HomeMy WebLinkAboutRatify Emergency Sewer Repair at Western and Chapin - Selge Construction1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/235-9171
CITY OF SOUTH BEND TAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
May 13, 2025
Mr. Kyle Silveus
Selge Construction Co., Inc.
92833 S. 1 la' Street
Niles, Ave. 49120
ksilveus&selgeconstruction.com; jbutlerkselgeconstruction.com
RE: Ratify Emergency Repair Contract
Dear Mr. Silveus:
At its May 13, 2025 meeting, the Board of Public Works approved the above
referenced contract to ratify time and materials contract for Emergency Repair Services for the
intersection of Western Ave. and Chapin St. in the amount of $220,379.51.
Enclosed please find a copy of the contract for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/hh
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MIcou
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISON OF ENGINEERING
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk of the Board of Public Works
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: Agenda Request — Ratify Emergency Work
Emergency Sewer Repair at Western and Chapin
PO-0037116
DATE: May 6, 2025
The Division of Engineering and Division of Streets & Sewers requests the Board of Public
Works approval and ratification of an emergency purchase order contract with Selge
Construction Company, Inc. for a sewer collapse and repair at the intersection of Western
Avenue and Chapin Street.
This emergency work was identified by the Division of Streets & Sewers upon inspection of a
sinking pavement at the south leg of the intersection. Upon inspection, the sewer had debris
and sand indicating a sewer break. The root cause of this sewer break was identified as a fiber
optic cable that had been bored through the sewer pipe by Zayo Group (a fiber optic cable
company) that installed fiber optic cable along Western Avenue in late 2020, early 2021.
It is our recommendation that the Board of Public Works work with the Legal Department to file
a claim for the full amount of the emergency contractor's invoice along with costs for City
personnel, equipment, engineering, and administration costs required to identify and manage
the repair.
Selge Construction was contracted on a time and materials basis for the emergency repair
work as they were available to perform the work after contacting multiple contractors about
availability. The contractor's work included traffic control, pavement removal, replacement of
two sewer manholes, 36-inch diameter pipe, backfill, pavement restoration and specialty
crosswalk pavement and stamping.
Total Emergency Repair Cost: $220,379.51
Attached is a breakdown of the costs associated with the repair work and subcontractor
invoices reflecting the costs incurred to perform this repair work.
Emergency Purchase Order PO-0036349 will be paid through Sewage Works Operations,
Other Contractual Services, Account 641-06-602-509-439001.
For questions regarding the subject Agenda Request or project scope of work, contact
Jacob M. Klosinski (Ext. 9496) at the Division of Engineering.
�7EL
�Selge Construction Co Inc.
2833 S. 11 th St.
1 4 Niles, MI 49120
Invoice 11247
Bill to: Job: 745-25
City of South Bend INMISC
227 W. Jefferson Blvd
1316 County -City Building
South Bend, IN 46601
Invoice #: 11247 Date: 04/25/25 Customer P.O. #:
Payment Terms: Net 30 Days Salesperson:
Customer Code: 1012
Remarks
ER Sewer Repair at Western & Chapin St,
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
pz", ' 'k 7--'
Murray L. Miller, Member
Total:
Current Due:
�m
Joseph R. Molnar, Vice President
Breana MMiicou, Member
Attest: Theresa M. Heffner, Clerk
Date: May 13, 2025
1. Checks made payable to: Selge Construction Co. Inc. 2833 S. 11th St, Niles, MI 49120
2. All invoices are to be paid within 30 days of receipt. A 1.5% monthly late fee will be added to
all overdue balances until paid. If additional means are necessary to recover overdue funds,
buyer agrees to pay Selge all costs of collection.
3. All payments are non-refundable.
4. For questions regarding your invoice, please call Selge Construciton at 269-684-0842
Thank you for your Business!
