CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name South Bend WWTP WAS Thickening Improvements
Project No. 123-031 B
For Bids Due April 22, 2025
PART
(Must be completed for all bids. Please type or print)
04.22.25 Bidder (Firm): Bowen Engineering Corporation
Address: 8802 North Meridian Street
City/State/Zip: Indianapolis, IN 46260 Telephone Number: ( 317 ) 576-8712
Email Address: rob@bowenengineering.com
Agent of Bidder (if Applicable): n/a
Pursuant to notices given, the undersigned offers to furnish
public works project of:
labor and/or material necessary to complete the
South Bend WWTP WAS Thickenina Improvements
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Black & Veatch, 8415 Allison Pointe Blvd, Suite 410, Indianapolis, IN 46250
and dated March 2025
for the sum of (enter the Total Bid as shown on the Proposal)
Four million, seven hundred fifty-six thousand dollars
(Enter sum of Total Base Bid plus Alternates shown on Proposal)
(s 4,756,000 )
(Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the Cit of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown n a eparate attachment.
By
(i ture)
Doug Stout
(Printed Name of Person Signing)
The above bid is accepted this
Subject to the following conditions:
ACCEPTANCE
day of
BOARD OF PUBLIC WORKS
President
Members
Version 5/20/2024 Contractor's Bid for Public Works - 2
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: South Bend WWTP WAS Thickening Improvements
Project Number: 123-031 B
For Bids Due: April 22, 2025
Contractor Name: Bowen Engineering Corporation
BASE BID
45pUTH BE�O
2
� d
W
1865
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
WAS Thickening improvements, including all
1
LSUM
4,543,275
4,543,275
labor and materials to complete the Work
Concrete Surface Repair, Floor Surface
2
Repairs, Thickness of 1/4 inch or less
25
SF
104
2600
Section 03 01 26.76
Concrete Surface Repair, Floor Surface
3
Repairs, Thickness between 1/4 inch and 1
25
SF
108
2700
inch Section 03 01 26.76
Concrete Surface Repair, Floor Surface
4
Repairs, Thickness greater than 1 inch
1,400
SF
132
184,800
Section 03 01 26.76
Concrete Surface Repair, Vertical and
5
Overhead Surface Repairs, Trowel Applied
25
SF
557
13,925
Section 03 01 26.76
Concrete Surface Repair, Vertical and
6
Repairs, Form and Pour, Thickness 6 inches
25
SF
348
8700
or Less Section 03 01 26.76
BASE BID TOTAL 4,756,000
BID ALTERNATES
Bid Alternate #1 (indicate one): _ Additive _ Deductive
Price
Item
Description
Manufacturer
Quantity
Unit
Difference
Total Amount
No.
from Base
Bid, per Unit
1
GBT Manufacturer
2
LSUM
46 71 16
ALTERNATE #1 TOTAL N/A
Bid Alternate #2 (indicate one): _ Additive _ Deductive
Price
Item
Description
Manufacturer
Quantity
Unit
Difference
Total Amount
No.
from Base
Bid, per Unit
PCP Manufacturer
2
2
LSUM
43 23 57
ALTERNATE #2 TOTAL N/A
Version 5/20/2024 Contractor's Bid for Public Works - 7
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: South Bend WWTP WAS Thickening Improvements
Project Number: 123-031 B
For Bids Due: April 22, 2025
Contractor Name: Bowen Engineering Corporation
Bidder (Firm): Bowen Engineering Corporation
Address: 8802 North Meridian Street
City/State/Zip: Indianapolis, IN 46260 Telephone NL14bei
317 ) 842-2616
(Signature)
Doug Stout, Estimating Manager
(Printed Name of Person Signing)
Version 5/20/2024 Contractor's Bid for Public Works - 7A
�ou'rti y ,
=H6_
45pUTIRI g�,��
2
U C7
EQUIPMENT QUESTIONNAIRE
CITY OF SOUTH BEND
Project Name: South Bend WWTP WAS Thickening Improvements 1865
Project Number: 123-031 B
For Bids Due: April 22, 2025
Contractor Name: Bowen Engineering Corporation
The Bidder shall enter in the spaces provided the names of the manufacturers of equipment which Bidder
proposes to furnish and shall submit this Equipment Questionnaire with its Bid. Owner will review and
evaluate the information before award of the Contract.
Only one manufacturer's name shall be listed for each item of equipment. Upon award of a contract, the
named equipment shall be furnished. Substitutions will be permitted only if named equipment does not
meet the requirements of the Contract Documents, the manufacturer is unable to meet the delivery
requirements of the construction schedule, or the manufacturer is dilatory in complying with the
requirements of the Contract Documents. Substitutions shall be subject to concurrence of Owner and
shall be confirmed by Change Order.
Preliminary acceptance of equipment listed by manufacturer's name shall not in any way constitute a
waiver of the specifications covering such equipment; final acceptance will be based on full conformity
with the Contract Documents.
Failure to furnish all information requested or entering more than one manufacturer's name for any item in
this Equipment Questionnaire may be cause for rejection of the Bid.
Equipment
600 Volt Class Motor Control Centers
2. Air -Operated Diaphragm Pumps
Dry Polymer Feed System
ManufacturPr
Addendum No. 1 Removed Equipment item 1
FLSmidth
Cleanwater1
Version 5/20/2024 Contractor's Bid for Public Works - 8
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF IN )
) SS:
Marion COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 5/20/2024 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 5/20/2024 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 22 day of April 2025
Subscribed and sworn to before me this 22
My Commission Expires November 20, 2032
County of Residence
Bowen Engineering Corporation
C trac or/Bidder (Firm)
1—n
Sig ture o Contractor/Bidder or Its Agent
Doug Stout, Estimating Manager
Printed Name and Title
day of April 2025
Z&, �z �Y
Notary Public
Marion
El
P�, MATTHEW CARLINNotary Public, State of IndianaAL;"=Marion County
Commission Number NP0760095My commission Expiresn.".. November20,2032
Version 5/20/2024 Contractor's Bid for Public Works - 6
Docusign Envelope ID: 4F2F936E-A622-4DFC-AC06-6DE98FF06AOF
CNA SURETY
CONTRACTOR:
(Name, legal status and address)
Bowen Engineering Corporation
8802 North Meridian Street
Indianapolis, IN 46260
OWNER:
(Name, legal status and address)
City of South Bend, Indiana, Board of Public
Works
227 West Jefferson Blvd.
South Bend, IN 46601
Bond No. N/A
SURETY: Continental Casualty Company
(Name, legal status and principal place
of business)
151 N. Franklin Street
17th Floor
Chicago, IL 60606
BOND AMOUNT: Five Percent of the Maximum Amount of the Total Bid (5%)
PROJECT:
(Name, location or address, and Project number, if any)
South Bend WWTP WAS Thickening Improvements; Project No. 123-031 B
This document has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so
furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this 22nd day of April 2025
F Signed
by:
(Witness)
5DocuSigned by: �� ""
�a.Sbl', 4tiLG�(,D�. at"
IM'l S&S3BB64 ...
(Witness)
Bowen En i eenq corporation
(Princip l) p W / 1-4d /' (Seal)
(Title) Care 4M-- CFO
Conti nenjaLgq&WJVPompany
(Surety) l ----- -- --- --- -
(Title)
, Attorney -in -Fact
(Seal)
Signed by:
Printed in cooperation with the American Institute of Architects (AIA).
The language in this document conforms to the language used in AIA Document A310 - Bid Bond - 2010 Edition.
Docusign Envelope ID: 4F2F936E-A622-4DFC-AC06-6DE98FF06AOF
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT
Know All Men By These Presents, That Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an
Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company (herein called "the CNA Companies"), are
duly organized and existing insurance companies having their principal offices in the City of Chicago, and State of Illinois, and that they do by virtue of the signatures
and seals herein affixed hereby make, constitute and appoint
Jason D McEldowney, Katie Pikula, John W Hannon III, Robert L Sherfick, Individually
of Carmel, IL, their true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on their behalf bonds,
undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their insurance companies and all the acts of
said Attorney, pursuant to the authority hereby given is hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By -Laws and Resolutions, printed below, duly adopted, as indicated, by the
Boards of Directors of the insurance companies.
In Witness Whereof, the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto affixed on this
23rd day of September, 2023.
N,GAS Ug4l %NSUpq MvpNYCA Continental Casualty Company
�P FxP� NSF ° National Fire Insurance Company of Hartford
Z OORPORArf O z i M `HOORPORgtfo c:. American Casualty Company of Readin Pennsylvania
Z > O JULY 31. .2z,
oU SEAL s lsoz aT
Olc b �
tgg7 HAR�F� Larry Kasten Vice President
State of South Dakota, County of Minnehaha, ss:
On this 23rd day of September, 2023, before me personally came Larry Kasten to me known, who, being by me duly sworn, did depose and say: that he resides in
the City of Sioux Falls, State of South Dakota; that he is a Vice President of Continental Casualty Company, an Illinois insurance company, National Fire Insurance
Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company described in and
which executed the above instrument; that he knows the seals of said insurance companies; that the seals affixed to the said instrument are such corporate seals; that
they were so affixed pursuant to authority given by the Boards of Directors of said insurance companies and that he signed his name thereto pursuant to like authority,
and acknowledges same to be the act and deed of said insurance companies.
..................,..,.,.,.,.. .
`
My commission expires S M. BENT
NOTARY PUBLIC sMN s
i Jc SOUTH DAKOTA
March 2, 2026.,,,,,,......,.,................. M. Bent Notary Public
CERTIFICATE
I, D. Johnson, Assistant Secretary of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois
insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company do hereby certify that the Power of Attorney
herein above set forth is still in force, and further certify that the By -Laws and Resolutions of the Board of Directors of the insurance companies printed below are still
in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said insurance companies this 22nd day of April 2025
P�GASUq, 04SURgt MP NM OFP� Continental Casualty Company
Z OORPORArf `NCORP°RgT o
t
j.
Z a O �� a n JULY 31, c
Ou SEAL s �d lsoz a�
1897
HARIF sky 0 ca
National Fire Insurance Company of Hartford
American Casualty Company of Reading, Pennsylvania
D. Johnson Assistant Secretary
Authorizing By -Laws and Resolutions
ADOPTED BY THE BOARD OF DIRECTORS OF EACH OF CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF
HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA (as defined above, the "CNA Companies"):
This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of each of the above CNA
Companies at a meeting held on May 12, 1995:
"RESOLVED: That any Senior or Group Vice President may authorize an officer to sign specific documents, agreements and instruments on behalf of the Company
provided that the name of such authorized officer and a description of the documents, agreements or instruments that such officer may sign will be provided in
writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective."
This Power of Attorney is signed by Larry Kasten, Vice President, who has been authorized pursuant to the above resolution to execute power of attorneys on behalf
of each of the CNA Companies.
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of each of the above
Companies by unanimous written consent dated the 25L' day of April, 2012:
"Whereas, the bylaws of the Company or specific resolution of the Board of Directors has authorized various officers (the "Authorized Officers") to execute various
policies, bonds, undertakings and other obligatory instruments of like nature; and
Whereas, from time to time, the signature of the Authorized Officers, in addition to being provided in original, hard copy format, may be provided via facsimile or
otherwise in an electronic format (collectively, "Electronic Signatures"); Now therefore be it resolved: that the Electronic Signature of any Authorized Officer shall
be valid and binding on the Company."
This Power of Attorney may be signed by digital signature and sealed by a digital or otherwise electronic -formatted corporate seal under and by the authority of the
following Resolution adopted by the Board of Directors of each of the above CNA Companies by unanimous written consent dated the 27th day of April, 2022:
"RESOLVED: That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify
and confirm the use of a digital or otherwise electronic -formatted corporate seal, each to be considered the act and deed of the Company."
Go to www.cnasurety.com > Owner / Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity.
Form F6853-6/2023
Docusign Envelope ID: CF83FE34-FCDB-4FO5-AFOC-CB8FFB2C3096
CNA ,, i __ 1
_> r) 1
January 27, 2025
RE: Bowen Engineering Corporation
8802 North Meridian Street
Indianapolis, IN 46260
To whom it may concern:
Bowen Engineering Corporation is a highly regarded and valued client of Continental Casualty
Company. Continental Casualty Company has an A.M. Best Rating of A XV and is listed on the U.S.
Treasury Department's List of Approved Sureties.
We have had the privilege of providing surety bonds to Bowen Engineering Corporation for many
years. Based on their current financial position, we would consider providing Performance and
Payment Bonds up to $350,000,000 single project and support a $1,250,000,000 total work
program. Naturally, we would expect that the execution of any final bonds would be subject to a
review of the final contract terms, conditions, and financing by our client and ourselves.
Any arrangement for bonds required by the contract is a matter between Bowen Engineering
Corporation and Continental Casualty Company and we assume no liability to you or third parties if
for any reason we do not execute these bonds.
If you have any questions regarding this company and their performance history or capabilities,
please feel free to give me a call at (317) 853-3668.
Continental Casualty Company
EDocuSigned by:
2A32F1B510FA4D6 ..
Robert 1. Sherfick
Attorney -In -Fact
L
by:
Docusign Envelope ID: CF83FE34-FCDB-4F05-AFDC-CB8FFB2C3096
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT
Know All Men By These Presents, That Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an
Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company (herein called "the CNA Companies"), are
duly organized and existing insurance companies having their principal offices in the City of Chicago, and State of Illinois, and that they do by virtue of the signatures
and seals herein affixed hereby make, constitute and appoint
Jason D McEldowney, Katie Pikula, John W Hannon III, Robert L Sherfick, Individually
of Carmel, IL, their true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on their behalf bonds,
undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their insurance companies and all the acts of
said Attorney, pursuant to the authority hereby given is hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By -Laws and Resolutions, printed below, duly adopted, as indicated, by the
Boards of Directors of the insurance companies.
In Witness Whereof, the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto affixed on this
23rd day of September, 2023.
pP.3Uq�T iNSURq O,�spwr oA�, Continental Casualty Company
�P ► gi M�F hyc Fso National Fire Insurance Company of Hartford
COflPORATF �O o �y `p�ppPOPAt, ' American Casualty Company of Readin Pennsylvania
Z
OV SEAL
leg? MAH Larry Kasten Vice President
State of South Dakota, County of Minnehaha, ss:
On this 23rd day of September, 2023, before me personally came Larry Kasten to me known, who, being by me duly sworn, did depose and say: that he resides in
the City of Sioux Falls, State of South Dakota; that he is a Vice President of Continental Casualty Company, an Illinois insurance company, National Fire Insurance
Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company described in and
which executed the above instrument; that he knows the seals of said insurance companies; that the seals affixed to the said instrument are such corporate seals; that
they were so affixed pursuant to authority given by the Boards of Directors of said insurance companies and that he signed his name thereto pursuant to like authority,
and acknowledges same to be the act and deed of said insurance companies.
My commission expires M. BENT
f s^En� NOTARY PUBLIC +
SS AM),
DAKOTA i
March 2, 2026 .......I ................. M. Bent Notary Public
CERTIFICATE
I, D. Johnson, Assistant Secretary of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois
insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company do hereby certify that the Power of Attorney
herein above set forth is still in force, and further certify that the By -Laws and Resolutions of the Board of Directors of the insurance companies printed below are still
in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said insurance companies this 27th day of January, 2025.
P�GAS uq94SUR4,� �aLMrVA Continental Casualty Company
F �yL National Fire Insurance Company of Hartford
2� CORPORATf r' o &� s,�,eiwnaa7•rn American Casualty Company of Reading, Pennsylvania
1902
�J SEAL
1897 � 77A71�� •
D. Johnson Assistant Secretary
Authorizing By -Laws and Resolutions
ADOPTED BY THE BOARD OF DIRECTORS OF EACH OF CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF
HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA (as defined above, the "CNA Companies"):
This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of each of the above CNA
Companies at a meeting held on May 12, 1995:
"RESOLVED: That any Senior or Group Vice President may authorize an officer to sign specific documents, agreements and instruments on behalfof the Company
provided that the name of such authorized officer and a description of the documents, agreements or instruments that such officer may sign will be provided in
writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective."
This Power of Attorney is signed by Larry Kasten, Vice President, who has been authorized pursuant to the above resolution to execute power of attomeys on behalf
of each of the CNA Companies.
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of each of the above
Companies by unanimous written consent dated the 25" day of April, 2012:
"Whereas, the bylaws of the Company or specific resolution of the Board of Directors has authorized various officers (the "Authorized Officers") to execute various
policies, bonds, undertakings and other obligatory instruments of like nature; and
Whereas, from time to time, the signature of the Authorized Officers, in addition to being provided in original, hard copy format, may be provided via facsimile or
otherwise in an electronic format (collectively, "Electronic Signatures"); Now therefore be it resolved: that the Electronic Signature of any Authorized Officer shall
be valid and binding on the Company."
This Power of Attorney may be signed by digital signature and sealed by a digital or otherwise electronic -formatted corporate seal under and by the authority of the
following Resolution adopted by the Board of Directors of each of the above CNA Companies by unanimous written consent dated the 27th day of April, 2022:
"RESOLVED: That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify
and confirm the use of a digital or otherwise electronic -formatted corporate seal, each to be considered the act and deed of the Company."
Go to www.cnasurety.com > Owner I Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity.
Form F6853-612023
yCIU'I'li /f
\�j
J J1'
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
2.
FORM MBE-1.0
IHI i
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
***Goals should be calculated based on the Base Bid only."'
Project Number: _123-031B Project Name: South Bend WWTP WAS Thickening Improvements
Bidder: Bowen Engineering Corporation Total Bid Amount: 4,756,000
MBE Goal: 1.98 %
Page 1 of 1
Name & Address of MBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of MBE
Percentage
of Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
AD Distribution LLC
Marlon Gill
Process pipe supply
$117,913
2.48
2345 S Briarwood Dr
New Palestine, IN 46163
317-447-1524
Submitted by: Doug Stout
Print Name
Si ture
***Goals should be calculated based on the Base Bid only.***
Version 5/20/2024 Contractor's Bid for Public Works - 9
04.22.25
Date
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-1.0 "
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number:
Bidder:
123-031 B
Project Name:
Bowen Engineering Corporation
South Bend WWTP WAS Thickening Improvements
Total Bid Amount: 4,756,000 WBE Goal: 4.56 %
Page 1 of 2
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
Percentage
of Total
Name/Tele hone
( phone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
Service Pipe & Supply
Justin Bennett
Process pipe and plumbing supply
$32,250
302 S. New Jersey Street
317-639-9308
0.68
Indianapolis, IN 46203
FloSource, Inc.
Austin Musial
Process valve supply
$32,780
489 Gardner Ave.
0.69
Martinsville, IN 46151
765-342-1360
Coleman Insulation Company
Melissa Coleman
Plumbing insulation
$11,440
890 Wabash Ave.
0.24
Chesterton, IN 46304
219-929-6492
Reece Rebholz Co., Inc
Jeff Scroggins
Painting and coating
$11,800
440 N. Bancroft
0.25
Indianapolis, IN 46201
317-359-0633
Submitted by:
Doug Stout
Print Name
_C
Sig ure
***Goals should be calculated based on the Base Bid only.***
Version 5/20/2024 Contractor's Bid for Public Works - 10
04.22.25
Date
�06i pF,
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN,,
FORM WBE-1.0
1Hi5
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number:
Bidder:
123-031 B
Project Name:
Bowen Engineering Corportaion
South Bend WWTP WAS Thickening Improvements
Total Bid Amount: 4,756,000 WBE Goal: 4.56 %
Page 2 of 2
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
Percentage
of Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
Tesco Solutions
Kris Bowen
Construction material supplier
$136,500
9955 Crosspoint Bouleveard
(317) 537-2410
2.87
Indianapolis, IN 46256
Submitted by. Doug Stout
Print Name
Vature
***Goals should be calculated based on the Base Bid only.***
Version 5/20/2024 Contractor's Bid for Public Works - 10
04.22.25
Date
.; O�yOXJTJJ
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANT
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 123-031B Date: 04.22.25
Project Name: South Bend WWTP WAS Thickening Improvements
Bidder: Bowen Engineering Corporation
Contact Person: Doug Stout Telephone: 317-842-2616
Address: 8802 North Meridian Street
City: Indianapolis State: IN Zip: 46260
Email: stout@bowenengineering.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
.n
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: htt ://www.in. ov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
S
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
S
I affirm that I have made good faith efforts to solicit through all reasonable and available
-}/�
means the interest of all MBEs in the scopes of work of the contract.
affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
!M-SI
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
Sconcerning
subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
S
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
!v �✓CC
sufficient time for MBEs to participate effectively.
