Dear Selection Committee:
A&Z Engineering, LLC (A&Z) is eager for the opportunity to partner with the City of South
Bend on another important project. Throughout our proposal we will highlight our project
approach along with the added value unique to A&Z as the prime inspection firm, which
includes:
Qualified, Experienced Key Staff
• Jason Pace, A&Z's lead project supervisor, is an INDOT-certified technician with seven
years of transportation industry experience.
• This project also has two key staff to serve as inspectors with ample experience on similar
projects.
• We have also earmarked three designated "back up" inspectors who also have relevant
qualifications and experience.
A Team with Proven Success
Extensive experience inspecting INDOT/LPA federally funded projects.
Deep understanding of construction challenges, quality control, and skilled in providing
continuous communication with all stakeholders.
Proven ability to keep projects on schedule and within standards, as evidenced by our above
average scores on INDOT evaluations.
Established Working Relationships
• A&Z is fortunate enough to have collaborated with the City on several important design
projects, so we have established contacts that enable us to hit the ground running.
• Our team also has relationships with key staff and area engineers in the LaPorte District,
most recently through a structure replacement project on US 421.
Commitment to Communication & Outreach
• Proactive public engagement to keep residents informed of project progress.
• Clear, effective communication with the project team and local officials.
• Dedicated to ensuring a smooth, community -supported project.
A&Z is committed to delivering a high -quality pedestrian project while providing outstanding service
to ensure a smooth, successful experience for the community and stakeholders alike.
INDOT PERFORMANCE EVALUATIONS:
A&Z VS. CONSULTANT AVERAGE
5/14/2023-5/14/2025
A&Z Average Score
Consultant Averages
from INDOT Reviews
IN 11
Budget Quality
Responsiveness
am
Schedule
A 6 Z ENGINEERING
Each person listed is assigned specifically to this project, providing consistent support, clear communication, and
dependable inspection and documentation every step of the way. Our Project Engineers/Supervisors (PE/S)
have passed all six subject areas of the INDOT Certified Technician Program.
*%m
CITY OF SOUTH BEND
GEMMA STANTON, ERC/PROJECT ENGINEER
01A R
O
Q
INSPECTION DEPT. MGR. LAPORTE DISTIRCT
MARK VOSS I A&Z AREA ENGINEER, PM
PROEJCT ENGINEER/SUPERVISOR
JASON PACE I A&Z
SINGLE POINT OF CONTACT I TECHNICAL OVERSIGHT
DAILY COORDINATION
JAASSISTANT PETS INSPECTOR
NATHAN STEVENS Ik CODY HEPLER
A&Z APEX
ON -CALL INSPECTORSIRPRS
We've also named trusted backups who can step in if needed —no delays, no learning curve. They
bring the same qualifications and project familiarity to keep things running smoothly no matter what.
INSPECTOR
NATHAN PATRICK
3 YEARS OF EXPERIENCE
f- `
SWPPP CERTIFIED
INSPECTOR -TESTER
ZANE ANABTAWI
^r 17 YEARS OF EXPERIENCE
INDOT CERTIFIED TESTER
A&Z is committed to
keeping the team shown
in this proposal on the
Kennedy Academy Safe
Routes to School project
from start to finish.
TEAMING
STRUCTURE
J «.
A & Z ENGINEERING
Lead Firm
95%
1 �
CONSULTING & SURVEYING
DBE Firm
5%
Ae'.
A & Z ENGINEERING
JASON PACE 1 7 YEARS OF EXPERIENCE
Jason Pace will serve as the project manager and project engineer/supervisor (PE/S) for this
project. With extensive experience —including multiple INDOT and LPA-funded roadway, trail,
and intersection improvement projects —Jason brings a proven record of field leadership and
technical compliance. A Purdue Fort Wayne graduate in Construction Engineering, he is both an
INDOT Certified technician and tester.