220,379.51
220,379.51
220,379.51
Print Date: 04/25/25 Page: 1
CONSTRUCTION
5/6/2025
1of1
2833 South 11th Street
Niles, MI 49120
P: 269-684-0842
www.selgeconstruction.com
Owner: CITY OF SOUTH BEND
Engineer: N/A
Project: WESTER AND CHAPIN
Emergency PO # 0037116
SANITARY
SEWER REPAIR
ITEM/DESCRIPTION
TOTAL
Materials
Labor & Equipment
Subcontractor - State Barricade
Subcontractor -JEM Concrete Cutting and Sawing
Subcontractor - Xylem Bypass Pumping - Skid Steer, Service Truck, Mob
Subcontractor - Xylem Bypass Pumping - Skid Steer, Service Truck
Subcontractor - Xylem Bypass Pumping - 2, 6" PUMP AND SYSTEM RENTAL
Subcontractor - Xylem Bypass Pumping - Pump Servicing
Subcontractor - Bob Frame - Sewer Cleaning
$
49,261.05
$
113,228.05
$
21,805.15
$
943.00
$
6,274.69
$
4,536.75
$
11,558.72
$
161.00
$
11,495.40
Subcontractor - Weaver Consultants Group - Beam Breaks
$
940.70
Administration Fee
$
125.00
Shop Fee
$
50.00
GRAND TOTAL:
$
220,379.51
T&M WORKSHEET - South Bend Western and Chapin Repair
Selge Construction
2833 Sth 1lth Street
Niles, MI 49120
Terms Net 15
State Barricading Inc
P.O. Box 3751
South Bend, IN 46619
Phone (574) 287-2078
INVOICE
Invoice No 351964
Invoice Date 04/16/25
Order NO
0037116
Customer NO
160
SB Job
34739
Job Title
Western Ave. at Chapin St.
Item Description From To Hrs/Days Qty Price Amount
Sales:
MT Maintaining Traffic
Sales Bill
03/26/25
1 18961.00 18961.00
Sales: Subtotal 18961.00
Tax 0.00
Total Amount 18961.00
Total Taxes 0.00
Invoice Total $18,961.00
PLEASE PAY BY THIS INVOICE * NO STATEMENT WILL BE RENDERED
Invoice
mi. Invoice No: 11629
Concrete Drilling & Sawing Invoice Date: 22Apr 2026
12914 Industrial Park Drive
PO No.:
Granger, IN 46530 Requisition No.:
(574) 288-8464 Phone • (574) 288-0905 Fax
Email: eddie@jemconcrete.com Quote No.:
www.JEMConcrete.com Name:
Site Address: 900 W Western Ave
Bill To: Selge Construction Co., Inc. /� f� South Bend, IN 46601
2833 South 11th Street
Niles, MI 49120 / IL
Terms: Net 30 Day
Dt of Sry Item
Qty WO No. Ref. Number Description Total
1.00 03/26/2025 Diesel Slab Sawing 820.00
015699
Explanation: Slab saw 150' of 15" overlay
Push slurry
Job Ticket 12987
Thank you for your business!
Sub Total: tSLu.uu
Tax: 0.00
Invoice Total: 820.00
Page 1 of 1
lem
Let's Solve Water
godWin G
S
O
L Selge Construction Co Inc
D 2833 S 11 th St
T Niles, MI 49120-4421
O
Customer PO Ordered By
Emergency ORDER Mr. Scott Riley
south Bend/bypass
CITY I ITEM
2 MOBILIZATION
30.25 LABOR
2 SERVICETRUCK
Invoice
Sold by: Branch 006
9661 194th Street
Mokena, IL 60448
Tel; 708-889-1560
Fax: 708-889-1561
Contract Date
03-26-2025
Skid Steer
Labor Standard Rate
Godwin Service Truck
S
H
I
P
T
O
Selge Construction Co Inc
900 W. Western Avenue
South Bend, IN 46601
Remit to: Xylem Dewatering Solutions, Inc.
26717 Network Place
Chicago, IL 60673-1267
Phone: 1.855.278.2248 (Opt 1)
NOTE:Valued customers, please note the NEW remit
address change included on this invoice.
Service Contract # Sales Representative
206014532 Perre Krizanek
DESCRIPTION
Eli 1 E
TRANS:
MAR 3 1 025
ACC;. = - -
J0BI
COOT
Cust. No.
Invoice Date
Invoice No.
00115704
03-28-2025
401409436
Page 1 of 1
Order Taken By
Perre Krizanek
UNIT
AMOUNT
Payment Terms
Net 30
EXTENDED
AMOUNT
ALL PAST DUE INVOICES ARE SUBJECT TO Rental Labor Shipping I Misc. Charges Taxes
1 112% PER MONTH SERVICE CHARGE $ 0.00 $ 5,136.25 $ 0.00 $ 320.00 $ 0.00
Important Information: Due to fraud attempts any communication for changes of bank account Total Invoice $ 5,456.25
details have to be confirmed by a call-back with your respective Xylem contact person.