/�,1
Y
I affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
C
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
Y
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 5/20/2024 Contractor's Bid for Public Works - 11
CITY OF SOUTH BEND
w "
JI=i
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
�'',
FORM WBE-2.1
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE OF
Project Number: 123-031B WBE Participation Goal 4.56 %
Project South Bend WWTP WAS Thickening Improvements
Bidd
By: I
,Bowen Engineering Corporation
Estimating Manger 04.22.25
nature) (Title) (Date)
WBE Firm SEE ATTACHED CONTACT FORMS
Owner or Contact at WBE Firm
Telephone: Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Email:
RESULTS OF CONTACT WITH THE WBE FIRM:
WBE Firm
Owner or Contact at WBE Firm
Telephone. Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Version 5/20/2024 Contractor's Bid for Public Works - 16
CITY OF SOUTH BEND
)LrI'ff
UG..
+
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.1
LeAu
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages if necessa
PAGE OF
Project Number: 123-031B MBE Participation Goal 1.98 %
Projec me. South Bend WWTP WAS Thickening Improvements
Bid er: Bowen Engineering Corporation
By:
Estimating Manger
04.22.25
( +Wature) (Title) (Date)
MBE Firm SEE ATTACHED CONTACT FORMS
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT.
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 5/20/2024 Contractor's Bid for Public Works - 15
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested WBEs in obtaining
C
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
I affirm that I did not reject any WBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 5/20/2024 Contractor's Bid for Public Works - 14
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
y,/V'-5
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 5/20/2024 Contractor's Bid for Public Works - 12
0
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 123-031 B Date: 04.22.25
Project Name: South Bend WWTP WAS Thickening Improvements
Bidder: Bowen Engineering Corporation
Contact Person:
Address:
City:
Doug Stout Telephone: 317-842-2616
8802 North Meridian Street
_Indianapolis State: IN
Email: stout@bowenengineering.com
zip 46260
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidderreviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: htt ://www.in. 2Y 22/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
M,
S
means the interest of all WBEs in the scopes of work of the contract.
C
1 affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
I v
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
/
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
l
sufficient time for WBEs to participate effectively.
/A5
I affirm that I followed up on initial solicitations with interested WBEs.
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
l
�MC
subcontract.
1 affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
V %
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 5/20/2024 Contractor's Bid for Public Works - 13
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid. SEE ATTACHED
2. Attach a listing of public works projects currently in process of construction by your
organization. SEE ATTACHED
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof. NOT APPLICABLE
4. Attach references from private firms for which you have performed work. SEE ATTACHED
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.) SEEATTACHED
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor. SEEATTACHED
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
BOWEN ENGINEERING CORPORATION WILL PROVIDE A LIST PRIOR TO CONTRACT APPROVAL, UPON REQUEST
4. Attach a listing of equipment you have available to use for the proposed project.
SEE ATTACHED
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
BOWEN HAS NOT ENTERED INTO ANY AGREEMENTS BUT HAS RECEIVED BIDS TO BE ABLE TO
SUBMIT A BID FOR THIS PROJECT. ONCE AWARDED, CONTRACTS TO SUBS WILL BE AWARDED.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
SEE ATTACHED
03029045.0000 0041 13-8
x x i
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name South Bend WWTP WAS Thickening Improvements
Project No. 123-031 B
For Bids Due April 22, 2025
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check X
or Bid Bond.
X Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
XEquipment Questionnaire.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
X with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good
X Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and
WBE-2.1 ].
X Acknowledge Receipt of 1 Addendum(s) included with the bid.
X All required additional information is included with the bid.
X Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Bowen Engineerin
By Authorized Representai
Signature:
ion
Print Name & Title: Doug St6ut, Estimating Manager
Version 5/20/2024 Contractor's Bid for Public Works - 1
Date: 04.22.25
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name South Bend WWTP WAS Thickening Improvements
Project No.
For Bids Due
123-031 B
April 22, 2025
Contractor Name: Bowen Engineering Corporation
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
**THIS FORM ONLY APPLIES TO BIDS GREATER THAN $250,000. **
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
71 of The Responsible Bidding Ordinance No. 10975-23 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") within twelve (12) months of obtaining pre -qualified standing. If the status of any item changes
within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -
qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the
time prescribed above shall result in automatic removal of the designation, effective immediately following
the twelve (12) months of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-71 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-71 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 5/20/2024 General Requirements - 11
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-72 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least two -hundred fifty
thousand dollars ($250,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder for projects greater than $250,000 and all subcontractors performing work
greater than $250,000 on a public works project are required to submit certified payroll utilizing the
federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days
after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft
for each employee. Certified payrolls shall be submitted electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 5/20/2024 General Requirements - 12
I. PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) N/A By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) NIA By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(iii) N/A By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(iv) N/A By checking this box, I hereby acknowledge that all subcontractors performing
work greater than $250,000 also meet the qualifications of the Responsible Bidder
Ordinance.
(b) Attachments:
(i) N/A Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) N/A Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) N/A List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) N/A For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization. This includes, but may not be limited
to, letters from apprenticeship coordinators detailing the bidder's association with
the program, and the United States Department of Labor Office of Apprenticeship
Certificates of Registration of Apprenticeship Programs for each type of work to be
performed on the project.
Version 5/20/2024 General Requirements - 13
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) X
By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) X
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) X
By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
X
upon request.
(iv)
By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(v) X
By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(vi) X
By checking this box, I hereby acknowledge that all subcontractors performing
work greater than $250,000 also meet the qualifications of the Responsible Bidder
Ordinance.
(b) Attachments:
(i) X
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) NSA
List identifying all former business names.
(iii) X
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) X
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
X
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v)
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(v) X
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization. This includes, but may not be limited
to, letters from apprenticeship coordinators detailing the bidder's association with
Version 5/20/2024 General Requirements - 14
the program, and the United States Department of Labor Office of Apprenticeship
Certificates of Registration of Apprenticeship Programs for each type of work to be
performed on the project.
(vi) X Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(vii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
(viii) NSA Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(ix) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date 04.2 .25
e
i
(Sig7Fe)
Doug Stout
(Print Name Here)
Bowen Engineering Corporation
(Name of Company)
8802 North Meridian Street
(Address of Company)
Indianapolis
(City)
IN
(State)
317-596-4654
(Telephone Number)
Version 5/20/2024 General Requirements - 15
1316 COUNTY-CIT-v BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
Date:
To:
From
Subject
PHONE 574/235-9251
FAN 574/ 235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND, JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
04-17-2025
All Planholders
Theresa Heffner, Clerk, Board of Public Works
Addendum Number: 1
Project Name: 123-031B Wastewater Treatment Plant WAS Thickening Improvements
Project No.:
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: 04.18.25
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
—no-c1lrnentS a n A heCnme a parrt� of hat-ein
va aa�a �. as a.
Company: Bowen Eng f eerin� Corporation
Authorized Signature:
Date: 04.18.25
Version 4/2/2015
Section I: EXPERIENCE QUESTIONNAIRE
VCU GSC WWTP Improvements
CEG Belmont WWTP GBT Piping Modifications
Shirley, IN WWTP Improvements
CEG Westfield WWTP Expansion
BOWEN
2025 Active Project List:
This list includes current active construction projects, with contracts in various stages of
completion.
Project Name
Location
Total Contracts
CEG Si nia Steam and Chilled Water Lines
Indianapolis, IN
$3,500,000
NAVFAC Crane ULTF
Crane, IN
$83,000,000
TN American Water Citico Station Switch ear
Chattanooga, TN
$5,000,000
16 Tech Watermain Relocation
Indianapolis, IN
$2,500,000
Heartwell Renewables Valentine
Hastings, NE
$17,500,000
Cedar Rapids Iowa WWTP Expansion
Cedar Rapids, IA
$346,000,000
NJ American Water Camden Morris-Delair WTP PFAS
Camden, NJ
$20,000,000
City of Lafayette CSO High Rate Treatment
Lafayette, IN
$51,000,000
VA American Water Hopewell Sed. Basin Replacement
Hopewell, VA
$8,400,000
Aqua Ohio Lake Darby Parshall Flume
Lake Darby
$1,000,000
City of Nashville 81h Avenue Reservoir Ph. 2
Nashville, TN
$40,000,000
City of Johnstown CMAR WWTP Upgrade
Johnstown, OH
$15,000,000
NJ American Water Canoe Brook PFAS Treatment
Short Hills, NJ
$41,000,000
Town of Cumberland WWTP Expansion & CSO Collections
Cumberland, IN
$35,000,000
NJ American Water Salem PFAS
Salem, NJ
$35,500,000
Kaiser Aluminum Wastewater Treatment Plant
Newburgh, IN
$9,000,000
City of Warrensburg, MO WWTP CMAR
Warrensburg, MO
$15,000,000
CEG Fall Creek CSO CCS
Indianapolis, IN
$54,000,000
Knoxville Utilities Board WTP Upgrades
Knoxville, TN
$66,000,000
City of Oak Ridge Water Treatment Plant
Oak Ridge, TN
$62,000,000
American Water Parkside D-B PFAS Removal
Camden, NJ
$8,800,000
Ameresco Norfolk Naval Shipyard CHIP & IWTP
Norfolk, VA
$50,400,000
CWS Danby WWTP
Charlotte, NC
$15,000,000
Knoxville Utility Board Water Treatment Plant Filters
Knoxville, TN
$65,000,000
OVEC/IKEC Clifty and Kyger ELG Projects
Cheshire, OH / Madison, IN
$28,000,000
Merrillville Conservancy District Madison St. Lift Station
Merrillville, IN
$4,500,000
Indiana American Water Winchester WTP
Winchester, IN
$23,000,000
City of South Bend WWTP CSO Basin & Clarifiers
South Bend, IN
$30,000,000
Fayette County, OH Honda Battery Plant WTP
Fayette County, OH
$28,000,000
CEG Elanco Steam Lines
Indianapolis, IN
$5,800,000
CEG IU School of Medicine Steam & Chilled Water Line
Indianapolis, IN
$8,300,000
Columbus Utilities Ph. 1 Elevated Tanks & Booster Station
Columbus, OH
$18,000,000
Georgia Power Plant Bowen Biological ELG
Cartersville, GA
$30,000,000
CEG Belmont and Southport Filter Replacement
Indianapolis, IN
$20,000,000
CEG Cherry Tree Water Treatment Tank
Westfield, IN
$5,100,000
Muncie Sanitary District
Muncie, IN
$4,500,000
TVA Gallatin Pre -Engineered Building
Gallatin, TN
$5,000,000
Bowen Capacity:
Bowen's Backlog Under Contract is as follows:
2025: $564,417,935
2026: $372,567,550
2027: $115,303,993
Bowen has capacity/staff to build Excess of $750 Million Annually. The team continues to grow,
adding 45 employees in the past year, with continued plans to hire. We are confident in the
team's ability to effectively staff and build your project.
Section I: EXPERIENCE QUESTIONNAIRE
4. Attach references from private firms for which you have performed work
Indiana American Water Company - Greenwood
Citizens Energy Group - Indianapolis
Duke Energy Indiana - Indianapolis
Jared Burnett 317.885.2428
Matt Thomas 812.664.2779
Adam Williams 812.664.277
BOWEN
Section II: Plan and Equipment Questionnaire
1. Plan or layout for performing proposed work:
The proposed jobsite was inspected by our Operations and Preconstruction teams
during the pre -bid and prior to the bid submittal. During a jobsite visit, attention is
directed to the existing conditions and site access. Once awarded the project, Bowen
Engineering Corporation will perform extensive preplanning activities and develop a
detailed project schedule.
We intend to construct the job generally in line with the recommended construction
sequencing plan presented on Sheet C-001 and as follows:
A. Upon award of work, begin purchase and submittal process of all long -lead
equipment and materials.
B. Mobilize on site and install necessary erosion control.
C. Work with the City of South Bend to shut down DAF units 2 & 3.
D. Demolish DAF units 2 & 3 and install new GBT units, new Polymer Feed system,
and associated piping.
E. In parallel with installing the new GBT units, demolish and install the new Sludge
Thickening Pumps one at a time.
F. Test and commission new GBT units and Polymer Feed system. Bring the systerr
online.
G. Demolish remaining DAF unit 1 and existing chemical systems.
H. Perform all surface restoration.
I. Demobilize from the site.
BOWEN
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that
you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor.
WORK
SUBCONTRACTOR NAME
ADDRESS
CITY
STATE
ZIP
PHONE
FAX
Paving
Calumet Asphalt
5266 E. 96th Street
Indianapolis
Indiana
46240
317.571.8900
317.571.8924
Paving
Reith Riley
3425 O'Ferrall Road
Lafayette
Indiana
47905
765.447.2324
765.448.1053
Fence
Capitol City Fence
920 E. Ohio Street
Indianapolis
Indiana
46202
317.638.3381
317.686.2233
Fence
Imperial Fence
100 Academy Street
Greenwood
Indiana
46142
317.888.3241
317.881.1396
Landscaping
Rose Seeding and Sodding
3718 Crescent Road
Charlestown
Indiana
47111
812.256.4323
812.256.5163
Landscaping
Slusser's Green Thumb
125 Montgomery Street
Logansport
Indiana
46947
574.7223102
574.722.2993
Rebar Erection
Harmon Steel
1002 W. Troy Street
Indianapolis
Indiana
46225
317.780.5025
317.780.5030
Rebar Erection
Delta Steel
10860 Paddy's Run Road
Harrison
Ohio
45030
513.738.1232
513.738.1244
Masonry
Purdy Masonry
7601 Indianapolis Road
Zionsville
Indiana
46077
317.769.4673
317.769.4693
Masonry
Whaley
4810 West State Road 45
Bloomington
Indiana
47403
812.825.5536
812.825.4137
Roofing
Nu-Tec
5025 Emco Drive
Indianapolis
Indiana
46226
317.255.4464
317.255.0692
Doors and Windows
Tri-County Glass and Mirror
231 Legends Creek Way,#205
Indianapolis
Indiana
46229
317.626.0428
317.898.9866
Doors and Windows
Architectural Sales
600 N. 6th Avenue
Evansville
Indiana
47706
812.423.6891
812.421.3788
Painting
Howard Painting
1740 Spruce Street
Defiance
Ohio
43512
419.782.7786
419.782.0353
Instrumentation
Integrity
7992 Black Oak Drive
Plainfield
Indiana
46168
317.839.1000
317.837.7418
Instrumentation
Precision
501 TechneCenter Drive, Suite C
Milford
Ohio
45150
317.241.3000
317.247.6837
Instrumentation
Scadaware
1602 Rhodes Lane
Bloomington
Illinois
61704
309.665.0135
309.665.0975
HVAC
Bright Sheet Metal
4212 West 71 st Street
Indianapolis
Indiana
46268
317.291.7600
317.291.7604
HVAC
CK United
5 East Riverside Drive, Suite 9
Evansville
Indiana
47713
812.423.5090
812.423.5499
Electrical
Miller-Eads Co, Inc.
4125 North Keystone Avenue
Indianapolis
Indiana
46205
317.545.7101
317.545.4660
Electrical
Huston Electric
2723 Old Romney Road
Lafayette
Indiana
47909
765.474.6115
765.474.6071
Electrical
Austgen Electric
P.O. Box 195
Griffith
Indiana
46319
219.922.2078
219.922.2788
Excavators
•
2024 Caterpillar 352X
•
2020 Caterpillar 323 X (2)
•
2024 Caterpillar 308X
•
2020 Caterpillar 336 X
•
2024 Caterpillar 315X
•
2019 Caterpillar 374FL
•
2024 Caterpillar 340X (2)
•
2019 Caterpillar 349 F
•
2023 Caterpillar 340X
•
2018 Caterpillar 336FL
•
2023 Komatsu PC360L-CI
•
2018 Caterpillar 336F (1)
•
2023 Caterpillar 349X
•
2018 Caterpillar 326F (1)
2023 Caterpillar 336X (2)
•
2017 Caterpillar 336E (2)
•
2022 Komatsu PC360L-CI
•
2017 Caterpillar 320E
•
2021 Caterpillar 336 X (4)
•
2016 Caterpillar 326F
•
2021 Caterpillar 308 T
•
2016 Caterpillar 308E2
•
2021 Komatsu PC360L-CI
•
2012 Caterpillar 305 E CR
•
2021 Takeuchi TB-260-CL
Wheeled and Track
• 2024 Caterpillar 938M (8)
• 2023 Caterpillar 938M (3)
• 2022 Caterpillar 938M (3)
• 2021 Caterpillar 938M
• 2021 Caterpillar 930M
• 2020 Caterpillar 930M
Loaders
• 2019 Caterpillar 963K
• 2019 Caterpillar 930M (2)
• 2018 Caterpillar 930M
• 2017 Caterpillar 930M (3)
• 2004 Caterpillar 961 C (2)
Cranes
• 2024 Grove 765E-2 (2)
• 2023 Grove 765E-2 (2)
• 2021 Grove 765E-2 (3)
• 2019 Grove 765E-2
• 2017 Grove 765E-2 (2)
• 2016 Grove 765E-2
• 2015 Manitowoc M-12,000
• 2015 Grove 765E-2
• 2014 Grove 765E-2
Rubber Tired Backhoes
• 2021 Caterpillar 420F IT
• 2019 Caterpillar 420F IT (4)
• 2018 Caterpillar 420F IT (4)
• 2015 Caterpillar 420F IT (5)
• 2013 Caterpillar 420F IT
Dozers and Skid Steers Drill Rigs
• 2018 Caterpillar D5K LGP • 2024 Caterpillar 265 (7) • 2018 CZM EK125 Drill Rig
• 2017 Caterpillar D5K (2) • 2024 Caterpillar 279D3 (2) • In -House Sheeting,
• 2017 Caterpillar D6N LGP • 2023 Caterpillar 279D3 (6) Dewatering Services
• 2023 Vermeer Walk Behind (3)
• 2022 Caterpillar 279D3
• 2022 Takeuchi TLBRD (2)
• 2021 Caterpillar 279D3 (2)
• 2020 Caterpillar 279D3 (2)
• 2020 Takeuchi TL10V2
• 2019 Caterpillar 279D3 (3)
Compactors
• 2017 Caterpillar CS44
• 2014 Caterpillar CS44
• 2004 Caterpillar CS433E Roller
Water Trucks
• Ford 2000 Gallon Water Trucks (3)
ATV Trucks
• 2020 CAT 730 (1)
Trac Fusion Machine
• 2023 McElroy - Series 2 (1)
• 2022 McElroy - Series 2 (2)
• 2021 McElroy - Series 2 (1)
• 2020 McElroy - Series 2
• 2019 McElroy - Series 2
• 2018 McElroy - Series 2
In addition to the heavy equipment listed above, Bowen owns and maintains a
significant fleet of medium tools including: Various implements, Generators, Trailers,
Medium Tools Conexes, Welding Equipment, Fusion Machines, Trenchers, Shoring Systems,
Sheeting Systems, Pumps, Concrete Vibrators, Heaters, Utility Carts, Radios,
Troweling Machines, Scaffolding, Pipefitter Equipment, Hoists, Compressors, Field
Worker Boxes. We're happy to provide more specific information upon request.
........................................................................................................................................
Suppliers
Equipment is maintained and delivered to project sites from Bowen's Fairland, IN shop.
By way of Bowen's Fleet of Highway Haul Trucks.
In addition to Bowen owned equipment, we maintain a strong relationship with the following suppliers for equipment rentals.
If you prefer, we are happy to work with equipment suppliers local to your project.
