or capabilities, please feel free to give me a call at (317) 853-3668. Continental Casualty Company DocuSigned by: 2A32F18510FA4D6... Robert 1. Sherfick Attorney -In -Fact Signed by: SEAL 189� Docusign Envelope ID: CF83FE34-FCDB-4FO5-AFOC-CB8FFB2C3096 POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know All Men By These Presents, That Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company (herein called "the CNA Companies"), are duly organized and existing insurance companies having their principal offices in the City of Chicago, and State of Illinois, and that they do by virtue of the signatures and seals herein affixed hereby make, constitute and appoint Jason D McEldowney, Katie Pikula, John W Hannon III, Robert L Sherfick, Individually of Carmel, IL, their true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on their behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their insurance companies and all the acts of said Attorney, pursuant to the authority hereby given is hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By -Laws and Resolutions, printed below, duly adopted, as indicated, by the Boards of Directors of the insurance companies. In Witness Whereof, the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto affixed on this 23rd day of September, 2023. �PticAsuy�r` 01SUR4�c `oaaaNroe� Continental Casualty Company National Fire Insurance Company of Hartford 2 ,,ORPORAT$ J o ` q&ORFQP4 �`� American Casualty Company of Readin Pennsylvania Z a O � i► a f, JULY 31. y L) SEAL Y asRc / � y 1SO •Z 1897 MMA+� Larry Kasten Vice President State of South Dakota, County of Minnehaha, ss: On this 23rd day of September, 2023, before me personally came Lary Kasten to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is a Vice President of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company described in and which executed the above instrument; that he knows the seals of said insurance companies; that the seals affixed to the said instrument are such corporate seals; that they were so affixed pursuant to authority given by the Boards of Directors of said insurance companies and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said insurance companies. ..................,..,.,.,.,.. . ` My commission expires S M. BENT NOTARY PUBLIC sir s i Jc SOUTH DAKOTAr March 2, 2026.,,,,,,,,.....,.,................. M. Bent Notary Public CERTIFICATE I, D. Johnson, Assistant Secretary of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company do hereby certify that the Power of Attorney herein above set forth is still in force, and further certify that the By -Laws and Resolutions of the Board of Directors of the insurance companies printed below are still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said insurance companies this 27th day of January, 2025. P� pASU q,ly yNSURq ` eawr 04 Continental Casualty Company 2 OORPORATf o �� ,4ORPOegtro�� Oa O a JULY 31, y J SEAL s rs < 199 1891 31A National Fire Insurance Company of Hartford American Casualty Company of Reading, Pennsylvania D. Johnson Assistant Secretary Authorizing By -Laws and Resolutions ADOPTED BY THE BOARD OF DIRECTORS OF EACH OF CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA (as defined above, the "CNA Companies"): This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of each of the above CNA Companies at a meeting held on May 12, 1995: "RESOLVED: That any Senior or Group Vice President may authorize an officer to sign specific documents, agreements and instruments on behalf of the Company provided that the name of such authorized officer and a description of the documents, agreements or instruments that such officer may sign will be