HomeMy WebLinkAboutOpening of Bids - 2025 Curb and Sidewalk Program Proj No 125-001 - C&E Excavating IncCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name 2026 Curb and Sidewalk Replacement
Project No. 125-001
For Bids Due May 27th, 2025 at 9:00am to bpwbids@southbendin.gov
PART I
(Must be completed for all bids. Please type or print)
Date: May 27, 2025 — Bidder (Firm): C & E Excavating, Inc
Address: 53767 County Road 9
City/State/Zip: Elkhart, IN 46514 Telephone Number: _ ( 574 ) 262-4346
Email Address: bonadies candeexcavatinct.com -
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
2025 Curb & Sidewalk Re lacem n
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
City of South Bend Engineering Division
and dated 4/22/2025 for the sum of (enter the Total Bid as shown on the Proposal)
One Million Six Hundred Ei h -Ei ht Thousand Four Hundred Thi - ($ 1,688A38.5Q )
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a s a attachment.
By t (Signature)
The above bid is accepted this
Subject to the following conditions:
Thad 8essin er
(Printed Name of Person Signing)
ACCEPTANCE
day of
BOARD OF PUBLIC WORKS
President
Members
Version 1/3/2025 Contractors Bid for Public Works - 2
20
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2025 Curb and Sidewalk Replacement
Project Number:
For Bids Due:
125-001
May 27th, 2025 at 9:30am
Contractor Name: C&E Excavating, Inc.
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
CONCRETE SIDEWALK, REMOVE
2783
SY
$22.50
$62,617.50
2
CONCRETE SIDEWALK, 4-IN
2783
SY
$102.00
$283,866.00
3
CONCRETE CURB, REMOVE
2420
LF
$8.25
$19,965.00
4
CONCRETE CURB, MODIFIED
2420
LF
$97.00
$234,740.00
5
CONCRETE APPROACH, REMOVE
546
SY
$27.00
$14,742.00
6
PCCP FOR APPROACHES, 6-IN
546
SY
$123.00
$67,158.00
7
CONCRETE CURB RAMP, REMOVE
85
SY
$23.00
$1,955.00
8
PERPENDICULAR CURB RAMP
85
SY
$235.00
$19,975.00
9
1 TOPSOIL AND SEEDING
3103
SY
$17.00
$52,751.00
10
TREE, REMOVE, 6-IN
2
EA
$405.00
$810.00
11
TREE, REMOVE, 10-IN
13
EA
$805.00
$10,465.00
12
TREE, REMOVE, 30-IN
19
EA
$2,450.00
46,550.00
13
TREE, REMOVE, 48-IN
6
EA
$6,050.00
$36,300.00
14
STUMP, REMOVE
7
EA
$605.00
$4,235.00
15
PLANT, DECIDUOUS TREE, SINGLE
STEM. 2-IN TO 2.5-IN
53
EA
$800.00
$42,400.00
BASE BID TOTAL $898,529.50
[CONTINUED]
Version 1/3/2025 Contractor's Bid for Public Works - 7
e
AM
Project Name: 2025 Curb and Sidewalk Replacement
Project Number: 125-001
For Bids Due: May 27th, 2025 at 9:30am
Contractor Name: C&E Excavating, Inc.
BID/PROPOSAL
CITY OF SOUTH BEND
ALTERNATE 1
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
CONCRETE SIDEWALK, REMOVE
986
SY
$17.00
$16,762.00
2
CONCRETE SIDEWALK, 4-IN
949
SY
$102.00
$96,798.00
3
CONCRETE CURB, REMOVE
965
LF
$12.00
$11,580.00
4
CONCRETE CURB, MODIFIED
965
LF
$97.00
$93,605.00
5
CONCRETE APPROACH, REMOVE
116
SY
$18.00
$2,088.00
6
PCCP FOR APPROACHES, 6-IN
116
SY
$123.00
$14,268.00
7
j CONCRETE CURB RAMP, REMOVE
27
SY
$29.00
$783.00
8
PERPENDICULAR CURB RAMP
27
SY
$235.00
$6,345.00
9
TOPSOIL AND SEEDING
1284
SY
$18.00
$23,112.00
10
TREE, REMOVE, 10-IN
6
EA
$805.00
$4,830.00
11
TREE, REMOVE, 30-IN
6
EA
$3,025.00
$18,150.00
12
STUMP, REMOVE
5
EA
$605.00
$3,025.00
13
PLANT, DECIDUOUS TREE, SINGLE
STEM. 2-IN TO 2.5-IN
20
EA
$850.00
$17,000.00
ALTERNATE 1 TOTAL $308,346.00
[CONTINUED]
Version 1/3/2025 Contractor's Bid for Public Works - 8
Project Name:
Project Number:
For Bids Due:
Contractor Name:
ALTERNATE 2
BID/PROPOSAL �r
. �, _. t.arr
CITY OF SOUTH BEND 'rx
2025 Curb and Sidewalk Replacement
125-001
May 27th, 2025 at 9:30am
C&E Excavating, Inc.
Item I
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
CONCRETE SIDEWALK, REMOVE
1503
SY
$17.00
$25,551.00
2
CONCRETE SIDEWALK, 4-IN
1501
SY
$101.00
$151,601.00
3
CONCRETE CURB, REMOVE
1440
LF
$12.00
$17,280.00
4
CONCRETE CURB, MODIFIED
1440
LF
$100.00
$144.000.00
5
CONCRETE APPROACH, REMOVE
136
SY
$27.00
$3,672.00
6
PCCP FOR APPROACHES, 6-IN
136
SY
$122.00
$16,592.00
7
CONCRETE CURB RAMP, REMOVE
29
SY
$29.00
$841.00
8
PERPENDICULAR CURB RAMP
29
SY
$234.00
$6,786.00
9
TOPSOIL AND SEEDING
2180
SY
$17.00
$37,060.00
10
TREE, REMOVE, 10-IN
4
EA
$805.00
$3,220.00
11
TREE, REMOVE, 30-IN
5
EA
$2,450.00
$12,250.00
12
TREE, REMOVE, 48-IN
4
EA
$6,025.00
$24,100.00
13
STUMP, REMOVE
12
EA
$605.00
$7,260.00
14
PLANT, DECIDUOUS TREE, SINGLE
STEM. 2-IN TO 2.5-IN
38
EA
$825.00
$31,350.00
Bidder (Firm):
Address:
City/State/Zip:
ALTERNATE 2 TOTAL $481,563.UU
C&E Excavating, Inc.
