Loading...
HomeMy WebLinkAboutOpening of Proposals - SRTS Kennedy School Proj No 123-017 - A&Z EngineeringC� lip: r all 7 CONSTRUCTION INSPECTION SERVICES SAFE ROUTES TO SCHOOL AT KENNEDY ACADEMY CITY OF SOUTH BEND INDOT LAPORTE DISTRICT, DES. 2201237 7:7 6e Responsible Office L A&Z Engineering, LC 1220 Ruston Pass PEE Image generated for visual purposes only, not a representation of planned improvements. 4r rj Dear Selection Committee: A&Z Engineering, LLC (A&Z) is eager for the opportunity to partner with the City of South Bend on another important project. Throughout our proposal we will highlight our project approach along with the added value unique to A&Z as the prime inspection firm, which includes: Qualified, Experienced Key Staff • Jason Pace, A&Z's lead project supervisor, is an INDOT-certified technician with seven years of transportation industry experience. • This project also has two key staff to serve as inspectors with ample experience on similar projects. • We have also earmarked three designated "back up" inspectors who also have relevant qualifications and experience. A Team with Proven Success Extensive experience inspecting INDOT/LPA federally funded projects. Deep understanding of construction challenges, quality control, and skilled in providing continuous communication with all stakeholders. Proven ability to keep projects on schedule and within standards, as evidenced by our above average scores on INDOT evaluations. Established Working Relationships • A&Z is fortunate enough to have collaborated with the City on several important design projects, so we have established contacts that enable us to hit the ground running. • Our team also has relationships with key staff and area engineers in the LaPorte District, most recently through a structure replacement project on US 421. Commitment to Communication & Outreach • Proactive public engagement to keep residents informed of project progress. • Clear, effective communication with the project team and local officials. • Dedicated to ensuring a smooth, community -supported project. A&Z is committed to delivering a high -quality pedestrian project while providing outstanding service to ensure a smooth, successful experience for the community and stakeholders alike. INDOT PERFORMANCE EVALUATIONS: A&Z VS. CONSULTANT AVERAGE 5/14/2023-5/14/2025 A&Z Average Score Consultant Averages from INDOT Reviews IN 11 Budget Quality Responsiveness am Schedule A 6 Z ENGINEERING Each person listed is assigned specifically to this project, providing consistent support, clear communication, and dependable inspection and documentation every step of the way. Our Project Engineers/Supervisors (PE/S) have passed all six subject areas of the INDOT Certified Technician Program. *%m CITY OF SOUTH BEND GEMMA STANTON, ERC/PROJECT ENGINEER 01A R O Q INSPECTION DEPT. MGR. LAPORTE DISTIRCT MARK VOSS I A&Z AREA ENGINEER, PM PROEJCT ENGINEER/SUPERVISOR JASON PACE I A&Z SINGLE POINT OF CONTACT I TECHNICAL OVERSIGHT DAILY COORDINATION JAASSISTANT PETS INSPECTOR NATHAN STEVENS Ik CODY HEPLER A&Z APEX ON -CALL INSPECTORSIRPRS We've also named trusted backups who can step in if needed —no delays, no learning curve. They bring the same qualifications and project familiarity to keep things running smoothly no matter what. INSPECTOR NATHAN PATRICK 3 YEARS OF EXPERIENCE f- ` SWPPP CERTIFIED INSPECTOR -TESTER ZANE ANABTAWI ^r 17 YEARS OF EXPERIENCE INDOT CERTIFIED TESTER A&Z is committed to keeping the team shown in this proposal on the Kennedy Academy Safe Routes to School project from start to finish. TEAMING STRUCTURE J «. A & Z ENGINEERING Lead Firm 95% 1 � CONSULTING & SURVEYING DBE Firm 5% Ae'. A & Z ENGINEERING JASON PACE 1 7 YEARS OF EXPERIENCE Jason Pace will serve as the project manager and project engineer/supervisor (PE/S) for this project. With extensive experience —including multiple INDOT and LPA-funded roadway, trail, and intersection improvement projects —Jason brings a proven record of field leadership and technical compliance. A Purdue Fort Wayne graduate in Construction Engineering, he is both an INDOT Certified technician and tester. Jason is also trained in INDOT's new project management system: AWP, which replaces SiteManager on all projects let after May 2025. Education & Training: BS, Construction Engineering Technology I Purdue Fort Wayne INDOT Certified Technician (Project Engineer/Supervisor: PE/S) OSHA 30 AWP Trained Select Experience Winona Ave., Argonne Rd., Kings Hwy I INDOT/LPA Project I Winona Lake, IN I I Lead project PE/S for intersection improvements, including a 10' trail and teardrop roundabout with curb and gutter. His role involved pedestrian MOT, railroad coordination, and community outreach. A&Z was able to keep the roadway open during construction. Trail, Sidewalk & Pedestrian