provided in writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective." This Power of Attorney is signed by Larry Kasten, Vice President, who has been authorized pursuant to the above resolution to execute power of attorneys on behalf of each of the CNA Companies. This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of each of the above Companies by unanimous written consent dated the 25' day of April, 2012: "Whereas, the bylaws of the Company or specific resolution of the Board of Directors has authorized various officers (the "Authorized Officers") to execute various policies, bonds, undertakings and other obligatory instruments of like nature; and Whereas, from time to time, the signature of the Authorized Officers, in addition to being provided in original, hard copy format, may be provided via facsimile or otherwise in an electronic format (collectively, "Electronic Signatures"); Now therefore be it resolved: that the Electronic Signature of any Authorized Officer shall be valid and binding on the Company." This Power of Attorney may be signed by digital signature and sealed by a digital or otherwise electronic -formatted corporate seal under and by the authority of the following Resolution adopted by the Board of Directors of each of the above CNA Companies by unanimous written consent dated the 27th day of April, 2022: "RESOLVED: That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify and confirm the use of a digital or otherwise electronic -formatted corporate seal, each to be considered the act and deed of the Company." Go to www.cnasurety.com > Owner / Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity. Form F6853-6/2023 Projects Last 5 years 327 Projects / $2.55B / Average Size: $7.8M Account Name Opportunity Name Amount I Fiscal Period I Location city Location State Gty of Lafayette CSO High -Rate Treatment Facility $51,074,521.00 Q1-2025 Lafayette Indiana Aqua Ohio: Westerville Blacklick Creek WWTP 2024 Influent Screen $500,000.00 Q1-2025 Worthington Ohio Citizens Energy Group CEG Thermal - State Archive $1,700,000.00 Q1-2025 Indianapolis Indiana Citizens Energy Group CEG Belmont -Southport Waste Pump Replacement $1,025,000.00 Q1-2025 Indianapolis Indiana Citizens Energy Group CEG Belmont Gravity Thickener Upgrade $2,600,000.00 Q1-2025 Indianapolis Indiana Indiana American Water INAW Charlestown WTP PEAS $1,379,000.00 Q1-2025 Charlestown Indiana Citizens Energy Group CEG Steam - Capital Ave Potholing $218,137.00 Q1-2025 Indianapolis Indiana Muncie Sanitary District MSD Cut Off Leyee & Solar (BOT) $6,500,000.00 Q4-2024 1 Muncie Indiana City of West Lafayette WWTP Wet Weather Expansion (BOT) $29,177,898.00 04-2024 West Lafayette Indiana New Jersey American Water Canoe Brook PEAS Treatment Plant Design -Build: (North) $41,103,852.00 44-2024 Short Hills New Jersey Town of Cumberland WWTP Expansion & Collections Projects (BOT) $35,172,940.00 Q4-2024 cumberland Indiana Aqua Ohio: Westerville Lake Darby WWTP 2024 - Parshall Flume Addition Design Build $1,000,000.00 Q4-2024 _ Worthington Ohio Citizens Energy Group CEG Southport Nat Gas Genset Replacement $295,000.00 Q4-2024 Indianapolis Indiana Citizens Energy Group CEG Southport Ferrous Building Rehab $1,450,000.00 Q4-2024 Indianapolis Indiana Town of Danville Southside Interceptor $1,842,745.00 Q4-2024 danville Indiana Citizens Energy Group CEG Riverside Well F- Rebid $895,000.00 Q4-2024 _ Indianapolis Indiana Indiana American Water INAW- Kokomo Phillips WTP- Aerolator Replacement $2,754,400.00 Q4-2024 Kokomo Indiana Citizens Energy Group CEG Well Ba and 14a RFQ $575,000.00 Q4-2024 _ Indianapolis Indiana Tennessee American Water TNAW -Citico PEAS RFD $0.00 Q4-2024 _ Chattanooga Tennessee Citizens Energy Group CEG WIN Expansion-15MGD New Plant Facilities- Budget Estimate $15,000.00 Q3-2024 _ Indianapolis Indiana Citizens Energy Group CEG Bridgeport Interceptor Storage Tank GMP for Installation(add to Pre -purchase) $6,642,045.00 Q3-2024 Indianapolis Indiana Citizens Energy Group CEG Signia (Pan Am Plaza) Chilled Water _ $3,100,000.00 Q3-2024 _ Indianapolis Indiana City of Lafayette BOT Sewer, Water & Lift Station for Service Area 11B $43,000,000.00 Q3-2024 Lafayette Indiana City of Cedar Rapids Iowa Cedar Rapids Iowa WPCF Improvements $348,307,556.00 Q3-2024 Cedar Rapids Iowa Citizens Energy Group CEG LS 164 Ferrous Room Rehab $1,300,000.00 Q3-2024 Indianapolis Indiana Aqua Indiana: Indianapolis Aqua IN HCRSD Solids Handling Conveyor Replacement $1,065,000.00 43-2024 Indianapolis Indiana Citizens Energy Group CEG WR Settled Water Basin Demo STUDY $30,000.0003-2024 Indianapolis Indiana New Jersey American Water Salem PEAS Removal Design -Build (South) $13,972,992.00 Q3-2024 Salem New Jersey City of Warrensburg, MO City of Warrensburg, MO - WWTPs(CMAR) $15,000,000.00 Q3-2024 Warrensburg Missouri Carolina Water Service Darby WWTP Replacement $16,225,000.00 Q2-2024 Darby North Carolina Valparaiso City Utilities WWTP System Improvements $46,000,000.00 Q2-2024 Valparaiso Indiana Valparaiso City Utilities Lift Station $5,981,408.00 Q2-2024 Valparaiso Indiana Utilities Inc USI- Ferson Creek WWTP: PDB -GMAX Pricing $5,000,000.00 Q2-20N R. Charles Illinois City of Johnstown, Ohio CMAR-Gtyof Johnstown OHWTP-GMAX $35,000,000.00 Q2-2024 Johnstown Ohio Aqua Ohio: Westerville Aqua Ohio Blacklick WWTP Clarifier Progressive Design Build $4,487,500.00 Q2-2024 Columbus Ohio Valparaiso City Utilities Wells& WTPSystem Improvements $8,000,000.00 Q2-2024 Valparaiso Indiana McKim & Geed: Sewickly PPG Rock Hill Putty Line Project $2,250,000.00 Q2-2024 Rock Hill South Carolina City of Lafayette Misc WWTP and Sewer (Three Pack Projects) $3,669,000.00 Q2-2024 Lafayette Indiana Brightmark Renewables Brightmark RNG - Lake Station, IN, Plant City FIE, Maricopa Cty, AZ- RFQ $0.00 Q2-2024 Ashley Indiana Utilities Inc CUII - Roselawn Lift Station Rehab $355,897.00 Q2-2024 Crown Point Indiana Indiana American Water INAW Ogden Dunes- LSP Valve Replacements $800,000.00 Q2-2024 Ogden Dunes Indiana Indiana American Water INAW Ogden Dunes - HSP Replacement $1,200,000.00 Q2-2024 Ogden Dunes Indiana Citizens Energy Group CEG Dam debris clearing at steam plant $30,000.00 Q2-2024 Indianapolis Indian Town of Danville Eastside Interceptor BOT $2,793,105.00 Q2-2024 danville Indiana Indiana American Water INAW- Seymour Groundwater Plant RFD Phase $0.00 Q1-2024 Seymour Indiana Merrillville Conservancy District Madison Street Lift Station $4,516,186.00 Q1-2024 Merrillville Indiana Citizens Energy Group CEG Signia (Pan Am Plaza) Steam $3,005,000.00 Q1-2024 Indianapolis Indiana OVEC: Kyger Creek Station EEG Biological & OF $14,400,700.00 Q1-2024 Cheshire Ohio OVEC: Clifty Creek Station EEG Biological & OF $13,772,700.00 Q1-2024 Madison Indiana Citizens Energy Group CEG - IUSM- Health Steam Relocations $5,600,000.00 Q1-2024 Indianapolis Indiana Pure Development Lebanon-LS & FM- Pure Development $8,358,000.00 Q1-2024 Lebanon Indiana Virginia American Water Section 8 Clarifier Replacement $3,812,823.00 Q1-2024 Dale City Virginia Citizens Energy Group CEG - IUSM- Health Chilled Relocations- Final Connection $2,700,000.00 Q1-2024 Indianapolis Indiana Citizens Energy Group CEG Corrosion SWF-GMP $2,650,000.00 Q1-2024 Indianapolis Indiana Citizens Energy Group CEG Corrosion TWM -GMP _ $6,950,000.00 Q1-2024 Indianapolis Indiana Citizens Energy Group