Invoice
=
xyle9661
Sold by:
Branch 006
194th Street
Let's Solve Water
Mokena, IL 60448
Tel: 708-889-1560
godwin e �.Y T
Fax: 708-889-1561
S
S
O
H
L Selge Construction Co Inc
IrSelge
Construction Co Inc
D 2833 S 11th St
P0
W. Western Avenue
MI 49120 4421
uth Bend, IN 46601
TNiles,
0
0
Remit to: Xylem Dewatering Solutions, Inc.
26717 Network Place
Chicago, IL 60673-1267
Phone: 1.855.278.2248 (Opt 1)
NOTE:Valued customers, please note the NEW remit
address change included on this invoice.
Cust. No.
Invoice Date
Invoice No.
00115704
04-11-2025
401412148
Page 1 of 2
Customer PO
Ordered By
Contract Date
Rental Contract#" -'Sales
Representative
Order Taken By
Payment Terms
Emergency ORDER
south Bend/bypass
Mr. Scott Riley
03-26-2025
206014527
Perre Krizanek
Perre Krizanek
Net 30
QTY
ITEM
DESCRIPTION
PER
D/W/M
RATE
AMOUNT
Rental 031216/2025 Thru 04/04/2025 *Return*
1
D-62879
CD150M 6" 4045T290-iT4 RGT
2
W
1
D-62867
CD150M 6" 4045T290-iT4 RGT
2
W
1
51810A
Lansas Multisize Back Plug 15"-30"
2
W
i
CAPGMA005R
PrimeGuard 65' NM Mechanical Float Set
2
W
• On lag pump
3
HSWS080020ODDR
8" x 20' Black Water Suction Hose WIQD
2
W
3
HSWS080010ODDR
8" x 10' Black Water Suction Hose WlQD
2
W
2
VLCK080F1COOR
8" Check Valve W1150#FL
2
W1
• QD Fittings
-
2
BN12090QDG000R
12" 90 Degree QD Bend
2
W
1
AD120080QMQFGOR
12" MQD x 8" FQD Adapter
2
W
1
BN12090QDGOOOR
12" 90 Degree QD Bend
2
W
ALL PAST DUE INVOICES ARE SUBJECT TO
1 1/2% PER MONTH SERVICE CHARGE
Important Information: Due to fraud attempts any communication for changes of bank account
details have to be confirmed by a call-back with your respective Xylem contact person.
Invoice
Sold by:
le,
Branch 006
Remit to: Xylem Dewatering Solutions, Inc.
m9661
XY
194th Street
26717 Network Place
Let's Solve Water
Mokena, IL 60448
Chicago, IL 60673-1267
Tel: 708-889-1560
Phone: 1.855.278.2248 (Opt 1)
godw n0i
Fax: 708-889-1561
NOTE:Valued customers, please note the NEW remit
address change included on this invoice.
S
S
Cust. No. Invoice Date Invoice No.
O
H
L Selge Construction Cc Inc
I
Selge Construction Co Inc
00115704 04-11-2025 401412148
D 2833 S 11th St
P
900 W. Western Avenue
Niles, MI 49120-4421
South Bend, IN 46601
Page 2 of 2
T
T
O
O
Customer PO
Ordered By
Contract Date
Rental Contract #
Sales Representative
Order Taken By
Payment Terms
Emergency ORDER
south Bend/bypass
Mr. Scott Riley
03-26-2025
206014527
Perre Krizanek
Perre Krizanek
Net 30
QTY
ITEM
DESCRIPTION
PER
DIW/M
RATE
AMOUNT
32
PPQP120010QDOOR
12" x 10' Godwin QD Pipe
2
W
2
BN08090QDGDDOR
8" 90 Degree QD Bend
2
W
2
AD080060QMGFGOR
8" MQD x 6" FQD Adapter
2
W
2
AD080060QFQMGOR
8" FQD x 6" MOD Adapter
2
W
1
TEOBOQFQFQMGOOR
8" Godwin QD Tee (F x F x M)
2
W
1
PLFL002001 R
1/4" x 30' Rope & Air Fill Kit W/Gauge
2
W
1
DZONE04ROLLBACK
Delivery Zone 4 - Rollback
1
PZONE04HOLLBACK
Pickup Zone 4 - Rollback
172
FUELSURCHARGE
Fuel Surcharge by the Mile
1
ENVFEE
Environmental Fee
ALL PAST DUE INVOICES ARE SUBJECT TO Rental Labor Shipping Misc. Charges Taxes
1 1/2% PER MONTH SERVICE CHARGE $ 8,238.54 $ 0.00 $ 1,732.60 $ 79.92 $ 0.00
Important Information: Due to fraud attempts any communication for changes of bank account Total Invoice $ 10,051.06
details have to be confirmed by a call-back with your respective Xylem contact person.
xylem
Sold by.