Bridge I Monroeville IN I Jason served as the PE/S for the inspection multi -use paths, trails, sidewalks, z-channel crossings, mid -block crossings, and pedestrian railroad crossings along with a pedestrian bridge. Trail & Sidewalk I Woodburn, IN I Jason served as the PE/S for a series of sidewalks and multi -use paths throughout the town to improve connectivity. Part of the Stellar Grant funding, this project included federal funding. Drake Rd. Corridor Overhaul I INDOT/LPA Project I Kendallville, IN I PE/S for a multiphase roadway overhaul that included sidewalks, crossings, ADA compliance, crosswalks. He managed coordination with the railroad, city agencies, and the community to navigate challenges in a dense residential area near East Noble Middle School (ENMS) and emergency services. Pedestrian MOT was important for students attending ENMS. Also coordinated INDOT lighting standards exemptions so that the City could have their signature style lighting. Maplecrest Rd. Reconstruction, Phase II 1 Ft. Wayne, IN I Project engineer/supervisor for the second phase of roadway reconstruction that included sidewalk and a multiuse path in addition to crossings at 4 intersections. PROJECT SUPPORT Fr QUALITY ASSURANCE MARK VOSS, VP INSPECTION DEPARTMENT MANAGER Mark is a seasoned Construction Manager with extensive experience overseeing municipal and INDOT infrastructure projects. He leads inspection teams with a focus on quality, clear communication, and timely delivery. Mark also mentors junior staff and ensures consistency across all projects. Under his leadership, A&Z's construction inspection team has earned a strong reputation and routinely "Exceeds Expectations" on INDOT reviews —attracting some of the region's top inspection talent. Mark will maintain vigilance and serve as an additional point of contact for the City. He will manage contract documents, ensure quality performance, and serve as another professional g out for the quality and is of this project. Page 4 ■ /4«, A 6 Z ENGINEERING NATHAN STEVENS 1 3 YEARS OF EXPERIENCE Nathan brings transportation experience from INDOT's LaPorte District, where he focused on construction oversight for federally funded projects. Now based in A&Z's Valparaiso office, Nathan has been working as an engineer on projects similar in scope to the SRTS in South Bend. Nathan is also positioned near the Kennedy Academy site to provide consistent daily observation. He will document progress, verify quantities and estimates, and ensure compliance with plans and specifications. Nathan's most notable construction supervision experience includes the I-65 concrete patching and milling for the LaPorte District. Education & Training BS, Civil Engineering I Purdue Northwest INDOT Certified: Technician, AWP Trained Select Experience 3rd Street Improvements I St. Joe, IN I Engineer for a full -depth reconstruction that included concrete curb and gutter, ADA compliant curb ramps, concrete sidewalk, concrete drive approaches, storm sewer improvements, and restoration. Woodburn & Webster Rd. Sidewalks I Allen County Highway Department I Design of new sidewalks around Woodlan Jr./Sr High School including ADA compliant curb ramps. Westgate Neighborhood Improvements, Phase III I Columbia City, IN I Design for CCMG project that consisted of roadway improvements and the addition of sidewalk and ADA accessible connectivity. CODY HEPLER 1 10 YEARS OF EXPERIENCE Cody has been providing construction inspection services on transportation projects since 2014. His experience spans bridge rehabilitation, roadway construction, utility improvements, and pedestrian facilities. He monitors field activities, verifies materials, conducts on -site testing, and ensures compliance with INDOT and LPA standards. Known for his attention to detail and collaborative approach, Cody is a reliable partner in keeping projects on track and up to spec. Education & Training BS, Construction Engineering & Project Management, Purdue University Fort Wayne INDOT Certified: Tester, Technician (all proficiencies), AWP trained, Stormwater Mgmt., Guardrail, Digital FCR OSHA 30 Select Experience • Waterloo Safe Routes to School I Waterloo, IN I INDOT/LPA Project, R-35906 I Inspector for sidewalk network throughout town surrounding Garrett -Keyser -Butler Schools. Included crosswalks, curb and gutter, ADA curb ramps.