Jason is also trained in INDOT's new project management system: AWP, which replaces
SiteManager on all projects let after May 2025.
Education & Training:
BS, Construction Engineering Technology I Purdue Fort Wayne
INDOT Certified Technician (Project Engineer/Supervisor: PE/S)
OSHA 30
AWP Trained
Select Experience
Winona Ave., Argonne Rd., Kings Hwy I INDOT/LPA Project I Winona Lake, IN I I Lead project PE/S for intersection
improvements, including a 10' trail and teardrop roundabout with curb and gutter. His role involved pedestrian MOT, railroad
coordination, and community outreach. A&Z was able to keep the roadway open during construction.
Trail, Sidewalk & Pedestrian Bridge I Monroeville IN I Jason served as the PE/S for the inspection multi -use paths, trails,
sidewalks, z-channel crossings, mid -block crossings, and pedestrian railroad crossings along with a pedestrian bridge.
Trail & Sidewalk I Woodburn, IN I Jason served as the PE/S for a series of sidewalks and multi -use paths throughout the
town to improve connectivity. Part of the Stellar Grant funding, this project included federal funding.
Drake Rd. Corridor Overhaul I INDOT/LPA Project I Kendallville, IN I PE/S for a multiphase roadway overhaul that
included sidewalks, crossings, ADA compliance, crosswalks. He managed coordination with the railroad, city agencies, and
the community to navigate challenges in a dense residential area near East Noble Middle School (ENMS) and emergency
services. Pedestrian MOT was important for students attending ENMS. Also coordinated INDOT lighting standards
exemptions so that the City could have their signature style lighting.
Maplecrest Rd. Reconstruction, Phase II 1 Ft. Wayne, IN I Project engineer/supervisor for the second phase of roadway
reconstruction that included sidewalk and a multiuse path in addition to crossings at 4 intersections.
PROJECT
SUPPORT Fr
QUALITY
ASSURANCE
MARK VOSS, VP
INSPECTION DEPARTMENT MANAGER
Mark is a seasoned Construction Manager with
extensive experience overseeing municipal and
INDOT infrastructure projects. He leads
inspection teams with a focus on quality, clear
communication, and timely delivery. Mark also
mentors junior staff and ensures consistency
across all projects. Under his leadership, A&Z's
construction inspection team has earned a
strong reputation and routinely "Exceeds
Expectations" on INDOT reviews —attracting
some of the region's top inspection talent.
Mark will maintain vigilance and
serve as an additional point of
contact for the City. He will
manage contract documents,
ensure quality performance, and
serve as another professional
g out for the quality and
is of this project.
Page 4 ■
/4«,
A 6 Z ENGINEERING
NATHAN STEVENS 1 3 YEARS OF EXPERIENCE
Nathan brings transportation experience from INDOT's LaPorte District, where he focused on construction
oversight for federally funded projects. Now based in A&Z's Valparaiso office, Nathan has been working as
an engineer on projects similar in scope to the SRTS in South Bend. Nathan is also positioned near the
Kennedy Academy site to provide consistent daily observation. He will document progress, verify
quantities and estimates, and ensure compliance with plans and specifications. Nathan's most notable
construction supervision experience includes the I-65 concrete patching and milling for the LaPorte
District.
Education & Training
BS, Civil Engineering I Purdue Northwest
INDOT Certified: Technician, AWP Trained
Select Experience
3rd Street Improvements I St. Joe, IN I Engineer for a full -depth reconstruction that included concrete curb and
gutter, ADA compliant curb ramps, concrete sidewalk, concrete drive approaches, storm sewer improvements, and
restoration.
Woodburn & Webster Rd. Sidewalks I Allen County Highway Department I Design of new sidewalks around
Woodlan Jr./Sr High School including ADA compliant curb ramps.
Westgate Neighborhood Improvements, Phase III I Columbia City, IN I Design for CCMG project that consisted of
roadway improvements and the addition of sidewalk and ADA accessible connectivity.
