Loading...
HomeMy WebLinkAboutRTA & Title Sheet - Wastewater Treatment Plant WAS Thickening Improvements Proj No 123-031B INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk of the Board of Public Works FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: Title Sheet and Request to Advertise Wastewater Treatment Plant WAS Thickening Improvements Project No. 123-031B / DFO PROJ00000435 DATE: February 27, 2025 The Department of Public Works, Division of Engineering and Division of Water Works request the Board of Public Works approval of the Title Sheet and Requests to Advertise for Project No. 123-031B Wastewater Treatment Plant WAS Thickening Improvements. at the Board of Public Works Regular Meeting on March 11, 2025. Project 123-031B is the second phase of the subject project and the scope of work is focused on interior building and process equipment replacements at Building #6 at the Wastewater Treatment Plant. The three (3) existing Dissolved Air Floatation (DAF) Units will be replaced with two (2) Gravity Belt Thickeners (one duty and one standby). In addition, SCADA instrumentation, process pipe improvements, electrical modifications, and a new polymer feed system will be installed to complete the new system installation. Many different forms of waste activated sludge thickening technologies were evaluated during design, and the choice do change from Dissolved Air Floatation Units to Gravity Belt Thickeners was driven by both cost and operation and maintenance considerations. Equipment for this project will have a long lead time and actual construction activities are expected to begin in Q3/Q4-2025 with completion in Q2-2026. Tentative Bidding Schedule:  March 14, 2025 First Advertisement  March 21, 2025 Second Advertisement  March 27, 2025 Pre-Bid Meeting, at 10:00 AM at Wastewater Treatment Plant Conf. Room  April 22, 2025 Bid Opening  May 13 or May 27, 2025 Project Award Notice to Bidders will be provided to the Board Clerk in MS Word format once virtual meeting links are updated in the Notice to Bidders documents. For questions regarding the subject Agenda Request or project scope of work, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. G - GENERAL C - CIVIL S - STRUCTURAL M - PROCESS MECHANICAL P - PLUMBING E - ELECTRICAL PLANS PREPARED BY:PLANS PREPARED FOR: BOARD OF PUBLIC WORKS DRAWING GENERAL TABLE OF CONTENTS CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT SEWER WATER TRAFFIC STREET OTHER SOUTH BEND WWTP WAS THICKENING IMPROVEMENTS PROJECT NO. 123-031B MARCH 2025 SEE SOUTH BEND WWTP WAS THICKENING IMPORVEMENTS PROJ NO. 123-031B (SPECIFICATIONS), VOLUMES I AND II SPECIFICATION GENERAL TABLE OF CONTENTS 8415 Allison Pointe Blvd, Suite 410 Indianapolis, Indiana 46250 I - INSTRUMENTATION AND CONTROLS *D - DEMOLITION *=DISCIPLINE CODE PROJECT LOCATION 3113 RIVERSIDE DRIVE SOUTH BEND, INDIANA 46628 SOUTH BEND WASTEWATER TREATMENT PLANT HEATREPROFESSIN H E 01/16/2412/16/2024 12/16/2024MARKWA C K OWIL L I M RA 12400574 12/16/2024 BRYA N D A V ID QU A R L ESPROF ESSIONA L E N G IN EERPE12300018 R E G I S TERE D STATE OF INDIA N A 12/16/2024 12/16/2024 3/6/205 3/13/2025 March 11, 2025 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 02-27-2025 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 03-11-2025 Phone Extension: Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Mickey Lovy / Ron O'Connor Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Wastewater Treatment Plant WAS Thickening Improvements Project Number 123-031B / DFO PROJ00000435 Funding Source Sewage Works Capital (642-06-605-514-442005 Treatment & Disp Equip) Account No. PR/PO # Amount Terms of Contract Special Contract Provisions Purpose/Description The Division of Engineering and Division of Wastewater recommend the approval of the Title Sheet and Request to Advertise for the subject project. Refer to Inter-Office Memorandum for scope of work and bid schedule. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: March 11, 2025