My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Preliminary Engineering Report and Signatory Authorization
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Preliminary Engineering Report and Signatory Authorization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:55:18 PM
Creation date
3/25/2025 12:37:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER- MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Becca Plantz, Assistant City Engineer <br />SUBJECT: 2025 Preliminary Engineering Report for State Revolving Funds <br />DATE: <br />North Water Treatment Plant PFAS Minimization, Edison Water Filtration <br />Plant, and Lead Service Line Replacement <br />March 18, 2025 <br />The Preliminary Engineering Report (PER) is a crucial component of the DWSRF loan <br />application process. Its primary purpose is to provide a comprehensive evaluation of the <br />proposed project, ensuring it meets technical, financial, and environmental <br />standards. The PER helps the Indiana Finance Authority and other stakeholders <br />understand the project's feasibility and benefits, facilitating informed decision -making. <br />This PER consists of three project components. A PFAS minimization project at the City <br />of South Bend's North Water Treatment Plant, an improvement project at the City's <br />Edison Water Filtration Plant, and Lead Service Line Replacements in the City's <br />distribution system. <br />To accompany the PER for submission, the project team is requesting Board Signature <br />on the SRF Loan Program Signatory Authorization Resolution and PER Acceptance <br />Resolution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.