CODY HEPLER 1 10 YEARS OF EXPERIENCE
Cody has been providing construction inspection services on transportation projects since 2014. His
experience spans bridge rehabilitation, roadway construction, utility improvements, and pedestrian
facilities. He monitors field activities, verifies materials, conducts on -site testing, and ensures
compliance with INDOT and LPA standards. Known for his attention to detail and collaborative
approach, Cody is a reliable partner in keeping projects on track and up to spec.
Education & Training
BS, Construction Engineering & Project Management, Purdue University Fort Wayne
INDOT Certified: Tester, Technician (all proficiencies), AWP trained, Stormwater Mgmt., Guardrail, Digital FCR
OSHA 30
Select Experience
• Waterloo Safe Routes to School I Waterloo, IN I INDOT/LPA Project, R-35906 I Inspector for sidewalk network
throughout town surrounding Garrett -Keyser -Butler Schools. Included crosswalks, curb and gutter, ADA curb
ramps.*
• North Manchester 2022 CCMG I North Manchester, IN I Inspector for seven street projects with sidewalks, curb
and gutter, curb ramps along with full -depth reconstruction.
*Indicates projects Cody completed while working with A&Z Engineering; these are A&Z projects.
A&Z Inspectors are ahead
of the curve with AWP
Proficiency.
INDOT is phasing out SiteManager and adopting
AASHTOWare Project (AWP) as its new standard
for construction documentation. This modern, web -
based system streamlines reporting, materials
tracking, and daily field entries.
A&Z inspectors are ahead of the curve —
several team members have already trained in
AWP and are actively preparing for the full
transition. Our familiarity with both SiteManager
and AWP ensures accurate, compliant
documentation and a seamless shift for this and
future INDOT/LPA projects. Choosing A&Z means
choosing a team that's ready for what's next.
A&Z project engineerslsupervisors and inspectors are
using the AWP software on all projects that have
been let after May.
�«
A & Z ENGINEERING
CCMG: Westgate Neighborhood
Client: City of Columbia City
Reference: Ryan Daniel, Mayor
This is a multi -phase CCMG project that included the
design and inspection of the roadway improvements
throughout an entire neighborhood. A large portion
of these improvements included sidewalk
replacement and new sidewalk construction along
with ADA compliant ramps.
CCMG: Avilla, Indiana
Reference: Adam Dunlap, Town Manager
Since 2017, the Town has sele --
partner for the construction ove
CCMG projects. In addition to 1
underground infrastructure imp
of these projects has also inclu
pedestrian facilities and ensurii
CCMG: Logansport, IN
Reference: Chris Martin, May(
A&Z's most recent collaboratie
Logansport was the inspection
concrete curb and gutter, ADA
and roadway milling/resurfacin
FAMILIARITY WI
CITY OF SOUTH
A&Z has assisted the City of
numerous improvements as t
Just like our design staff, the
integrity and expertise of our
of our notable work with the C
Ongoing CCMG Projects
Mishawaka Avenue Stree
Ameritech Dr. & Clevelan
Miami St. and Lincolnway
Ironwood Dr. and Ireland
SAFE ROUTES TO SCHOOL
A&Z COMPLETED PROJECTS
Projects featured below include the design and/or
construction inspection of the pedestrian facilities.
Location
Description
City of
1,100 LF of sidewalk replacement in
Angola
addition to 1,500 LF of new sidewalk
Town of
5,000 LF of sidewalk including all
Waterloo
ADA curb ramps and pavement
markings
5,650 LF of pedestrian facilities
City of
surrounding McKenney-Harrison and
Auburn, IN
James R. Watson Elementary
Schools.
City of
2,500 LF of sidewalk replacement
Garrett
and 85 ADA compliant curb ramps
Town of
12,000 LF of sidewalk throughout
St. Joe
town with 60 ADA cub ramps and 12
crossings.