Let's Solve Water
godwina wz'4�
S
0
L Selge Construction Co Inc
D 2833 S 11 th St
T
Niles, MI 49120-4421
O
Customer PO Ordered By Contract Date
Tear Down
RC206014527 04-09-2025
QTY I ITEM
1
BOBCATUSAGE
540
MILEAGE
21
LABOR
3
SERVICETRUCK
BOBCAT
Mileage
Labor Standard Rate
Godwin Service Truck
Tear Down RC 206014527
Invoice
Branch 006
9661 194th Street
Mokena, IL 60448
Tel: 708-889-1560
Fax:708-889-1561
In (A5
H
I Selge Construction Co Inc
P 900 W Western Ave
T South Bend, IN 46601
O
Remit to: Xylem Dewatering Solutions, Inc.
26717 Network Place
Chicago, IL 60673-1267
Phone: 1.855.278.2248 (Opt 1)
NOTE:Valued customers, please note the NEW remit
address change included on this invoice.
Cust. No.
Invoice Date
Invoice No.
00115704
04-11-2025
401412235
Page 1 of i
Service Contract # Sales Representative Order Taken By Payment Terms
206014556 Perre Krizanek Perre Krizanek Net 30
UNIT EXTENDED
DESCRIPTION AMOUNT AMOUNT
Comments
,i
ALL PAST DUE INVOICES ARE SUBJECT TO Rental Labor Shipping Misc. Charges Taxes
1 1/2% PER MONTH SERVICE CHARGE $ 0.00 $ 3,045.00 $ 0.00 $ 900.00 $ 0.00
Important Information: Due to fraud attempts any communication for changes of bank account Total Invoice
details have to be confirmed by a call-back with your respective Xylem contact person. $ 3,945.00
hem
Let's Solve Water
g o d w i n
S
O
L Selge Construction Cc Inc
D 2833 S 11 th St
T Niles MI 49120-4421
O
Customer PO Ordered By
Emergency
ORDER south Mr. SS
Bend/bypass
ITEM
Invoice
Sold by. Branch 006
9661 194th Street
Mokena, IL 60448
Tel: 708-889-1560
Fax: 708-889-1561
S
H
I Selge Construction Cc Inc
P 900 W. Western Avenue
South Bend, IN 46601
T
O
Contract Date Completed Date
Riley 1 04-10-2025 1 04-10-2025
DESCRIPTION
Remit to. Xylem Dewatering Solutions, Inc.
26717 Network Place
Chicago, IL 60673-1267
Phone: 1.855.278.2248 (Opt 1)
NOTE:Valued customers, please note the NEW remit
address change included on this invoice.
Cust. No.
Invoice Date
Invoice No.
00115704
04-10-2025
401412079
W/O Number Sales
Representative
706017186 Perre Krizanek
Repair On: D-62867
Serviced Rental Fleet CD150M returned from rental. Volute full of
debris. Removed front cover so Impeller could be cleaned. Power
washed inside of volute and front cover and then reassembled
pump. tested pump.
LABOR Labor Standard Rate
Pala B
QUANTITY
2.00
Page 1 of 1
Order Taken By I Payment Terms
Perre Krizanek
UNIT
AMOUNT
Net 0
EXTENDED
AMOUNT
70.00 F 140.00
ALL PAST DUE INVOICES ARE SUBJECT TO Merchandise I Labor Shipping Misc. Charges Taxes
1 112% PER MONTH SERVICE CHARGE $ 0.00 $ 140.00 $ 0.00
$ o.00 $ o.oa
Important Information: Due to fraud attempts any communication for changes of bank account
details have to be confirmed by a call-back with your respective Xylem contact person. Total Invoice $ 14Q.pQ
Invoice
III
PLUMBING SERVICES
Bob Frame Plumbing Services, Inc.