Gradison Storm Line for CEG O Magnolia Ridge Sec 2A-2B Exhibit $321,000.00 Q1-2024 Noblesville Indiana Citizens Energy Group CEG 13th and Capital Sanitary ReRoute $321,116.00 Q1-2024 Indianapolis Indiana Nature Works Conservancy District Phase 2 (Locker) $595,463.00 Q1-2024 Valparaiso Indiana New Jersey American Water Cooper Ivy WTP Design-Build(South) $21,140,000.00 Q1-2024 Delran New Jersey City of Columbia Missouri Columbia, MO - WTP Improvements $31,168,000.00 20Columbia Missouri Citizens Energy Group CEG CherryTree WTP Tank - GPM $5,100,000.0041-Q1-202424 Westfield Indiana Citizens Energy Group CEG Harding St WTP Corrosion $379,000.00 Q1-2024 Indianapolis Indiana Utilities Inc CUII-Twin Lakes WTP 2 BWW Tanks _ $194,703.00 Q1-2024 Crown Point Indiana Utilities Inc CUII- Roselawn LS Rehab _ $426,890.00 Q1-2024 DeMotte Indiana Cleveland County, NC Lawndale Floc/Sed Improvements Project $4,145,000.00 Q1-2024 Lawndale North Carolina New Jersey American Water Canal Road Course Intake Screens Installation Design -Build $1,671,545.00 Q1-2024 Somerset New Jersey Citizens Energy Group CEG Signia Maryland St Vault Valve Work $132,200.00 Q1-2024 Indianapolis Indiana Citizens Energy Group CEG Bridgeport Interceptor Storage Tank Pipe Pre -Order $1,382,955.00 Q1-2024 Indianapolis Indiana Gty of South Bend South Bend WWTP CSO Basin & Clarifiers GSC $30,000,000.00 Q4-2023 South Bend Indiana Town of Middletown Collections Upgrades $3,767,731.00 Q4-2023 Middletown Indiana Citizens Energy Group CEG EIanco Steam -GMP $5,800,000.00 Q4-2023 Indianapolis Indiana Indiana American Water INAW - Winchester WTP DB Target Cost Phase $23,000,000.00 Q4-2023 Winchester Indiana Citizens Energy Group CEG Corrosion Group 2-RFD SUBMISSION $0.00 Q4-2023 Indianapolis Indiana Citizens Energy Group CEG Corrosion TWM-Design Assist $75,000.00 Q4-2023 Indianapolis Indiana Citizens Energy Group CEG Corrosion SWF- Design Assist $75,000.00 Q4-2023 Indianapolis Indiana Citizens Energy Group CEG FaII Creek High Service Pumps -Budget Estimate $15,000.00 Q4-2023 Indianapolis Indiana Citizens Energy Group CEG-Tacoma Dam Replacement -Budget Pricing $8,000.00 Q4-2023 Indianapolis Indiana Muncie Sanitary District Hoyt Ave Sewer $4,512,000.00 Q4-2023 Muncie Indiana Citizens Energy Group CEG CherryTree WTP Tank -RFQ $0.0044-2023 Westfield Indiana Virginia American Water Ft. Gregg -Adams Backup Generator Design -Build $460,000.00 Q4-2023 Petersburg Virginia Fayette County Department of Sanitary Services GMAX 4 - CMAR - Fayette County, OH / Honda Battery Plant WTP $0.00 Q4-2023 Washington Courtht Ohio Citizens Energy Group CEG CherryTree WTP Tank - Design Assist $75,000.00 Q4-2023 Westfield Indiana 16 Tech Development 16Tech 12" Water Main Construction $640,000.00 Q4-2023 Indianapolis Indiana Anne Arundel County Maryland Annapolis Courthouse Boiler/Chiller Replacement Temporary Piping Phases l and ll $1,495,000.00 Q3-2023 Annapolis Maryland Citizens Energy Group CEG Bridgeport Interceptor Storage Tank RFD $50,000.00 Q3-2023 Indianapolis Indiana Nature Works Conservancy District Nature Works CD Multi -Phase Wastewater/Stormwater GSC $2,145,219.00 Q3-2023 Valparaiso Indiana Town of Westville LS#2 Amendment(DOC expansion) $3,995,801.00 Q3-2023 Westville Indiana Holtec International Inc Palisades ISFSI Storage Pad and CTP $2,670,000.00 Q3-2023 Covert Michigan Citizens Energy Group CEG WR Corrosion Inhibitor Building-GMP $1,400,000.00 Q3-2023 Indianapolis Indiana Citizens Energy Group CEG WRN Corrosion Inhibitor- Basement placement-GMP $1,825,000.00 Q3-2023 Indianapolis Indiana Citizens Energy Group CEG Fall Creek Corrosion Inhibitor Building -GMP $2,200,000.00 Q3-2023 Indianapolis Indiana Heartwell