53767 CR 9
Elkhart, IN 46514 Telephone Number: ( 574 )262-4346
By 9.,
(Signature)
Jeffrey L. Bonadies
(Printed Name of Person Signing)
Version 1/3/2025 Contractor's Bid for Public Works - 9
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 1l3/2025 Contractors Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
) SS:
Elkhart COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2 Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 1 /3/2025 Contractors Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/herlits subcontractors perrorming work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the tern of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment. materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards.
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and W B E subcontractors. A Finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or im:imidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, stational origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
1, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby
certify that l and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duly to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. l understand it is my sole obligation and responsibility to provide ajustification
to the City. subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make adetermination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 1 /3/2025 Contractors Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 27th day of May 2025
C & E Excavating, Inc
Contractor/Bid (Firm)
1 -
Signature of ContractorBidder or Its Agent
Thad BessinAer, President
Printed Name and Title
Subscribed and sworn to before me this 27th day of May 2025
My Commission Expires
1 /21 /2026
County of Residence
�10 �
Notary Public
St. Jose h
JEFFREY L BONADIES
?tP�•••'d�%
Notary Public, State of Indiana
—'Z:SEAL "=
St. Joseph County
s : * w
Commission # 709551
:
My Commission Expires
��., ,,,,.•+`
January 21, 2026
Version 1/3/2025 Contractor's Bid for Public Works - 6
/EMClnsuranoe Companies. Document A310 - 2010
Bid Bond
CONTRACTOR: SURETY:
(Name, legal status and address) (Name, legal status and principal place
C & E Excavating, Inc. of business)
53767 CR 9 N Employers Mutual Casualty Company
This document has important legal
Elkhart, IN 46514 P.O. BOX 712
consequences. Consultation with an attorney is
encouraged with respect to its completion or
OWNER: Des Moines, IA 50306-0712
modification.
(Name legal status and address)
City of South Bend
Any singular reference to Contractor, surety,
227 W Jefferson St., Ste 130ON
owner or other party shall be considered plural
South Bend, IN 46601
where applicable.
BOND AMOUNT:
5% Five Percent of Amount Bid
PROJECT:
(Name, location or address, and Project number, if any)
2025 Curb and Sidewalk Replacement Project; Project No. 125-001
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Coritiactor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid,
and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the
jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for
the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference,
not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the
Owner may in good faith contract with another parry to perform the work covered by said bid, then this obligation shall
be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement
between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the
Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids
specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond
sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be
deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so
furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this 27th day of May, 2025
(Witness)
(Witness) David J. Roth
C & E Excavating, Inc.
(Principal) (Seal)
By:,-- -
(Title)
Employers Mutual Casualty Company
(Surety)
.1 ; ^r ' '.
(Title) Tracie House Attorney-ih c.o;
061110
This document conforms to the wording and provisions of the AIA A310-2010 bond form.
P.O. Box 712 • Des Moines, Iowa 50306-0712
CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT
KNOW ALL MEN BY THESE PRESENTS, that:
1. Employers Mutual Casualty Company, an Iowa Corporation
2. EMCASCO Insurance Company, an Iowa Corporation
3. Unlon Insurance Company of Providence, an Iowa Corporation
semc
INSURANCE
4. Illinois EMCASCO Insurance Company, an Iowa Corporation
S. Dakota Fire Insurance Company, a North Dakota Corporation
6. EMC Property & Casualty Company, an Iowa Corporation
hereinafter referred to severally as `Company' and collectively as "Companies", each does, by these presents, make, constik,te and appoint:
Tracie House
its true and lawful attorney -in -fad, with full power and authority conferred to sign, seal, and execute the following Surety Bond:
Surety Bond Number: Bid Bond
Principal C & E Excavating, Inc.
Obligee City of South Bend
and to bind each Company thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of each such Company, and all
of the acts of said attorney pursuant to the authority hereby given are hereby ratified and confirmed.
AUTHORITY FOR POWER OF ATTORNEY
This Power -of -Attorney is made and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at the
first regularly scheduled meeting of each company duly called and held in 1999:
RE50LVED: The President and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers Mutual Casualty Company shall have
power and authority to (1) appoint attomeys•in-fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds
and undertakings, reooxgnizances, contracts of indemnity and other writings obligatory in the nature thereof; and (2) to remove any such attomeyin•fact at any time
and revoke the pourer and authority given to him or her, Attomeys-in-fact shall have power and authority, subject to the terms and limitations of the power-at-adomey
issued to them, to execute and deIlver on behalf of the Company, and to attach the seal of the Company thereto, bonds and undertakings, reoognlzances, contracts of
indemnity and other writings obligatory in the nature thereof, and any such instrument executed by any such attomey-in-fact shah be fully and in all respects binding upon
the Company. Certification as to The validity of any power -of -attorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and In all
respects binding upon this Company. The facsimile or mechanically reproduced signature of such otlieer, whether made heretofore or hereafter, wherever appearing upon
a certified copy of any power-of•attomey of the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed.
IN WITNESS THEREOF, the Companies have caused these presents to be sighed for each by their officers as shown, and the Corporate seals to be hereto affixed this
19'' day of September, 2022. /!
h.�
Seals
colt R. Jean, sidant & CEO Todd Strother,Executive Vice President
''GovA+x 01 Company 1 airman, President Chief Legal Officer & Secretary of
�•� ': : t :;�'°ti; =� = : Q �"t7; = & CEO of Co anies 2, 3, 4, 5 & 6 Companies 1, 2 3 4 5 & 6
SEAL' ? toWA 1O
wn y =*i Soo"
00
�'�•' iTaty._y
SEAL == SEAL `- _ :SEAL =A=
' •Y•Igvt •� ` '• i�i14P�� •,tiba.�i.