2442 Jaclyn Ct
South Bend, IN 46614
(574)291-7511
tyler@frameplumbing.com
PC887700840
Invoice Date:
04/22/2025
Invoice No:
F-6890
Due Date:
05/22/2025
Sales Rep:
Customer PO:
Work Order No.
WO-4891
Bill To Address it dd s
SELGE CONSTRUCTION -MAIN SELGE - CHAPIN/WESTERN
2833 S 11TH ST CHAPIN / WESTERN
NILES, MI 49120 SOUTH BEND, 46601
Description
!
419-Used the vac truck to jet approx. 300 ft of 36" sewer and storm lines. Used (2) loads of
water to jet. Hauled away and dumped the debris at the treatment plant (3) times-6 yards
1.00
0.00
0.00
each time. Will return the next day to continue.
4/9-VAC TRUCK
8.00
408.00
3264.00
4/10-Arrived back on site and completed the 1st run of 310' of 36" main. Began jetting and
1.00
0.00
0.00
cleaning the 2nd run and got 65 ft. Will return to complete the next day.
4/10-VAC TRUCK
8.50
408.00
3468.00
4/11-Finished jetting the 550' of 36" main sewer line and dumped (4) times at the treatment
1.00
0.00
0.00
plant. Approx. 15,000 gallons of water used for jetting.
4/11-VAC TRUCK
8.00
408.00
3264.00
Sub Total $9,996.00
Tax ( 7.0000 % ) $0.00
Total $9,996.00
Message
Thank you for your business! COD CUSTOMERS: DUE UPON COMPLETION, CUSTOMERS SET-UP ON TERMS: NET 30 2% FINANCE CHARGE
AFTER 30 DAYS
Weaver
Office Location:
PLEASE REMIT PAYMENT TO:
7121 Grape Road
8203 SOLUTIONS CENTER
Consultants
Granger, IN 46530
CHICAGO, IL 60677-8002
Phone - 574-271-3447
Group
Fax - 574-271-3343
Accounts Payable
May 2, 2025
Selge Construction Company, Inc.
Project No:
1147-505-21-00
2833 South 1 lth Street
Invoice No:
106970
Niles, MI 49120
PO Number:
Project 1147-505-21-00 2025 Misc Testing - Various Sites
Professional Services for the Period:March 29, 2025 to April 25, 2025
Phase 01 Western and Chapin
Supplemental Expenses
Air Test (ASTM C138, C231 and C173)
Mold and Test 3 Beam in Flexure
Report Charge
Trip Charge
Unit Weight (Yield) (ASTM C138)
1.0 Each @ 50.00
$50.00
1.0 Each @ 420.00
$420.00
1.0 Each @ 50.00
$50.00
2.0 Each @ 120.00
$240.00
1.0 Each @ 50.00
$50.00
Total Units:
$810.00
Phase Total
$810.00
INVOICE TOTAL: $810.00
2025 Misc Testing - Budget Current Prior Total Remaining
Various Sites, IN
Billing Summary $1,000.00 $810.00 $0.00 $810.00 $190.0a
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 05-06-2025
Name: Jacob M. Klosinski Department of Public Works — Engineering Division
BPW Date: 05-13-2025 Phone Extension:
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney ® Attorney Name Michael Schmidt
Purchasing ® Mickey Low / Ron O'Connor
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
® Other: Ratify Emergency ❑ Ease./Encroach
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Special Contract Provisions
Purpose/Description
Amount of
Previous Amount
Information
Construction C
Inc.
U YesU If Yes, Approved by Purchasing
❑ No
❑ WBE Completed E-Verify Form Attached El Yes
❑ No
Emergency Sewer Repair at Western and Chapin Intersection
N/A
641-06-602-509-439001 Sewage Works Operations, Other Contract. Svcs.
PO #0037116
$220,379.51
Time and Materials — Emergency Work
The Division of Engineering and Division of Streets & Sewers requests the
Board of Public Works ratify the Emergency Repair Work purchase order for
a sewer collapse repair at the intersection of Western and Chapin. A sewer
collapse was identified and required structure and pipe replacement due to a
fiber optic conduit bore that had been bored through the sewer.
❑ Increase
❑ Decrease
Current Percent of Change
New Amount
For Change Orders
Increase %
Decrease ( %
Increase %
Total Percent of Change: Decrease %
Time Extension Amount:
New Completion Date: