HomeMy WebLinkAboutAward Quote - Lift Station #33 Platform Replacement and Generator Paint - Premier 1 Construction1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/235-9171
CITY OF SOUTH BEND TAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
May 13, 2025
Mr. Al Lusk
Premier 1 Construction
26137 Lake Drive
Elkhart, IN 46514
alusk(apremierl constructioninc.com
RE: Quotation Award — Lift Station #33 Platform Replacement and Generator Paint
Dear Mr. Lusk:
At its May 13, 2025 meeting, the Board of Public Works awarded the above referenced
quotation to you in the amount of $4,745.
Please forward the following documents in one submittal by May 27, 2025 to my
attention for Board of Public Works approval at hhorvath(aOsouthbendin.gov :
1) One (1) signed original of the Contract (enclosed); and
2) Certificate of Insurance naming the City of South Bend as an additional insured.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/hh
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MIcou
1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/235-9171
CITY OF SOUTH BEND TAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
May 13, 2025
Mr. Chad Becker
Larson Danielson Construction Co., Inc.
302 Tyler Street
LaPorte, IN 46350
info&ldconstruction.com
RE: Quotation Award — Lift Station #33 Platform Replacement and Generator Paint
Dear Mr. Becker:
At its May 13, 2025 meeting, the Board of Public Works awarded the above
referenced quotation to Premier 1 Construction in the amount of $4,745.
We thank you for quoting and hope you will quote with us again in the future.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/hh
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MIcou
1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/235-9171
CITY OF SOUTH BEND TAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
May 13, 2025
Mr. Mack Keller
HomeWorks
1511 S Pulaski St.
South Bend, IN 46613
mkellerkgohomeworks.com
RE: Quotation Award — Life Station #33 Platform Replacement and Generator Paint
Dear Mr. Keller:
At its May 13, 2025 meeting, the Board of Public Works awarded the above
referenced quotation to Premier 1 Construction in the amount of $4,745.
We thank you for quoting and hope you will quote with us again in the future.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/hh
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MIcou
A FOUNDATION OF EXPERTISE AND EXPERIENCE
Premier 1 Construction
26137 Lake Drive, Elkhart, IN 46514
Chip Enos
Superintendent V
Division of Waste water, Department of Public Works
3113 Riverside Drive
South Bend, IN 46628
April 10, 2025
RE Generator Platform
Dear Chip
Premier 1 Construction is please to provide you a budget proposal to perform the following work listed below at you
facility.
Break Down as follows
• Remove exisitng wooden platform and haul offsite.
• Furnish and install (3) 12-0 pressure treated platforms around 3 side of the exisitng generator. The
platforms will be constructed out 2x8 material with 4x4 supports.
• Furnish and install (2) steps for each end.
• Reattach battery enclosure under the new deck.
• Clean up all debris and haul offsite.
We proposal to furnish all above listed work for the sum of $ 3,768.00
Alt to furnish all labor and material to wash down, prime and repaint exisitng generator
Add $ 977.00
If you have any questions regarding this proposal please don't hesitate to contact me.
Sincerely,
Al Lusk President
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
•; � _ �7l7f�7
Gary A. Gilot, Member
Murray L. Miller, Member
Joseph R. Molnar, Vice President
BreanaMiMicou, Member
�'
Attest: Theresa M. Heffner, Clerk
Date: May 13, 2025
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
This Agreement is made and entered into this 13th Day of May 2025, by and between Premier
Construction, (the "Contractor"), and the Board of Public Works (the "Board").
The Contractor covenants and agrees to make the following improvement, as fully set out in the
Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all
of which are set forth as a part of this Contract, for:
PROJECT NO.
DESCRIPTION:
COMPLETION DATE:
AMOUNT:
FT TNDTN(T.
LIFT STATION #33 PLATFORM REPLACEMENT AND
GENERATOR
SEE SPECIFICATIONS
$4,745
PR-00040413
The unit prices for this improvement were those prices as received and accepted by the Board on
the 13th Day of May 2025.
The Contractor further agrees to notify the assigned Engineer when this improvement is
completed. This notification shall be in the form of a Project Completion Affidavit, signed by the
Contractor. Upon final acceptance of the improvement by the Engineer, the Contractor's final
estimate will be presented to the Board for final Payment with one (1) copy of the Project
Completion Affidavit and one (1) copy of a Waiver of Lien.
Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has
the authority to bind the named person or entity to this Agreement.
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray L. Miller, Member
�/ m
Joseph R. Molnar, Vice President
Breana Micou, Member
�4
Attest: Theresa M. Heffner, Clerk
Date: May 13, 2025
PREMIER I CONSTRUCTION
Printed Name
Signature
Page I of I
LARSON 302 Tyler Street
DANIELSON Proposal LaPorte, Indiana46350
(219) 362-2127
Cons LIcdon Company, Inc. Fax (219) 362-2848
QUALITY CONSTRUCTION SINCE 1908 www.ldconstruction.com
To: South Bend Wastewater Treatment Date: April 29th, 2025
3113 Riverside Drive job Name: Generator Platform
South Bend, IN 46628
Attn: Chip Enos job Location: 17881 Inwood Drive, South Bend, IN 46614
Phone/Fax: (574) 370-0827 E-Mail: CEnosp_southbend in.gov
Our Construction Costs for the Removal & Replacement of the Generator Platform at the Inwood Drive location.
Scope of Work:
I. Mobilize manpower, materials & equipment as needed to complete the project in a professional manner.
2. Demolition & disposal of the existing (3) sections of wood platforms & (2) stairs into a Contractor supplied dumpster.
3. Fabricate (3) treated wood platforms (approx. T-0" wide x I T-0" long x T-0" high) & (2) stair sections (3 steps each stair)
to be independent of one another to create a "U"-shape platform to match the existing platform that is to be removed.
4. Scrape & sand steel structure & exterior of generator housing.
5. (2) Coats of Sherwin Williams Macropoxy 646 on steel structure & generator housing.
6. General Construction cleanup of debris.
Clarifications & Exclusions:
• All work is figured for standard weekday working hours, 7:00am-3:30pm. Excludes Holidays & Premium Time.
• Permit fees, inspections, builder's risk & bonds are excluded from this proposal.
• Excludes sales tax. A tax exemption certificate is required for credit, otherwise taxes will be charged.
• Excludes any staining of the new deck materials. The platforms will NOT be mounted to the existing asphalt.
• Excludes any type of handrail for the new stairs & wooden platforms.
• Excludes high temperature coatings for paint.
• Platform below the generator will be sanded/cleaned/painted as far as can be reached by hand.
• Excludes power washing & sand blasting. Tags/letters to be masked off &/or cut around to best results.
• Work is weather dependent — excludes any tenting or temporary heat.
• Work not described in this scope of work or different to assumptions will be completed by approved Change Orders.
Important! Our Proposal does not include the identification, detection, abatement, encapsulation, disposal, nor removal of
Asbestos, lead -based paints, PCB's, Fungi, Bacteria, nor any hazardous substances.
We propose to furnish labor, material and equipment in accordance with the above, for the sum of:
Nine Thousand Nine Hundred Eighty & 00/ 100--------------------------------------------------- DOLLARS $ 9,980.00 ---------------------------
Payment due within 30 days of invoice for work completed and material stored during the month. After 30 days, a finance charge of 1'/2% per month is added to
balance, representing an annual percentage rate of 18%.
General Conditions of this proposal are as listed on latest LARSON-DANIELSON CONSTRUCTION CO., INC.
edition of ConsensusDOC 205 except property insurance /
including Builder's Risk Insurance is by the owner. By ✓�
If not accepted within [30] days, this proposal may be subject to change. Chad Becker
Authorization - You are authorized to do the above outlined work as
specified. Prices, specifications and conditions are accepted and
payment will be made as noted above.
Signature
Date Accepted Signature
Ho 1 eworks Homeworks Construction, Inc.
CONSTRUCTION & HOME MAINTENANCE
Home Works Construction, Inc
1511 Pulaski St., South Bend, IN 46613
574-318-9675 FAX 574-807-9414
Client: Chip Enos
Property: 3700 S. Ironwood Drive
South Bend, IN 46614
Operator: MKELLER
Estimator:
Mack Keller
Position:
Sales & Estimating
Company:
HomeWorks
Business:
1511 S Pulaski St.
South Bend, IN 46613
Home: (574) 370-0827
Business: (615) 879-4659
E-mail: mkeller@gohomeworks.com
PAINT SCOPE OF WORK
The Project Work Scope describes the entire scope of the project. Other items and ideas may have been discussed during the
sales process but should not be assumed as part of the project unless specified in the Project Work Scope. Your estimator has, in
good faith, created a scope that meets the project expectations, but items could have been missed. Please take time to review and
understand the Project Work Scope so there is no confusion as this will result in a more successful and stress -free project.
MaN
-am
'HomeWorks
CONSTRUCTION & REMODELING
Ho 1 eworks Homeworks Construction, Inc.
CONSTRUCTION & HOME MAINTENANCE
Home Works Construction, Inc
1511 Pulaski St., South Bend, IN 46613
574-318-9675 FAX 574-807-9414
CHIP-ENOS-SB-PAINT
Main Level
Main Level
DESCRIPTION
1. Permits
-HomeWorks will acquire any permits necessary for this project
Platform
DESCRIPTION
7. Scrape & Paint Generator
Grand Total
Mack Keller
Sales & Estimating
HOMC.works
CONSTRUCTION & 'REMODELING
$2,327.64
CHIP-ENOS-SB-PAINT 4/9/2025 Page:2
Ho 1 eworks Homeworks Construction, Inc.
CONSTRUCTION & HOME MAINTENANCE
Home Works Construction, Inc
1511 Pulaski St., South Bend, IN 46613
574-318-9675 FAX 574-807-9414
Client: Chip Enos
Property: 3700 S. Ironwood Drive
South Bend, IN 46614
Operator: MKELLER
Estimator:
Mack Keller
Position:
Sales & Estimating
Company:
HomeWorks
Business:
1511 S Pulaski St.
South Bend, IN 46613
Home: (574) 370-0827
Business: (615) 879-4659
E-mail: mkeller@gohomeworks.com
PLATFORM SCOPE OF WORK
The Project Work Scope describes the entire scope of the project. Other items and ideas may have been discussed during the
sales process but should not be assumed as part of the project unless specified in the Project Work Scope. Your estimator has, in
good faith, created a scope that meets the project expectations, but items could have been missed. Please take time to review and
understand the Project Work Scope so there is no confusion as this will result in a more successful and stress -free project.
9V
�omeWorks
CONSTRUCTION & REMODELING
Ho 1 eworks Homeworks Construction, Inc.
CONSTRUCTION & HOME MAINTENANCE
Home Works Construction, Inc
1511 Pulaski St., South Bend, IN 46613
574-318-9675 FAX 574-807-9414
CHIP-ENOS-SOUTHBEND
Main Level
Main Level
DESCRIPTION
1. Permits
-HomeWorks will acquire any permits necessary for this project
2. Dumpster/Dump Trailer
3. General Demolition
-Demo Platform surrounding generator
Platform
DESCRIPTION
4. Supply Treated Lumber to Build Stairs and Platform
5. Framing Labor to Build Stairs and Platform
Grand Total
Mack Keller
Sales & Estimating
.1
EH(OME..wor6
CONSTRUCTION & REMODELING
$11,498.04
CHIP-ENOS-SOUTHBEND 4/9/2025 Page:2
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 5/5/25
Department
Name Roger Oakley Wastewater
BPW Date 5/8/25 Phone Extension 5787
Review and Approval Required Prior to Submittal to Board
Diversity Compliance
❑
Officer Name
and Inclusion Officer
BPW Attorney
®
Attorney Name
Dept. Attorney
❑
Attorney Name
Purchasing
Check the Appropriate
Item Type — Re uired or All Submissions
❑ Professional Services Agreement
❑ Contract
❑ Proposal
❑ Open Market Contract
❑ Amendment/Addendum
❑ Special Purchase, QPA
❑ Bid Opening
❑ Bid Award
❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening
® Quote Award
❑ Reject Bids/Quotes
❑ Proposal Opening
❑ C/O & PCA No.
❑ PCA
❑ Chg. Order, No.
❑ Traffic Control
❑ Resolution
❑ Other:
❑ Ease./Encroach
Reauired Information
Company or Vendor Name
Premier 1 Construction
❑ Yes[:] If Yes, Approved by Purchasing
New Vendor
® No
Yes
MBE
MBE/WBE Contractor
Completed E-Verify Form Attached
❑ ❑ No
Project Name
Lift Station #33 Platform Replacement and Generator Paint
Project Number
Funding Source
Account No.
641-06-605-514-436005
Amount
$4745.00
Terms of Contract
Purpose/Description
Lift Station #33 at Ironwood and Inwood sustained damage as the result of a
car accident. The service platform around the back-up generator was badly
damaged on one side. The rest of the platform is showing it's age so it makes
sense to replace the entire platform at one time. The generator is also showing
age and has flaking paint and rust in some areas. It made sense to take
advantage of this opportunity to scrape, clean, and repaint the generator while
the platform is out of the way.
For Change Orders Only-1
Amount of ❑
Increase $
❑
Decrease ($ )
Previous Amount
$
Increase %
Current Percent of Change:
Decrease ( %)
New Amount
$
Total Percent of Change:
Increase %