* • North Manchester 2022 CCMG I North Manchester, IN I Inspector for seven street projects with sidewalks, curb and gutter, curb ramps along with full -depth reconstruction. *Indicates projects Cody completed while working with A&Z Engineering; these are A&Z projects. A&Z Inspectors are ahead of the curve with AWP Proficiency. INDOT is phasing out SiteManager and adopting AASHTOWare Project (AWP) as its new standard for construction documentation. This modern, web - based system streamlines reporting, materials tracking, and daily field entries. A&Z inspectors are ahead of the curve — several team members have already trained in AWP and are actively preparing for the full transition. Our familiarity with both SiteManager and AWP ensures accurate, compliant documentation and a seamless shift for this and future INDOT/LPA projects. Choosing A&Z means choosing a team that's ready for what's next. A&Z project engineerslsupervisors and inspectors are using the AWP software on all projects that have been let after May. �« A & Z ENGINEERING CCMG: Westgate Neighborhood Client: City of Columbia City Reference: Ryan Daniel, Mayor This is a multi -phase CCMG project that included the design and inspection of the roadway improvements throughout an entire neighborhood. A large portion of these improvements included sidewalk replacement and new sidewalk construction along with ADA compliant ramps. CCMG: Avilla, Indiana Reference: Adam Dunlap, Town Manager Since 2017, the Town has sele -- partner for the construction ove CCMG projects. In addition to 1 underground infrastructure imp of these projects has also inclu pedestrian facilities and ensurii CCMG: Logansport, IN Reference: Chris Martin, May( A&Z's most recent collaboratie Logansport was the inspection concrete curb and gutter, ADA and roadway milling/resurfacin FAMILIARITY WI CITY OF SOUTH A&Z has assisted the City of numerous improvements as t Just like our design staff, the integrity and expertise of our of our notable work with the C Ongoing CCMG Projects Mishawaka Avenue Stree Ameritech Dr. & Clevelan Miami St. and Lincolnway Ironwood Dr. and Ireland SAFE ROUTES TO SCHOOL A&Z COMPLETED PROJECTS Projects featured below include the design and/or construction inspection of the pedestrian facilities. Location Description City of 1,100 LF of sidewalk replacement in Angola addition to 1,500 LF of new sidewalk Town of 5,000 LF of sidewalk including all Waterloo ADA curb ramps and pavement markings 5,650 LF of pedestrian facilities City of surrounding McKenney-Harrison and Auburn, IN James R. Watson Elementary Schools. City of 2,500 LF of sidewalk replacement Garrett and 85 ADA compliant curb ramps Town of 12,000 LF of sidewalk throughout St. Joe town with 60 ADA cub ramps and 12 crossings. 5,800 LF of sidewalk along with ADA City of New compliant ramps and drainage Haven improvements /L► A & Z ENGINEERING A&Z Engineering understands that the Kennedy School Safe Routes to School project is far more than a sidewalk upgrade —it is a community safety investment requiring careful oversight and proactive field coordination. Our approach ensures the project is constructed according to INDOT/LPA requirements, ADA standards, and the City of South Bend's expectations for quality, cost -efficiency, and communication. Dedicated Daily Site Presence • All field staff featured in this LOI are INDOT AWP trained and will document daily work in accordance with LPA standards. • With key staff working out of A&Z's Valparaiso office, we ensure daily on -site inspection and immediate responsiveness to field issues. • Our inspection team will verify slopes, curb transitions, and ramp dimensions using smart levels and other field tools to ensure ADA compliance. A&Z inspectors will: • Track contractor progress and verify quantities in real- time. • Monitor workmanship and safety. • Identify issues early —especially related to drainage, trip hazards, and utility conflicts. • Close coordination with the contractor and City Project Representative helps keep work within scope and minimizes unnecessary delays or rework. ADA Compliance is Not Optional • Drawing on design priorities, A&Z's inspection team is trained to review: • Ramp slopes and landings • Cross slopes and transitions • Pavement interfaces that could cause ponding or non- compliance • We approach ADA field inspection with the same attention to detail expected in full design reviews. Communication That Builds Trust The A&Z team will maintain: • Daily communication with the City and INDOT Area Engineer o Weekly progress updates summarizing milestones, concerns, and upcoming work • Clear documentation of action items, changes, and field resolutions we recognize that no two projects —or communities —are the same. That's why we don't offer cookie -cutter services. Tailoring our inspection approach isn't just a preference —it's essential for the success of the Kennedy Academy Safe Routes to School project. This initiative presents a unique set of conditions that require thoughtful, flexible oversight. Active School Zone Awareness o Construction will occur near a functioning school, requiring heightened attention to safety, access, and timing. Our inspectors will closely monitor sidewalk closures, ADA ramp construction, and curb tie -ins — ensuring all work supports a safe path of travel. If requested, we'll coordinate with the school and City to support communication during student arrival and dismissal periods. Community -Focused Communication o This project is highly visible to nearby residents and school families. To maintain trust and minimize disruption, our team will support public outreach — including clear signage, real-time updates, and, if needed, assistance with digital or printed communication. We've used similar strategies successfully on past projects like Drake Road. Urban Utility &Site Coordination o Underground utilities, roadway constraints, and limited working space mean field crews must remain alert and responsive. A&Z inspectors are experienced in coordinating with utility providers and adjusting inspection efforts as conditions shift —keeping the project moving on schedule and within scope. A 6 Z ENGINEERING Maintenance of Traffic (MOT) & Pedestrian Safety Should construction take place during the school year, ensuring the safety of students, families, and neighborhood pedestrians will be our top priority. A&Z will actively review and enforce the contractor's Maintenance of Traffic (MOT) plan to ensure: • Safe, ADA-compliant pedestrian detours are in place and well -marked. • Sidewalk and crossing closures are clearly communicated and minimized near Kennedy Academy during school hours. o Access routes remain open during student arrival and dismissal times. Community Outreach Construction near a school requires more than technical oversight —it demands proactive, accessible communication with those affected. A&Z has successfully supported public outreach on projects like Drake Road and is prepared to assist the City of South Bend with clear, coordinated messaging throughout the Kennedy Academy project. Our team offers the following outreach tools if requested: • Social Media Messaging o We have the ability to develop and publish timely updates related to traffic shifts, sidewalk closures, and construction milestones. Posts will be coordinated with City departments, school officials, and other key stakeholders to ensure one unified message is shared across platforms. This approach keeps information consistent and relieves the City from managing outreach alone. • Project Landing Page o A&Z can create a dedicated project webpage where residents and school families can view current construction details, timelines, and safe walking routes. Users can subscribe for email updates, keeping them informed throughout construction without having to seek out information. This school -aware, neighborhood -focused communication strategy helps the City foster transparency and community trust while maintaining safety and minimizing disruption. !IN T1- -_~---- CCMayor, I can tell you it has been a pleasure to work with A & Z Engineering on this project. I so appreciate their efforts to tag all city and school entities in their social media posts. This allows parents and students to stay informed of any changes as construction continues. Lance Waters, Mayor I Kendallville, IN I RE: Drake Rd. Reconstructic Tbm of wlnona lake ... - � -,V , 7013 d 116ur1dih6u[ C6r53[rutai6n V pda[t - wi.6.h A.E, Cogs *he3y, ind Pik krt. WW OPEH 7e tw9-W 7r;Pfic... S" m9,v A+Z EN EROWG aowurRe, cwiwsleninvxls Park Are- AE W1, . .1llYrerr Are t'A OP-400 Paned * Caen ra.2-4-v a away t y •..:3 `.', i:.:i "i:' 40 WrnmMIL 112,Ke Mike Lewis This is an excellent graphic and makes it clear how traffic can Flow. 2y Like y 0 Ann Sharkey Baker Thanks for the update well in advance. 2y Like Reply z 0 TURNING QUESTIONS INTO CONFIDENCE A&Z maintained traffic throughout construction on the Winona Lake Roundabout. A key component in ensuring site safety and mitigating driver confusion was the use of coordinated public messaging. If desired, A&Z can lead early public outreach efforts to build trust and address concerns. From informal meetings to clear visuals and targeted communication, we help communities better understand —and ultimately support —roundabout projects. A & Z ENGINEERING Schedule Management Given the high public anticipation for this project's completion, an in-depth review of the contractor's schedule will be conducted to ensure the project stays on time and within budget. Special attention will be placed on intermediate completion and/or milestones if applicable to keep the overall project on track. While A&Z cannot dictate the contractor's means and methods, we will help identify inefficiencies or opportunities for concurrent operations to improve overall project efficiency and fully reopen the roadway sooner. A&Z will participate in progress meetings and verify that the contractor's 2-week lookaheads align with field conditions and school calendar events. Contract Compliance A&Z will conduct