�KATNY LOVEAIDGE
�eCyrrn�h+bn r,R.nt.r�m�ef
On this 19" day of September. 2022 before me a Nolary Publicin and for the Slate of Iowa,
personally appeared Scott R. Jean and Todd Strother, who, being by me duly svmorn, did
say that they are, and are known to me to be the CEO, Chairman, Presidenl, Executive Vice
President, Chief Legal Officer andlor Secretary, respectively, of each of the Companies
above, that the seals affixed to this instrument are the seats of said corporations; that said
instrument was signed and sealed on behalf of each of the Companies by authority of their
respedlve Boards of Directors; and that the said Scott A. Jean and Todd Sirother, as such
officers, acknowledged the execution of said instrument to be their voluntary act and dead,
and the voluntary act and deed of each of the Companies.
My Commission Expires October 10, 2025.
760" Azth�(&_
Notary Public in and for the State lowa
CERTIFICATE
I, Ryan J. Springer, Vice President of the Companies, do hereby certify :nat the foregoing resolution of the 9oards of Directors by each of the Companies, and
this Power of Axcirey rued pursuant thereto on 191, day of September, 2022, are true and correct and are still in lull farce and effect.
In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 27th day of May , 2025
Vice President
7853 (9-22) 0000000-NA 00000 000 SSS 000000 "For verification of the authenticity of the Power of Attorney you may call (515) 345-7548."
�xur
ig A .
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN " F
FORM MBE-1.0 -`
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number: 125-001 Project Name: 2025 Curb and Sidewalk Replacement
C&E Excavating, Inc. Total Base Bid u
Bidder: Amount: $898,529.50 MBE Goal: 1.09/0
Page 1 of 1
Name &Address of MBE
Primary Contact Person
Name/Tele hone
( p )
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of MBE
Component
Percentage
of Total
Bid/Proposal
1st Class Logistics LLC
2213 St. Charles Ave.
Bernard Coutee
574-993-0071
Hauling/Trucking
$30,976.00
3.53%
Submitted by: Jeffrey L Bonadies
3,f, 2 @ate 5/27/2025
Print Name Signature Date
Version 1 /3/2025 Contractor's Bid for Public Works - 10
CITY OF SOUTH BEND;;
V....
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number: 125-001 Project Name: 2025 Curb and Sidewalk Replacement
Total Base Bid
Bidder: C&EExcavating. Inc. Amount: $898,529.50 WBE Goal: 4.07%
Page 1 of 1
Name & Address of WBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of WBE
Component
P r entage
B d/Proposal
Slussers Green Thumb Inc.
125 Montgomery Street
PO Box 33
Logansport, IN 46947
John
Williamson
574-722-3102
Seeding/Landscape/Tree plantings
$54,838.00
6.25%
Submitted by: Jeffrey L Bonadies
Print Name
Signature
Version 1/3/2025 Contractor's Bid for Public Works -11
5/27/2025
Date
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN {1 .
FORM MBE-2.0 ,B�f
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 125-001 Date: 5/27/2025
Project Name: 2025 Curb and Sidewalk Re lacement
RiririPr• C&E Excavating, Inc.
Contact Person: Jeffrey L Bonadies Telephone: 574-262-4346
Address: 53767 CR9
City: Elkhart State: IN Zip: 46514
Fmn ii • jbonadies@candeexcavating.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
RFC]IIIRF ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the I ndiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: Fitt :Ilwww.in. pv/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
JB
Indiana Minority and Women Business Enterprises, found on their website
htt :/Iwww.in. ov/idoa .
JB
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
JB
I affirm that I have made good faith efforts to solicit through all reasonable and available
7
means the interest of all MBEs in the scopes of work of the contract.
-
JB
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
JB
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
JB
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
JB
I affirm that I followed up on initial solicitations with interested MBEs.
JB
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
JB
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 1/3/2025 Contractor's Bid for Public Works - 12
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
J3
1 affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
JB
] affirm that l did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
"Proper demonstration of Good Faith Efforts requires your initials next to au of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 1 /3/2025 Contractor's Bid for Public Works - 13
r�
CITY OF SOUTH BEND -L4
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 125-001 Date: 5/27/2025
Project Name: 2025 Curb and Sidewalk Replacement
Bidder: C&E Excavating, Inc.
Contact Person: Jeffrey L Bonadies Telephone: 574 262-4346
Address: 53767 CR9
City: Elkhart State: IN Zip. 46514
Email: ibonadies@candeexcavating.com
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the followina Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: http://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
JB
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(htip://www.i i.ovlidoa).
JB
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation.
JB
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all WBEs in the scopes of work of the contract.
JB
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
WBEs of contracting and subcontracting opportunities.
JB
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements.
JB
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively.
JB
I affirm that I followed up on initial solicitations with interested WBEs.
JB
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
wit adequate information about the plans, specifications and other requirements of the
s . contract.
JB
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 1/3/2025 Contractor's Bid for Public Works - 14
.$p�LiTN�
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
1Nli3
EVIDENCE OF GOOD FAITH EFFORTS
rg
1 affirm that I have made good faith efforts to assist interested WBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
JB
I affirm that I did not reject any WBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to an of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 1/3/2025 Contractor's Bid for Public Works - 15
M
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.1
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 1
Project Number: 125-001 MBE Participation Goal 1.09%
Project Name:
Bidder:
By: Estimator 5/27/2025
(Signature) (Title) (Date)
2025 Curb and Sidewalk Replacement
C&E Excavating, Inc.
MBE Firm 1st Class Logistics
Owner or Contact at MBE Firm Bernard Coutee
Telephone:574-993-0071 Fax: Email: 1stclasslogistics2013@gmail.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Trucking/hauling
RESULTS OF CONTACT WITH THE MBE FIRM:
Bid pricing used in bid submission
MBE Firm Modern Edge, LLC
Owner or Contact at MBE Firm D. Sarkisian
Telephone: 866-504-3343 Fax: 219-531-1411 Email: dsarkisian@modemedgellc.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Landscape/seeding/tree planting
RESULTS OF CONTACT WITH THE MBE FIRM:
No response
Version 1/3/2025 Contractor's Bid for Public Works - 16
CITY OF SOUTH BEND
j`jJJ� x'
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
JF
;
FORM MBE-2.1
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 1
Project Number: 125-001 WBE Participation Goal 4.07%
Project Name:
Bidder:
RV. N-T @__a eo
(Signature)
2025 Curb and Sidewalk Replacement
C&E Excavating, Inc.
Estimator
WBE Firm Slussers Green Thumb Inc.
(Title)
5/27/2025
Owner or Contact at WBE Firm John Williamson
Telephone: 574-722-3102 Fax: 574-722-2993 Email: jdw@slussers.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
WBE Firm
(Date)
Owner or Contact at WBE Firm Pamela Albertson
Telephone: 765-913-9012 Fax: Email: aaaqueenbee@gmail.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Tree removal
RESULTS OF CONTACT WITH THE WBE FIRM:
No response
Version 1/3/2025 Contractor's Bid for Public Works - 17
1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
Date:
To:
From
Subject
Project Name:
Project No.:
PHONE 574/235-9251
FAX 574/ 235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
May 21, 2025
All Planholders
Theresa Heffner, Clerk, Board of Public Works
Addendum Number: 1
2025 Curb and Sidewalk
125-001
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: 'D 1 ZZ � 2-0 2.�
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company: C '1-c
Authorized Signature:
r
Date: 5 - .2-3 S
1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
Date:
To:
From
Subject
Project Name:
Project No.:
PHONE 574/235-9251
FAX 574/235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
May 22, 2025
All Planholders
Theresa Heffner, Clerk, Board of Public Works
Addendum Number: 2
2025 Curb and Sidewalk
125-001
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
s1231-,R o2�
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADIENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Signature:
Date: — 12-3—
x
ri
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name 2025 Curb and Sidewalk Replacement
Project No. 125-001
For Bids Due May 27th, 2025 at 9:00am to bpwbids@southbendin.gov
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is dune in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
J Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
/ with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
✓ Certification of use of United States Steel Products or Foundry Products.
Proof of MMBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good
/ Faith Efforts Forms [MBE-2.0 and WBE-2.01 and MANBE Contacted Forms [MBE-2.1 and
✓ WBE-2.1 ].
✓ Acknowledge Receipt of (� 2- Addendum(s) included with the bid.
All required additional information is included with the bid.
/ Proposal statements and other affidavits all signed by the proper party with name either
✓ printed or typed underneath signature.
This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: C & E Excavating, Inc
By Authorized Representative:
Signature: _
Print Name & Title: Thad Bessi
President
Version 1/3/2025 Contractors Bid for Public Works - 1
Date: May 27, 2025
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name 2025 Curb and Sidewalk Replacement
Project No. 125-001
For Bids Due May 27th, 2025 at 9:00am to bpwbids@southbendin.gov
Contractor Name: C & E Excavating, Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
**THIS FORM ONLY APPLIES TO BIDS GREATER THAN $250,000. **
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
if you are not a pre -qualified bidder, complete Section II only.
Section It acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
71 of The Responsible Bidding Ordinance No. 10975-23 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") within twelve (12) months of obtaining pre -qualified standing. If the status of any item changes
within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -
qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the
time prescribed above shall result in automatic removal of the designation, effective immediately following
the twelve (12) months of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-71 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-71 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 1/3/2025 General Conditions - 11
POST 131D SUBMISSION
Post -bid submissions must be submitted in accordance with Section 6-72 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least two -hundred fifty
thousand dollars ($250,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder for projects greater than $250,000 and all subcontractors performing work
greater than $250,000 on a public works project are required to submit certified payroll utilizing the
federal form known as WH-34 7 or a similar form on a bi-weekly basis, submitted within 10 days
after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft
for each employee. Certified payrolls shall be submitted electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 1/3/2025 General Conditions - 12
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) N By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize ail information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) X By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) X By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(v) X By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(vi) X By checking this box, I hereby acknowledge that all subcontrac#ors performing
work greater than $250,000 also meet the qualifications of the Responsible Bidder
Ordinance.
(b) Attachments:
(i) X
N/A
(III) N/A
(iv) X
(v) X
(v) X
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
Statement about staffing capabilities, including tabor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization. This includes, but may not be limited
to, letters from apprenticeship coordinators detailing the bidder's association with
Version 1/3/2025 General Conditions - 14
the program, and the United States Department of Labor Office of Apprenticeship
Certificates of Registration of Apprenticeship Programs for each type of work to be
performed on the project.
(vi) X Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(vii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
(viii) NSA Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(ix) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: Ma 27, 2025
(Sign Here)
Thad Bessinger
(Print Name Here)
_C & E Excavating, Inc
(Name of Company)
53767 County Road 9
(Address of Company)
Elkhart
(City)
Indiana
(State)
574-262-4346
(Telephone Number)
Version 1/3/2025 General Conditions - 15
Request for Quotes
To: Bidding Suppliers & Subcontractors
From: C&E Excavating
Attn: Estimators
Project: City of South Bend — 2025 Curb
and Sidewalk Replacement
❑ Will Provide Quote
Project Location:
Please Provide Quotes By:
Project Letting Date:
Bid Documents:
❑ Will Not Quote
Date: 05/13/2025
South Bend, IN
Monday May 26", 2025
Tuesday May 2r, 2025
littps�//-oril_e.nie/7c li6F/kOJhCtii
l
aa
Excavarar�c
If interested, please respond to this RFQ and provide a quote for your scope of work by the date and time noted above.
This project has the following MMIBE Goals
MBE 1.09%
WBE 4.07%
Trucking Contractors — Please provide hourly rates.
Thank You,
Jeffrey L. Bonadies
Estimator / Project Manager
C&E Excavating, Inc.
Phone: (574) 262-4346
Fax: (574) 262-9251
Email: ibonadiesCacandeexcavatinq �m
............................
Request for Quote - 2025 South Bend Curb and Sidewalk Replacement
isJeffrey ff Bonadies
To • Jeffrey LBonadia
0 Reply t Reply All —> Forward •••
Fn 5e1o2t4S4.21 AM
Bcc jdw@slussers.com; hrnoloytrpressline@yahao.com; kennedyecpresslinemanagement@gmail.tam; dru5panjnx dernedgellccom; Bernard Coutee; Dndeiwood, Scott;
jacobwoodesmithreazwz.eotr! Paynes Services LLC; Lyle& Allison Watson; Lyle Watson- Watson's TtetU%tt aaaqueenbee@gmail.com; Donald Handy, Tim Miller
Request For Quote - SB Curb and Sidewalk Replacement Project.pelf
429 KB
Good morning,
please find the attached request for quote for 2025 City of South Bend curb and sidewalk replacement project
Thankyou,
Jeffrey L Bonadies
Estimator/Project Manager
C&E Excatralfng, Inc.