Renewables Heartwell Renewables Project Valentine Rail Unloading Facilities $3,000,000.00 Q3-2023 Hastings Nebraska Grain Processing Corporation GPC: Washington IN EPC New Settling Basin Tanks Foundations- Alliance Delivery $4,788,061.00 Q3-2023 Washington Indiana Crane Naval Surface Warfare Center(NSWC) Crane NAVFAC ULT Launch Pit Special Test Equipment(LPSTE) Steel Package A-D $1,195,000.00 Q3-2023 Crane Indiana Town of Danville Scope Amendment (North Interceptor) $400,000.00 Q3-2023 Danville Indiana Citizens Energy Group CEG - IUSM- Health Chilled Relocations - Phase 1 $850,000.00 Q2-2023 Indianapolis Indiana Nashville TN Metro Water Services Bth Avenue 20MG Reservoir Improvements Phase 2 $39,897,025.00 Q2-2023 Nashville Tennessee Tennessee American Water TNAW- Citico Station Switchgear Replacement $7,995,890.00 Q2-2023 Chattanooga Tennessee Fayette County Department of Sanitary Services CMAR - Fayette County, OH / Honda Battery Plant WTP $58,536,996.00 Q2-2023 Washington Courtht Ohio Carolina Water Service Carolina Water Raleigh Area Well Modifications $579,349.00 Q2-2023 Raleigh North Carolina Citizens Energy Group CEG Belmont and Southport Filter Media Replacement $20,000,000.00 Q2-2023 Indianapolis Indiana Indiana American Water INAW - Winchester WTP DB REP Phase $0.00 Q2-2023 Winchester Indiana Citizens Energy Group CEG Lanndale Fuel System Replacement $950,000.00 Q2-2023 Indianapolis Indiana Citizens Energy Group CEG EIanco Chilled Water-GMP $11,500,000.00 Q2-2023 Indianapolis Indiana Carolina Water Service Saddlewood Wells Project _ $611,500.00 Q2-2023 Gastonia North Carolina ESI Inc. of Tennessee ESI- Battery Energy Storage System $766,500.00 Q2-2023 Brandywine Maryland Muncie Sanitary District Northview Roadway and Drainage Improvements (SA N3) $2,782,921.00 Q2-2023 Muncie Indiana TRUE TRUE TRUE FALSE TRUE FALSE FALSE TRUE TRUE TRUE TRUE TRUE FALSE FALSE TRUE TRUE FALSE TRUE FALSE TRUE TRUE TRUE TRUE FALSE FALSE FALSE TRUE TRUE TRUE FALSE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE FALSE FALSE FALSE TRUE TRUE TRUE TRUE FALSE FALSE TRUE FALSE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE FALSE TRUE FALSE FALSE FALSE FALSE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE FALSE FALSE TRUE TRUE FALSE TRUE TRUE TRUE FALSE TRUE FALSE TRUE TRUE FALSE TRUE TRUE TRUE FALSE TRUE TRUE TRUE FALSE FALSE TRUE Burns &McDonnell. Kansas City(Headquarters) CPV St. Charles EC Black Start Civil/Foundations $1,338,080.00 Q2-2011 Waldorf Maryland FALSE City of Butler Phase 2 N. Broadway Watermain & Sewer $4,749,374.00 Q1-2023 Butler Indiana TRUE TVA Gallatin Station EPC PEMB Office Complex Building $7,699,438.00 Q1-2021 Gallatin Tennessee FALSE Citizens Energy Group CEG Bloomfield Estates LS and FM $1,596,916.00 11 - 023 Pleasant View Indiana TRUE Citizens Energy Group CEG WRN Corrosion Inhibitor- Basement placement-RFQ SUBMISSION $0.00 Q1-2023 Indianapolis Indiana FALSE Citizens Energy Group CEG Fall Creek Corrosion Inhibitor Building -RFQ SUBMISSION $0.00 Q1-2023 Indianapolis Indiana FALSE Kaiser Aluminum Warrick Facility (Newburgh IN) Treatment Plant Upgrades $18,831,051.00 Q1-2023 Newburgh Indiana TRUE Town of Shirley Shirley IN WW -GSC $5,683,500.00 Q1-2023 Shirley Indiana TRUE Town Of Plainfield Digester Improvements(N. WWTP) $1,908,732.00 Q1-2023 Plainfield Indiana FALSE Citizens Energy Group CEG WRN Filter Media Replacement $1,050,000.00 Q1-2023 Indianapolis Indiana FALSE Columbus Utilities Phase 2 (Watermain) $2,272,166.00 Q1-2023 Columbus Indiana FALSE Indiana American Water INAW - Winchester WTP DB RFQ Q1-2023 Winchester Indiana TRUE Citizens Energy Group CEG Belmont Centrifuge Installation $1,820,000.00 Q1-2023 