5,800 LF of sidewalk along with ADA
City of New
compliant ramps and drainage
Haven
improvements
/L►
A & Z ENGINEERING
A&Z Engineering understands that the Kennedy School Safe Routes to School project is far more than a sidewalk
upgrade —it is a community safety investment requiring careful oversight and proactive field coordination. Our
approach ensures the project is constructed according to INDOT/LPA requirements, ADA standards, and the City
of South Bend's expectations for quality, cost -efficiency, and communication.
Dedicated Daily Site Presence
• All field staff featured in this LOI are INDOT AWP trained and will
document daily work in accordance with LPA standards.
• With key staff working out of A&Z's Valparaiso office, we ensure
daily on -site inspection and immediate responsiveness to field
issues.
• Our inspection team will verify slopes, curb transitions, and ramp
dimensions using smart levels and other field tools to ensure ADA
compliance.
A&Z inspectors will:
• Track contractor progress and verify quantities in real-
time.
• Monitor workmanship and safety.
• Identify issues early —especially related to drainage, trip
hazards, and utility conflicts.
• Close coordination with the contractor and City Project
Representative helps keep work within scope and
minimizes unnecessary delays or rework.
ADA Compliance is Not Optional
• Drawing on design priorities, A&Z's inspection team is trained to
review:
• Ramp slopes and landings
• Cross slopes and transitions
• Pavement interfaces that could cause ponding or non-
compliance
• We approach ADA field inspection with the same attention to
detail expected in full design reviews.
Communication That Builds Trust
The A&Z team will maintain:
• Daily communication with the City and INDOT Area Engineer
o Weekly progress updates summarizing milestones, concerns, and upcoming work
• Clear documentation of action items, changes, and field resolutions
we recognize that no two projects —or
communities —are the same. That's why we
don't offer cookie -cutter services.
Tailoring our inspection approach isn't just a preference —it's
essential for the success of the Kennedy Academy Safe
Routes to School project. This initiative presents a unique set
of conditions that require thoughtful, flexible oversight.
Active School Zone Awareness
o Construction will occur near a functioning school,
requiring heightened attention to safety, access, and
timing. Our inspectors will closely monitor sidewalk
closures, ADA ramp construction, and curb tie -ins —
ensuring all work supports a safe path of travel. If
requested, we'll coordinate with the school and City to
support communication during student arrival and
dismissal periods.
Community -Focused Communication
o This project is highly visible to nearby residents and
school families. To maintain trust and minimize
disruption, our team will support public outreach —
including clear signage, real-time updates, and, if
needed, assistance with digital or printed
communication. We've used similar strategies
successfully on past projects like Drake Road.
Urban Utility &Site Coordination
o Underground utilities, roadway constraints, and limited
working space mean field crews must remain alert
and responsive. A&Z inspectors are experienced in
coordinating with utility providers and adjusting
inspection efforts as conditions shift —keeping the
project moving on schedule and within scope.
A 6 Z ENGINEERING
Maintenance of Traffic (MOT) &
Pedestrian Safety
Should construction take place during the school year, ensuring the
safety of students, families, and neighborhood pedestrians will be
our top priority.
A&Z will actively review and enforce the contractor's Maintenance
of Traffic (MOT) plan to ensure:
• Safe, ADA-compliant pedestrian detours are in place and
well -marked.
• Sidewalk and crossing closures are clearly communicated
and minimized near Kennedy Academy during school
hours.
o Access routes remain open during student arrival and
dismissal times.
Community Outreach
Construction near a school requires more than technical oversight —it
demands proactive, accessible communication with those affected.
A&Z has successfully supported public outreach on projects like
Drake Road and is prepared to assist the City of South Bend with
clear, coordinated messaging throughout the Kennedy Academy
project.
Our team offers the following outreach tools if requested:
• Social Media Messaging
o We have the ability to develop and publish timely updates related to traffic shifts, sidewalk closures,
and construction milestones. Posts will be coordinated with City departments, school officials, and
other key stakeholders to ensure one unified message is shared across platforms. This approach
keeps information consistent and relieves the City from managing outreach alone.