Phone: (S74(262-4346
Fax:(S74(262-9251
e�nde�atvaHne.ranl
State of Indiana
Office of the Secretary of State
CERTIFICATE OF EXISTENCE
To Whom These Presents Come, Greeting:
I, DIEGO MORALES, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of
the State of Indiana, the custodian of the corporate records and the proper official to execute this
certificate.
I further certify that records of this office disclose that
C & E EXCAVATING, INC.
duly filed the requisite documents to commence business activities under the laws of the State of
Indiana on October 16, 1990, and was in existence or authorized to transact business in the State of
Indiana on April 23, 2025.
I further certify this Foreign For -Profit Corporation has filed its most recent report required by Indiana
law with the Secretary of State, or is not yet required to file such report, and that no notice of
withdrawal, dissolution, or expiration has been filed or taken place. All fees, taxes, interest, and
penalties owed to Indiana by the domestic or foreign entity and collected by the Secretary of State
have been paid.
cTA7ka
181
In Witness Whereof, I have caused to be affixed my
signature and the seal of the State of Indiana, at the City
of Indianapolis, April 23, 2025
DIEGO MORALES
SECRETARY OF STATE
1990100696/20254369534
All certificates should be validated here: https://bsd.sos.in.gov/VaIi date Certificate
Expires on May 23, 2025.
Dom
q�tstts Pffarfutp.,f
45rl
AL,
ff is of
igurplau laf nubEra'
(g,errjrjrafr gf �!!jsjrufivru IATED-RimmFRS & CONTRACTORS i RAC:TORS DF INDIANA
ASSC)C
X"
INDIANAPOLIS, INDIA1�iA
RUR'l}IF: l3CCt+l'n ali?NSF. K!'+T7E:R`51'lt7i�iiliEll YSTF.AiS SO40aA7, PL{FA1iiER �Dd ZL pUON 6FEt {WX 7,!lF.ET h1[•[� L 1'rU[<!i[ it{D51D7 li �AC�(b37 yGCUT7ST[i f[-'11C1ti9y
41i,TE APKIUOIfiFR {Ob6i]� ASjF„Rll3l.Eli-17STA1. g!!IL[!}[�[C [a3�11. [ 44U1.1TION' u'Ull1tF.R (0."91. [:I.�%i 0221) .iro�rQ�
e rsfPreo�as�" o�e¢fionaj�..enrcesiJLJ
in accoro/ance a�if�s'basic sfano�arc's 01 cPpj-.en fices�ip
es�a� is& 6f fie cSecrefarrJ of�Q�or
REGISTERED MARCH 2,1982
REVISED JANUARY 6, 2006
IN030060001
�es7ir/�a/ion `Xo
cSeerelary a%G'a6or
`.Adminu/raior, �ppr�+/ices%iipJrainin9, f�,j,Iayer w+�iGa6or c5eruicer
; E3C,�
4A;LN4,
Associated Builders and Contractors
Indiana
Kentucky
Memorandum of Understanding
2/12/20024
Please accept this as verification that C & E Excavating, Inc. is
a member in good standing of Associated Builders & Contrac-
tors of Indiana/Kentucky, Inc (ABC).
ABC's Program is certified by the Federal Department of Labor,
Office of Apprenticeship and Training and by the National
Center for Constructions Education and Research (NCCER).
ABC uses the NCCER curriculum.
C & E Excavating has 3 (three) students enrolled in the HEO
(Heavy -Equipment Operator) Apprenticeship training
program.
Feel free to call me with any questions regarding our
apprenticeship program.
Regards,
Brianne Feeks
Elkhart Apprenticeship Coordinator
2701 Industrial Dr. Ste. 190—Elkhart, Indiana 46516— 574-218-0340
brianne@abeindianakentucky.0r9
%='c%_= =•%�`
-
�ifti1, 'if •+i5�'•'.1: •�11*••ii: •,�1 �'':1 �I1Irl ��•1111r, 1%■tip: :�'"'. ••���� ,'1!r �1■1� ,r1 i1, I�/��.
mM
'������• 'i•HI i il•+N i �N11; � ,Ills i 1111+r ■ i��1�1 � I1�il � 'flfll ■ „!f• i �,����
_ _jlfir;l• �I11!II ,i Ffl�:� ii11}ilEf1 ffW:il, AI, �lil. �N aill'1 �Hlillill. 11111}lilt II1i1111I
IT
Is.S[JED RY
'11 � Ilflll•-_
ntrta� Jaf Q�='Sfrorwtm
INDIANAPOLIS, IN April 30, 2025
:-_-_— TO
C & E EXCAVATING, INC. ELKHART, IN
who has filed with the Department a Contractor's Statement of Experience and Financial Condition as
required under Indiana Code 8-23-10. is hereby qualified to bid at any Department of Transportation
letting in Classes of Work and within the amount and other limitation of each classification as listed
= below. for such period as the uncompleted work on hand from all sources does not exceed the Aggregate
amount_ Classification references by name or symbol are in accordance with the definitions in the
Gontrador's Statement of Experience and Financial Condition. This certii�cate supersedes any certificate
mreviausi Issued, but is sub' t to revision or revocation according to the law, if and when changes
the financial condition of the contracting Rrm or other facts justify such revision or revocation.