Indianapolis Indiana FALSE Citizens Energy Group CEG Belmont and Southport Filter Valve Replacement $4,875,000.00 Q1-2023 Indianapolis Indiana FALSE Valparaiso City Utilities Wells to Support Water Syeem $1,780, 199.00 Q1-2023 Valparaiso Indiana TRUE Columbus Utilities Phase 1 (Elevated Tank/Booster Station & Wells) $17,930,004.00 Q1-2023 Columbus Indiana TRUE Virginia American Water VAAW Hydropneumatic Tank Replacements CMAR $390,070.00 Q1-2023 Hague Virginia TRUE Citizens Energy Group CEG WR Corrosion Inhibitor Building -RFQ SUBMISSION $0.00 Q1-2023 Indianapolis Indiana FALSE Citizens Energy Group CEG Elanco Steam and Chilled Water- PreOrder Chilled Pipe $2,058,453.00 Q1-2023 Indianapolis Indiana TRUE Pure Development Lebanon -Waterline- Pure Development $2,342,970.00 Q1-2023 Lebanon Indiana FALSE City of Fishers West Leg Metro Airport Sewer(BOT) $3,079,889.00 Q1-2023 Fishers Indiana TRUE Citizens Energy Group _ CEG Morse Dam outfall repair $499,843.00 Q1-2023 Indianapolis Indiana TRUE Citizens Energy Group CEG FC Shutdown Projects $150,600.00 Q1-2023 Indianapolis Indiana TRUE Town of Danville Phase 1 North Interceptor $5,000,000.00 Q1-2023 danAlle Indiana TRUE Citizens Energy Group CEG WR Corrosion Inhibitor Building -Design Assist Precon $75,000.00 Q1-2023 Indianapolis Indiana FALSE Citizens Energy Group CEG WRN Corrosion Inhibitor- Basement placement -Design Assist Precon $75,000.00 Q1-2023 Indianapolis Indiana TRUE Citizens Energy Group CEG Fall Creek Corrosion Inhibitor Building- Design Assist Precon $75,000.00 Q1-2023 Indianapolis Indiana TRUE City of Oak Ridge TN Pkg 1- New 16MGD Membrane WTP & 20,000 sgtt PEMB $62,000,000.00 Q4-2022 Oak Ridge Tennessee FALSE Regional Water Resource Agency(RWRA) Max Rhoads WestWWTP (MR P) Retrofit $35,979,449.00 Q4-2022 Owensboro Kentucky FALSE LG&E-KU IGhent&Mill Creek Maintenance Tanks $8,000,000.00 04-2022 Ghent Kentucky FALSE Columbus Utilities lPhase 2 (Inwood and Industrial Dr. Sewer/Lift station Rehab) $3,990,923.00 04-2022 Columbus _ Indiana FALSE Indiana American Water INAW-Chlorine Gas Conversions SIOTC-DB RFP $2,123,572.00 04-2022 Jeffersonville _ Indiana TRUE Indiana American Water INAW- Chlorine Gas Conversions Terre Haute-DB RFP $2,374,389.00 04-2022 Terre Haute _ Indiana TRUE Indiana American Water INAW- Chlorine Gas Conversions Lowell -DB RFP $4,255,448.00 04-2022 Lowell _ Indiana TRUE Indiana American Water INAW- Chlorine Gas Conwirsions Ogden Dunes -DB RFP $4,712,875.00 04-2022 Ogden Dunes _ Indiana TRUE Citizens Energy Group CEG Southport DNS RAS Elbow Replacment $194,490.00 04-2022 Indianapolis _ Indiana _ TRUE Citizens Energy Group CEG -IUSM- Health Chilled Pipe Pre -Purchase $531,997.00 QI Indianapolis Indiana TRUE Citizens Energy Group CEG Steam Plan Dam_ Maintenance $29,872.00 04-2022 Indianapolis Indiana FALSE Citizens Energy Group CEG Southport Bar Screen#3 $205,520.00 04-2022 Indianapolis Indiana FALSE Utilities Inc UI - Twin Lakes WTP N2-Chem Rm Rehab $200,000.00 Q4-2022 Crown Point Indiana FALSE Citizens Energy Group CEG- Southport Diesel Line Replacement $95,000.00 Q4-2022 Westfield Indiana FALSE Citizens Energy Group CEG- Sludge Line Replace Epler&Warman $1,200,000.00 Q4-2022 Indianapolis Indiana FALSE Columbus Utilities 2022 Phase 1 (Lift Station Rehab) $6,159,542.00 04-2022 Columbus Indiana FALSE Citizens Energy Group CEG- Westfield WWTP Expansion $17,500,000.00 04-2022 Westfield Indiana FALSE Citizens Energy Group CEG- WR Aquaduct Structure Rehab -Construction $5,000,000.00 04-2022 Indianapolis Indiana FALSE Lauth Group, Inc. Ford Site Demolition $5,630,000.00 Q3-2022 Indianapolis Indiana TRUE 16 Tech Development 16Tech 24" and 30"Water Main Re -Route Construction $4,684,248.00 Q3-2022 Indianapolis Indiana TRUE Utilities Inc USI- Ferson CreekWWTP: PDB -GMAX Pricing $5,200,000.00 Q3-2022 St. Charles Illinois TRUE City of Lafayette WWTP Renovation -Phase 2 of 2020 POTW (Partial Scope Addition) $1,809,000,00 Q3-2022 Lafayette Indiana TRUE Citizens Energy Group CEG TW Moses- Plant Improvement Jobs(^6pack) $330,000.00 Q3-2022 Indianapolis Indiana FALSE Town of Upland WWTP Rehab $5,393,000.00 Q3-2022 Upland Indiana FALSE City of Johnstown, Ohio CMAR- City of Johnstown OH -RFQ Phase $0.00 Q3-2022 Johnstown Ohio TRUE LG&E-KU Glendale 345 kV & 138 kV Substations (Ford Battery Plant) $32,764,184.00 Q3-2022 Glendale Kentucky FALSE Indiana American Water INAW- Noblesville Backwash Water Recycle Tank Replacement $1,655,000.001 Q3-2022 Noblesville Indiana FALSE Knoxville Utilities Board KUB Whitaker WTP 38MGD Expansion $66,406,700.00 Q3-2022 Knoxville Tennessee FALSE Virginia American Water Hopewell Polymer System Modifications $390,000.00 Q3-2022 Hopewell Virginia FALSE Virginia American Water Hopewell Domestic Sedimentation Basin Replacement $8,400,000.00 Q3-2022 Hopewell Virginia FALSE Aqua America _ 2022 Aqua OhioTimberbrook WTP Aeralater Replacement $1,400,000.00 Q3-2022 Columbus Ohio FALSE City of Johnstown, Ohio CMAR- City of Johnstown OH -RFP Phase $0.00 Q3-2022 Johnstown Ohio TRUE Scalfo Electric Inc Gloucester County NJ CHP $1,210,000.00 Q3-2022 Glassboro New Jersey FALSE Aqua America Progressive Design Build RFP, New Clarifier Installation at Lake Darby Wastewater Trea $3,500,000.00 Q3-2022 Galloway Ohio FALSE Indiana American Water INAW- OR 550 Booster Station $350,000.00 Q3-2022 Valparaiso Indiana TRUE City of Shelbyville_ Convey Lift Station (Phased 2020 Capital Projects) $1,600,000.00 Q2-2022 Shelbyville Indiana TRUE Georgia Power: Plant Bowen Plant Bowen Biological ELG 700 gpm $27,818,070.00 Q2-2022 Cartersville Georgia FALSE Citizens Energy Group CEG 106th& Cumberland PS Tank $1,680,000.00 Q2-2022 Indianapolis Indiana FALSE Citizens Energy Group CEG-Geist Dam Cone Valve Replacement $1,044,000.00 Q2-2022 Indianapolis Indiana FALSE Muncie Sanitary District MSD Phase4 of 2020 Phased Capital Improvement (45torm Projects) $9,360,208.00 Q2-2022 Muncie Indiana TRUE City of Butler _ 2021 Storm Sewer Phased GSC _ $6,677,997.00 Q2-2022 Butler Indiana TRUE (SDRSD) South Dearborn County Regional Sewer Di! WWTP Rehab (Additional Sludge Holding/Processing) $24,361,000.00 Q2-2022 Lawerenceburg Indiana FALSE Citizens Energy Group CEG Senate Ave Steam Line Relocation $76,028.00 Q2-2022 Indianapolis Indiana TRUE Tennessee American Water TNAW - Whitwell Pump Station and Intake $3,444,300.00 Q2-2022 Chattanooga Tennessee FALSE Indiana American Water INAW -Sheridan, IN 2.0 MGD WTP RFQ DB $0.00 Q2-2022 Sheridan Indiana TRUE Virginia American Water Dale City Lift Station and Force Main $2,665,280.00 Q2-2022 Dale City Virginia FALSE Virginia American Water Dale City WWTP Clarifiers 1&2 Replacement $2,566,363.00 Q2-2022 Dale City Virginia FALSE Evansville Water& Sewer Utility(EWSU) 1 EWSU Pfeiffer Rd- Wansford Yard Sanita ry Lift Station $25,407,445.00 Q2-2022 Evansville Indiana FALSE Citypf Shelbyville UV Amendment(Conrey Lift Station) $766,424.00 Q2-2022 Shelbyville Indiana TRUE 16 Tech Development 16Tech 24" and 30" Water Main Re -Route Phase 1 $52,500.00 Q1-2022 11ndi a na pol is Indiana TRUE Citizens Energy Group ICEG Belmont Chemical Storage Addition (Hypo) $2,410,000.00 Q1-2022 Indianapolis Indiana FALSE Citizens Energy Group CEG FC WTP Well Line and In Stream Improvements $202,000.00 Q1-2022 Indianapolis Indiana FALSE Citizens Energy Group CEG Belmont Septage Receiving Improvements $177,000.00 Q1-2022 Indianapolis