• Project Landing Page
o A&Z can create a dedicated project webpage where residents and school families can view current
construction details, timelines, and safe walking routes. Users can subscribe for email updates,
keeping them informed throughout construction without having to seek out information.
This school -aware, neighborhood -focused communication strategy helps the City foster transparency and
community trust while maintaining safety and minimizing disruption.
!IN
T1- -_~----
CCMayor, I can tell you it has been a pleasure to work with A & Z
Engineering on this project. I so appreciate their efforts to tag all city and
school entities in their social media posts. This allows parents and
students to stay informed of any changes as construction continues.
Lance Waters, Mayor I Kendallville, IN I RE: Drake Rd. Reconstructic
Tbm of wlnona lake ...
- � -,V , 7013 d
116ur1dih6u[ C6r53[rutai6n V pda[t - wi.6.h A.E, Cogs *he3y, ind Pik krt. WW OPEH 7e
tw9-W 7r;Pfic... S" m9,v
A+Z EN EROWG
aowurRe, cwiwsleninvxls
Park Are- AE W1,
. .1llYrerr Are
t'A OP-400 Paned * Caen
ra.2-4-v a away t
y •..:3 `.', i:.:i "i:' 40 WrnmMIL 112,Ke
Mike Lewis
This is an excellent graphic and makes it clear how traffic can Flow.
2y Like y 0
Ann Sharkey Baker
Thanks for the update well in advance.
2y Like Reply z 0
TURNING QUESTIONS
INTO CONFIDENCE
A&Z maintained traffic throughout construction on the
Winona Lake Roundabout. A key component in ensuring
site safety and mitigating driver confusion was the use of
coordinated public messaging.
If desired, A&Z can lead early public outreach efforts to
build trust and address concerns. From informal
meetings to clear visuals and targeted communication,
we help communities better understand —and
ultimately support —roundabout projects.
A & Z ENGINEERING
Schedule Management
Given the high public anticipation for this project's completion, an in-depth review of the
contractor's schedule will be conducted to ensure the project stays on time and within budget.
Special attention will be placed on intermediate completion and/or milestones if applicable to
keep the overall project on track. While A&Z cannot dictate the contractor's means and
methods, we will help identify inefficiencies or opportunities for concurrent operations
to improve overall project efficiency and fully reopen the roadway sooner. A&Z will
participate in progress meetings and verify that the contractor's 2-week lookaheads
align with field conditions and school calendar events.
Contract Compliance
A&Z will conduct a thorough review of contract documents, special provisions, and the
geotechnical report will be conducted. Analyzing the geotechnical report for anticipated soil
conditions will help identify potential constructability challenges early. A&Z will work closely
with the contractor to address any concerns proactively, ensuring project continuity.
Bid Calculations
To minimize risk of cost overruns, A&Z will request and review the designer's bid quantity
calculations at the start of the project. Jason will track quantities in the field and flag any
discrepancies early, helping prevent budget issues before they occur. This proactive review
supports accurate pay requests and protects the City's investment. It also allows for potential
adjustments if costs are exceeding planned amounts.
Quality Control & Documentation
• Our Project Engineer/Supervisor will:
• Review all pay applications and change orders
• Ensure all materials and quantities are supported by field logs and test results
• Maintain documentation in AWP to meet INDOT audit standards
• Internal QA/QC checks will be conducted regularly to uphold project integrity.
Utility Coordination Assistance
• A&Z inspectors are experienced in managing utility impacts during construction.
We will:
• Maintain utility coordination records and notes.
o Work with the City to resolve utility conflicts proactively and without delay.
Adjust field operations when needed to avoid unnecessary relocation costs or scope creep.