0 United SUNBELT I � MAL�M
Rentals RENTALS ��ER OVER 65 YEYRS OF SERVICE
Crane Works, L.P.
CITY OF SOUTH BEND This completed form is an adapted Form MBE-2.1 MBE Contacted Form that is supplied with Bids taht pertain
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's
sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
FORM TO BE ATTACHED TO BE MBE-2.1
Project Number: 123-031B MBE Participation Goal 1.98%
Project Name: South Bend WWTP WAS Thickening Improvements
Bidder: Bowen Engineering Corporation
SEE FRONT PAGE FOR SIGNATURE
MBE FIRM
OWNER/CONTACT
PHONE
FAX
EMAIL
TYPE OF WORK
RESULTS OF CONTACT
AD Distribution LLC
Marlon Gill
317-447-1524
ADdustribution@usa.com
Pipe Supply
Proposed
Thompson Distribution Co., Inc.
Johnny Lynch
317-923-2581
317-923-4819
iohnnyl@thomdist.com
Exposed Process Pipe Supply
Non responsive
Team Cruiser
Christopher Barney
317-423-2430
317-423-8963
cbarney@teamcruiser.com
Flanged Ductile Iron Pipe Supply
Proposed
D.A. Dodd, LLC
Ben Mikel
574-968-0589
574-968-0590
benmikel@dadodd.com
Plumbing Contractors
Non responsive
C.Lee Construction Services, Inc.
Frederick Lee
219-888-9554
219-888-9564
clee@cleecsi.com
Demolition
Non responsive
Fox Contrators Corporation
Nik Knoblauch
260-747-7461
260-747-7717
nkoblauch@foxcontractors.com
Demolition
Non responsive
HG Metals
Cynthia Gardner
317-351-9500
317-351-9504
cgardner@hgmetals.com
Structual Steel Framing/Fab/Supply
Non responsive
Sheild Coatings, LLC
Keenan Darby
317-490-6491
keenan.darby@shieldcoatingsindy.com
Coatings
Proposed
Robert Haines Co
Kevin Wilson
317-547-5271
kevin@roberthainesco.com
Rehabilitaion of Cast -in -Place Concrete
Proposed
CITY OF SOUTH BEND This completed form is an adapted Form MBE-2.1 MBE Contacted Form that is supplied with Bids taht pertain to
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole
responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
FORM TO BE ATTACHED TO BE WBE-2.1
Project Number: 123-031B WBE Participation Goal 4.56%
Project Name: South Bend WWTP WAS Thickening Improvements
Bidder: Bowen Engineering Corporation
SEE FRONT PAGE FOR SIGNATURE
WBE FIRM
OWNER/CONTACT
PHONE
FAX
EMAIL
TYPE OF WORK
RESULTS OF CONTACT
BUC Constuction Supply
Teresa Butler
765-412-3484
765-412-3484
tc@bucconstructionsupply.com
Pipe Supply
Propopsed
Service Pipe & Supply
Justin Bennett
317-639-9308
317-639-4567
jordans@servicepipe.com
Pipe Supply
Propopsed
FloSource, Inc.
Austin Musial
765-342-1360
765-342-1361
amusial@flosource.com
Process Valve Supply
Propopsed
Circle R Mechanical, Inc.
C Shaffer
219-787-5566
219-787-5567
cshaffer@circlermechanical.com
Plumbing Contractors
Non responsive
Coleman Insulation Company
Melissa Coleman
219-929-6492
colemaninsulation@frontier.com
Plumbing Insulation
Propopsed
Ritschard Bros., Inc.
Don Ritschard
574-288-4777
574-288-5438
rit1204@datacruz.com
Demolition
Non responsive
Chicago Decking
Jim Clutter
219-947-3939
219-947-7215
jclutter@chicagodecking.com
Structural Steel Framing/Fab/Supply
Non responsive
Deco Coatings, Inc.
Laura Blechl
317-889-9290
317-737-2027
laurab@decocoatings.com
Coating/Painting
Declined
Foundation Steel, LLC
Greg Martin
419-402-4241
419-402-4248
gregmartin@foundationsteel.net
Structural Steel Framing/Fab/Supply
Declined
Freedom Rebar & Concrete Supply Inc.
Jim Rhoads
574-551-1545
iim@freedomrebar.net
Reinforcing Steel/Fab/Supply
Propopsed
Jewel Contracting
Peri Mason
574-400-9194
peri@lewelcontactingllc.con
Painting/Coating
Declined
Reece Rebholz Co., Inc
Jeff Scroggins
317-359-0633
317-359-0642
ieff@rebholzinc.com
Painting/Coating
Accepted
Venus Painting, CO
Tony Tsahas
219-531-9364
tong@venuspainting.com
Painting/Coating
Non responsive
Martell Electric, LLC
Andy West
574-271-5000
571-271-4468
estimating@martellelectric.com
Electrical Contractors
Declined
McMann Electric, Inc
Terri Mcmann
574-674-5748
574-674-5739
terimcmann@mcmannelectric.com
Electrical Contractors
Declined
Tesco Solutions
Kris Bowen
317-537-2410
kbowen@tesco-solutions.com
Construction material supplier
Propopsed
LOCAUG
South Bend Tribune I The Herald Times PO Box 630485 Cincinnati, OH 45263-0485
The Times -Mail ( Evening World
The Reporter Times
AFFIDAVIT OF PUBLICATION
Bowen Engineering Corporation
8802 north Meridian Street
Indianapolis IN 46260
STATE OF INDIANA, COUNTY OF ST JOSEPH
The South Bend Tribune, a newspaper printed and published in
the county of St Joseph, in the State of Indiana, and personal
knowledge of the facts herein state and that the notice hereto
annexed was Published in said newspaper in the issue dated:
04/04/2025, 04/11/2025
and that the fees charged are legal.
Sworn to and subscribed before on 04/11/2025
�Z-�
My commission expires
Publication Cost: $150.06
Tax Amount:
$0.00
Payment Cost:
$150.06
Order No:
11193753 # of Copies:
Customer No:
1523562 0
PO #: LSBN0270910
THIS IS NOT AN INVOICE!
Please do not use this form Jor payment remittance.
„,�,� �1 SPPLLEP,
NotaryV.Public
*. 0{ V
lSC0nSm
a l'_'t
Page 1 of 3
NOTICE TO BIDDERS
Bowen Engineering Corpora-
tion (a General Contractor)
An Equal Employment Oppor-
tunity Employer is seeking
Certified MBE/WB E owned
business bids for the South
Bend, IN WWTP WAS Thick-
ening P ro i ect. Subcontract-
ing opportunities available
are for Demolition, Trucking,
Seeding, Concrete, Reinforc-
ing Steel Placement, Misc.
Metal Fabrications, Painting,
Process Pipe & Valves,. Instru-
mentation/Controls and Elec-
trical. Interested and Certified
MBE/WBE business parties
should contact Matt Carlin at
matthew.carlin@bowenengi-
neering.com to discuss subcon-
tracting opportunities. All bids
and applicable XB E documen-
tation must be submitted on or
before April 17, 2025 @ 12pm
EDT. Plans are available for
viewing at Bowen Engineer-
ing Corporation, at http://
SUb-s.0 VV�IICI1�111CC1 '1I�...vo
planroom/ .Job Name: sbwas
Password: sbwas
****Please return the required
documents that will be listed
in the plan room. ****
HSPAXLP
April 4,, 11 2025
LSB N0270910
From: Elaine Dabney
To: Matthew Carlin
Subject: FW: Thank you for placing your order with us.
Date: Tuesday, April 1, 2025 2:32:08 PM
See below
Elaine Dabney
Estimating Coordinato
Bowen Engineering Corporation
8802 North Meridian Street
Indianapolis IN 46260
Phone: 317-915-6809
www.BowenEnaineerina.com
RESOURCEFUL • RESPONSIVE • RESULTS
This message contains information from Bowen Engineering Corporation that may be confidential or privileged. The information is intended to be for the use of the individuals) named
above. If you are not the intended recipient, please be aware that any disclosure, copying, distribution or use of the contents of this message is prohibited. If you have received this
electronic transmission in error, please notify us by email immediately.
From: South Bend Legals <legals@sbtinfo.com>
Sent: Tuesday, April 1, 2025 2:31 PM
To: Elaine Dabney <elaine.dabney@bowenengineering.com>
Subject: Thank you for placing your order with us.
This Message Is From an Untrusted Sender
You have not previously corresponded with this sender.
If the sender is an employee of Bowen Engineering, please consider the possibility of email phishing and validate with them directly before replying,
clicking on links or opening attachments.
THANK YOU for your ad submission!
This is your confirmation that your order has been submitted. Below are the details of your transaction. Please save this confirmation for your records.
We appreciate you using our online self-service ads portal, available 24/7. Please continue to visit South Bend Tribune's online Classifieds HERE
Ileegals.gannettclassifieds.com] to place your legal notices in the future.
Changes and/or cancellations may not be honored up to 2 business days prior to your first
publication date.
Job Details
Order Number: LSBN0270910
Classification:
Bids & Proposals
Package:
General Package
Additional Options:
1 Affidavit $12.50
Base amount:
$150.06
Service fee:
$5.99
Cash/Check/ACH
A
Discount:
-$0.00
Total payment:
$156.05
As an incentive for customers, we
provide a discount off the total order
cost equal to the 3.99% service fee if
you pay with Cash/Check/ACH. Pay by
Cash/Check/ACH and save! In no
event are service fees refundable.
Payment Type:
mastercard
Account Details
Elaine Dabney
8802 north Meridian Street
Indianapolis, IN A 46260
317-842-2616
elaine.dabney@bowenengineering. com
Bowen Engineering Corporation
Credit Card - mastercard
******---0293
Schedule for ad number LSBN02709100
Fri Apr 4, 2025
South Bend Tribune
All Zones
Fri Apr 11, 2025
South Bend Tribune
All Zones
O WiEN
BID DOCUMENT SIGNING RESOLUTION
_'� (5 n
Resourcehil Nespon a P—IM
I HEREBY CERTIFY that I am the Secretary of Bowen Engineering Corporation and that on the date of
February 1 ", 2023, and in accordance with the By -Laws, the Board of Directors of Bowen Engineering
Corporation, a Corporation duly organized and existing under the laws of the State of Indiana, duly adopted a
resolution that has not been rescinded or modified, and reads as follows:
RESOLVED THAT, A. Douglas Bowen, and/or Aaron Purdue, and/or Ed Storrs, and/or John Dettman, and/or
William Fyffe, and/or Jameson Pearson, and/or Jason Lemire, and/or Steve Gladding, and/or Chris Manges,
and/or Matt Gentry, and/or Adam Kluemper, and/or Doug Stout, and/or Eric Beier are hereby employed to
submit project bid documents less than $10,000,000 on behalf of Bowen Engineering Corporation.
I FUTHER CERTIFY that the following named persons are the officers of said Corporation, duly qualified and
now acting as such:
PRESIDENT & CEO
VICE PRESIDENT of OPERATIONS
VICE PRESIDENT of OPERATIONS
VICE PRESIDENT of OPERATIONS
VICE PRESIDENT of OPERATIONS
REGIONAL MANAGER
REGIONAL MANAGER
REGIONAL MANAGER
OPERATIONS MANAGER
OPERATIONS MANAGER
ESTIMATING MANAGER
ESTIMATING MANAGER
ESTIMATING MANAGER
A. Douglas Bowen
Aaron Purdue, P.E.
Ed Storrs
John Dettman
William Fyffe
Jameson Pearson
Jason Lemire
Steve Gladding
Chris Manges
Matt Gentry
Adam Kluemper
Doug Stout
Eric Beier
IN WITNESS THEREOF, I have hereunto subscribed my
name and affixed the seal of said corporation this I" day of
February 2023.
Carey Weddle, Secretary / Treasurer
8802 North Meridian Street
Indianapolis, Indiana 46260
State of Incorporation: Indiana
8802 North Meridian Street - Indianapolis, IN 46260 • P: 317.842.2616 • F: 317.841.4257 • www.bowenengineering.com
State of Indiana
Office of the Secretary of State
CERTIFICATE OF EXISTENCE
To Whom These Presents Come, Greeting:
I, DIEGO MORALES, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of
the State of Indiana, the custodian of the corporate records and the proper official to execute this
certificate.
I further certify that records of this office disclose that
BOWEN ENGINEERING CORPORATION
duly filed the requisite documents to commence business activities under the laws of the State of
Indiana on September 05, 1967, and was in existence or authorized to transact business in the State of
Indiana on April 01, 2025.
I further certify this Domestic For -Profit Corporation has filed its most recent report required by
Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of
withdrawal, dissolution, or expiration has been filed or taken place. All fees, taxes, interest, and
penalties owed to Indiana by the domestic or foreign entity and collected by the Secretary of State
have been paid.
%STATc
I*
isr
In Witness Whereof, I have caused to be affixed my
signature and the seal of the State of Indiana, at the City
of Indianapolis, April 01, 2025
Me No, *,- �
DIEGO MORALES
SECRETARY OF STATE
194527-021 / 20254327373
All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate
Expires on May 01, 2025.
2025 SAFETY OVERVIEW
t
�r
+yn p ,,yam
AN-t.
PILLARS OF BOWEN'S SAFETY CULTURE
■ Genuine concern for others
• Model the way / leadership by example
■ Use of STOPP (Stop. Think. Observe. Plan. Proceed)
■ Celebrate active reporting of near -miss and good catch
• Don't Be A Spectator
■ SQP Lean Construction: planning, communication and
accountability to drive safety into projects
• Partnership with owners to learn and share lessons learned
■ Subcontractor participation in planning, orientation, daily meetings
■ Communication of safety events and trends across organization
• Executive participation and ownership of safety
0.64 13 YRS 0.37 0.12
2024-2025 EMR TRIR < 1.0 2024 TRIR 2024 DART RATE
BOWEN
4-4
2025 AREAS OF CONTINUOUS IMPROVEMENT
• Participate in Contruction Safety Week - "Value Every Voice"
• Expanded use of Good Catch and Near Miss reporting as primary
safety metric within the organization
• Digital QR Submission of Good Catch and Near Misses
• Expanded use of technology and video to more clearly communicate
lessons learned and best practices
• Addition of full-time safety training manager
• Improvement on 2024 Safety Hours Trained
• Increased focus on the hazards of stored energy
• Better digital tracking of Safety Training Records
• Z Company -Wide superintendent meetings exclusively dedicated to
reviewing near -miss events and implementing corrective measures
&PRODUCTIONIU.UT1
325 SAFETY OVERVIEW e
Ad&
_djjijj1Mjjjjj&
OSHA Metrics
Total Hours
2022•
1,427,195
1,421,251
1,617,843
Number of OSHA Recordable Cases
5
4
3
OSHA Recordable Rate (TRIR)
0.70
0.56
0.37
Days Away & Restricted Time (DART) Cases
2
1
1
Days Away & Restricted Time (DART) Rate
0.28
0.14
0.12
Number of Days: Days Away & Restricted Time
105
180
180
Fatalities
0
0
0
ADDITIONAL DOCUMENTS AVAILABLE:
Full Safety Manual, OSHA 300/300A Logs, EMR
Letter, Training Overview, Drug and Alcohol Policy,
Safety Culture Overview
TRAININGS PROVIDED TO EMPLOYEES:
OSHA 1OHR, OSHA 30HR, OSHA 500,
Competent Person, CPR/First Aid, Incident
Investigation, Hazard Identification, POCT, Job
Site Orientation, New Hire Orientation, SQP Lean
Construction, Hazard Recognition, FTE Competent
Person Training
ACTIVE ON PREQUALIFICATION SERVICES:
*
��Wood
ackenzie Ah, Avetta
0:�L 0-*4
. j
Ar
are some
projects more
successful
than others?
I
�f
n T �
e
Ll
Don't just
hire a
contractor.
Hire leadership
to deliver
results on
your project.
Alignment of individuals around
a common goal
A culture where people can be the most
successful version of themselves
-�_ ■ irw_
• � �■�■�■� �■- .
�-
� �� ®_....: _� •_
����,■¥■
111MOOR-
illallsk,.� ,.._E '
����-§�Z;a/
/.
.. ■
.
� �.
�
2me:
.
�/�
What if Vou had a construction partner
: w h o could get eve rVo n e on t h e same page —
a n d keep them there?
�
ENGINEERING
AND CRAFT...
BETTER TOGETHER
Match degreed engineers with experienced
craft to learn, grow and succeed together.
True collaboration to solve problems with smart,
safe and cost-effective solutions.
Everyone contributes with an equal voice
and the best approaches win.
Site -Civil
• Site work
• Underground Piping
• Concrete Foundations/Walls
• Cast & Post Tensioned Tanks
• Valve, Metering & Air Releases
• Sheeting & Shoring
Structural
• Structural Steel
• Pre -Engineered Metal Buildings
• Handrail & Access Stairs
• Critical Lift Planning & Design
• Modular Pipe Racks & Equipment Skids
BOWEN +
LOCAL CRAFT...
THRIVING TOGETHER
Extensive recruitment network
to find and hire the best local craft.
Training on core values, operations,
equipment and safety on day one.
Mechanical / Boilermaker
• Process Tanks & Stacks
• Process Mechanical Piping
• Chemical Feed /Aeration Piping
• Process Instrumentation
• Process Boilermaker Ductwork
• Conveyors
Focus on the single mission
and a culture of involvement.
Equipment
• Process Equipment
• Water Treatment Equipment
• Power / Energy Equipment
• Conveyors
• Boilermaker / Burner Management
fir.► � y�4ja
RES
y 721
� •ir� ate. _ i,` r . x
What if you had a proactive
construction partner that
never ran away from a problem?
K��1■ AHEAU . 4WEEK Wt.....�1ERa � a.weErt i00r .n .... .... _... � S^�
f.. ow
ISTRUCTURED COMMUNICATION F:
THAT DRIVES ACCOUNTABILITY
All client personnel have assigned
Bowen counterparts.
Single point of accountability for project control.
Access to Bowen senior management through our
project Executive Sponsors.
Bowen strives for mutual trust and respect
with customers, partners, and employees
who share these values and practices.
_Jk.
IV
Zero injury
and genuine
concern for
others
1�f
L..
CONNECTED CONSTRUCTION,
A BETTER WAY TO BUILD
Pads replace paper blueprints and documents to
increase productivity, reduce rework, and keep
our supervision at the workface.
Real time updates and access to
the latest project drawings and
documents.
Safety, quality and productivity
status available via online
k _ i 'n, reporting.
IV
Continuous
improvement
IV
Enthusiastic
teamwork &
celebration
IV
Never walk
away from
a problem
S
R
P
QUALITY
• Engaged from Beginning to End
• Last 5%
• Never Walk Away From a Problem
SAFETY
• Genuine Concern
Model the Way
STOPP
I
QUALITY PRODUCTION
SQP. You need all 3.
PRODUCTION
• Engaged & Empowered Craft
• Solution Focused
• Culture of Continuous Improvement
wen SQP is a proven repeatable lean construction
)cess that eliminates waste and drives Results.
u get a highly engaged, bought -in,
d accountable team - and most importantly
a great project outcome, every time.