Indiana FALSE Citizens Energy Group CEG W-WW Piping Replacement Program - Syr $6,DDD,D0D.D0 Q1-2022 Indianapolis Indiana TRUE Citizens Energy Group CEG Geist and Morse Dam Boat Warning System $359,000.00 Q1-2022 Indianapolis Indiana FALSE Citizens Energy Group CEG Shelby County LS and FM $7,398,655.00 Q1-2022 Pleasant View Indiana TRUE IU Health IU Health Ring Road Extension $12,900,000.00 Q1-2022 Indianapolis Indiana TRUE Citizens Energy Group CEG WRN 24" GW Connectto CLTank $97,402.00 Q1-2022 Indianapolis Indiana TRUE Aqua Illinois, Inc. Aqua IL- Peptone WWTP Clarifier Rehabilitation DB $350,000.00 Q1-2022 Peotone Illinois TRUE Citizens Energy Group CEG- Lift Station 101 Capacity Redesigned Upgrades $2,805,000.00 Q1-2022 Indianapolis Indiana FALSE City of West Lafayette 2021 RFQ Phase 1 (Dehart Outfall) $13,941,000.00 Q1-2022 West Lafayette Indiana TRUE Michelin North America Inc Michelin New High Pressure Boilers $43,400,000.00 Q1-2022 Louisville Kentucky TRUE Citizens Energy Group CEG Belmont & Southport DNS Wall Reinforcement $9,264,000.00 04-2021 Indianapolis Indiana FALSE City of Fishers WWTP Grit &Screen $466,667.00 04-2021 Fishers Indiana FALSE OVEC: Ciifty Creek Station OVEC Ciifty Creek Boiler Slag Civil Foundations/Underground $9,974,804.00 04-2021 Madison Indiana FALSE Citizens Energy Group CEG Belmont and Southport DNS Screw Pump Replacement $6,350,000.00 04-2021 Indianapolis Indiana FALSE Indiana American Water INAW- Crawfordsville HSPS $2,000,000.00 Q4-2021 Crawfordsville Indiana TRUE Indiana American Water INAW- Crawfordsville Site Pkg for Elevated Tank $13,000.00Q4-2021 Crawfordsville Indiana TRUE Indiana Department of Natural Resources Charlestown State Park- Rainey Well Closures $1,500,000.00 Q4-2021 Charlestown Indiana FALSE OVEC: Ciifty Creek Station OVEC Ciifty Creek Mechanical Construction $5,371,000.00 04-2021 Madison Indiana FALSE Aqua Illinois, Inc. Aqua IL- Kankakee UV Disinfection FEED $23,500.00 04-2021 Kankakee Illinois FALSE Citizens Energy Group CEG Belmont Clarifier 7& B Collector Rehab $2,205,000.00 04-2021 Indianapolis Indiana FALSE Citizens Energy Group CEG Riverside Well E $310,000.00 04-2021 Indianapolis Indiana FALSE Citizens Energy Group CEG WR Diesel Tank Replacement $235,000.00 04-2021 Indianapolis Indiana FALSE New Jersey American Water Canal Road Raw Water Intake Improvements: (North) $2,424,679.00 04-2021 Bridgewater Towns New Jersey TRUE Muncie Sanitary District MSD 2020 Phased Capital Improvement (Phase 3) SA#2 $482,486.00 04-2021 Muncie Indiana TRUE Town Of Plainfield 2020 Capital Project Advertisement (North WWTP Improvements) $7,830596.00 Q3-2021 Town of Plainfield Indiana FALSE OVEC Kyger Creek Station OVEC Kyger Creek Boiler Slag Civil Foundations/Underground $8,397:88.00 Q3-2021 Cheshire Ohio FALSE OVEC Kyger Creek Station OVECKyger Dry Fly Ash Mechanical Construction $4,980,000.00 Q3-2021 Cheshire Ohio FALSE Town of Cambridge City (IN) (WWRSD) WWTP Rehab& Expansion(BOT) $18,402,154.00 Q3-2021 Town of Cambridge Indiana TRUE Indiana American Water INAW- Charlestown, IN WTP -GMP $10,700,000.00 Q3-2021 Charlestown Indiana TRUE New Jersey American Water Raritan Millstone Ammonia Handling (North)_ $4,230:340.00 Q3-2021 Bridgewater New Jersey FALSE Town Of Plainfield 2020 Capital Project Advertisement (Mill Street Sewer Improvements)) $479900.00 Q3-2021 Town of Plainfield Indiana FALSE Town of Westville Plant Improvements (Phase 2) $10:212,286.00 Q3-2021 westville Indiana FALSE Pennsylvania American Water Milton WTP Improvements $5899,818.00 Q3-2021 Milton Pennsylvania FALSE Virginia American Water ISouth Hill Banks New Well Station $494,035.00 Q3-2021 Westmoreland Coui Virginia FALSE