O FIELD EXPERTISE
THAT PAYS OFF
PREVENTING DELAYS
& PROTECTING THE BUDGET
On the Drake Road Reconstruction project in
Kendallville, A&Z's inspection team helped the City
save nearly $90,000 through proactive oversight
and practical field knowledge.
Our clear documentation and communication of
utility delays resulted in $21,000 in cost savings.
Later in the project, our inspectors and supervisors
identified a more efficient, compliant alternative to
the originally specified treatment around structures
—saving the City an additional $66,000.
These savings weren't accidental —they were the result
of experienced inspectors who understand construction,
think critically in the field, and work closely with project
stakeholders to deliver smarter, more efficient
outcomes.
now Page 9
/L►«"
A & Z ENGINEERING
This project demands an experienced, flexible inspection team that understands the expectations of Local Public Agencies and the communities they serve. A&Z's certified
inspectors and project managers have overseen similar rural roundabout and roadway projects and are well -versed in identifying and resolving issues before they impact
progress. We're ready to support the City with proactive oversight, strong communication, and a commitment to quality from start to finish.
Scoring Category
A&Z's Advantage
Our team is known for its responsiveness, clear documentation, and ability to keep projects moving smoothly.
• Strong history of high INDOT performance ratings in inspection categories
Past Performance
Positive feedback from LPA clients across northern Indiana.
• Recognized for maintaining open communication, thorough reporting, and dependable field presence
• Trusted by local agencies for our ability to navigate challenges and support timely project delivery
A&Z's inspection team has direct experience with sidewalk, curb ramp, and pedestrian -focused improvements in urban environments.
Additionally:
Team's
Proven success on Safe Routes to School- specific projects.
Demonstrated
All proposed inspectors are INDOT AWP trained and experienced with LPA procedures
Qualifications
Daily field staff backed by an in-house QA/QC lead and inspection manager
Familiar with contractor expectations, City standards, and INDOT/FHWA compliance
Routinely praised for professionalism, accuracy, and proactive field coordination
• In-house QA/QC backing all inspection work.
A&Z has the staff, structure, and flexibility to fully support this project —without overextending resources or compromising quality.
• Dedicated inspection staff assigned specifically to this project
Capacity of Team
• Regional presence ensures quick response and consistent daily oversight
• Backup personnel identified —equally qualified and ready to step in if needed
• Team availability carefully managed to ensure full coverage from pre -con to closeout
A&Z understands the unique setting near Kennedy Academy and will continue to tailor our services to meet the project demands and the needs
of the City.
• Daily on -site presence with the technology to generate real-time documentation.
Project Approach
Support for MOT and detour management —including contingencies for pedestrians and increased traffic during peak school times.
• Close utility coordination to prevent relocation delays
• Clear, responsive communication tailored to City preferences
• Ability to support community outreach efforts if requested.
u1AN� INDHINADEPAIITMENTOFTRANSPOBTATION
gib M4 Driving lodiana's Economic Growiir
� a �
g 100 North Senate Avenue PHONE: (317) 233-4664 Eric Holcomb, Governor
r�}• .�}tl•' Room N750 FAX: (317) 233-0891 Michael Smith, Commissioner
Indianapolis, Indiana 46204
06/06/2024
Apex Consulting & Surveying
1313 Broadway
Fort Wayne IN 46802
Dear Nana Opoku,
Subject:No Change Affidavit
This letter confirms receipt of your annual No Change Affidavit and supporting documentation.The Indiana Department of
Transportation's Equity Initiative Services (EIS),in compliance with 49 CFR Parts 23 and 26, is pleased to inform you that your
firm's information has been reviewed and approved.
Your firm's DBE/ACDBE Certification will remain valid for another year.
The DBE Directory, located atINDOT: Doing Business with INDOT: DBE Directory, will continue to list your contact information
and will include the NAICS codes and description of services performed.
As a DBE/ACDBE, you have the responsibility to comply with all aspects of 49 CFR Parts 23 and 26, which include maintaining
an accurate mailing address, phone number and email addresswith INDOT EIS and promptly following up on all inquiries.