•
0 Operation Capable States
EMPLOYEE THE TOP
OWNED 400
CONTRACTORS
ODING ENR
1967DATUEN
NBIC
Advanced Certified A-�_VjE S Stamp R Stamp
Steel Erector PP Stamp NB Stamp
p
MARKETS
• Municipal Water / Wastewater
• Industrial Water / Wastewater
• Fossil Power
• Industrial
• Renewable Energy
• Mining & Metals
• Oil, Gas & Chemical
• Nuclear Energy
WATER
PROJECT TYPES
• Physical Chemical Treatment
• Biological Treatment
• Ion Exchange
• Membranes: OF/Nano/RO
• Zero Liquid Discharge
• Trace Metal Removal
• Recycle/Reuse Water
• Drinking Water Storage
• PFAS Treatment
• Chemical Piping
• Cooling Towers
• Anaerobic Digestion / Biogas
• W/WW Outage Work
• Pump Stations
• Stormwater / CSO Management
SELF -PERFORM
CONSTRUCTION
• Sitework
• Underground Utilities
• Concrete Foundations
• Structural Steel
• Equipment Setting
• Process Mechanical
• Boilermaker
• Conveying Systems
• Pile Driving
• Sheeting
• Dewatering
ENERGY &
INDUSTRIAL
PROJECT TYPES
• Air Quality Projects
• Ash Conversions
• Combined Heat and Power
• ELG Wastewater Treatment
• FGD Wastewater
• Fuel Conversions
• Gas Combined -Cycle
• Gas Simple -Cycle
• Industrial Process
• Outage Work and Turnaround Work
• SCR / Baghouse / Precip
• Wind Farm Projects
a
•
B6 IV
% 5
Qv
Resourceful. Responsive. Results.
www.bowensgp.com
WATER/WASTEWATER EXPERIENCE
SELF PERFORM CONSTRUCTION CAPABILITIES
MARKETS
■ Municipal Water
• Municipal Wastewater
■ Fossil Energy
• Mining
■ Oil, Gas & Chemical
• Industrial Process
■ Steam and Chilled Water
ASSOCIATED CAPABILITIES
■ Physical Chemical Treatment
• Biological Treatment
■ Ion Exchange
• Membranes: OF/Nano/RO
■ Zero Liquid Discharge (ZLD)
■ Gravity Sewer
■ Force Main
BOWEN
• Pump Station / Lift Station • Outage/Shutdown Work
• Trace Metal Removal • Dam and Spillway
• Drinking Water Storage • Flood Walls
• EPA ELG Treatment ■ Stormwater Management
• Chemical Piping • Ponds and Lagoons
■ Cooling Towers ■ CSO Management
• Anaerobic Digestion Biogas • PFAS/PFOS/PFOA Removal
Bowen has spent over 50 years providing critical water and wastewater
infrastructure to communities and private owners across the country. We have
worked with and installed every major technology, treatment process, and are ready
to bring this expertise to your project.
Wastewater Treatment
Bowen consistently works with Physical, Chemical, Biological, Membrane, UV
systems to provide new treatment facilities or critical upgrades to existing facilities.
Sewer Infrastructure
Bowen is at work across the country upgrading sewer infrastructure. Through
stormwater/sewer water separation, or through holding tanks or basins, we are
supporting communities in eliminating CSO events into community waterways.
Bowen also supports upgrades and ongoing maintenance of collection systems to
support population and community growth.
Municipal Water Treatment and Distribution
Bowen has constructed water treatment and distribution systems over 50 years. We
have built new facilities and upgraded facilities nearing 100 years in age. In addition
we have extensive experience with steam and chilled water lines. Bowen has
extensive experience with PFAS/PFOS/PFOA removal.
Industrial Water and Wastewater
Bowen has built Industrial Water and Wastewater solutions for Mining, Chemical,
Automotive, Food and Beverage, Pharmaceutical, Steel and Power markets. We
have applied every available treatment process and have treated the toughest
constituents.
pr ''
BdWENResourceful. Responsive. Results.
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
PER (b) Attachment:
(v) Bowen Engineering Corporation states that individuals who will perform work on the public
work project on our behalf will be properly classified as an employee or as an independent
contractor under all applicable state and federal laws and local ordinances.
8802 North Meridian Street • Indianapolis, IN 46260 • P: 317.842.2616 • www.bowensgp.com
INDIANA LABORERS' TRAINING TR UST FUND
David A. Frye
Secretary -Treasurer
Jerry J. Bolk
Chris Brickey
Ricky Henson, Jr.
Ramon Mendoza, Jr.
Brian Short
P.O. Box 758 - Bedford, Indiana 47421
(812)279-9751
April 4, 2025
To Whom It May Concern:
Sean Coakley, Director
John P. Brown
Chairman
Kelly Abel
Michael Ferrara
Jade Painter
Nick Timmerman
Jim Wiseman
FAX: (812) 279-5545
Toll Free (800) 742-4086
This letter is to confirm that "Bowen Engineering" is a signatory contractor in good standing
with the Indiana Laborers' Training Trust Fund.
The above -mentioned company is a participant in the Joint Apprenticeship and Training
Committee through this Union and has been an active participant in good standing for each of the
past five plus consecutive years, and is currently eligible to use our apprentices on a project.
Further, our organization's program is approved by the U.S. Veterans Administration to
participate in the GI educational benefits program. A copy of our approval letters are attached
along with the collective bargaining agreement stating the ratios of Journey workers to
Apprentices; which is one (1) Apprentice for every five (5) Journey workers and thereafter may
not employ more that (1) Apprentice for every (3) Journey workers.
Sincerely,
Sean Coakley,
Director
SC:ap
www.indianalaborerstraining.org
tp
k F1�
Vureau of Apprrnttres4tV unb 01rutntng
Trrttftratr of Reptstrattion
INDIANA LABORER'S TRAINING TRUST FUND
BEDFORD, INDIANA
for the trade classification of CONSTRUCTION CRAFT LABORER
Re yisfereo'( as parf o� Elie Xafional .Wppreniiceslip JTro_yram
in accordance wifli I& basic slandarrdsr of apprenficeslip
December 14, 1995
D.le
esfa6lisl eo( 6y Elie c3ecrefarr, of Labor
CSzm aig of -ns.c
IN040-0528 ,y
,%2eyv1ra1ion X0. 1�1 eto¢, �u2cau of cff��,u�trc and'7�avetag
STATE OF INDIANA
DEPARTMENT OF VETERANS AFFAIRS
STATE APPROVING AGENCY
402 WEST WASHINGTON STREET ROOM W469
INDIANAPOLIS, INDIANA 46204-2738
Jeremy Brewer
Apprenticeship Coordinator
Indiana Laborers Training Trust Fund -Apprenticeship
439 Patton Hill Rd.
Bedford, IN 47421
Dear Jeremy Brewer,
Eric Holcomb, Governor
James M. Brown, Director
January 9, 2019
This will acknowledge receipt of your updated Wage Scale for the Construction Craft Laborer program
offered by Indiana Laborers Training Trust Fund -Apprenticeship. The State Approving Agency has reviewed
the document as listed below:
Wage Scale: Construction Craft Laborer
FACILITY CODE: 30004114
To the best of my knowledge Indiana Laborers Training Trust Fund -Apprenticeship does not utilize erroneous
or misleading advertisement, either by actual statement, omission, or intimation. It is understood by Indiana
Laborers Training Trust Fund -Apprenticeship that they will maintain a complete record of all advertising
utilized by or on behalf of the Indiana Laborers Training Trust Fund -Apprenticeship in regards to their
training programs during the preceding 12 months. Indiana Laborers Training Trust Fund -Apprenticeship's
advertising will be available for review by any and all future supervisory visits by the SAA, or the U.S.
Department of Veteran Affairs.
Please Review the entire packet for content and accuracy. Approval is granted pursuant to the provisions of
Title 38, U.S. Code 3687, with an effective date of April 1, 2018.
If you have any questions, please feel free to give me a call at 317-232-3916 or email me at
tgriffin@dva.in.gov. Thank you for what you do for our Veterans, and have a great day!
Sincerely,
1,2
Taniqua Griffin
Program Director
State Approving Agency
Cc: VARO/ELR
` 9 2Qj�
STq
A
STATE OF INDIANA
DEPARTMENT OF VETERANS AFFAIRS
STATE APPROVING AGENCY
402 WEST WASHINGTON STREET ROOM W-469
INDIANAPOLIS, INDIANA 46204-2738
Jeremy Brewer
Apprenticeship Coordinator
Indiana Laborers Training Trust Fund -Apprenticeship
439 Patton Hill Rd.
Bedford, IN 47421
Dear Jeremy Brewer,
Eric Holcomb, Governor
James M. Brown, Director
January 9, 2019
The Indiana State Approving Agency conducted a supervisory visit on 01/8/2019 at Indiana
Laborers Training Trust Fund -Apprenticeship. The purpose of the visit was to provide training to
the Certifying Officials and review enrollment certifications, record retention and reporting
procedures.
The organization demonstrated proper record maintenance and record maintenance and reporting
procedures. During the visit, we discussed the importance of reporting hours on a monthly basis,
good record keeping techniques, and how to report a leave of absence or completion via VA Form
22-1999b. We also updated the Certifying Officials via VA Form 22-8794, work processes, and
wage scale.
If you need any assistance or have any questions regarding this technical visit please contact me
directly at tgriffm@dva.in.gov or (317) 232-3916. Thank you for the courtesy extended during my
visit. The education and training opportunities that your organization continues to provide veterans
and their dependents are appreciated.
Sincerely,
Taniqua Griffin
Program Director
Phone (317)-234-6062 Toll Free (800)-400-4520 Fax (317)-234-8744
STATE OF INDIANA
DEPARTMENT OF VETERANS AFFAIRS
STATE APPROVING AGENCY
402 WEST WASHINGTON STREET ROOM W-469
INDIANAPOLIS, INDIANA 46204-2738
Jeremy Brewer
Apprenticeship Coordinator
Indiana Laborers Training Trust Fund -Apprenticeship
439 Patton Hill Rd.
Bedford, IN 47421
Dear Jeremy Brewer,
Eric Holcomb, Governor
James M. Brown, Director
January 9, 2019
This will acknowledge receipt of your revised Work Processes for the Construction Craft
Laborer program offered at Hoosier Energy, located in Bedford, Indiana. The State Approving
Agency has reviewed the document as listed below:
TRAINING PROGRAM LENGTH DOT CODE
Construction Craft Laborer
FACILITY CODE: 30004114
4,000-7800 hours 47-2061.00
To the best of my knowledge Indiana Laborers Training Trust Fund -Apprenticeship does not utilize
erroneous or misleading advertisement, either by actual statement, omission, or intimation. It is
understood by Indiana Laborers Training Trust Fund -Apprenticeship that they will maintain a
complete record' of all advertising utilized by or on behalf of the company in regards to their training
programs during the preceding 12 months. The company's advertising will be available for review
by any and all future supervisory visits by the SAA, or the U.S. Department of Veteran Affairs.
This approval is made pursuant to and under the provisions of Title 38, U. S. Code 3687, with an
effective date of January 8, 2019.
If you have any questions, please contact me at 317-232-3916.
Sincerely,
Taniqua Griffin
Program Director
State Approving Agency
Cc:VARO/ELR
Phone (317)-234-6062 Toll Free (800)-400-4520 Fax (317)-234-8744
Apprentice Status Report By Indenture Date
Apprentices Indentured Between 1/1/2020 And 12/31/2024
Apprentice Program: IN2
Year Apprentice Status Apprentices Percentage
2024
Active
920
80,07%
Active Duty
1
0.09%
Adv. to ]ourneyman
21
1.83%
Deceased
1
0.09%
Graduated
1
0.09%
Med. Susp.
2
0.17%
Not Registered
1
0.09%
Reinstate
SS
4.79%
Suspended
5
0.44%
Terminated
138
12.01%
Voluntary withdraw
4
0.35%
Total Indentured 1149
Printed: Friday, February 7, 2025 Page 3 of 3
Apprentice Status Report By Indenture Date
Apprentices Indentured Between 1/1/2020 And 12/31/2024
Apprentice Program: IN2
Year Apprentice Status Apprentices Percentage
2022
2023
Active
217
22.89%
Adv. to Journeyman
75
7.91%
Deceased
5
0.53%
Graduated
95
10.02%
Journeyman
1
0.11%
Med. Susp.
3
0.32%
Not Registered
1
0.11%
Reinstate
6
0.63%
Suspended
7
0.74%
Terminated
498
52.53%
Transferred Out
2
0.21%
Voluntary withdraw
38
4.01%
Total Indentured 948
Active
447
43.91%
Adv. to Journeyman
55
5.40%
Deceased
2
0.20%
Graduated
5
0.49%
Journeyman
3
0.29%
Med. Susp.
1
0.10%
Not Registered
5
0.49%
Reinstate
25
2.46%
Suspended
7
0.69%
Terminated
441
43.32%
Voluntary withdraw
27
2.65%
Total Indentured 1018
Printed: Friday, February 7, 2025 Page 2 of 3
Apprentice Status Report By Indenture Date
Apprentices Indentured Between 1/1/2020 And 12/31/2024
Apprentice Program: IN2
Year Apprentice Status Apprentices Percentage
2020
2021
Active
22
3.42%
Adv. to Journeyman
73
11.34%
Deceased
2
0.31%
Graduated
64
9.94%
Journeyman
1
0.16%
Not Registered
1
0,16%
Reinstate
2
0.31%
Suspended
1
0.16%
Terminated
433
67.24%
Voluntary withdraw
451
6.99%
Total Indentured 644
Active
53
7.13%
Active Duty
2
0.27%
Adv. to Journeyman
72
9.69%
Deceased
4
0.54%
Graduated
93
12.52%
Med. Susp.
1
0.13%
Reinstate
2
0.27%
Suspended
1
0.13%
Terminated
471
63.39%
Voluntary withdraw
44
5.92%
Total Indentured 743
Printed: Friday, February 7, 2025 Page i of 3
�riite� tatr5 Brpartwrut of f
Olt
(off irr of Apprrutt'robip
Certift"tate Of Rrgiqtration of Rpprentirt.5bip Program
INDIANA/KENTUCKY/OHIO REGIONAL COUNCIL OF CARPENTERS J.A.T.F.
MERRILLVILLE, INDIANA
FOR THE TRADE CLASSIFICATIONS: CARPENTER; MILLWRIGHT; RESIDENTIAL CARPENTER
7e91sfereol-¢s pdrf of 1-4'e XQflonczl 12joprenflcesal-lp 6ysfem
In Qccoro(¢n ce rvAi� 1,& ,6¢slc sfdn o'drors o'f¢p, renflces &,l o
esf��l s�eo��Jr 1,61-e 6ecrefdry of ca&."
���' ��� � ► r�! Fyn SEPTEMBER 24, 1952
Dale
Revised: April 2, 2018
IN010520001 V •��
wey"ialralion Xo. �rJ.S'If;. , A r�minrslralar, Off —
of �PprenlicesFirP
►r�u
�ffue of apprenticoyip
Certifitate of Regi!gtration of �prrntttr!gbtp grogram
Operating Engineers Local #150 tlpprentice3 ,Fund
wicMington, lainois
For the grade -Operating Engineer
�e9rsferea�¢s�ndrf o�f�e `.�Qfrondj�pprenfices�ip c�rJ. sfem
in Qccoro(¢nce mif�i f ie OQSlc sf¢nafdr� o�dpprenlices-iP
esfd�ls�ieo��rJ. fie c�ecrefQrJr, o���'a�or
Registered -March i8, ig6g �4�� `��
glaye
o
Revised- June 23, 2021
92e7ls! alioa x. 6r�2,,5 ��� P' 7ld lnlsf atoms, Office f7lpprealeu6p
ILoo8780173
United States 11 partment of il`abor
triurunl of Apprenticeship and ariinin`l
PIPEFITTERS ASSOCIATION U.A. LOCAL. #597 J,A.C.
CHICAGO, ILLINOIS
FOR THE TRADE OF
� / PIPEFITTERR
,.1/dFC/.rrirr.��/r�rrt�%/�icinri�cl
r/llml fr ���c/w�,l/ ✓ �tc:,f// rz �n� tfzafv
CJIIF�1f;11dGPfA% �'�f�".���i.J�f,�P�CG91�',,P
FEBRUARY 5, 1951
REVISED � _ APRN U MR
mm
�IIl�toirQ111'f:�
$ECAETM. OF UBOB
MBBCRiM. BU�aU Oi.APN1ENTICE$WVP •NO TpRIMMi
PIPEFITTERS' TRAINING FUND, LOCAL UNION 597
10850 W. 187th Street, Mokena, IL 60448 708.326.9240 TRAINING@ HF59TORG
4/4/25
Haley Eckelbarger
Payroll Specialist
Bowen Engineering Corporation
8802 North Meridian Street,
Indianapolis, IN 46260
Phone: 317-915-6873
www. Bowen Engineeri ng.com
Haley:
This letter verifies that The Pipefitters' Training Fund, Local Union 597, is registered with the
United States Department of Labor, apprenticeship registration number IL017780093.
This letter also verifies that Bowen Engineering Corp. is signatory to the Collective Bargaining
Agreement and participates in the Pipe Fitters' Apprenticeship Program and is in good standing.
Please call 708-326-9240 if you have any questions regarding this information.
SinceriJ
Match ajszak
Pipe Fitters' Training Center
Local Union 597
Ap•pren•tice -noun,
1.A helper of a professional; a worker in training.
INDIANA/KENTUCKY/OHIO REGIONAL COUNCIL OF CARPENTERS
JOINT APPRENTICESHIP AND TRAINING FUND
1565 EAST 70TH COURTNcn
MERRILLVILLE, IN 46410
ADMINISTRATION OFFICE
711 Greenwood Springs Drive
Greenwood, IN 46143
Phone:317-807-1112
Fax:317-807-1115 April 4, 2025
Grayson Campus
574 Carpenters Way
Grayson, KY 41143
Phone:606-929-1362
Fax:606-929-5319
Indianapolis Campus
711 Greenwood Springs Drive
Greenwood, IN 46143
Phone: 317-807-1116
Fax:317-807-1131
Lafayette Campus
2953 South Creasy Lane
Lafayette, IN 47905
P64e:765-447-5959
Fax:'765-447-7676
Louisville Campus
1245 Durrett Lane
Louisville, KY 40213
Phone:502-366-8668
Fax:502-366-8678
Merrillville Campus
1565 East 70th Court
Merrillville, IN 46410
Phone:219-947-3348
Fax:219-947-1889
Muncie Campus
4121 East Centennial Avenue
Muncie, IN 47303
Phone:765-288-9015
Fax:765-288-9298
Newburgh Campus
5400 Covert Court
Newburgh, IN 47630
Phone:812-853-9312
Fax:812-853-9316
Terre Haute Campus
3099 South 6th Street
Terre Haute, IN 47802
Phone:812-466-7899
Fax:812-466-9840
Warsaw Campus
1095 Mariners Drive
Warsaw, IN 46582
Phone: 574-267-5264
Fax: 574-269-1464
Bowen Engineering Corporation
8802 North Meridian Street
Indianapolis, IN 46260
To Whom It May Concern:
This letter is in response to verification needed by Bowen Engineering Corporation
for work to be performed on varies jobs. Bowen Engineering Corporation
regularly employs a number of apprentices affiliated with our apprenticeship
program and has done so for more than four years. We are registered with the
United States Department of Labor, Bureau of Apprenticeship and Training and
our registration number is 1205-0223. Our program participates in the Building
Trades Associate Degree Program with Ivy Tech Community College and has done
so since 1996.
Bowen Engineering Corporation is a bona fide contractor in good standing as of
this date with the Indiana/Kentucky/Ohio Regional Council of Carpenters Joint
Apprenticeship and Training fund and is eligible to employ apprentice carpenters
in the future. I have enclosed a copy of our certificate from the United States
Department of Labor.
If I can be of further assistance, please do not hesitate to give me a call.
Sincerely,
Chris Charters
Area Training Coordinator
IKORCCJATF — Merrillville, Lafayette & Warsaw Campuses
CC/Imf
Pasterers' & Cement Masons'
Apprenticeship Coordinator Local Union #692
To Whom it May Concern:
Phone: (21 9) 707-7767
Email: bkristoff@plcmlocal692.org
April 4, 2025,
This letter is to certify that Bowen Engineering, Inc.. is and has been a signatory
contractor with OPCMIA Local 692 and has participated in the Plasterers &
Cement Masons Apprenticeship Training Program for many years. Bowen
Engineering, Inc. is a valued Contractor in good standing with Local 692 and the
JATC. All our apprentices are registered with the United States Department of
Labor.
I may be reached at (219) 707-7767 if additional information is needed.
Further, our organization's program is approved by the U.S. Veterans
Administration to participate in the GI Education Benefit Program.
Thank you,
Brian Kristoff
Apprentice Coordinator
Plasterers & Cement Masons
9200 Louisiana Street ° Merrillville, Indiana 46410
ANDREW THOMAS
COORDINATOR JATC
(219) 962-7675 SCHOOL
(219) 962-1615 FAX
iw395jac@msn.com
TRUSTEES
-UNION-
RON WARE, JR.
Business Manager
CHARLESCURRY
President/Business Agent
Organizer
ERIK ATTEBERRY
-CONTRACTORS-
KEVIN COMERFORD
Construction Advancement Foundation
JEFF CARLSON
Superior
MICHAEL MACDONALD
The Pangere Corp.
IRONWORKERS
JOINT APPRENTICE AND TRAINING COMMITTEE
OF
IRONWORKERS LOCAL UNION NO. 395 AND
NORTHWEST INDIANA CONTRACTORS ASSOCIATION, INC.
890 EAST 25TH AVENUE • LAKE STATION, INDIANA 46405
To Bowen Engineering,
We are an active apprenticeship program for Ironworkers Local 395,
certified by The International Association of Ironworkers. We currently
have 117 apprentices enrolled in our program varying in stages of the
four program.
Sincerely,
Andrew Thomas, Apprenticeship Coordinator
Ironworkers Local 395 Apprenticeship School
BOWEN SAFETY POLICY MANUAL
SECTION 3 - DRUG -FREE WORKPLACE POLICY
3.1 NOTICE TO SUPERVISION
RE: Drug -Free Workplace Policy/Notice to Employees
A. Post the Drug -Free Workplace Policy/Notice to Employees on your safety bulletin
board.
B. Have all new employees read policy and sign acknowledgment.
C. Workplace Supervision is trained in drug and alcohol awareness and has the
ability to execute the guidelines set forth in this section.
3.2 NOTICE TO EMPLOYEES REGARDING THE FEDERAL DRUG -FREE WORKPLACE ACT
"Conviction" means a finding of guilt (including a plea of nolo contendere) or imposition of
sentence, or both, by any judicial body charged with the responsibility to determine violations
of the federal or state criminal drugstatutes.
"Criminal drug statute" means a criminal statute involving manufacture, distribution,
dispensation, use or possession of any controlled substance.
"Controlled substance" means a controlled substance in schedules I though V of Section 202 of
the Controlled Substance Act (21 U.S.C. 812).
"Workplace" means a site for the performance of work done in connection with a specific grant
or contract of a federal or state agency and any place a Bowen employee performs work.
A. Bowen has contracts with the Federal Government and other State and Local
Agencies, therefore, it is covered by the Drug -Free Workplace Act of 1988 and its
Final Rule published May 25, 1990. We must certify to the Federal Government
and other State and Local Agencies that we will provide a drug -free workplace.
This Notice is given in compliance with the requirement.
B. The unlawful manufacture, distribution, dispensation, possession or use of a
controlled substance in our workplace is prohibited. Controlled substances are
those identified in Schedules I though V of Section 202 of the Controlled
Substance Act and in Regulation 21 C.F.R. Section 1308.11-15.
C. Violations of this provision will result in discipline up to and including termination
and/or a requirement that the employee satisfactorily participate in a drug abuse
assistance or rehabilitation program approved by a federal, state or local agency.
Last Revised: March 2018 Section 3 Page 1
BOWEN SAFETY POLICY MANUAL
D. Bowen will establish an ongoing drug -free awareness program designed to inform
employees of (a) the dangers of drug abuse in the workplace, (b) Bowen's policy
of maintaining a drug -free workplace, (c) penalties that may be imposed for drug
abuse violations. Bowen will establish an Employee Assistance Program (EAP) to
include counseling for employees classified as part of Bowen management staff.
E. If an employee is convicted of violating any criminal drug statute and that
violation occurred in the workplace, the employee must notify Bowen in writing
of this fact no later than five (5) calendar days after theconviction.
F. Within ten (10) days after receiving such notice of the conviction, Bowen, in turn,
must notify the contracting Federal and State and Local Agencies, in writing, of
the employee's conviction. Bowen's notice will include the employee's name and
position or title. Reference Form 003-3.2-01 Drug -free Workplace Act Criminal
Drug Statue Violation.
G. If an employee is convicted for a criminal drug statute violation that occurred in
the workplace, within thirty (30) calendar days after receiving notice of that fact,
Bowen will take appropriate personnel action against the employee up to and
including termination, and/or will require the employee's satisfactory
participation in a drug abuse assistance or rehabilitation program. Reference
Form 003-3.2-02 Disciplinary Action Form for Convicted Employees.
H. As a condition of continued employment with Bowen, employees must abide by
the terms of this Notice.
This policy and testing program is also designed to meet the substance abuse
testing requirements for employees that operate vehicles that require a
Commercial Driver's License (CDL). All CDL holders are required to be tested in
accordance with DOT regulations, 49 CFR Part 40 and 382, as amended. All testing
procedures for CDL holders will comply with DOT regulations. (state or federal)
J. DOT covered employees are considered to be performing a DOT safety -sensitive
function when they are performing, ready to perform, or immediately available
to perform any of the following functions:
a. All time spent at a company facility waiting to be dispatched.
b. All time inspecting, servicing, or conditioning any commercial motor
vehicle at anytime.
C. All driving time or time spent at the driving controls of a commercial
vehicle in operation.
d. All time, other than driving, in or upon any commercial motor vehicle
except time resting in a sleeper berth.
Last Revised: March 2018 Section 3 Page 2
BOWEN SAFETY POLICY MANUAL
e. All time spent loading or unloading a vehicle, supervising, or assisting in
the loading or unloading, attending a vehicle being loaded or unloaded,
remaining in readiness to operate the vehicle, or in giving or receiving
receipts of shipments loaded and unloaded.
f. All time repairing, obtaining assistance, or remaining in attendance upon
on a disabled vehicle.
3.3 MANDATORY SUBSTANCE ABUSE TESTING POLICY FOR ALLUN
AND NON -UNION SALARIED AND HOURLYEMPLOYEES
A. Purpose
1. It is Bowen's policy to provide a safe working environment for all
employees and to continue the tradition of the highest standards of
quality in services. This policy has been established for several reasons.
The use of drugs and alcohol lead to unsafe working conditions for
workers; the "impaired worker" is a potential hazard to himself and for
those working with him. The purpose of the program is to establish and
maintain a drug -free, alcohol -free, safe, and healthy work environment
for all workers.
2. Upon your agreement to participate you will be bound to the conditions
and provisions in Section 3.2 of this policy, sub -parts B-J.
3. All employees presenting for a drug and/or alcohol screen must have a
valid photo ID.
4. Form 003-3.3-01 Medical Services Authorization must be filled out and
presented to the clinic for services needed.
B. Policy
1. GENERAL PROVISIONS
a. Pursuant to the Drug -Free Workplace Act of 1988, the unlawful
manufacture, distribution, dispensation, possession, or use of a
controlled substance in the workplace is prohibited.
Any employee who violates the above rule may be subject to
disciplinary action, up to and including termination.
DOT covered employees will not be permitted to perform safety -
sensitive functions until a negative test results is reported and DOT
rehabilitation requirements have been completed.
Last Revised: March 2018 Section 3 Page 3
BOWEN SAFETY POLICY MANUAL
b. Alcohol and other drug dependence are recognized as a serious
condition requiring professional treatment. Consequently, any
worker who is experiencing problems in their work or personal life
due to alcohol and other drug abuse is encouraged to seek help
through the Employee Assistance Program (EAP).
C. The most efficient means of reducing the prevalence of substance
abuse is through the provision of continuous education. Education
and training will be conducted through formal and informal
presentations, flyers and other educational materials.
d. The misuse of any prescription, nonprescription or over-the-
counter drug and/or medication is prohibited.
e. Legally prescribed drugs and/or medications may be permitted on
Bowen premises or workplaces provided the drugs are contained
in the original prescription container or provide proof that they are
prescribed by a medical practitioner for the current use of the
person in possession of the drug and/or medication.
f. The prescription must be presented at time of drug screen and/or
within three (3) days of a non -negative result to the MRO. Failure
to do so will be subject to disciplinary action per Section 3.3.D.2 of
this policy. Bowen Management may ask employee to provide a
release from a medical practitioner stating the employee meets
the requirements of the job description and functional task
analysis.
g. An employee must notify their supervisor prior to reporting to
work, if they are taking a legally prescribed, nonprescription or
over-the-counter medication which displays warnings about
adverse side effects that may affect job performance or impair an
employee's mental or motor functions to safely perform their
duties and responsibilities. Using or being under the influence of
such a drug and/or medication is prohibited.
Bowen reserves the right to determine whether an individual can
safely perform their duties and responsibilities while taking the
prescription or over-the-counter drugs and/or medications and
in some cases may request, the employee obtain written
documentation based on the job description, functional task
analysis and workplace environment from their medical provider
or prescribing physician that details as to how the medication
may impair the Employee's workability and/or safety.
ii. Should there be questions concerning the employee's ability to
perform the job safely, the employee could be assigned other
work, if, at the sole discretion of management, such duties are
appropriate and available or the employee may be terminated.
Last Revised: March 2018 Section 3 Page 4
BOWEN SAFETY POLICY MANUAL
h. All employees, for annual and random drug tests, have a
maximum of two (2) hours to provide a specimen from time of
notification. Failure to provide the required specimen in the
required time frame will be subject to Section C.9.a.v and
disciplinary action per Section 3.3.D.2 of this policy.
If a pre -employment, annual, random and post incident drug,
regardless of testing method including alcohol test, initially
produces a non -negative result and the specimen is sent to an
MRO, the employee will be required to leave the workplace until
the MRO investigates and makes a determination. If the MRO
deems the specimen to be negative, then the time away from the
workplace will be compensated to the employee at the employee's
straight time rate. The hours will not exceed eight (8) hours per
day or surpass forty (40) hours, regardless of the workplace work
hours. For results that are confirmed to be non -negative by the
MRO, employees must meet the requirements of Section 3.31D of
this policy.
If any employee or subcontractor's employee produces an
unacceptable/non-negative test result and is not cleared by the
MRO, the employee will not be eligible for placement on the
original test workplace or any other Bowen controlled workplace,
for Bowen or its subcontractors or vendors of any tier without
proof of meeting the requirements of Section 3.31D of this policy
and Owner/Client policies/procedures.
2. PRE-EMPLOYMENTTESTING
a. All candidates who have received an offer of employment and all
union craft workers will be required to participate in a pre-
employment drug screen. Candidates and craft workers may be
placed on the payroll and may be allowed to work pending receipt
of a negative drug test result. Upon receipt of a non -negative result
the newly hired employee will be terminated with documentation
stating "employee unable to meet pre -hire requirements" and will
be subject to disciplinary action per Section 3.3D.5.a of this policy.
b. For candidates or craft workers not placed on the payroll and who
produce a non -negative test result will not be hired for the open
position or be eligible for employment and will be subject to
disciplinary action per Section 3.3.D.5.a of this policy.
C. Worksites accepting drug program cards, the drug card and test
must be current and verified through the Safety Coordinator.
Last Revised: March 2018 Section 3 Page 5
BOWEN SAFETY POLICY MANUAL
d. Previously Employed Workers
Employees that have not been employed by Bowen for
period of three (3) months or longer, will be considered a
new hire and be subject to fulfill the pre -employment
requirements of this Policy.
3. OWNER MANDATED PRE-EMPLOYMENTTESTING
a. Where pre -employment testing for drug and/or alcohol use is
required by an owner in order to perform work on their site, those
employees shall be tested in accordance with the owner program.
The Owner may have different requirements and therefore
employees may be required to be re -tested per the owners'
requirements.
4. RANDOM TESTING
a. All employees are subject to Bowen's policy to conduct
unscheduled random drug testing (minimum of one (1) time per
year or per owner requirement). Employees randomly selected
will be required to report for testing. Dates for random selection
will not be posted or announced prior to the selection.
b. Union employees will be subjected to the above or per the terms
and conditions of their union funded program.
C. Union employees have the right to request their on -site steward
be present, if available. If the steward is requested, the typically
two (2) hour time frame for completing the test will not be
hindered. This time frame shall start upon notification of test. Any
and all union agreement provisions will also be adheredto.
d. DOT covered employees will be subject to the random testing to
meet the current FMCSA random rates and will be in a random
pool that conducts random selections, at a minimum, on a
quarterly basis.
5. REASONABLE/PROBABLE CAUSE TESTING
a. Substance testing may be implemented when there is probable
cause. Probable cause shall be defined as those circumstances,
based on objective evidence about the worker's conduct in the
workplace, which would cause a reasonable person to believe that
the worker is demonstrating signs of impairment due to alcohol or
drugs. The objective evidence giving rise to probable cause will be
observed by at least two individuals, ideally two supervisors. Prior
to engaging an employee for probable cause the Form 003-3.3-02
Reasonable, Probable Cause shall be completed.
Last Revised: March 2018 Section 3 Page 6
BOWEN SAFETY POLICY MANUAL
b. Union employees have the right to request their on -site steward
be present, if available. If the steward is requested, the typically
two (2) hour time frame for completing the test will not be
hindered. This time frame shall start upon notification of test. Any
and all union agreement provisions will also be adheredto.
Reference Section 3.3.D for Disciplinary Procedures
6. POST ACCIDENWINCIDENTTESTING
a. Drug and Alcohol Testing may be requiredfor all employees
involved in a workplace accident/incident based on resonible
suspicion that meets the following definition:
Accident- Any event caused by an employee, either directly or
indirectly, resulting in injury to a person, to the extent the
attention of a physician is required, or that resulted in damage
to property.
ii. Incident - An event which has all the attributes of an accident,
except that no harm was caused to person or property.
b. All post -accident alcohol tests shall be completed within two (2)
hours to eight (8) hours or sooner following anaccident/incident.
C. All post -accident drug tests shall be completed within twenty-four
(24) to thirty-two (32) hours or sooner following an
accident/incident.
d. All post -accident drug tests will be sent to and evaluated by the
MRO for results.
Reference Section 3.3.D for Disciplinary Procedures
7. POST MOTOR VEHICLE ACCIDENTTESTING
a. All employees operating Bowen owned vehicles or operatingtheir
own vehicles while conducting company business maybe
subjected to a post -accident drug and alcohol test based on
resoniblr suspiction under the following circumstances:
The driver receives a citation under state or local law for a
moving violation arising from the accident.
ii. A fatality occurs.
iii. Bodily injury to a person, which requires medical treatment
away from the scene of the accident.
iv. One or more motor vehicles incur damage as a result of the
Last Revised: March 2018 Section 3 Page 7
BOWEN SAFETY POLICY MANUAL
accident.
b. All post -accident alcohol tests shall be completed within two (2)
hours to eight (8) hours or sooner following an accident.
C. All post -accident drug tests shall be completed within twenty-four
(24) to thirty-two (32) hours or sooner following an accident.
d. DOT covered employees will be subject to a DOT drug and alcohol
testing if the accident involves
i. A fatality or
ii. The employee receiving a citation under state or local law
for a moving violation arising from the accident and either:
a. There is bodily injury to a person which requires
medical treatment away from the scene of the
accident or
b. One or more vehicles incur disabling damage as a
result of the accident and must be towed from the
accident scene.
iii. DOT covered employees will be removed from duty until a
negative drug and alcohol result is verified.
Reference Section 3.3.D for Disciplinary Procedures
8. DOT - The following shall be considered "prohibited conduct" specifically
for DOT covered employees:
a. No employee shall report for duty or remain on duty requiring the
performance of safety -sensitive functions while having an
alcoholic concentration of .04 or greater.
b. No employee shall be on duty or operate a commercial vehicle
while the employee possesses alcohol.
C. No employee shall use alcohol while performing safety -sensitive
functions.
d. No employee shall perform safety -sensitive functions within four
(4) hours after using alcohol.
e. No employee required to take a post -accident test shall use alcohol
for eight (8) hours following the accident or until he or she
undergoes a post -accident test, whichever occursfirst.
Last Revised: March 2018 Section 3 Page 8
BOWEN SAFETY POLICY MANUAL
f. No employee shall refuse to submit to a post -accident, random,
reasonable suspicion, return -to -duty, or follow-up alcohol or drug
test.
g. An employee is prohibited from reporting for duty or remaining on
duty when the employee uses any controlled substance, except
when the use is pursuant to the written instruction of a physician
who has advised the employee that the substance will not
adversely affect their ability to safely perform theirduties.
h. DOT covered employees that engage in prohibited conduct will be
immediately removed from safety -sensitive functions and will be
subject to discipline as outlined in the section. Rehabilitation
including return to duty and follow-up testing will follow minimum
DOT requirements if not as stringent as described in thissection.
Reference Section 3.3.D for Disciplinary Procedures
C. Testing Method
Unless governed differently by applicable laws, employees will be subject to
testing methods described below.
1. All non -negative tests for controlled substances and alcohol will be
confirmed with a second reliable testing method. Initial testing for
controlled substances will be of the immunoassay type, with all
confirmation testing being by gas chromatography/mass spectrometry.
Chemicals to be tested are listed in the SAMSHA Drug Screen Table below.
2. Bowen may choose to preform POCT (Point of Collection Test) drug tests
for pre -employment and random testing. If a person receives a negative
result, the person may begin work immediately. If a person receives a non
negative result, the person shall not be eligible to work. The person shall
remain ineligible until Bowen receives confirmation from the MRO
(Medical Review Officer) that the specimen meets the guidelines of this
policy.
3. Bowen reserves the right to test covered employees for additional
substances including but not limited to substances listed on Schedules I
through V of Section 202 of the Controlled Substance Act and in
Regulation 21 C.F.R. Section 1308.11-15 (examples include synthetic
marijuana and designer stimulants). Initial breath alcohol tests will be
screened for .02 or higher. For results .02 or higher a confirmation test is
required. Employees will be required to wait 15- 30 minutes to be re-
tested. A breath alcohol test result of .04 or higher will be considered non -
negative. Breath alcohol test results of .02 - .0399 will be considered
negative, but employee will be asked to leave the job site until the next
scheduled shift. The employee will be tested again at thattime.
Last Revised: March 2018 Section 3 Page 9
BOWEN SAFETY POLICY MANUAL
4. All post -accident alcohol tests must be completed within two (2) hoursof
the incident but if circumstances prevent the testing from occurring, an
alcohol test can be administered up to eight (8) hours after the incident.
5. DOT covered employees will be required to be removed from duty for
twenty four (24) hours, until a negative drug and alcohol result is verified
and until their next scheduled work period, whichever islonger.
Note: Limits for each of the substances will be as shown in the SAMSHA Drug Screen Table below
or according to appropriate federal, state and DOT regulations as they are updated periodically.
SAMSHA DRUG SCREEN (Bowen Thresholds) Table
LAB DRUG SCREEN THRESHOLD
Drug
Screen
Conf
6-monoacetlmorphine
(Heroin)
10
10
Amphetamines/
Methamphetamines
500
250
Barbiturates
200
200
Benzodiazepines
200
200
Benzoylecgonine-
Cocaine
150
100
Extended Opiates
300
300
Marijuana
50
15
MDMA (Ecstasy)
500
250
PCP -Phencyclidine
25
25
Propoxyphene
300
300
Methaqualone
300
300
ALCOHOL (Breath Test)
Abbreviation
Substance
Cut-off Level
BAC
Alcohol
.04
Reference•
Form 003-3.3-03 POCT Certification Procedure
Form 003-3.3-04 Drug and Alcohol Test Result Log
6. Diluted Drug Test Results
POCT (Point of Collection Test) INSTANT
DRUG SCREEN
Abr.
Drug
Scree i
Conf.
AMP
Amphetamine
1000
250
BAR
Barbiturates
300
200
BZO
Benzodiazepines
300
200
COC
Cocaine
300
100
mAMP
Methamphetamine
1000
250
MDM
Ecstasy
500
250
MOR
Opiates
300
300
OXY
Oxycodone
100
300
PCP
Phencyclidine
25
25
THC
Marijuana
50
15
A test result that produces a diluted specimen requires a retest.