a thorough review of contract documents, special provisions, and the geotechnical report will be conducted. Analyzing the geotechnical report for anticipated soil conditions will help identify potential constructability challenges early. A&Z will work closely with the contractor to address any concerns proactively, ensuring project continuity. Bid Calculations To minimize risk of cost overruns, A&Z will request and review the designer's bid quantity calculations at the start of the project. Jason will track quantities in the field and flag any discrepancies early, helping prevent budget issues before they occur. This proactive review supports accurate pay requests and protects the City's investment. It also allows for potential adjustments if costs are exceeding planned amounts. Quality Control & Documentation • Our Project Engineer/Supervisor will: • Review all pay applications and change orders • Ensure all materials and quantities are supported by field logs and test results • Maintain documentation in AWP to meet INDOT audit standards • Internal QA/QC checks will be conducted regularly to uphold project integrity. Utility Coordination Assistance • A&Z inspectors are experienced in managing utility impacts during construction. We will: • Maintain utility coordination records and notes. o Work with the City to resolve utility conflicts proactively and without delay. Adjust field operations when needed to avoid unnecessary relocation costs or scope creep. O FIELD EXPERTISE THAT PAYS OFF PREVENTING DELAYS & PROTECTING THE BUDGET On the Drake Road Reconstruction project in Kendallville, A&Z's inspection team helped the City save nearly $90,000 through proactive oversight and practical field knowledge. Our clear documentation and communication of utility delays resulted in $21,000 in cost savings. Later in the project, our inspectors and supervisors identified a more efficient, compliant alternative to the originally specified treatment around structures —saving the City an additional $66,000. These savings weren't accidental —they were the result of experienced inspectors who understand construction, think critically in the field, and work closely with project stakeholders to deliver smarter, more efficient outcomes. now Page 9 /L►«" A & Z ENGINEERING This project demands an experienced, flexible inspection team that understands the expectations of Local Public Agencies and the communities they serve. A&Z's certified inspectors and project managers have overseen similar rural roundabout and roadway projects and are well -versed in identifying and resolving issues before they impact progress. We're ready to support the City with proactive oversight, strong communication, and a commitment to quality from start to finish. Scoring Category A&Z's Advantage Our team is known for its responsiveness, clear documentation, and ability to keep projects moving smoothly. • Strong history of high INDOT performance ratings in inspection categories Past Performance Positive feedback from LPA clients across northern Indiana. • Recognized for maintaining open communication, thorough reporting, and dependable field presence • Trusted by local agencies for our ability to navigate challenges and support timely project delivery A&Z's inspection team has direct experience with sidewalk, curb ramp, and pedestrian -focused improvements in urban environments. Additionally: Team's Proven success on Safe Routes to School- specific projects. Demonstrated All proposed inspectors are INDOT AWP trained and experienced with LPA procedures Qualifications Daily field staff backed by an in-house QA/QC lead and inspection manager Familiar with contractor expectations, City standards, and INDOT/FHWA compliance Routinely praised for professionalism, accuracy, and proactive field coordination • In-house QA/QC backing all inspection work. A&Z has the staff, structure, and flexibility to fully support this project —without overextending resources or compromising quality. • Dedicated inspection staff assigned specifically to this project Capacity of Team • Regional presence ensures quick response and consistent daily oversight • Backup personnel identified —equally qualified and ready to step in if needed • Team availability carefully managed to ensure full coverage from pre -con to closeout A&Z understands the unique setting near Kennedy Academy and will continue to tailor our services to meet the project demands and the needs of the City. • Daily on -site presence with the technology to generate real-time documentation. Project Approach Support for MOT and detour management —including contingencies for pedestrians and increased traffic during peak school times. • Close utility coordination to prevent relocation delays • Clear, responsive communication tailored to City preferences • Ability to support community outreach efforts if requested. u1AN� INDHINADEPAIITMENTOFTRANSPOBTATION gib M4 Driving lodiana's Economic Growiir � a � g 100 North Senate Avenue PHONE: (317) 233-4664 Eric Holcomb, Governor r�}• .�}tl•' Room N750 FAX: (317) 233-0891 Michael Smith, Commissioner Indianapolis, Indiana 46204 06/06/2024 Apex Consulting & Surveying 1313 Broadway Fort Wayne IN 46802 Dear Nana Opoku, Subject:No Change Affidavit This letter confirms receipt of your annual No Change Affidavit and supporting documentation.The Indiana Department of Transportation's Equity Initiative Services (EIS),in compliance with 49 CFR Parts 23 and 26, is pleased to inform you that your firm's information has been reviewed and approved. Your firm's DBE/ACDBE Certification will remain valid for another year. The DBE Directory, located atINDOT: Doing Business with INDOT: DBE Directory, will continue to list your contact information and will include the NAICS codes and description of services performed. As a DBE/ACDBE, you have the responsibility to comply with all aspects of 49 CFR Parts 23 and 26, which include maintaining an accurate mailing address, phone number and email addresswith INDOT EIS and promptly following up on all inquiries. If you have any questions, please feel free to contact us atElSinguiry@indot.in.govatany time. Sincerely, / Derrick Casson DBE Program Administrator, Equity Initiative Services Indiana Department of Transportation cc: file www. irr. govldol! An Equal Opportunity Employer lndln aa :.-4m DBE Code DBE Description NAICS Code NAICS Description DBE Speciality Code Description 0055.161 P Other Activities Related 531390 Other Activities Right of Way Plan Development; to Real Estate Related to Real Project Management for Estate Acquisition Services 0052.30E Engineering Services 541330 Civil Engineering Civil and Construction Services Engineering 0052.28E Surveying and Mapping 541370 Surveying and Land surveying services; (except Geophysical) Mapping (except Topographic Survey Data Services Geophysical) Collection, Boundry and Services Investigation Surveys, Drone Service, Land Title 0052.35E Environmental 541620 Environmental Environmental Document preparation - CE Consulting Services Consulting Services Standard RFP Form Ver. 1l2023 (Rev. 06f27118) Ties. #: 2201237 Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana's DBE program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between 1NDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confum that the firms listed below are currently certified DBEs: INDOT: httns:llentapps.indot.in.aovIDBELocatori KYTC: httm:lltransportation.ky.govlCivil-Rip_hts-and-Small-Business-DevelopmentfPapesfCertified-DBE-Directory.aspx I certify that I have contacted the certified DBE's listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by 1NDOT's Economic Opportunity Division. I. DBE Subeomultants to be applied toward DBE goal for the 1JFP item: Certifiers DBE Marne Service Planned Estimated Percentage to be Paid* Apex Consulting & Surveying 13.1 Construction Inspection 5% °la °la II. DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item - Certified DBE Name Service Planned Estimated Percentage to be Paid* °{o �f4 8fQ % Estimated Total Percentage Credited toward DBE Goal: 5% Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: Company Name: Signature: A&Z Engineering, LLC Date: 23 May 2025 * It is understood that thes�ividual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of contract scope of work- My fum will use good faith of oos to meet the overall DBF- goal through the use of these or other certified and approved DBE firms. Prequalified Work Type Certification Issued By Indiana Department of Transportation Date Printed: 09/08/2023 A & Z Engineering, LLC Valid Work Groups Effective: 07/26/2023 Work Type Code Work Type Description 4.1 Traffic Safety Analysis 6A Topographic Survey Data Collection 8.1 8.2 Non -Complex Roadway Design Complex Roadway Design Traffic Signal Design Complex Roadway Sign Design Right of Way Plan Development Project Management for Acquisition Services Construction Inspection 16.1 Utility Coordination 17.1 Drainage Design for Driveway Permits Expires on: 08/31/2025 Qualifying Person(s) Timble, Nitin V www.in.gov/dot/ An Equal Opportunity Employer Ross, Ian B Timble, Nitin V Anabtawi, Jamal T Anabtawi, Jamal T Zwick, Warren J Zwick, Warren J Zwick, Warren J Downing, Wesley W Timble, Nitin V Timble, Nibn V Curry, Matthew Voss, Mark G Downing, Wesley W Zwick, Warren J ork Type Code Work Type Description 17.2 Small Structure and Pipe Hydraulic Design 17.3 Storm Sewer and Detention Design cc: Prequalit cation File Qualifying Person(s) Zwick, Warren J Zwick, Warren J Crystal M. Weaver, P.E. Prequalification Engineer www.in.gov/dot/ An Equal Opportunity Employer