Valid May 02, 2025 Thru April 30, 2026
Aggregate Bidding Capacity: 31,594,000.(
0188 FORCE MAINS AND LIFT STATIONS .............. ......................... .............................. .......... $5,000,000.00
C(A) HEAVY GRADING.............................................................................................................. $30,000,000.00
E(E) SMALL STRUCTURES AND DRAINAGE ITEMS.... ....... ................... ........ ..................... $20,000,000.00
E(F) SURFACE MASONRY AND MISCELLANEOUS CONCRETE. ................... .. . .................. $1,000,000.00
E(H) DEEP SEWER AND/OR EXCAVATION ................ ........ ................. ___ .......................... $10,000,000.00
E(T) DEMOLITION ................... ..... ...... ......... ................. ..... ............... ....................... :........... $20,000,000.00
VE
0(16
f :.:�♦ PREQUALIFICATION ENGINEER COMMISSIONER
Form 20508 (R 3 5-0)
f f 1 I {}If +lilll 114{,I {Ilf}I hull Illill fill+i fl'{•I Ihlll Iflfll ,I{li,
=111 III .III f u}1 II
••''111f,1 'II{n, IH1111 IIr II I' Op I}!• 11 l;l41 '114n1 II•f�u In 1111 I11lIV• ■ P 111 'I II III IIIIr11 In III' 111y1}
.1� ^ Il�III 1111{I IH nI ` f.l•11 , '1�111 fll nl i 14 ,Iln Ii1V' ■ ;Ilbfrl� II'I �1 i.1411 .11'+, r1111'lifj�
;:;��1f• ,��f.1,11 y�14 i!. :'I, .�� �il�flr��y 14 ��, •� ��1� • !� , I�, �tl�' �• �.
The above bid is accepted this
following conditions:
Contracting Authority Members:
ACCEPTANCE
day of
PART II
(For projects of $150,000 or more — !C 36-1-12-4)
subject to the
Governmental Unit: City of South Bend
Bidder (Firm) C & E Excavating, Inc.
Date (month, day, year): 5 � 21 1 2b2S
These statements to be submitted under oath by each bidder with and as a part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
Contract Amount I
Class of Work
Site/Utility
Completion
Date
Name and Address of Owner
5,782,660.17
12/2023
Elkhart County1CR38
6,035,120.93
Site/Utility
11/2023
City of Mishawaka/City Hall Campus
1,620,606.00
Site/Utility
7/2024
Town of Middlebury
530,709.72
Demo
12/2023
City of Mishawaka
2. What public works projects are now in process
of construction by your organization?
Expected
Contract Amount
Class of Work
Completion
Name and Address of Owner
Date
3,672,616.50
Sitework
8/2025
St. Joseph County/Niespodziany
10,895,376.00
Site/Utility
9/2025
St. Joseph County/SR2 Lift Station
11,866,259.00
Site/Utility
9/2025
City of Elkhart / Oakland Ave
1,584,808.00
Site/Utility
8/2024
City of South Bend / South Well Field
3. Have you ever failed to complete any work awarded to you? No If so, where and why?
4
List references from private firms for which you have performed work.
Real America
Lithko Contracting
BCI Construction
DJ Construction
Ancon Construction
Turner Construction
Harman Construction
W.A. Randolph Construction
Nuway Construction
R Yoder Construction
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, complete the project, number of workers, etc. and any other information which you
believe would enable the governmental unit to consider your bid.)
Work would begin within a reasonable time of the notice of award and within 5 days of
the notice to proceed. Work would be completed within time frame as stated in specifications.
We currently employ 35 field staff and operate a total of 5 crews in addition to subcontract labor
if necessary. A fully detailed schedule will be provided at pre -construction meeting.
Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
See attached.
3. If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit in the event that you subsequently determine that you will use a
subcontractor on the proposed project.
List provided upon award of project.
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
See attached.
Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
Bidded projects are quoted by several suppliers and all quotes are used in preparation
of the bid, however, the low, most responsive quote is the one used to prepare the
final numbers.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough In detail so that said goveming body can make
a proper determination of the bidder's capability for completing the project if awarded.
1st Class Logistics, LLC ,
A-l5 p Service Inc.
A & G Environmental Solutions LLC
A & R Wastewater Management
Ai�onmarche Consultants
American Waste5y5enls, Inc.
Badger DayligMing Corp
Bender Electric
Bertsch Frank & Associates
Best Sweeping Specialist
Bob Frame Plumbing &Heating
Bontrager Excavating
Brooks Construction.CompamL Inc.
Brian Beckwith
Brushy Construction
Chupp Plumbing & Heating
Canto Spray Solutions
Concrete Cutting & Breaking
Condon Trucking
Core Bore LLC _
Crane Industrial Service Co
DBL Services Inc.
Dewind Dewatering
Inc.
Fuerbr'rnger LandScaplrlg
G.eissinger Truc ing, LLC
Geo-Synthetics Systems__
great Lakes Property Maintenance
Green Head Trucking LLC
Hawk Enterprises Inc.
Hunter Transit, LLC
iIOLOeed Inc.
Inserv. Inc
IL Milling, Inc.
lohn Boettcher Sewer & Excavating
lo_nes Petrie Rafinski
I & J Contracting, LLC
Klink Trucking
Uahthouse Productions
Address
2213 St. Charles Ave, South Bend_, IN 46614
5fi8255p1rea Road New Carlisle, IN 46552
12191 N Woodland Acres Dr, Syracuse, IN 46567
3611 Cassopalis St. Elkhart, IN 46514 _
750 Llnc01nWM East, South Bend, IN 46601
P.O. Box65, Union, M149130
75 Remittance Dr. Chlc220, IL 60675-3185
P.O. Box 143, Camopolis, M 149031 _
811 Lawrence Dr Ft. Wayne, IN 46804
632 S. Sixth Street, Goshen, IN 46526
2442JaClym Ct. South Bend, IN 46614
59285 CR 33 Middlebury, IN 46540
2711 Banks Ave Ft, Wayne, IN 46899
2667 Lakeshore Dr, Nlles, MI 49120
7. 69 Elizabeth St. Mlles; MI 49120
23409 US 33 E, Elkhart, IN 46517 _
P.O. Box 36726, tndianapft IN 46236
4500 Airwest Dr. Grand Rapids, MI 49512
PhoneJIM
574-993-0071
_ Hauling
574-654-8626
Thermoplastic Striping
574-780-7402
Asbestos inspection/Abatement
574-674-5779
leturi Camera
574-232-8700:
Consultants
269-641-7502
O.umpsters
877-322-3437
Vac Work/Losating
260-459-9393
574-534-8024
574-291-7511.
574-825-3807
269-684-2335
574-298-5417 _
574-875-5243 _
317-428-6543,
f,16-554-4876
Electrical
Consultants
5vreepin
HVAC
TrucWng
Concrete/Asphalt.