If the retest also produces a diluted specimen, it will carry the
same consequences as a non -negative test result unless a valid
Last Revised: March 2018 Section 3 Page 10
BOWEN SAFETY POLICY MANUAL
medical reason exists.
b. The collection for another test must be done the morningafter
the employee has been notified. Instructions shall be given to
the employee prior to retesting.
C. Employee Instruction prior to retesting:
i. Consume no fluids after 9:00 PM the night before the
test.
ii. Limit fluid intake to a minimum the day of thetest.
iii. It is the employee's responsibility to monitor intake of
fluids to prevent another dilutespecimen.
d. If the employee has a medical condition that will cause a dilute
specimen, the employee's physician must provide medical
information in writing to the MRO forevaluation.
e. For DOT covered employees, Bowen will require the driver to be
re -tested if they have a diluted specimen and DOT protocol will be
followed for the re -test.
7. Invalid Drug Test Results
a. All specimens will undergo validity testing at the laboratory to
identify whether a specimen was tampered with. The employee
of a specimen that is confirmed to be adulterated or substituted
will be disciplined per Section 3.3D of this policy. If the specimen
is reported as invalid and is issued as a cancelled test, the
employee may be required to provide another specimen under
direct observation depending on the reason for the cancelled test.
The MRO will make the proper recommendation to Bowen after
the MRO review process has been completed.
8. Specimen Collection Problems
a. All employees will be afforded privacy for the urine collection
unless any of the situations listed below occur, and then the donor
will be required to submit to an immediate second collection
under direct observation.
The collector observes evidence of an employee's attempt
to tamper with a specimen, (e.g., collector observes
materials brought to the collection site or the employee's
conduct clearly indicates an attempt to tamper with a
specimen).
ii. The temperature on the original specimen was out of
range.
Last Revised: March 2018 Section 3 Page 11
BOWEN SAFETY POLICY MANUAL
iii. The original specimen appeared to have been tampered
with.
b. In the case of a "non -negative" test result, the employee shall be
so advised by the Medical Review Officer, on a confidential basis,
prior to reporting of the results to Bowen. The employee has the
right to discuss and explain the results, including the right to advise
medical personnel of any medication prescribed by their own
physician, which may have affected the results of thetest.
C. Ingestion of products that contain hemp will not be an acceptable
explanation for testing positive formarijuana.
d. An employee who receives a "non -negative" test result shall have
the right to have a portion of the same urine sample tested by an
accredited laboratory (DHHS) of their choice at their expense. The
result of the test must be released to Bowen within a maximum of
ten (10) working days after notice of a non -negative test. The
employee must have a negative test in order to comply with this
Bowen policy. The employee will be required to re -test and their
collection will be done under direct observation following DOT
protocol.
Reference Section 3.3.D for Disciplinary Procedures
9. Refusal to Test
a. Refusing to submit to drug and alcohol tests required by Bowen
will be grounds for refusal to hire employee/applicant(s) and to
discipline existing employee(s) covered by this policy. A refusal to
test would include, but not limited to, any of the following
situations:
i. Failing to appear for any test within a reasonable time after
being directed to do so.
ii. Failing to remain at the testing site until the testing process
is completed.
iii. Failure to provide a breath, hair, saliva or urine sample as
directed.
iv. Failure to permit, if the situation requires, the observation
or monitoring of providing a urine specimen.
V. Failure to provide a breath, hair, saliva or urine specimen
within required time frames may be considered a refusal.
If an employee cannot provide a sufficient quantity of urine
or breath, they will be directed to be evaluated by a
physician of employer's choice. If the physician cannot find
Last Revised: March 2018 Section 3 Page 12
BOWEN SAFETY POLICY MANUAL
a legitimate medical explanation for the inability to provide
a specimen (either breath or urine), it will be considered a
refusal to test. In that circumstance the employee has
violated one of the prohibitions of the DOT regulations and
this policy.
vi. Failure or decline to take an additional drug test Bowen or
collector has directed you totake.
vii. Failure to undergo a medical examination or evaluation, as
directed by the MRO as part of the verification process, or
as directed by the DER as part of a "shy bladder" or
"insufficient breath" situation.
viii. Failure to cooperate with any part of the testing process
and/or conduct that would obstruct the proper
administration of a test. (e.g., refusing to empty pockets
when so directed by the collector, behave in a
confrontational way that disrupts the collection process).
ix. For an observed collection, fail to follow the observer's
instructions to raise and lower clothing to permit the
observer to determine if you have any type of prosthetic or
other device that could be used to interfere with the
collection process.
X. Possess or wear a prosthetic or other device that could be
used to interfere with the collection process.
xi. Admit to the collector, MRO or supervisor that you
adulterated or substituted the specimen. A report from the
MRO that you have a verified adulterated or substituted
test result.
Reference Section 3.3.D for Disciplinary Procedures
D. Discipline Policy
1. It is the intention of Bowen to comply with state and federal laws. Where
state and federal law differ, Bowen will comply with federal law. For
example, some state laws permit the use and possession of marijuana for
medical and/or non -medical purposes. Federal law does not. Consistent
with federal law, Bowen considers marijuana to be an illegal drug for
purposes of this policy in all states — even those states that allow for
medical and/or non -medical use.
2. Employees who test above the allowable measured amount of prohibited
substances as indicated in SAMSHA Drug Screen Table of this Policy or as
set by project's requirements while on duty will beterminated.
Last Revised: March 2018 Section 3 Page 13
BOWEN SAFETY POLICY MANUAL
3. Pre -employment Testing
a. For scenarios referenced in 3.3.13.2 a and b, candidates or craft
workers producing a non negative specimen will not be eligible for
employment for a period of six (6) months. If after six (6) months
from date of the non -negative test result, the candidate successfully
produces a negative test result, shows proof of a completed
Substance Abuse Program (SAP), the candidate or craft workers may
be considered for any openings that they would be qualified to seek.
The candidate or craft workers may be hired but will be subject to
periodic drug testing. The results will be released to the Safety
Coordinator or the Human Resources Representative for all pre-
employment testing.
4. Reasonable Cause
a. When Bowen has reasonable cause to believe an employee is
under the influence of a prohibited substance or alcohol, for
reasons of safety, the employee will be suspended from duty until
test results are available.
5. Refusal
a. Employees who refuse to cooperate with testing procedures may
be terminated and may not be eligible for rehire for a maximum of
one (1) year. Employees must show proof of attending a
rehabilitation program, have a negative drug test, and be subject
to periodic drug testing. Employees that refuse a second (2" d) time
will be permanently terminated.
6. Adulteration/Tampering
a. Any adulteration or switching of urine is a breach of this program,
and as such, will result in termination. The employee may not be
eligible for rehire for a maximum of one (1) year. In the event of a
second (2 d) offense, the employee may be permanently
terminated
7. Offenses — (for random, reasonable suspicion/probable cause, DOT, non -
DOT post accident/incident and post vehicle accident)
a. For first (1st) offenses, Bowen's policy requires that employees
who test non -negative will be suspended for thirty (30) days and
must seek rehabilitation. Upon suspension completion, the
employee will be allowed to re -test and must submit to Bowen and
the testing facility, written documentation from a Substance
Abuse Professional (SAP), stating they have successfully completed
a rehabilitation program and be subject to periodic drug testing.
Last Revised: March 2018 Section 3 Page 14
BOWEN SAFETY POLICY MANUAL
The cost for re -testing will be at the expense of the employee.
b. In the event of a second (2n1) offense, the employee will be
terminated for a minimum of one (1) year. Employee must show
proof of attending a mandated Substance Abuse Professional
(SAP), produce a negative drug test, and be subject to periodic
drug testing.
C. In the event of a third (3rd) offense, the employee will be
permanently terminated.
d. After a five (5) year period, from the date of the most resent offense,
assuming no other offenses/events have taken place, employees will be
granted one (1) reset period. (i.e. when an employee has their first event
and does not have another event for a five (5) year period from the first,
then the offenses resets.)
8. Workers refusing to use SAP services following a, first (1st) or second (2nd)
offense, positive test result will be permanentlyterminated.
9. Any terminated employee due to substance abuse, will need to provide
documentation of Counseling from an SAP and will be subject to frequent
drug testing.
10. For Union Employees all aspects of this program shall be subject to the
grievance procedure spelled out in their collective bargaining agreement.
11. Disciplinary procedures and rehabilitation guidelines for employees who
participate in union funded programs may vary. Bowen, when signatory
to a specific union, may recognize and comply with said procedures.
12. All of the above will be implemented and monitored by the Human
Resources Manager. Bowen has given complete authority to the Human
Resources Manager to implement the above stated steps. Any questions
that may arise should be directed to the Human Resources Manager.
E. Confidentiality
1. The identifying code for a test specimen(s) will be the employee's social
security number.
2. A suspected non -negative test result will first be reported to the
employee, and secondly to Bowen, by the Medical Review Officer(MRO).
If the MRO is unable to contact an employee within a reasonable amount
of time (not to exceed 72 hours) Bowen will be the only onecontacted.
Last Revised: March 2018 Section 3 Page 15
BOWEN SAFETY POLICY MANUAL
F. Employee Assistance Program — For Employees Classified as part of Bowen
Management Staff
1. We recognize that it is sometimes difficult to cope successfully with the
pressures that life puts on us, and that personal problems canadversely
affect your ability to perform satisfactorily on thejob.
2. We have therefore, implemented an Employee Assistance Plan to provide
counseling and referral services to employees who are having such
problems and voluntarily choose to use this program. The employee or
dependent does not have to notify Bowen for approval to contact this
referral service. If treatment necessitates time away from work, Bowen
may provide for the employee an unpaid leave of absence, not to exceed
30 days, for purposes of participation in an agreed upon treatment
program. During this 30-day period an employee who seeks treatment,
and successfully completes a rehabilitation program, or is in the process
of completing such a program, may be reinstated to their former
employment status, if work for which they are qualified is available at that
time. For employees that choose to take a leave of absence prior to
returning to work, must submit written documentation from a Substance
Abuse Professional (SAP) of completion or the present participation in, a
rehabilitation program, and submit a negative drugtest.
3. Confidentiality is of the highest concern at Bowen for those seeking help
for their personal problems. Bowen encourages those in need to
participate in this program. You may reach this service, at no cost to you,
by placing a call to One to One Employee Assistance at 1-800-745-4838, in
order to set an appointment. The cost of five (5) sessions is at nocharge.
4. You should understand, however, that our firm has no part in the
operation of this program. It is an independent consulting agency, and we
therefore assume no responsibility or liability for any of its acts or
omissions. In the event of a non -negative drug or alcohol test result an
initial mandatory referral to Bowen's EAP willoccur.
5. The cost of a rehabilitation program may be the responsibility of the
employee.
G. Conclusion
1. This program and policy statement is intended to protect our most
valuable asset, our employees. The health and safety of all employees and
the general public is of utmost concern. The above presented policy will
help insure a safe DRUG -FREE WORKPLACE for all.
2. Employees shall read Bowen's Drug -Free Workplace Policy and sign Form
003-3.3-05 Drug Free Acknowledgment Receipt and Authorization for
Release of Results.
Last Revised: March 2018 Section 3 Page 16
Projects Last 5 years
327 Projects / $2.55B / Average Size: $7.8M
Account Name Opportunity Name Amount I Fiscal Period I Location city Location State
Gty of Lafayette CSO High -Rate Treatment Facility $51,074,521.00 Q1-2025 Lafayette Indiana
Aqua Ohio: Westerville Blacklick Creek WWTP 2024 Influent Screen $500,000.00 Q1-2025 Worthington Ohio
Citizens Energy Group CEG Thermal - State Archive $1,700,000.00 Q1-2025 Indianapolis Indiana
Citizens Energy Group CEG Belmont -Southport Waste Pump Replacement $1,025,000.00 Q1-2025 Indianapolis Indiana
Citizens Energy Group CEG Belmont Gravity Thickener Upgrade $2,600,000.00 Q1-2025 Indianapolis Indiana
Indiana American Water INAW Charlestown WTP PEAS $1,379,000.00 Q1-2025 Charlestown Indiana
Citizens Energy Group CEG Steam - Capital Ave Potholing $218,137.00 Q1-2025 Indianapolis Indiana
Muncie Sanitary District MSD Cut Off Leyee & Solar (BOT) $6,500,000.00 Q4-2024 1 Muncie Indiana
City of West Lafayette WWTP Wet Weather Expansion (BOT) $29,177,898.00 04-2024 West Lafayette Indiana
New Jersey American Water Canoe Brook PEAS Treatment Plant Design -Build: (North) $41,103,852.00 44-2024 Short Hills New Jersey
Town of Cumberland WWTP Expansion & Collections Projects (BOT) $35,172,940.00 Q4-2024 cumberland Indiana
Aqua Ohio: Westerville Lake Darby WWTP 2024 - Parshall Flume Addition Design Build $1,000,000.00 Q4-2024 _ Worthington Ohio
Citizens Energy Group CEG Southport Nat Gas Genset Replacement $295,000.00 Q4-2024 Indianapolis Indiana
Citizens Energy Group CEG Southport Ferrous Building Rehab $1,450,000.00 Q4-2024 Indianapolis Indiana
Town of Danville Southside Interceptor $1,842,745.00 Q4-2024 danville Indiana
Citizens Energy Group CEG Riverside Well F- Rebid $895,000.00 Q4-2024 _ Indianapolis Indiana
Indiana American Water INAW- Kokomo Phillips WTP- Aerolator Replacement $2,754,400.00 Q4-2024 Kokomo Indiana
Citizens Energy Group CEG Well Ba and 14a RFQ $575,000.00 Q4-2024 _ Indianapolis Indiana
Tennessee American Water TNAW -Citico PEAS RFD $0.00 Q4-2024 _ Chattanooga Tennessee
Citizens Energy Group CEG WIN Expansion-15MGD New Plant Facilities- Budget Estimate $15,000.00 Q3-2024 _ Indianapolis Indiana
Citizens Energy Group CEG Bridgeport Interceptor Storage Tank GMP for Installation(add to Pre -purchase) $6,642,045.00 Q3-2024 Indianapolis Indiana
Citizens Energy Group CEG Signia (Pan Am Plaza) Chilled Water _ $3,100,000.00 Q3-2024 _ Indianapolis Indiana
City of Lafayette BOT Sewer, Water & Lift Station for Service Area 11B $43,000,000.00 Q3-2024 Lafayette Indiana
City of Cedar Rapids Iowa Cedar Rapids Iowa WPCF Improvements $348,307,556.00 Q3-2024 Cedar Rapids Iowa
Citizens Energy Group CEG LS 164 Ferrous Room Rehab $1,300,000.00 Q3-2024 Indianapolis Indiana
Aqua Indiana: Indianapolis Aqua IN HCRSD Solids Handling Conveyor Replacement $1,065,000.00 43-2024 Indianapolis Indiana
Citizens Energy Group CEG WR Settled Water Basin Demo STUDY $30,000.0003-2024 Indianapolis Indiana
New Jersey American Water Salem PEAS Removal Design -Build (South) $13,972,992.00 Q3-2024 Salem New Jersey
City of Warrensburg, MO City of Warrensburg, MO - WWTPs(CMAR) $15,000,000.00 Q3-2024 Warrensburg Missouri
Carolina Water Service Darby WWTP Replacement $16,225,000.00 Q2-2024 Darby North Carolina
Valparaiso City Utilities WWTP System Improvements $46,000,000.00 Q2-2024 Valparaiso Indiana
Valparaiso City Utilities Lift Station $5,981,408.00 Q2-2024 Valparaiso Indiana
Utilities Inc USI- Ferson Creek WWTP: PDB -GMAX Pricing $5,000,000.00 Q2-20N R. Charles Illinois
City of Johnstown, Ohio CMAR-Gtyof Johnstown OHWTP-GMAX $35,000,000.00 Q2-2024 Johnstown Ohio
Aqua Ohio: Westerville Aqua Ohio Blacklick WWTP Clarifier Progressive Design Build $4,487,500.00 Q2-2024 Columbus Ohio
Valparaiso City Utilities Wells& WTPSystem Improvements $8,000,000.00 Q2-2024 Valparaiso Indiana
McKim & Geed: Sewickly PPG Rock Hill Putty Line Project $2,250,000.00 Q2-2024 Rock Hill South Carolina
City of Lafayette Misc WWTP and Sewer (Three Pack Projects) $3,669,000.00 Q2-2024 Lafayette Indiana
Brightmark Renewables Brightmark RNG - Lake Station, IN, Plant City FIE, Maricopa Cty, AZ- RFQ $0.00 Q2-2024 Ashley Indiana
Utilities Inc CUII - Roselawn Lift Station Rehab $355,897.00 Q2-2024 Crown Point Indiana
Indiana American Water INAW Ogden Dunes- LSP Valve Replacements $800,000.00 Q2-2024 Ogden Dunes Indiana
Indiana American Water INAW Ogden Dunes - HSP Replacement $1,200,000.00 Q2-2024 Ogden Dunes Indiana