If you have any questions, please feel free to contact us atElSinguiry@indot.in.govatany time.
Sincerely, /
Derrick Casson
DBE Program Administrator, Equity Initiative Services
Indiana Department of Transportation
cc: file
www. irr. govldol!
An Equal Opportunity Employer lndln aa
:.-4m
DBE Code
DBE Description
NAICS Code
NAICS Description
DBE Speciality Code
Description
0055.161 P
Other Activities Related
531390
Other Activities
Right of Way Plan Development;
to Real Estate
Related to Real
Project Management for
Estate
Acquisition Services
0052.30E
Engineering Services
541330
Civil Engineering
Civil and Construction
Services
Engineering
0052.28E
Surveying and Mapping
541370
Surveying and
Land surveying services;
(except Geophysical)
Mapping (except
Topographic Survey Data
Services
Geophysical)
Collection, Boundry and
Services
Investigation Surveys, Drone
Service, Land Title
0052.35E
Environmental
541620
Environmental
Environmental Document
preparation - CE
Consulting Services
Consulting Services
Standard RFP Form Ver. 1l2023
(Rev. 06f27118)
Ties. #: 2201237
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified
by the State of Indiana's DBE program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this
proposal. An Agreement between 1NDOT and KYTC established reciprocal acceptance of certification of DBE firms in their
respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a
blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confum that
the firms listed below are currently certified DBEs:
INDOT: httns:llentapps.indot.in.aovIDBELocatori
KYTC: httm:lltransportation.ky.govlCivil-Rip_hts-and-Small-Business-DevelopmentfPapesfCertified-DBE-Directory.aspx
I certify that I have contacted the certified DBE's listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be
applied toward the DBE goal must have prior approval by 1NDOT's Economic Opportunity Division.
I. DBE Subeomultants to be applied toward DBE goal for the 1JFP item:
Certifiers DBE Marne
Service Planned
Estimated Percentage to
be Paid*
Apex Consulting & Surveying
13.1 Construction Inspection
5%
°la
°la
II. DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item -
Certified DBE Name
Service Planned
Estimated Percentage to
be Paid*
°{o
�f4
8fQ
%
Estimated Total Percentage Credited toward DBE Goal: 5%
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:
Company Name:
Signature:
A&Z Engineering, LLC
Date: 23 May 2025
* It is understood that thes�ividual firm percentages are estimates only and that percentages paid may be greater or less as a result
of negotiation of contract scope of work- My fum will use good faith of oos to meet the overall DBF- goal through the use of these
or other certified and approved DBE firms.
Prequalified Work Type Certification
Issued By
Indiana Department of Transportation
Date Printed: 09/08/2023
A & Z Engineering, LLC
Valid Work Groups
Effective: 07/26/2023
Work Type Code Work Type Description
4.1 Traffic Safety Analysis
6A Topographic Survey Data Collection
8.1
8.2
Non -Complex Roadway Design
Complex Roadway Design
Traffic Signal Design
Complex Roadway Sign Design
Right of Way Plan Development
Project Management for Acquisition Services
Construction Inspection
16.1 Utility Coordination
17.1 Drainage Design for Driveway Permits
Expires on: 08/31/2025
Qualifying Person(s)
Timble, Nitin V
www.in.gov/dot/
An Equal Opportunity Employer
Ross, Ian B
Timble, Nitin V
Anabtawi, Jamal T
Anabtawi, Jamal T
Zwick, Warren J
Zwick, Warren J
Zwick, Warren J
Downing, Wesley W
Timble, Nitin V
Timble, Nibn V
Curry, Matthew
Voss, Mark G
Downing, Wesley W
Zwick, Warren J
ork Type Code Work Type Description
17.2 Small Structure and Pipe Hydraulic Design
17.3 Storm Sewer and Detention Design