Hauling
Hauling
HVAC
Manhole Lining
Concrete Removal
18245 Amberley Ave South Bend, IN 46637
1574-271-8984
Hauling
1601 Echo Valley Dr., Niles, MI 49120
269-262-2982
1]lrectlonal prilpng _
11035 Anderson Rd. Granger, IN 46530
574-272-5388
Crane Services
1811 N. Clover Rd. Mishawaka, IN 46545
574-968-2028.
Striping/ Lendscaping
9150 96th Ave, Zeeland, MI 49464
P.O. Box 3630, South Bend, IN 46619
_ 616-875-7580
574-287-8908.
Dewaterin
Landscaping
22530 Brick Road South Bend, IN 4662874-271-9714
Landscaping
10399 Shively Rd. Nappanee, IN 46550
574-633-4720
Hauling
2401 Pewaukee Rd., Waukesha, WI 53188
262-524-7979^
Geogrld
804 Union St. Mishawaka, IN 46544
574-257-8002
Fence Rental
1004 Granger, IN 46530
574-286-0177
Hauling
P.O. Box
Crown Point, IN 46307
219-662-8090
Electrical
1850 E. North St.
574-936-9217
_
Directional Drilling
Plymouth, IN 46563
121115R 17, Y
800-468-5296
Landscaping,__
1320 3rd St., Osceola, IN 46561
514 E Marion Mishawaka, IN 46545
574-968-0372
Hydrovac
15262 Industrial Or Schoolcraft, MI 49087
269-679-5769
Asphalt
3305 N. Home St. Mishawaka, IN 46545
574-259-1418
Trucking
200 NIBCO Parkway Elkhart, IN 46516
574-293-7762
Consultants
�573 Shoreview Park Rd., Shoreview, MN 55126
1 651-379-2791
Abatement Contractor
I IN 46705
1 574-287-9000
Trucking
Lowe Construction
Michfarta Contracting, Inc.
Michiana Tree Works, Inc.
Milestone Contractors North, Inc.
Milestone Fence LLC f
Miller Excavating, Inc.
Niblock Excavating, Inc.
Northern Indiana Construction
Norway Septic._Inc.
Patriot Fence LLC Y
Peerless Midwest Inc.
Paynes Services LLC
Pemberton DavisEi MIC Inc.
Mend & Brown f W
Premium Concrete Services
R & R Visual, Inc.
Rieth-Riley Construction Co., Inc.
Rock Solid Stabilization Inc. _
SIT Bancroft
Schrock Masonry & Insulation, LLC
Slusser's Green Thumb Inc.
specialities Company LLC
Taber'sPumv
tate Barricading, Inc.
& Well Service, Inc.
P.O. Box 428 Ash ey,
1100 N thieago Ave. Ste 7A Goshen, IN 46528 1 574-202-5502
2535 Bader Road, Horton, MI 49246 517-529-9406
P.O. Box 929 Plymouth, IN 46563 574-936-8613
15596 CR26, Middlebury, IN 46540 574-533-5651
1700 E Main St. Griffith, IN 46319 317-616-4876
13399 McKinley Hwy, Mishawaka, IN 46545 574-259-3101
0855N 840W Shiipsh_e_wana, IN 46565 260-768-7420
iP.O. Box 211 Bristol, IN 46507 574-848-4437
P.O. Box 1333 Mishawaka, IN 46546 574-256-1811
53076 Old Farm Rd, Elkhart, IN 46514 574-206-1234
21525 Maple Glen Dr Edwardsbung, MI 49112 269-228-1819
55860 Russell Industrial Pkwy Mishawaka, IN 46545 574-254-9050
21551 Fieldview OrEdwardsburg, MI 49112 269-663-8091
P.O. Box 1034, Mishawaka, IN 46546 574-277_7001
P O. Box 150, MlIfQrd, IN 46542 574-658-4166
712 Richmond St. Elkhart, IN 46516
1828 W. Olson Rd, Rochester, IN 46975
P.D. Box 1775 South Bend, IN 46614
1001 Williams Rd Genoa City, WI 53128
25020 SR 2 South Bend, IN 46619
6143 W 1300 N, Nappanee, IN 46550
P.O. Box 33 Logans_port, IN 46947 _.
SW E. 30th St., lndlanapolks IN 46229
P.O. Box 3751 South Bend, IN 46619
10100 Harrison Rd., Osceola, IN 46561
574-288-8321
262-240-4100
574-968-2040
800-896-5538
317-594-0291
574-287-2078
Preconstruction Video
Case Boring —
(Electrical
Tree Removal
Asphalt
Fencing
Hauli
Asphalt
Sheeting
Septic Pumping
- Fencing
Plumbing.
Clearing
Electrical
^Concrete/Asphalt
Concrete
Consultants
_ Asphalt _
Soil Stabilization
Electrical
TuckPointing
Landscaping
_Surveying_
Traffic Control
Wells
C E Excavating, Inc. Subcontractor Listing Prior 5 Years
Techsery Environmental Inc.
iheAirmaddngCompany, Inc.
The Robert Henry corporation
Traffic Control Specialists, Inc.
Trucks R Us
Weaver ZOT15LLItants Group _
1911 Clover Rd Ste 10, Mishawaka, IN 46545
15" N SR 25 Rochester, IN 46975
P.O. Box 1407, South send,. IN 46624
_ 1810 W. Pacific Ave, Knox, IN 46534
23300 State Road 23 South Bend, IN 46614
a203 soluiaow center, Chicago, IL 60677
=a South Bend Ave, South Bend, I N 46637
574232-2091
574-772-7001
574-340-8471
574-271-3447
574-273-6645
Asbestos
Striping _
Concrete _
Traffic Control
Consultants
C E Excavating, Inc. Subcontractor Listing Prior 5 Years
EQUIPMENT NUMBERS - REVISED 4/17/2025
ATTACHMENTS -SHOP ONLY
8919
NIBBLER SHEAR Attachment
8920 jCLAM
Attachment
8921 ICAT
HAMMER MODEL 120 Attachment
8924
BOBCAT Attachments
8928
lBuckets
8938
IFELCO Hoe Pac-220
8943
KENT Hoe Pac
8944
MISIQN 20YD SCRAPER BOWL
8944D
TACTOR DISK
8948
MP 20 FOR 330EX
8949
MP 30 FOR 400 EX
8966
]D 330 SPADE
8969
IFELCO Hoe Pac 135
EQUIPMENT NUMBERS - REVISED 4/17/2025
Drug and Alcohol Polic
The company's safety sensitive work, the widespread availability and use of unauthorized, prohibited, illegal or
controlled substances, and the company's commitment to maintain a drug free work force, requires the pre-
employment, post -accident and unannounced periodic or random drug and alcohol testing of all employees.