Citizens Energy Group CEG Dam debris clearing at steam plant $30,000.00 Q2-2024 Indianapolis Indian
Town of Danville Eastside Interceptor BOT $2,793,105.00 Q2-2024 danville Indiana
Indiana American Water INAW- Seymour Groundwater Plant RFD Phase $0.00 Q1-2024 Seymour Indiana
Merrillville Conservancy District Madison Street Lift Station $4,516,186.00 Q1-2024 Merrillville Indiana
Citizens Energy Group CEG Signia (Pan Am Plaza) Steam $3,005,000.00 Q1-2024 Indianapolis Indiana
OVEC: Kyger Creek Station EEG Biological & OF $14,400,700.00 Q1-2024 Cheshire Ohio
OVEC: Clifty Creek Station EEG Biological & OF $13,772,700.00 Q1-2024 Madison Indiana
Citizens Energy Group CEG - IUSM- Health Steam Relocations $5,600,000.00 Q1-2024 Indianapolis Indiana
Pure Development Lebanon-LS & FM- Pure Development $8,358,000.00 Q1-2024 Lebanon Indiana
Virginia American Water Section 8 Clarifier Replacement $3,812,823.00 Q1-2024 Dale City Virginia
Citizens Energy Group CEG - IUSM- Health Chilled Relocations- Final Connection $2,700,000.00 Q1-2024 Indianapolis Indiana
Citizens Energy Group CEG Corrosion SWF-GMP $2,650,000.00 Q1-2024 Indianapolis Indiana
Citizens Energy Group CEG Corrosion TWM -GMP _ $6,950,000.00 Q1-2024 Indianapolis Indiana
Citizens Energy Group Gradison Storm Line for CEG O Magnolia Ridge Sec 2A-2B Exhibit $321,000.00 Q1-2024 Noblesville Indiana
Citizens Energy Group CEG 13th and Capital Sanitary ReRoute $321,116.00 Q1-2024 Indianapolis Indiana
Nature Works Conservancy District Phase 2 (Locker) $595,463.00 Q1-2024 Valparaiso Indiana
New Jersey American Water Cooper Ivy WTP Design-Build(South) $21,140,000.00 Q1-2024 Delran New Jersey
City of Columbia Missouri Columbia, MO - WTP Improvements $31,168,000.00 20Columbia Missouri
Citizens Energy Group CEG CherryTree WTP Tank - GPM $5,100,000.0041-Q1-202424 Westfield Indiana
Citizens Energy Group CEG Harding St WTP Corrosion $379,000.00 Q1-2024 Indianapolis Indiana
Utilities Inc CUII-Twin Lakes WTP 2 BWW Tanks _ $194,703.00 Q1-2024 Crown Point Indiana
Utilities Inc CUII- Roselawn LS Rehab _ $426,890.00 Q1-2024 DeMotte Indiana
Cleveland County, NC Lawndale Floc/Sed Improvements Project $4,145,000.00 Q1-2024 Lawndale North Carolina
New Jersey American Water Canal Road Course Intake Screens Installation Design -Build $1,671,545.00 Q1-2024 Somerset New Jersey
Citizens Energy Group CEG Signia Maryland St Vault Valve Work $132,200.00 Q1-2024 Indianapolis Indiana
Citizens Energy Group CEG Bridgeport Interceptor Storage Tank Pipe Pre -Order $1,382,955.00 Q1-2024 Indianapolis Indiana
Gty of South Bend South Bend WWTP CSO Basin & Clarifiers GSC $30,000,000.00 Q4-2023 South Bend Indiana
Town of Middletown Collections Upgrades $3,767,731.00 Q4-2023 Middletown Indiana
Citizens Energy Group CEG EIanco Steam -GMP $5,800,000.00 Q4-2023 Indianapolis Indiana
Indiana American Water INAW - Winchester WTP DB Target Cost Phase $23,000,000.00 Q4-2023 Winchester Indiana
Citizens Energy Group CEG Corrosion Group 2-RFD SUBMISSION $0.00 Q4-2023 Indianapolis Indiana
Citizens Energy Group CEG Corrosion TWM-Design Assist $75,000.00 Q4-2023 Indianapolis Indiana
Citizens Energy Group CEG Corrosion SWF- Design Assist $75,000.00 Q4-2023 Indianapolis Indiana
Citizens Energy Group CEG FaII Creek High Service Pumps -Budget Estimate $15,000.00 Q4-2023 Indianapolis Indiana
Citizens Energy Group CEG-Tacoma Dam Replacement -Budget Pricing $8,000.00 Q4-2023 Indianapolis Indiana
Muncie Sanitary District Hoyt Ave Sewer $4,512,000.00 Q4-2023 Muncie Indiana
Citizens Energy Group CEG CherryTree WTP Tank -RFQ $0.0044-2023 Westfield Indiana
Virginia American Water Ft. Gregg -Adams Backup Generator Design -Build $460,000.00 Q4-2023 Petersburg Virginia
Fayette County Department of Sanitary Services GMAX 4 - CMAR - Fayette County, OH / Honda Battery Plant WTP $0.00 Q4-2023 Washington Courtht Ohio
Citizens Energy Group CEG CherryTree WTP Tank - Design Assist $75,000.00 Q4-2023 Westfield Indiana
16 Tech Development 16Tech 12" Water Main Construction $640,000.00 Q4-2023 Indianapolis Indiana
Anne Arundel County Maryland Annapolis Courthouse Boiler/Chiller Replacement Temporary Piping Phases l and ll $1,495,000.00 Q3-2023 Annapolis Maryland
Citizens Energy Group CEG Bridgeport Interceptor Storage Tank RFD $50,000.00 Q3-2023 Indianapolis Indiana
Nature Works Conservancy District Nature Works CD Multi -Phase Wastewater/Stormwater GSC $2,145,219.00 Q3-2023 Valparaiso Indiana
Town of Westville LS#2 Amendment(DOC expansion) $3,995,801.00 Q3-2023 Westville Indiana
Holtec International Inc Palisades ISFSI Storage Pad and CTP $2,670,000.00 Q3-2023 Covert Michigan
Citizens Energy Group CEG WR Corrosion Inhibitor Building-GMP $1,400,000.00 Q3-2023 Indianapolis Indiana
Citizens Energy Group CEG WRN Corrosion Inhibitor- Basement placement-GMP $1,825,000.00 Q3-2023 Indianapolis Indiana
Citizens Energy Group CEG Fall Creek Corrosion Inhibitor Building -GMP $2,200,000.00 Q3-2023 Indianapolis Indiana
Heartwell Renewables Heartwell Renewables Project Valentine Rail Unloading Facilities $3,000,000.00 Q3-2023 Hastings Nebraska
Grain Processing Corporation GPC: Washington IN EPC New Settling Basin Tanks Foundations- Alliance Delivery $4,788,061.00 Q3-2023 Washington Indiana
Crane Naval Surface Warfare Center(NSWC) Crane NAVFAC ULT Launch Pit Special Test Equipment(LPSTE) Steel Package A-D $1,195,000.00 Q3-2023 Crane Indiana
Town of Danville Scope Amendment (North Interceptor) $400,000.00 Q3-2023 Danville Indiana
Citizens Energy Group CEG - IUSM- Health Chilled Relocations - Phase 1 $850,000.00 Q2-2023 Indianapolis Indiana
Nashville TN Metro Water Services Bth Avenue 20MG Reservoir Improvements Phase 2 $39,897,025.00 Q2-2023 Nashville Tennessee
Tennessee American Water TNAW- Citico Station Switchgear Replacement $7,995,890.00 Q2-2023 Chattanooga Tennessee
Fayette County Department of Sanitary Services CMAR - Fayette County, OH / Honda Battery Plant WTP $58,536,996.00 Q2-2023 Washington Courtht Ohio
Carolina Water Service Carolina Water Raleigh Area Well Modifications $579,349.00 Q2-2023 Raleigh North Carolina
Citizens Energy Group CEG Belmont and Southport Filter Media Replacement $20,000,000.00 Q2-2023 Indianapolis Indiana
Indiana American Water INAW - Winchester WTP DB REP Phase $0.00 Q2-2023 Winchester Indiana
Citizens Energy Group CEG Lanndale Fuel System Replacement $950,000.00 Q2-2023 Indianapolis Indiana
Citizens Energy Group CEG EIanco Chilled Water-GMP $11,500,000.00 Q2-2023 Indianapolis Indiana
Carolina Water Service Saddlewood Wells Project _ $611,500.00 Q2-2023 Gastonia North Carolina
ESI Inc. of Tennessee ESI- Battery Energy Storage System $766,500.00 Q2-2023 Brandywine Maryland
Muncie Sanitary District Northview Roadway and Drainage Improvements (SA N3) $2,782,921.00 Q2-2023 Muncie Indiana
TRUE
TRUE
TRUE
FALSE
TRUE
FALSE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
FALSE
TRUE
TRUE
FALSE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
FALSE
FALSE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
FALSE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
FALSE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
FALSE
FALSE
FALSE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
FALSE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
FALSE
TRUE
FALSE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
FALSE
FALSE
TRUE
Burns &McDonnell. Kansas City(Headquarters)
CPV St. Charles EC Black Start Civil/Foundations
$1,338,080.00 Q2-2011
Waldorf
Maryland
FALSE
City of Butler
Phase 2 N. Broadway Watermain & Sewer
$4,749,374.00 Q1-2023
Butler
Indiana
TRUE
TVA Gallatin Station
EPC PEMB Office Complex Building
$7,699,438.00 Q1-2021
Gallatin
Tennessee
FALSE
Citizens Energy Group
CEG Bloomfield Estates LS and FM
$1,596,916.00 11 - 023
Pleasant View
Indiana
TRUE
Citizens Energy Group
CEG WRN Corrosion Inhibitor- Basement placement-RFQ SUBMISSION
$0.00 Q1-2023
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG Fall Creek Corrosion Inhibitor Building -RFQ SUBMISSION
$0.00 Q1-2023
Indianapolis
Indiana
FALSE
Kaiser Aluminum Warrick Facility (Newburgh IN)
Treatment Plant Upgrades
$18,831,051.00 Q1-2023
Newburgh
Indiana
TRUE
Town of Shirley
Shirley IN WW -GSC
$5,683,500.00 Q1-2023
Shirley
Indiana
TRUE
Town Of Plainfield
Digester Improvements(N. WWTP)
$1,908,732.00 Q1-2023
Plainfield
Indiana
FALSE
Citizens Energy Group
CEG WRN Filter Media Replacement
$1,050,000.00 Q1-2023
Indianapolis
Indiana
FALSE
Columbus Utilities
Phase 2 (Watermain)
$2,272,166.00 Q1-2023
Columbus
Indiana
FALSE
Indiana American Water
INAW - Winchester WTP DB RFQ
Q1-2023
Winchester
Indiana
TRUE
Citizens Energy Group
CEG Belmont Centrifuge Installation
$1,820,000.00 Q1-2023
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG Belmont and Southport Filter Valve Replacement
$4,875,000.00 Q1-2023
Indianapolis
Indiana
FALSE
Valparaiso City Utilities
Wells to Support Water Syeem
$1,780, 199.00 Q1-2023
Valparaiso
Indiana
TRUE
Columbus Utilities
Phase 1 (Elevated Tank/Booster Station & Wells)
$17,930,004.00 Q1-2023
Columbus
Indiana
TRUE
Virginia American Water
VAAW Hydropneumatic Tank Replacements CMAR
$390,070.00 Q1-2023
Hague
Virginia
TRUE
Citizens Energy Group
CEG WR Corrosion Inhibitor Building -RFQ SUBMISSION
$0.00 Q1-2023
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG Elanco Steam and Chilled Water- PreOrder Chilled Pipe
$2,058,453.00 Q1-2023
Indianapolis
Indiana
TRUE
Pure Development
Lebanon -Waterline- Pure Development
$2,342,970.00 Q1-2023
Lebanon
Indiana
FALSE
City of Fishers
West Leg Metro Airport Sewer(BOT)
$3,079,889.00 Q1-2023
Fishers
Indiana
TRUE
Citizens Energy Group
_
CEG Morse Dam outfall repair
$499,843.00 Q1-2023
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG FC Shutdown Projects
$150,600.00 Q1-2023
Indianapolis
Indiana
TRUE
Town of Danville
Phase 1 North Interceptor
$5,000,000.00 Q1-2023
danAlle
Indiana
TRUE
Citizens Energy Group
CEG WR Corrosion Inhibitor Building -Design Assist Precon
$75,000.00 Q1-2023
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG WRN Corrosion Inhibitor- Basement placement -Design Assist Precon
$75,000.00 Q1-2023
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Fall Creek Corrosion Inhibitor Building- Design Assist Precon
$75,000.00 Q1-2023
Indianapolis
Indiana
TRUE
City of Oak Ridge TN
Pkg 1- New 16MGD Membrane WTP & 20,000 sgtt PEMB
$62,000,000.00 Q4-2022
Oak Ridge
Tennessee
FALSE
Regional Water Resource Agency(RWRA)
Max Rhoads WestWWTP (MR P) Retrofit
$35,979,449.00 Q4-2022
Owensboro
Kentucky
FALSE
LG&E-KU
IGhent&Mill Creek Maintenance Tanks
$8,000,000.00 04-2022
Ghent
Kentucky
FALSE
Columbus Utilities
lPhase 2 (Inwood and Industrial Dr. Sewer/Lift station Rehab)
$3,990,923.00 04-2022
Columbus
_
Indiana
FALSE
Indiana American Water
INAW-Chlorine Gas Conversions SIOTC-DB RFP
$2,123,572.00 04-2022
Jeffersonville
_
Indiana
TRUE
Indiana American Water
INAW- Chlorine Gas Conversions Terre Haute-DB RFP
$2,374,389.00 04-2022
Terre Haute
_
Indiana
TRUE
Indiana American Water
INAW- Chlorine Gas Conversions Lowell -DB RFP
$4,255,448.00 04-2022
Lowell
_
Indiana
TRUE
Indiana American Water
INAW- Chlorine Gas Conwirsions Ogden Dunes -DB RFP
$4,712,875.00 04-2022
Ogden Dunes
_
Indiana
TRUE
Citizens Energy Group
CEG Southport DNS RAS Elbow Replacment
$194,490.00 04-2022
Indianapolis
_
Indiana _
TRUE
Citizens Energy Group
CEG -IUSM- Health Chilled Pipe Pre -Purchase
$531,997.00 QI
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Steam Plan Dam_ Maintenance
$29,872.00 04-2022
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG Southport Bar Screen#3
$205,520.00 04-2022
Indianapolis
Indiana
FALSE
Utilities Inc
UI - Twin Lakes WTP N2-Chem Rm Rehab
$200,000.00 Q4-2022
Crown Point
Indiana
FALSE
Citizens Energy Group
CEG- Southport Diesel Line Replacement
$95,000.00 Q4-2022
Westfield
Indiana
FALSE
Citizens Energy Group
CEG- Sludge Line Replace Epler&Warman
$1,200,000.00 Q4-2022
Indianapolis
Indiana
FALSE
Columbus Utilities
2022 Phase 1 (Lift Station Rehab)
$6,159,542.00 04-2022
Columbus
Indiana
FALSE
Citizens Energy Group
CEG- Westfield WWTP Expansion
$17,500,000.00 04-2022
Westfield
Indiana
FALSE
Citizens Energy Group
CEG- WR Aquaduct Structure Rehab -Construction
$5,000,000.00 04-2022
Indianapolis
Indiana
FALSE
Lauth Group, Inc.
Ford Site Demolition
$5,630,000.00 Q3-2022
Indianapolis
Indiana
TRUE
16 Tech Development
16Tech 24" and 30"Water Main Re -Route Construction
$4,684,248.00 Q3-2022
Indianapolis
Indiana
TRUE
Utilities Inc
USI- Ferson CreekWWTP: PDB -GMAX Pricing
$5,200,000.00 Q3-2022
St. Charles
Illinois
TRUE
City of Lafayette
WWTP Renovation -Phase 2 of 2020 POTW (Partial Scope Addition)
$1,809,000,00 Q3-2022
Lafayette
Indiana
TRUE
Citizens Energy Group
CEG TW Moses- Plant Improvement Jobs(^6pack)
$330,000.00 Q3-2022
Indianapolis
Indiana
FALSE
Town of Upland
WWTP Rehab
$5,393,000.00 Q3-2022
Upland
Indiana
FALSE
City of Johnstown, Ohio
CMAR- City of Johnstown OH -RFQ Phase
$0.00 Q3-2022
Johnstown
Ohio
TRUE
LG&E-KU
Glendale 345 kV & 138 kV Substations (Ford Battery Plant)
$32,764,184.00 Q3-2022
Glendale
Kentucky
FALSE
Indiana American Water
INAW- Noblesville Backwash Water Recycle Tank Replacement
$1,655,000.001 Q3-2022
Noblesville
Indiana
FALSE
Knoxville Utilities Board KUB
Whitaker WTP 38MGD Expansion
$66,406,700.00 Q3-2022
Knoxville
Tennessee
FALSE
Virginia American Water
Hopewell Polymer System Modifications
$390,000.00 Q3-2022
Hopewell
Virginia
FALSE
Virginia American Water
Hopewell Domestic Sedimentation Basin Replacement
$8,400,000.00 Q3-2022
Hopewell
Virginia
FALSE
Aqua America
_
2022 Aqua OhioTimberbrook WTP Aeralater Replacement
$1,400,000.00 Q3-2022
Columbus
Ohio
FALSE
City of Johnstown, Ohio
CMAR- City of Johnstown OH -RFP Phase
$0.00 Q3-2022
Johnstown
Ohio
TRUE
Scalfo Electric Inc
Gloucester County NJ CHP
$1,210,000.00 Q3-2022
Glassboro
New Jersey
FALSE
Aqua America
Progressive Design Build RFP, New Clarifier Installation at Lake Darby Wastewater Trea
$3,500,000.00 Q3-2022
Galloway
Ohio
FALSE
Indiana American Water
INAW- OR 550 Booster Station
$350,000.00 Q3-2022
Valparaiso
Indiana
TRUE
City of Shelbyville_
Convey Lift Station (Phased 2020 Capital Projects)
$1,600,000.00 Q2-2022
Shelbyville
Indiana
TRUE
Georgia Power: Plant Bowen
Plant Bowen Biological ELG 700 gpm
$27,818,070.00 Q2-2022
Cartersville
Georgia
FALSE
Citizens Energy Group
CEG 106th& Cumberland PS Tank
$1,680,000.00 Q2-2022
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG-Geist Dam Cone Valve Replacement
$1,044,000.00 Q2-2022
Indianapolis
Indiana
FALSE
Muncie Sanitary District
MSD Phase4 of 2020 Phased Capital Improvement (45torm Projects)
$9,360,208.00 Q2-2022
Muncie
Indiana
TRUE
City of Butler _
2021 Storm Sewer Phased GSC _
$6,677,997.00 Q2-2022
Butler
Indiana
TRUE
(SDRSD) South Dearborn County Regional Sewer Di!
WWTP Rehab (Additional Sludge Holding/Processing)
$24,361,000.00 Q2-2022
Lawerenceburg
Indiana
FALSE
Citizens Energy Group
CEG Senate Ave Steam Line Relocation
$76,028.00 Q2-2022
Indianapolis
Indiana
TRUE
Tennessee American Water
TNAW - Whitwell Pump Station and Intake
$3,444,300.00 Q2-2022
Chattanooga
Tennessee
FALSE
Indiana American Water
INAW -Sheridan, IN 2.0 MGD WTP RFQ DB
$0.00 Q2-2022
Sheridan
Indiana
TRUE
Virginia American Water
Dale City Lift Station and Force Main
$2,665,280.00 Q2-2022
Dale City
Virginia
FALSE
Virginia American Water
Dale City WWTP Clarifiers 1&2 Replacement
$2,566,363.00 Q2-2022
Dale City
Virginia
FALSE
Evansville Water& Sewer Utility(EWSU)
1 EWSU Pfeiffer Rd- Wansford Yard Sanita ry Lift Station
$25,407,445.00 Q2-2022
Evansville
Indiana
FALSE
Citypf Shelbyville
UV Amendment(Conrey Lift Station)
$766,424.00 Q2-2022
Shelbyville
Indiana
TRUE
16 Tech Development
16Tech 24" and 30" Water Main Re -Route Phase 1
$52,500.00 Q1-2022
11ndi a na pol is
Indiana
TRUE
Citizens Energy Group
ICEG Belmont Chemical Storage Addition (Hypo)
$2,410,000.00 Q1-2022
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG FC WTP Well Line and In Stream Improvements
$202,000.00 Q1-2022
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG Belmont Septage Receiving Improvements
$177,000.00 Q1-2022
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG W-WW Piping Replacement Program - Syr
$6,DDD,D0D.D0 Q1-2022
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Geist and Morse Dam Boat Warning System
$359,000.00 Q1-2022
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG Shelby County LS and FM
$7,398,655.00 Q1-2022
Pleasant View
Indiana
TRUE
IU Health
IU Health Ring Road Extension
$12,900,000.00 Q1-2022
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG WRN 24" GW Connectto CLTank
$97,402.00 Q1-2022
Indianapolis
Indiana
TRUE
Aqua Illinois, Inc.
Aqua IL- Peptone WWTP Clarifier Rehabilitation DB
$350,000.00 Q1-2022
Peotone
Illinois
TRUE
Citizens Energy Group
CEG- Lift Station 101 Capacity Redesigned Upgrades
$2,805,000.00 Q1-2022
Indianapolis
Indiana
FALSE
City of West Lafayette
2021 RFQ Phase 1 (Dehart Outfall)
$13,941,000.00 Q1-2022
West Lafayette
Indiana
TRUE
Michelin North America Inc
Michelin New High Pressure Boilers
$43,400,000.00 Q1-2022
Louisville
Kentucky
TRUE
Citizens Energy Group
CEG Belmont & Southport DNS Wall Reinforcement
$9,264,000.00 04-2021
Indianapolis
Indiana
FALSE
City of Fishers
WWTP Grit &Screen
$466,667.00 04-2021
Fishers
Indiana
FALSE
OVEC: Ciifty Creek Station
OVEC Ciifty Creek Boiler Slag Civil Foundations/Underground
$9,974,804.00 04-2021
Madison
Indiana
FALSE
Citizens Energy Group
CEG Belmont and Southport DNS Screw Pump Replacement
$6,350,000.00 04-2021
Indianapolis
Indiana
FALSE
Indiana American Water
INAW- Crawfordsville HSPS
$2,000,000.00 Q4-2021
Crawfordsville
Indiana
TRUE
Indiana American Water
INAW- Crawfordsville Site Pkg for Elevated Tank
$13,000.00Q4-2021
Crawfordsville
Indiana
TRUE
Indiana Department of Natural Resources
Charlestown State Park- Rainey Well Closures
$1,500,000.00 Q4-2021
Charlestown
Indiana
FALSE
OVEC: Ciifty Creek Station
OVEC Ciifty Creek Mechanical Construction
$5,371,000.00 04-2021
Madison
Indiana
FALSE
Aqua Illinois, Inc.