Additionally, all employees will be subject to searches and inspections of their person, vehicle and personal
effects for the presence of illegal or controlled drugs, chemicals or substances, alcohol, explosives, contraband
or firearms.
Administration
Prohibited Activit
The Use, bringing onto company property or job site, possession, concealment, transportation, promotion or
sale of the following substances or items, by any employee, contractor, subcontractor, their employees and
invitees is strictly prohibited, to wit:
Illegal drugs, unauthorized controlled substances, look -a -likes, designer, synthetic or any other drug
Which may affect an employee's motor functions or alter a person's perception
Prescription drugs/over the counter medication except under the following conditions:
The prescription vial shall be labeled by the dispensing pharmacy and the label shall show the
employees name, physician, prescription number, date the prescription was filled and the dosage
rate. Prescriptions more than 30 days old will not be allowed.
® The over the counter medication will be in its original package or container.
® Alcoholic beverages.
o Firearms, weapons, explosives, and ammunition
• Unauthorized items such as stolen property or drug paraphernalia
Enforcement
As a condition of employment or continued employment, all employees shall be deemed to have and agreed
to cooperate with the implementation of this policy and abide by its terms. In addition, as a condition of
employment or continued employment, all employees shall be deemed to have agreed to the following
enforcement procedures.
® Searches and Inspections — An individual's entry into, or presence at, company property, or project
work sites, is conditioned upon such persons to consent to the right of the company, its authorized
representative, or appropriate law enforcement personnel to search the person, his vehicle and personal
effects for the presence of unauthorized, prohibited, illegal, or controlled drugs, chemicals or substances,
alcohol, explosives, contraband, or firearms.
• Drug and Alcohol Testing — A pre -employment drug will be required of all persons, prior to being
approved for work on the premises of any customer. A post -accident drug and alcohol screen will be
required of any employee involved in an on-the-job accident resulting in injury, to himself or others; a
serious or potentially serious accident or incident in which safety rules and precautions were
5
violated; issuing unsafe orders or instructions, damaging equipment or property of the company or
others, usually careless acts, or where the cause was employee's failure to wear required personal
protective equipment. A "for cause" drug and alcohol screen will be required of all persons who show
signs of possible intoxication or using or being under the influence of drugs or alcohol, or when such
other circumstances exist that would lead a prudent supervisor to be concerned about the
employee's safety and the safety of others.
• All employees will be subject to unannounced drug and alcohol testing, unless prohibited by law or
regulation. Random or periodic testing will be conducted, as permitted by statute or regulation. These
tests will be without cause, suspicion, detectable performance problems, or the occurrence of an
accident, incident or safety violation. Failure to pass a drug screen will result in immediate termination.
All searches, inspections and drug screens will be performed in a professional manner, with concern
for the privacy and confidentiality of all individuals.
Testing Procedures
Laboratory Testing
The company will designate the laboratories to perform substance testing on blood or urine specimens in
accordance with standards set for the by the National Institute for Drug Abuse. The substances and detection
levels covered by this testing program are set forth below. Employees may be asked by collection site personnel
to indicate whether there is the potential that they will test positive for prescription or other substances. A
consent form and information sheet will be provided. If the employee fails to provide and acceptable urine
specimen the company may take the following steps:
Extend the stay of the employee at the designated collection site, if feasible, until an acceptable
specimen can be collected.
Reschedule the test due to unusual circumstances, i.e. post -operative situations.
• Discipline the employee, up to and including termination, on the first offense for failing to cooperate or
refusing to provide an acceptable specimen.
Disciplinary Action for Policy Violation
Applicants
If the final result of a pre -employment drug screen is positive, the applicant will not be employed.
Reemployment of an employee who has previously failed a drug screen is at the discretion of the employer.
Contractors, Subcontractors, Vendors, Their Employees' Agents, Servants or Representatives.
■ No search, inspection or drug test will be conducted without written consent. However, anyone who
refuses to provide such written consent and does not fully cooperate with this policy will be subject to
disciplinary action up to and including removal from the job or job site, as may be appropriate.
Preliminary findings of a policy violation may require that the individual involved be suspended from
the job pending the results of the company investigation.
If the final result of a "random", "for cause" or "post -accident" drug screen is positive, the individual
• will be permanently barred from job.
Administrative Guidelines
■ All employees will be informed regarding this policy at the time of employment. Additionally it will
be discussed periodically at "tail gate" safety meetings.
■ In the even an employee or terminated employee requests a review be conducted regarding his/her
positive test result, the laboratory will conduct a retest of a portion of the same sample previously
tested and will
make the results of the retest available to the employee or terminated employee provided the request is
made within 12 months following the initial test. The employee who requests a retest will be responsible for
all costs involved.
■ A good faith effort will be made to advise any employee who receives a positive test result via a
meeting
with the employee's Supervisor.
Target Substances
As a minimum, the following substances and detection levels shall be tested for:
Alcohol .04 BAL Amphetamines 1000 NG/ML
Opiates 2000 NG/ML Cannabinoids 50 NG/ML
Cocaine 300 NG/ML Phencyclidine 25 NG/ML
"Concentrations at or in excess of the above levels shall be conclusive proof of unacceptable levels
of unauthorized, prohibited, illegal or controlled substances.
7
Client Requirements
In the event that an Operator/Client has Drug Testing Guidelines that are more stringent than those outlined
above, the client's guidelines will be followed for all work done with that client. Examples of more stringent
guidelines include but are not limited to:
A greater number of substances (panels) to be tested for
A lower detection/cut off levels
• Specified number or percent of employees to be tested on site
DOT or similar mandated programs.
8