Aqua IL- Kankakee UV Disinfection FEED
$23,500.00 04-2021
Kankakee
Illinois
FALSE
Citizens Energy Group
CEG Belmont Clarifier 7& B Collector Rehab
$2,205,000.00 04-2021
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG Riverside Well E
$310,000.00 04-2021
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG WR Diesel Tank Replacement
$235,000.00 04-2021
Indianapolis
Indiana
FALSE
New Jersey American Water
Canal Road Raw Water Intake Improvements: (North)
$2,424,679.00 04-2021
Bridgewater Towns
New Jersey
TRUE
Muncie Sanitary District
MSD 2020 Phased Capital Improvement (Phase 3) SA#2
$482,486.00 04-2021
Muncie
Indiana
TRUE
Town Of Plainfield
2020 Capital Project Advertisement (North WWTP Improvements)
$7,830596.00 Q3-2021
Town of Plainfield Indiana
FALSE
OVEC Kyger Creek Station
OVEC Kyger Creek Boiler Slag Civil Foundations/Underground
$8,397:88.00 Q3-2021
Cheshire
Ohio
FALSE
OVEC Kyger Creek Station
OVECKyger Dry Fly Ash Mechanical Construction
$4,980,000.00 Q3-2021
Cheshire
Ohio
FALSE
Town of Cambridge City (IN)
(WWRSD) WWTP Rehab& Expansion(BOT)
$18,402,154.00 Q3-2021
Town of Cambridge Indiana
TRUE
Indiana American Water
INAW- Charlestown, IN WTP -GMP
$10,700,000.00 Q3-2021
Charlestown
Indiana
TRUE
New Jersey American Water
Raritan Millstone Ammonia Handling (North)_
$4,230:340.00 Q3-2021
Bridgewater
New Jersey
FALSE
Town Of Plainfield
2020 Capital Project Advertisement (Mill Street Sewer Improvements))
$479900.00 Q3-2021
Town of Plainfield Indiana
FALSE
Town of Westville
Plant Improvements (Phase 2)
$10:212,286.00 Q3-2021
westville
Indiana
FALSE
Pennsylvania American Water
Milton WTP Improvements
$5899,818.00 Q3-2021
Milton
Pennsylvania
FALSE
Virginia American Water
ISouth Hill Banks New Well Station
$494,035.00 Q3-2021
Westmoreland Coui Virginia
FALSE
Lebanon Utilities
Ground Storage Tank and Booster 5tation(BOT)
$5,991,450.00 Q3-2021
Lebanon
Indiana
TRUE
City of Elkhart, Indiana
Elkhart IN WWTP
$27,356,000.00 Q3-2021
Elkhart
Indiana
FALSE
Duke Energy- Gibson Generating Station
U4 and US Air Heater Cold Side Baskets Project
$1,100,000.00 Q3-2021
Owensville
Indiana
FALSE
Muncie Sanitary District
MSD 2020 Phased Capital Improvement (Phase 2) White River Interceptor Rehab
$3,840,854.00 Q3-2021
Muncie
Indiana
FALSE
City of Columbus, OH
Columbus OH - Jackson Pike WWTP Co -Gen Plant
$30,132,734.00 Q3-2021
Columbus
Ohio
FALSE
Nalco Water
NALGO/Unilever MBBR Installation Design -Build
$1,160,873.00 Q3-2021
Covington
Tennessee
TRUE
Town of Westville
Lift Station/Plant Improvements (Phase l)
$4,794,965.00 Q2-2021
vestville
Indiana
TRUE
IU Health
IU Health Enabling Infrastructure
$24,975,495.00 Q2-2021
Indianapolis
Indiana
TRUE
Cityof Columbus, OH
Lower Olentangy Tunnel Near Surface Work
$3,000,000.00 Q2-2021
Columbus
Ohio
FALSE
American Water
Parkside WTP FAST -TRACK Design -Build PFAS Removal
$8,768,387.00 Q2-2021
Camden
New Jersey
FALSE
Citizens Energy Group
CEG Waterline Vaults (86th & mudd/86th & Mich)
$425,000.00 Q2-2021
Indianapolis
Indiana
FALSE
Tennessee American Water
TNAW Citico HS PS Valve Replacement
$807,500.00 Q2-2021
Chattanooga
Tennessee
FALSE
Indiana American Water
INAW- Borman Park Chlorine Gas Conversion
$5,497,500.001 Q2-2021
Gary
Indiana
FALSE
Muncie Sanitary District
MSD 2020 Phased Capital Improvement (CS0028, 013, 023, 007& Any Uhaul Rehab)
$20,727,646.00 Q2-2021
Muncie
Indiana
FALSE
Citizens Energy Group
CEG Belmont Headworks Screw Pump Program
$4,070,000.00 Q2-2021
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Belmont Scum Equipment Replacement
$239,000.00 Q2-2021 _
Indianapolis
Indiana
FALSE
Ingredion
Ingredion -A/V Flow Meter Installation Plant Outfall
$140,000.00 Q2-2021
Indianapolis
Indiana
FALSE
_
Big Rivers Electric: DB Wilson Station
D.B. Wilson Absorber Foundation
$4,000,000.00 Q2-2021
West Centertown
Kentucky
FALSE
Citizens Energy Group
CEG White River North Storage Building
$280,000.00 Q2-2021
Indianapolis
Indiana
FALSE
Aqua Indiana: Indianapolis
Aqua Indiana - SouthEast WWTP-Phase l D/B Engage
$327,430.00 Q2-2021
Pleasant View
Indiana
TRUE
City of Lafayette
Pearl River Storage Tank& Other Improvements
$12,000,000.00 Q2-2021
Lafayette
Indiana
FALSE
City of Scottsburg
WWTP Rehab(BOT)
$13,000,000.00 Q1-2021
Scottsburg
Indiana
TRUE
New Jersey American Water
Delran WTP Ferric Tanks Replacement(South)
$1,206,585.00 Q1-2021
Delran]
New Jersey
FALSE
Citizens Energy Group
CEG 48"Water Main - Stop 11 for 1-69
$4,160,000.00 Q1-2021
Indianapolis
Indiana
TRUE
City of South Bend
WTP Filter Project
$1,785,000.00 Q1-2021
South Bend
Indiana
TRUE
Citizens Energy Group
CEG WRN Floc Drive Replacement
$300,000.00 Q1-2021
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG OFT Pump Station Improvements Grp 6 work
$414,426.00 Q1-2021
Indianapolis
Indiana
TRUE
SABIC: Mount Vernon IN
Splitter Box Repair
$325,000.00 Q1-2021
Mount Vernon
Indiana
FALSE
Citizens Energy Group
CEG WRN & Geist Well Platforms IS total)
$195,000.00 Q1-2021
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG Belmont Grit Removal Drive Replacement
$269,000.00 Q1-2021
Indianapolis
Indiana
FALSE
Utilities Inc
Utilities Inc- Lake Holiday WTP PHASE II -GMP
$3,111,105.00 Q1-2021
Somonauk
Illinois
TRUE
Citizens Energy Group
CEG DIRT Pump Station Improvements Grp 7 work
$211,892.00 Q1-2021
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Geist Detention Tank Piping
$150,000.00 Q1-2021
Indianapolis
Indiana
FALSE
Indiana American Water
INAW- Charlestown, IN WTP -RFQ
$1,439,923.00 Q1-2021
Charlestown
Indiana
TRUE
New Jersey American Water
Delran 1-4 Dioxane Treatment (South)
$1,969,000.00 Q1-2021
Delran
New Jersey
TRUE
Town Of Plainfield
2020 Capital Project Advertisement (Phase 1)
$247,890.00 Q1-2021
Town of Plainfield
Indiana
FALSE
Citizens Energy Group
CEG Belmont Headworks Screw Pump Program GMP Pricing
$15,000.00 Q1-2021
I Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG DIRT Pump Station Improvements Grp B work
$461,501.00 Q1-2021
I Indianapolis
Indiana
TRUE
Aqua Indiana: Indianapolis
Aqua Indiana- Shelby County WWTP- Phasel
$31,270.00 Q1-2021
Pleasant View
Indiana
TRUE
City of Butler
Phase 2 LTCP
$7,312,940.00 Q1-2021
Butler
Indiana
FALSE
LG&E-KU
LG&E-KU Trimble County ELG Biological EPC Project
$25,500,000.00 Q1-2021
Bedford
Kentucky
TRUE
LG&E-KU
LG&E-KU Mill Creek ELG Biological EPC Project
$30,000,000.00 Q1-2021
Louisville
Kentucky
TRUE
LG&E-KU
KU Ghent ELG Biological & BATW EPC Project
$35,000,000.00 Q1-2021
Ghent
Kentucky
TRUE
Tennessee American Water
TNAW- Filter Building p2 Facade Upgrades
$2,300,000.00 Q1-2021
Chattanooga
Tennessee
TRUE
Crane Naval Surface Warfare Center (NSWC)
Crane NSWC Underwater Launch Test Facility(ULTF)
$112,827,333.00 Q4-2020
Crane
Indiana
FALSE
Talen Energy Corporation
Talen Energy Montour Plant Pump Station Project
$3,300,000.00Q4-2020
Washingtonville
_
Pennsylvania
FALSE
Citizens Energy Group
CEG- Cooper Road 2MG tank -GC RFP
$2,086,520.00 Q4-2020
Indianapolis
Indiana
TRUE
Talen Energy Corporation
Talen Energy Foundation and Pump Skid Installation
$144,750.00 Q4-2020
Baltimore
Maryland
FALSE
Citizens Energy Group
CEG- Geist Station 750K Gal tank
$1,806,950.00 Q4-2020
Indianapolis
Indiana
FALSE
SABIC: Mount Vernon IN
Ultem Facility Siting Building 26,000 sgft
$11,381,716.00 Q4-2020
Mount Vernon
Indiana
TRUE
DELRAN NJ WATER PLANT
Delran Belt Filter Press Replacement
$113,500.00 Q4-2020
Delran
New Jersey
FALSE
Citizens Energy Group
CEG- Belmont DNS WWPS Actuator Replacement
$288,000.00 Q4-2020
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG- White River Rock Ramp Replacement GMP
$7,100,000.00 04-2020
Indianapolis
Indiana
FALSE
Aqua America
Aqua Indiana- Avon Plant Expansion-GMP
$11,325,000.00 04-2020
Avon
Indiana
TRUE
Utilities Inc
USI Ferson Creek W WTP PDB Project - Design Assist Phase
$170,000.00 04-2020
St. Chades
Illinois
TRUE
Citizens Energy Group
CEG DIRT Pump Station Improvements Grp 4 work
$496,908.00 04-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG DIRT Pump Station Improvements Grp S work
$631,757.00 04-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Fall Creek Dust Collector
$21,645.00 04-2020
Indianapolis
Indiana
TRUE
CountryMark
Jolietville terminal mwater improvements
$249,000.00 04-2020
Westfield
Indiana
FALSE
Citizens Energy Group
CEG Geist Mechanical Work for Tank
$189,963.00 04-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Geist Dam Scan with Drone and 3d
$4,500.00 04-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG LS 504
$43,902.00 Q4-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG FC Hypo Tank Rehabilitation
$34,804.0004-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Southport DNS Control Valve Repair
$5,899.00 04-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG River Road 36" Pipe Extension (added Phase)
$321,812.00 Q4-2020
Indianapolis
Indiana
FALSE
Nashville TN Metro Water Services
Bth Avenue 20MG ❑earwell Tank - Phasel
$23,181,557.0004-2020
Nashville
Tennessee
FALSE
City of Carmel
Phosphorus Elimination
$1,176,700.00 Q3-2020
Carmel
Indiana
FALSE
McKim & Creed: Sewickly
Covanta Raw Water Re -Route
$1,270,200.00 Q3-2020
Dickerson
Maryland
FALSE
City of South Bend
South Bend WWTP Clarifiers - REBID
$6,000,000.00 C13-2020
South Bend
Indiana
FALSE
City of Fishers
City of Fishers Hague and Allisonville Road Lift Staton Improvements
$2,600,000.00 Q3-2020
Fishers
Indiana
FALSE
Duke Energy- Gibson Generating Station
Duke Energy Gibson Leachate Phase 2 & 3 Mechanical & Electric
$5,400,000.00 Q2-2020
Owensville
Indiana
FALSE
Citizens Energy Group
CEG Belmont Lab Renovation
$88,749.00 Q2-2020
Indianapolis
Indiana
FALSE
City of Frankfort Indiana
City of Frankfort, IN WWTP Expansion
$22,719,000.00 Q2-2020
Frankfort
Indiana
FALSE
Middlesex Water Company
Middlesex Raw Water Generator Addition
$491,000.00 Q2-2020
New Brunswick
New Jersey
FALSE
Virginia American Water
IVA AW Westmoreland Production Well 3B
$1,019,000.00 Q2-2020
Colonial Beach
Virginia
FALSE
Associated Electric Cooperative (AECI) Thomas
Hill U1-3 Ash Pond Reconfigure Ash Ponds & Misc Coal Pile Improvements
_
$7,331,997.00 Q2-2020
Clifton Hills
Missouri
FALSE
Citizens Energy Group
CEG River Road 24"Valves, Mag&Pipe
1319,067.00Q2-2.
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG PERILPurdueVent Shaft Ventilation Study
$1,500.00 Q2-2020
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG DIRT Pump Station Improvements Grp 1 work
$381,482.00 Q2-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG DIRT Pump Station Improvements Grp 2 work
$386,473.00 Q2-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG DIRT Pump Station Improvements Grp 3 work
$398,297.00 Q2-2020
Indianapolis
Indiana
TRUE
Citizens Energy Group
CEG Southport Chlorination Improvements
$67,880.00 Q2-2020
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG -Deep RockTunnel Fall Creek Collection work
$53,814,697.00 Q2-2020
Indianapolis
Indiana
FALSE
City of Greenwood
Western lntercptr Phase 2
$34,870,713.00 Q2-2020
Greenwood
Indiana
FALSE
Ameresco
Ameresco/Duke Energy Cherry Point Phase 11 ECM3WWTP
$2,000,000.00 Q2-2020
Haverlock
North Carolina
TRUE
Citizens Energy Group
CEG- 30th St Rock Ramp Replacement- RFQ Solicitation
$0.00 Q2-2020
Indianapolis
Indiana
FALSE
AEP: American Electric Power Corporate HQ
Big Sandy Ash Pond Closure Spill Way for Entact
$2,700,000.00 Q2-2020
Louisa
Kentucky
FALSE
Aqua Indiana: Indianapolis
Aqua Indiana- Avon Plant Expansion -RFQ Selection
$0.00 C11 020
Avon
Indiana
TRUE
Muncie Sanitary District
Scope Addition (Phosphorus, Clarifier & CSO 007)
$2,800,000.00 Q2-2020
Muncie
Indiana
FALSE
AECOM: Austin TX
AECOM Texas A&M WWTP
$4,544,17.00 Q2-2020
College City
Texas
FALSE
_ _
Utilities Inc
Utilities Inc -Twin Lakes WTP: Iron Removal Filters
$1,860,000.00 Q1-2020
Crown Point
Indiana
FALSE
_
AECOM: Austin TX
AECOM Vectren AB Brown Fly Ash Recycle Electrical
$3,500,000.00 Q1-2020
Evansville
Indiana
FALSE
Invenergy LLC
Invenergy- Deuel 300 MW Windfarm Foundations Only Spring 2020
$22,700,000.00 Q1-2020
Deuel County
South Dakota
FALSE
Duke Energy- Gibson Generating Station
Duke Energy Gibson Ul& U3 Spring 2020 Outage
$1,200,000.00 Q1-2020
Owensville
Indiana
FALSE
Citizens Energy Group
CEG River Road WTP Clearwell Piping
$199,306.00 Q1-2020
Westfield
Indiana
FALSE
Citizens Energy Group
CEG TW Moses Chem PACL Feed
$122,000.00 Q1-2020
Indianapolis
Indiana
FALSE
Citizens Energy Group
CEG River Road WTP New 750KgaI Clearivell
$1,445,000.00 Q1-2020
Westfield
Indiana
FALSE
Town Of Plainfield
N. WWTP Phos Improvements
$1,046,217.00 Q1-2020
plainfield
Indiana
FALSE
Utilities Inc
Utilities Inc-Somonauk, IL WTP Renovations PHASE 1
$151,00000 Q1-2020
Somonauk
Illinois
TRUE
Town of La Crosse, Indiana
La Crosse
$2,3951001 Q1-2020
La Crosse
Indiana
FALSE
Citizens Energy Group
CEG - WR Residual Handling system replacement
$80,000.00 Q1-2020
Indianapolis
Indiana
FALSE
Town Of Plainfield
Simmons/ Stafford(Reprice a previous G MAX)
$2,569,300.00 Q1-2020
Indianapolis
Indiana
FALSE
AECOM: Austin TX
AECOM Vectren AB Brown Wet Fly Ash Recycle Infrastructure 81.010
$8,600,962.00 Q1-2020
Mount Vernon
Indiana
FALSE
Duke Energy- Gibson Generating Station
Duke Energy Gibson Station Leachate Piping and Haul Road Repairs
$6,970600.00 Q1-2020
OwensAlle
Indiana
FALSE
Ameresco
Ameresco Norfolk Nary Shipyard CHIP
$50,400:000.00 Q1-2020
Norfolk
Virginia
FALSE
City of Delphi
Water Phase
$6,825,647.00 Q1-2020
I Delphi
Indiana
FALSE
Ameresco
Ameresco- Norfolk Naval Shipyard IWTP
$29,820,000.00 1 Q1-2020
I Norfolk
Virginia
FALSE
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 04-15-2025
Name: Jacob M. Klosinski Department of Public Works — Engineering Division
BPW Date: 04-22-2025 Phone Extension:
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney ® Attorney Name Michael Schmidt
Purchasing ® Mickey Low / Ron O'Connor
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
® Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Information
U YesU If Yes, Approved by Purchasing
❑ No
❑ WBE Completed E-Verify Form Attached ❑❑ Nos
Wastewater Treatment Plant WAS Thickening Improvements
123-031B / DFO PROJ00000435
Sewage Works Capital (642-06-605-514-442005 Treatment & Disp Equip)
PR/PO #
Special Contract Provisions
Purpose/Description The Division of Engineering and Division of Wastewater request the Board of
Public Works open Public Bids for the subject project at its regular Board
Meeting on 04-22-2025. Refer to Inter -Office Memorandum for scope of
work and project schedule.
For Change Orders Only
Amount of ❑ Increase $
❑ Decrease ($ )
Previous Amount
Current Percent of Change
New Amount
Total Percent of Change:
Time Extension Amount:
New Completion Date:
Increase %
Decrease ( %)
Increase %
Decrease ( %)
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENVIRONMENTAL SERVICES
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk of the Board of Public Works
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: Agenda Request — Bid Opening
Wastewater Treatment Plant WAS Thickening Improvements
Project No. 123-031 B / DFO PROJ00000435
DATE: April 15, 2025
The Department of Public Works, Division of Engineering, and Division of Wastewater request
the Board of Public Works open Public Bids for Project No. 123-031 B Wastewater Treatment
Plant WAS Thickening Improvements at the Board of Public Works Regular Meeting on April
22, 2025.
Project 123-031 B is the second phase of the subject project and the scope of work is focused
on interior building and process equipment replacements at Building #6 at the Wastewater
Treatment Plant. The three (3) existing Dissolved Air Floatation (DAF) Units will be replaced
with two (2) Gravity Belt Thickeners (one duty and one standby). In addition, SCADA
instrumentation, process pipe improvements, electrical modifications, and a new polymer feed
system will be installed to complete the new system installation. Many different forms of waste
activated sludge thickening technologies were evaluated during design, and the choice do
change from Dissolved Air Floatation Units to Gravity Belt Thickeners was driven by both cost
and operation and maintenance considerations.
Equipment for this project will have a long lead time and construction activities are expected to
begin in Q3/Q4-2025 with completion in Q2-2026.
Bid Opening and Tentative Award Schedule:
• April 22, 2025 Bid Opening
• May 13 or May 27, 2025 Tentative Date(s) for Project Award
For questions regarding the subject Agenda Request or project scope of work, contact
Jacob M. Klosinski (Ext. 9496) at the Division of Engineering.